ML14086A520: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14086A520
| number = ML14086A520
| issue date = 04/01/2014
| issue date = 04/01/2014
| title = Arkansas Nuclear One, Units 1 and 2 - Redacted Letter, Request for Additional Information on the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15 (TAC Nos. MF3598 and MF3599)
| title = Redacted Letter, Request for Additional Information on the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15
| author name = Bamford P J
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLIV-2
| author affiliation = NRC/NRR/DORL/LPLIV-2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000313, 05000368
| docket = 05000313, 05000368
| license number = DPR-051, NPF-006
| license number = DPR-051, NPF-006
| contact person = Bamford P J
| contact person = Bamford P
| case reference number = TAC MF3598, TAC MF3599
| case reference number = TAC MF3598, TAC MF3599
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY SECURITY RELATED INFORMATION Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 1, 2014
{{#Wiki_filter:OFFICIAL USE ONLY         SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 1, 2014 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802


==SUBJECT:==
==SUBJECT:==
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2-REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION 15 OF THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS .. MF3598 AND MF3599}  
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2- REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION 15 OF THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS .. MF3598 AND MF3599}


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By letter dated June 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13165A344}, Entergy Operations, Inc. (Entergy, the licensee), submitted the Arkansas Nuclear One (ANO), Units 1 and 2 Physical Security Plan (PSP), Training and Qualification Plan (T&QP}, and Safeguards Contingency Plan (SCP}, Revision 15. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure.
The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 1 0 of the Code of Federal Regulations ( 10 CFR), Section 50.54(p)(2).
The NRC staff has determined that the additional information requested in the enclosure is needed to complete its review. A clarification call for these questions took place with the Entergy security and licensing staff on March 10, 2014. Your response is requested no later than 30 days from the date of this letter. The Enclosure to this letter contains Security-Related Information.
When separated from the enclosure, this letter is DECONTROLLED.
OFFICIAL USE ONLY SECURITY RELATED INFORMATION OFFICIAL USE ONLY SECURITY RELATED INFORMATION If you have any questions, please contact me at (301) 415-2833 or by e-mail at Peter.Bamford@nrc.gov.
Docket Nos. 50-313 and 50-368


==Enclosures:==
By letter dated June 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13165A344}, Entergy Operations, Inc. (Entergy, the licensee),
submitted the Arkansas Nuclear One (ANO), Units 1 and 2 Physical Security Plan (PSP),
Training and Qualification Plan (T&QP}, and Safeguards Contingency Plan (SCP}, Revision 15.
The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations ( 10 CFR),
Section 50.54(p)(2). The NRC staff has determined that the additional information requested in the enclosure is needed to complete its review.
A clarification call for these questions took place with the Entergy security and licensing staff on March 10, 2014. Your response is requested no later than 30 days from the date of this letter.
The Enclosure to this letter contains Security-Related Information. When separated from the enclosure, this letter is DECONTROLLED.
OFFICIAL USE ONLY          SECURITY RELATED INFORMATION


Request for Additional Information cc w/letter only: Distribution via Listserv Sincerely, Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICIAL USE ONLY SECURITY RELATED INFORMATION OFFICIAL USE ONLY SECURITY RELATED INFORMATION If you have any questions, please contact me at (301) 415-2833 or by e-mail at Peter. Bamford@nrc.gov.
OFFICIAL USE ONLY         SECURITY RELATED INFORMATION If you have any questions, please contact me at (301) 415-2833 or by e-mail at Peter.Bamford@nrc.gov.
Docket Nos. 50-313 and 50-368  
Sincerely, Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368


==Enclosures:==
==Enclosures:==


Request for Additional Information Sincerely, IRA by FLyon for/ Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/letter only: Distribution via Listserv DISTRIBUTION:
Request for Additional Information cc w/letter only: Distribution via Listserv OFFICIAL USE ONLY          SECURITY RELATED INFORMATION
PUBLIC LPL4-1 Reading RidsAcrsAcnw_MaiiCTR Resource RidsNrrDoriLp14-1 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource RidsNsirDspRsps Resource RidsRgn4MaiiCenter Resource JPetrucelli, NSIR/DSP/RSLB ADAMS Accession Nos.: Redacted Letter ML 14086A520; OUO-SRI Letter/RAI ML 14073A535
 
*memo dated 12/12/13 OFFICE NRR/DORLILPL4-1/PM NRR/DORL/LPL4-1/PM NRR/DORLILPL4-1/LA NAME MOrenak PBamford JBurkhardt DATE 3/28/14 3/28/14 3/27/14 OFFICE NSIR/DSP/RSLB/BC*
Redacted Letter ML14086A520; OUO-SRI Letter/RAI ML14073A535        *memo dated 12/12/13 OFFICE     NRR/DORLILPL4-1/PM             NRR/DORL/LPL4-1/PM         NRR/DORLILPL4-1/LA NAME       MOrenak                       PBamford                   JBurkhardt DATE       3/28/14                       3/28/14                     3/27/14 OFFICE       NSIR/DSP/RSLB/BC*             NRR/DORLILPL4-1/BC         NRR/DORLILPL4-1/PM NAME         RCaldwell                     MMarkley                   PBamford (Flyon for)
NRR/DORLILPL4-1/BC NRR/DORLILPL4-1/PM NAME RCaldwell MMarkley PBamford (Flyon for) DATE 12/12/13 4/1/14 4/1/14 OFFICIAL RECORD COPY OFFICIAL USE ONLY SECURITY RELATED INFORMATION}}
DATE         12/12/13                     4/1/14                       4/1/14}}

Latest revision as of 22:58, 19 March 2020

Redacted Letter, Request for Additional Information on the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15
ML14086A520
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/01/2014
From: Peter Bamford
Plant Licensing Branch IV
To:
Entergy Operations
Bamford P
References
TAC MF3598, TAC MF3599
Download: ML14086A520 (3)


Text

OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 1, 2014 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2- REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION 15 OF THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS .. MF3598 AND MF3599}

Dear Sir or Madam:

By letter dated June 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13165A344}, Entergy Operations, Inc. (Entergy, the licensee),

submitted the Arkansas Nuclear One (ANO), Units 1 and 2 Physical Security Plan (PSP),

Training and Qualification Plan (T&QP}, and Safeguards Contingency Plan (SCP}, Revision 15.

The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations ( 10 CFR),

Section 50.54(p)(2). The NRC staff has determined that the additional information requested in the enclosure is needed to complete its review.

A clarification call for these questions took place with the Entergy security and licensing staff on March 10, 2014. Your response is requested no later than 30 days from the date of this letter.

The Enclosure to this letter contains Security-Related Information. When separated from the enclosure, this letter is DECONTROLLED.

OFFICIAL USE ONLY SECURITY RELATED INFORMATION

OFFICIAL USE ONLY SECURITY RELATED INFORMATION If you have any questions, please contact me at (301) 415-2833 or by e-mail at Peter.Bamford@nrc.gov.

Sincerely, Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368

Enclosures:

Request for Additional Information cc w/letter only: Distribution via Listserv OFFICIAL USE ONLY SECURITY RELATED INFORMATION

Redacted Letter ML14086A520; OUO-SRI Letter/RAI ML14073A535 *memo dated 12/12/13 OFFICE NRR/DORLILPL4-1/PM NRR/DORL/LPL4-1/PM NRR/DORLILPL4-1/LA NAME MOrenak PBamford JBurkhardt DATE 3/28/14 3/28/14 3/27/14 OFFICE NSIR/DSP/RSLB/BC* NRR/DORLILPL4-1/BC NRR/DORLILPL4-1/PM NAME RCaldwell MMarkley PBamford (Flyon for)

DATE 12/12/13 4/1/14 4/1/14