ML050690390: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE | {{#Wiki_filter:JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 1 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
JTA#: ANO2-RO-ELECD-SURV-25 KA VALUE | SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Perform offsite power availability and vital electrical availability checklist. | ||
JTA#: ANO2-RO-ELECD-SURV-25 KA VALUE RO: 4.2 SRO: 3.9 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.1.31 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.1.31 APPROVED FOR ADMINISTRATION TO: | X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: | ||
RO: | X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
INSIDE CR: | PLANT SITE: SIMULATOR: LAB: | ||
OUTSIDE CR: | Perform POSITION EVALUATED: RO: SRO: | ||
BOTH: X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
PLANT SITE: | TESTING METHOD: SIMULATE: PERFORM: | ||
SIMULATOR: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: SSN: | ||
Perform | EVALUATOR'S NAME: | ||
RO: | |||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE | JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 2 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. | ||
Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable. | Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable. | ||
TASK STANDARD: Supplement 4 complete and 2B5 voltage determined to be low and the bus inoperable. | |||
TASK PERFORMANCE AIDS: Copy of OP 2107.001 Supplement 4. | |||
SIMULATOR SETUP: Degrade Offsite voltage to ~ 490KV. Degrade 2B5 voltage to ~ 431VAC and 2B6 voltage to ~ 440VAC. | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 3 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: | |||
The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage. | |||
CRITICAL STEPS: 33, 34, 38, 39, 41 PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
EXAMINERS NOTE: | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE | |||
The SM/CRS directs, | |||
CRITICAL STEPS: | |||
The steps of this surveillance may be performed in any order. | The steps of this surveillance may be performed in any order. | ||
: 1. Verify SU-2 status. | : 1. Verify SU-2 status. Verified only SU #2 to 2A2, 2H1, N/A SAT UNSAT 2H2 are in PTL and SU #2 to 2A1 is NOT in PULL-TO-LOCK. | ||
Verified only SU #2 to 2A2, 2H1, 2H2 are in PTL and SU #2 to 2A1 is NOT in PULL-TO-LOCK. | On Supplement 4, step 2, initialed step 2.1and 2.3 and NAd the rest. | ||
On Supplement 4, step 2, initialed step 2.1and 2.3 and | On Supplement 4, 3.0 table 1 circled NA for UA to 2A1 and UA to 2A2. | ||
: 2. Verify SU-2 To 2A1 (2A-111) Verified 2A-111 green and white N/A SAT UNSAT status. lights lit. | |||
: 2. Verify SU-2 To 2A1 (2A-111) | |||
On Supplement 4, Table 2 placed a check in 2A-111 "Measured Value" column. | On Supplement 4, Table 2 placed a check in 2A-111 "Measured Value" column. | ||
On Supplement 4, Table 2, circled "YES" for 2A-111 WITHIN ACCEPTABLE NORMAL RANGE. | On Supplement 4, Table 2, circled "YES" for 2A-111 WITHIN ACCEPTABLE NORMAL RANGE. | ||
: 3. Verify SU-2 To 2A2 (2A-211) | : 3. Verify SU-2 To 2A2 (2A-211) Verified 2A-211 green and white N/A SAT UNSAT status. lights lit. | ||
On Supplement 4, Table 2, placed a check in 2A-211 "Measured Value" column. | On Supplement 4, Table 2, placed a check in 2A-211 "Measured Value" column. | ||
On Supplement 4, Table 2, circled "YES" for 2A-211 WITHIN ACCEPTABLE NORMAL RANGE. | On Supplement 4, Table 2, circled "YES" for 2A-211 WITHIN ACCEPTABLE NORMAL RANGE. | ||
: 4. Verify 2A3 Supply Breaker | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 4 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
Observed red light ON for 2A-309. On Supplement 4, Table 2, placed a check in 2A-309 "Measured Value" column. | : 4. Verify 2A3 Supply Breaker Verified 2A-309 CLOSED. N/A SAT UNSAT (2A-309) CLOSED. | ||
On Supplement 4, Table 2, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE. | Observed red light ON for 2A-309. | ||
: 5. Verify 2A4 Supply breaker | On Supplement 4, Table 2, placed a check in 2A-309 "Measured Value" column. | ||
On Supplement 4, Table 2, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE. | |||
Observed red light ON for 2A-409. On Supplement 4, Table 2, placed a check in 2A-409 "Measured Value" column. | : 5. Verify 2A4 Supply breaker Verified 2A-409 CLOSED. N/A SAT UNSAT (2A-409) CLOSED. | ||
On Supplement 4, Table 2, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE. | Observed red light ON for 2A-409. | ||
: 6. Verify SU-2 voltage. | On Supplement 4, Table 2, placed a check in 2A-409 "Measured Value" column. | ||
On Supplement 4, Table 2, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE. | |||
Using SPDS-EST2R OR PMS E4013, verified SU-2 voltage | : 6. Verify SU-2 voltage. Using SPDS-EST2R OR PMS N/A SAT UNSAT E4013, verified SU-2 voltage | ||
> 154 KV. | > 154 KV. | ||
On Supplement 4, Table 2, recorded SU-2 voltage in "Measured Value" column. | EXAMINERs CUE: | ||
On Supplement 4, Table 2, circled "YES" for SU-2 voltage WITHIN ACCEPTABLE NORMAL RANGE. | On Supplement 4, Table 2, ER-ANO-2004-0548 is not recorded SU-2 voltage in installed. "Measured Value" column. | ||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE | On Supplement 4, Table 2, circled "YES" for SU-2 voltage WITHIN ACCEPTABLE NORMAL RANGE. | ||
: 7. Contact dispatcher to determine if ANO switchyard capacitors "in service" or not required. | Note to Examiner: | ||
The answers to the System Dispatcher calls should be given by the Examiner. | |||
On Supplement 4, Table 2, placed a check in ANO switchyard capacitor "Measured Value" column. | JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 5 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
On Supplement 4, Table 2, circled "YES" for ANO switchyard capacitor WITHIN ACCEPTABLE NORMAL RANGE. | : 7. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if ANO switchyard capacitors "in determine if ANO switchyard service" or not required. capacitors "in service" or not required. | ||
: 8. Contact dispatcher to determine if Russellville East Substation capacitors "in service" or not | EXAMINERS CUE: | ||
On Supplement 4, Table 2, Dispatcher reports ANO placed a check in ANO switchyard capacitors "in switchyard capacitor "Measured service". | |||
Value" column. | |||
On Supplement 4, Table 2, placed a check in Russellville East Substation capacitor "Measured Value" column. | On Supplement 4, Table 2, circled "YES" for ANO switchyard capacitor WITHIN ACCEPTABLE NORMAL RANGE. | ||
On Supplement 4, Table 2, circled "YES" for Russellville East Substation capacitor status WITHIN ACCEPTABLE NORMAL RANGE. | : 8. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if Russellville East Substation determine if Russellville East capacitors "in service" or not Substation capacitors "in service" required. or not required. | ||
: 9. Contact dispatcher to determine if any other condition that could degrade offsite power sources | EXAMINERS CUE: On Supplement 4, Table 2, placed a check in Russellville Dispatcher reports Russellville East Substation capacitor East Substation capacitors "in "Measured Value" column. | ||
service". | |||
On Supplement 4, Table 2, circled "YES" for Russellville East Substation capacitor status WITHIN ACCEPTABLE NORMAL RANGE. | |||
On Supplement 4, Table 2, placed a check in "Measured Value" column for other conditions known which could degrade offsite power. | : 9. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if any other condition that could determine if any other condition degrade offsite power sources that could degrade offsite power is known. sources was known. | ||
On Supplement 4, Table 2, circled "YES" for other conditions known which could degrade offsite power WITHIN ACCEPTABLE NORMAL RANGE. | EXAMINERS CUE: On Supplement 4, Table 2, placed a check in "Measured Dispatcher reports NO Value" column for other conditions which could degrade conditions known which could offsite are power known. | ||
: 10. Contact Dispatcher to determine if SU-2 automatic | degrade offsite power. | ||
On Supplement 4, Table 2, circled "YES" for other conditions known which could degrade offsite power WITHIN ACCEPTABLE NORMAL RANGE. | |||
SU-2 Automatic | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 6 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
On Supp 4 Table 2, placed check in status column for SU-2 Voltage Regulator in service. | : 10. Contact Dispatcher to Contacted dispatcher to N/A SAT UNSAT determine if SU-2 automatic determine if SU-2 Automatic voltage regulator is in service or Voltage Regulator is in service or not required. if it is not required. | ||
On Supp 4 Table 2, circled YES for SU-2 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE. | EXAMINERS CUE: On Supp 4 Table 2, placed check in status column for SU-2 Voltage SU-2 Automatic Voltage Regulator in service. | ||
: 11. Verify SU-3 To 2A1 (2A-113) | Regulator is in service. | ||
On Supp 4 Table 2, circled YES for SU-2 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE. | |||
: 11. Verify SU-3 To 2A1 (2A-113) Checked 2A-113 green and white N/A SAT UNSAT status. lights lit. | |||
On Supplement 4, Table 3, placed a check in 2A-113 "Measured Value" column. | On Supplement 4, Table 3, placed a check in 2A-113 "Measured Value" column. | ||
On Supplement 4, Table 3, circled "YES" for 2A-113 WITHIN ACCEPTABLE NORMAL RANGE. | On Supplement 4, Table 3, circled "YES" for 2A-113 WITHIN ACCEPTABLE NORMAL RANGE. | ||
: 12. Verify SU-3 To 2A2 (2A-213) | : 12. Verify SU-3 To 2A2 (2A-213) Verified 2A-213 green and white N/A SAT UNSAT status. lights lit. | ||
On Supplement 4, Table 3, placed a check in 2A-213 "Measured Value" column. | On Supplement 4, Table 3, placed a check in 2A-213 "Measured Value" column. | ||
On Supplement 4, Table 3, circled "YES" for 2A-213 WITHIN ACCEPTABLE NORMAL RANGE. | On Supplement 4, Table 3, circled "YES" for 2A-213 WITHIN ACCEPTABLE NORMAL RANGE. | ||
: 13. Verify 2A3 Supply breaker | : 13. Verify 2A3 Supply breaker Verified 2A-309 CLOSED. N/A SAT UNSAT (2A-309) CLOSED. | ||
Observed red light ON for 2A-309. | |||
: 14. Verify 2A4 Supply breaker | On Supplement 4, Table 3, placed a check in 2A-309 "Measured Value" column. | ||
On Supplement 4, Table 3, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE. | |||
: 15. Verify SU-3 Voltage. | JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 7 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
Using SPDS point E2ST3R, OR using PMS E9664, OR on panel 2C10 using SU3 regulated voltage indication verified SU-3 voltage > 21.7 KV. On Supplement 4, Table 3, recorded SU-3 voltage in "Measured Value" column. On Supplement 4, Table 3, circled "YES" for SU-3 voltage WITHIN ACCEPTABLE NORMAL RANGE. | : 14. Verify 2A4 Supply breaker Verified 2A-409 CLOSED. N/A SAT UNSAT (2A-409) CLOSED. | ||
: 15. Contact dispatcher to determine Auto-Transformer status. | Observed red light ON for 2A-409. | ||
EXAMINERS CUE: On Supplement 4, Table 3, placed a check in 2A-409 Red light ON for 2A409 to 2A4. | |||
"Measured Value" column. | |||
: 16. Contact Dispatcher to determine if SU-3 automatic | On Supplement 4, Table 3, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE. | ||
: 15. Verify SU-3 Voltage. Using SPDS point E2ST3R, OR N/A SAT UNSAT using PMS E9664, OR on panel 2C10 using SU3 regulated voltage indication verified SU-3 voltage > 21.7 KV. | |||
SU-3 Automatic | On Supplement 4, Table 3, recorded SU-3 voltage in "Measured Value" column. | ||
On Supplement 4, Table 3, circled "YES" for SU-3 voltage WITHIN ACCEPTABLE NORMAL RANGE. | |||
: 17. Verify both SU-2 and SU-3 | : 15. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT Auto-Transformer status. determine if Auto-Transformer 500 KV source was connected. | ||
: 18. Mark step 3.1.2 & 3.1.3 "N/A". | On Supplement 4, Table 3, EXAMINERS CUE: | ||
Marked step 3.1.2 & 3.1.3 "N/A". N/A | placed a check in Dispatcher reports 500 KV Auto-Transformer 500 KV source source connected to AUTO "Measured Value" column. | ||
: 19. Evaluate steps 3.1.1 through 3.1.3 for "NO" answers. | transformer. | ||
On Supplement 4, Table 3, circled "YES" for Auto-Transformer 500 KV source WITHIN ACCEPTABLE NORMAL RANGE. | |||
: 20. Verify 2A3-2A4 Tie Breaker | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 8 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
Observed green light ON for 2A-310. On Supplement 4, Table 4, placed a check in 2A-310 "Measured Value" column. | : 16. Contact Dispatcher to Contacted dispatcher to N/A SAT UNSAT determine if SU-3 automatic determine if SU-3 Automatic voltage regulator is in service or Voltage Regulator is in service or not required. if it is not required. | ||
On Supplement 4, Table 4, circled "YES" for 2A-310 status agreeing with limiting condition for operability. | On Supp 4 Table 3, placed check in status column for SU-3 Voltage EXAMINERS CUE: | ||
: 21. Verify 2A3-2A4 Tie Breaker | Regulator in service. | ||
SU-3 Automatic Voltage On Supp 4 Table 3, circled YES Regulator is in service. | |||
Observed green light ON for 2A-410. On Supplement 4, Table 4, placed a check in 2A-410 "Measured Value" column. | for SU-3 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE.. | ||
On Supplement 4, Table 4, circled "YES" for 2A-410 status agreeing with limiting condition for operability. | : 17. Verify both SU-2 and SU-3 Verified both SU-2 and SU-3 N/A SAT UNSAT operable. operable as shown in Table 2 and Table 3. | ||
: 22. Verify 2A3 voltage. | Circled "YES" in step 3.1.1. | ||
On panel 2C33 OR using SPDS point E2A3, verified 2A3 voltage > 3640v and < 4440v. | : 18. Mark step 3.1.2 & 3.1.3 "N/A". Marked step 3.1.2 & 3.1.3 "N/A". N/A SAT UNSAT | ||
: 19. Evaluate steps 3.1.1 through Evaluated steps 3.1.1 through N/A SAT UNSAT 3.1.3 for "NO" answers. 3.1.2 for "NO" answers. | |||
Determined that there were no "NO" answers NAd bullets below 3.1.4. | |||
EXAMINERs NOTE: This starts section 3.2, of electrical checklist. | |||
: 20. Verify 2A3-2A4 Tie Breaker Verified 2A-310 OPEN. N/A SAT UNSAT (2A-310) OPEN. | |||
Observed green light ON for 2A-310. | |||
On Supplement 4, Table 4, placed a check in 2A-310 "Measured Value" column. | |||
On Supplement 4, Table 4, circled "YES" for 2A-310 status agreeing with limiting condition for operability. | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 9 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 21. Verify 2A3-2A4 Tie Breaker Verified 2A-410 OPEN. N/A SAT UNSAT (2A-410) OPEN. | |||
Observed green light ON for 2A-410. | |||
On Supplement 4, Table 4, placed a check in 2A-410 "Measured Value" column. | |||
On Supplement 4, Table 4, circled "YES" for 2A-410 status agreeing with limiting condition for operability. | |||
: 22. Verify 2A3 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2A3, verified 2A3 voltage | |||
> 3640v and < 4440v. | |||
On Supplement 4, Table 4, recorded 2A3 voltage in "Measured Value" column. | On Supplement 4, Table 4, recorded 2A3 voltage in "Measured Value" column. | ||
On Supplement 4, Table 4, circled "YES" for 2A3 voltage agreeing with limiting condition for operability. | On Supplement 4, Table 4, circled "YES" for 2A3 voltage agreeing with limiting condition for operability. | ||
: 23. Determine 2A3 Operability Knowing the status of 2VEF-56B, weather data and Table 4 data, USED the flow chart to verify 2A3 operable. | : 23. Determine 2A3 Operability Knowing the status of 2VEF-56B, N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A3 operable. | ||
: 24. Verify 2A3-2A4 Tie Breaker | : 24. Verify 2A3-2A4 Tie Breaker Verified 2A-310 OPEN. N/A SAT UNSAT (2A-310) OPEN. | ||
Verified 2A-310 OPEN. | Observed green light ON for 2A-310. | ||
On Supplement 4, Table 5, placed a check in 2A-310 "Measured Value" column. | |||
On Supplement 4, Table 5, circled "YES" for 2A-310 status agreeing with limiting condition for operability. | |||
operable. | JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 10 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 25. Verify 2A3-2A4 Tie Breaker Verified 2A-410 OPEN. N/A SAT UNSAT (2A-410) OPEN. | |||
: 31. Verify 2B5-2B6 Tie Breaker | Observed green light ON for 2A-410. | ||
On Supplement 4, Table 5, placed a check in 2A-410 "Measured Value" column. | |||
Observed green light ON for 2B-513. On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column. | On Supplement 4, Table 5, circled "YES" for 2A-410 status agreeing with limiting condition for operability. | ||
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability. | : 26. Verify 2A4 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2A4, verified 2A4 voltage | ||
: 32. Verify 2B5-2B6 Tie Breaker | > 3640v and < 4440v. | ||
On Supplement 4, Table 5, recorded 2A4 voltage in "Measured Value" column. | |||
Observed green light ON for 2B-613. On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column. | On Supplement 4, Table 5, circled "YES" for 2A3 voltage agreeing with limiting condition for operability. | ||
: 27. Determine 2A4 Operability Knowing the status of 2VEF-56A, N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A4 operable. | |||
: 28. Verify both 2A3 and 2A4 Verified both 2A3 and 2A4 N/A SAT UNSAT operable. operable as shown in Table 4 and Table 4. | |||
Circled "YES" in step 3.2.1. | |||
: 29. Mark step 3.2.2 "N/A". Marked step 3.2.2 "N/A". N/A SAT UNSAT | |||
: 30. Evaluate steps 3.2.1 and 3.2.2 Evaluated steps 3.2.1 and 3.2.2 N/A SAT UNSAT for "NO" answers. for "NO" answers. | |||
Determined 2A3 and 2A4 to be operable. | |||
And NAd initialed step 3.2.3. | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 11 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 31. Verify 2B5-2B6 Tie Breaker Verified 2B-513 OPEN. N/A SAT UNSAT (2B-513) OPEN. | |||
Observed green light ON for 2B-513. | |||
On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column. | |||
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability. | |||
: 32. Verify 2B5-2B6 Tie Breaker Verified 2B-613 OPEN. | |||
(2B-613) OPEN. | |||
Observed green light ON for 2B-613. | |||
On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column. | |||
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability. | On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability. | ||
(C) 33. Verify 2B5 voltage. | (C) 33. Verify 2B5 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2B5, verified 2B5 voltage is NOT > 436v. | ||
On panel 2C33 OR using SPDS point E2B5, verified 2B5 voltage is NOT > 436v. | |||
On Supplement 4, Table 4, recorded 2B5 voltage in "Measured Value" column. | On Supplement 4, Table 4, recorded 2B5 voltage in "Measured Value" column. | ||
On Supplement 4, Table 4, circled "NO" for 2B5 voltage agreeing with limiting condition for operability. | On Supplement 4, Table 4, circled "NO" for 2B5 voltage agreeing with limiting condition for operability. | ||
: 35. Verify 2B5-2B6 Tie Breaker | (C) 34. Determine 2B5 Operability Using the Low voltage recorded N/A SAT UNSAT in Table 6, used flow chart to determine that 2B5 is INOPERBLE. | ||
Observed green light ON for 2B-513. On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column. | JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 12 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability. | : 35. Verify 2B5-2B6 Tie Breaker Verified 2B-513 OPEN. N/A SAT UNSAT (2B-513) OPEN. | ||
: 36. Verify 2B5-2B6 Tie Breaker | Observed green light ON for 2B-513. | ||
On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column. | |||
Observed green light ON for 2B-613. On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column. | On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability. | ||
: 36. Verify 2B5-2B6 Tie Breaker Verified 2B-613 OPEN. | |||
(2B-613) OPEN. | |||
Observed green light ON for 2B-613. | |||
On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column. | |||
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability. | On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability. | ||
: 37. Verify 2B6 voltage. | : 37. Verify 2B6 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2B6, verified 2B6 voltage is > 436v. | ||
On panel 2C33 OR using SPDS point E2B6, verified 2B6 voltage is > 436v. On Supplement 4, Table 4, recorded 2B6 voltage in "Measured Value" column. On Supplement 4, Table 4, circled "YES" for 2B6 voltage agreeing with limiting condition for operability. | On Supplement 4, Table 4, recorded 2B6 voltage in "Measured Value" column. | ||
Verified 2B5 INOPERABLE and 2B6 OPERABLE as shown in Table 6 and Table 7. | On Supplement 4, Table 4, circled "YES" for 2B6 voltage agreeing with limiting condition for operability. | ||
Circled "NO" in step 3.3.1. | (C) 38. Determine 2B6 Operability Using the status of 2VEF-56A, N/A SAT UNSAT weather data, the status of ESF Switchgear Room Coolers 2VUC-2A and 2VUC-2B, and Table 5 data, used the flow chart to verify 2B6 OPERABLE. | ||
: 40. Mark step 3.3.2 "N/A". | |||
Marked step 3.3.2 "N/A". N/A | JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 13 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
(C) 39. Verify 2B5 INOPERABLE and Verified 2B5 INOPERABLE and N/A SAT UNSAT 2B6 OPERABLE. 2B6 OPERABLE as shown in Table 6 and Table 7. | |||
Circled "NO" in step 3.3.1. | |||
: 40. Mark step 3.3.2 "N/A". Marked step 3.3.2 "N/A". N/A SAT UNSAT (C) 41. Evaluate steps 3.3.1 and 3.3.2 Evaluated steps 3.3.1 and 3.3.2 N/A SAT UNSAT for "NO" answers. for "NO" answers. | |||
NOTE CRITICAL PART OF | Determined 2B5 to be INOPERABLE and 2B6 to be EXAMINERs CUE: | ||
operable. | |||
Do not refer to Tech Specs the SM will perform that for you. | |||
Inform the SM SM has been informed. | |||
Initiate CR Initiating Condition Report has been simulated complete. | |||
NOTE CRITICAL PART OF Initialed steps 3.3.3. | |||
THIS STEP IS DECLARING 2B5 INOPERABLE. | |||
END | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 14 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. | |||
Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable. | |||
Initiating CUE: | Initiating CUE: | ||
The SM/CRS directs, | The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage. | ||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE | |||
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 15 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. | |||
Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable. | |||
Initiating CUE: | Initiating CUE: | ||
The SM/CRS directs, | The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage. | ||
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE | |||
JTA#: ANO-SRO-ADMIN-NORM-152 KA VALUE | JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Review and approve offsite power availability and vital electrical availability checklist. | |||
JTA#: ANO-SRO-ADMIN-NORM-152 KA VALUE RO: 4.2 SRO: 3.9 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.1.31 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.1.31 APPROVED FOR ADMINISTRATION TO: | X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: | ||
RO: | X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
INSIDE CR: | PLANT SITE: SIMULATOR: LAB: | ||
OUTSIDE CR: | Perform POSITION EVALUATED: RO: SRO: | ||
BOTH: X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
PLANT SITE: | TESTING METHOD: SIMULATE: PERFORM: | ||
SIMULATOR: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: SSN: | ||
Perform | EVALUATOR'S NAME: | ||
RO: | |||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | |||
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE | JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable. | ||
TASK STANDARD: Review Supplement 4 data and identify the following: | |||
TASK STANDARD: | |||
Review Supplement 4 data and identify the following: | |||
: 1) Voltage recorded in table 3, Startup 3 for SU3 regulated voltage was less than acceptable. | : 1) Voltage recorded in table 3, Startup 3 for SU3 regulated voltage was less than acceptable. | ||
: 2) Declared SU3 INOPERBLE. | : 2) Declared SU3 INOPERBLE. | ||
: 3) Identified TS 3.8.1.1 to be applicable and performance of a complete OP 2107.001 Supplement 4 must be done within one hour. | : 3) Identified TS 3.8.1.1 to be applicable and performance of a complete OP 2107.001 Supplement 4 must be done within one hour. | ||
: 4) Initiated Condition Report to correct problem. | : 4) Initiated Condition Report to correct problem. | ||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: Completed copy of OP 2107.001 Supplement 4. | ||
Completed copy of OP 2107.001 Supplement 4. | SIMULATOR SETUP: N/A. | ||
SIMULATOR SETUP: | |||
N/A. | JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: | ||
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE | The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.) | ||
The SM directs, | |||
Critical Steps: 1,2,3 START TIME: | Critical Steps: 1,2,3 START TIME: | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Review completed copy of OP | PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
Review Table 3, startup 3 and identified that SU #3 voltage is lower than acceptable. | (C) 1. Review completed copy of OP Review Table 3, startup 3 and N/A SAT UNSAT 2107.001 Supplement 4 and identified that SU #3 voltage is identify Table3, startup 3 has lower than acceptable. | ||
been completed incorrectly. | |||
Determined that SU #3 should be declared inoperable due to low voltage. | (C) 2. Declared SU #3 inoperable. Determined that SU #3 should be N/A SAT UNSAT declared inoperable due to low voltage. | ||
(C) 3. Identified Technical Identified that Technical N/A SAT UNSAT Specification 3.8.1.1 is Specification 3.8.1.1 LCO is applicable. applicable and that action A.1, performance of OP 2107.001 Supplement 4 must be performed within one hour. | |||
: 4. Initiate Condition report. | : 4. Initiate Condition report. Identified need to initiate N/A SAT UNSAT condition report. | ||
EXAMINERs CUE: | |||
Condition report will be initiated by Shift Engineer. | |||
END STOP TIME: | |||
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE | JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. | ||
Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable. | |||
Initiating CUE: | Initiating CUE: | ||
The SM directs, | The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.) | ||
JPM- ANO-2-JPM-NRC- | |||
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. | |||
Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable. | |||
Initiating CUE: | Initiating CUE: | ||
The SM directs, | The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.) | ||
JPM-#- | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
SYSTEM/DUTY AREA: A1b Conduct of Operations TASK: Spent Fuel Pool Makeup JTA#: | |||
KA VALUE RO: 3.9 SRO: 4.0 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.1.23 | X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: | ||
RO: | X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
INSIDE CR: | PLANT SITE: SIMULATOR: LAB: | ||
OUTSIDE CR: | Perform POSITION EVALUATED: RO: SRO: | ||
BOTH: X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
PLANT SITE: | TESTING METHOD: SIMULATE: PERFORM: | ||
SIMULATOR: | APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: SSN: | ||
Perform | EVALUATOR'S NAME: | ||
RO: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SIMULATOR: | SATISFACTORY: UNSATISFACTORY: | ||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
20 Minutes REFERENCE(S): | |||
OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
SYSTEM/DUTY AREA: | SYSTEM/DUTY AREA: | ||
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
JPM-#- | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
Plant is at 100% power. PMS computer is out of service. Spent Fuel Pool Level = 401 | * Plant is at 100% power. | ||
RO candidates should calculate required SFP makeup | * PMS computer is out of service. | ||
* Spent Fuel Pool Level = 401 0 | |||
* Tilt Pit Gate is installed | |||
* Cask Loading Pit Gate is installed | |||
* A BAM tank concentration is 5950 ppmb | |||
* SFP boron concentration is 2964 ppmb TASK STANDARD: | |||
RO candidates should calculate required SFP makeup volume to be within 1828 to 1928 gallons, determine Boric acid volume to be within 910 gallons to 960 gallons, determine DI water volume to be within 918 gallons to 968 gallons. | |||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
OP 2104.006, Rev 021-06-0, Attachment F | OP 2104.006, Rev 021-06-0, Attachment F | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: | ||
: 1. Record initial Spent Fuel Pool | Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F. | ||
CRITICAL ELEMENTS (C): 5, 7, 8 START TIME: | |||
level of 401 | PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 1. Record initial Spent Fuel Pool On 2104.006, Attachment F N/A SAT UNSAT Level. recorded initial Spent Fuel Pool level of 401 0 given in initial conditions. | |||
It is not necessary for the candidate to fill in every blank on OP 2104.005, attachment F to arrive at the correct total volume to be added to the SFP. | Examiners Note: It is not necessary for the candidate to fill in every blank on OP 2104.005, attachment F to arrive at the correct total volume to be added to the SFP. | ||
: 2. Calculate initial Spent Fuel Pool | : 2. Calculate initial Spent Fuel Pool Obtained Gal/Ft value for Fuel N/A SAT UNSAT Volume. Pool - Top of racks to Elev 4016 (5634.4 gal/ft). | ||
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in. | |||
Multiplied 469.5 by 6 inches to obtain 2817 gallons. | |||
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal) | |||
Subtracted 1878 gal from 133,817 gal to obtain 131000 gallons total volume above top of racks. | |||
Added 131000 gal and 84,255 gal to find initial pool volume of 215255 gallons. | |||
: 3. Record desired Spent Fuel On 2104.006, Attachment F N/A SAT UNSAT Pool Level. recorded desired Spent Fuel Pool level of 401 4 given in initial conditions. | |||
Pool - Top of racks to Elev | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 4. Calculate desired Spent Fuel Obtained Gal/Ft value for Fuel N/A SAT UNSAT Pool Volume. Pool - Top of racks to Elev 4016 (5634.4 gal/ft). | |||
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in. | Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in. | ||
Multiplied 469.5 by 2 inches to obtain 939 gallons. | |||
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal) | |||
Subtracted 939 gal from 133,817 gal to obtain 132878 gallons total volume above top of racks. | |||
Multiplied 469.5 by 2 inches to | |||
obtain 939 gallons. | |||
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev | |||
Subtracted 939 gal from 133,817 | |||
gal to obtain 132878 gallons total volume above top of racks. | |||
Added 132878 gal and 84,255 gal to find desired pool volume of 217133 gallons. | Added 132878 gal and 84,255 gal to find desired pool volume of 217133 gallons. | ||
C 5. Calculate volume of makeup Subtracted initial Spent Fuel Pool N/A SAT UNSAT required to raise Spent Fuel volume from desired Spent Fuel Pool level to desired level. Pool volume and determined amount of makeup needed to be Total Volume within 1828 to 1878 gallons. | |||
1928. | |||
Pool level to desired level. | : 6. Record A BAMT boron On 2104.006, Attachment F, N/A SAT UNSAT concentration. recorded value of 5950 ppm for A BAMT concentration. | ||
C 7. Calculate feed volume of boric Inserted values into formula and N/A SAT UNSAT acid required to raise pool level. determined Boric acid volume to Volume within 910 gallons to be 935.53 gallons. | |||
960 gallons. | |||
C 8. Calculate the feed volume of DI Inserted values into formula and N/A SAT UNSAT water required to raise pool determined DI water volume to level. Volume within 918 be 942.47 gallons. | |||
gallons to 968 gallons. | |||
: 6. Record | END STOP TIME: | ||
On 2104.006, Attachment F, recorded value of 5950 ppm for | |||
Volume within 910 gallons to | |||
level. Volume within 918 | |||
JPM-#- | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | ||
Plant is at 100% power. PMS computer is out of service. Spent Fuel Pool Level = 401 | * Plant is at 100% power. | ||
Chemistry has just notified the Control Room | * PMS computer is out of service. | ||
* Spent Fuel Pool Level = 401 0 | |||
* Tilt Pit Gate is installed | |||
* Cask Loading Pit Gate is installed | |||
* A BAM tank concentration is 5950 ppmb | |||
* SFP boron concentration is 2964 ppmb INITIATING CUE: | |||
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F. | |||
JPM-#- | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | ||
Plant is at 100% power. PMS computer is out of service. Spent Fuel Pool Level = 401 | * Plant is at 100% power. | ||
Chemistry has just notified the Control Room | * PMS computer is out of service. | ||
* Spent Fuel Pool Level = 401 0 | |||
* Tilt Pit Gate is installed | |||
* Cask Loading Pit Gate is installed | |||
* A BAM tank concentration is 5950 ppmb | |||
* SFP boron concentration is 2964 ppmb INITIATING CUE: | |||
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F. | |||
JPM-#- | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
SYSTEM/DUTY AREA: A1b Conduct of Operations TASK: Spent Fuel Pool Makeup JTA#: | |||
KA VALUE RO: 3.9 SRO: 4.0 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.1.23 | X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: | ||
RO: | X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
INSIDE CR: | PLANT SITE: SIMULATOR: LAB: | ||
OUTSIDE CR: | Perform POSITION EVALUATED: RO: SRO: | ||
BOTH: X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
PLANT SITE: | TESTING METHOD: SIMULATE: PERFORM: | ||
SIMULATOR: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: SSN: | ||
Perform | EVALUATOR'S NAME: | ||
RO: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SIMULATOR: | SATISFACTORY: UNSATISFACTORY: | ||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
SYSTEM/DUTY AREA: | SYSTEM/DUTY AREA: | ||
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
JPM-#- | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
Plant is at 100% power. PMS computer is out of service. Initial Spent Fuel Pool Level = 401 | * Plant is at 100% power. | ||
SRO candidates should identify the following: 1) Boron Concentration of the feed source should be 5950 NOT 4950. 2) The Feed volume (F) calculated previously was transposed into the feed volumes calc as 1788 gallons not the 1878 gallons correctly calculated. Therefore both the calculated Boric acid and DI water volumes are wrong. And calculate the following correct feed volumes: | * PMS computer is out of service. | ||
* Initial Spent Fuel Pool Level = 401 0 | |||
* Tilt Pit Gate is installed | |||
* Cask Loading Pit Gate is installed | |||
* A BAM tank concentration is 5950 ppmb | |||
* SFP boron concentration is 2964 ppmb | |||
* Cask loading pit operations has lowered the SFP level | |||
* CBOT has performed actions per OP 2104.006 step 10.3. | |||
* Final Spent Fuel Pool Level = 401 4 TASK STANDARD: | |||
SRO candidates should identify the following: | |||
: 1) Boron Concentration of the feed source should be 5950 NOT 4950. | |||
: 2) The Feed volume (F) calculated previously was transposed into the feed volumes calc as 1788 gallons not the 1878 gallons correctly calculated. Therefore both the calculated Boric acid and DI water volumes are wrong. | |||
And calculate the following correct feed volumes: | |||
: 3) Boric acid volume calculated to be within 910 gallons to 960 gallons. | |||
: 4) Determine DI water volume to be within 918 gallons to 968 gallons. | |||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
OP 2104.006, Rev 021-06-0, Attachment F | OP 2104.006, Rev 021-06-0, Attachment F | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: | ||
: 1. Reviewed the completed form OP 2104.006, Attachment F. | Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F. | ||
CRITICAL ELEMENTS (C): 3, 4, 5, 6 START TIME: | |||
N/A | PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 1. Reviewed the completed form Reviewed the completed form N/A SAT UNSAT OP 2104.006, Attachment F. OP 2104.006, Attachment F. | |||
: 2. Determined the calculated Calculated the feed volume to be N/A SAT UNSAT volume of solution to be correct. added to the SFP, F, to be 1878 gallons. | |||
C 3. Determined that the boron Recognized the boron N/A SAT UNSAT concentration of the feed concentration of the feed source source was in error. was recorded as 4950 ppm instead of the given value of 5940 ppm. | |||
C 4. Determined the calculated Recognized that the feed volume N/A SAT UNSAT volume of solution used in the to be added to the SFP, F, was calculation of the feed volumes recorded in error as 1788 gallons of boric acid NOT the 1878 gallons calculated on the previous page. | |||
Examiners Note: the candidate may need to be prompted to calculate the volume of Boric acid and DI water. | |||
C 5. Determined the Boron volume Recognized the Boron volume to N/A SAT UNSAT to be added as calculated was be added as calculated was in in error and determined the error and determined the correct correct volume to be 910 volume to be 935.5 gallons. | |||
gallons to 960 gallons. | |||
C 6. Determined the DI water Recognized the DI water volume N/A SAT UNSAT volume to be added as to be added as calculated was in calculated was in error and error and determined the correct determined the correct volume volume to be 942.5 gallons. | |||
to be within 918 gallons to 968 gallons. | |||
END STOP TIME: | |||
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | |||
* Plant is at 100% power. | |||
* PMS computer is out of service. | |||
* Initial Spent Fuel Pool Level = 401 0 | |||
* Tilt Pit Gate is installed | |||
* Cask Loading Pit Gate is installed | |||
* A BAM tank concentration is 5950 ppmb | |||
* SFP boron concentration is 2964 ppmb | |||
* Cask loading pit operations has lowered the SFP level | |||
* CBOT has performed actions per OP 2104.006 step 10.3. | |||
* Final Spent Fuel Pool Level = 401 4 INITIATING CUE: | |||
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F. | |||
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
* Plant is at 100% power. | |||
* PMS computer is out of service. | |||
* Initial Spent Fuel Pool Level = 401 0 | |||
* Tilt Pit Gate is installed | |||
* Cask Loading Pit Gate is installed | |||
* A BAM tank concentration is 5950 ppmb | |||
* SFP boron concentration is 2964 ppmb | |||
* Cask loading pit operations has lowered the SFP level | |||
* CBOT has performed actions per OP 2104.006 step 10.3. | |||
* Final Spent Fuel Pool Level = 401 4 INITIATING CUE: | |||
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F. | |||
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | |||
SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review completed 2P89B surveillance and determine 2P-89B operability JTA#: | |||
KA VALUE RO: 3.5 SRO: 3.9 KA | |||
JPM- | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.2.12 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.2.12 APPROVED FOR ADMINISTRATION TO: | X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: | ||
RO: | X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
INSIDE CR: | PLANT SITE: SIMULATOR: LAB: | ||
OUTSIDE CR: | Perform POSITION EVALUATED: RO: SRO: | ||
BOTH: X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
PLANT SITE: | TESTING METHOD: SIMULATE: PERFORM: | ||
SIMULATOR: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME: SSN: | ||
Perform | EVALUATOR'S NAME: | ||
RO: | |||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2104.039 | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. | ||
2P89C is aligned to the GREN side. | |||
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | |||
TASK STANDARD: (Identification of three of the four errors is required and one of the three must be the Pump D/P) | TASK STANDARD: (Identification of three of the four errors is required and one of the three must be the Pump D/P) | ||
Pump P is out of LIMITING RANGE FOR OPERABILITY. Calculation for determining lower pump P limit is in error. Inboard Radial Bearing #1 | * Pump P is out of LIMITING RANGE FOR OPERABILITY. | ||
TASK PERFORMANCE AIDS: | * Calculation for determining lower pump P limit is in error. | ||
NA | * Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY. | ||
* Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY. | |||
TASK PERFORMANCE AIDS: marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE: | ||
The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors. | |||
CRITICAL STEPS: 2, 3, 4, 5 START TIME: | |||
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test | |||
: 1. Perform review of the surveillance Reviews the surveillance procedure N/A procedure results. provided. | |||
(C) 2. | |||
Pump P is out of LIMITING Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY. FOR OPERABILITY. N/A SAT UNSAT (C) 3. Calculation for determining lower Calculation for determining lower pump pump P limit is in error. P limit should be 1380.81 psid. N/A SAT UNSAT (C) 4. Inboard Radial Bearing #1 Vibes Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY. | |||
(C) 5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY. | |||
EXAMINERs CUE: The Shift Engineer will enter the pump data into the database. | |||
: 6. Report to CRS that the results of Reports to CRS that results of the the surveillance are unsatisfactory surveillance are unsatisfactory and N/A SAT UNSAT and 2P89B is inoperable. 2P89B is inoperable. | |||
END STOP TIME: | |||
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. | |||
2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | 2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | ||
Initiating CUE: | Initiating CUE: | ||
The Control Room Supervisor/Shift Manager | The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors. | ||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. | ||
2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | 2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | ||
Initiating CUE: | Initiating CUE: | ||
The Control Room Supervisor/Shift Manager | The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors. | ||
PROC./ | PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 61 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE: | ||
SUPPLEMENT 2 PAGE 7 OF 9 3.0 ACCEPTANCE CRITERIA 3.1 Record values observed during 2P-89B operation below AND compare with limiting range of values for operability. | |||
Record date and time Test begins TODAYs DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT MEASURED ACCEPTABLE LIMITING IS DATA IN (INCLUDE VALUE NORMAL RANGE FOR LIMITING TEST INST) RANGE OPERABILITY RANGE? | |||
Running Suct. 2PI-5100 33.5 psig 8 psig 8 psig YES NO Pressure (local) 2PI-5101 1389 psig N/A N/A N/A (local) | |||
Discharge 2PI-5109 Pressure 1379 psig N/A N/A N/A (2C16) | |||
TABLE 2 CHECK | RWT 2TIS-5675 Temperature (2C17) 90 °F 40 to 110°F N/A N/A Pump P 2PI-5101 - 1360.81(1)to 1355.5 psid N/A YES NO | ||
2SI-10C Closed 2P-89C NOT rotating YES NO | {4.3.1} 2PI-5100 1612.8 psid Motor Running Ammeter at A 34 Amps N/A N/A N/A Amps 2A-406 B 33 Amps (CR-1-96-0272- C 35 Amps 07) | ||
Inboard Brg VIB001 0.325 0.700 0.825 in/sec YES NO Radial #1 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.22 in/sec YES NO Radial #2 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.073 in/sec YES NO Axial Vibes in/sec in/sec Outboard Brg VIB001 0.325 0.700 0.187 in/sec YES NO Radial #1 in/sec in/sec Vibes Outboard Brg VIB001 0.325 0.700 0.207 In/sec YES NO Radial #2 in/sec in/sec Vibes Outboard Brg VIB001 0.232 0.558 0.610 In/sec YES NO Axial Vibes in/sec in/sec Record date and time Test completed TODAYs DATE 0930 Vibration Instrument Cal Due Date 7 days from TODAY Vibration Data Collected By Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is: | |||
1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90 - 40)/4] = 1360.81 psid 3.2 Independently verify pump P calculation. JJB | |||
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 62 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE: | |||
SUPPLEMENT 2 PAGE 8 OF 9 3.3 Document observation of check valve stroke in Table 2. | |||
TABLE 2 CHECK TEST TEST CRITERIA IS PROPER VALVE VALVE DIRECTION STROKE INDICATED? | |||
2SI-10C Closed 2P-89C NOT rotating YES NO N/A 2SI-10B Closed 2P-89B NOT rotating YES NO N/A 3.4 IF NO circled in Table 1 OR 2, THEN perform the following: | |||
* Declare affected component inoperable. | |||
* Refer to Tech Spec 3.5.2 OR 3.5.3. | |||
* Notify Shift Manager. | |||
* Initiate WR/WO as applicable. | |||
NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator. | NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator. | ||
3.5 | 3.5 IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2), | ||
THEN perform the following: | THEN perform the following: | ||
N/A Annotate on status board. | * Initiate notification to perform test during current quarter OR as directed by IST Coordinator. N/A | ||
N/A | * Annotate on status board. N/A | ||
3.7 | * Annotate in Work Exceptions section of WR/WO. N/A 3.6 Pump Data recorded in database AND reviewed by SRO. | ||
3.7 IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O). N/A Comments ________________________________________________________________ | |||
________________________________________________________________ | |||
Performed By ____________________________________________ Date __________ | Performed By ____________________________________________ Date __________ | ||
PROC./ | PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 63 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE: | ||
YES | SUPPLEMENT 2 PAGE 9 OF 9 4.0 SUPERVISOR REVIEW AND ANALYSIS 4.1 Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY? YES NO 4.2 Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside YES NO N/A normal range also outside limiting range.) | ||
4.3 IF NO answered to 4.1, THEN perform the following corrective actions: | |||
4.4 | * Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed. | ||
* Verify Condition Report initiated. | |||
4.4 IF NO circled in 4.2, THEN perform the following corrective actions: | |||
* Verify WR/WO has been initiated. | |||
* Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency. | |||
Comments ________________________________________________________________ | Comments ________________________________________________________________ | ||
4.5 Are all administrative requirements of this test satisfied? | |||
YES NO Supervisor ______________________________________________ Date __________ | |||
4.5 | |||
YES | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
JTA#: | SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review and approve as a supervisor the completed 2P89B surveillance. | ||
JTA#: | |||
KA VALUE RO: 3.5 SRO: 3.9 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.2.12 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.2.12 APPROVED FOR ADMINISTRATION TO: | X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: | ||
RO: | X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
INSIDE CR: | PLANT SITE: SIMULATOR: LAB: | ||
OUTSIDE CR: | Perform POSITION EVALUATED: RO: SRO: | ||
BOTH: X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
PLANT SITE: | TESTING METHOD: SIMULATE: PERFORM: | ||
SIMULATOR: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME: SSN: | ||
Perform | EVALUATOR'S NAME: | ||
RO: | |||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2104.039 | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. | ||
2P89C is aligned to the GREEN side. | |||
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | |||
TASK STANDARD: | TASK STANDARD: | ||
(Identification of Five of the Six errors is required and two of the six must be the Pump D/P and the tech spec applicabiltiy) | (Identification of Five of the Six errors is required and two of the six must be the Pump D/P and the tech spec applicabiltiy) | ||
Pump P is out of LIMITING RANGE FOR OPERABILITY. Calculation for determining lower pump P limit is in error. Inboard Radial Bearing #1 | * Pump P is out of LIMITING RANGE FOR OPERABILITY. | ||
* Calculation for determining lower pump P limit is in error. | |||
The Shift | * Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY. | ||
* Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY. | |||
* Determine TS 3.5.2 applicability | |||
Pump D/P is out of LIMITING | * Yes is circled on parameters that do not meet acceptance criteria TASK PERFORMANCE AIDS: marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA | ||
Inboard | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE: | ||
N/A | The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2. | ||
CRITICAL STEPS: 2, 3, 4, 5, 6, 7 START TIME: | |||
N/A | PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test | ||
: 1. Perform supervisor review of the Reviews the surveillance acceptance N/A surveillance procedure results and criteria provided. | |||
Identifies that YES was circled on | determine errors. | ||
N/A | EXAMINERs NOTE: the following are the errors in the form provided. | ||
(C) 2. Pump P is out of LIMITING Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY. FOR OPERABILITY. N/A SAT UNSAT (C) 3. Calculation for determining lower Calculation for determining lower pump pump P limit is in error. P limit should be 1380.81 psid. N/A SAT UNSAT (C) 4. Inboard Radial Bearing #1 Vibes Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY. | |||
(C) 5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY. | |||
(C) 6. Identify the technical specification Identifies TS 3.5.2 applicability. | |||
applicability error. N/A SAT UNSAT (C) 7. Identified that YES was circled on Identifies that YES was circled on parameters that did not meet parameters that did not meet acceptance N/A SAT UNSAT acceptance criteria. criteria. | |||
EXAMINERs NOTE: The candidate will probably require another RO to review the data table before proceeding. | |||
Ask the candidate to continue on with completing section 4.0 as though that review matched the same errors previously identified. | |||
: 8. Inoperable equipment checklist Identifies need to perform inoperable needed. equipment checklist must be completed. N/A SAT UNSAT EXAMINERs CUE: | |||
The SRO ADMIN will perform the inoperable equipment checklist. | |||
: 9. Condition Report needed. Identifies need to generate condition report. N/A SAT UNSAT EXAMINERs CUE: | |||
The SE will initiate the condition report. | |||
END STOP TIME: | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. | ||
2P89C is aligned to the GREEN side. | 2P89C is aligned to the GREEN side. | ||
The 2P-89B Quarterly test has been | The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | ||
Initiating CUE: | Initiating CUE: | ||
The Shift Manager directs | The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2. | ||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. | ||
2P89C is aligned to the GREEN side. | 2P89C is aligned to the GREEN side. | ||
The 2P-89B Quarterly test has been | The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2. | ||
Initiating CUE: | Initiating CUE: | ||
The Shift Manager directs | The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2. | ||
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 61 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE: | |||
SUPPLEMENT 2 PAGE 7 OF 9 3.0 ACCEPTANCE CRITERIA 3.1 Record values observed during 2P-89B operation below AND compare with limiting range of values for operability. | |||
Record date and time Test begins TODAYs DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT MEASURED ACCEPTABLE LIMITING IS DATA IN (INCLUDE VALUE NORMAL RANGE FOR LIMITING TEST INST) RANGE OPERABILITY RANGE? | |||
Running Suct. 2PI-5100 33.5 psig 8 psig 8 psig YES NO Pressure (local) 2PI-5101 1389 psig N/A N/A N/A (local) | |||
Discharge 2PI-5109 Pressure 1379 psig N/A N/A N/A (2C16) | |||
RWT 2TIS-5675 Temperature (2C17) 90 °F 40 to 110°F N/A N/A Pump P 2PI-5101 - 1360.81(1)to 1355.5 psid N/A YES NO | |||
{4.3.1} 2PI-5100 1612.8 psid Motor Running Ammeter at A 34 Amps N/A N/A N/A Amps 2A-406 B 33 Amps (CR-1-96-0272- C 35 Amps 07) | |||
Inboard Brg VIB001 0.325 0.700 0.825 in/sec YES NO Radial #1 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.22 in/sec YES NO Radial #2 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.073 in/sec YES NO Axial Vibes in/sec in/sec Outboard Brg VIB001 0.325 0.700 0.187 in/sec YES NO Radial #1 in/sec in/sec Vibes Outboard Brg VIB001 0.325 0.700 0.207 In/sec YES NO Radial #2 in/sec in/sec Vibes Outboard Brg VIB001 0.232 0.558 0.610 In/sec YES NO Axial Vibes in/sec in/sec Record date and time Test completed TODAYs DATE 0930 Vibration Instrument Cal Due Date 7 Days from TODAY Vibration Data Collected By Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is: | |||
1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90 - 40)/4] = 1360.81 psid 3.2 Independently verify pump P calculation. JJB | |||
PROC./ | PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 62 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE: | ||
SUPPLEMENT 2 PAGE 8 OF 9 3.3 Document observation of check valve stroke in Table 2. | |||
TABLE 2 CHECK TEST TEST CRITERIA IS PROPER VALVE VALVE DIRECTION STROKE INDICATED? | |||
2SI-10C Closed 2P-89C NOT rotating YES NO N/A 2SI-10B Closed 2P-89B NOT rotating YES NO N/A 3.4 IF NO circled in Table 1 OR 2, THEN perform the following: | |||
* Declare affected component inoperable. N/A | |||
TABLE 2 CHECK | * Refer to Tech Spec 3.5.2 OR 3.5.3. N/A | ||
2SI-10C Closed 2P-89C NOT rotating YES NO | * Notify Shift Manager. N/A | ||
N/A Refer to Tech Spec 3.5.2 OR 3.5.3. | * Initiate WR/WO as applicable. N/A NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator. | ||
N/A Notify Shift Manager. | 3.5 IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2), | ||
N/A NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator. | THEN perform the following: | ||
3.5 | * Initiate notification to perform test during current quarter OR as directed by IST Coordinator. N/A | ||
THEN perform the following: | * Annotate on status board. N/A | ||
N/A Annotate on status board. | * Annotate in Work Exceptions section of WR/WO. N/A 3.6 Pump Data recorded in database AND reviewed by SRO. SBR 3.7 IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O). N/A Comments ________________________________________________________________ | ||
N/A | Performed By Sammy Reactor Date TODAY Jimmy Reactor | ||
SBR | |||
N/A | |||
PROC./ | PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 63 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE: | ||
YES | SUPPLEMENT 2 PAGE 9 OF 9 4.0 SUPERVISOR REVIEW AND ANALYSIS 4.1 Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY? YES NO 4.2 Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside YES NO N/A normal range also outside limiting range.) | ||
4.3 IF NO answered to 4.1, THEN perform the following corrective actions: | |||
4.4 | * Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed. | ||
* Verify Condition Report initiated. | |||
4.4 IF NO circled in 4.2, THEN perform the following corrective actions: | |||
* Verify WR/WO has been initiated. | |||
* Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency. | |||
Comments ________________________________________________________________ | Comments ________________________________________________________________ | ||
4.5 Are all administrative requirements of this test satisfied? | |||
YES NO Supervisor ______________________________________________ Date __________ | |||
4.5 | |||
YES | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
JTA#: | SYSTEM/DUTY AREA: A.3 Radiation Control TASK: Review the emergency RWP and determine stay time based on radiation levels expected. | ||
JTA#: | |||
KA VALUE RO: 2.9 SRO: 3.3 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.3.10 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.3.10 | X X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: Perform SIMULATOR: LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
OUTSIDE CR: | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: X | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2004-0009; emergency RWP and status board printout of Aux Building 354. | ||
Perform | EXAMINEE'S NAME: SSN: | ||
LAB: | EVALUATOR'S NAME: | ||
RO: | |||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
2004-0009; emergency RWP and status board printout of Aux Building 354 | |||
EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS | ||
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured. 2. Power has been lost to both SFP cooling pumps and 2K11-K5 | : 1. Plant is DEFUELED and all FUEL HANDLING operations are secured. | ||
: 2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm. | |||
: 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG. | |||
: 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate. | |||
: 5. Fuel Pool low level alarm is in and SFP level is lowering. | |||
: 6. RP coverage will not be available. | |||
TASK STANDARD: | TASK STANDARD: | ||
Using Emergency RWP: Identify General Area, GA, dose rates in SFP valve gallery are ~ 500 MR/HR. Determine a maximum stay time of 1. | Using Emergency RWP: | ||
6 hours based on EAD alarm set-points. Using normal inspection RWP: Determine appropriate dosimeter Entered RCA Observed proper radiological controls while in RCA Properly uses the PCM-1 Properly scans loose items in TCM | * Identify General Area, GA, dose rates in SFP valve gallery are ~ 500 MR/HR. | ||
TASK PERFORMANCE AIDS: | * Determine a maximum stay time of 1.6 hours based on EAD alarm set-points. | ||
NA | Using normal inspection RWP: | ||
* Determine appropriate dosimeter | |||
* Entered RCA | |||
* Observed proper radiological controls while in RCA | |||
* Properly uses the PCM-1 | |||
* Properly scans loose items in TCM JPM time is based on the review of the emergency RWP and the calculation of the stay time. | |||
TASK PERFORMANCE AIDS: Emergency RWP 2004-0009 SIMULATOR SETUP: NA | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE: | ||
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency Radiological Work Permit, RWP, and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area. | |||
Critical Steps: 2, 3, 4, 5, 6 START TIME: | |||
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide Emergency RWP. | |||
The Shift Manager directs that Service water | EXAMINERs CUE: The candidate may attempt to check out a radiation survey meter per monitoring step 7.0. It is not a part of this JPM to check out the survey meter, but that the candidate knows one is needed. | ||
: 1. Review Emergency RWP for Determines that the alarming dosimeter N/A limits. is set to alarm in an 800mr/hr field and that the Dose alarm is set at 800 mrem. | |||
(C) 2. | |||
Determine stay time in SFP valve Using the status board printout provided gallery to be a maximum of 1.6 determined that the General Area (GA) N/A SAT UNSAT hours. field is 500 MR/HR so the maximum stay time will be 1.6 hours. | |||
EXAMINERs NOTE: The rest of these steps determine the candidates ability to enter and exit controlled access correctly using the Actual RWP for inspections, DO NOT allow the candidate to use the emergency RWP to enter controlled access. | |||
(C) 3. Determined that an alarming Obtained an alarming dosimeter from dosimeter will be required for rack. N/A SAT UNSAT entry into the Radiologically Controlled Area, RCA, using the normal inspection RWP. | |||
(C) 4. Entered appropriate information Entered the RCA under the general into the log in screen and inspection RWP. N/A SAT UNSAT successfully entered the RCA. | |||
(C) 5. While in the RCA the examinee While in the RCA the examinee observes observes and adheres to all and adheres to all applicable postings N/A SAT UNSAT applicable postings and entry and entry requirements. | |||
requirements. | |||
(C) 6. When exiting the RCA the Enters and exits PCM-1. | |||
examinee enters the control point N/A SAT UNSAT area and enters a PCM-1 monitor. | |||
: 7. All loose materials will be cleared Examinee places loose items in the TCM through the tool contamination for counting. N/A SAT UNSAT monitor (TCM) | |||
: 8. After clearing the PCM-1 monitor, Examinee clears the Portal Monitor the examinee exits through the N/A SAT UNSAT Portal Monitor | |||
: 9. Examinee deactivates EAD at Examinee deactivates his EAD and final exit of session returns it to the Health Physics rack. N/A SAT UNSAT END STOP TIME: | |||
JPM-ANO-2-JPM- | JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS | ||
: 1. | : 1. Plant is DEFUELED and all FUEL HANDLING operations are secured. | ||
: | : 2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm. | ||
: 6. RP coverage will NOT be | : 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG. | ||
The Shift Manager directs that Service water | : 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate. | ||
: 5. Fuel Pool low level alarm is in and SFP level is lowering. | |||
: 6. RP coverage will NOT be available. | |||
Initiating CUE: | |||
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area. | |||
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS | |||
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured. | |||
: 2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm. | |||
: 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG. | |||
: 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate. | |||
: 5. Fuel Pool low level alarm is in and SFP level is lowering. | |||
: 6. RP coverage will NOT be available. | |||
Initiating CUE: | |||
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area. | |||
RWP for TRAINING USE ONLY RWP ANO Page 1 of 5 l l l Status: Active RADIOLOGICAL WORK PERMIT Rev 0 Unit C RWP 2004-0009l l______________________________________________________________________________l l l l SECTION I RWP DESCRIPTION l l______________________________________________________________________________l l l l l l START DATE: 01-jan-2004 l END DATE: 31-dec-2004 l RWP TYPE: General l l__________________________l_________________________l_________________________l l l l DESCRIPTION: l l l l Emergencies l l l l SYSTEM COMPONENT BLDG LOCATION l l l l NA Various A1/A2 Non LHRA's l l NA Various OSCA Non LHRA's l l NA Various A1/A2 LHRA's l l l l JOB CONTACTS..Shift Manager ALARA CODE....C0007014 l l JOB CODE......ROS- ALARA CAT.....Level III l l______________________________________________________________________________l l l l SECTION II TASK LIST l l______________________________________________________________________________l l l l l l l l l l ESTIMATED l l TASKl STATUS l TASK DESCRIPTION l PR-HR lPER-REMl l_____l_________l______________________________________________l_______l_______l l l l l l l l 1 lActive lEmergency Response in Non LHRA's l 1000.0l 5.000l l l l l l l l 2 lActive lEmergency Response in LHRA's l 200.0l 6.000l l_____l_________l______________________________________________l_______l_______l l l l l l TOTALS l 1200.0l 11.000l l______________________________________________________________l_______l_______l l l l SECTION III RWP REVIEWS AND APPROVAL l l______________________________________________________________________________l l l l Originator ELLISON PW 18-dec-2003 Development ELLISON PW 19-dec-2003 l l ALARA Eval ELLISON PW 19-dec-2003 HP Supv. DORAN GA 19-dec-2003 l l Terminated ____________ ___________ Completed ____________ ___________ l l Withdrawn ____________ ___________ l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009 | |||
RWP for TRAINING USE ONLY RWP | RWP for TRAINING USE ONLY RWP ANO Page 2 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 1 ) l l______________________________________________________________________________l l l l 1) Emergency Response in Non LHRA's l l______________________________________________________________________________l l l l RADIOLOGICAL CONDITIONS ( Task# 1 ) l l______________________________________________________________________________l l l l l l l l l l l (mrem/Hr) l dpm l l l l l l Component/Location l Gen Max l100cm2l l Yr/DANI# l l l l______________________l_____l_____l______l________l____________l_______l______l l l l l l l l l l lUnit 1&2 Aux. Bldgs l 1 l 200 l <1K l lMonthly Pkg l l l lOutside Controlled Ac l 1 l 80 l <1K l lMonthly Pkg l l l lVarious / Aux. Bldgs l 1 l1000 l <1K l lANTICIPATED l l l l______________________l_____l_____l______l________l____________l_______l______l l l l Dosimetry : Whole body TLD required, and Alarming Dosimeter. l l l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l ALARA Actions: l l 1) Utilize low dose waiting areas whenever possible to minimize l l exposure. l l l l Monitoring: l l 1) Notify the zone coverage RP or the duty shift RP when Emergency l l Conditions exist. l l 2) Unless otherwise directed by RP Supervision, Electronic Alarming l l Dosimeter (EAD) set points will be 800 mrem dose and 800 mrem/hr l l dose rate. l l 3) During Emergency conditions the possibility of changing l l radiological conditions is increased. Radiological information l l should be obtained from in plant monitors, Rads Telmetry devices in l l the field or RP personnel. l l 4) Periodically check your Electronic Alarming Dosimeter (EAD). This l l check should be more frequent in areas where your ability to hear l l the alarm is diminished. l l 5) If an EAD dose alarm occurs: l l 1. Secure work. l l 2. Immediately leave Controlled Access. l l 3. Notify RP. l l 6) If an EAD dose rate alarm occurs: l l 1. Secure work. l l 2. Back out of the immediate area until alarm clears. l l 3. Notify others in work crew. l l 4. Immediately contact RP for further instructions. l l 7) Initial/Intermittent RP coverage is required for High Radiation l l Areas unless the individual is "Category 3 Advanced Radworker" l l qualified and has an appropriate radiation survey meter at all l l times during the entry. l l NOTE: An EAD is not an appropriate survey meter. l l 8) Access to the overhead >8ft. is allowed with the following l l l l --Continued on next page-- l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009 | ||
l | |||
l l | |||
l l l | |||
l | |||
TASK | RWP for TRAINING USE ONLY RWP ANO Page 3 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 1 ) l l______________________________________________________________________________l l l l --Continued from previous page-- l l l l provisions: l l A.) Use a ladder to climb directly below the valve to be l l operated. l l B.) Do not touch any interferences or components in the overhead. l l C.) Use your survey meter to obtain dose rates of all areas l l entered. l l D.) Wear rubber gloves while operating the valve but remove them l l prior to descending the ladder. l l E.) Upon completion, perform a large area masslin survey of the l l ladder to determine if any cross contamination has occurred. l l l l 9) Accessing the top of partial walls separating Radiation/High l l Radiation areas from Locked High Radiation areas is not permitted l l on this RWP. l l l l Work Controls: l l l l 1) Ensure the proper surveys are performed prior to removing any l l items from the RCA. l l l l Respiratory: l l l l 1) Airborne Activity will be assessed based on process monitor's and l l continuous air monitor activity. l l l l Anti-C's: l l l l 1) Use Anti-C's appropriate for the area to be entered. l l l l Additional: l l l l 1) Radiological Conditions are ANTICIPATED and must be determined l l prior to beginning work in the area. l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009 | ||
l l | |||
l | |||
RWP for TRAINING USE ONLY RWP ANO Page 4 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 2 ) l l______________________________________________________________________________l l l l 2) Emergency Response in LHRA's l l______________________________________________________________________________l l l l RADIOLOGICAL CONDITIONS ( Task# 2 ) l l______________________________________________________________________________l l l l l l l l l l l (mrem/Hr) l dpm l l l l l l Component/Location l Gen Max l100cm2l l Yr/DANI# l l l l______________________l_____l_____l______l________l____________l_______l______l l l l l l l l l l lUnit 1/2 Aux. Bldgs. l 1 l 200 l <1K l lMonthly Pkg l l l lOutside Controlled Ac l 1 l 80 l <1K l lMonthly Pkg l l l lVarious U1/2 Aux. Bld l 1 l1000 l <1K l lANTICIPATED l l l l______________________l_____l_____l______l________l____________l_______l______l l l l Dosimetry : Whole body TLD required, and Alarming Dosimeter. l l l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009 | |||
l | |||
( Task# | |||
RADIOLOGICAL CONDITIONS | |||
( Task# | |||
: Whole body TLD required, and Alarming Dosimeter. | |||
RWP for TRAINING USE ONLY RWP ANO Page 5 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 2 ) l l______________________________________________________________________________l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l l l ALARA Actions: l l l l 1) A pre-job-brief is required for this task. l l l l 2) RP staff and or Shift Manager will conduct the pre-job-brief. l l l l 3) Utilize low dose waiting areas whenever possible to minimize l l exposure. l l l l Monitoring: l l l l 1) Contiuous RP coverage is required for this task. l l l l 2) Periodically check Electronic Alarming Dosimeter (EAD). This check l l should be more frequent in areas where your ability to hear the l l alarm is deminished. If any (EAD) alarm is received secure work, l l find as low a dose rate area as possible and contact RP supervision l l for further guidance. l l l l 3) Unless otherwise directed by RP Supervision, Electronic Alarming l l Dosimeter set points will be 800 mrem dose and 4000 mrem/hr dose l l rate. l l l l 4) During Emergency conditions the possibility of changing l l radiological conditions is increased. Radiological information l l should be obtained from in plant radiation monitors, Rads Telemetry l l devices in the field or RP personnel. l l l l Work Controls: l l l l 1) Ensure the proper surveys are preformed prior to removing any l l items from the RCA l l l l Respiratory: l l l l 1) Airborne Activity will be assessed based on process monitor's and l l continuous air monitor's activity. l l l l Anti-C's: l l l l 1) Use Anti-C's appropriate for the area to be entered. l l l l Additional: l l l l 1) Radiological conditions are ANTICIPATED and must be determined l l prior to beginning work in the area. l l______________________________________________________________________________l Tue Oct 19 13:59:59 2004 working RWP 2004-0009 | |||
l | |||
l | |||
( Task# 2 ) l l______________________________________________________________________________l l | |||
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE: | |||
SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#: | |||
KA VALUE RO: 2.3 SRO: 4.1 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO: | |||
2.4.41 | X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: | ||
RO: | X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
INSIDE CR: | PLANT SITE: SIMULATOR: LAB: | ||
OUTSIDE CR: | Perform POSITION EVALUATED: RO: SRO: | ||
BOTH: X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
PLANT SITE: | TESTING METHOD: SIMULATE: PERFORM: | ||
SIMULATOR: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 1903.010 Rev 037-02-0 EXAMINEE'S NAME: SSN: | ||
Perform | EVALUATOR'S NAME: | ||
RO: | |||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 1903.010 Rev 037-02-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | |||
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE | JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: | ||
Plant had been operating | * Plant had been operating for 150 days at 100% power. | ||
* A reactor trip occurred two hours ago. | |||
* A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm. | |||
* Containment Spray Actuation Signal (CSAS) has actuated. | |||
* Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR. | |||
* Chemists have been notified to sample the RCS. | |||
TASK STANDARD: | |||
Declared a Site Area Emergency (based on EAL 1.4, Containment radiation readings which indicate LOCA and >1% fuel cladding failure). Also acceptable is a review of the 1903.010 paragraph 4.10, Fission Product Barrier Failure and 4.11, Fission Product Barrier Challenge criteria and determine that two fission product barriers are challenged or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility. | |||
TASK PERFORMANCE AIDS: OP 1903.010 Rev. 037-02-0 SIMULATOR SETUP: N/A. | |||
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: | |||
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE | |||
As Shift Manager, determine the EAL classification based on the given plant conditions. | As Shift Manager, determine the EAL classification based on the given plant conditions. | ||
Critical Steps: | Critical Steps: 2, 3, 4 PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 1. Review E-Plan procedure | : 1. Review E-Plan procedure Review 1903.010 index and EAL N/A SAT UNSAT 1903.010 to determine classification tabs. | ||
Review 1903.010 index and EAL | classification. | ||
N/A | (C) 2. Reviewed 1903.010 attachment Determined that the containment N/A SAT UNSAT 6 containment radiation EAL radiation reading exceeds the plot to determine that Site Area Emergency Criteria. | ||
containment radiation levels exceed the Site area emergency criteria. | |||
(C) 3. Reviewed initial conditions and Determined LOCA inside N/A SAT UNSAT determined that a LOCA inside containment was in progress. | |||
containment was in progress. | |||
(C) 4. Reviewed EAL 1.4., Site Area Classified EAL as a Site Area N/A SAT UNSAT Emergency based on a LOCA Emergency (SAE) based on EAL and > 1% failed fuel. 1.4, Containment Radiation readings which indicate LOCA Or and > 1% fuel cladding failure. | |||
Also acceptable is a review of the 1903.010 paragraph 4.10, OR Fission Product Barrier Failure Classified EAL as a Site Area and 4.11, Fission Product Emergency (SAE) based on EAL Barrier Challenge criteria and 9.3, Plant conditions exist that determine that two fission warrant activation of the product barriers are challenged Emergency Response Facility. | |||
or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility. | |||
END | |||
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS | |||
* Plant had been operating for 150 days at 100% power. | |||
* A reactor trip occurred two hours ago. | |||
* A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm. | |||
* Containment Spray Actuation Signal (CSAS) has actuated. | |||
* Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR. | |||
* Chemists have been notified to sample the RCS. | |||
INITIATING CUE: | INITIATING CUE: | ||
As Shift Manager, determine the EAL classification based on the given plant conditions. | As Shift Manager, determine the EAL classification based on the given plant conditions. | ||
JPM- ANO-2-JPM-NRC- | |||
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS | |||
* Plant had been operating for 150 days at 100% power. | |||
* A reactor trip occurred two hours ago. | |||
* A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm. | |||
* Containment Spray Actuation Signal (CSAS) has actuated. | |||
* Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR. | |||
* Chemists have been notified to sample the RCS. | |||
INITIATING CUE: | INITIATING CUE: | ||
As Shift Manager, determine the EAL classification based on the given plant conditions. | As Shift Manager, determine the EAL classification based on the given plant conditions. | ||
JPM- ANO-2-JPM-NRC-AOP2 PAGE | JPM- ANO-2-JPM-NRC-AOP2 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
Containment Cooling Water System | SYSTEM/DUTY AREA: Containment Cooling Water System TASK: Reset CIAS and establish cooling water to containment JTA#: | ||
KA VALUE RO: 3.1 SRO: 3.2 KA | |||
TASK: | |||
JTA#: | |||
==REFERENCE:== | ==REFERENCE:== | ||
022 A4.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
022 A4.04 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: SIMULATOR: Perform LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.0039 Rev 03-02-0 EXAMINEE'S NAME: SSN: | ||
SIMULATOR: | EVALUATOR'S NAME: | ||
Perform | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
AOP 2203.0039 Rev 03-02-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
JPM- ANO-2-JPM-NRC-AOP2 | JPM- ANO-2-JPM-NRC-AOP2 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall review the "Briefing Checklist - | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | JPM INITIAL TASK CONDITIONS: An inadvertent CIAS has occurred. | ||
JPM INITIAL TASK CONDITIONS: | Steps 1-10 of AOP 2203.039 have been completed. | ||
An inadvertent CIAS has occurred. | TASK STANDARD: CIAS has been reset and containment Chilled water has been realigned. | ||
Steps 1-10 of AOP 2203.039 have been completed. | TASK PERFORMANCE AIDS: Copy of AOP 2203.039 Revision 003-02-0 is available. | ||
AOP 2203.039 Steps 1-10 have been completed. | |||
SIMULATOR SETUP: Inadvertent CIAS present. Containment parameters and RCS parameters are above setpoints, containment pressure < 18.3 psia, PZR pressure > 1650psia. Verify CBO to VCT valves, 2CV-4847-2 and 2CV 4846-1 handswitches are in CLOSE. | |||
JPM- ANO-2-JPM-NRC-AOP2 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE: | |||
The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, beginning with step 11." | |||
CRITICAL ELEMENTS (C): 1, 2, 6, 7, 8 PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
(C) 1. Reset CIAS on 2C23B. Obtained key 15 from Shift N/A SAT UNSAT Manager. | |||
Examiners note: On panel 2C23B placed key in trip path keyswitch to UNLK. | |||
Only one channel of PPS is modeled on simulator Depressed CIAS pushbutton for completely. Correctly resetting trip path and observed trip paths of this channel will reset CIAS lights on panel above 2C23 lit. | |||
trip paths. | |||
Placed trip path keyswitch to LK and removed key. | |||
JPM- ANO-2-JPM-NRC-AOP2 | |||
The SM/CRS directs, "Perform actions in | |||
1, 2, 6, 7, 8 PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Reset CIAS on 2C23B. | |||
Examiners note: | |||
Only one channel of PPS is modeled on simulator completely. Correctly resetting of this channel will reset CIAS trip paths. | |||
Examiners Cue @ Step 11.D: | Examiners Cue @ Step 11.D: | ||
All four PPS trip path channels have been reset. | All four PPS trip path channels have been reset. | ||
(C) 2. Reset ESF CIAS actuation on Depressed CIAS lockout reset N/A SAT UNSAT 2C40. pushbutton on 2C40-7 and observed CIAS ON light lit. | |||
Examiners note: | |||
Depressed CIAS | Only one channel of ESF actuation path is modeled on simulator completely. Correctly resetting of this channel will reset CIAS ESF actuation. | ||
N/A | |||
Only one channel of ESF | |||
actuation path is modeled on simulator completely. Correctly resetting of this channel will reset CIAS ESF actuation. | |||
Examiners Cue @ Step 12.B: | Examiners Cue @ Step 12.B: | ||
2C39 ESF CIAS actuation has been reset. | 2C39 ESF CIAS actuation has been reset. | ||
: 3. (Step 12.c) Go to step 14. Using procedure 2203.039, N/A SAT UNSAT transition to step 14. | |||
: 4. Open RCP Bleedoff to VCT On panel 2C17, Placed N/A SAT UNSAT valve, 2CV-4846-1. handswitches for RCP bleedoff to VCT valve 2CV-4846-1 to OPEN. | |||
: 3. (Step 12.c) Go to step 14. | Observed RED light ON above hand switch. | ||
Using procedure 2203.039, transition to step 14. | |||
N/A | |||
handswitches for RCP bleedoff to VCT valve 2CV- | JPM- ANO-2-JPM-NRC-AOP2 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 5. Open RCP Bleedoff to VCT On panel 2C16, Placed N/A SAT UNSAT valve, 2CV-4847-2. handswitches for RCP bleedoff to VCT valve 2CV-4847-2 to OPEN. | |||
Observed RED light ON above hand switch. | Observed RED light ON above hand switch. | ||
N/A | (C) 6. Open Chilled water to CNTMT On panel 17, placed N/A SAT UNSAT valve 2CV-3851-1. handswitches for Chilled Water to CNTMT Isolation valve 2CV-3851-1 to OPEN. | ||
Observed RED light ON above hand switch. | Observed RED light ON above hand switch. | ||
(C) 7. Open Chilled water to CNTMT On panel 17, placed N/A SAT UNSAT valve 2CV-3852-1. handswitches for Chilled Water to CNTMT Isolation valve 2CV-3852-1 to OPEN. | |||
On panel 17, placed | Observed RED light ON above hand switch. | ||
(C) 8. Open Chilled water to CNTMT On panel 16, placed N/A SAT UNSAT valve 2CV-3850-2. handswitches for Chilled Water to CNTMT Isolation valve 2CV-3850-2 to OPEN. | |||
Observed RED light ON above hand switch. | |||
: 9. Verify Main Chiller (2VCH1A) On panel 22, verified hand switch N/A SAT UNSAT running. for 2VCH1A is in normal after start (RED flagged). | |||
Observed RED light ON above Examiners note: hand switch for 2VCH-1A. | |||
N/A | |||
Observed RED light ON above | |||
hand switch. | |||
Observed RED light ON above | |||
hand switch. | |||
: 9. Verify Main Chiller (2VCH1A) running. | |||
The red light above hand switch for 2VCH-1A indicates the chiller is running. | The red light above hand switch for 2VCH-1A indicates the chiller is running. | ||
Observed RED light ON above label for 2HS-3810. | |||
The red light label for 2HS-3810 for 2VCH-1A indicates the 2A1 breaker is closed. | Examiners note: | ||
The red light label for 2HS-3810 for 2VCH-1A indicates the 2A1 Observed all chilled water alarms breaker is closed. are clear on annunciator 2K13 (Lights slow flashing or clear). | |||
EXAMINERs NOTE: | |||
JPM standard does not require completion of steps past procedure step 15. | |||
END | |||
JPM- ANO-2-JPM-NRC-AOP2 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | |||
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed. | An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Perform actions in Inadvertent CIAS AOP, 2203.039, beginning with step 11." | The SM/CRS directs, "Perform actions in Inadvertent CIAS AOP, 2203.039, beginning with step 11." | ||
JPM- ANO-2-JPM-NRC-AOP2 | |||
JPM- ANO-2-JPM-NRC-AOP2 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed. | An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Perform actions in Inadvertent CIAS AOP, 2203.039, beginning with step 11." | The SM/CRS directs, "Perform actions in Inadvertent CIAS AOP, 2203.039, beginning with step 11." | ||
JPM- ANO-2-JPM-NRC-CVCS010 PAGE | |||
Chemical and Volume Control System TASK: | JPM- ANO-2-JPM-NRC-CVCS010 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
JTA#: | SYSTEM/DUTY AREA: Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path) | ||
JTA#: | |||
KA VALUE RO: 3.9 SRO: 3.7 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
004 A4.07 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
004 A4.07 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: SIMULATOR: Perform LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 12 Minutes REFERENCE(S): OP 2203.032 Rev. 008-06-0 EXAMINEE'S NAME: SSN: | ||
SIMULATOR: | EVALUATOR'S NAME: | ||
Perform | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
12 Minutes REFERENCE(S): | |||
OP 2203.032 Rev. 008-06-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
JPM- ANO-2-JPM-RO-CVCS010 PAGE | JPM- ANO-2-JPM-RO-CVCS010 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall review the "Briefing Checklist - System Walkthrough" | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
Mode 3. | Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. | ||
TRM 3.1.2.4 entered for only 1 CCP | TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action. | ||
A Shutdown Margin is calculated following a reactor trip. | A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required. | ||
Shutdown Margin is found to be less than required. | |||
TASK STANDARD: | TASK STANDARD: | ||
Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using HPSI pump and HPSI injection | Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using HPSI pump and HPSI injection MOVs. This is an alternate success path JPM> | ||
This is an alternate success path JPM> | |||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
AOP 2203.032 Steps 2 through 16. OP 4104.039 | AOP 2203.032 Steps 2 through 16. OP 4104.039 section 9, Starting any HPSI pump on recirc. | ||
SIMULATOR SETUP: | SIMULATOR SETUP: | ||
A mode 3 IC will be set up for this JPM. RCS | A mode 3 IC will be set up for this JPM. RCS cooldown in progress, PZR pressure ~ 1200psia, RCS temp | ||
~480°F. | ~480°F. A CCP running. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action. | ||
Set T1=2CV-4873-1a < 75% (this will trigger T1 when the VCT outlet gets to 75% open.) | Set T1=2CV-4873-1a < 75% (this will trigger T1 when the VCT outlet gets to 75% open.) | ||
T1 = | T1 = A CCP plunger failure (flow out of pump ~ 30gpm). | ||
JPM- ANO-2-JPM-RO-CVCS010 PAGE | JPM- ANO-2-JPM-RO-CVCS010 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs, "Initiate Emergency Boration | The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2." | ||
: 1. Verify at least one charging Pump (CCP) running with flow greater than 40 GPM. | CRITICAL ELEMENTS (C): 5, 10, 15 PERFORMANCE CHECKLIST STANDARD (Circle One) | ||
: 1. Verify at least one charging On panel 2C09, verified CCP(s) N/A SAT UNSAT Pump (CCP) running with flow running. | |||
greater than 40 GPM. | |||
OFF above at least one of the following handswitch(es): | Observed red light ON; green light OFF above at least one of the following handswitch(es): | ||
2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863). | 2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863). | ||
: 2. Align boric acid supply to CCP On panel 2C09, opened BAMT N/A SAT UNSAT suction. gravity feed valves 2CV-4920-1 and/or 2CV-4921-1 Observed red light ON and green light OFF above handswitch(es): | |||
: 2. Align boric acid supply to CCP | * 2HS-4920-1 for 2CV-4920-1 | ||
2HS-4920-1 for 2CV-4920-1 | * 2HS-4921-1 for 2CV-4921-1 | ||
: 3. Close volume control tank (VCT) outlet valve (2CV-4873- | : 3. Close volume control tank On panel 2C09, observed that N/A SAT UNSAT (VCT) outlet valve (2CV-4873- 2CV-4873-1 closed. | ||
1). | |||
Observed green light ON; red light OFF above VCT Outlet valve handswitch (2HS-4873-1). | |||
Observed green light ON; red light | : 4. Check Reactor Makeup Water On panel 2C09, verified 2CV-4927 N/A SAT UNSAT Flow Control valve (2CV-4927) or 2CV-4941-2 closed. | ||
OFF above VCT Outlet valve handswitch (2HS-4873-1). | |||
: 4. Check Reactor Makeup Water Flow Control valve (2CV-4927) | |||
or 2CV 4941-2 closed. | or 2CV 4941-2 closed. | ||
Observed green light ON; red light OFF above Reactor Makeup Water Flow Controller (2FIC-4927) or above 2CV-4941-2 handswitch. | |||
(C) 5. Check charging header flow. On panel 2C09 (upright portion), N/A SAT UNSAT observed flow about 30 gpm on Charging Header Flow indicator (2FIS-4863). | |||
JPM- ANO-2-JPM-RO-CVCS010 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One) | |||
: 6. GO to step 2 and verify TCBs On panel 2C14, verifies that the N/A SAT UNSAT open and then transition to step TCBs are open by observing the | |||
: 8. green lights ON and red lights OFF. | |||
: 7. Check RCS pressure less than On panel 2C04, SPDS, PMS or N/A SAT UNSAT 1265 psia. PDS verified that PZR pressure is less than 1265 psia. | |||
: 8. Verify RWT level greater than On panel 2C16 or 2C17, verified N/A SAT UNSAT 7.5%. RWT level greater than 7.5%. | |||
: 6. GO to step 2 and verify | EXAMINERS CUE: When asked as CRS which HPSI pump to start, state that B HPSI pump is to be started. | ||
: 9. Verify 2CV-5631-2 is OPEN. On panel 2C16 verified RWT outlet N/A SAT UNSAT valve 2CV-5631-2 is OPEN. | |||
: 7. Check RCS pressure less than | NOTE: If Examinee goes to use OP2104.039 section 9.0 then give the following cue. | ||
On panel 2C04, SPDS, PMS or | EXAMINERs CUE: CRS directs to start B HPSI pump and verify steps in appropriate section in OP 2104.039 after Emergency boration is established. | ||
(C) 10. Start 2P89B. On panel 2C16 rotated handswitch N/A SAT UNSAT for 2P89B to start postion. | |||
PDS verified that PZR pressure is less than 1265 psia. | |||
: 8. Verify RWT level greater than | |||
: 9. Verify 2CV-5631-2 is OPEN. | |||
On panel 2C16 verified RWT outlet | |||
valve 2CV-5631-2 is OPEN. | |||
On panel 2C16 rotated handswitch for 2P89B to start postion. | |||
Observed Red light ON and Green light OFF. | Observed Red light ON and Green light OFF. | ||
: 11. Verify SDC secured. On panel 2C16 and 2C17 verified N/A SAT UNSAT LPSI pumps secured. | |||
: 11. Verify SDC secured. | : 12. Check RCS temperature greater On panel 2C04, SPDS, PMS or N/A SAT UNSAT than 450°F. PDS verified RCS temperature greater than 450°F. | ||
On panel 2C16 and 2C17 verified LPSI pumps secured. | : 13. Commence RCS cooldown to Verify conditions will allow for a N/A SAT UNSAT allow a makeup rate of 40 GPM. makeup rate of 40 gpm. (Step 12) | ||
N/A | EXAMINERS CUE: CRS has verified RCS cooldown rate is sufficient to allow make-up rate greater than 40 gpm. The CRS and CBOR will monitor and control RCS Cooldown. | ||
: 14. Use one HPSI train B injection Opened ONE of the following HPSI N/A SAT UNSAT MOV to maintain PZR level. injection MOV: | |||
2CV-5016-2 2CV-5036-2 2CV5056-2 2CV-5076-2 Observed Red light ON and Green light ON above handswitch. | |||
JPM- ANO-2-JPM-RO-CVCS010 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One) | |||
N/A | (C) 15. Verified HPSI to RCS flow Adjust valve position to maintain N/A SAT UNSAT greater than 40 GPM using greater than 40 GPM HPSI flow SPDS computer. using indications on SPDS computer. | ||
END | |||
JPM- ANO-2-JPM-RO-CVCS010 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERs COPY JPM INITIAL TASK CONDITIONS: | |||
Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action. | |||
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required. | |||
Mode 3. | |||
A Shutdown Margin is calculated following a | |||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2." | The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2." | ||
JPM- ANO-2-JPM-RO-CVCS010 PAGE | |||
Mode 3. | JPM- ANO-2-JPM-RO-CVCS010 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY JPM INITIAL TASK CONDITIONS: | ||
A Shutdown Margin is calculated following a | Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action. | ||
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required. | |||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2." | The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2." | ||
KA VALUE | JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE: | ||
SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron (ALTERNATE SUCCESS PATH) | |||
JTA#: ANO2-RO-PZR-NORM-3 KA VALUE RO: 3.7 SRO: 3.5 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
010 A4.01 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: SIMULATOR: Perform LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2103.005 Rev. 024-00-0 and AOP 2203.028 Rev 06-00-0 EXAMINEE'S NAME: SSN: | ||
SIMULATOR: | EVALUATOR'S NAME: | ||
Perform | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2103.005 Rev. 024-00-0 and AOP 2203.028 | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
JPM- ANO-2-JPM-NRC-PZR02 | JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall review the "Briefing Checklist - | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed. | ||
JPM INITIAL TASK CONDITIONS: | |||
100% Power Operation. A power escalation has been completed. | |||
Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM. | Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM. | ||
TASK STANDARD: | TASK STANDARD: Spray Valve (2CV-4651) is isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM. | ||
Spray Valve (2CV-4651) is isolated. | TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028. | ||
THIS IS AN ALTERNATE SUCCESS PATH JPM. | SIMULATOR SETUP: Run CAE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position. | ||
TASK PERFORMANCE AIDS: | |||
OP 2103.005 section 7.0 and AOP | |||
SIMULATOR SETUP: | |||
Run CAE FILE JPM03. This will open | |||
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them): | The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them): | ||
Set T5 file to | Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized. | ||
T5 | T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light) | ||
T5 | T5 2HS-4651-5 false (red light) | ||
JPM- ANO-2-JPM-NRC-PZR02 | JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs: | The SM/CRS directs: Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651." | ||
2, 3, 4, 6 START TIME: | CRITICAL ELEMENTS (C): 2, 3, 4, 6 START TIME: | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 1. Verify spray valve, 2CV-4651, On panel 2C04 verified red lights N/A SAT UNSAT isolation valves 2CV-4655 AND ON, green lights OFF for 2CV-4656 are OPEN. 2CV-4655 and 2CV-4656. | |||
(C) 2. Place RCP A spray valve On panel 2C04, rotated N/A SAT UNSAT MAN/AUTO select switch 2HS-4651B in the CCW direction (2HS-4651B) to MANUAL. to MANUAL. | |||
(C) 3. Energize all available Backup On panel 2C04 verified the N/A SAT UNSAT Heaters. following hand switches to ON: | |||
Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater hand switches. | |||
EXAMINERS NOTE: | |||
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker. | |||
(C) 4 Partially open 2CV-4651. On panel 2C04, took hand switch N/A SAT UNSAT for 2CV-4651 to the open position when PZR pressure rises. | |||
EXAMINERS NOTE: | |||
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM. | |||
JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 5. Recognizes that 2CV4651 is On panel 2C04, observed that N/A SAT UNSAT deenergized open. light position indications above 2CV-4651 are out and PZR Attempts to close 2CV4651 may pressure is lowering. | |||
be made, but is not necessary. | |||
(C) 6. Close PZR Spray Block Valves. On panel 2C04, placed hand- N/A SAT UNSAT switch for 2CV-4655 and 2CV-4656 to "CLOSE". | |||
JPM- ANO-2-JPM-NRC-PZR02 | |||
: 5. Recognizes that 2CV4651 is | |||
On panel 2C04, observed that light position indications above 2CV-4651 are out and PZR | |||
pressure is lowering. | |||
On panel 2C04, placed hand- | |||
switch for 2CV-4655 and 2CV-4656 to "CLOSE". | |||
Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656. | Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656. | ||
END STOP TIME: | |||
JPM- ANO-2-JPM-NRC-PZR02 | JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | ||
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM. | 100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Equalize RCS and | The SM/CRS directs, "Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651." | ||
JPM- ANO-2-JPM-NRC-PZR02 | |||
JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM. | 100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Equalize RCS and | The SM/CRS directs, "Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651." | ||
KA VALUE | JPM- ANO-2-JPM-NRC-SIT05 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 003 DATE: | ||
SYSTEM/DUTY AREA: Safety Injection System TASK: Adjust SIT Pressure (Increase) ALTERNATE SUCCESS PATH JTA#: ANO2-RO-ECCS-NORM-10 KA VALUE RO: 3.5 SRO: 3.7 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
006 A1.13 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
006 A1.13 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: SIMULATOR: Perform LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 8 Minutes REFERENCE(S): OP 2104.001 EXAMINEE'S NAME: SSN: | ||
SIMULATOR: | EVALUATOR'S NAME: | ||
Perform | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
8 Minutes REFERENCE(S): | |||
OP 2104.001 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
JPM- ANO-2-JPM-NRC-SIT05 | JPM- ANO-2-JPM-NRC-SIT05 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall review the "Briefing Checklist - | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | JPM INITIAL TASK CONDITIONS: Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. | ||
JPM INITIAL TASK CONDITIONS: | |||
Safety Injection Tank (2T2A) level is between 80.1% and | |||
Pressure is approximately 606 psig. | Pressure is approximately 606 psig. | ||
TASK STANDARD: | TASK STANDARD: Safety Injection Tank (2T2A) pressure raised to 615 psig. Nitrogen Isolated to A SIT. | ||
Safety Injection Tank (2T2A) pressure raised to 615 psig. Nitrogen Isolated to | 2T2A pressure is < 700 psig. THIS IS AN ALTERNATE SUCCESS PATH JPM. | ||
2T2A pressure is < 700 psig. THIS IS AN ALTERNATE SUCCESS PATH JPM. | TASK PERFORMANCE AIDS: OP 2104.001 Section 11.0 SIMULATOR SETUP: Ensure A SIT pressure is ~606 psig and A SIT level is ~ 84%. Run CAE file JPM05. | ||
CAE file JPM05 will do the following: | |||
TASK PERFORMANCE AIDS: | |||
OP 2104.001 Section 11.0 | |||
SIMULATOR SETUP: | |||
Ensure | |||
CAE file JPM05 will do the following: | |||
Set trigger T5=PD4R5005 (trigger when 2SV-5005 red light energized) | Set trigger T5=PD4R5005 (trigger when 2SV-5005 red light energized) | ||
Set 2SV5005 to stick open (Hand switch for the valve faulty) (IMF CV5005_(5 0) 1.0 0 0.0) | Set 2SV5005 to stick open (Hand switch for the valve faulty) (IMF CV5005_(5 0) 1.0 0 0.0) | ||
JPM- ANO-2-JPM-NRC-SIT05 | JPM- ANO-2-JPM-NRC-SIT05 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs, "Raise Safety Injection Tank ( | The SM/CRS directs, "Raise Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0." | ||
2, 3, 6 START TIME: | CRITICAL ELEMENTS (C): 2, 3, 6 START TIME: | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | : 1. Verify nitrogen supply is Using the gaitronics, plant N/A SAT UNSAT aligned. telephone system, or radio; contacted Unit-1 OR contacted Examiners Cue: Unit-2 operator. | ||
: 1. Verify nitrogen supply is | Unit-1 (or Unit-2 operator) reports high pressure N2 is Requested alignment of high aligned. pressure N2. | ||
(C) 2. Open Supply Header to On panel 2C16, placed N/A SAT UNSAT Containment Isolation handswitch for 2CV-6207-2 to (2CV-6207-2). OPEN. | |||
Requested alignment of high pressure | Observed red light ON above handswitch. | ||
EXAMINER'S NOTE: | |||
On panel 2C16, placed handswitch for 2CV-6207-2 to OPEN. Observed red light ON above handswitch. | 2SV-5005A and B are both operated by handswitch for 2SV-5005. | ||
(C) 3. Open SIT N2 Supply valves On panel 2C33, placed N/A SAT UNSAT (2SV-5005A/B). handswitch 2SV-5005 for 2SV-5005A/B to OPEN. | |||
2SV-5005A and B are both operated by handswitch for 2SV-5005. (C) 3. Open SIT | |||
handswitch 2SV-5005 for 2SV-5005A/B to OPEN. | |||
Observed red light ON; green light OFF above handswitch. | Observed red light ON; green light OFF above handswitch. | ||
: 4. Verify SIT (2T2A) at desired Verified SIT (2T2A) pressure N/A SAT UNSAT pressure. between 615 and 620 psig. | |||
: 4. Verify SIT (2T2A) at desired | Observed SIT (2T2A) pressure on any of the following: | ||
Verified SIT (2T2A) pressure | |||
between 615 and 620 psig. | |||
Observed SIT (2T2A) pressure | |||
on any of the following: | |||
2PIS-5012 (2C17) 2PI-5013 (2C17) 2PIS-5011 (2C16) | 2PIS-5012 (2C17) 2PI-5013 (2C17) 2PIS-5011 (2C16) | ||
OR: | OR: | ||
Observed SIT (2T2A) pressure on PMS or SPDS computer points/trend for 2T2A pressure. | |||
JPM- ANO-2-JPM-NRC-SIT05 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 5. Close SIT N2 Supply valves On panel 2C33, placed hand N/A SAT UNSAT (2SV-5005A/B). switch 2SV-5005 for 2SV-5005A/B to CLOSE. | |||
: 5. Close SIT | |||
Observed green light OFF; red light ON above handswitch. | Observed green light OFF; red light ON above handswitch. | ||
Reports that valve hand switch | Reports that valve hand switch will not close the valve and SIT pressure is continuing to increase. | ||
EXAMINER'S NOTE: | |||
will not close the valve and SIT pressure is continuing to increase. | SIT high and high-high pressure alarms may come in. These will not influence the passing of the following step. If the operator does not isolate N2 from 2C16 and pressurizes the SIT to 700psig, the following step should be considered UNSAT. | ||
(C) 6. Close Supply Header to On panel 2C16, placed N/A SAT UNSAT Containment Isolation valve handswitch for 2CV-6207-2 to (2CV-6207-2). CLOSE. | |||
SIT high and high-high pressure alarms may come in. These will not influence the passing of the following step. If the operator does not isolate | Observed green light ON above handswitch. | ||
Isolated N2 from 2C16 with SIT pressure less than 700psig, | |||
Isolated | : 7. Isolate the nitrogen supply. Using the gaitronics, plant N/A SAT UNSAT telephone system, or radio; Examiners Cue: contacted Unit-1 OR contacted Unit-1 (or Unit-2 operator) Unit-2 operator. | ||
: 7. Isolate the nitrogen supply. | reports high pressure N2 is isolated. Requested isolation of high pressure N2. | ||
END STOP TIME: | |||
Using the gaitronics, plant telephone system, or radio; contacted Unit-1 OR contacted Unit-2 operator. | |||
Requested isolation of high | |||
pressure | |||
JPM- ANO-2-JPM-NRC-SIT05 | JPM- ANO-2-JPM-NRC-SIT05 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | ||
Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig. | Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP | The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0." | ||
JPM- ANO-2-JPM-NRC-SIT05 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
JPM- ANO-2-JPM-NRC-SIT05 | |||
Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig. | Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP | The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0." | ||
JPM- ANO-2-JPM-NRC-EOP03 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | |||
JPM- ANO-2-JPM-NRC-EOP03 PAGE | SYSTEM/DUTY AREA: Emergency Operating Procedures TASK: Verify Natural Circulation Conditions exist (ALTERNATE SUCCESS PATH) | ||
Emergency Operating Procedures TASK: Verify Natural Circulation | JTA#: | ||
JTA#: | KA VALUE RO: 4.3 SRO: 4.5 KA | ||
==REFERENCE:== | ==REFERENCE:== | ||
002 A4.02 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
002 A4.02 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: SIMULATOR: Perform LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): EOP 2202.006 Rev. 006-01-0 EXAMINEE'S NAME: SSN: | ||
SIMULATOR: | EVALUATOR'S NAME: | ||
Perform | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
10 Minutes REFERENCE(S): EOP 2202.006 Rev. 006-01-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
JPM- ANO-2-JPM-NRC-EOP03 | JPM- ANO-2-JPM-NRC-EOP03 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall review the "Briefing Checklist - | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | JPM INITIAL TASK CONDITIONS: A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW. | ||
JPM INITIAL TASK CONDITIONS: | |||
A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. | |||
Feed to | |||
RCS temperature dropped less than 500°F during transient and cooldown has been stopped per step 25. | RCS temperature dropped less than 500°F during transient and cooldown has been stopped per step 25. | ||
TASK STANDARD: | TASK STANDARD: Take required actions to restore Natural Circulation conditions per Loss of Feedwater procedure. THIS IS AN ALTERNATE SUCCESS PATH JPM. | ||
Take required actions to restore | TASK PERFORMANCE AIDS: EOP 2202.006 Step 26. | ||
THIS IS AN ALTERNATE SUCCESS PATH JPM. | SIMULATOR SETUP: Loss of feedwater in progress. SDBCS is in auto (setpoint ~ 1000 psia). | ||
TASK PERFORMANCE AIDS: | |||
EOP 2202.006 Step 26. | |||
SIMULATOR SETUP: | |||
Ensure that actions completed in EOP 2202.006 up to step 26 have been completed. RCS Tc < 500°F. | Ensure that actions completed in EOP 2202.006 up to step 26 have been completed. RCS Tc < 500°F. | ||
Ensure MTS on SPDS is less than 30°. All other steps in 26 are satisfied. PZR level ~ 40%. | Ensure MTS on SPDS is less than 30°. All other steps in 26 are satisfied. PZR level ~ 40%. | ||
All Backup Heater hand switches are in OFF. Both banks of proportional heaters have NOT been reset from PZR level heater cutout. Ensure SG levels are | All Backup Heater hand switches are in OFF. Both banks of proportional heaters have NOT been reset from PZR level heater cutout. Ensure SG levels are greater than 25% and levels are slowly restoring. | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | JPM- ANO-2-JPM-NRC-EOP03 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
: 1. Verify Loop T is Less than | The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26. | ||
CRITICAL ELEMENTS (C): 3, 5 START TIME: | |||
: 2. Verify RCS loop | PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
Using SPDS | : 1. Verify Loop T is Less than Using SPDS SFD Screen, PMS, N/A SAT UNSAT 50°F. PDS or 2C04 indications, determine Loop T to be less than 50°F. | ||
: 2. Verify RCS loop TH and TC Using SPDS SFD Screen, PMS, N/A SAT UNSAT constant or lowering. PDS or 2C04 indications, determine that RCS loop TH and TC are constant. | |||
(C) 3. Verify RCS MTS 30°F or Using SPDS SFD Screen, PMS, N/A SAT UNSAT greater. PDS or 2C04 indications, determine that RCS MTS is less than 30°F. | |||
: 4. Contingency column step 26.A, Using SPDS SFD Screen, PMS, N/A SAT UNSAT verify SG levels being PDS or 2C04 indications, maintained 10% to 90%. determine that Steam Generator levels are above 10% and less than 90%. | |||
(C) 5. Contingency column step 26.B, Refer to Attachment 1, P-T Limits N/A SAT UNSAT verify RCS pressure within limits and verify that MTS is less than of Attachment 1, P-T Limits. 30°F. | |||
Examiners note: Critical Take PZR Backup heaters out of element is that examinee OFF. Verify that red light ON recognizes that PZR pressure above hand switch(es). | |||
is LOW due to all heaters de- Take Proportional heaters hand energized and this is causing switches to ON. Verify that Red MTS problems. The number light is ON above associated of heaters re-energized is hand switch. | |||
discretionary. Verify P-T limits of Attachment 1 Candidate may consider a are restored. | |||
plant cooldown, but as CRS report that Tc should remain constant until system engineering completes analysis. | |||
JPM- ANO-2-JPM-NRC-EOP03 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 6. Verify T between TH and Using SPDS SFD Screen, PMS, N/A SAT UNSAT CETs less than 10°F. PDS or 2C04 indications, determine that T between TH and CETs is less than 10°F. | |||
END STOP TIME: | |||
Using SPDS | |||
JPM- ANO-2-JPM-NRC-EOP03 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | |||
A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW. RCS temperature dropped less than 500°F during transient and cooldown has been stopped per step 25. | |||
JPM- ANO-2-JPM-NRC-EOP03 | |||
A Loss of Feedwater is in progress. | |||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Verify Natural | The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26. | ||
JPM- ANO-2-JPM-NRC-EOP03 | JPM- ANO-2-JPM-NRC-EOP03 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | ||
A Loss of Feedwater is in progress. | A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW. RCS temperature dropped less than 500°F during transient and cooldown has been stopped per step 25. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Verify Natural | The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26. | ||
ANO-2-JPM-NRC-ELECXT PAGE | ANO-2-JPM-NRC-ELECXT PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
A. C. Electrical Distribution TASK: | SYSTEM/DUTY AREA: A. C. Electrical Distribution TASK: Perform Synchronized Cross Connect of 480 VAC load-centers 2B1 and 2B2 JTA#: ANO2-RO-480VAC-NORM-15 KA VALUE RO: 3.3 SRO: 3.1 KA | ||
==REFERENCE:== | ==REFERENCE:== | ||
062 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
062 A4.01 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: SIMULATOR: Perform LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP 2107.001 Revision 049-00-0 EXAMINEE'S NAME: SSN: | ||
SIMULATOR: | EVALUATOR'S NAME: | ||
Perform | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
10 Minutes REFERENCE(S): | |||
OP 2107.001 Revision 049-00-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
ANO-2-JPM-NRC-ELECXT PAGE | ANO-2-JPM-NRC-ELECXT PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | |||
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. | Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. | ||
TASK STANDARD: | TASK STANDARD: | ||
Cross connect 480VAC non- | Cross connect 480VAC non-vital busses 2B1 and 2B2 with 2B1 supplying and 2B2 supply breakers open. Maintain 2B1 amperage less than 130 amps. | ||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
OP 2107.001 Section 12.0. | OP 2107.001 Section 12.0. | ||
SIMULATOR SETUP: | SIMULATOR SETUP: | ||
Any | Any power level or mode. | ||
All Non-Vital 4160VAC and 480VAC Busses energized. | All Non-Vital 4160VAC and 480VAC Busses energized. | ||
Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2). | Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2). | ||
ANO-2-JPM-NRC-ELECXT PAGE | ANO-2-JPM-NRC-ELECXT PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs, "Cross Connect 2B1 and | The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0." | ||
CRITICAL ELEMENTS (C): 2, 3, 4, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
PERFORMANCE CHECKLIST | Examiners note: | ||
If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A. | If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A. | ||
: 1. Check that Operations Manager approval obtained. | : 1. Check that Operations Manager Ask if Operations Manager has N/A SAT UNSAT approval obtained. given approval to cross connect 2B1 and 2B2 at power. | ||
EXAMINERS CUE: | |||
The Operations Manager has given permission to perform Cross Connect of 2B1 and 2B2. | |||
Examiners note: | |||
The | The following two steps may be completed after cross-connecting the busses. The resolution on the meters is low at the low end. | ||
On Panel 2C10, summed the current reading of 2B1 and 2B2. | (C) 2. Determine combined load of On Panel 2C10, summed the N/A SAT UNSAT 2B1 an 2B2. current reading of 2B1 and 2B2. | ||
Observed that the summed load is greater than 130 amps. | Observed that the summed load is greater than 130 amps. | ||
(C) 3. Reduce loads on 2B1 and 2B2 Direct the AO or inform CRS of N/A SAT UNSAT so that combined loading is less need to reduce non-essential than 130 amps when cross loads on 2B1 and 2B2 so that connected. combined loading is less than EXAMINERS CUE: 130 amps. | |||
EXAMINERS CUE: | AO has been directed to secure non-essential loads on 2B1 and 2B2 to reduce loading on 2B1 and 2B2 to less than 130 amps. | ||
EXAMINERS NOTE: | EXAMINERS NOTE: | ||
Direct operator in simulator | Direct operator in simulator instructors station to reduce loading on 2B1 and 2B2 so that loading is less than 130 amps (use REMOTE malfunctions 480CURR2B1 and 480CURR2B2). | ||
ANO-2-JPM-NRC-ELECXT PAGE | ANO-2-JPM-NRC-ELECXT PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
(C) 4. Synchroscope switch inserted in On Panel 2C10, Placed N/A SAT UNSAT 2B1/2B2 cross-tie slot and Synchroscope switch into placed in ON. 2B1/2B2 cross-tie slot and rotated clockwise to the ON position. | |||
: 5. Observed that the On Panel 2C10, Observed that N/A SAT UNSAT Synchroscope is at the 12 the Synchroscope is at the 12 oclock position. oclock position with the Synchroscope switch in the ON position. | |||
: 5. Observed that the | (C) 6. Close the 2B1/2B2 Cross Tie On panel 2C10, rotate the Cross N/A SAT UNSAT breaker. Tie handswitch for 2B1/2B2 clockwise. | ||
On Panel 2C10, Observed that the Synchroscope is at the 12 | |||
Observed that the Green light turns OFF and the Red light turns ON above the Cross Tie handswitch. | Observed that the Green light turns OFF and the Red light turns ON above the Cross Tie handswitch. | ||
(C) 7. Open normal supply breaker on On Panel 2C10, rotate the N/A SAT UNSAT 2B2. normal feeder supply breaker on 2B2 counter clockwise to the AND open position. | |||
On Panel 2C10, rotate the normal feeder supply breaker on 2B2 counter clockwise to the open position. | Open Transformer feeder Observed that the RED light went breaker from 2A2 to 2B2. OFF and the GREEN light went ON. | ||
Observed that the RED light went OFF and the GREEN light went ON. On Panel 2C10, rotate the transformer feeder breaker on 2A2 to 2B2 counter clockwise to the open position. | On Panel 2C10, rotate the transformer feeder breaker on 2A2 to 2B2 counter clockwise to the open position. | ||
Observed that the RED light went OFF and the GREEN light went ON. | Observed that the RED light went OFF and the GREEN light went ON. | ||
: 8. Verify that the amperage | : 8. Verify that the amperage On panel 2C10, observe that the N/A SAT UNSAT indicated on 2B1 is less than current is less than 130 amps on 130 amps. 2B1. | ||
On panel 2C10, observe that the current is less than 130 amps on 2B1. | : 9. Turn sync switch to OFF. On Panel 2C10, turn sync switch N/A SAT UNSAT counter clockwise to the OFF position. | ||
: 9. Turn sync switch to OFF. | |||
On Panel 2C10, turn sync switch counter clockwise to the OFF position. | ANO-2-JPM-NRC-ELECXT PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
N/A | : 10. Notified AO to monitor 2B1 Notify AO to monitor 2B1 N/A SAT UNSAT transformer during cross transformer during cross connected operation and connected operation and maintain temperature less than maintain temperature less than 220°C. 220°C. | ||
EXAMINERS CUE: | |||
AO has been notified to monitor 2B1 transformer and notify the control room if temperature exceeds 220°C during cross connected operations. | |||
END | |||
ANO-2-JPM-NRC-ELECXT PAGE | ANO-2-JPM-NRC-ELECXT PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | ||
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. | Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0." | The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0." | ||
ANO-2-JPM-NRC-ELECXT PAGE | |||
ANO-2-JPM-NRC-ELECXT PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. | Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0." | The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0." | ||
ANO-2-JPM-NRC-BMSRM PAGE 1 OF 7 | |||
Process Radiation Monitoring System TASK: | ANO-2-JPM-NRC-BMSRM PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE: | ||
SYSTEM/DUTY AREA: Process Radiation Monitoring System TASK: Perform BMS Liquid Discharge Radiation Monitor Functional Check JTA#: ANO2WCOLRWBMSNORM21 KA VALUE RO: 3.6 SRO: 3.6 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
068 A3.02 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
068 A3.02 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: | PLANT SITE: Simulate SIMULATOR: LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 2104.014 Rev 034-00-0 EXAMINEE'S NAME: SSN: | ||
Simulate | EVALUATOR'S NAME: | ||
LAB: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
10 Minutes REFERENCE(S): | |||
2104.014 Rev 034-00-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
ANO-2-JPM-NRC-BMSRM PAGE 2 OF 7 | ANO-2-JPM-NRC-BMSRM PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee. | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
2T21A Liquid Radwaste Release Permit, 2104.014 | 2T21A Liquid Radwaste Release Permit, 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release. | ||
TASK STANDARD: | TASK STANDARD: | ||
Functional Test has been completed on 2RITS-2330. | Functional Test has been completed on 2RITS-2330. | ||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
2104.014 Supplement 1 EXAMINER'S NOTE: | 2104.014 Supplement 1 EXAMINER'S NOTE: | ||
ANO-2-JPM-NRC-BMSRM PAGE 3 OF 7 | ANO-2-JPM-NRC-BMSRM PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs, "Perform the | The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1." | ||
4, 6, 10, 11 PERFORMANCE CHECKLIST STANDARDS (Circle One) | CRITICAL ELEMENTS (C): 4, 6, 10, 11 PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 1. Direct WCO to verify 2P-53A/B Discharge to Circ Water Flume (2LRW-13) is closed. | : 1. Direct WCO to verify 2P-53A/B Directed the WCO to verify N/A SAT UNSAT Discharge to Circ Water Flume 2LRW-13 is closed. | ||
(2LRW-13) is closed. | |||
WCO reports 2LRW-13 is closed. | EXAMINERs CUE: | ||
WCO reports 2LRW-13 is closed. | |||
: 2. Direct WCO to verify 2P47A/B Discharge to Circ Water Flume (2BM-35) is closed. | : 2. Direct WCO to verify 2P47A/B Directed the WCO to verify N/A SAT UNSAT Discharge to Circ Water Flume 2BM-35 is closed. | ||
(2BM-35) is closed. | |||
WCO reports | EXAMINERs CUE: | ||
WCO reports 2BM-35 is closed. | |||
: 3. Direct WCO to verify 2F11/11A Disch to CW Flume (2LRW-24) is closed. | : 3. Direct WCO to verify 2F11/11A Directed the WCO to verify N/A SAT UNSAT Disch to CW Flume (2LRW-24) 2LRW-24 is closed. | ||
is closed. | |||
WCO reports | EXAMINERs CUE: | ||
WCO reports 2LRW-24 is closed. | |||
(C) 4. Hold 2RITS-2330 Selector On panel 2C25, held 2RITS-2330 N/A SAT UNSAT Switch in CHECK SOURCE. Selector Switch in CHECK SOURCE. | |||
EXAMINERs CUE: | |||
Switch in CHECK SOURCE. | Switch in CHECK SOURCE. | ||
On panel 2C25, | : 5. Verify 2RITS-2330 meter moves On panel 2C25, verified N/A SAT UNSAT up scale. 2RITS-2330 indication moved up scale. | ||
EXAMINERs CUE: | |||
Meter moved up scale. | Meter moved up scale. | ||
On panel 2C25, | (C) 6. Return 2RITS-2330 Selector On panel 2C25, placed N/A SAT UNSAT Switch to OPERATE. 2RITS-2330 Selector Switch to OPERATE. | ||
EXAMINERs CUE: | |||
Switch to OPERATE. | Switch to OPERATE. | ||
ANO-2-JPM-NRC-BMSRM PAGE 4 OF 7 | ANO-2-JPM-NRC-BMSRM PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One) | ||
: 7. Verify 2RITS-2330 meter reading returns to normal. | : 7. Verify 2RITS-2330 meter On panel 2C25, verified N/A SAT UNSAT reading returns to normal. 2RITS-2330 meter reading returned to original level. | ||
EXAMINERs CUE: | |||
Meter returns to normal. | Meter returns to normal. | ||
: 8. Direct WCO to open LRW/BMS Directed WCO to open N/A SAT UNSAT Discharge to Circ Water Flume 2CV-2330A. | |||
: 8. Direct WCO to open LRW/BMS Discharge to Circ Water Flume | |||
valve(s) (2CV-2330A). | valve(s) (2CV-2330A). | ||
EXAMINERs CUE: | |||
WCO reports 2CV-2330A is open | WCO reports 2CV-2330A is open. | ||
EXAMINER'S NOTE: | |||
Provide the following cue: | |||
EXAMINERs CUE: | EXAMINERs CUE: | ||
Setpoint from Prerelease Report = "3E3". | Setpoint from Prerelease Report = "3E3". | ||
: 9. Determine dial setting to be | : 9. Determine dial setting to be From Radiation Monitor Alarm N/A SAT UNSAT used from Radiation Monitor Setpoint Table determined that Alarm Setpoint Table using Prerelease Report setpoint of setpoint from Prerelease 3E3 equals dial setpoint of 4.78. | ||
Report. | |||
(C) 10. Release 2RE-2330 On panel 2C25, released 2RE- N/A SAT UNSAT potentiometer stop AND adjust 2330 potentiometer stop AND dial to setting of 4.78. adjusted dial setting of 4.78. | |||
Potentiometer dial setting is set at 4.78. Potentiometer is locked. On panel 2C25, | Locks potentiometer stop. | ||
N/A | EXAMINERs CUE: | ||
Potentiometer dial setting is set at 4.78. Potentiometer is locked. | |||
(C) 11. Place 2RE-2330 Selector On panel 2C25, placed N/A SAT UNSAT Switch in PULSE CAL. 2RE-2330 Selector Switch in PULSE CAL. | |||
EXAMINERs CUE: | |||
Switch in PULSE CAL. | Switch in PULSE CAL. | ||
: 12. Direct WCO to verify Directed WCO to verify N/A SAT UNSAT annunciator 2K14-B1 "LIQUID annunciator 2K14-B1 actuated on RADWASTE DISCHARGE 2C112. | |||
RADIATION HIGH" is actuated on Panel 2C112. | |||
EXAMINERs CUE: | |||
2K14-B1 is actuated. | |||
ANO-2-JPM-NRC-BMSRM PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 13. Verify annunciator 2K11-J9 On panel 2C14, verified 2K11-J9 N/A SAT UNSAT BORON MGMT SYS is actuated on Panel 2C14. | |||
TROUBLE" is actuated on Panel 2C14. | |||
EXAMINERs CUE: | |||
: 13. Verify annunciator 2K11-J9 BORON MGMT SYS TROUBLE" is actuated on Panel 2C14. | |||
2K11-J9 is actuated. | 2K11-J9 is actuated. | ||
On panel 2C14, verified | 14 Verify annunciator 2K11-C10 On panel 2C14, verified N/A SAT UNSAT "PROC LIQUID RADIATION 2K11-C10 is actuated on Panel HI/LO" is actuated on Panel 2C14. | ||
N/A | 2C14. | ||
EXAMINERs CUE: | |||
HI/LO" is actuated on Panel 2C14. | |||
2K11-C10 is actuated. | 2K11-C10 is actuated. | ||
15 Direct WCO to verify LRW/BMS Directed WCO to verify N/A SAT UNSAT Discharge to Circ Water Flume 2CV-2330A is closed. | |||
(2CV-2330A) is closed. | |||
WCO reports | EXAMINERs CUE: | ||
WCO reports 2CV-2330A is closed. | |||
High Alarm light OFF | 16 Reset 2RE-2330 and place in On panel 2C25, placed the N/A SAT UNSAT OPERATE. Operation Selector switch to RESET. | ||
Switch in OPERATE. | EXAMINERs CUE: | ||
High Alarm light OFF Observed High Alarm light OFF. | |||
Channel Test light OFF. | EXAMINERs CUE: Placed the Operation Selector Switch in OPERATE. switch to OPERATE. | ||
On panel | EXAMINERs CUE: Observed the Channel Test light Channel Test light OFF. OFF. | ||
17 Verify valve(s) tested have Directed WCO to verify 2CV-reopened. 2330A open. | |||
EXAMINERs CUE: | |||
WCO reports 2CV-2330A open. | |||
18 Check associated alarms clear. On panel 2C14, verified N/A SAT UNSAT 2K11-C10 and 2K11-J9 are in EXAMINERs CUE: "slow flash" OR NOT illuminated. | |||
2K11-C10, 2K11-J9 and Directed WCO to verify 2K14-B1 are in "slow flash". annunciator 2K14-B1 on 2C112 is in "slow flash" OR NOT illuminated. | |||
END | |||
ANO-2-JPM-NRC-BMSRM PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | |||
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release. | |||
INITIATING CUE: | |||
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1." | |||
ANO-2-JPM-NRC-BMSRM PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release. | |||
INITIATING CUE: | |||
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1." | |||
ANO-2-JPM-NRC-BMSRM PAGE 7 OF 7 JOB PERFORMANCE MEASURE | |||
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release. | |||
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with | |||
TASK: Restore SDC Flow following an instrument failure - inadvertent Auto-Closure Initiation (ACI) | JPM-ANO-2-JPM-NRC-EOP02 Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: | ||
JTA#: ANO2-RO-EOPAOP-OFFNORM KA VALUE | SYSTEM/DUTY AREA: Abnormal/Emergency Operations TASK: Restore SDC Flow following an instrument failure - inadvertent Auto-Closure Initiation (ACI) | ||
JTA#: ANO2-RO-EOPAOP-OFFNORM KA VALUE RO: 3.0 SRO: 3.1 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
016 A2.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
016 A2.01 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: X | PLANT SITE: SIMULATOR: Perform LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
X | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
BOTH: | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.029 EXAMINEE'S NAME: SSN: | ||
SIMULATOR: | EVALUATOR'S NAME: | ||
Perform | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
AOP 2203.029 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
JPM-ANO-2-JPM-NRC-EOP02 Page 2 of 7 JOB PERFORMANCE MEASURE | JPM-ANO-2-JPM-NRC-EOP02 Page 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee. | |||
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | |||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 | |||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
AOP 2203.029 has been entered due to 2PI-4623-2 failing | AOP 2203.029 has been entered due to 2PI-4623-2 failing High. SDC pump secured, fuse for 2PS-4623-2 removed, and Loss of SDC AOP, 2203.029, has been completed up to step 13.C. | ||
TASK STANDARD: | TASK STANDARD: Shutdown Cooling Flow has been restored per Loss of SDC AOP, 2203.029. | ||
TASK PERFORMANCE AIDS: Loss of SDC AOP, 2203.029 SIMULATOR SETUP: | |||
Mode 5, SDC aligned for the A LPSI Pump through the A SDC Heat Exchanger. | |||
2P-60 A & B secured, All LPSI Injection MOVs are OPEN, and 2CV-5086-2 is CLOSED. | |||
ACI actuation is clear due to de-energizing 2PS-4623-2 by fuse removal. | |||
JPM-ANO-2-JPM-NRC-EOP02 Page 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE: | |||
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C." | |||
CRITICAL ELEMENTS (C): 2, 6, 9,10 PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 1. Verify SDC RCS isolation On panels 2C16 and 2C17, N/A SAT UNSAT valves open. checked indications for: | |||
- 2CV-5038-1 | |||
- 2CV-5084-1 | |||
- 2CV-5086-2 Observed 2CV-5086-2 closed by green light ON, red light OFF above hand switch. | |||
(C) 2. Determine that 2CV-5086-2 is On panel 2C16, placed hand N/A SAT UNSAT shut due to the Auto-Closure switch for 2CV-5086-2 to Initiation (ACI) and Open 2CV- "OPEN". | |||
5086-2. | |||
Observed red light ON; green light OFF above hand switch. | |||
: 3. Verify RAS has not actuated. On panel 2C03, verified Alarms N/A SAT UNSAT cleared on Annunciator panels 2K04 and 2K07 or verified red lights ON at 2C03 above the RAS placard. | |||
: 4. Verify RCS indicators Requests that CRS verify OP N/A SAT UNSAT functioning properly using 2103.011 Attachment M is OP 2103.011. complete. | |||
EXAMINERs CUE: CRS reports that OP 2103.011 attachment M, RCS level transmitter and tygon tube alignment has been completed and all RCS level indicators are functioning properly. | |||
JPM-ANO-2-JPM-NRC-EOP02 | JPM-ANO-2-JPM-NRC-EOP02 Page 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 5. Check SDC pump running. On 2C17, determined That no N/A SAT UNSAT SDC pumps are running. | |||
: 5. Check SDC pump running. | |||
On 2C17, determined That no SDC pumps are running. | |||
Observed 2C-16 and 2C-17 that 2P-60 A & B were secured. | Observed 2C-16 and 2C-17 that 2P-60 A & B were secured. | ||
Observed green light ON; red light OFF above hand switches. | Observed green light ON; red light OFF above hand switches. | ||
(C) 6. Close ALL LPSI Injection On 2C16 & 17, placed hand N/A SAT UNSAT MOVs. switches for Safety Injection MOVs to CLOSE". | |||
POSITIVE CUE: | |||
Green lights ON; red lights 2CV-5017-1 OFF. 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green light ON; red light OFF above Hand switch for all valves. | |||
: 7. Partially open ONE LPSI On 2C-16 or 17, held 1 LPSI N/A SAT UNSAT Injection. Injection MOV hand switch in the open direction for about 2 second. | |||
2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green light ON; red light OFF above Hand switch for all valves. | 2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green and red light ON above associated hand switch. | ||
: 8. Verify RCS level adequate; Referred to Attachment A N/A SAT UNSAT refer to Attachment A, RCS and verified RCS Level Level. adequate for SDC Pump restart. | |||
: 7. Partially open ONE LPSI | NOTE: | ||
On 2C-16 or 17, held 1 LPSI Injection MOV hand switch in the open direction for about 2 second. 2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green and red light ON above associated hand switch. | If 2CV-5091 is not in Automatic, the candidate may have to transverse from 2C-16 & 17 back to 2C-04 multiple times to control flow. 2CV-5091 should be monitored to ensure that it has control of flow when placed in automatic. | ||
: 8. Verify RCS level adequate; refer to Attachment A, RCS | |||
JPM-ANO-2-JPM-NRC-EOP02 Page 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 9. Start SDC pump, refer to 2104.004, Shutdown Cooling | JPM-ANO-2-JPM-NRC-EOP02 Page 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
(C) 9. Start SDC pump, refer to On 2C17 placed hand switch N/A SAT UNSAT 2104.004, Shutdown Cooling for 2P-60A to "START". | |||
System. | |||
Observed red light ON; green light OFF above hand switch. | Observed red light ON; green light OFF above hand switch. | ||
(C) 10. Raise SDC flow to greater On 2C-16 & 17 placed hand- N/A SAT UNSAT than 2400 gpm by opening switches for Safety Injection LPSI Injection MOVs. MOVs to OPEN) as necessary to achieve > 2400 gpm flow. | |||
On 2C-16 & 17 placed hand-switches for Safety Injection MOVs to | 2FIC-5091 indicates > 2400 gpm. | ||
2FIC-5091 indicates > 2400 | Examiners note: Inform candidate that the CRS and CBOR will control RCS cool down. | ||
END | |||
JPM-ANO-2-JPM-NRC-EOP02 Page 6 of 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS: | |||
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to step 13.C. | |||
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing | |||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C." | The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C." | ||
JPM-ANO-2-JPM-NRC-EOP02 Page 7 of 7 JOB PERFORMANCE MEASURE | |||
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing | JPM-ANO-2-JPM-NRC-EOP02 Page 7 of 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | ||
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to step 13.C. | |||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C." | The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C." | ||
JPM-ANO-2-JPM-NRC-EFWRS PAGE 1 | |||
JPM-ANO-2-JPM-NRC-EFWRS PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 014 DATE: | |||
SYSTEM/DUTY AREA: Emergency Feedwater System TASK: Reset the EFW pump trip throttle valve JTA#: ANO2AOEFWEMERG1 KA VALUE RO: 3.4 SRO: 3.8 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
061 A2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH: | |||
061 A2.04 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: X | PLANT SITE: Simulate SIMULATOR: LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
OUTSIDE CR: | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
X | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 14 Minutes REFERENCE(S): OP 2106.006 Rev 055-04-0 EXAMINEE'S NAME: SSN: | ||
Simulate | EVALUATOR'S NAME: | ||
LAB: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
14 Minutes REFERENCE(S): | |||
OP 2106.006 Rev 055-04-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
JPM-ANO-2-JPM-NRC-EFWRS PAGE | JPM-ANO-2-JPM-NRC-EFWRS PAGE 2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
: 1. EFW pump (2P7A) started automatically following a reactor trip. | : 1. EFW pump (2P7A) started automatically following a reactor trip. | ||
: 2. During the speed ramp the Turbine for 2P-7A tripped on overspeed. | : 2. During the speed ramp the Turbine for 2P-7A tripped on overspeed. | ||
TASK STANDARD: | TASK STANDARD: The trip throttle valve for EFW pump(2P7A) has been reset and is open. | ||
The trip throttle valve for EFW pump(2P7A) has been reset and is open. | TASK PERFORMANCE AIDS: OP 2106.006 Exhibit 1 and Exhibit 2 | ||
TASK PERFORMANCE AIDS: | |||
OP 2106.006 Exhibit 1 and Exhibit 2 | |||
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Position the latch lever to engage the trip hook. | JPM-ANO-2-JPM-NRC-EFWRS PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1 starting with step 2.0. | |||
CRITICAL ELEMENTS (C): 1, 2, 3, 5 START TIME: | |||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
(C) 1. Position the latch lever to Turned the trip throttle valve N/A SAT UNSAT engage the trip hook. handwheel clockwise so that the rotation of the screw raised the sliding nut and latch lever to EXAMINERS CUE: where it could engage with the trip hook. | |||
Latch lever positioned to engage with the trip hook. | Latch lever positioned to engage with the trip hook. | ||
Observed latch lever positioned to engage with the trip hook. | |||
EXAMINERs NOTE: This linkage and the indications for steps 2, 3, and 4 are underneath a walkway. Have the examinee point to the lever and tappet then discuss actions using Exhibit 2 located on the wall in the A emergency feed-water pump room. | |||
(C) 2. Reset the mechanical trip Locally manually, pulled the N/A SAT UNSAT linkage manually. spring loaded emergency connecting rod against the spring EXAMINERS CUE: | |||
force. | |||
engage with the trip hook. | |||
This linkage and the indications for steps 2, 3, and 4 are underneath a walkway. Have the examinee point to the lever and tappet then discuss | |||
Mechanical trip linkage is in TRIP RESET. | Mechanical trip linkage is in TRIP RESET. | ||
Moved the emergency head lever away from the emergency tappet and tappet nut to allow tappet to move downward to TRIP RESET. | |||
JPM-ANO-2-JPM-NRC-EFWRS PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
(C) 3. Verify emergency tappet is in Verified the tappet is in TRIP N/A SAT UNSAT TRIP RESET. RESET. | |||
OR EXAMINERS CUE: Pressed downward on the emergency tappet to place it in The tappet is in TRIP RESET. | |||
The tappet is in TRIP RESET. | TRIP RESET and; EXAMINERs Note: | ||
Submitted a Condition Report The emergency tappet is located on the turbine not the trip throttle valve. Failure to ensure this is in the TRIP RESET position might defeat the O/S trip device. | |||
Verified the | : 4. Verify tappet nut/emergency Verified the flat side of the tappet N/A SAT UNSAT head lever positioning. nut is to the flat side of the emergency head lever. | ||
EXAMINERS CUE: | |||
The flat side of the tappet nut is to the flat side of the emergency head lever. | The flat side of the tappet nut is to the flat side of the emergency head lever. | ||
(C) 5. Open the trip throttle valve. With latch and trip hook engaged, N/A SAT UNSAT turned trip throttle valve handwheel CCW until valve was EXAMINERS CUE: full open. | |||
The trip throttle valve is fully open. | |||
Observed stem at full travel. | Observed stem at full travel. | ||
: 6. Close trip throttle valve 1/4 turn. Turned the trip throttle valve N/A SAT UNSAT handwheel Counter clockwise 1/4 turn. | |||
: 6. Close trip throttle valve 1/4 turn. | EXAMINERS CUE: | ||
The trip throttle valve is closed 1/4 turn. | The trip throttle valve is closed 1/4 turn. | ||
: 7. Verify 2P7A turbine overspeed Contacted the control room to N/A SAT UNSAT trip (2K05-A9) alarm is clear determine 2K05-A9 alarm status. | |||
EXAMINERS CUE: | |||
The control room reports 2K05-A9 is clear. | The control room reports 2K05-A9 is clear. | ||
END STOP TIME: | |||
JPM-ANO-2-JPM-NRC-EFWRS PAGE | JPM-ANO-2-JPM-NRC-EFWRS PAGE 5 of 6 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS: | ||
* EFW pump (2P7A) started automatically following a reactor trip. | |||
INITIATING CUE | * During the speed ramp the Turbine for 2P-7A tripped on overspeed. | ||
INITIATING CUE: | |||
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1 starting with step 2.0. | |||
JPM-ANO-2-JPM-NRC-EFWRS PAGE | JPM-ANO-2-JPM-NRC-EFWRS PAGE 6 of 6 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS: | ||
* EFW pump (2P7A) started automatically following a reactor trip. | |||
INITIATING CUE | * During the speed ramp the Turbine for 2P-7A tripped on overspeed. | ||
INITIATING CUE: | |||
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1 starting with step 2.0. | |||
JPM-ANO-2-JPM-NRC-IA01 | JPM-ANO-2-JPM-NRC-IA01 PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE: | ||
JTA#: ANO2-A0-EP-PAOP-OFFNORM-127 KA VALUE | SYSTEM/DUTY AREA: Emergency & Abnormal Operations TASK: Isolate the instrument air supply to the MSIVs (locally) | ||
JTA#: ANO2-A0-EP-PAOP-OFFNORM-127 KA VALUE RO: 3.1 SRO: 4.3 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
067 AA2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH: | |||
067 AA2.04 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: X | PLANT SITE: Simulate SIMULATOR: LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
OUTSIDE CR: | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
X | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2203.049, Rev. 001-01-0 EXAMINEE'S NAME: SSN: | ||
Simulate | EVALUATOR'S NAME: | ||
LAB: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2203.049, Rev. 001-01-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
JPM-ANO-2-JPM-NRC-IA01 | JPM-ANO-2-JPM-NRC-IA01 PAGE 2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). | ||
A severe fire has occurred in | |||
Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown. | Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown. | ||
TASK STANDARD: | TASK STANDARD: Main Turbine Generator has been locally tripped and Instrument air has been isolated and air bled off the MSIVs. | ||
Main Turbine Generator has been locally tripped and Instrument air has been isolated and air bled off the | |||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
: 1) OP 2203.049 EOP actions for Corridor Behind Door 340 (Zone 2109-U) pages 1-3 (page 31 of 91). | : 1) OP 2203.049 EOP actions for Corridor Behind Door 340 (Zone 2109-U) pages 1-3 (page 31 of 91). | ||
: 2) Flashlight and gloves | : 2) Flashlight and gloves | ||
: 3) RWP and dosimeter. | : 3) RWP and dosimeter. | ||
JPM-ANO-2-JPM-NRC-IA01 | JPM-ANO-2-JPM-NRC-IA01 PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs, | The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally beginning with step 3. | ||
to trip the main turbine generator locally and close the | CRITICAL ELEMENTS (C): 3, 4, 6, 7 START TIME: | ||
CRITICAL ELEMENTS (C): | PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
EXAMINERs NOTE: Access to platform in MSIV room requires an RWP. To save time, the examinee should be prompted to obtain dosimeter and log onto the RWP and task for outside controlled access before starting JPM. Also a flashlight will be needed. | |||
: 1. Locally trip the Main Turbine At the north end of the Main Turbine N/A SAT UNSAT at the front standard, located the red handle and simulates pulling the EXAMINERS CUE: handle. | |||
Main Turbine is tripped. | |||
EXAMINERS NOTE: | |||
All valves are located in the MSIV room on the first platform above 2T-91. | |||
Leather Gloves will be needed for climbing ladder to platform. | |||
Care should be taken around the MSIVs to prevent bumping into valves. | |||
: 2. Close the IA supply from 2T91 At the A MSIV actuator, closed N/A SAT UNSAT 2F-356 I/N valve (2MS-540) 2MS-540 by rotating hand wheel CLOCKWISE. | |||
EXAMINERS CUE: | |||
2MS-540 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed (C) 3. Close IA supply IA to Just south of the A MSIV actuator, N/A SAT UNSAT 2CV-1010-1 valve (2IA-166) closed 2IA-166 by rotating its hand wheel CLOCKWISE. | |||
EXAMINERS CUE: | |||
2IA-166 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed (C) 4. Open filter vent valve on A At the A MSIV actuator, opened N/A SAT UNSAT MSIV point of use air filter 2F-356 vent valve by turning the (2F-356). petcock valve until air escapes. | |||
EXAMINERS CUE: Observed valve motion stopped when Air bleeds off the actuator system valve fully open. | |||
and dies away. The A MSIV is slowly closing. | |||
JPM-ANO-2-JPM-NRC-IA01 PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
: 5. Close IA supply from 2T91 At the B MSIV actuator, closed N/A SAT UNSAT 2F-357 I/N valve, (2MS-539) 2MS-539 by rotating hand wheel CLOCKWISE. | |||
EXAMINERS CUE: | |||
2MS-539 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed. | |||
(C) 6. Close IA supply 2CV-1060-2 AIR Just south of the A MSIV actuator, N/A SAT UNSAT ISOL valve, (2IA-93) closed 2IA-93 by rotating its handwheel CLOCKWISE. | |||
EXAMINERS CUE: | |||
2IA-93 valve CLOCKWISE motio Observed valve motion stopped when n stops. valve fully closed. | |||
(C) 7. Open filter vent on MSIV IA At the B MSIV actuator, opened N/A SAT UNSAT FILTER 2CV-1060-2 AIR 2F-357 vent valve by turning the CONTROL VLV valve (2F-357) petcock valve until air escapes. | |||
(Valve on B MSIV point of use . | |||
air filter (2F-357)) | |||
Observed valve motion stopped when EXAMINERS CUE: valve fully open Air bleeds off the actuator system and dies away. The B MSIV is slowly closing. | |||
Examiners Note: The next step is to locally secure the main feed pumps located in the basement of the turbine building. Stop the JPM before transitioning to this area. | |||
END STOP TIME: ___________________ | |||
: 5. Close IA supply from 2T91 | |||
2MS-539 | |||
Observed valve motion stopped when valve fully closed. | |||
Observed valve motion stopped when valve fully closed. | |||
Air bleeds off the actuator system and dies away. The | |||
END | |||
___________________ | |||
JPM-ANO-2-JPM-NRC-IA01 | JPM-ANO-2-JPM-NRC-IA01 PAGE 5 of 6 JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL CONDITIONS: | ||
A severe fire has occurred in the | A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, | The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally beginning with step 3. | ||
JPM-ANO-2-JPM-NRC-IA01 | JPM-ANO-2-JPM-NRC-IA01 PAGE 6 of 6 JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL CONDITIONS: | ||
A severe fire has occurred in the | A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, | The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally beginning with step 3. | ||
JPM- | JPM- ANO-2-JPM-RO-XTCEA PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 02 DATE: | ||
SYSTEM/DUTY AREA: Control Element Drive Mechanism Control System TASK: Perform CEA#1 Upper Gripper Coil Temperature Measurement JTA#: ANO2-RO-CEDM-NORM-10 KA VALUE RO: 3.7 SRO: 3.9 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
001 A2.14 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH: | |||
001 A2.14 APPROVED FOR ADMINISTRATION TO: | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
RO: X | PLANT SITE: Simulate SIMULATOR: LAB: | ||
INSIDE CR: | POSITION EVALUATED: RO: SRO: | ||
OUTSIDE CR: | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: | ||
X | TESTING METHOD: SIMULATE: PERFORM: | ||
PLANT SITE: | APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2105.009, Rev. 021-01-0 EXAMINEE'S NAME: SSN: | ||
Simulate | EVALUATOR'S NAME: | ||
LAB: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
RO: | SATISFACTORY: UNSATISFACTORY: | ||
SIMULATOR: | |||
PLANT SITE: | |||
LAB: | |||
SIMULATE: | |||
PERFORM: | |||
15 Minutes REFERENCE(S): | |||
OP 2105.009, Rev. 021-01-0 EXAMINEE'S NAME: | |||
SSN: | |||
THE EXAMINEE'S PERFORMANCE | |||
SATISFACTORY: | |||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED: | Start Time Stop Time Total Time SIGNED: DATE: | ||
AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
JPM- | JPM- ANO-2-JPM-RO-XTCEA PAGE 2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
: 1. Plant is at full power. 2. Both Main Chillers have tripped and cannot be started. 3. I&C is not available to obtain CEDM Coil temperatures. 4. OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm. | : 1. Plant is at full power. | ||
: 2. Both Main Chillers have tripped and cannot be started. | |||
: 3. I&C is not available to obtain CEDM Coil temperatures. | |||
: 4. OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm. | |||
TASK STANDARD: | TASK STANDARD: | ||
CEA 01 Upper Gripper coil temperature has been measured and determined to be 360 - | CEA 01 Upper Gripper coil temperature has been measured and determined to be 360 - 367oF using Exhibit 2 in 2105.009 (CEDM Control System Operation). | ||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
: 1. OP 2105.009 Exhibit 2 2. Digital Voltmeter (DVM) 3. 2OPG-012 for DVM usage. | : 1. OP 2105.009 Exhibit 2 | ||
: 2. Digital Voltmeter (DVM) | |||
: 3. 2OPG-012 for DVM usage. | |||
: 4. Calculator. | : 4. Calculator. | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | JPM- ANO-2-JPM-RO-XTCEA PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
The SM/CRS directs, As directed by OP 2203012M, 2K13-C4, CEDM Cooling coils Water Flow Low ACA, measure the Upper Gripper temperature for CEA 01 using 2105.009, Exhibit 2. | |||
CRITICAL ELEMENTS (C): 3, 4, 6, 7 & 8 START TIME: | |||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
EXAMINERS NOTE: | EXAMINERS NOTE: | ||
2OPG-12 contains guidance for using a Digital Volt Meter. | 2OPG-12 contains guidance for using a Digital Volt Meter. | ||
: 1. Obtain a currently calibrated handheld Digital Voltmeter (DVM). | : 1. Obtain a currently calibrated Obtained a currently calibrated N/A SAT UNSAT handheld Digital Voltmeter handheld Digital Voltmeter (DVM). (DVM). | ||
EXAMINERS NOTE: | |||
Hand examinee DVM. | Hand examinee DVM. | ||
EXAMINERs Note: The Hold Bus and 2C72 is in the CEDMCS Room located above the control room. No panel doors are allowed to be opened. Use the photographs provided for cables in back of 2C72 and coil monitor connector on the front of 2C72. | |||
The Hold Bus and 2C72 is in the CEDMCS Room located above the control room. No panel doors are allowed to be opened. Use the | : 2. Verify CEA 01 is NOT on the Verified that the Subgroup N/A SAT UNSAT Hold Bus. Maintenance toggle switch for CEA Subgroup 12 is pointing down. Red light is OUT above EXAMINERS CUE: toggle switch. | ||
: 2. Verify CEA 01 is NOT on the Hold Bus. | |||
The Subgroup Maintenance toggle switch for subgroup 12 is pointing down and RED light is OUT above the toggle switch. | The Subgroup Maintenance toggle switch for subgroup 12 is pointing down and RED light is OUT above the toggle switch. | ||
EXAMINERs NOTE: When examinee identifies panel to be opened in back of 2C72, give examinee picture of cables in back of 2C72 to complete next step. | |||
(C) 3. Obtain CEA 01 upper gripper AT back of panel 2C-72, CEA #1 N/A SAT UNSAT coil voltage. power cables on TBC4C6 have been located. | |||
EXAMINERS CUE: | |||
Selected DVM scale on 200 and CEA 01 upper gripper voltage recorded the voltage across the is 44 VDC. | |||
black and white cables located on TBC4C6, terminals #4 and | |||
#5. | |||
AT back of panel 2C-72, CEA #1 | Recorded 44 VDC in Step 3.2. | ||
power cables on TBC4C6 have been located. | |||
Selected DVM scale on 200 and recorded the voltage across the | |||
#5. Recorded 44 VDC in Step 3.2. | |||
connector cap. | JPM- ANO-2-JPM-RO-XTCEA PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
Selected the 200 mV scale on | EXAMINERs NOTE: When examinee identifies Connector for CEA #1 on front of 2C72, give examinee picture of connector to perform next step. | ||
(C) 4. Obtain CEA #01 Upper Gripper Located the CEA #01 coil monitor N/A SAT UNSAT shunt voltage (Vshunt). connector on the front side of 2C72. | |||
the DVM and measured the voltage across pins | Unscrewed and removed the connector cap. | ||
Divided 7.62 millivolts by 1000 and recorded .00762V in step 4.3.1. | EXAMINERS CUE: | ||
: 5. Install connector cap. | Selected the 200 mV scale on CEA 01 Upper Gripper shunt the DVM and measured the voltage reads 7.62 millivolts DC. voltage across pins C and D. | ||
Divided 7.62 millivolts by 1000 and recorded .00762V in step 4.3.1. | |||
: 5. Install connector cap. Installed the connector cap back N/A SAT UNSAT on CEA #01 coil monitor connector. | |||
EXAMINERS CUE: | |||
Connector cap is installed. | Connector cap is installed. | ||
(C) 6. Calculate coil current (Icoil). Calculated coil current by N/A SAT UNSAT dividing Shunt voltage by .002. | |||
EXAMINERS CUE: | |||
Recorded 3.81 amps in step 5.2. | Recorded 3.81 amps in step 5.2. | ||
None (C) 7. Calculate coil resistance Calculated coil resistance by N/A SAT UNSAT (Rcoil). dividing Upper Gripper voltage by Upper Gripper current. | |||
Divided 44 VDC by 3.81 amps EXAMINERS CUE: | |||
Divided 44 VDC by 3.81 amps | and recorded 11.55 ohms in None step 6.1 Subtracted .525 from 11.55 and recorded ~11.02 ohms in step 6.3. | ||
(C) 8. Obtain CEA #01 coil Obtained the coil temperature N/A SAT UNSAT temperature. for the CEA #01 Upper Gripper by using the coil resistance from step 6.3 and using the chart. | |||
and recorded 11.55 ohms in step 6.1 Subtracted .525 from 11.55 and | EXAMINERS CUE: | ||
Using the chart in step 7.1 None calculated a coil temperature between 360 oF and 367 oF. | |||
recorded ~11.02 ohms in step 6.3. | END STOP TIME: | ||
Using the chart in step 7.1 | |||
calculated a coil temperature between 360 | |||
JPM- | JPM- ANO-2-JPM-RO-XTCEA PAGE 5 of 6 JOB PERFORMANCE MEASURE EXAMINERs COPY JPM INITIAL TASK CONDITIONS: | ||
Plant is at full power. Both Main Chillers have tripped and cannot be started. I&C is not available to obtain CEDM Coil temperatures. OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm. | * Plant is at full power. | ||
* Both Main Chillers have tripped and cannot be started. | |||
* I&C is not available to obtain CEDM Coil temperatures. | |||
* OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm. | |||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, | The SM/CRS directs, As directed by OP 2203012M, 2K13-C4, CEDM Cooling coils Water Flow Low ACA, measure the Upper Gripper temperature for CEA 01 using 2105.009, Exhibit 2. | ||
JPM- | JPM- ANO-2-JPM-RO-XTCEA PAGE 6 of 6 JOB PERFORMANCE MEASURE EXAMINEEs COPY JPM INITIAL TASK CONDITIONS: | ||
Plant is at full power. Both Main Chillers have tripped and cannot be started. I&C is not available to obtain CEDM Coil temperatures. OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm. | * Plant is at full power. | ||
* Both Main Chillers have tripped and cannot be started. | |||
* I&C is not available to obtain CEDM Coil temperatures. | |||
* OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm. | |||
INITIATING CUE: | INITIATING CUE: | ||
The SM/CRS directs, | The SM/CRS directs, As directed by OP 2203012M, 2K13-C4, CEDM Cooling coils Water Flow Low ACA, measure the Upper Gripper temperature for CEA 01 using 2105.009, Exhibit 2. | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Facility: ANO-2 Scenario No.: 1 Op-Test No.: 2005-1 Page 1 Examiners: Operators: | ||
Initial | Initial Conditions: | ||
56% MOL, All Engineered Safety Features (ESF) systems in standby. Condenser outer water box is isolated for tube plugging. B circulating water pump is secured. | |||
Green Train Maintenance Week. | |||
Turnover: | Turnover: | ||
56%. 250 EFPD. | 56%. 250 EFPD. Condenser outer water box is isolated for tube plugging. Estimated time to complete repairs is 12 hours. B circulating water pump is secured. Equipment Out of Service Monitor (EOOS) indicates Minimal Risk. Green Train Maintenance Week. | ||
Event Malf. No. Event Event No. Type* Description 1 NIALINEPWR I (CBOT) Safety channel linear power channel A fails low. | |||
CBOT must bypass points in Plant Protection System (PPS) channel. | |||
Event Type* | 2 CVC2P36AFAL C (CBOR) Running charging pump trips breaker. Abnormal Operating Procedures (AOP) entry start standby charging pump. | ||
2 | 3 SGATUBE R(CBOR) A Steam Generator (SG) tube leak results in N(CBOT) power reduction to take unit off line. | ||
4 SGATUBE M(ALL) A Steam Generator tube rupture results in reactor trip and Reactor Coolant System (RCS) cool down. | |||
4 | 5 4162A406 C (CBOT) B High Pressure Safety Injection (HPSI) pump trips breaker on start. | ||
5 | 6 2CV50151 C (CBOT) A HPSI train injection Motor Operated Valve (MOV) fails to open on actuation. | ||
6 | 7 BUHTRS C(CBOR) Back up Heaters fail on due to relay failure and will not shut off when Pressurizer level drops less than set point. | ||
* | * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 16 | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Scenario #1 Objectives | ||
: 1) Evaluate individual | : 1) Evaluate individual response to a failure of an Excore nuclear instrument. | ||
: 2) Evaluate individual | : 2) Evaluate individual response to a failure of a running charging pump. | ||
: | : 3) Evaluate individual response to a small Pri-Sec leak. | ||
: 4) Evaluate individual ability to perform a reduction in plant power. | : 4) Evaluate individual ability to perform a reduction in plant power. | ||
: 5) Evaluate individual | : 5) Evaluate individual ability to mitigate a SGTR. | ||
: 6) Evaluate individual ability to monitor operation of ESF equipment. | : 6) Evaluate individual ability to monitor operation of ESF equipment. | ||
: 7) Evaluate individual | : 7) Evaluate individual response to a failure of the PZR heaters. | ||
power steady state. | SCENARIO #1 NARRATIVE Simulator session begins with the plant at 56% power steady state. B circulating water pump is secured and the outer main condenser water boxes are tagged out. | ||
When the crew has completed their control | When the crew has completed their control room walk down and brief, A Excore will fail low. This will result in a CPC sensor failure alarm and the NI linear and log power instruments on A channel failing to Zero. The CRS will enter the Nuclear Instrument Malfunction AOP, AOP 2203.026. The CRS will direct the CBOT to bypass points 1, 2, 3, and 4 on A PPS. TS 3.3.1.1 will be entered due to the excore failure. | ||
The CRS will enter the Nuclear Instrument Malfunction AOP, AOP 2203.026. The CRS will | About 10 minutes after the excore failure, the A CCP will trip its breaker. A CCP low flow alarm will alert the operator that the CCP has tripped. If another pump is not started quickly, letdown will be isolated due to high regenerative heat exchanger outlet temperature high (alarm).The CRS will enter the loss of charging AOP, OP 2203.036, Crew will verify that the breaker tripped; then start a backup CCP. The CBOR will assess the proper operation of the pump, PZR level and letdown flow. | ||
10 minutes after the CCP trips, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The CRS will isolate steam to A EFW pump from A SG and enter TS 3.7.1.2. Crew will perform a plant shutdown. | |||
10 minutes after the | When cued by the lead evaluator after the CBOR has completed the required reactivity manipulation, a 500 gpm SGTR on A SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR recognize that the SGTR is greater than CCP capacity. The CRS will direct the CBOR will manually trip the reactor. | ||
When cued by the lead evaluator after the | Post trip, the PZR backup heaters will fail to de-energize when PZR level drops below 29%, the CBOR will manually secure the heaters. | ||
Post trip, the PZR | Post SIAS, the B HPSI pump Breaker will trip (green train) and one of the red train HPSI injection MOVs will fail to open on actuation. The CBOT will manually start the swing HPSI pump and open the failed injection MOV. This is Tech Spec 3.0.3 entry. | ||
Post SIAS, the | |||
The CBOT will | |||
This is Tech Spec 3.0.3 entry. | |||
Page 2 of 16 | Page 2 of 16 | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 SCENARIO #1 NARRATIVE (continued) | ||
The Crew will | The Crew will implement SPTAs and secure 2 RCPs when RCS pressure drops below 1400 psia. The CRS will diagnose a SGTR and enter EOP 2202.004, SGTR. | ||
The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to the | The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the A SG using standard attachment 10 when RCS Thot is less than 535°F. | ||
Page 3 of 16 | Page 3 of 16 | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Simulator Instructions for Scenario 1 Reset simulator to MOL 56% power IC stead state. | ||
Markup OP 2102.004, power operations up to step 9.22. | |||
80%. Place MINIMAL RISK | Ensure that AACG is secured and annunciators clear. | ||
Ensure hotwell level is ~80%. | |||
Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11. | |||
Swing ESF equipment aligned to the Green train. | |||
A CCP lead charging pump. | |||
2PCV0231, Gland sealing steam pressure control valve failed closed. | |||
T1, T2, T3, T5 set to false. | T1, T2, T3, T5 set to false. | ||
T4 set to | T4 set to SIAS1. | ||
Value/ Ramp Time | T5 set to PZR Pressure < 2000 psia Event Malf. No. Value/ Event No. Ramp Description Time 1 NIALINEPWR 0.0 Safety Channel A Excore Linear instrument fails Trigger = T1 LOW. | ||
3 | 2 CVC2P36AFAL TRUE A Coolant Charging Pump trips on instantaneous Trigger = T2 Over Current due to motor fault. | ||
4 | 3 SGATUBE 5.0 A SG primary-secondary leak. | ||
Trigger = T3 4 SGATUBE 500 A Steam Generator Tube Rupture (500 gpm ramped CUED RAMP= over 10 Minutes). | |||
7 | 10 MIN 5 4162A406 TRUE B HPSI pump trips breaker on start. | ||
Trigger = T4 6 CV50151 TRUE Red train HPSI injection MOV fails to open on SIAS Trigger = T4 actuation. | |||
7 RCSHTRON TRUE PZR Backup heaters fail to de-energize. | |||
Trigger = T5 Page 4 of 16 | |||
Event No.: | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Event | ||
1 Event | |||
== Description:== | == Description:== | ||
Channel A excore nuclear instrument will fail low. The CRS will enter the NI malfunction AOP, OP 2203.026. | |||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior ALL Crew will diagnose that A Excore is the only channel that has failed. | ||
CRS Enter AOP 2203.026, NI malfunction and perform the following actions: | |||
1 - Hi Linear Power 2 - Hi Log Power 3 - High LPD 4 - Low DNBR Verify that bypass lights illuminated on operator inserts on | Refer to TS 3.3.1.1 Direct the CBOT to bypass points 1,2,3 and 4 on A PPS Verify that Log channel is also affected Notify maintenance of problem with A Excore CBOT Will perform the following: | ||
Termination criteria: When points 1,2,3 and 4 are | Obtain Key 12 from SM Notify control room of potential PPS security door and Bypass alarms Open 2C23 door and unlock panel door Push bypass buttons for points : | ||
1 - Hi Linear Power 2 - Hi Log Power 3 - High LPD 4 - Low DNBR Verify that bypass lights illuminated on operator inserts on 2C03 CBOR Will perform the following: | |||
PEER check that bypass lights for points 1,2,3 and 4 are illuminated on operator inserts on 2C03 Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on A Excore. | |||
Termination criteria: When points 1,2,3 and 4 are bypassed on A PPS or at the discretion of the lead examiner. | |||
Page 5 of 16 | Page 5 of 16 | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
A CCP trip. The CCP low flow alarm will alert operators of this failure. | |||
Check for | Letdown will isolate, if backup CCP not started in timely manner. | ||
Check that | Time Position Applicant's Actions or Behavior CBOR Announce that A CCP has tripped its breaker (Red and Green lights out on 2C09) | ||
CBOR Verify VCT outlet valve open Verity CCP header | CRS Enter loss of Charging AOP and perform the following actions: | ||
Check for proper Charging suction and discharge flow path. | |||
Check that A CCP has tripped breaker Direct Starting backup CCP Direct verification of proper operation of running CCP Check for indications of CCP header rupture using control room indications Direct WCO to locally vent A CCP TRM 3.1.2.4 Applicability Simulator Operator Cue: When contacted as WCO to vent A CCP wait a few minutes and report that no air bubbles only water came out vent. | |||
CBOR Verify VCT outlet valve open Verity CCP header isolation valve open Manually start backup CCP by taking hand-switch to start Verify VCT level stable or going up CBOT Verify CCP header not ruptured: | |||
/CBOR | |||
* Aux Building or CNTMT radiation level steady | * Aux Building or CNTMT radiation level steady | ||
* Waste | * Waste Tanks 2T20A/B level not rising | ||
* | * CNTMT Sump level not rising | ||
* Aux Building sump level not | * Aux Building sump level not rising NOTE: Letdown may have isolated on high temperature. Letdown may be restored at this point. | ||
Termination criteria: When backup CCP started or at discretion of lead examiner. | |||
Page 6 of 16 | Page 6 of 16 | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
5.0 GPM primary to | 5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time Position Applicant's Actions or Behavior CBOR Announce annunciators: | ||
The CRS will | * 2K11-A10 Sec Sys Radiation Hi | ||
2K11-A10 Sec Sys | * 2K11-J8 SG Tube Leak Detection Rate of Change Hi | ||
Direct | * 2K11-K8 SG Tube Leak Detection Trouble/LKRT Hi CRS Implement AOP 2203.038, PRI-SEC leakage and perform the following: | ||
Direct CBOs to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SGs for activity Direct CBOT to isolate steam to A EFW pump from A SG Direct CBOR to perform a plant shutdown using normal boration method. | |||
CBOR Perform a plant shutdown Use reactivity plans to determine the amount of boron required. | CBOT Close 2CV 1000-1, steam from A SG to A EFW pump. | ||
Adjust | CBOR Perform a plant shutdown Use reactivity plans to determine the amount of boron required. | ||
Insert | Adjust turbine load to maintain Tave within 2°F of Tref. | ||
Insert CEAs as directed by reactivity plan. | |||
Page 7 of 16 | |||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
5.0 GPM primary to | 5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown. | ||
The CRS will | Simulator Operator Cue: When contacted as AO acknowledge requirement to begin working on Standard attachment 19. | ||
Termination criteria: | Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner. | ||
Page 8 of 16 | Page 8 of 16 | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event | ||
Scenario No.: | |||
Event No.: | |||
4 Event | |||
== Description:== | == Description:== | ||
500 gpm Tube Rupture on | 500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. | ||
This will | This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOR Report that PZR level is lowering Start all back up CCPs or report that they are running Isolate Letdown CRS Recognize SGTR has exceeded CCP capacity and the ability to maintain PZR level. | ||
Direct the CBOR to | Direct the CBOR to manually trip the reactor CBOR Manually trip the reactor. | ||
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions. | |||
CBOR Check reactivity control: | CBOR Check reactivity control: | ||
Reactor power decreasing. | Reactor power decreasing. | ||
All CEAs inserted. | All CEAs inserted. | ||
CBOT Check maintenance of vital | CBOT Check maintenance of vital auxiliaries: | ||
Generator output and exciter | Main turbine tripped. | ||
Generator output and exciter breakers open. | |||
All 4160v and 6900 v Non-Vital busses energized. | |||
ALL 4160v and 480v vital AC bus energized. | |||
All 125v vital DC bus energized. | All 125v vital DC bus energized. | ||
Page 9 of 16 | Page 9 of 16 | ||
Appendix D | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event | ||
Scenario No.: | |||
Event No.: | |||
4 Event | |||
== Description:== | == Description:== | ||
500 gpm Tube Rupture on | 500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. | ||
This will | This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOR Check inventory control: | ||
PZR level | PZR level 16 to 80%. | ||
Trend from set point. | Trend from set point. | ||
Report SIAS actuated or manually actuate | Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%. | ||
%. | (SEE Event 7) | ||
CBOR Check RCS pressure control: | |||
Trend from set point Secure Two | RCS pressure 1800 to 2300 psia. | ||
Place | Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia. | ||
Verify SIAS | Place spray valve for secured RCPs in manual closed. | ||
CBOR Check core heat | Verify SIAS when pressure less than 1650 psia. | ||
RCP | CBOR Check core heat removal by forced circulation: | ||
Service | RCP s running Loop T less than 10° F. | ||
RCS MTS 30° F or greater. | |||
Service water pump suction aligned to Lake. | |||
Component cooling water aligned to RCPs. | |||
CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes) | |||
Check SIAS actuated. | Check SIAS actuated. | ||
Maintain SW pressure greater than 85 psig. | Maintain SW pressure greater than 85 psig. | ||
Page 10 of | Page 10 of 16 | ||
Scenario No.: | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event | ||
Event No.: | |||
4 Event | |||
== Description:== | == Description:== | ||
500 gpm Tube Rupture on | 500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. | ||
This will | This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal: | ||
Report feed water line | Report SG levels and main feed water is in RTO. | ||
CBOR Check CNTMT | Report feed water line intact. | ||
Status of | Report SG pressures (May take manual local (ML) control of SDBCS master controller (at CRS direction) and reduce set point to 950-1050 psia). | ||
CRS Notify SM to perform the following: | CBOR Check CNTMT parameters: | ||
SE report to control | Temperature less than 140° F. | ||
Pressure less than 16 psia. | |||
Status of radiation alarms: | |||
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure. | |||
CRS Notify SM to perform the following: | |||
SE report to control room. | |||
Announce reactor trip on plant page. | |||
Refer to Tech Specs and EALs. | |||
Page 11 of 16 | |||
Event No.: | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event | ||
4 Event | |||
== Description:== | == Description:== | ||
500 gpm Tube Rupture on | 500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. | ||
This will | This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG. | ||
CRS Direct CBOs to | CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms. | ||
ALL Perform | Diagnose Steam Generator Tube Rupture CRS Implement Steam Generator Tube Rupture procedure and open place keeping page. | ||
CRS Determine | ALL Perform crew brief and review floating steps. | ||
Commence cool down | CRS Determine applicable floating steps: | ||
CRS Direct the | * Commence cool down to less than 535° F Thot. | ||
* HPSI Override Criteria. | |||
CRS Direct the following actions: | |||
Commence cool down to less than 535° F Thot. | |||
Inform SM to contact Chemistry to sample both SG for activity. | |||
Determine ruptured SG Perform post-SIAS actions: | Determine ruptured SG Perform post-SIAS actions: | ||
Verify | Verify Safety Injection flow to RCS: | ||
Isolate | Isolate A SG when RCS Thot is less than 535°F Verify HPSI override criteria met: | ||
Page 12 of | * RCS MTS 30°F or greater. | ||
* PZR level greater than 29% and controlled. | |||
* RVLMS LVL 03 or higher elevation indicates WET. | |||
* At least ONE intact SG available for Heat Removal Level 10 to 90% with FW available. | |||
Page 12 of 16 | |||
Event No.: | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event | ||
4 Event | |||
== Description:== | == Description:== | ||
500 gpm Tube Rupture on | 500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. | ||
This will | This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior Critical CBOR RCS cool down to less than 535°F T-hot : (floating step) | ||
CBOR Reset low SG set points. | Step CBOR Reset low SG set points. | ||
Commence RCS | Commence RCS depressurization to maintain RCS MTS 30 to 45° (When HPSI overridden) | ||
Take manual control of | Take manual control of SDBCS bypass valves to condenser (2CV0302/2CV0303) | ||
Place ALL ADV Permissive switches in OFF. Verify EFW feeding SGs. | Place ALL ADV Permissive switches in OFF. | ||
Verify EFW feeding SGs. | |||
Secure running MFW pump. | Secure running MFW pump. | ||
Close ALL MFW Block valves. | Close ALL MFW Block valves. | ||
Record and plot cool | Record and plot cool down on Attachments 1 and 8. | ||
CBOR Verify Safety Injection flow to RCS: | |||
Check HPSI flow using Exhibit 2. | Check HPSI flow using Exhibit 2. | ||
Check LPSI flow using | /CBOT Check LPSI flow using Exhibit 3. | ||
Page 13 of 16 | |||
Scenario No.: | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event | ||
Event No.: | |||
4 Event | |||
== Description:== | == Description:== | ||
500 gpm Tube Rupture on | 500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. | ||
This will | This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOT Perform post-SIAS actions: | ||
SW pumps running on | SW pumps running on each loop. | ||
SW pump suction | EDG SW outlet valves open. | ||
Report all | SW pump suction aligned to Lake. | ||
Report all non-vital buses energized. | |||
Termination criteria: | Verify SG sample valves open. | ||
Page 14 of | Critical CBOT Use Attachment 10 to isolate Ruptured SG Step CBOR OVERRIDE HPSI: | ||
CBOT Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal. | |||
Termination criteria: RCS Cool down to less than 535°F and A SG isolated or at examiners discretion. | |||
Page 14 of 16 | |||
Scenario No.: | Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 5/6 Event | ||
== Description:== | |||
B HPSI pump trips on SIAS start. 2CV5015-1 fails to open on SIAS signal. This will make HPSI flow UNACCEPTABLE. C HPSI pump must be started or 2CV5015-1 must be opened. | |||
Time Position Applicant's Actions or Behavior CBOT 2K05 E-3, B HPSI pump trip alarm announced. | |||
Observes green light lit on pump and no discharge pressure. | |||
CBOT Observes 2CV 5015-1 is closed, green light on, red light off, Z-tape reading 0. | |||
CRS Directs starting C HPSI pump Directs opening 2CV 5015-1 Critical CBOT Starts C HPSI pump Step Verified proper discharge pressure and flow(depending on RCS pressure) | |||
Critical And/or Part is Opens 2CV 5015-1 by taking hand switch to OPEN and to observing red light on green light off and Z-tape reading ~ | |||
either 100% | |||
start 2P89C or open 2CV-5015-1 Termination criteria: When C HPSI pump started or 2CV5015-1 is opened or at discretion of lead examiner. | |||
Page 15 of 16 | |||
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 7 Event | |||
Appendix D | |||
== Description:== | == Description:== | ||
Backup heaters fail to de-energize on PZR pressure control signal or PZR level less than 29%. Failure to turn backup heaters off will cause them to fail and potential for loss of PZR pressure control. | Backup heaters fail to de-energize on PZR pressure control signal or PZR level less than 29%. Failure to turn backup heaters off will cause them to fail and potential for loss of PZR pressure control. | ||
Time Position Applicant's Actions or Behavior CBOR Observes the red light | Time Position Applicant's Actions or Behavior CBOR Observes the red light ON on the backup heaters when PZR level is less than 29 % | ||
Reports observation to CRS CRS | Reports observation to CRS CRS Directs taking Backup heater hand switches to OFF CBOR Takes Backup Heater hand switches to OFF Observes green lights ON red lights OFF Termination criteria: When PZR heater hand switches are taken to OFF or at the discretion of the lead examiner. | ||
Page 16 of 16 | |||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Facility: ANO-2 Scenario No.: 2 Op-Test No.: 2005-1 Examiners: Operators: | ||
Initial | Initial Conditions: | ||
100%. 250 EFPD. | 100% MOL, All ESF systems in standby. C HPSI pump tagged out for oil bubbler replacement. C HPSI is aligned to green train. Green train maintenance week. | ||
Green train maintenance week. | Turnover: | ||
Event | 100%. 250 EFPD. C HPSI pump tagged out for oil bubbler replacement. EOOS indicates Minimal Risk. Green train maintenance week. | ||
Event Type* | Event Malf. No. Event Event No. Type* Description 1 XRCCHAPLVL I (CBOR) Control Channel A Pressurizer Level fails LOW. | ||
2 XSG2PT10411 I (CBOT) Steam Generator safety channel pressure fails LOW. | |||
%. 4 | 3 FWPMPATRP R (CBOR) A Main Feed Pump (MFP) trips due to thrust N (CBOT) bearing wear and results in a power reduction to less than 90%. | ||
6 | 4 FWAFT5A M (ALL) Feed water line break in containment after 2FW5A, feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A SG. | ||
* | 5 ESCSBPMP C (CBOT) Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS. | ||
6 ESFCSASFAIL C (CBOR) Fail CSAS channel 1 to actuate auto. | |||
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 15 | |||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Scenario #2 Objectives | ||
: 1) Evaluate individual | : 1) Evaluate individual response to a failure of Pressurizer level control channel failure. | ||
: 2) Evaluate individual | : 2) Evaluate individual response to a failure of a Plant Protection System Steam Generator Level instrument failure. | ||
: 3) Evaluate individual | : 3) Evaluate individual response to a Main Feed Pump Trip at 100% power. | ||
: 4) Evaluate individual ability to perform a reduction in plant power. | : 4) Evaluate individual ability to perform a reduction in plant power. | ||
: 5) Evaluate individual | : 5) Evaluate individual ability to mitigate an unisolatable Feed water break in containment. | ||
: 6) Evaluate individual | : 6) Evaluate individual ability to monitor operation of Engineered Safety Features equipment. | ||
: 7) Evaluate individual | : 7) Evaluate individual response to a failure of required Engineered Safety Features Actuation System actuation. | ||
SCENARIO #2 NARRATIVE Simulator session begins with the plant at 100% power steady state. C HPSI pump is tagged out to replace a pump oil bubbler. | |||
power steady state. | When the crew has completed their control room walk down and brief, the in service Pressurizer (PZR) control channel level instrument will fail low. Alarms on control channel 1 level lo and level lo lo will come in. This will result in letdown going to minimum flow, the two backup CCPs will automatically start, all PZR heaters de-energizing and actual PZR level go up. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR will take the letdown flow controller to manual and control PZR level. The CBOR will also verify that the other level control channel is reading correctly and select that channel for control and place the PZR low low level cutoff switch to the unaffected channel. When the auto and manual signals are matched, the CBOR will place the letdown flow controller to automatic About 10 minutes after PZR level control failure, A Steam Generator safety channel pressure instrument, 2PT1041-1, will fail low. This will trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel A operator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1 and 3.3.3.5 for guidance. The CBOT will place Channel A PPS in bypass for point 11, SG pressure low, point 19, A SG delta-P for EFAS 1, and point 20, B SG delta-P for EFAS 2 for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the tech spec LCO. | ||
When the crew has completed their control room walk down and | About 10 minutes after the Steam Generator instrument failure, A MFP will trip. CRS will enter AOP 2203.037, Loss of Main Feed Pump. This will result in Steam Flow exceeding Feed flow and SG levels dropping. The crew will manually start the fourth condensate pump, reduce turbine load, and borate using emergency boration to the RCS until Feed flow is greater than Steam Flow. Then continue with a normal boration power reduction to less than 90%. | ||
AOP 2203.028, PZR Systems | |||
3.2.1 and 3.3.3.5 for | |||
The crew will have one hour to place these points in bypass before exceeding the tech spec LCO. | |||
About 10 minutes after the Steam Generator | |||
Page 2 of 15 | Page 2 of 15 | ||
Appendix D | Appendix D Scenario 2 Form ES-D-1 SCENARIO #2 NARRATIVE (continued) | ||
Once the Reactor | Once the Reactor operators reactivity manipulations are complete, the main feed line break will occur. This will cause containment pressure, temperature and sump level to go up. A Steam Generator level will lower. The crew will manually trip the reactor and complete SPTAs. Once feed (Main and Emergency) is secured to the SG, an Excess Steam Demand will occur on A Steam Generator. | ||
The CRS will diagnose an Excess Steam Demand event and enter OP 2202.005, ESD. | |||
The CRS will | The crew will manually control Reactor Coolant Temperature once the A SG boils dry using the upstream Atmospheric Dump Valves on B SG. The crew will manually control PZR pressure using the Auxiliary Spray valve. | ||
The crew will | When Containment pressure exceeds 23.3 psia, the crew will recognize that CSAS, Containment Spray Actuation Signal, has not automatically actuated on Channel 1 and that the Spray pump on channel 2 side did not start. The crew will manually actuate spray on Channel 1 and manually start B CSAS pump. | ||
When Containment pressure | |||
Page 3 of 15 | Page 3 of 15 | ||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Simulator Instructions for Scenario 2 Reset simulator to MOL 100% power IC stead state. | ||
Ensure hotwell level is ~ | Ensure that AACG is secured and annunciators clear. | ||
80%. Place MINIMAL RISK | C HPSI pump is tagged out for oil bubbler replacement. | ||
Ensure hotwell level is ~80%. | |||
Event | Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11. | ||
Value/ Ramp Time | T1, T2, T3, T4 set to false. | ||
Event Malf. No. Value/ Event No. Ramp Description Time 1 XRCCHAPLVL 0.0 Control Channel A Pressurizer Level fails LOW. | |||
6 | Trigger 1 2 XSG2PT10411 0.0 Steam Generator safety channel pressure fails LOW. | ||
Trigger 2 3 FWPMPATRP TRUE A Main Feed Pump (MFP) trips due to thrust bearing Trigger 3 wear and results in a power reduction to less than 90%. | |||
4 FW2PW5AAFT 1000 Feed water line break in containment after 2FW5A, Trigger 4 Ramp feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A 5 min SG. | |||
5 BS2P35BFAL TRUE Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS. | |||
6 ESFCSASFAIL TRUE Fail CSAS channel 1 to actuate auto. | |||
Page 4 of 15 | Page 4 of 15 | ||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 1 Event | ||
Scenario No.: | |||
Event No.: | |||
1 Event | |||
== Description:== | == Description:== | ||
Channel A pressurizer level control channel 2LT-4627-1 fails low. The CRS will enter the PZR Systems Malfunction AOP 2203.028. | |||
The CRS will enter the PZR Systems Malfunction AOP 2203.028. | Time Position Applicant's Actions or Behavior ALL Announce alarms 2K10-G6 CNTRL CH 1 LEVEL LO. | ||
Time Position Applicant's Actions or | |||
2K10-F6 CNTRL CH 1 LEVEL LO LO. | 2K10-F6 CNTRL CH 1 LEVEL LO LO. | ||
Report 2LI-4627-2 and 2LR-4625 indicate normal. | Report 2LI-4627-2 and 2LR-4625 indicate normal. | ||
Report backup charging pumps started. | Report backup charging pumps started. | ||
CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions. | |||
CBOR Determine PZR level Channel A failed. | |||
Place Letdown Flow controller (2HIC-4817) in MANUAL. | |||
Place PZR Level Channel Select switch (2HS-4628) to Channel B. | Place PZR Level Channel Select switch (2HS-4628) to Channel B. | ||
Place PZR Low Low Level Cutoff select switch (2HS-4642) to Channel B. | Place PZR Low Low Level Cutoff select switch (2HS-4642) to Channel B. | ||
Verify PZR heaters and Normal Spray maintaining RCS | Verify PZR heaters and Normal Spray maintaining RCS pressure 2025 to 2275 psia. | ||
CRS Enter 3.3.3.6 Post | The CBOR will take the letdown flow controller to manual and control PZR level. | ||
Simulator Operator Cue: | CRS Enter 3.3.3.6 Post Accident Instrumentation. | ||
Termination criteria: Unaffected PZR level channel selected and | Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LI-4627-1. | ||
Termination criteria: Unaffected PZR level channel selected and letdown in automatic or at the discretion of the lead examiner. | |||
Page 5 of 15 | Page 5 of 15 | ||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
2PT1041-1, Channel A SG pressure transmitter fails low. | |||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOT Announce annunciators: | ||
2K04-A4 CH A RPS/ | 2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04 B3 PPS TRIP 2K04-E4 MSIS PRETRIP Compare all four channels and report 2PI-1041-1 indicates 0 psia. | ||
CRS Implement Annunciator Corrective Action AOP 2203.012D. | |||
Refer to Tech Spec 3.3. | Refer to Tech Spec 3.3.1.1, 3.3.2.1, 3.3.3.6. | ||
1.1, 3.3.2.1, 3.3.3.6. CBOR Report A SG pressure low pretrip and trip. | CBOR Report A SG pressure low pretrip and trip. | ||
CBOT | CBOT Place the following channels in bypass on Channel A: | ||
A SG pressure low - RPS (Bistable 11) | |||
A SG P - EFAS 1 (Bistable 19) | |||
B SG P - EFAS 2 (Bistable 20) | B SG P - EFAS 2 (Bistable 20) | ||
CBOR Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass. | CBOR Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass. | ||
CRS Contact maintenance to repair 2PT1041-1. | CRS Contact maintenance to repair 2PT1041-1. | ||
Simulator Operator Cue: | Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2PT1041-1. Report that planning on repair of 2PT1041-1 is in progress. | ||
Termination criteria: When A plant protection system points 11, 19 and 20 are bypassed or at discretion of lead examiner. | |||
Page 6 of 15 | Page 6 of 15 | ||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 3 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027. | |||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOT Announce A MFP trip alarms: | ||
2K03 A8, | 2K03 A8, A MFP trip 2K03 K8, Thrust Bearing Wear Trouble CRS Enter 2203.027, Loss of Main Feed Pump AOP and direct the following actions: | ||
Verify Recirc valves closed (Condensate | Verify Recirc valves closed (Condensate and MFP) | ||
Verify Main Feed water regulating valve bypasses are opening Start standby condensate pump Commence emergency boration using exhibit 1 Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7°F Secure Emergency boration when Feed water Flow > Steam Flow CBOT Check tripped MFW pump recirc and Condensate recirc closed. | |||
Check MFWRV B/P valves open. | |||
Start standby Condensate Pump. | Start standby Condensate Pump. | ||
Reduce MTG load to establish | Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7°F. | ||
CBOR Commence boration using Exhibit 1. | |||
Page 7 of 15 | |||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 3 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027. | |||
CRS When FF>SF, direct CBOR to commence down power to < | |||
90% using normal boration method. | 90% using normal boration method. | ||
CBOR Align normal boration to RCS. | |||
Reduce turbine load to maintain Tave within 2° of Tref until power is less than 90%. | Reduce turbine load to maintain Tave within 2° of Tref until power is less than 90%. | ||
Termination criteria: When CBOR has completed reactivity | Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner. | ||
Page 8 of 15 | Page 8 of 15 | ||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
Main Feed line | Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations. | ||
ALL Announce that | ALL Announce that A SG level is lowering. | ||
Containment temperature and pressure are rising. | |||
Announce that radiation levels in containment are steady. | |||
Announce that | Announce that containment sump level is rising quickly. | ||
Diagnose | Diagnose that a feed line leak is in progress inside containment. | ||
CRS Direct CBOR to manually trip the reactor. | CRS Direct CBOR to manually trip the reactor. | ||
CBOR CBOR | CBOR CBOR manually trip the reactor. | ||
CRS Implement Standard Post Trip | CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions. | ||
CBOR Check reactivity control: | CBOR Check reactivity control: | ||
Reactor power decreasing. | Reactor power decreasing. | ||
All CEAs inserted. | All CEAs inserted. | ||
CBOT Check maintenance of vital | CBOT Check maintenance of vital auxiliaries: | ||
Generator output and exciter | Main turbine tripped. | ||
ALL 4160 v and 480 v | Generator output and exciter breakers open. | ||
All 4160 v and 6900 v Non-Vital busses energized. | |||
ALL 4160 v and 480 v vital AC bus energized. | |||
All 125 v vital DC bus energized. | All 125 v vital DC bus energized. | ||
Page 9 of 15 | Page 9 of 15 | ||
Appendix D | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
Main Feed line | Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOR Check inventory control: | ||
PZR level | PZR level 16 to 80%. | ||
Trend from set point. | Trend from set point. | ||
Report SIAS actuated or manually actuate | Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%. | ||
%. CBOR Check RCS pressure | CBOR Check RCS pressure control: | ||
Trend from set point Secure Two | RCS pressure 1800 to 2300 psia. | ||
Place | Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia. | ||
Verify SIAS | Place spray valve for secured RCPs in manual closed. | ||
CBOR Check core heat | Verify SIAS when pressure less than 1650 psia. | ||
RCP | CBOR Check core heat removal by forced circulation: | ||
Service | RCP s running Loop T less than 10° F. | ||
RCS MTS 30° F or greater. | |||
Service water pump suction aligned to Lake. | |||
Component cooling water aligned to RCPs. | |||
CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes) | |||
Check SIAS actuated. | Check SIAS actuated. | ||
Maintain SW pressure greater than 85 psig. | Maintain SW pressure greater than 85 psig. | ||
Restore CCW to | Restore CCW to RCPs using exhibit 5 (when CIAS actuates). | ||
Page 10 of | Page 10 of 15 | ||
Scenario No.: | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event | ||
== Description:== | == Description:== | ||
Main Feed line | Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal: | ||
Report SG levels and main feed water is in RTO. | |||
Report feed water line is NOT intact. | Report feed water line is NOT intact. | ||
Report SG | Report SG pressures A SG lower than B SG. | ||
Manually actuate EFAS, Emergency Feed water Actuation Signal if not already actuated. | |||
Verify Feed water is not aligned to | Verify that MSIS is actuated. | ||
Verify Feed water is not aligned to A SG CBOR Check CNTMT parameters: | |||
SE report to control | Temperature greater than 140° F. | ||
Pressure greater than 16 psia. | |||
Status of radiation alarms: | |||
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm Secure ALL RCPs when Containment Spray Actuation Signal (CSAS) occurs. | |||
CRS Notify SM to perform the following: | |||
SE report to control room. | |||
Announce reactor trip on plant page. | |||
Refer to Tech Specs and EALs. | |||
Page 11 of 15 | |||
Scenario No.: | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event | ||
== Description:== | == Description:== | ||
Main Feed line | Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations. | ||
CRS Direct CBOs to | CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms. | ||
CRS Implement | Diagnose EXCESS STEAM DEMAND EOP. | ||
ALL Perform | CRS Implement EXCESS STEAM DEMAND EOP procedure and open place keeping page. | ||
CRS Determine | ALL Perform crew brief and review floating steps. | ||
Control post steam generator blow down RCS | CRS Determine applicable floating steps: | ||
Control post steam generator blow down RCS | Control post steam generator blow down RCS temperature and pressure CRS Direct the following actions: | ||
Control PZR pressure | Isolate A SG using Attachment 10. | ||
Override HPSI when conditions are met. RCS MTS | Control post steam generator blow down RCS temperature using B steam generator upstream atmospheric dump valve. | ||
PZR level greater than | Control PZR pressure within P-T limits using Auxiliary Spray valve and Attachment 27. | ||
Override HPSI when conditions are met. | |||
RCS MTS 30°F or greater. | |||
PZR level greater than 29% [50%] and controlled. | |||
RVLMS LVL 03 or higher elevation indicates WET. | |||
At least ONE intact SG available for Heat Removal Page 12 of 15 | |||
Scenario No.: | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event | ||
== Description:== | == Description:== | ||
Main Feed line | Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior Critical CBOT Control post Steam Generator blow down RCS temperature Step using upstream atmospheric dump valve within 25°F of A Steam Generator Tc when generator boiled dry. | ||
Critical CBOR Maintain Post steam generator blow down PZR pressure using Step auxiliary spray valve and attachment 27 within the Pressure-Temperature limits of 200°F and 30°F. | |||
CBOR Override HPSI flow and charging flow to maintain PZR level. | |||
Termination criteria: | /CBOT Termination criteria: When plant temperature and pressures are stabilized after A Steam Generator boils dry or at the discretion of the lead examiner. | ||
Page 13 of | Page 13 of 15 | ||
Scenario No.: | Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 5 Event | ||
== Description:== | |||
B Containment Spray pump, 2P35B fails to automatically start. CBOT will manually start the B containment spray pump. | |||
Time Position Applicant's Actions or Behavior CBOT Reports that no flow is indicated on 2C16 for containment spray flow after actuation. | |||
Reports that B containment spray pump is not running Reports that the B containment spray containment isolation valve is open. | |||
Reports Alarm on 2K05 A1, 2P35B failure on ESFAS, Engineered Safety Features Actuation System CRS Directs manual start of 2P35B, B containment spray pump. | |||
Critical CBOT Manually starts 2P35B, B containment spray pump on 2C16. | |||
Step Verifies proper containment spray flow on 2C16. | |||
(Either start of 2P35B or actuate CSAS 1) | |||
Termination criteria: 2P35B is manually started or at the discretion of the lead examiner. | |||
Page 14 of 15 | |||
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 6 Event | |||
Appendix D | |||
== Description:== | == Description:== | ||
Channel 1 Containment Spray actuation signal (CSAS-1) fails to automatically actuate. | Channel 1 Containment Spray actuation signal (CSAS-1) fails to automatically actuate. | ||
Time Position Applicant's Actions or Behavior CBOR Observes that containment pressure is greater than 23.3. psia and containment spray actuation signal (CSAS) | Time Position Applicant's Actions or Behavior CBOR Observes that containment pressure is greater than 23.3. psia and containment spray actuation signal (CSAS) | ||
(Note this may be completed prior to reaching the 23.3 psia set | (Note this may be completed prior to reaching the 23.3 psia set point.) | ||
CRS Directs manually actuating CSAS. | |||
point.) | Critical CBOR On 2C03 manually actuates CSAS and verifies all four operator Step insert red lights are out above the CSAS label on 2C03. | ||
Critical | (Either start of 2P35B or actuate CSAS 1) | ||
Termination criteria: | Termination criteria: When CSAS is manually actuated or at discretion of lead examiner. | ||
Page 15 of 15 | |||
examiner. | |||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Facility: ANO-2 Scenario No.: 3 Op-Test No.: 2005-1 Page 1 Examiners: Operators: | ||
Initial | Initial Conditions: | ||
100% MOL, All ESF systems in standby. Green Train Maintenance Week. | |||
Turnover: | Turnover: | ||
100%. 250 EFPD. EOOS indicates | 100%. 250 EFPD. EOOS indicates Minimal Risk. Green Train Maintenance Week. | ||
Event Malf. No. Event Event No. Type* Description 1 XCV2LT4861 I (CBOR) VCT level instrument fails low resulting in RWT being aligned to CCP suction. | |||
Event | 2 XFW2FIS0735 I (CBOT) A MFP suction flow transmitter fails low. Results in condensate and MFP recircs to condenser opening fully and reducing feed water to SGs. | ||
Event Type* | 3 CNDVACUUM R (CBOR) Air leakage into condenser requiring a power N (CBOT) reduction to maintain condenser vacuum. | ||
2 | 4 CNDVACUUM M (ALL) Air leakage into condenser results in loss of condenser vacuum and turbine and reactor trip. | ||
5 SU#3 lockout N (CBOT) Loss of offsite power. Must energize non-vital 2A111 fails to busses. | |||
4 | close Startup #2 to 2A1 fails OPEN. | ||
5 | I (CBOR) Loss of power to PZR controllers must be controlled manually or transfer to automatic. | ||
This will | 6 2CV1503-1 fails to C (CBOT) #1 EDG service water outlet MOV. This will result open in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5. | ||
7 2CV0340-2 | 7 2CV0340-2 C (CBOT) A EFW pump steam inlet valve fails to open. This breaker trips will result in a loss of all feed water. | ||
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 13 | |||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Scenario #3 Objectives | ||
: 1) Evaluate individual | : 1) Evaluate individual response to a failure of Volume Control Tank level transmitter. | ||
: 2) Evaluate individual | : 2) Evaluate individual response to a failure of a Main Feed Pump suction Flow transmitter. | ||
: 3) Evaluate individual response to a small condenser vacuum leak. | |||
: 4) Evaluate individual ability to perform a reduction in plant power. | : 4) Evaluate individual ability to perform a reduction in plant power. | ||
: 5) Evaluate individual ability to mitigate a loss of all Feed Water. | : 5) Evaluate individual ability to mitigate a loss of all Feed Water. | ||
: 6) Evaluate individual ability to mitigate a loss of off site power. | : 6) Evaluate individual ability to mitigate a loss of off site power. | ||
: 7) Evaluate individual | : 7) Evaluate individual response to a failure Loss of power to a vital bus. | ||
SCENARIO #3 NARRATIVE Simulator session begins with the plant at 100% power steady state. | |||
When the crew has completed their | When the crew has completed their control room walk down and brief, one of the two volume control tank (VCT) level transmitters will fail low. The crew will respond to VCT low low level alarm, 2K12 G5. This will result in the VCT outlet valve to the charging pump suction to close and the Refueling Water tank (RWT) suction to the charging pumps to open. RCS temperature and pressure will lower until the CBOR positions the VCT outlet valve manually opened and the RWT valve manually closed. | ||
About 10 minutes after VCT level | About 10 minutes after VCT level transmitter failure, A main feed pump suction transmitter will fail low. This will result in 2K03-D9 (A MFP SUCT FLOW LO) alarm. This will result in both the A MFP and A / C condensate pump recirc valves opening. This will reduce Main feed water flow to A Steam Generator and reduce MFP suction pressure so that the standby condensate pump will automatically start. The CBOT will recognize the instrument failure due to flow on the A MFP controller indicating zero even with the recirc valve open and flow indicated on the Feed water flow transmitters to the steam generator. | ||
The CBOT will take manual control of both the MFP and condensate pump recirc valves and close them. | |||
The CBOT will take manual | About 10 minutes after the MFP suction flow instrument failure, air in-leakage into the main condenser will start. This will result in condenser vacuum slowly degrading. The CRS will enter OP 2203.019, Loss of condenser vacuum. The CBOR will begin an emergency boration and the CBOT will reduce main turbine load to restore condenser vacuum. The crew will secure emergency boration and reducing turbine load when vacuum stabilizes. | ||
About 10 minutes after the MFP suction flow instrument failure, air in-leakage into the main | The CBOR will then commence normal boration and reduce turbine load to allow condenser vacuum to be restored to less than ~5 in Hg. | ||
The CBOR will then | Once the Reactor operators reactivity manipulations are complete, the air in-leakage will be raised to beyond the vacuum pumps capacity and the plant will be manually tripped. | ||
Once the Reactor | Upon the reactor trip, Startup transformer #3 will lock-out and startup transformer #2 feeder to 2A1 will fail resulting in a loss of off-site power. When #1 EDG starts, the service water value from the EDG will fail to open. This will result in the CRS directing the #1 EDG to be locally secured resulting in a loss of the red train vital power (2A3 and 2B5). Also, the CRS will direct selecting channel #2 PZR level and pressure control channel instrumentation due to a loss of power to the selected channel #1 instruments. | ||
Upon the reactor trip, | |||
Page 2 of 13 | Page 2 of 13 | ||
Appendix D | Appendix D Scenario 3 Form ES-D-1 SCENARIO #3 NARRATIVE (continued) | ||
When an Emergency Feed water Actuation Signal ( | When an Emergency Feed water Actuation Signal (EFAS) occurs and A emergency feed water pump attempts to start automatically start, the steam inlet valve, 2CV 0340-2, will trip its breaker when it starts to open. This will result in a loss of all feed water to the steam generators. The CRS will direct that at least one RCP in each loop are secured and Steam Generator blowdown is isolated from both steam generators. When standard post trip actions, SPTAs, are complete, the CRS will diagnose and enter the Loss of Feed EOP OP2202.006. The CBOT will manually start the Alternate AC Generator from 2C14 and energize 2A3, vital 4160 bus or open the Service water valve from the #1 EDG and start | ||
When standard post trip actions, | #1 EDG. Once 2A3 is energized the CBOT will manually start the emergency feed water pump, 2P7B, from 2C17 and align feed to both steam generators using the Emergency Feed water valves. | ||
#1 EDG. Once 2A3 is energized | |||
Page 3 of 13 | Page 3 of 13 | ||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Simulator Instructions for Scenario 3 Reset simulator to MOL 100% power IC stead state. | ||
80%. Place MINIMAL RISK | Ensure that AACG is secured and annunciators clear. | ||
Ensure hotwell level is ~80%. | |||
Value/ Ramp Time | Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11. | ||
2 | T1, T2, T3, T4, T5 set to false. | ||
T6 set to EFAS-1 T7 set to EFAS-2 Event Malf. No. Value/ Event No. Ramp Description Time 1 XCV2LT4861 0.0 VCT level instrument fails low resulting in RWT Trigger=T1 being aligned to CCP suction. | |||
4 | 2 XFW2FIS0735 0.0 A MFP suction flow transmitter fails low. Results in Trigger=T2 condensate and MFP recircs to condenser opening fully and reducing feed water to SGs. | ||
5 FailSU3 | 3 CNDVACUUM 3.0 Air leakage into condenser requiring a power Trigger=T3 Ramp reduction to maintain condenser vacuum. | ||
loose Aux feed water pump and non-vital loads. | 2 min 4 CNDVACUUM 10.0 Air leakage into condenser results in loss of Ramp condenser vacuum and turbine and reactor trip. | ||
Loss of | 5 min 5 FailSU3 TRUE Startup 3 lockout results in a loss of offsite power. | ||
This will | Causes EDGs to automatically start/ loose Aux feed water pump and non-vital loads. | ||
7 | 416A111 Locked | ||
Page 4 of 13 | -Open Loss of power to PZR controllers must be controlled manually or transfer to automatic. | ||
Trigger=T4 6 CV15031 0.0 #1 EDG service water outlet MOV. This will result in Trigger=T5 deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5. | |||
7 CV0340 0.0 A EFW pump steam inlet valve fails to open. This Trigger=T6 will result in a loss of all feed water. | |||
Trigger=T7 Page 4 of 13 | |||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 1 Event | ||
Scenario No.: | |||
Event No.: | |||
1 Event | |||
== Description:== | == Description:== | ||
VCT level transmitter | VCT level transmitter 2LT4861 fails low. This causes the RWT to be aligned to CCP suction and Tave lowering. | ||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K12-G5 VCT 2T4 LEVEL LO LO. | ||
CRS Implement Annunciator Corrective Action AOP 2203.012L. | CRS Implement Annunciator Corrective Action AOP 2203.012L. | ||
CBOR Report level | CBOR Report level indicates normal on 2LIS-4857 but 2LT-4861 reads 0% on computer. | ||
Reports | Reports charging pump suction swapping to RWT. | ||
CBOR May secure charging to stop | CBOR May secure charging to stop boration if have not determined indication is a failed instrument and VCT level is normal. | ||
OR When faulty instrument identified, then manually reopen VCT outlet and close the RWT to CCP suction valve. | |||
OR When faulty instrument identified, | CBOT Reduce turbine load to maintain Tave within 2° F of Tref if Tave | ||
/CBOR lowered. | |||
Termination criteria: Charging suction | CRS Contact maintenance/PS liaison to troubleshoot failed instrument. | ||
Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LT-4861. | |||
Termination criteria: Charging suction manually aligned to the VCT and RWT to CCP valve closed or at the discretion of the lead examiner. | |||
Page 5 of 13 | Page 5 of 13 | ||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 2 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
2FIS0735, A loop condensate flow fails low. Condensate and MFP recirc valves open. CBOT must take manual control of recircs and control MFP suction pressure. | |||
CBOT Report auto start of | Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K03-D9 (A MFP SUCT FLOW LO) | ||
Determine instrument 2FIS-0735 failure by use of PMS or | CRS Implement Annunciator corrective action 2203.012C and direct board operator actions. | ||
CBOT Report auto start of condensate pump. | |||
(Examiners Note | Determine instrument 2FIS-0735 failure by use of PMS or control board indications. | ||
: Crew may elect to leave fourth | Place A condensate recirc and A main feed pump recirc valves in manual to control condensate header pressure. | ||
CRS Contact maintenance/ | Secure condensate pump that auto started. | ||
Simulator Operator Cue: | (Examiners Note: Crew may elect to leave fourth condensate pump running until a later point in the shutdown.) | ||
CRS Contact maintenance/WWM to investigate failed transmitter. | |||
Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2FIS 0735. Report that planning on repair of 2FIS0735 is in progress. | |||
Termination criteria: When condensate and MFP recircs are in manual and secondary plant is stable or at discretion of lead examiner. | |||
Page 6 of 13 | Page 6 of 13 | ||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
Condenser vacuum slowly degrades. Crew will reduce turbine load Time Position Applicant's Actions or Behavior CBOT Main Condenser lowering vacuum: | |||
2K03 A3, 2E11A | 2K03 A3, 2E11A Pressure HI 2K03 B3, 2E11A Turb Hood Press HI 2K03 E4, Vacuum pump 2C5B Auto Start 2K02 B14, Condenser Interlock CRS Enter 2203.019, Loss of condenser vacuum and direct the following actions: | ||
Verify both vacuum pumps running Verify adequate gland seal steam pressure Verify both circulating water pumps running Reduce MTG load to maintain | Verify both vacuum pumps running Verify adequate gland seal steam pressure Verify both circulating water pumps running Reduce MTG load to maintain Tc less than 554.7°F and condenser vacuum < 6.5 inHg. | ||
Commence emergency boration using exhibit 1 Secure Emergency boration when | Commence emergency boration using exhibit 1 Secure Emergency boration when condenser vacuum is < 6.5 inHg. | ||
CBOT Reduce MTG load to maintain Tc less than 554.7°F and condenser vacuum < 6.5 inHg. | |||
CBOR Commence boration using Exhibit 1. | |||
Page 7 of 13 | |||
Scenario No.: | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Event | ||
== Description:== | == Description:== | ||
Condenser vacuum slowly degrades. Crew will reduce turbine load CRS When vacuum is less than 6.5 inHg. Secure emergency boration. | |||
Contact Ops Management. | Contact Ops Management. | ||
Simulator Operator Cue: | Simulator Operator Cue: When contacted as AO report that you can hear the air leak on the vacuum suction piping on the East heater deck under the deck floor. It is unisolatable. | ||
Simulator Operator Cue: | Simulator Operator Cue: When contacted as Maintenance, report that it will take at least 3 hours to patch the leak. | ||
Simulator Operator Cue: | Simulator Operator Cue: When contacted as OPS Management, tell the CRS to reduce plant power until vacuum alarms are cleared. | ||
CRS Direct CBOR to reduce commence a normal boration at power and reduce turbine load to < 5 inHg. | |||
CBOR Align normal boration to RCS. | |||
Reduce turbine load to maintain Tave within 2° of Tref until condenser vacuum is less than 5 inHg. | Reduce turbine load to maintain Tave within 2° of Tref until condenser vacuum is less than 5 inHg. | ||
Termination criteria: When CBOR has completed reactivity | Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner. | ||
Page 8 of 13 | Page 8 of 13 | ||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
Condenser air in-leakage exceeds the capacity of the vacuum pumps. | |||
CRS Direct CBOR to manually trip the reactor. | This results in a reactor trip. | ||
CBOR CBOR | ALL Announce that condenser vacuum is degrading. | ||
CRS Implement Standard Post Trip | CRS Direct CBOR to manually trip the reactor. | ||
CBOR Check reactivity control: | CBOR CBOR manually trip the reactor. | ||
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions. | |||
CBOR Check reactivity control: | |||
Reactor power decreasing. | Reactor power decreasing. | ||
All CEAs inserted. | All CEAs inserted. | ||
CBOT Check maintenance of vital | CBOT Check maintenance of vital auxiliaries: | ||
Generator output and exciter | Main turbine tripped. | ||
Generator output and exciter breakers open. | |||
All 4160v and 6900 v Non-Vital busses NOT energized. | |||
All 4160v and 480v vital AC bus energized. (see event 6) | All 4160v and 480v vital AC bus energized. (see event 6) | ||
All 125v vital DC bus energized. | All 125v vital DC bus energized. | ||
Page 9 of 13 | Page 9 of 13 | ||
Appendix D | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event | ||
Scenario No.: | |||
== Description:== | == Description:== | ||
Condenser air in-leakage exceeds the capacity of the vacuum pumps. This results in a reactor trip. | |||
Time Position Applicant's Actions or | Time Position Applicant's Actions or Behavior CBOR Check inventory control: | ||
PZR level | PZR level 16 to 80%. | ||
Trend to set point. | Trend to set point. | ||
CBOR Check RCS pressure | (See event 5/6) | ||
Trend to set point | CBOR Check RCS pressure control: | ||
RCP | RCS pressure 1800 to 2300 psia. | ||
Service | Trend to set point CBOR Check core heat removal by forced circulation: | ||
RCP s running Loop T less than 10° F. | |||
RCS MTS 30° F or greater. | |||
Service water pump suction aligned to Lake. | |||
Component cooling water aligned to RCPs. | |||
SW to aligned to CCW and ACW CBOT Check RCS Heat Removal: | |||
Report SG levels Main feed water is secured. | |||
Manually actuate EFW. | |||
Report feed water line is NOT intact. | Report feed water line is NOT intact. | ||
Report SG | Report SG pressures Shut both MSIVs due to 2CV 0400 and 2CV 0460, Main Steam to the moisture separator reheaters, have no power and are open. | ||
Page 10 of 13 | |||
Scenario No.: | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event | ||
== Description:== | == Description:== | ||
Condenser air in-leakage exceeds the capacity of the vacuum pumps. | |||
Status of | This results in a reactor trip. | ||
SE report to control | Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters: | ||
Temperature less than 140° F. | |||
Page 11 of | Pressure less than 16 psia. | ||
Status of radiation alarms: | |||
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm CRS Notify SM to perform the following: | |||
SE report to control room. | |||
Announce reactor trip on plant page. | |||
Refer to Tech Specs and EALs. | |||
Termination criteria: CRS has diagnosed a Loss of All Feed event and transitions to EOP or at discretion of lead examiner. | |||
Page 11 of 13 | |||
Scenario No.: 3 Event No.: | Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 5 and 6 Event | ||
== Description:== | == Description:== | ||
Startup transformer #3 lockout and feeder breaker from Startup transformer #2 to 2A1, non-vital 4160VAC bus fails to open. This will result in a loss of offsite power and automatic start of both emergency diesel generators (#1 and #2 EDG). | |||
This will | CRS Verify Service Water is aligned to #1 EDG and #2 EDG. | ||
#2 EDG). CRS Verify | CBOT Report that service water is not aligned to #1 EDG and that service water is aligned to #2 EDG and is running with proper voltage. | ||
1 EDG and #2 EDG. CBOT Report that service water is not | CRS Direct that AO locally take #1 EDG to lockout. | ||
CRS Direct that AO locally take #1 EDG to lockout. | CRS Direct CBOR to select channel 2 PZR level and pressure controllers. | ||
CRS Direct CBOR to select channel 2 PZR level and pressure controllers. | CBOR Select channel 2 PZR level and pressure controllers and places them in automatic. | ||
CBOR Select | |||
Termination criteria: When CBOR has selected channel 2 PZR level and pressure controllers or at discretion of lead examiner. | Termination criteria: When CBOR has selected channel 2 PZR level and pressure controllers or at discretion of lead examiner. | ||
Page 12 of | Page 12 of 13 | ||
Appendix D | |||
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 7 Event | |||
== Description:== | == Description:== | ||
Failure of | Failure of A Emergency Feed water pump to start due to a failure of the steam admission valve, 2CV-0340-2, to open. This will result in a loss of all feed water and the crew will reenergize 2A3 and start 2P7B, B emergency feed water pump and restore feed to the steam generators. | ||
Time Position Applicant's Actions or Behavior CRS Direct the following from the Loss of All Feed water EOP: Refer to Standard attachment 11 and direct the CBOT to manually start the Alternate AC Generator and energize 2A3. | Time Position Applicant's Actions or Behavior CRS Direct the following from the Loss of All Feed water EOP: | ||
Refer to Standard attachment 11 and direct the CBOT to manually start the Alternate AC Generator and energize 2A3. | |||
Direct the CBOT to manually start 2P7B and restore feed water to both steam generators at < 150 GPM for five minutes or until level rise is observed. | Direct the CBOT to manually start 2P7B and restore feed water to both steam generators at < 150 GPM for five minutes or until level rise is observed. | ||
Simulator Operator Cue: | Simulator Operator Cue: When contacted as WCO, to open the service water from #1 EDG isolation valve. Report that the hand-wheel spins freely and valve will not move. | ||
Critical | Critical CBOT Manually starts the Alternate AC Generator and energizes 2A3. | ||
Critical | Step Critical CBOT Manually starts B Emergency Feed Pump and restores feed Step water to both steam generators at < 150 GPM for five minutes or until level rise is observed. | ||
CBOR | CBOR Monitor control Steam generator pressures less than main steam safety valve lift set point (~1078 psig). | ||
Termination criteria: | Control PZR pressure using auxiliary spray less than 2500 psia. | ||
Termination criteria: When Emergency Feed water is established to both Steam Generators or at the discretion of the lead examiner. | |||
Page 13 of 13}} |
Latest revision as of 01:17, 15 March 2020
ML050690390 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 01/27/2005 |
From: | Gody A Operations Branch IV |
To: | Forbes J Entergy Operations |
References | |
-RFPFR, 50-368/05-301 50-368/05-301 | |
Download: ML050690390 (176) | |
Text
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 1 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Perform offsite power availability and vital electrical availability checklist.
JTA#: ANO2-RO-ELECD-SURV-25 KA VALUE RO: 4.2 SRO: 3.9 KA
REFERENCE:
2.1.31 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: LAB:
Perform POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 2 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected.
Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
TASK STANDARD: Supplement 4 complete and 2B5 voltage determined to be low and the bus inoperable.
TASK PERFORMANCE AIDS: Copy of OP 2107.001 Supplement 4.
SIMULATOR SETUP: Degrade Offsite voltage to ~ 490KV. Degrade 2B5 voltage to ~ 431VAC and 2B6 voltage to ~ 440VAC.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 3 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.
CRITICAL STEPS: 33, 34, 38, 39, 41 PERFORMANCE CHECKLIST STANDARDS (Circle One)
EXAMINERS NOTE:
The steps of this surveillance may be performed in any order.
- 1. Verify SU-2 status. Verified only SU #2 to 2A2, 2H1, N/A SAT UNSAT 2H2 are in PTL and SU #2 to 2A1 is NOT in PULL-TO-LOCK.
On Supplement 4, step 2, initialed step 2.1and 2.3 and NAd the rest.
On Supplement 4, 3.0 table 1 circled NA for UA to 2A1 and UA to 2A2.
On Supplement 4, Table 2 placed a check in 2A-111 "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for 2A-111 WITHIN ACCEPTABLE NORMAL RANGE.
On Supplement 4, Table 2, placed a check in 2A-211 "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for 2A-211 WITHIN ACCEPTABLE NORMAL RANGE.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 4 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Observed red light ON for 2A-309.
On Supplement 4, Table 2, placed a check in 2A-309 "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE.
Observed red light ON for 2A-409.
On Supplement 4, Table 2, placed a check in 2A-409 "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE.
> 154 KV.
EXAMINERs CUE:
On Supplement 4, Table 2, ER-ANO-2004-0548 is not recorded SU-2 voltage in installed. "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for SU-2 voltage WITHIN ACCEPTABLE NORMAL RANGE.
Note to Examiner:
The answers to the System Dispatcher calls should be given by the Examiner.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 5 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 7. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if ANO switchyard capacitors "in determine if ANO switchyard service" or not required. capacitors "in service" or not required.
EXAMINERS CUE:
On Supplement 4, Table 2, Dispatcher reports ANO placed a check in ANO switchyard capacitors "in switchyard capacitor "Measured service".
Value" column.
On Supplement 4, Table 2, circled "YES" for ANO switchyard capacitor WITHIN ACCEPTABLE NORMAL RANGE.
- 8. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if Russellville East Substation determine if Russellville East capacitors "in service" or not Substation capacitors "in service" required. or not required.
EXAMINERS CUE: On Supplement 4, Table 2, placed a check in Russellville Dispatcher reports Russellville East Substation capacitor East Substation capacitors "in "Measured Value" column.
service".
On Supplement 4, Table 2, circled "YES" for Russellville East Substation capacitor status WITHIN ACCEPTABLE NORMAL RANGE.
- 9. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if any other condition that could determine if any other condition degrade offsite power sources that could degrade offsite power is known. sources was known.
EXAMINERS CUE: On Supplement 4, Table 2, placed a check in "Measured Dispatcher reports NO Value" column for other conditions which could degrade conditions known which could offsite are power known.
degrade offsite power.
On Supplement 4, Table 2, circled "YES" for other conditions known which could degrade offsite power WITHIN ACCEPTABLE NORMAL RANGE.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 6 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 10. Contact Dispatcher to Contacted dispatcher to N/A SAT UNSAT determine if SU-2 automatic determine if SU-2 Automatic voltage regulator is in service or Voltage Regulator is in service or not required. if it is not required.
EXAMINERS CUE: On Supp 4 Table 2, placed check in status column for SU-2 Voltage SU-2 Automatic Voltage Regulator in service.
Regulator is in service.
On Supp 4 Table 2, circled YES for SU-2 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE.
On Supplement 4, Table 3, placed a check in 2A-113 "Measured Value" column.
On Supplement 4, Table 3, circled "YES" for 2A-113 WITHIN ACCEPTABLE NORMAL RANGE.
On Supplement 4, Table 3, placed a check in 2A-213 "Measured Value" column.
On Supplement 4, Table 3, circled "YES" for 2A-213 WITHIN ACCEPTABLE NORMAL RANGE.
Observed red light ON for 2A-309.
On Supplement 4, Table 3, placed a check in 2A-309 "Measured Value" column.
On Supplement 4, Table 3, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 7 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Observed red light ON for 2A-409.
EXAMINERS CUE: On Supplement 4, Table 3, placed a check in 2A-409 Red light ON for 2A409 to 2A4.
"Measured Value" column.
On Supplement 4, Table 3, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE.
- 15. Verify SU-3 Voltage. Using SPDS point E2ST3R, OR N/A SAT UNSAT using PMS E9664, OR on panel 2C10 using SU3 regulated voltage indication verified SU-3 voltage > 21.7 KV.
On Supplement 4, Table 3, recorded SU-3 voltage in "Measured Value" column.
On Supplement 4, Table 3, circled "YES" for SU-3 voltage WITHIN ACCEPTABLE NORMAL RANGE.
- 15. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT Auto-Transformer status. determine if Auto-Transformer 500 KV source was connected.
On Supplement 4, Table 3, EXAMINERS CUE:
placed a check in Dispatcher reports 500 KV Auto-Transformer 500 KV source source connected to AUTO "Measured Value" column.
transformer.
On Supplement 4, Table 3, circled "YES" for Auto-Transformer 500 KV source WITHIN ACCEPTABLE NORMAL RANGE.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 8 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 16. Contact Dispatcher to Contacted dispatcher to N/A SAT UNSAT determine if SU-3 automatic determine if SU-3 Automatic voltage regulator is in service or Voltage Regulator is in service or not required. if it is not required.
On Supp 4 Table 3, placed check in status column for SU-3 Voltage EXAMINERS CUE:
Regulator in service.
SU-3 Automatic Voltage On Supp 4 Table 3, circled YES Regulator is in service.
for SU-3 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE..
- 17. Verify both SU-2 and SU-3 Verified both SU-2 and SU-3 N/A SAT UNSAT operable. operable as shown in Table 2 and Table 3.
Circled "YES" in step 3.1.1.
- 18. Mark step 3.1.2 & 3.1.3 "N/A". Marked step 3.1.2 & 3.1.3 "N/A". N/A SAT UNSAT
- 19. Evaluate steps 3.1.1 through Evaluated steps 3.1.1 through N/A SAT UNSAT 3.1.3 for "NO" answers. 3.1.2 for "NO" answers.
Determined that there were no "NO" answers NAd bullets below 3.1.4.
EXAMINERs NOTE: This starts section 3.2, of electrical checklist.
Observed green light ON for 2A-310.
On Supplement 4, Table 4, placed a check in 2A-310 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2A-310 status agreeing with limiting condition for operability.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 9 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Observed green light ON for 2A-410.
On Supplement 4, Table 4, placed a check in 2A-410 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2A-410 status agreeing with limiting condition for operability.
> 3640v and < 4440v.
On Supplement 4, Table 4, recorded 2A3 voltage in "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2A3 voltage agreeing with limiting condition for operability.
- 23. Determine 2A3 Operability Knowing the status of 2VEF-56B, N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A3 operable.
Observed green light ON for 2A-310.
On Supplement 4, Table 5, placed a check in 2A-310 "Measured Value" column.
On Supplement 4, Table 5, circled "YES" for 2A-310 status agreeing with limiting condition for operability.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 10 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Observed green light ON for 2A-410.
On Supplement 4, Table 5, placed a check in 2A-410 "Measured Value" column.
On Supplement 4, Table 5, circled "YES" for 2A-410 status agreeing with limiting condition for operability.
> 3640v and < 4440v.
On Supplement 4, Table 5, recorded 2A4 voltage in "Measured Value" column.
On Supplement 4, Table 5, circled "YES" for 2A3 voltage agreeing with limiting condition for operability.
- 27. Determine 2A4 Operability Knowing the status of 2VEF-56A, N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A4 operable.
- 28. Verify both 2A3 and 2A4 Verified both 2A3 and 2A4 N/A SAT UNSAT operable. operable as shown in Table 4 and Table 4.
Circled "YES" in step 3.2.1.
- 29. Mark step 3.2.2 "N/A". Marked step 3.2.2 "N/A". N/A SAT UNSAT
- 30. Evaluate steps 3.2.1 and 3.2.2 Evaluated steps 3.2.1 and 3.2.2 N/A SAT UNSAT for "NO" answers. for "NO" answers.
Determined 2A3 and 2A4 to be operable.
And NAd initialed step 3.2.3.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 11 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Observed green light ON for 2B-513.
On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability.
(2B-613) OPEN.
Observed green light ON for 2B-613.
On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability.
(C) 33. Verify 2B5 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2B5, verified 2B5 voltage is NOT > 436v.
On Supplement 4, Table 4, recorded 2B5 voltage in "Measured Value" column.
On Supplement 4, Table 4, circled "NO" for 2B5 voltage agreeing with limiting condition for operability.
(C) 34. Determine 2B5 Operability Using the Low voltage recorded N/A SAT UNSAT in Table 6, used flow chart to determine that 2B5 is INOPERBLE.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 12 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Observed green light ON for 2B-513.
On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability.
(2B-613) OPEN.
Observed green light ON for 2B-613.
On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability.
- 37. Verify 2B6 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2B6, verified 2B6 voltage is > 436v.
On Supplement 4, Table 4, recorded 2B6 voltage in "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B6 voltage agreeing with limiting condition for operability.
(C) 38. Determine 2B6 Operability Using the status of 2VEF-56A, N/A SAT UNSAT weather data, the status of ESF Switchgear Room Coolers 2VUC-2A and 2VUC-2B, and Table 5 data, used the flow chart to verify 2B6 OPERABLE.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 13 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 39. Verify 2B5 INOPERABLE and Verified 2B5 INOPERABLE and N/A SAT UNSAT 2B6 OPERABLE. 2B6 OPERABLE as shown in Table 6 and Table 7.
Circled "NO" in step 3.3.1.
- 40. Mark step 3.3.2 "N/A". Marked step 3.3.2 "N/A". N/A SAT UNSAT (C) 41. Evaluate steps 3.3.1 and 3.3.2 Evaluated steps 3.3.1 and 3.3.2 N/A SAT UNSAT for "NO" answers. for "NO" answers.
Determined 2B5 to be INOPERABLE and 2B6 to be EXAMINERs CUE:
Do not refer to Tech Specs the SM will perform that for you.
Inform the SM SM has been informed.
Initiate CR Initiating Condition Report has been simulated complete.
NOTE CRITICAL PART OF Initialed steps 3.3.3.
THIS STEP IS DECLARING 2B5 INOPERABLE.
END
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 14 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.
Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
Initiating CUE:
The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 15 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.
Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
Initiating CUE:
The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Review and approve offsite power availability and vital electrical availability checklist.
JTA#: ANO-SRO-ADMIN-NORM-152 KA VALUE RO: 4.2 SRO: 3.9 KA
REFERENCE:
2.1.31 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: LAB:
Perform POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.
TASK STANDARD: Review Supplement 4 data and identify the following:
- 1) Voltage recorded in table 3, Startup 3 for SU3 regulated voltage was less than acceptable.
- 2) Declared SU3 INOPERBLE.
- 3) Identified TS 3.8.1.1 to be applicable and performance of a complete OP 2107.001 Supplement 4 must be done within one hour.
- 4) Initiated Condition Report to correct problem.
TASK PERFORMANCE AIDS: Completed copy of OP 2107.001 Supplement 4.
SIMULATOR SETUP: N/A.
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)
Critical Steps: 1,2,3 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 1. Review completed copy of OP Review Table 3, startup 3 and N/A SAT UNSAT 2107.001 Supplement 4 and identified that SU #3 voltage is identify Table3, startup 3 has lower than acceptable.
been completed incorrectly.
(C) 2. Declared SU #3 inoperable. Determined that SU #3 should be N/A SAT UNSAT declared inoperable due to low voltage.
(C) 3. Identified Technical Identified that Technical N/A SAT UNSAT Specification 3.8.1.1 is Specification 3.8.1.1 LCO is applicable. applicable and that action A.1, performance of OP 2107.001 Supplement 4 must be performed within one hour.
- 4. Initiate Condition report. Identified need to initiate N/A SAT UNSAT condition report.
EXAMINERs CUE:
Condition report will be initiated by Shift Engineer.
END STOP TIME:
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.
Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.
Initiating CUE:
The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.
Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.
Initiating CUE:
The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A1b Conduct of Operations TASK: Spent Fuel Pool Makeup JTA#:
REFERENCE:
2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: LAB:
Perform POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SYSTEM/DUTY AREA:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
- Plant is at 100% power.
- PMS computer is out of service.
- Spent Fuel Pool Level = 401 0
- Tilt Pit Gate is installed
- Cask Loading Pit Gate is installed
- A BAM tank concentration is 5950 ppmb
RO candidates should calculate required SFP makeup volume to be within 1828 to 1928 gallons, determine Boric acid volume to be within 910 gallons to 960 gallons, determine DI water volume to be within 918 gallons to 968 gallons.
TASK PERFORMANCE AIDS:
OP 2104.006, Rev 021-06-0, Attachment F
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.
CRITICAL ELEMENTS (C): 5, 7, 8 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Record initial Spent Fuel Pool On 2104.006, Attachment F N/A SAT UNSAT Level. recorded initial Spent Fuel Pool level of 401 0 given in initial conditions.
Examiners Note: It is not necessary for the candidate to fill in every blank on OP 2104.005, attachment F to arrive at the correct total volume to be added to the SFP.
- 2. Calculate initial Spent Fuel Pool Obtained Gal/Ft value for Fuel N/A SAT UNSAT Volume. Pool - Top of racks to Elev 4016 (5634.4 gal/ft).
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.
Multiplied 469.5 by 6 inches to obtain 2817 gallons.
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal)
Subtracted 1878 gal from 133,817 gal to obtain 131000 gallons total volume above top of racks.
Added 131000 gal and 84,255 gal to find initial pool volume of 215255 gallons.
- 3. Record desired Spent Fuel On 2104.006, Attachment F N/A SAT UNSAT Pool Level. recorded desired Spent Fuel Pool level of 401 4 given in initial conditions.
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 4. Calculate desired Spent Fuel Obtained Gal/Ft value for Fuel N/A SAT UNSAT Pool Volume. Pool - Top of racks to Elev 4016 (5634.4 gal/ft).
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.
Multiplied 469.5 by 2 inches to obtain 939 gallons.
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal)
Subtracted 939 gal from 133,817 gal to obtain 132878 gallons total volume above top of racks.
Added 132878 gal and 84,255 gal to find desired pool volume of 217133 gallons.
C 5. Calculate volume of makeup Subtracted initial Spent Fuel Pool N/A SAT UNSAT required to raise Spent Fuel volume from desired Spent Fuel Pool level to desired level. Pool volume and determined amount of makeup needed to be Total Volume within 1828 to 1878 gallons.
1928.
- 6. Record A BAMT boron On 2104.006, Attachment F, N/A SAT UNSAT concentration. recorded value of 5950 ppm for A BAMT concentration.
C 7. Calculate feed volume of boric Inserted values into formula and N/A SAT UNSAT acid required to raise pool level. determined Boric acid volume to Volume within 910 gallons to be 935.53 gallons.
960 gallons.
C 8. Calculate the feed volume of DI Inserted values into formula and N/A SAT UNSAT water required to raise pool determined DI water volume to level. Volume within 918 be 942.47 gallons.
gallons to 968 gallons.
END STOP TIME:
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
- Plant is at 100% power.
- PMS computer is out of service.
- Spent Fuel Pool Level = 401 0
- Tilt Pit Gate is installed
- Cask Loading Pit Gate is installed
- A BAM tank concentration is 5950 ppmb
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
- Plant is at 100% power.
- PMS computer is out of service.
- Spent Fuel Pool Level = 401 0
- Tilt Pit Gate is installed
- Cask Loading Pit Gate is installed
- A BAM tank concentration is 5950 ppmb
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A1b Conduct of Operations TASK: Spent Fuel Pool Makeup JTA#:
REFERENCE:
2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: LAB:
Perform POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SYSTEM/DUTY AREA:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
- Plant is at 100% power.
- PMS computer is out of service.
- Initial Spent Fuel Pool Level = 401 0
- Tilt Pit Gate is installed
- Cask Loading Pit Gate is installed
- A BAM tank concentration is 5950 ppmb
- Cask loading pit operations has lowered the SFP level
- CBOT has performed actions per OP 2104.006 step 10.3.
- Final Spent Fuel Pool Level = 401 4 TASK STANDARD:
SRO candidates should identify the following:
- 1) Boron Concentration of the feed source should be 5950 NOT 4950.
- 2) The Feed volume (F) calculated previously was transposed into the feed volumes calc as 1788 gallons not the 1878 gallons correctly calculated. Therefore both the calculated Boric acid and DI water volumes are wrong.
And calculate the following correct feed volumes:
- 3) Boric acid volume calculated to be within 910 gallons to 960 gallons.
- 4) Determine DI water volume to be within 918 gallons to 968 gallons.
TASK PERFORMANCE AIDS:
OP 2104.006, Rev 021-06-0, Attachment F
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.
CRITICAL ELEMENTS (C): 3, 4, 5, 6 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Reviewed the completed form Reviewed the completed form N/A SAT UNSAT OP 2104.006, Attachment F. OP 2104.006, Attachment F.
- 2. Determined the calculated Calculated the feed volume to be N/A SAT UNSAT volume of solution to be correct. added to the SFP, F, to be 1878 gallons.
C 3. Determined that the boron Recognized the boron N/A SAT UNSAT concentration of the feed concentration of the feed source source was in error. was recorded as 4950 ppm instead of the given value of 5940 ppm.
C 4. Determined the calculated Recognized that the feed volume N/A SAT UNSAT volume of solution used in the to be added to the SFP, F, was calculation of the feed volumes recorded in error as 1788 gallons of boric acid NOT the 1878 gallons calculated on the previous page.
Examiners Note: the candidate may need to be prompted to calculate the volume of Boric acid and DI water.
C 5. Determined the Boron volume Recognized the Boron volume to N/A SAT UNSAT to be added as calculated was be added as calculated was in in error and determined the error and determined the correct correct volume to be 910 volume to be 935.5 gallons.
gallons to 960 gallons.
C 6. Determined the DI water Recognized the DI water volume N/A SAT UNSAT volume to be added as to be added as calculated was in calculated was in error and error and determined the correct determined the correct volume volume to be 942.5 gallons.
to be within 918 gallons to 968 gallons.
END STOP TIME:
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
- Plant is at 100% power.
- PMS computer is out of service.
- Initial Spent Fuel Pool Level = 401 0
- Tilt Pit Gate is installed
- Cask Loading Pit Gate is installed
- A BAM tank concentration is 5950 ppmb
- Cask loading pit operations has lowered the SFP level
- CBOT has performed actions per OP 2104.006 step 10.3.
- Final Spent Fuel Pool Level = 401 4 INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
- Plant is at 100% power.
- PMS computer is out of service.
- Initial Spent Fuel Pool Level = 401 0
- Tilt Pit Gate is installed
- Cask Loading Pit Gate is installed
- A BAM tank concentration is 5950 ppmb
- Cask loading pit operations has lowered the SFP level
- CBOT has performed actions per OP 2104.006 step 10.3.
- Final Spent Fuel Pool Level = 401 4 INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review completed 2P89B surveillance and determine 2P-89B operability JTA#:
REFERENCE:
2.2.12 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: LAB:
Perform POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREN side.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
TASK STANDARD: (Identification of three of the four errors is required and one of the three must be the Pump D/P)
- Pump P is out of LIMITING RANGE FOR OPERABILITY.
- Calculation for determining lower pump P limit is in error.
- Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
- Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
TASK PERFORMANCE AIDS: marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.
CRITICAL STEPS: 2, 3, 4, 5 START TIME:
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test
- 1. Perform review of the surveillance Reviews the surveillance procedure N/A procedure results. provided.
(C) 2.
Pump P is out of LIMITING Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY. FOR OPERABILITY. N/A SAT UNSAT (C) 3. Calculation for determining lower Calculation for determining lower pump pump P limit is in error. P limit should be 1380.81 psid. N/A SAT UNSAT (C) 4. Inboard Radial Bearing #1 Vibes Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.
(C) 5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.
EXAMINERs CUE: The Shift Engineer will enter the pump data into the database.
- 6. Report to CRS that the results of Reports to CRS that results of the the surveillance are unsatisfactory surveillance are unsatisfactory and N/A SAT UNSAT and 2P89B is inoperable. 2P89B is inoperable.
END STOP TIME:
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
Initiating CUE:
The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
Initiating CUE:
The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 61 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:
SUPPLEMENT 2 PAGE 7 OF 9 3.0 ACCEPTANCE CRITERIA 3.1 Record values observed during 2P-89B operation below AND compare with limiting range of values for operability.
Record date and time Test begins TODAYs DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT MEASURED ACCEPTABLE LIMITING IS DATA IN (INCLUDE VALUE NORMAL RANGE FOR LIMITING TEST INST) RANGE OPERABILITY RANGE?
Running Suct. 2PI-5100 33.5 psig 8 psig 8 psig YES NO Pressure (local) 2PI-5101 1389 psig N/A N/A N/A (local)
Discharge 2PI-5109 Pressure 1379 psig N/A N/A N/A (2C16)
RWT 2TIS-5675 Temperature (2C17) 90 °F 40 to 110°F N/A N/A Pump P 2PI-5101 - 1360.81(1)to 1355.5 psid N/A YES NO
{4.3.1} 2PI-5100 1612.8 psid Motor Running Ammeter at A 34 Amps N/A N/A N/A Amps 2A-406 B 33 Amps (CR-1-96-0272- C 35 Amps 07)
Inboard Brg VIB001 0.325 0.700 0.825 in/sec YES NO Radial #1 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.22 in/sec YES NO Radial #2 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.073 in/sec YES NO Axial Vibes in/sec in/sec Outboard Brg VIB001 0.325 0.700 0.187 in/sec YES NO Radial #1 in/sec in/sec Vibes Outboard Brg VIB001 0.325 0.700 0.207 In/sec YES NO Radial #2 in/sec in/sec Vibes Outboard Brg VIB001 0.232 0.558 0.610 In/sec YES NO Axial Vibes in/sec in/sec Record date and time Test completed TODAYs DATE 0930 Vibration Instrument Cal Due Date 7 days from TODAY Vibration Data Collected By Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is:
1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90 - 40)/4] = 1360.81 psid 3.2 Independently verify pump P calculation. JJB
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 62 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:
SUPPLEMENT 2 PAGE 8 OF 9 3.3 Document observation of check valve stroke in Table 2.
TABLE 2 CHECK TEST TEST CRITERIA IS PROPER VALVE VALVE DIRECTION STROKE INDICATED?
2SI-10C Closed 2P-89C NOT rotating YES NO N/A 2SI-10B Closed 2P-89B NOT rotating YES NO N/A 3.4 IF NO circled in Table 1 OR 2, THEN perform the following:
- Declare affected component inoperable.
- Refer to Tech Spec 3.5.2 OR 3.5.3.
- Notify Shift Manager.
- Initiate WR/WO as applicable.
NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator.
3.5 IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),
THEN perform the following:
- Annotate on status board. N/A
- Annotate in Work Exceptions section of WR/WO. N/A 3.6 Pump Data recorded in database AND reviewed by SRO.
3.7 IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O). N/A Comments ________________________________________________________________
Performed By ____________________________________________ Date __________
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 63 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:
SUPPLEMENT 2 PAGE 9 OF 9 4.0 SUPERVISOR REVIEW AND ANALYSIS 4.1 Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY? YES NO 4.2 Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside YES NO N/A normal range also outside limiting range.)
4.3 IF NO answered to 4.1, THEN perform the following corrective actions:
- Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed.
- Verify Condition Report initiated.
4.4 IF NO circled in 4.2, THEN perform the following corrective actions:
- Verify WR/WO has been initiated.
- Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.
Comments ________________________________________________________________
4.5 Are all administrative requirements of this test satisfied?
YES NO Supervisor ______________________________________________ Date __________
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review and approve as a supervisor the completed 2P89B surveillance.
JTA#:
REFERENCE:
2.2.12 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: LAB:
Perform POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
TASK STANDARD:
(Identification of Five of the Six errors is required and two of the six must be the Pump D/P and the tech spec applicabiltiy)
- Pump P is out of LIMITING RANGE FOR OPERABILITY.
- Calculation for determining lower pump P limit is in error.
- Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
- Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
- Determine TS 3.5.2 applicability
- Yes is circled on parameters that do not meet acceptance criteria TASK PERFORMANCE AIDS: marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.
CRITICAL STEPS: 2, 3, 4, 5, 6, 7 START TIME:
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test
- 1. Perform supervisor review of the Reviews the surveillance acceptance N/A surveillance procedure results and criteria provided.
determine errors.
EXAMINERs NOTE: the following are the errors in the form provided.
(C) 2. Pump P is out of LIMITING Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY. FOR OPERABILITY. N/A SAT UNSAT (C) 3. Calculation for determining lower Calculation for determining lower pump pump P limit is in error. P limit should be 1380.81 psid. N/A SAT UNSAT (C) 4. Inboard Radial Bearing #1 Vibes Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.
(C) 5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.
(C) 6. Identify the technical specification Identifies TS 3.5.2 applicability.
applicability error. N/A SAT UNSAT (C) 7. Identified that YES was circled on Identifies that YES was circled on parameters that did not meet parameters that did not meet acceptance N/A SAT UNSAT acceptance criteria. criteria.
EXAMINERs NOTE: The candidate will probably require another RO to review the data table before proceeding.
Ask the candidate to continue on with completing section 4.0 as though that review matched the same errors previously identified.
- 8. Inoperable equipment checklist Identifies need to perform inoperable needed. equipment checklist must be completed. N/A SAT UNSAT EXAMINERs CUE:
The SRO ADMIN will perform the inoperable equipment checklist.
- 9. Condition Report needed. Identifies need to generate condition report. N/A SAT UNSAT EXAMINERs CUE:
The SE will initiate the condition report.
END STOP TIME:
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
Initiating CUE:
The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
Initiating CUE:
The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 61 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:
SUPPLEMENT 2 PAGE 7 OF 9 3.0 ACCEPTANCE CRITERIA 3.1 Record values observed during 2P-89B operation below AND compare with limiting range of values for operability.
Record date and time Test begins TODAYs DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT MEASURED ACCEPTABLE LIMITING IS DATA IN (INCLUDE VALUE NORMAL RANGE FOR LIMITING TEST INST) RANGE OPERABILITY RANGE?
Running Suct. 2PI-5100 33.5 psig 8 psig 8 psig YES NO Pressure (local) 2PI-5101 1389 psig N/A N/A N/A (local)
Discharge 2PI-5109 Pressure 1379 psig N/A N/A N/A (2C16)
RWT 2TIS-5675 Temperature (2C17) 90 °F 40 to 110°F N/A N/A Pump P 2PI-5101 - 1360.81(1)to 1355.5 psid N/A YES NO
{4.3.1} 2PI-5100 1612.8 psid Motor Running Ammeter at A 34 Amps N/A N/A N/A Amps 2A-406 B 33 Amps (CR-1-96-0272- C 35 Amps 07)
Inboard Brg VIB001 0.325 0.700 0.825 in/sec YES NO Radial #1 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.22 in/sec YES NO Radial #2 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.073 in/sec YES NO Axial Vibes in/sec in/sec Outboard Brg VIB001 0.325 0.700 0.187 in/sec YES NO Radial #1 in/sec in/sec Vibes Outboard Brg VIB001 0.325 0.700 0.207 In/sec YES NO Radial #2 in/sec in/sec Vibes Outboard Brg VIB001 0.232 0.558 0.610 In/sec YES NO Axial Vibes in/sec in/sec Record date and time Test completed TODAYs DATE 0930 Vibration Instrument Cal Due Date 7 Days from TODAY Vibration Data Collected By Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is:
1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90 - 40)/4] = 1360.81 psid 3.2 Independently verify pump P calculation. JJB
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 62 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:
SUPPLEMENT 2 PAGE 8 OF 9 3.3 Document observation of check valve stroke in Table 2.
TABLE 2 CHECK TEST TEST CRITERIA IS PROPER VALVE VALVE DIRECTION STROKE INDICATED?
2SI-10C Closed 2P-89C NOT rotating YES NO N/A 2SI-10B Closed 2P-89B NOT rotating YES NO N/A 3.4 IF NO circled in Table 1 OR 2, THEN perform the following:
- Declare affected component inoperable. N/A
- Refer to Tech Spec 3.5.2 OR 3.5.3. N/A
- Notify Shift Manager. N/A
- Initiate WR/WO as applicable. N/A NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator.
3.5 IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),
THEN perform the following:
- Annotate on status board. N/A
- Annotate in Work Exceptions section of WR/WO. N/A 3.6 Pump Data recorded in database AND reviewed by SRO. SBR 3.7 IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O). N/A Comments ________________________________________________________________
Performed By Sammy Reactor Date TODAY Jimmy Reactor
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 63 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:
SUPPLEMENT 2 PAGE 9 OF 9 4.0 SUPERVISOR REVIEW AND ANALYSIS 4.1 Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY? YES NO 4.2 Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside YES NO N/A normal range also outside limiting range.)
4.3 IF NO answered to 4.1, THEN perform the following corrective actions:
- Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed.
- Verify Condition Report initiated.
4.4 IF NO circled in 4.2, THEN perform the following corrective actions:
- Verify WR/WO has been initiated.
- Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.
Comments ________________________________________________________________
4.5 Are all administrative requirements of this test satisfied?
YES NO Supervisor ______________________________________________ Date __________
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A.3 Radiation Control TASK: Review the emergency RWP and determine stay time based on radiation levels expected.
JTA#:
REFERENCE:
2.3.10 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Perform SIMULATOR: LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2004-0009; emergency RWP and status board printout of Aux Building 354.
EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS
- 1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
- 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
- 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
- 5. Fuel Pool low level alarm is in and SFP level is lowering.
- 6. RP coverage will not be available.
TASK STANDARD:
Using Emergency RWP:
- Identify General Area, GA, dose rates in SFP valve gallery are ~ 500 MR/HR.
- Determine a maximum stay time of 1.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> based on EAD alarm set-points.
Using normal inspection RWP:
- Determine appropriate dosimeter
- Entered RCA
- Observed proper radiological controls while in RCA
- Properly uses the PCM-1
- Properly scans loose items in TCM JPM time is based on the review of the emergency RWP and the calculation of the stay time.
TASK PERFORMANCE AIDS: Emergency RWP 2004-0009 SIMULATOR SETUP: NA
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency Radiological Work Permit, RWP, and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.
Critical Steps: 2, 3, 4, 5, 6 START TIME:
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide Emergency RWP.
EXAMINERs CUE: The candidate may attempt to check out a radiation survey meter per monitoring step 7.0. It is not a part of this JPM to check out the survey meter, but that the candidate knows one is needed.
- 1. Review Emergency RWP for Determines that the alarming dosimeter N/A limits. is set to alarm in an 800mr/hr field and that the Dose alarm is set at 800 mrem.
(C) 2.
Determine stay time in SFP valve Using the status board printout provided gallery to be a maximum of 1.6 determined that the General Area (GA) N/A SAT UNSAT hours. field is 500 MR/HR so the maximum stay time will be 1.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
EXAMINERs NOTE: The rest of these steps determine the candidates ability to enter and exit controlled access correctly using the Actual RWP for inspections, DO NOT allow the candidate to use the emergency RWP to enter controlled access.
(C) 3. Determined that an alarming Obtained an alarming dosimeter from dosimeter will be required for rack. N/A SAT UNSAT entry into the Radiologically Controlled Area, RCA, using the normal inspection RWP.
(C) 4. Entered appropriate information Entered the RCA under the general into the log in screen and inspection RWP. N/A SAT UNSAT successfully entered the RCA.
(C) 5. While in the RCA the examinee While in the RCA the examinee observes observes and adheres to all and adheres to all applicable postings N/A SAT UNSAT applicable postings and entry and entry requirements.
requirements.
(C) 6. When exiting the RCA the Enters and exits PCM-1.
examinee enters the control point N/A SAT UNSAT area and enters a PCM-1 monitor.
- 7. All loose materials will be cleared Examinee places loose items in the TCM through the tool contamination for counting. N/A SAT UNSAT monitor (TCM)
- 8. After clearing the PCM-1 monitor, Examinee clears the Portal Monitor the examinee exits through the N/A SAT UNSAT Portal Monitor
- 9. Examinee deactivates EAD at Examinee deactivates his EAD and final exit of session returns it to the Health Physics rack. N/A SAT UNSAT END STOP TIME:
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS
- 1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
- 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
- 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
- 5. Fuel Pool low level alarm is in and SFP level is lowering.
- 6. RP coverage will NOT be available.
Initiating CUE:
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS
- 1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
- 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
- 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
- 5. Fuel Pool low level alarm is in and SFP level is lowering.
- 6. RP coverage will NOT be available.
Initiating CUE:
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.
RWP for TRAINING USE ONLY RWP ANO Page 1 of 5 l l l Status: Active RADIOLOGICAL WORK PERMIT Rev 0 Unit C RWP 2004-0009l l______________________________________________________________________________l l l l SECTION I RWP DESCRIPTION l l______________________________________________________________________________l l l l l l START DATE: 01-jan-2004 l END DATE: 31-dec-2004 l RWP TYPE: General l l__________________________l_________________________l_________________________l l l l DESCRIPTION: l l l l Emergencies l l l l SYSTEM COMPONENT BLDG LOCATION l l l l NA Various A1/A2 Non LHRA's l l NA Various OSCA Non LHRA's l l NA Various A1/A2 LHRA's l l l l JOB CONTACTS..Shift Manager ALARA CODE....C0007014 l l JOB CODE......ROS- ALARA CAT.....Level III l l______________________________________________________________________________l l l l SECTION II TASK LIST l l______________________________________________________________________________l l l l l l l l l l ESTIMATED l l TASKl STATUS l TASK DESCRIPTION l PR-HR lPER-REMl l_____l_________l______________________________________________l_______l_______l l l l l l l l 1 lActive lEmergency Response in Non LHRA's l 1000.0l 5.000l l l l l l l l 2 lActive lEmergency Response in LHRA's l 200.0l 6.000l l_____l_________l______________________________________________l_______l_______l l l l l l TOTALS l 1200.0l 11.000l l______________________________________________________________l_______l_______l l l l SECTION III RWP REVIEWS AND APPROVAL l l______________________________________________________________________________l l l l Originator ELLISON PW 18-dec-2003 Development ELLISON PW 19-dec-2003 l l ALARA Eval ELLISON PW 19-dec-2003 HP Supv. DORAN GA 19-dec-2003 l l Terminated ____________ ___________ Completed ____________ ___________ l l Withdrawn ____________ ___________ l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009
RWP for TRAINING USE ONLY RWP ANO Page 2 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 1 ) l l______________________________________________________________________________l l l l 1) Emergency Response in Non LHRA's l l______________________________________________________________________________l l l l RADIOLOGICAL CONDITIONS ( Task# 1 ) l l______________________________________________________________________________l l l l l l l l l l l (mrem/Hr) l dpm l l l l l l Component/Location l Gen Max l100cm2l l Yr/DANI# l l l l______________________l_____l_____l______l________l____________l_______l______l l l l l l l l l l lUnit 1&2 Aux. Bldgs l 1 l 200 l <1K l lMonthly Pkg l l l lOutside Controlled Ac l 1 l 80 l <1K l lMonthly Pkg l l l lVarious / Aux. Bldgs l 1 l1000 l <1K l lANTICIPATED l l l l______________________l_____l_____l______l________l____________l_______l______l l l l Dosimetry : Whole body TLD required, and Alarming Dosimeter. l l l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l ALARA Actions: l l 1) Utilize low dose waiting areas whenever possible to minimize l l exposure. l l l l Monitoring: l l 1) Notify the zone coverage RP or the duty shift RP when Emergency l l Conditions exist. l l 2) Unless otherwise directed by RP Supervision, Electronic Alarming l l Dosimeter (EAD) set points will be 800 mrem dose and 800 mrem/hr l l dose rate. l l 3) During Emergency conditions the possibility of changing l l radiological conditions is increased. Radiological information l l should be obtained from in plant monitors, Rads Telmetry devices in l l the field or RP personnel. l l 4) Periodically check your Electronic Alarming Dosimeter (EAD). This l l check should be more frequent in areas where your ability to hear l l the alarm is diminished. l l 5) If an EAD dose alarm occurs: l l 1. Secure work. l l 2. Immediately leave Controlled Access. l l 3. Notify RP. l l 6) If an EAD dose rate alarm occurs: l l 1. Secure work. l l 2. Back out of the immediate area until alarm clears. l l 3. Notify others in work crew. l l 4. Immediately contact RP for further instructions. l l 7) Initial/Intermittent RP coverage is required for High Radiation l l Areas unless the individual is "Category 3 Advanced Radworker" l l qualified and has an appropriate radiation survey meter at all l l times during the entry. l l NOTE: An EAD is not an appropriate survey meter. l l 8) Access to the overhead >8ft. is allowed with the following l l l l --Continued on next page-- l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009
RWP for TRAINING USE ONLY RWP ANO Page 3 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 1 ) l l______________________________________________________________________________l l l l --Continued from previous page-- l l l l provisions: l l A.) Use a ladder to climb directly below the valve to be l l operated. l l B.) Do not touch any interferences or components in the overhead. l l C.) Use your survey meter to obtain dose rates of all areas l l entered. l l D.) Wear rubber gloves while operating the valve but remove them l l prior to descending the ladder. l l E.) Upon completion, perform a large area masslin survey of the l l ladder to determine if any cross contamination has occurred. l l l l 9) Accessing the top of partial walls separating Radiation/High l l Radiation areas from Locked High Radiation areas is not permitted l l on this RWP. l l l l Work Controls: l l l l 1) Ensure the proper surveys are performed prior to removing any l l items from the RCA. l l l l Respiratory: l l l l 1) Airborne Activity will be assessed based on process monitor's and l l continuous air monitor activity. l l l l Anti-C's: l l l l 1) Use Anti-C's appropriate for the area to be entered. l l l l Additional: l l l l 1) Radiological Conditions are ANTICIPATED and must be determined l l prior to beginning work in the area. l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009
RWP for TRAINING USE ONLY RWP ANO Page 4 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 2 ) l l______________________________________________________________________________l l l l 2) Emergency Response in LHRA's l l______________________________________________________________________________l l l l RADIOLOGICAL CONDITIONS ( Task# 2 ) l l______________________________________________________________________________l l l l l l l l l l l (mrem/Hr) l dpm l l l l l l Component/Location l Gen Max l100cm2l l Yr/DANI# l l l l______________________l_____l_____l______l________l____________l_______l______l l l l l l l l l l lUnit 1/2 Aux. Bldgs. l 1 l 200 l <1K l lMonthly Pkg l l l lOutside Controlled Ac l 1 l 80 l <1K l lMonthly Pkg l l l lVarious U1/2 Aux. Bld l 1 l1000 l <1K l lANTICIPATED l l l l______________________l_____l_____l______l________l____________l_______l______l l l l Dosimetry : Whole body TLD required, and Alarming Dosimeter. l l l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009
RWP for TRAINING USE ONLY RWP ANO Page 5 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 2 ) l l______________________________________________________________________________l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l l l ALARA Actions: l l l l 1) A pre-job-brief is required for this task. l l l l 2) RP staff and or Shift Manager will conduct the pre-job-brief. l l l l 3) Utilize low dose waiting areas whenever possible to minimize l l exposure. l l l l Monitoring: l l l l 1) Contiuous RP coverage is required for this task. l l l l 2) Periodically check Electronic Alarming Dosimeter (EAD). This check l l should be more frequent in areas where your ability to hear the l l alarm is deminished. If any (EAD) alarm is received secure work, l l find as low a dose rate area as possible and contact RP supervision l l for further guidance. l l l l 3) Unless otherwise directed by RP Supervision, Electronic Alarming l l Dosimeter set points will be 800 mrem dose and 4000 mrem/hr dose l l rate. l l l l 4) During Emergency conditions the possibility of changing l l radiological conditions is increased. Radiological information l l should be obtained from in plant radiation monitors, Rads Telemetry l l devices in the field or RP personnel. l l l l Work Controls: l l l l 1) Ensure the proper surveys are preformed prior to removing any l l items from the RCA l l l l Respiratory: l l l l 1) Airborne Activity will be assessed based on process monitor's and l l continuous air monitor's activity. l l l l Anti-C's: l l l l 1) Use Anti-C's appropriate for the area to be entered. l l l l Additional: l l l l 1) Radiological conditions are ANTICIPATED and must be determined l l prior to beginning work in the area. l l______________________________________________________________________________l Tue Oct 19 13:59:59 2004 working RWP 2004-0009
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:
SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#:
REFERENCE:
2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO:
X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: LAB:
Perform POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 1903.010 Rev 037-02-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
- Plant had been operating for 150 days at 100% power.
- A reactor trip occurred two hours ago.
- A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
- Containment Spray Actuation Signal (CSAS) has actuated.
- Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
- Chemists have been notified to sample the RCS.
TASK STANDARD:
Declared a Site Area Emergency (based on EAL 1.4, Containment radiation readings which indicate LOCA and >1% fuel cladding failure). Also acceptable is a review of the 1903.010 paragraph 4.10, Fission Product Barrier Failure and 4.11, Fission Product Barrier Challenge criteria and determine that two fission product barriers are challenged or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility.
TASK PERFORMANCE AIDS: OP 1903.010 Rev. 037-02-0 SIMULATOR SETUP: N/A.
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
Critical Steps: 2, 3, 4 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Review E-Plan procedure Review 1903.010 index and EAL N/A SAT UNSAT 1903.010 to determine classification tabs.
classification.
(C) 2. Reviewed 1903.010 attachment Determined that the containment N/A SAT UNSAT 6 containment radiation EAL radiation reading exceeds the plot to determine that Site Area Emergency Criteria.
containment radiation levels exceed the Site area emergency criteria.
(C) 3. Reviewed initial conditions and Determined LOCA inside N/A SAT UNSAT determined that a LOCA inside containment was in progress.
containment was in progress.
(C) 4. Reviewed EAL 1.4., Site Area Classified EAL as a Site Area N/A SAT UNSAT Emergency based on a LOCA Emergency (SAE) based on EAL and > 1% failed fuel. 1.4, Containment Radiation readings which indicate LOCA Or and > 1% fuel cladding failure.
Also acceptable is a review of the 1903.010 paragraph 4.10, OR Fission Product Barrier Failure Classified EAL as a Site Area and 4.11, Fission Product Emergency (SAE) based on EAL Barrier Challenge criteria and 9.3, Plant conditions exist that determine that two fission warrant activation of the product barriers are challenged Emergency Response Facility.
or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility.
END
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS
- Plant had been operating for 150 days at 100% power.
- A reactor trip occurred two hours ago.
- A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
- Containment Spray Actuation Signal (CSAS) has actuated.
- Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
- Chemists have been notified to sample the RCS.
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS
- Plant had been operating for 150 days at 100% power.
- A reactor trip occurred two hours ago.
- A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
- Containment Spray Actuation Signal (CSAS) has actuated.
- Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
- Chemists have been notified to sample the RCS.
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
JPM- ANO-2-JPM-NRC-AOP2 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: Containment Cooling Water System TASK: Reset CIAS and establish cooling water to containment JTA#:
REFERENCE:
022 A4.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.0039 Rev 03-02-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-AOP2 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: An inadvertent CIAS has occurred.
Steps 1-10 of AOP 2203.039 have been completed.
TASK STANDARD: CIAS has been reset and containment Chilled water has been realigned.
TASK PERFORMANCE AIDS: Copy of AOP 2203.039 Revision 003-02-0 is available.
AOP 2203.039 Steps 1-10 have been completed.
SIMULATOR SETUP: Inadvertent CIAS present. Containment parameters and RCS parameters are above setpoints, containment pressure < 18.3 psia, PZR pressure > 1650psia. Verify CBO to VCT valves, 2CV-4847-2 and 2CV 4846-1 handswitches are in CLOSE.
JPM- ANO-2-JPM-NRC-AOP2 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, beginning with step 11."
CRITICAL ELEMENTS (C): 1, 2, 6, 7, 8 PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 1. Reset CIAS on 2C23B. Obtained key 15 from Shift N/A SAT UNSAT Manager.
Examiners note: On panel 2C23B placed key in trip path keyswitch to UNLK.
Only one channel of PPS is modeled on simulator Depressed CIAS pushbutton for completely. Correctly resetting trip path and observed trip paths of this channel will reset CIAS lights on panel above 2C23 lit.
trip paths.
Placed trip path keyswitch to LK and removed key.
Examiners Cue @ Step 11.D:
All four PPS trip path channels have been reset.
(C) 2. Reset ESF CIAS actuation on Depressed CIAS lockout reset N/A SAT UNSAT 2C40. pushbutton on 2C40-7 and observed CIAS ON light lit.
Examiners note:
Only one channel of ESF actuation path is modeled on simulator completely. Correctly resetting of this channel will reset CIAS ESF actuation.
Examiners Cue @ Step 12.B:
2C39 ESF CIAS actuation has been reset.
- 3. (Step 12.c) Go to step 14. Using procedure 2203.039, N/A SAT UNSAT transition to step 14.
- 4. Open RCP Bleedoff to VCT On panel 2C17, Placed N/A SAT UNSAT valve, 2CV-4846-1. handswitches for RCP bleedoff to VCT valve 2CV-4846-1 to OPEN.
Observed RED light ON above hand switch.
JPM- ANO-2-JPM-NRC-AOP2 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 5. Open RCP Bleedoff to VCT On panel 2C16, Placed N/A SAT UNSAT valve, 2CV-4847-2. handswitches for RCP bleedoff to VCT valve 2CV-4847-2 to OPEN.
Observed RED light ON above hand switch.
(C) 6. Open Chilled water to CNTMT On panel 17, placed N/A SAT UNSAT valve 2CV-3851-1. handswitches for Chilled Water to CNTMT Isolation valve 2CV-3851-1 to OPEN.
Observed RED light ON above hand switch.
(C) 7. Open Chilled water to CNTMT On panel 17, placed N/A SAT UNSAT valve 2CV-3852-1. handswitches for Chilled Water to CNTMT Isolation valve 2CV-3852-1 to OPEN.
Observed RED light ON above hand switch.
(C) 8. Open Chilled water to CNTMT On panel 16, placed N/A SAT UNSAT valve 2CV-3850-2. handswitches for Chilled Water to CNTMT Isolation valve 2CV-3850-2 to OPEN.
Observed RED light ON above hand switch.
- 9. Verify Main Chiller (2VCH1A) On panel 22, verified hand switch N/A SAT UNSAT running. for 2VCH1A is in normal after start (RED flagged).
Observed RED light ON above Examiners note: hand switch for 2VCH-1A.
The red light above hand switch for 2VCH-1A indicates the chiller is running.
Observed RED light ON above label for 2HS-3810.
Examiners note:
The red light label for 2HS-3810 for 2VCH-1A indicates the 2A1 Observed all chilled water alarms breaker is closed. are clear on annunciator 2K13 (Lights slow flashing or clear).
EXAMINERs NOTE:
JPM standard does not require completion of steps past procedure step 15.
END
JPM- ANO-2-JPM-NRC-AOP2 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed.
INITIATING CUE:
The SM/CRS directs, "Perform actions in Inadvertent CIAS AOP, 2203.039, beginning with step 11."
JPM- ANO-2-JPM-NRC-AOP2 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed.
INITIATING CUE:
The SM/CRS directs, "Perform actions in Inadvertent CIAS AOP, 2203.039, beginning with step 11."
JPM- ANO-2-JPM-NRC-CVCS010 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path)
JTA#:
REFERENCE:
004 A4.07 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 12 Minutes REFERENCE(S): OP 2203.032 Rev. 008-06-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-RO-CVCS010 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair.
TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.
TASK STANDARD:
Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using HPSI pump and HPSI injection MOVs. This is an alternate success path JPM>
TASK PERFORMANCE AIDS:
AOP 2203.032 Steps 2 through 16. OP 4104.039 section 9, Starting any HPSI pump on recirc.
SIMULATOR SETUP:
A mode 3 IC will be set up for this JPM. RCS cooldown in progress, PZR pressure ~ 1200psia, RCS temp
~480°F. A CCP running. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.
Set T1=2CV-4873-1a < 75% (this will trigger T1 when the VCT outlet gets to 75% open.)
T1 = A CCP plunger failure (flow out of pump ~ 30gpm).
JPM- ANO-2-JPM-RO-CVCS010 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."
CRITICAL ELEMENTS (C): 5, 10, 15 PERFORMANCE CHECKLIST STANDARD (Circle One)
- 1. Verify at least one charging On panel 2C09, verified CCP(s) N/A SAT UNSAT Pump (CCP) running with flow running.
greater than 40 GPM.
Observed red light ON; green light OFF above at least one of the following handswitch(es):
2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).
- 2. Align boric acid supply to CCP On panel 2C09, opened BAMT N/A SAT UNSAT suction. gravity feed valves 2CV-4920-1 and/or 2CV-4921-1 Observed red light ON and green light OFF above handswitch(es):
- 2HS-4920-1 for 2CV-4920-1
- 2HS-4921-1 for 2CV-4921-1
- 3. Close volume control tank On panel 2C09, observed that N/A SAT UNSAT (VCT) outlet valve (2CV-4873- 2CV-4873-1 closed.
1).
Observed green light ON; red light OFF above VCT Outlet valve handswitch (2HS-4873-1).
- 4. Check Reactor Makeup Water On panel 2C09, verified 2CV-4927 N/A SAT UNSAT Flow Control valve (2CV-4927) or 2CV-4941-2 closed.
or 2CV 4941-2 closed.
Observed green light ON; red light OFF above Reactor Makeup Water Flow Controller (2FIC-4927) or above 2CV-4941-2 handswitch.
(C) 5. Check charging header flow. On panel 2C09 (upright portion), N/A SAT UNSAT observed flow about 30 gpm on Charging Header Flow indicator (2FIS-4863).
JPM- ANO-2-JPM-RO-CVCS010 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
- 6. GO to step 2 and verify TCBs On panel 2C14, verifies that the N/A SAT UNSAT open and then transition to step TCBs are open by observing the
- 8. green lights ON and red lights OFF.
- 7. Check RCS pressure less than On panel 2C04, SPDS, PMS or N/A SAT UNSAT 1265 psia. PDS verified that PZR pressure is less than 1265 psia.
- 8. Verify RWT level greater than On panel 2C16 or 2C17, verified N/A SAT UNSAT 7.5%. RWT level greater than 7.5%.
EXAMINERS CUE: When asked as CRS which HPSI pump to start, state that B HPSI pump is to be started.
- 9. Verify 2CV-5631-2 is OPEN. On panel 2C16 verified RWT outlet N/A SAT UNSAT valve 2CV-5631-2 is OPEN.
NOTE: If Examinee goes to use OP2104.039 section 9.0 then give the following cue.
EXAMINERs CUE: CRS directs to start B HPSI pump and verify steps in appropriate section in OP 2104.039 after Emergency boration is established.
(C) 10. Start 2P89B. On panel 2C16 rotated handswitch N/A SAT UNSAT for 2P89B to start postion.
Observed Red light ON and Green light OFF.
- 12. Check RCS temperature greater On panel 2C04, SPDS, PMS or N/A SAT UNSAT than 450°F. PDS verified RCS temperature greater than 450°F.
- 13. Commence RCS cooldown to Verify conditions will allow for a N/A SAT UNSAT allow a makeup rate of 40 GPM. makeup rate of 40 gpm. (Step 12)
EXAMINERS CUE: CRS has verified RCS cooldown rate is sufficient to allow make-up rate greater than 40 gpm. The CRS and CBOR will monitor and control RCS Cooldown.
- 14. Use one HPSI train B injection Opened ONE of the following HPSI N/A SAT UNSAT MOV to maintain PZR level. injection MOV:
2CV-5016-2 2CV-5036-2 2CV5056-2 2CV-5076-2 Observed Red light ON and Green light ON above handswitch.
JPM- ANO-2-JPM-RO-CVCS010 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
(C) 15. Verified HPSI to RCS flow Adjust valve position to maintain N/A SAT UNSAT greater than 40 GPM using greater than 40 GPM HPSI flow SPDS computer. using indications on SPDS computer.
END
JPM- ANO-2-JPM-RO-CVCS010 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERs COPY JPM INITIAL TASK CONDITIONS:
Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.
INITIATING CUE:
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."
JPM- ANO-2-JPM-RO-CVCS010 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY JPM INITIAL TASK CONDITIONS:
Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.
INITIATING CUE:
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."
JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE:
SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron (ALTERNATE SUCCESS PATH)
JTA#: ANO2-RO-PZR-NORM-3 KA VALUE RO: 3.7 SRO: 3.5 KA
REFERENCE:
010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2103.005 Rev. 024-00-0 and AOP 2203.028 Rev 06-00-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed.
Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.
TASK STANDARD: Spray Valve (2CV-4651) is isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028.
SIMULATOR SETUP: Run CAE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.
T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)
T5 2HS-4651-5 false (red light)
JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs: Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."
CRITICAL ELEMENTS (C): 2, 3, 4, 6 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Verify spray valve, 2CV-4651, On panel 2C04 verified red lights N/A SAT UNSAT isolation valves 2CV-4655 AND ON, green lights OFF for 2CV-4656 are OPEN. 2CV-4655 and 2CV-4656.
(C) 2. Place RCP A spray valve On panel 2C04, rotated N/A SAT UNSAT MAN/AUTO select switch 2HS-4651B in the CCW direction (2HS-4651B) to MANUAL. to MANUAL.
(C) 3. Energize all available Backup On panel 2C04 verified the N/A SAT UNSAT Heaters. following hand switches to ON:
Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater hand switches.
EXAMINERS NOTE:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.
(C) 4 Partially open 2CV-4651. On panel 2C04, took hand switch N/A SAT UNSAT for 2CV-4651 to the open position when PZR pressure rises.
EXAMINERS NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 5. Recognizes that 2CV4651 is On panel 2C04, observed that N/A SAT UNSAT deenergized open. light position indications above 2CV-4651 are out and PZR Attempts to close 2CV4651 may pressure is lowering.
be made, but is not necessary.
(C) 6. Close PZR Spray Block Valves. On panel 2C04, placed hand- N/A SAT UNSAT switch for 2CV-4655 and 2CV-4656 to "CLOSE".
Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.
END STOP TIME:
JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.
INITIATING CUE:
The SM/CRS directs, "Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."
JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.
INITIATING CUE:
The SM/CRS directs, "Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."
JPM- ANO-2-JPM-NRC-SIT05 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 003 DATE:
SYSTEM/DUTY AREA: Safety Injection System TASK: Adjust SIT Pressure (Increase) ALTERNATE SUCCESS PATH JTA#: ANO2-RO-ECCS-NORM-10 KA VALUE RO: 3.5 SRO: 3.7 KA
REFERENCE:
006 A1.13 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 8 Minutes REFERENCE(S): OP 2104.001 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-SIT05 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: Safety Injection Tank (2T2A) level is between 80.1% and 87.9%.
Pressure is approximately 606 psig.
TASK STANDARD: Safety Injection Tank (2T2A) pressure raised to 615 psig. Nitrogen Isolated to A SIT.
2T2A pressure is < 700 psig. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS: OP 2104.001 Section 11.0 SIMULATOR SETUP: Ensure A SIT pressure is ~606 psig and A SIT level is ~ 84%. Run CAE file JPM05.
CAE file JPM05 will do the following:
Set trigger T5=PD4R5005 (trigger when 2SV-5005 red light energized)
Set 2SV5005 to stick open (Hand switch for the valve faulty) (IMF CV5005_(5 0) 1.0 0 0.0)
JPM- ANO-2-JPM-NRC-SIT05 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Raise Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
CRITICAL ELEMENTS (C): 2, 3, 6 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Verify nitrogen supply is Using the gaitronics, plant N/A SAT UNSAT aligned. telephone system, or radio; contacted Unit-1 OR contacted Examiners Cue: Unit-2 operator.
Unit-1 (or Unit-2 operator) reports high pressure N2 is Requested alignment of high aligned. pressure N2.
(C) 2. Open Supply Header to On panel 2C16, placed N/A SAT UNSAT Containment Isolation handswitch for 2CV-6207-2 to (2CV-6207-2). OPEN.
Observed red light ON above handswitch.
EXAMINER'S NOTE:
2SV-5005A and B are both operated by handswitch for 2SV-5005.
(C) 3. Open SIT N2 Supply valves On panel 2C33, placed N/A SAT UNSAT (2SV-5005A/B). handswitch 2SV-5005 for 2SV-5005A/B to OPEN.
Observed red light ON; green light OFF above handswitch.
- 4. Verify SIT (2T2A) at desired Verified SIT (2T2A) pressure N/A SAT UNSAT pressure. between 615 and 620 psig.
Observed SIT (2T2A) pressure on any of the following:
2PIS-5012 (2C17) 2PI-5013 (2C17) 2PIS-5011 (2C16)
OR:
Observed SIT (2T2A) pressure on PMS or SPDS computer points/trend for 2T2A pressure.
JPM- ANO-2-JPM-NRC-SIT05 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 5. Close SIT N2 Supply valves On panel 2C33, placed hand N/A SAT UNSAT (2SV-5005A/B). switch 2SV-5005 for 2SV-5005A/B to CLOSE.
Observed green light OFF; red light ON above handswitch.
Reports that valve hand switch will not close the valve and SIT pressure is continuing to increase.
EXAMINER'S NOTE:
SIT high and high-high pressure alarms may come in. These will not influence the passing of the following step. If the operator does not isolate N2 from 2C16 and pressurizes the SIT to 700psig, the following step should be considered UNSAT.
(C) 6. Close Supply Header to On panel 2C16, placed N/A SAT UNSAT Containment Isolation valve handswitch for 2CV-6207-2 to (2CV-6207-2). CLOSE.
Observed green light ON above handswitch.
Isolated N2 from 2C16 with SIT pressure less than 700psig,
- 7. Isolate the nitrogen supply. Using the gaitronics, plant N/A SAT UNSAT telephone system, or radio; Examiners Cue: contacted Unit-1 OR contacted Unit-1 (or Unit-2 operator) Unit-2 operator.
reports high pressure N2 is isolated. Requested isolation of high pressure N2.
END STOP TIME:
JPM- ANO-2-JPM-NRC-SIT05 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig.
INITIATING CUE:
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
JPM- ANO-2-JPM-NRC-SIT05 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig.
INITIATING CUE:
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
JPM- ANO-2-JPM-NRC-EOP03 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: Emergency Operating Procedures TASK: Verify Natural Circulation Conditions exist (ALTERNATE SUCCESS PATH)
JTA#:
REFERENCE:
002 A4.02 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): EOP 2202.006 Rev. 006-01-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-EOP03 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW.
RCS temperature dropped less than 500°F during transient and cooldown has been stopped per step 25.
TASK STANDARD: Take required actions to restore Natural Circulation conditions per Loss of Feedwater procedure. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS: EOP 2202.006 Step 26.
SIMULATOR SETUP: Loss of feedwater in progress. SDBCS is in auto (setpoint ~ 1000 psia).
Ensure that actions completed in EOP 2202.006 up to step 26 have been completed. RCS Tc < 500°F.
Ensure MTS on SPDS is less than 30°. All other steps in 26 are satisfied. PZR level ~ 40%.
All Backup Heater hand switches are in OFF. Both banks of proportional heaters have NOT been reset from PZR level heater cutout. Ensure SG levels are greater than 25% and levels are slowly restoring.
JPM- ANO-2-JPM-NRC-EOP03 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.
CRITICAL ELEMENTS (C): 3, 5 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Verify Loop T is Less than Using SPDS SFD Screen, PMS, N/A SAT UNSAT 50°F. PDS or 2C04 indications, determine Loop T to be less than 50°F.
- 2. Verify RCS loop TH and TC Using SPDS SFD Screen, PMS, N/A SAT UNSAT constant or lowering. PDS or 2C04 indications, determine that RCS loop TH and TC are constant.
(C) 3. Verify RCS MTS 30°F or Using SPDS SFD Screen, PMS, N/A SAT UNSAT greater. PDS or 2C04 indications, determine that RCS MTS is less than 30°F.
- 4. Contingency column step 26.A, Using SPDS SFD Screen, PMS, N/A SAT UNSAT verify SG levels being PDS or 2C04 indications, maintained 10% to 90%. determine that Steam Generator levels are above 10% and less than 90%.
(C) 5. Contingency column step 26.B, Refer to Attachment 1, P-T Limits N/A SAT UNSAT verify RCS pressure within limits and verify that MTS is less than of Attachment 1, P-T Limits. 30°F.
Examiners note: Critical Take PZR Backup heaters out of element is that examinee OFF. Verify that red light ON recognizes that PZR pressure above hand switch(es).
is LOW due to all heaters de- Take Proportional heaters hand energized and this is causing switches to ON. Verify that Red MTS problems. The number light is ON above associated of heaters re-energized is hand switch.
discretionary. Verify P-T limits of Attachment 1 Candidate may consider a are restored.
plant cooldown, but as CRS report that Tc should remain constant until system engineering completes analysis.
JPM- ANO-2-JPM-NRC-EOP03 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 6. Verify T between TH and Using SPDS SFD Screen, PMS, N/A SAT UNSAT CETs less than 10°F. PDS or 2C04 indications, determine that T between TH and CETs is less than 10°F.
END STOP TIME:
JPM- ANO-2-JPM-NRC-EOP03 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW. RCS temperature dropped less than 500°F during transient and cooldown has been stopped per step 25.
INITIATING CUE:
The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.
JPM- ANO-2-JPM-NRC-EOP03 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW. RCS temperature dropped less than 500°F during transient and cooldown has been stopped per step 25.
INITIATING CUE:
The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.
ANO-2-JPM-NRC-ELECXT PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A. C. Electrical Distribution TASK: Perform Synchronized Cross Connect of 480 VAC load-centers 2B1 and 2B2 JTA#: ANO2-RO-480VAC-NORM-15 KA VALUE RO: 3.3 SRO: 3.1 KA
REFERENCE:
062 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP 2107.001 Revision 049-00-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-ELECXT PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.
JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer.
TASK STANDARD:
Cross connect 480VAC non-vital busses 2B1 and 2B2 with 2B1 supplying and 2B2 supply breakers open. Maintain 2B1 amperage less than 130 amps.
TASK PERFORMANCE AIDS:
OP 2107.001 Section 12.0.
SIMULATOR SETUP:
Any power level or mode.
All Non-Vital 4160VAC and 480VAC Busses energized.
Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2).
ANO-2-JPM-NRC-ELECXT PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0."
CRITICAL ELEMENTS (C): 2, 3, 4, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One)
Examiners note:
If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A.
- 1. Check that Operations Manager Ask if Operations Manager has N/A SAT UNSAT approval obtained. given approval to cross connect 2B1 and 2B2 at power.
EXAMINERS CUE:
The Operations Manager has given permission to perform Cross Connect of 2B1 and 2B2.
Examiners note:
The following two steps may be completed after cross-connecting the busses. The resolution on the meters is low at the low end.
(C) 2. Determine combined load of On Panel 2C10, summed the N/A SAT UNSAT 2B1 an 2B2. current reading of 2B1 and 2B2.
Observed that the summed load is greater than 130 amps.
(C) 3. Reduce loads on 2B1 and 2B2 Direct the AO or inform CRS of N/A SAT UNSAT so that combined loading is less need to reduce non-essential than 130 amps when cross loads on 2B1 and 2B2 so that connected. combined loading is less than EXAMINERS CUE: 130 amps.
AO has been directed to secure non-essential loads on 2B1 and 2B2 to reduce loading on 2B1 and 2B2 to less than 130 amps.
EXAMINERS NOTE:
Direct operator in simulator instructors station to reduce loading on 2B1 and 2B2 so that loading is less than 130 amps (use REMOTE malfunctions 480CURR2B1 and 480CURR2B2).
ANO-2-JPM-NRC-ELECXT PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 4. Synchroscope switch inserted in On Panel 2C10, Placed N/A SAT UNSAT 2B1/2B2 cross-tie slot and Synchroscope switch into placed in ON. 2B1/2B2 cross-tie slot and rotated clockwise to the ON position.
- 5. Observed that the On Panel 2C10, Observed that N/A SAT UNSAT Synchroscope is at the 12 the Synchroscope is at the 12 oclock position. oclock position with the Synchroscope switch in the ON position.
(C) 6. Close the 2B1/2B2 Cross Tie On panel 2C10, rotate the Cross N/A SAT UNSAT breaker. Tie handswitch for 2B1/2B2 clockwise.
Observed that the Green light turns OFF and the Red light turns ON above the Cross Tie handswitch.
(C) 7. Open normal supply breaker on On Panel 2C10, rotate the N/A SAT UNSAT 2B2. normal feeder supply breaker on 2B2 counter clockwise to the AND open position.
Open Transformer feeder Observed that the RED light went breaker from 2A2 to 2B2. OFF and the GREEN light went ON.
On Panel 2C10, rotate the transformer feeder breaker on 2A2 to 2B2 counter clockwise to the open position.
Observed that the RED light went OFF and the GREEN light went ON.
- 8. Verify that the amperage On panel 2C10, observe that the N/A SAT UNSAT indicated on 2B1 is less than current is less than 130 amps on 130 amps. 2B1.
- 9. Turn sync switch to OFF. On Panel 2C10, turn sync switch N/A SAT UNSAT counter clockwise to the OFF position.
ANO-2-JPM-NRC-ELECXT PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 10. Notified AO to monitor 2B1 Notify AO to monitor 2B1 N/A SAT UNSAT transformer during cross transformer during cross connected operation and connected operation and maintain temperature less than maintain temperature less than 220°C. 220°C.
EXAMINERS CUE:
AO has been notified to monitor 2B1 transformer and notify the control room if temperature exceeds 220°C during cross connected operations.
END
ANO-2-JPM-NRC-ELECXT PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer.
INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0."
ANO-2-JPM-NRC-ELECXT PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer.
INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 supply breakers from 2A2 using OP 2107.001 section 12.0."
ANO-2-JPM-NRC-BMSRM PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:
SYSTEM/DUTY AREA: Process Radiation Monitoring System TASK: Perform BMS Liquid Discharge Radiation Monitor Functional Check JTA#: ANO2WCOLRWBMSNORM21 KA VALUE RO: 3.6 SRO: 3.6 KA
REFERENCE:
068 A3.02 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Simulate SIMULATOR: LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 2104.014 Rev 034-00-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-BMSRM PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.
TASK STANDARD:
Functional Test has been completed on 2RITS-2330.
TASK PERFORMANCE AIDS:
2104.014 Supplement 1 EXAMINER'S NOTE:
ANO-2-JPM-NRC-BMSRM PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1."
CRITICAL ELEMENTS (C): 4, 6, 10, 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Direct WCO to verify 2P-53A/B Directed the WCO to verify N/A SAT UNSAT Discharge to Circ Water Flume 2LRW-13 is closed.
(2LRW-13) is closed.
EXAMINERs CUE:
WCO reports 2LRW-13 is closed.
- 2. Direct WCO to verify 2P47A/B Directed the WCO to verify N/A SAT UNSAT Discharge to Circ Water Flume 2BM-35 is closed.
(2BM-35) is closed.
EXAMINERs CUE:
WCO reports 2BM-35 is closed.
- 3. Direct WCO to verify 2F11/11A Directed the WCO to verify N/A SAT UNSAT Disch to CW Flume (2LRW-24) 2LRW-24 is closed.
is closed.
EXAMINERs CUE:
WCO reports 2LRW-24 is closed.
(C) 4. Hold 2RITS-2330 Selector On panel 2C25, held 2RITS-2330 N/A SAT UNSAT Switch in CHECK SOURCE. Selector Switch in CHECK SOURCE.
EXAMINERs CUE:
Switch in CHECK SOURCE.
- 5. Verify 2RITS-2330 meter moves On panel 2C25, verified N/A SAT UNSAT up scale. 2RITS-2330 indication moved up scale.
EXAMINERs CUE:
Meter moved up scale.
(C) 6. Return 2RITS-2330 Selector On panel 2C25, placed N/A SAT UNSAT Switch to OPERATE. 2RITS-2330 Selector Switch to OPERATE.
EXAMINERs CUE:
Switch to OPERATE.
ANO-2-JPM-NRC-BMSRM PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
- 7. Verify 2RITS-2330 meter On panel 2C25, verified N/A SAT UNSAT reading returns to normal. 2RITS-2330 meter reading returned to original level.
EXAMINERs CUE:
Meter returns to normal.
- 8. Direct WCO to open LRW/BMS Directed WCO to open N/A SAT UNSAT Discharge to Circ Water Flume 2CV-2330A.
valve(s) (2CV-2330A).
EXAMINERs CUE:
WCO reports 2CV-2330A is open.
EXAMINER'S NOTE:
Provide the following cue:
EXAMINERs CUE:
Setpoint from Prerelease Report = "3E3".
- 9. Determine dial setting to be From Radiation Monitor Alarm N/A SAT UNSAT used from Radiation Monitor Setpoint Table determined that Alarm Setpoint Table using Prerelease Report setpoint of setpoint from Prerelease 3E3 equals dial setpoint of 4.78.
Report.
(C) 10. Release 2RE-2330 On panel 2C25, released 2RE- N/A SAT UNSAT potentiometer stop AND adjust 2330 potentiometer stop AND dial to setting of 4.78. adjusted dial setting of 4.78.
Locks potentiometer stop.
EXAMINERs CUE:
Potentiometer dial setting is set at 4.78. Potentiometer is locked.
(C) 11. Place 2RE-2330 Selector On panel 2C25, placed N/A SAT UNSAT Switch in PULSE CAL. 2RE-2330 Selector Switch in PULSE CAL.
EXAMINERs CUE:
Switch in PULSE CAL.
- 12. Direct WCO to verify Directed WCO to verify N/A SAT UNSAT annunciator 2K14-B1 "LIQUID annunciator 2K14-B1 actuated on RADWASTE DISCHARGE 2C112.
RADIATION HIGH" is actuated on Panel 2C112.
EXAMINERs CUE:
2K14-B1 is actuated.
ANO-2-JPM-NRC-BMSRM PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 13. Verify annunciator 2K11-J9 On panel 2C14, verified 2K11-J9 N/A SAT UNSAT BORON MGMT SYS is actuated on Panel 2C14.
TROUBLE" is actuated on Panel 2C14.
EXAMINERs CUE:
2K11-J9 is actuated.
14 Verify annunciator 2K11-C10 On panel 2C14, verified N/A SAT UNSAT "PROC LIQUID RADIATION 2K11-C10 is actuated on Panel HI/LO" is actuated on Panel 2C14.
2C14.
EXAMINERs CUE:
2K11-C10 is actuated.
15 Direct WCO to verify LRW/BMS Directed WCO to verify N/A SAT UNSAT Discharge to Circ Water Flume 2CV-2330A is closed.
(2CV-2330A) is closed.
EXAMINERs CUE:
WCO reports 2CV-2330A is closed.
16 Reset 2RE-2330 and place in On panel 2C25, placed the N/A SAT UNSAT OPERATE. Operation Selector switch to RESET.
EXAMINERs CUE:
High Alarm light OFF Observed High Alarm light OFF.
EXAMINERs CUE: Placed the Operation Selector Switch in OPERATE. switch to OPERATE.
EXAMINERs CUE: Observed the Channel Test light Channel Test light OFF. OFF.
17 Verify valve(s) tested have Directed WCO to verify 2CV-reopened. 2330A open.
EXAMINERs CUE:
WCO reports 2CV-2330A open.
18 Check associated alarms clear. On panel 2C14, verified N/A SAT UNSAT 2K11-C10 and 2K11-J9 are in EXAMINERs CUE: "slow flash" OR NOT illuminated.
2K11-C10, 2K11-J9 and Directed WCO to verify 2K14-B1 are in "slow flash". annunciator 2K14-B1 on 2C112 is in "slow flash" OR NOT illuminated.
END
ANO-2-JPM-NRC-BMSRM PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.
INITIATING CUE:
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1."
ANO-2-JPM-NRC-BMSRM PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.
INITIATING CUE:
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1."
JPM-ANO-2-JPM-NRC-EOP02 Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: Abnormal/Emergency Operations TASK: Restore SDC Flow following an instrument failure - inadvertent Auto-Closure Initiation (ACI)
JTA#: ANO2-RO-EOPAOP-OFFNORM KA VALUE RO: 3.0 SRO: 3.1 KA
REFERENCE:
016 A2.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.029 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-NRC-EOP02 Page 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.
JPM INITIAL TASK CONDITIONS:
AOP 2203.029 has been entered due to 2PI-4623-2 failing High. SDC pump secured, fuse for 2PS-4623-2 removed, and Loss of SDC AOP, 2203.029, has been completed up to step 13.C.
TASK STANDARD: Shutdown Cooling Flow has been restored per Loss of SDC AOP, 2203.029.
TASK PERFORMANCE AIDS: Loss of SDC AOP, 2203.029 SIMULATOR SETUP:
Mode 5, SDC aligned for the A LPSI Pump through the A SDC Heat Exchanger.
2P-60 A & B secured, All LPSI Injection MOVs are OPEN, and 2CV-5086-2 is CLOSED.
ACI actuation is clear due to de-energizing 2PS-4623-2 by fuse removal.
JPM-ANO-2-JPM-NRC-EOP02 Page 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
CRITICAL ELEMENTS (C): 2, 6, 9,10 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Verify SDC RCS isolation On panels 2C16 and 2C17, N/A SAT UNSAT valves open. checked indications for:
- 2CV-5086-2 Observed 2CV-5086-2 closed by green light ON, red light OFF above hand switch.
(C) 2. Determine that 2CV-5086-2 is On panel 2C16, placed hand N/A SAT UNSAT shut due to the Auto-Closure switch for 2CV-5086-2 to Initiation (ACI) and Open 2CV- "OPEN".
5086-2.
Observed red light ON; green light OFF above hand switch.
- 3. Verify RAS has not actuated. On panel 2C03, verified Alarms N/A SAT UNSAT cleared on Annunciator panels 2K04 and 2K07 or verified red lights ON at 2C03 above the RAS placard.
- 4. Verify RCS indicators Requests that CRS verify OP N/A SAT UNSAT functioning properly using 2103.011 Attachment M is OP 2103.011. complete.
EXAMINERs CUE: CRS reports that OP 2103.011 attachment M, RCS level transmitter and tygon tube alignment has been completed and all RCS level indicators are functioning properly.
JPM-ANO-2-JPM-NRC-EOP02 Page 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Observed 2C-16 and 2C-17 that 2P-60 A & B were secured.
Observed green light ON; red light OFF above hand switches.
(C) 6. Close ALL LPSI Injection On 2C16 & 17, placed hand N/A SAT UNSAT MOVs. switches for Safety Injection MOVs to CLOSE".
POSITIVE CUE:
Green lights ON; red lights 2CV-5017-1 OFF. 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green light ON; red light OFF above Hand switch for all valves.
- 7. Partially open ONE LPSI On 2C-16 or 17, held 1 LPSI N/A SAT UNSAT Injection. Injection MOV hand switch in the open direction for about 2 second.
2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green and red light ON above associated hand switch.
- 8. Verify RCS level adequate; Referred to Attachment A N/A SAT UNSAT refer to Attachment A, RCS and verified RCS Level Level. adequate for SDC Pump restart.
NOTE:
If 2CV-5091 is not in Automatic, the candidate may have to transverse from 2C-16 & 17 back to 2C-04 multiple times to control flow. 2CV-5091 should be monitored to ensure that it has control of flow when placed in automatic.
JPM-ANO-2-JPM-NRC-EOP02 Page 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 9. Start SDC pump, refer to On 2C17 placed hand switch N/A SAT UNSAT 2104.004, Shutdown Cooling for 2P-60A to "START".
System.
Observed red light ON; green light OFF above hand switch.
(C) 10. Raise SDC flow to greater On 2C-16 & 17 placed hand- N/A SAT UNSAT than 2400 gpm by opening switches for Safety Injection LPSI Injection MOVs. MOVs to OPEN) as necessary to achieve > 2400 gpm flow.
2FIC-5091 indicates > 2400 gpm.
Examiners note: Inform candidate that the CRS and CBOR will control RCS cool down.
END
JPM-ANO-2-JPM-NRC-EOP02 Page 6 of 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to step 13.C.
INITIATING CUE:
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
JPM-ANO-2-JPM-NRC-EOP02 Page 7 of 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to step 13.C.
INITIATING CUE:
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
JPM-ANO-2-JPM-NRC-EFWRS PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 014 DATE:
SYSTEM/DUTY AREA: Emergency Feedwater System TASK: Reset the EFW pump trip throttle valve JTA#: ANO2AOEFWEMERG1 KA VALUE RO: 3.4 SRO: 3.8 KA
REFERENCE:
061 A2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Simulate SIMULATOR: LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 14 Minutes REFERENCE(S): OP 2106.006 Rev 055-04-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JPM-ANO-2-JPM-NRC-EFWRS PAGE 2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
- 1. EFW pump (2P7A) started automatically following a reactor trip.
TASK STANDARD: The trip throttle valve for EFW pump(2P7A) has been reset and is open.
TASK PERFORMANCE AIDS: OP 2106.006 Exhibit 1 and Exhibit 2
JPM-ANO-2-JPM-NRC-EFWRS PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1 starting with step 2.0.
CRITICAL ELEMENTS (C): 1, 2, 3, 5 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 1. Position the latch lever to Turned the trip throttle valve N/A SAT UNSAT engage the trip hook. handwheel clockwise so that the rotation of the screw raised the sliding nut and latch lever to EXAMINERS CUE: where it could engage with the trip hook.
Latch lever positioned to engage with the trip hook.
Observed latch lever positioned to engage with the trip hook.
EXAMINERs NOTE: This linkage and the indications for steps 2, 3, and 4 are underneath a walkway. Have the examinee point to the lever and tappet then discuss actions using Exhibit 2 located on the wall in the A emergency feed-water pump room.
(C) 2. Reset the mechanical trip Locally manually, pulled the N/A SAT UNSAT linkage manually. spring loaded emergency connecting rod against the spring EXAMINERS CUE:
force.
Mechanical trip linkage is in TRIP RESET.
Moved the emergency head lever away from the emergency tappet and tappet nut to allow tappet to move downward to TRIP RESET.
JPM-ANO-2-JPM-NRC-EFWRS PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 3. Verify emergency tappet is in Verified the tappet is in TRIP N/A SAT UNSAT TRIP RESET. RESET.
OR EXAMINERS CUE: Pressed downward on the emergency tappet to place it in The tappet is in TRIP RESET.
TRIP RESET and; EXAMINERs Note:
Submitted a Condition Report The emergency tappet is located on the turbine not the trip throttle valve. Failure to ensure this is in the TRIP RESET position might defeat the O/S trip device.
- 4. Verify tappet nut/emergency Verified the flat side of the tappet N/A SAT UNSAT head lever positioning. nut is to the flat side of the emergency head lever.
EXAMINERS CUE:
The flat side of the tappet nut is to the flat side of the emergency head lever.
(C) 5. Open the trip throttle valve. With latch and trip hook engaged, N/A SAT UNSAT turned trip throttle valve handwheel CCW until valve was EXAMINERS CUE: full open.
The trip throttle valve is fully open.
Observed stem at full travel.
- 6. Close trip throttle valve 1/4 turn. Turned the trip throttle valve N/A SAT UNSAT handwheel Counter clockwise 1/4 turn.
EXAMINERS CUE:
The trip throttle valve is closed 1/4 turn.
- 7. Verify 2P7A turbine overspeed Contacted the control room to N/A SAT UNSAT trip (2K05-A9) alarm is clear determine 2K05-A9 alarm status.
EXAMINERS CUE:
The control room reports 2K05-A9 is clear.
END STOP TIME:
JPM-ANO-2-JPM-NRC-EFWRS PAGE 5 of 6 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS:
- EFW pump (2P7A) started automatically following a reactor trip.
INITIATING CUE:
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1 starting with step 2.0.
JPM-ANO-2-JPM-NRC-EFWRS PAGE 6 of 6 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS:
- EFW pump (2P7A) started automatically following a reactor trip.
INITIATING CUE:
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1 starting with step 2.0.
JPM-ANO-2-JPM-NRC-IA01 PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE:
SYSTEM/DUTY AREA: Emergency & Abnormal Operations TASK: Isolate the instrument air supply to the MSIVs (locally)
JTA#: ANO2-A0-EP-PAOP-OFFNORM-127 KA VALUE RO: 3.1 SRO: 4.3 KA
REFERENCE:
067 AA2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Simulate SIMULATOR: LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2203.049, Rev. 001-01-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JPM-ANO-2-JPM-NRC-IA01 PAGE 2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U).
Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
TASK STANDARD: Main Turbine Generator has been locally tripped and Instrument air has been isolated and air bled off the MSIVs.
TASK PERFORMANCE AIDS:
- 1) OP 2203.049 EOP actions for Corridor Behind Door 340 (Zone 2109-U) pages 1-3 (page 31 of 91).
- 2) Flashlight and gloves
- 3) RWP and dosimeter.
JPM-ANO-2-JPM-NRC-IA01 PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally beginning with step 3.
CRITICAL ELEMENTS (C): 3, 4, 6, 7 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
EXAMINERs NOTE: Access to platform in MSIV room requires an RWP. To save time, the examinee should be prompted to obtain dosimeter and log onto the RWP and task for outside controlled access before starting JPM. Also a flashlight will be needed.
- 1. Locally trip the Main Turbine At the north end of the Main Turbine N/A SAT UNSAT at the front standard, located the red handle and simulates pulling the EXAMINERS CUE: handle.
Main Turbine is tripped.
EXAMINERS NOTE:
All valves are located in the MSIV room on the first platform above 2T-91.
Leather Gloves will be needed for climbing ladder to platform.
Care should be taken around the MSIVs to prevent bumping into valves.
- 2. Close the IA supply from 2T91 At the A MSIV actuator, closed N/A SAT UNSAT 2F-356 I/N valve (2MS-540) 2MS-540 by rotating hand wheel CLOCKWISE.
EXAMINERS CUE:
2MS-540 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed (C) 3. Close IA supply IA to Just south of the A MSIV actuator, N/A SAT UNSAT 2CV-1010-1 valve (2IA-166) closed 2IA-166 by rotating its hand wheel CLOCKWISE.
EXAMINERS CUE:
2IA-166 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed (C) 4. Open filter vent valve on A At the A MSIV actuator, opened N/A SAT UNSAT MSIV point of use air filter 2F-356 vent valve by turning the (2F-356). petcock valve until air escapes.
EXAMINERS CUE: Observed valve motion stopped when Air bleeds off the actuator system valve fully open.
and dies away. The A MSIV is slowly closing.
JPM-ANO-2-JPM-NRC-IA01 PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 5. Close IA supply from 2T91 At the B MSIV actuator, closed N/A SAT UNSAT 2F-357 I/N valve, (2MS-539) 2MS-539 by rotating hand wheel CLOCKWISE.
EXAMINERS CUE:
2MS-539 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed.
(C) 6. Close IA supply 2CV-1060-2 AIR Just south of the A MSIV actuator, N/A SAT UNSAT ISOL valve, (2IA-93) closed 2IA-93 by rotating its handwheel CLOCKWISE.
EXAMINERS CUE:
2IA-93 valve CLOCKWISE motio Observed valve motion stopped when n stops. valve fully closed.
(C) 7. Open filter vent on MSIV IA At the B MSIV actuator, opened N/A SAT UNSAT FILTER 2CV-1060-2 AIR 2F-357 vent valve by turning the CONTROL VLV valve (2F-357) petcock valve until air escapes.
(Valve on B MSIV point of use .
air filter (2F-357))
Observed valve motion stopped when EXAMINERS CUE: valve fully open Air bleeds off the actuator system and dies away. The B MSIV is slowly closing.
Examiners Note: The next step is to locally secure the main feed pumps located in the basement of the turbine building. Stop the JPM before transitioning to this area.
END STOP TIME: ___________________
JPM-ANO-2-JPM-NRC-IA01 PAGE 5 of 6 JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL CONDITIONS:
A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
INITIATING CUE:
The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally beginning with step 3.
JPM-ANO-2-JPM-NRC-IA01 PAGE 6 of 6 JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL CONDITIONS:
A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
INITIATING CUE:
The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally beginning with step 3.
JPM- ANO-2-JPM-RO-XTCEA PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 02 DATE:
SYSTEM/DUTY AREA: Control Element Drive Mechanism Control System TASK: Perform CEA#1 Upper Gripper Coil Temperature Measurement JTA#: ANO2-RO-CEDM-NORM-10 KA VALUE RO: 3.7 SRO: 3.9 KA
REFERENCE:
001 A2.14 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Simulate SIMULATOR: LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2105.009, Rev. 021-01-0 EXAMINEE'S NAME: SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JPM- ANO-2-JPM-RO-XTCEA PAGE 2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
- 1. Plant is at full power.
- 2. Both Main Chillers have tripped and cannot be started.
- 4. OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm.
TASK STANDARD:
CEA 01 Upper Gripper coil temperature has been measured and determined to be 360 - 367oF using Exhibit 2 in 2105.009 (CEDM Control System Operation).
TASK PERFORMANCE AIDS:
- 1. OP 2105.009 Exhibit 2
- 2. Digital Voltmeter (DVM)
- 4. Calculator.
JPM- ANO-2-JPM-RO-XTCEA PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, As directed by OP 2203012M, 2K13-C4, CEDM Cooling coils Water Flow Low ACA, measure the Upper Gripper temperature for CEA 01 using 2105.009, Exhibit 2.
CRITICAL ELEMENTS (C): 3, 4, 6, 7 & 8 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
EXAMINERS NOTE:
2OPG-12 contains guidance for using a Digital Volt Meter.
- 1. Obtain a currently calibrated Obtained a currently calibrated N/A SAT UNSAT handheld Digital Voltmeter handheld Digital Voltmeter (DVM). (DVM).
EXAMINERS NOTE:
Hand examinee DVM.
EXAMINERs Note: The Hold Bus and 2C72 is in the CEDMCS Room located above the control room. No panel doors are allowed to be opened. Use the photographs provided for cables in back of 2C72 and coil monitor connector on the front of 2C72.
- 2. Verify CEA 01 is NOT on the Verified that the Subgroup N/A SAT UNSAT Hold Bus. Maintenance toggle switch for CEA Subgroup 12 is pointing down. Red light is OUT above EXAMINERS CUE: toggle switch.
The Subgroup Maintenance toggle switch for subgroup 12 is pointing down and RED light is OUT above the toggle switch.
EXAMINERs NOTE: When examinee identifies panel to be opened in back of 2C72, give examinee picture of cables in back of 2C72 to complete next step.
(C) 3. Obtain CEA 01 upper gripper AT back of panel 2C-72, CEA #1 N/A SAT UNSAT coil voltage. power cables on TBC4C6 have been located.
EXAMINERS CUE:
Selected DVM scale on 200 and CEA 01 upper gripper voltage recorded the voltage across the is 44 VDC.
black and white cables located on TBC4C6, terminals #4 and
- 5.
Recorded 44 VDC in Step 3.2.
JPM- ANO-2-JPM-RO-XTCEA PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
EXAMINERs NOTE: When examinee identifies Connector for CEA #1 on front of 2C72, give examinee picture of connector to perform next step.
(C) 4. Obtain CEA #01 Upper Gripper Located the CEA #01 coil monitor N/A SAT UNSAT shunt voltage (Vshunt). connector on the front side of 2C72.
Unscrewed and removed the connector cap.
EXAMINERS CUE:
Selected the 200 mV scale on CEA 01 Upper Gripper shunt the DVM and measured the voltage reads 7.62 millivolts DC. voltage across pins C and D.
Divided 7.62 millivolts by 1000 and recorded .00762V in step 4.3.1.
- 5. Install connector cap. Installed the connector cap back N/A SAT UNSAT on CEA #01 coil monitor connector.
EXAMINERS CUE:
Connector cap is installed.
(C) 6. Calculate coil current (Icoil). Calculated coil current by N/A SAT UNSAT dividing Shunt voltage by .002.
EXAMINERS CUE:
Recorded 3.81 amps in step 5.2.
None (C) 7. Calculate coil resistance Calculated coil resistance by N/A SAT UNSAT (Rcoil). dividing Upper Gripper voltage by Upper Gripper current.
Divided 44 VDC by 3.81 amps EXAMINERS CUE:
and recorded 11.55 ohms in None step 6.1 Subtracted .525 from 11.55 and recorded ~11.02 ohms in step 6.3.
(C) 8. Obtain CEA #01 coil Obtained the coil temperature N/A SAT UNSAT temperature. for the CEA #01 Upper Gripper by using the coil resistance from step 6.3 and using the chart.
EXAMINERS CUE:
Using the chart in step 7.1 None calculated a coil temperature between 360 oF and 367 oF.
END STOP TIME:
JPM- ANO-2-JPM-RO-XTCEA PAGE 5 of 6 JOB PERFORMANCE MEASURE EXAMINERs COPY JPM INITIAL TASK CONDITIONS:
- Plant is at full power.
- Both Main Chillers have tripped and cannot be started.
- OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm.
INITIATING CUE:
The SM/CRS directs, As directed by OP 2203012M, 2K13-C4, CEDM Cooling coils Water Flow Low ACA, measure the Upper Gripper temperature for CEA 01 using 2105.009, Exhibit 2.
JPM- ANO-2-JPM-RO-XTCEA PAGE 6 of 6 JOB PERFORMANCE MEASURE EXAMINEEs COPY JPM INITIAL TASK CONDITIONS:
- Plant is at full power.
- Both Main Chillers have tripped and cannot be started.
- OP 2203.012M, 2K13 ACA, for window C3, Main Chiller 2VCH1A overload is in alarm.
INITIATING CUE:
The SM/CRS directs, As directed by OP 2203012M, 2K13-C4, CEDM Cooling coils Water Flow Low ACA, measure the Upper Gripper temperature for CEA 01 using 2105.009, Exhibit 2.
Appendix D Scenario 1 Form ES-D-1 Facility: ANO-2 Scenario No.: 1 Op-Test No.: 2005-1 Page 1 Examiners: Operators:
Initial Conditions:
56% MOL, All Engineered Safety Features (ESF) systems in standby. Condenser outer water box is isolated for tube plugging. B circulating water pump is secured.
Green Train Maintenance Week.
Turnover:
56%. 250 EFPD. Condenser outer water box is isolated for tube plugging. Estimated time to complete repairs is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. B circulating water pump is secured. Equipment Out of Service Monitor (EOOS) indicates Minimal Risk. Green Train Maintenance Week.
Event Malf. No. Event Event No. Type* Description 1 NIALINEPWR I (CBOT) Safety channel linear power channel A fails low.
CBOT must bypass points in Plant Protection System (PPS) channel.
2 CVC2P36AFAL C (CBOR) Running charging pump trips breaker. Abnormal Operating Procedures (AOP) entry start standby charging pump.
3 SGATUBE R(CBOR) A Steam Generator (SG) tube leak results in N(CBOT) power reduction to take unit off line.
4 SGATUBE M(ALL) A Steam Generator tube rupture results in reactor trip and Reactor Coolant System (RCS) cool down.
5 4162A406 C (CBOT) B High Pressure Safety Injection (HPSI) pump trips breaker on start.
6 2CV50151 C (CBOT) A HPSI train injection Motor Operated Valve (MOV) fails to open on actuation.
7 BUHTRS C(CBOR) Back up Heaters fail on due to relay failure and will not shut off when Pressurizer level drops less than set point.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 16
Appendix D Scenario 1 Form ES-D-1 Scenario #1 Objectives
- 1) Evaluate individual response to a failure of an Excore nuclear instrument.
- 2) Evaluate individual response to a failure of a running charging pump.
- 3) Evaluate individual response to a small Pri-Sec leak.
- 4) Evaluate individual ability to perform a reduction in plant power.
- 5) Evaluate individual ability to mitigate a SGTR.
- 6) Evaluate individual ability to monitor operation of ESF equipment.
- 7) Evaluate individual response to a failure of the PZR heaters.
SCENARIO #1 NARRATIVE Simulator session begins with the plant at 56% power steady state. B circulating water pump is secured and the outer main condenser water boxes are tagged out.
When the crew has completed their control room walk down and brief, A Excore will fail low. This will result in a CPC sensor failure alarm and the NI linear and log power instruments on A channel failing to Zero. The CRS will enter the Nuclear Instrument Malfunction AOP, AOP 2203.026. The CRS will direct the CBOT to bypass points 1, 2, 3, and 4 on A PPS. TS 3.3.1.1 will be entered due to the excore failure.
About 10 minutes after the excore failure, the A CCP will trip its breaker. A CCP low flow alarm will alert the operator that the CCP has tripped. If another pump is not started quickly, letdown will be isolated due to high regenerative heat exchanger outlet temperature high (alarm).The CRS will enter the loss of charging AOP, OP 2203.036, Crew will verify that the breaker tripped; then start a backup CCP. The CBOR will assess the proper operation of the pump, PZR level and letdown flow.
10 minutes after the CCP trips, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The CRS will isolate steam to A EFW pump from A SG and enter TS 3.7.1.2. Crew will perform a plant shutdown.
When cued by the lead evaluator after the CBOR has completed the required reactivity manipulation, a 500 gpm SGTR on A SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR recognize that the SGTR is greater than CCP capacity. The CRS will direct the CBOR will manually trip the reactor.
Post trip, the PZR backup heaters will fail to de-energize when PZR level drops below 29%, the CBOR will manually secure the heaters.
Post SIAS, the B HPSI pump Breaker will trip (green train) and one of the red train HPSI injection MOVs will fail to open on actuation. The CBOT will manually start the swing HPSI pump and open the failed injection MOV. This is Tech Spec 3.0.3 entry.
Page 2 of 16
Appendix D Scenario 1 Form ES-D-1 SCENARIO #1 NARRATIVE (continued)
The Crew will implement SPTAs and secure 2 RCPs when RCS pressure drops below 1400 psia. The CRS will diagnose a SGTR and enter EOP 2202.004, SGTR.
The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the A SG using standard attachment 10 when RCS Thot is less than 535°F.
Page 3 of 16
Appendix D Scenario 1 Form ES-D-1 Simulator Instructions for Scenario 1 Reset simulator to MOL 56% power IC stead state.
Markup OP 2102.004, power operations up to step 9.22.
Ensure that AACG is secured and annunciators clear.
Ensure hotwell level is ~80%.
Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.
Swing ESF equipment aligned to the Green train.
2PCV0231, Gland sealing steam pressure control valve failed closed.
T1, T2, T3, T5 set to false.
T4 set to SIAS1.
T5 set to PZR Pressure < 2000 psia Event Malf. No. Value/ Event No. Ramp Description Time 1 NIALINEPWR 0.0 Safety Channel A Excore Linear instrument fails Trigger = T1 LOW.
2 CVC2P36AFAL TRUE A Coolant Charging Pump trips on instantaneous Trigger = T2 Over Current due to motor fault.
3 SGATUBE 5.0 A SG primary-secondary leak.
Trigger = T3 4 SGATUBE 500 A Steam Generator Tube Rupture (500 gpm ramped CUED RAMP= over 10 Minutes).
10 MIN 5 4162A406 TRUE B HPSI pump trips breaker on start.
Trigger = T4 6 CV50151 TRUE Red train HPSI injection MOV fails to open on SIAS Trigger = T4 actuation.
7 RCSHTRON TRUE PZR Backup heaters fail to de-energize.
Trigger = T5 Page 4 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Event
Description:
Channel A excore nuclear instrument will fail low. The CRS will enter the NI malfunction AOP, OP 2203.026.
Time Position Applicant's Actions or Behavior ALL Crew will diagnose that A Excore is the only channel that has failed.
CRS Enter AOP 2203.026, NI malfunction and perform the following actions:
Refer to TS 3.3.1.1 Direct the CBOT to bypass points 1,2,3 and 4 on A PPS Verify that Log channel is also affected Notify maintenance of problem with A Excore CBOT Will perform the following:
Obtain Key 12 from SM Notify control room of potential PPS security door and Bypass alarms Open 2C23 door and unlock panel door Push bypass buttons for points :
1 - Hi Linear Power 2 - Hi Log Power 3 - High LPD 4 - Low DNBR Verify that bypass lights illuminated on operator inserts on 2C03 CBOR Will perform the following:
PEER check that bypass lights for points 1,2,3 and 4 are illuminated on operator inserts on 2C03 Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on A Excore.
Termination criteria: When points 1,2,3 and 4 are bypassed on A PPS or at the discretion of the lead examiner.
Page 5 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Event
Description:
A CCP trip. The CCP low flow alarm will alert operators of this failure.
Letdown will isolate, if backup CCP not started in timely manner.
Time Position Applicant's Actions or Behavior CBOR Announce that A CCP has tripped its breaker (Red and Green lights out on 2C09)
CRS Enter loss of Charging AOP and perform the following actions:
Check for proper Charging suction and discharge flow path.
Check that A CCP has tripped breaker Direct Starting backup CCP Direct verification of proper operation of running CCP Check for indications of CCP header rupture using control room indications Direct WCO to locally vent A CCP TRM 3.1.2.4 Applicability Simulator Operator Cue: When contacted as WCO to vent A CCP wait a few minutes and report that no air bubbles only water came out vent.
CBOR Verify VCT outlet valve open Verity CCP header isolation valve open Manually start backup CCP by taking hand-switch to start Verify VCT level stable or going up CBOT Verify CCP header not ruptured:
/CBOR
- Aux Building or CNTMT radiation level steady
- Waste Tanks 2T20A/B level not rising
- CNTMT Sump level not rising
- Aux Building sump level not rising NOTE: Letdown may have isolated on high temperature. Letdown may be restored at this point.
Termination criteria: When backup CCP started or at discretion of lead examiner.
Page 6 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event
Description:
5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time Position Applicant's Actions or Behavior CBOR Announce annunciators:
- 2K11-A10 Sec Sys Radiation Hi
- 2K11-K8 SG Tube Leak Detection Trouble/LKRT Hi CRS Implement AOP 2203.038, PRI-SEC leakage and perform the following:
Direct CBOs to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SGs for activity Direct CBOT to isolate steam to A EFW pump from A SG Direct CBOR to perform a plant shutdown using normal boration method.
CBOT Close 2CV 1000-1, steam from A SG to A EFW pump.
CBOR Perform a plant shutdown Use reactivity plans to determine the amount of boron required.
Adjust turbine load to maintain Tave within 2°F of Tref.
Insert CEAs as directed by reactivity plan.
Page 7 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event
Description:
5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown.
Simulator Operator Cue: When contacted as AO acknowledge requirement to begin working on Standard attachment 19.
Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner.
Page 8 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event
Description:
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Time Position Applicant's Actions or Behavior CBOR Report that PZR level is lowering Start all back up CCPs or report that they are running Isolate Letdown CRS Recognize SGTR has exceeded CCP capacity and the ability to maintain PZR level.
Direct the CBOR to manually trip the reactor CBOR Manually trip the reactor.
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
CBOR Check reactivity control:
Reactor power decreasing.
All CEAs inserted.
CBOT Check maintenance of vital auxiliaries:
Main turbine tripped.
Generator output and exciter breakers open.
All 4160v and 6900 v Non-Vital busses energized.
ALL 4160v and 480v vital AC bus energized.
All 125v vital DC bus energized.
Page 9 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event
Description:
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Time Position Applicant's Actions or Behavior CBOR Check inventory control:
PZR level 16 to 80%.
Trend from set point.
Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.
(SEE Event 7)
CBOR Check RCS pressure control:
RCS pressure 1800 to 2300 psia.
Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.
Place spray valve for secured RCPs in manual closed.
Verify SIAS when pressure less than 1650 psia.
CBOR Check core heat removal by forced circulation:
RCP s running Loop T less than 10° F.
Service water pump suction aligned to Lake.
Component cooling water aligned to RCPs.
CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Check SIAS actuated.
Maintain SW pressure greater than 85 psig.
Page 10 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event
Description:
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal:
Report SG levels and main feed water is in RTO.
Report feed water line intact.
Report SG pressures (May take manual local (ML) control of SDBCS master controller (at CRS direction) and reduce set point to 950-1050 psia).
CBOR Check CNTMT parameters:
Temperature less than 140° F.
Pressure less than 16 psia.
Status of radiation alarms:
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure.
CRS Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs and EALs.
Page 11 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event
Description:
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
Diagnose Steam Generator Tube Rupture CRS Implement Steam Generator Tube Rupture procedure and open place keeping page.
ALL Perform crew brief and review floating steps.
CRS Determine applicable floating steps:
- Commence cool down to less than 535° F Thot.
- HPSI Override Criteria.
CRS Direct the following actions:
Commence cool down to less than 535° F Thot.
Inform SM to contact Chemistry to sample both SG for activity.
Determine ruptured SG Perform post-SIAS actions:
Verify Safety Injection flow to RCS:
Isolate A SG when RCS Thot is less than 535°F Verify HPSI override criteria met:
- PZR level greater than 29% and controlled.
- RVLMS LVL 03 or higher elevation indicates WET.
Page 12 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event
Description:
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Time Position Applicant's Actions or Behavior Critical CBOR RCS cool down to less than 535°F T-hot : (floating step)
Step CBOR Reset low SG set points.
Commence RCS depressurization to maintain RCS MTS 30 to 45° (When HPSI overridden)
Take manual control of SDBCS bypass valves to condenser (2CV0302/2CV0303)
Place ALL ADV Permissive switches in OFF.
Secure running MFW pump.
Close ALL MFW Block valves.
Record and plot cool down on Attachments 1 and 8.
CBOR Verify Safety Injection flow to RCS:
Check HPSI flow using Exhibit 2.
/CBOT Check LPSI flow using Exhibit 3.
Page 13 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event
Description:
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Time Position Applicant's Actions or Behavior CBOT Perform post-SIAS actions:
SW pumps running on each loop.
SW pump suction aligned to Lake.
Report all non-vital buses energized.
Verify SG sample valves open.
Critical CBOT Use Attachment 10 to isolate Ruptured SG Step CBOR OVERRIDE HPSI:
CBOT Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal.
Termination criteria: RCS Cool down to less than 535°F and A SG isolated or at examiners discretion.
Page 14 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 5/6 Event
Description:
B HPSI pump trips on SIAS start. 2CV5015-1 fails to open on SIAS signal. This will make HPSI flow UNACCEPTABLE. C HPSI pump must be started or 2CV5015-1 must be opened.
Time Position Applicant's Actions or Behavior CBOT 2K05 E-3, B HPSI pump trip alarm announced.
Observes green light lit on pump and no discharge pressure.
CBOT Observes 2CV 5015-1 is closed, green light on, red light off, Z-tape reading 0.
CRS Directs starting C HPSI pump Directs opening 2CV 5015-1 Critical CBOT Starts C HPSI pump Step Verified proper discharge pressure and flow(depending on RCS pressure)
Critical And/or Part is Opens 2CV 5015-1 by taking hand switch to OPEN and to observing red light on green light off and Z-tape reading ~
either 100%
start 2P89C or open 2CV-5015-1 Termination criteria: When C HPSI pump started or 2CV5015-1 is opened or at discretion of lead examiner.
Page 15 of 16
Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 7 Event
Description:
Backup heaters fail to de-energize on PZR pressure control signal or PZR level less than 29%. Failure to turn backup heaters off will cause them to fail and potential for loss of PZR pressure control.
Time Position Applicant's Actions or Behavior CBOR Observes the red light ON on the backup heaters when PZR level is less than 29 %
Reports observation to CRS CRS Directs taking Backup heater hand switches to OFF CBOR Takes Backup Heater hand switches to OFF Observes green lights ON red lights OFF Termination criteria: When PZR heater hand switches are taken to OFF or at the discretion of the lead examiner.
Page 16 of 16
Appendix D Scenario 2 Form ES-D-1 Facility: ANO-2 Scenario No.: 2 Op-Test No.: 2005-1 Examiners: Operators:
Initial Conditions:
100% MOL, All ESF systems in standby. C HPSI pump tagged out for oil bubbler replacement. C HPSI is aligned to green train. Green train maintenance week.
Turnover:
100%. 250 EFPD. C HPSI pump tagged out for oil bubbler replacement. EOOS indicates Minimal Risk. Green train maintenance week.
Event Malf. No. Event Event No. Type* Description 1 XRCCHAPLVL I (CBOR) Control Channel A Pressurizer Level fails LOW.
2 XSG2PT10411 I (CBOT) Steam Generator safety channel pressure fails LOW.
3 FWPMPATRP R (CBOR) A Main Feed Pump (MFP) trips due to thrust N (CBOT) bearing wear and results in a power reduction to less than 90%.
4 FWAFT5A M (ALL) Feed water line break in containment after 2FW5A, feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A SG.
5 ESCSBPMP C (CBOT) Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS.
6 ESFCSASFAIL C (CBOR) Fail CSAS channel 1 to actuate auto.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 15
Appendix D Scenario 2 Form ES-D-1 Scenario #2 Objectives
- 1) Evaluate individual response to a failure of Pressurizer level control channel failure.
- 2) Evaluate individual response to a failure of a Plant Protection System Steam Generator Level instrument failure.
- 3) Evaluate individual response to a Main Feed Pump Trip at 100% power.
- 4) Evaluate individual ability to perform a reduction in plant power.
- 5) Evaluate individual ability to mitigate an unisolatable Feed water break in containment.
- 6) Evaluate individual ability to monitor operation of Engineered Safety Features equipment.
- 7) Evaluate individual response to a failure of required Engineered Safety Features Actuation System actuation.
SCENARIO #2 NARRATIVE Simulator session begins with the plant at 100% power steady state. C HPSI pump is tagged out to replace a pump oil bubbler.
When the crew has completed their control room walk down and brief, the in service Pressurizer (PZR) control channel level instrument will fail low. Alarms on control channel 1 level lo and level lo lo will come in. This will result in letdown going to minimum flow, the two backup CCPs will automatically start, all PZR heaters de-energizing and actual PZR level go up. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR will take the letdown flow controller to manual and control PZR level. The CBOR will also verify that the other level control channel is reading correctly and select that channel for control and place the PZR low low level cutoff switch to the unaffected channel. When the auto and manual signals are matched, the CBOR will place the letdown flow controller to automatic About 10 minutes after PZR level control failure, A Steam Generator safety channel pressure instrument, 2PT1041-1, will fail low. This will trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel A operator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1 and 3.3.3.5 for guidance. The CBOT will place Channel A PPS in bypass for point 11, SG pressure low, point 19, A SG delta-P for EFAS 1, and point 20, B SG delta-P for EFAS 2 for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the tech spec LCO.
About 10 minutes after the Steam Generator instrument failure, A MFP will trip. CRS will enter AOP 2203.037, Loss of Main Feed Pump. This will result in Steam Flow exceeding Feed flow and SG levels dropping. The crew will manually start the fourth condensate pump, reduce turbine load, and borate using emergency boration to the RCS until Feed flow is greater than Steam Flow. Then continue with a normal boration power reduction to less than 90%.
Page 2 of 15
Appendix D Scenario 2 Form ES-D-1 SCENARIO #2 NARRATIVE (continued)
Once the Reactor operators reactivity manipulations are complete, the main feed line break will occur. This will cause containment pressure, temperature and sump level to go up. A Steam Generator level will lower. The crew will manually trip the reactor and complete SPTAs. Once feed (Main and Emergency) is secured to the SG, an Excess Steam Demand will occur on A Steam Generator.
The CRS will diagnose an Excess Steam Demand event and enter OP 2202.005, ESD.
The crew will manually control Reactor Coolant Temperature once the A SG boils dry using the upstream Atmospheric Dump Valves on B SG. The crew will manually control PZR pressure using the Auxiliary Spray valve.
When Containment pressure exceeds 23.3 psia, the crew will recognize that CSAS, Containment Spray Actuation Signal, has not automatically actuated on Channel 1 and that the Spray pump on channel 2 side did not start. The crew will manually actuate spray on Channel 1 and manually start B CSAS pump.
Page 3 of 15
Appendix D Scenario 2 Form ES-D-1 Simulator Instructions for Scenario 2 Reset simulator to MOL 100% power IC stead state.
Ensure that AACG is secured and annunciators clear.
C HPSI pump is tagged out for oil bubbler replacement.
Ensure hotwell level is ~80%.
Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.
T1, T2, T3, T4 set to false.
Event Malf. No. Value/ Event No. Ramp Description Time 1 XRCCHAPLVL 0.0 Control Channel A Pressurizer Level fails LOW.
Trigger 1 2 XSG2PT10411 0.0 Steam Generator safety channel pressure fails LOW.
Trigger 2 3 FWPMPATRP TRUE A Main Feed Pump (MFP) trips due to thrust bearing Trigger 3 wear and results in a power reduction to less than 90%.
4 FW2PW5AAFT 1000 Feed water line break in containment after 2FW5A, Trigger 4 Ramp feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A 5 min SG.
5 BS2P35BFAL TRUE Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS.
6 ESFCSASFAIL TRUE Fail CSAS channel 1 to actuate auto.
Page 4 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 1 Event
Description:
Channel A pressurizer level control channel 2LT-4627-1 fails low. The CRS will enter the PZR Systems Malfunction AOP 2203.028.
Time Position Applicant's Actions or Behavior ALL Announce alarms 2K10-G6 CNTRL CH 1 LEVEL LO.
2K10-F6 CNTRL CH 1 LEVEL LO LO.
Report 2LI-4627-2 and 2LR-4625 indicate normal.
Report backup charging pumps started.
CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.
CBOR Determine PZR level Channel A failed.
Place Letdown Flow controller (2HIC-4817) in MANUAL.
Place PZR Level Channel Select switch (2HS-4628) to Channel B.
Place PZR Low Low Level Cutoff select switch (2HS-4642) to Channel B.
Verify PZR heaters and Normal Spray maintaining RCS pressure 2025 to 2275 psia.
The CBOR will take the letdown flow controller to manual and control PZR level.
CRS Enter 3.3.3.6 Post Accident Instrumentation.
Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LI-4627-1.
Termination criteria: Unaffected PZR level channel selected and letdown in automatic or at the discretion of the lead examiner.
Page 5 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Event
Description:
2PT1041-1, Channel A SG pressure transmitter fails low.
Time Position Applicant's Actions or Behavior CBOT Announce annunciators:
2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04 B3 PPS TRIP 2K04-E4 MSIS PRETRIP Compare all four channels and report 2PI-1041-1 indicates 0 psia.
CRS Implement Annunciator Corrective Action AOP 2203.012D.
Refer to Tech Spec 3.3.1.1, 3.3.2.1, 3.3.3.6.
CBOR Report A SG pressure low pretrip and trip.
CBOT Place the following channels in bypass on Channel A:
A SG pressure low - RPS (Bistable 11)
CBOR Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass.
CRS Contact maintenance to repair 2PT1041-1.
Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2PT1041-1. Report that planning on repair of 2PT1041-1 is in progress.
Termination criteria: When A plant protection system points 11, 19 and 20 are bypassed or at discretion of lead examiner.
Page 6 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 3 Event
Description:
A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.
Time Position Applicant's Actions or Behavior CBOT Announce A MFP trip alarms:
2K03 A8, A MFP trip 2K03 K8, Thrust Bearing Wear Trouble CRS Enter 2203.027, Loss of Main Feed Pump AOP and direct the following actions:
Verify Recirc valves closed (Condensate and MFP)
Verify Main Feed water regulating valve bypasses are opening Start standby condensate pump Commence emergency boration using exhibit 1 Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7°F Secure Emergency boration when Feed water Flow > Steam Flow CBOT Check tripped MFW pump recirc and Condensate recirc closed.
Check MFWRV B/P valves open.
Start standby Condensate Pump.
Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7°F.
CBOR Commence boration using Exhibit 1.
Page 7 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 3 Event
Description:
A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.
CRS When FF>SF, direct CBOR to commence down power to <
90% using normal boration method.
CBOR Align normal boration to RCS.
Reduce turbine load to maintain Tave within 2° of Tref until power is less than 90%.
Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner.
Page 8 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event
Description:
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
ALL Announce that A SG level is lowering.
Containment temperature and pressure are rising.
Announce that radiation levels in containment are steady.
Announce that containment sump level is rising quickly.
Diagnose that a feed line leak is in progress inside containment.
CRS Direct CBOR to manually trip the reactor.
CBOR CBOR manually trip the reactor.
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
CBOR Check reactivity control:
Reactor power decreasing.
All CEAs inserted.
CBOT Check maintenance of vital auxiliaries:
Main turbine tripped.
Generator output and exciter breakers open.
All 4160 v and 6900 v Non-Vital busses energized.
ALL 4160 v and 480 v vital AC bus energized.
All 125 v vital DC bus energized.
Page 9 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event
Description:
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Time Position Applicant's Actions or Behavior CBOR Check inventory control:
PZR level 16 to 80%.
Trend from set point.
Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.
CBOR Check RCS pressure control:
RCS pressure 1800 to 2300 psia.
Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.
Place spray valve for secured RCPs in manual closed.
Verify SIAS when pressure less than 1650 psia.
CBOR Check core heat removal by forced circulation:
RCP s running Loop T less than 10° F.
Service water pump suction aligned to Lake.
Component cooling water aligned to RCPs.
CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Check SIAS actuated.
Maintain SW pressure greater than 85 psig.
Restore CCW to RCPs using exhibit 5 (when CIAS actuates).
Page 10 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event
Description:
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal:
Report SG levels and main feed water is in RTO.
Report feed water line is NOT intact.
Report SG pressures A SG lower than B SG.
Manually actuate EFAS, Emergency Feed water Actuation Signal if not already actuated.
Verify that MSIS is actuated.
Verify Feed water is not aligned to A SG CBOR Check CNTMT parameters:
Temperature greater than 140° F.
Pressure greater than 16 psia.
Status of radiation alarms:
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm Secure ALL RCPs when Containment Spray Actuation Signal (CSAS) occurs.
CRS Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs and EALs.
Page 11 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event
Description:
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
Diagnose EXCESS STEAM DEMAND EOP.
CRS Implement EXCESS STEAM DEMAND EOP procedure and open place keeping page.
ALL Perform crew brief and review floating steps.
CRS Determine applicable floating steps:
Control post steam generator blow down RCS temperature and pressure CRS Direct the following actions:
Isolate A SG using Attachment 10.
Control post steam generator blow down RCS temperature using B steam generator upstream atmospheric dump valve.
Control PZR pressure within P-T limits using Auxiliary Spray valve and Attachment 27.
Override HPSI when conditions are met.
PZR level greater than 29% [50%] and controlled.
RVLMS LVL 03 or higher elevation indicates WET.
At least ONE intact SG available for Heat Removal Page 12 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event
Description:
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Time Position Applicant's Actions or Behavior Critical CBOT Control post Steam Generator blow down RCS temperature Step using upstream atmospheric dump valve within 25°F of A Steam Generator Tc when generator boiled dry.
Critical CBOR Maintain Post steam generator blow down PZR pressure using Step auxiliary spray valve and attachment 27 within the Pressure-Temperature limits of 200°F and 30°F.
CBOR Override HPSI flow and charging flow to maintain PZR level.
/CBOT Termination criteria: When plant temperature and pressures are stabilized after A Steam Generator boils dry or at the discretion of the lead examiner.
Page 13 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 5 Event
Description:
B Containment Spray pump, 2P35B fails to automatically start. CBOT will manually start the B containment spray pump.
Time Position Applicant's Actions or Behavior CBOT Reports that no flow is indicated on 2C16 for containment spray flow after actuation.
Reports that B containment spray pump is not running Reports that the B containment spray containment isolation valve is open.
Reports Alarm on 2K05 A1, 2P35B failure on ESFAS, Engineered Safety Features Actuation System CRS Directs manual start of 2P35B, B containment spray pump.
Critical CBOT Manually starts 2P35B, B containment spray pump on 2C16.
Step Verifies proper containment spray flow on 2C16.
(Either start of 2P35B or actuate CSAS 1)
Termination criteria: 2P35B is manually started or at the discretion of the lead examiner.
Page 14 of 15
Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 6 Event
Description:
Channel 1 Containment Spray actuation signal (CSAS-1) fails to automatically actuate.
Time Position Applicant's Actions or Behavior CBOR Observes that containment pressure is greater than 23.3. psia and containment spray actuation signal (CSAS)
(Note this may be completed prior to reaching the 23.3 psia set point.)
CRS Directs manually actuating CSAS.
Critical CBOR On 2C03 manually actuates CSAS and verifies all four operator Step insert red lights are out above the CSAS label on 2C03.
(Either start of 2P35B or actuate CSAS 1)
Termination criteria: When CSAS is manually actuated or at discretion of lead examiner.
Page 15 of 15
Appendix D Scenario 3 Form ES-D-1 Facility: ANO-2 Scenario No.: 3 Op-Test No.: 2005-1 Page 1 Examiners: Operators:
Initial Conditions:
100% MOL, All ESF systems in standby. Green Train Maintenance Week.
Turnover:
100%. 250 EFPD. EOOS indicates Minimal Risk. Green Train Maintenance Week.
Event Malf. No. Event Event No. Type* Description 1 XCV2LT4861 I (CBOR) VCT level instrument fails low resulting in RWT being aligned to CCP suction.
2 XFW2FIS0735 I (CBOT) A MFP suction flow transmitter fails low. Results in condensate and MFP recircs to condenser opening fully and reducing feed water to SGs.
3 CNDVACUUM R (CBOR) Air leakage into condenser requiring a power N (CBOT) reduction to maintain condenser vacuum.
4 CNDVACUUM M (ALL) Air leakage into condenser results in loss of condenser vacuum and turbine and reactor trip.
5 SU#3 lockout N (CBOT) Loss of offsite power. Must energize non-vital 2A111 fails to busses.
close Startup #2 to 2A1 fails OPEN.
I (CBOR) Loss of power to PZR controllers must be controlled manually or transfer to automatic.
6 2CV1503-1 fails to C (CBOT) #1 EDG service water outlet MOV. This will result open in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5.
7 2CV0340-2 C (CBOT) A EFW pump steam inlet valve fails to open. This breaker trips will result in a loss of all feed water.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 13
Appendix D Scenario 3 Form ES-D-1 Scenario #3 Objectives
- 1) Evaluate individual response to a failure of Volume Control Tank level transmitter.
- 2) Evaluate individual response to a failure of a Main Feed Pump suction Flow transmitter.
- 3) Evaluate individual response to a small condenser vacuum leak.
- 4) Evaluate individual ability to perform a reduction in plant power.
- 5) Evaluate individual ability to mitigate a loss of all Feed Water.
- 6) Evaluate individual ability to mitigate a loss of off site power.
- 7) Evaluate individual response to a failure Loss of power to a vital bus.
SCENARIO #3 NARRATIVE Simulator session begins with the plant at 100% power steady state.
When the crew has completed their control room walk down and brief, one of the two volume control tank (VCT) level transmitters will fail low. The crew will respond to VCT low low level alarm, 2K12 G5. This will result in the VCT outlet valve to the charging pump suction to close and the Refueling Water tank (RWT) suction to the charging pumps to open. RCS temperature and pressure will lower until the CBOR positions the VCT outlet valve manually opened and the RWT valve manually closed.
About 10 minutes after VCT level transmitter failure, A main feed pump suction transmitter will fail low. This will result in 2K03-D9 (A MFP SUCT FLOW LO) alarm. This will result in both the A MFP and A / C condensate pump recirc valves opening. This will reduce Main feed water flow to A Steam Generator and reduce MFP suction pressure so that the standby condensate pump will automatically start. The CBOT will recognize the instrument failure due to flow on the A MFP controller indicating zero even with the recirc valve open and flow indicated on the Feed water flow transmitters to the steam generator.
The CBOT will take manual control of both the MFP and condensate pump recirc valves and close them.
About 10 minutes after the MFP suction flow instrument failure, air in-leakage into the main condenser will start. This will result in condenser vacuum slowly degrading. The CRS will enter OP 2203.019, Loss of condenser vacuum. The CBOR will begin an emergency boration and the CBOT will reduce main turbine load to restore condenser vacuum. The crew will secure emergency boration and reducing turbine load when vacuum stabilizes.
The CBOR will then commence normal boration and reduce turbine load to allow condenser vacuum to be restored to less than ~5 in Hg.
Once the Reactor operators reactivity manipulations are complete, the air in-leakage will be raised to beyond the vacuum pumps capacity and the plant will be manually tripped.
Upon the reactor trip, Startup transformer #3 will lock-out and startup transformer #2 feeder to 2A1 will fail resulting in a loss of off-site power. When #1 EDG starts, the service water value from the EDG will fail to open. This will result in the CRS directing the #1 EDG to be locally secured resulting in a loss of the red train vital power (2A3 and 2B5). Also, the CRS will direct selecting channel #2 PZR level and pressure control channel instrumentation due to a loss of power to the selected channel #1 instruments.
Page 2 of 13
Appendix D Scenario 3 Form ES-D-1 SCENARIO #3 NARRATIVE (continued)
When an Emergency Feed water Actuation Signal (EFAS) occurs and A emergency feed water pump attempts to start automatically start, the steam inlet valve, 2CV 0340-2, will trip its breaker when it starts to open. This will result in a loss of all feed water to the steam generators. The CRS will direct that at least one RCP in each loop are secured and Steam Generator blowdown is isolated from both steam generators. When standard post trip actions, SPTAs, are complete, the CRS will diagnose and enter the Loss of Feed EOP OP2202.006. The CBOT will manually start the Alternate AC Generator from 2C14 and energize 2A3, vital 4160 bus or open the Service water valve from the #1 EDG and start
- 1 EDG. Once 2A3 is energized the CBOT will manually start the emergency feed water pump, 2P7B, from 2C17 and align feed to both steam generators using the Emergency Feed water valves.
Page 3 of 13
Appendix D Scenario 3 Form ES-D-1 Simulator Instructions for Scenario 3 Reset simulator to MOL 100% power IC stead state.
Ensure that AACG is secured and annunciators clear.
Ensure hotwell level is ~80%.
Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.
T1, T2, T3, T4, T5 set to false.
T6 set to EFAS-1 T7 set to EFAS-2 Event Malf. No. Value/ Event No. Ramp Description Time 1 XCV2LT4861 0.0 VCT level instrument fails low resulting in RWT Trigger=T1 being aligned to CCP suction.
2 XFW2FIS0735 0.0 A MFP suction flow transmitter fails low. Results in Trigger=T2 condensate and MFP recircs to condenser opening fully and reducing feed water to SGs.
3 CNDVACUUM 3.0 Air leakage into condenser requiring a power Trigger=T3 Ramp reduction to maintain condenser vacuum.
2 min 4 CNDVACUUM 10.0 Air leakage into condenser results in loss of Ramp condenser vacuum and turbine and reactor trip.
5 min 5 FailSU3 TRUE Startup 3 lockout results in a loss of offsite power.
Causes EDGs to automatically start/ loose Aux feed water pump and non-vital loads.
416A111 Locked
-Open Loss of power to PZR controllers must be controlled manually or transfer to automatic.
Trigger=T4 6 CV15031 0.0 #1 EDG service water outlet MOV. This will result in Trigger=T5 deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5.
7 CV0340 0.0 A EFW pump steam inlet valve fails to open. This Trigger=T6 will result in a loss of all feed water.
Trigger=T7 Page 4 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 1 Event
Description:
VCT level transmitter 2LT4861 fails low. This causes the RWT to be aligned to CCP suction and Tave lowering.
Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K12-G5 VCT 2T4 LEVEL LO LO.
CRS Implement Annunciator Corrective Action AOP 2203.012L.
CBOR Report level indicates normal on 2LIS-4857 but 2LT-4861 reads 0% on computer.
Reports charging pump suction swapping to RWT.
CBOR May secure charging to stop boration if have not determined indication is a failed instrument and VCT level is normal.
OR When faulty instrument identified, then manually reopen VCT outlet and close the RWT to CCP suction valve.
CBOT Reduce turbine load to maintain Tave within 2° F of Tref if Tave
/CBOR lowered.
CRS Contact maintenance/PS liaison to troubleshoot failed instrument.
Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LT-4861.
Termination criteria: Charging suction manually aligned to the VCT and RWT to CCP valve closed or at the discretion of the lead examiner.
Page 5 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 2 Event
Description:
2FIS0735, A loop condensate flow fails low. Condensate and MFP recirc valves open. CBOT must take manual control of recircs and control MFP suction pressure.
Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K03-D9 (A MFP SUCT FLOW LO)
CRS Implement Annunciator corrective action 2203.012C and direct board operator actions.
CBOT Report auto start of condensate pump.
Determine instrument 2FIS-0735 failure by use of PMS or control board indications.
Place A condensate recirc and A main feed pump recirc valves in manual to control condensate header pressure.
Secure condensate pump that auto started.
(Examiners Note: Crew may elect to leave fourth condensate pump running until a later point in the shutdown.)
CRS Contact maintenance/WWM to investigate failed transmitter.
Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2FIS 0735. Report that planning on repair of 2FIS0735 is in progress.
Termination criteria: When condensate and MFP recircs are in manual and secondary plant is stable or at discretion of lead examiner.
Page 6 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Event
Description:
Condenser vacuum slowly degrades. Crew will reduce turbine load Time Position Applicant's Actions or Behavior CBOT Main Condenser lowering vacuum:
2K03 A3, 2E11A Pressure HI 2K03 B3, 2E11A Turb Hood Press HI 2K03 E4, Vacuum pump 2C5B Auto Start 2K02 B14, Condenser Interlock CRS Enter 2203.019, Loss of condenser vacuum and direct the following actions:
Verify both vacuum pumps running Verify adequate gland seal steam pressure Verify both circulating water pumps running Reduce MTG load to maintain Tc less than 554.7°F and condenser vacuum < 6.5 inHg.
Commence emergency boration using exhibit 1 Secure Emergency boration when condenser vacuum is < 6.5 inHg.
CBOT Reduce MTG load to maintain Tc less than 554.7°F and condenser vacuum < 6.5 inHg.
CBOR Commence boration using Exhibit 1.
Page 7 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Event
Description:
Condenser vacuum slowly degrades. Crew will reduce turbine load CRS When vacuum is less than 6.5 inHg. Secure emergency boration.
Contact Ops Management.
Simulator Operator Cue: When contacted as AO report that you can hear the air leak on the vacuum suction piping on the East heater deck under the deck floor. It is unisolatable.
Simulator Operator Cue: When contacted as Maintenance, report that it will take at least 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to patch the leak.
Simulator Operator Cue: When contacted as OPS Management, tell the CRS to reduce plant power until vacuum alarms are cleared.
CRS Direct CBOR to reduce commence a normal boration at power and reduce turbine load to < 5 inHg.
CBOR Align normal boration to RCS.
Reduce turbine load to maintain Tave within 2° of Tref until condenser vacuum is less than 5 inHg.
Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner.
Page 8 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event
Description:
Condenser air in-leakage exceeds the capacity of the vacuum pumps.
This results in a reactor trip.
ALL Announce that condenser vacuum is degrading.
CRS Direct CBOR to manually trip the reactor.
CBOR CBOR manually trip the reactor.
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
CBOR Check reactivity control:
Reactor power decreasing.
All CEAs inserted.
CBOT Check maintenance of vital auxiliaries:
Main turbine tripped.
Generator output and exciter breakers open.
All 4160v and 6900 v Non-Vital busses NOT energized.
All 4160v and 480v vital AC bus energized. (see event 6)
All 125v vital DC bus energized.
Page 9 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event
Description:
Condenser air in-leakage exceeds the capacity of the vacuum pumps. This results in a reactor trip.
Time Position Applicant's Actions or Behavior CBOR Check inventory control:
PZR level 16 to 80%.
Trend to set point.
(See event 5/6)
CBOR Check RCS pressure control:
RCS pressure 1800 to 2300 psia.
Trend to set point CBOR Check core heat removal by forced circulation:
RCP s running Loop T less than 10° F.
Service water pump suction aligned to Lake.
Component cooling water aligned to RCPs.
SW to aligned to CCW and ACW CBOT Check RCS Heat Removal:
Report SG levels Main feed water is secured.
Manually actuate EFW.
Report feed water line is NOT intact.
Report SG pressures Shut both MSIVs due to 2CV 0400 and 2CV 0460, Main Steam to the moisture separator reheaters, have no power and are open.
Page 10 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event
Description:
Condenser air in-leakage exceeds the capacity of the vacuum pumps.
This results in a reactor trip.
Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:
Temperature less than 140° F.
Pressure less than 16 psia.
Status of radiation alarms:
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm CRS Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs and EALs.
Termination criteria: CRS has diagnosed a Loss of All Feed event and transitions to EOP or at discretion of lead examiner.
Page 11 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 5 and 6 Event
Description:
Startup transformer #3 lockout and feeder breaker from Startup transformer #2 to 2A1, non-vital 4160VAC bus fails to open. This will result in a loss of offsite power and automatic start of both emergency diesel generators (#1 and #2 EDG).
CRS Verify Service Water is aligned to #1 EDG and #2 EDG.
CBOT Report that service water is not aligned to #1 EDG and that service water is aligned to #2 EDG and is running with proper voltage.
CRS Direct that AO locally take #1 EDG to lockout.
CRS Direct CBOR to select channel 2 PZR level and pressure controllers.
CBOR Select channel 2 PZR level and pressure controllers and places them in automatic.
Termination criteria: When CBOR has selected channel 2 PZR level and pressure controllers or at discretion of lead examiner.
Page 12 of 13
Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 7 Event
Description:
Failure of A Emergency Feed water pump to start due to a failure of the steam admission valve, 2CV-0340-2, to open. This will result in a loss of all feed water and the crew will reenergize 2A3 and start 2P7B, B emergency feed water pump and restore feed to the steam generators.
Time Position Applicant's Actions or Behavior CRS Direct the following from the Loss of All Feed water EOP:
Refer to Standard attachment 11 and direct the CBOT to manually start the Alternate AC Generator and energize 2A3.
Direct the CBOT to manually start 2P7B and restore feed water to both steam generators at < 150 GPM for five minutes or until level rise is observed.
Simulator Operator Cue: When contacted as WCO, to open the service water from #1 EDG isolation valve. Report that the hand-wheel spins freely and valve will not move.
Critical CBOT Manually starts the Alternate AC Generator and energizes 2A3.
Step Critical CBOT Manually starts B Emergency Feed Pump and restores feed Step water to both steam generators at < 150 GPM for five minutes or until level rise is observed.
CBOR Monitor control Steam generator pressures less than main steam safety valve lift set point (~1078 psig).
Control PZR pressure using auxiliary spray less than 2500 psia.
Termination criteria: When Emergency Feed water is established to both Steam Generators or at the discretion of the lead examiner.
Page 13 of 13