ML053560168: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML053560168 | | number = ML053560168 | ||
| issue date = 12/19/2005 | | issue date = 12/19/2005 | ||
| title = | | title = Combined Reply of Petitioners to the Answers of Amergen and the NRC Staff | ||
| author name = Donato M | | author name = Donato M | ||
| author affiliation = Jersey Shore Nuclear Watch, New Jersey Environmental Federation, New Jersey Public Interest Research Group (NJPIRG), Nuclear Information & Resource Service (NIRS), Sierra Club, New Jersey Chapter | | author affiliation = Jersey Shore Nuclear Watch, New Jersey Environmental Federation, New Jersey Public Interest Research Group (NJPIRG), Nuclear Information & Resource Service (NIRS), Sierra Club, New Jersey Chapter | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES OF AMERICA DOCKETED BEFORE THE NUCLEAR REGULATORY COMMISSION USNRC OFFICE OF THE SECRETARY December 19, 2005 (4:30pm)OFFICE OF SECRETARY) RULEMAKINGS AND In the Matter of ADJUDICATIONS STAFF-) Docket No. 50-0219 AMERICAN ENERGY COMPANY,LLC (ALSO KNOWN AS AMERGEN) )OYSTER CREEK NUCLEAR )GENERATING STATION) December 19, 2005 Regarding the Renewal of Facility Operating License No. DPR-16 for a 20-Year Period )COMBINED REPLY OF PETITIONERS NUCLEAR INFORMATION AND RESOURCE SERVICE, NEW JERSEY SIERRA CLUB, NEW JERSEY PUBLIC INTEREST RESEARCH GROUP, GRANDMOTHERS, MOTHERS AND OTHERS FOR ENERGY SAFETY, JERSEY SHORE NUCLEAR WATCH AND NEW JERSEY ENVIRONMENTAL FEDERATION TO THE ANSWERS OF AMERGEN AND U.S. NUCLEAR REGULATORY COMMISSION STAFF Now come Petitioners Nuclear Information and Resource Service, New Jersey Sierra Club, New Jersey Public Interest and Research Group, Jersey Shore Nuclear Watch, New Jersey Environmental Federation and Grandmothers, Mothers and Others for Energy Safety, through counsel and reply to the Answer of AmerGen "Opposing NIRS ET AL. Request for Hearing and Petition to Intervene" (hereinafter referred to as"Amergen Answer") and the Answer of the United States Nuclear Regulatory Commission Staff "Opposing NIRS ET AL. Petition Requesting a Hearing and Petition to Intervene" (hereinafter referred to as the "Staff Answer.") | {{#Wiki_filter:UNITED STATES OF AMERICA DOCKETED BEFORE THE NUCLEAR REGULATORY COMMISSION USNRC OFFICE OF THE SECRETARY December 19, 2005 (4:30pm) | ||
Petitioners respond in opposition to those portions of the proffered respective answers which seek to deny admissibility of the Petitioners' proffered contention. | OFFICE OF SECRETARY | ||
e --T l PL | ) RULEMAKINGS AND In the Matter of ADJUDICATIONS STAFF | ||
The Petitioners reply in opposition to this assertion recognizing that an organization may satisfy the standing criteria of 10 CFR 2.309(d)(1) based either on its own interests or that of it members. Under the long-standing "proximity presumption" principle, an individual petitioner, or member of an organization, may base its standing upon showing that his or her residence, or that of its members, is within the geographical area that might be affected by an accidental release of radiation from the facility seeking licensing. | -) Docket No. 50-0219 AMERICAN ENERGY COMPANY,LLC (ALSO KNOWN AS AMERGEN) ) | ||
The presumption first appears to have been applied in Northern States Power Company (Prairie Island Nuclear Generating Plant, Units 1 and 2), ALAB-107, 6 AEC 188, 190 (1973), where, in a reactor licensing proceeding, the Appeal Board found that the proximity of petitioners living within 30 to 40 miles from the reactor established their standing to intervene. | OYSTER CREEK NUCLEAR ) | ||
In Gulf States Utilities Company (River Bend Station, Units 1 and 2) ALAB-183, 7 AEC 222, 226 (1974), the proximity presumption was found applicable to interveners in a reactor construction project whose members'every day activities occurred within 25 miles.AmerGen asserts that "there is no recognized proximity presumption applicable to license renewal cases" (AmerGen's Answer at Page 10) to which the Petitioners reply that AmerGen is unreasonably narrow and selective in a re-interpretation so as to misconstrue or misinterpret the NRC's established rule of thumb for representational standing of the Petitioners. | GENERATING STATION | ||
In the referenced matter of the license renewal proceeding for Turkey Point Units 3 & 4, the ASLB in fact found "And because it is the source of | ) December 19, 2005 Regarding the Renewal of Facility Operating License No. DPR-16 for a 20-Year Period ) | ||
Because Mr.Oncavage lives considerably less that 50 miles from the Turkey | COMBINED REPLY OF PETITIONERS NUCLEAR INFORMATION AND RESOURCE SERVICE, NEW JERSEY SIERRA CLUB, NEW JERSEY PUBLIC INTEREST RESEARCH GROUP, GRANDMOTHERS, MOTHERS AND OTHERS FOR ENERGY SAFETY, JERSEY SHORE NUCLEAR WATCH AND NEW JERSEY ENVIRONMENTAL FEDERATION TO THE ANSWERS OF AMERGEN AND U.S. NUCLEAR REGULATORY COMMISSION STAFF Now come Petitioners Nuclear Information and Resource Service, New Jersey Sierra Club, New Jersey Public Interest and Research Group, Jersey Shore Nuclear Watch, New Jersey Environmental Federation and Grandmothers, Mothers and Others for Energy Safety, through counsel and reply to the Answer of AmerGen "Opposing NIRS ET AL. Request for Hearing and Petition to Intervene" (hereinafter referred to as "Amergen Answer") and the Answer of the United States Nuclear Regulatory Commission Staff "Opposing NIRS ET AL. Petition Requesting a Hearing and Petition to Intervene" (hereinafter referred to as the "Staff Answer.") Petitioners respond in opposition to those portions of the proffered respective answers which seek to deny admissibility of the Petitioners' proffered contention. e - | ||
We find that it neither | -T l PL I'_ T Srs(-ca3 4 1 | ||
Since this proceeding is not about effectively shrinking the Emergency Planning Zone around Oyster Creek, AmerGen's assertion that the standard rule of thumb should not be applied to this densely populated coastal area of New Jersey around the site of the oldest operating nuclear power station in the United States that is demonstrated to have experienced severe corrosion and significant thinning of its radiation containment structure's wall would in deed require a "conjure of abstruse reasons" so as not to apply the NRC's established rule of the thumb for accepting the representational standing of the Petitioners. | |||
Furthermore, contrary to AmerGen assertion that the Petitioners have offered only"vague, generalized statements about a hypothetical future injuries" [AmerGen Answer at Page 11] the Petitioners have demonstrated in their Request for Hearing and Petition to Intervene that the subject component in particular to their aging management related contention, the drywell liner, is a vital safety-related component of Oyster Creek's radiation containment structure and that the corrosion event in particular to their' Florida Power and Light, Turkey Point Units 3 & 4, LBP-01-06, ASLB Memorandum and Order, February 26, 2001, page 9 3 contention has been identified by NRC as a "potentially significant safety problem."[Petitioners Exhibit 1, NRC Information Notice 86-99]It is therefore the clearly expressed and well founded concern of the Petitioners' members that reside, recreate and are employed within proximity and within the Emergency Planning Zone of Oyster Creek nuclear generating station that the failure of this very large and heavy radiation containment component due to age-related degradation threatens a radiological accident inflicting injury, sickness and death on themselves and their family members.Petitioners therefore request that the ASLB recognize that standing has been satisfied. | ARGUMENT Reply to AmerGen Answer that the "Petitioners Have Not Demonstrated Standing Based on Geographic Proximity" AmerGen seeks to demonstrate that the Petitioners do not have standing in this re-licensing proceeding. The Petitioners reply in opposition to this assertion recognizing that an organization may satisfy the standing criteria of 10 CFR 2.309(d)(1) based either on its own interests or that of it members. Under the long-standing "proximity presumption" principle, an individual petitioner, or member of an organization, may base its standing upon showing that his or her residence, or that of its members, is within the geographical area that might be affected by an accidental release of radiation from the facility seeking licensing. The presumption first appears to have been applied in Northern States Power Company (Prairie Island Nuclear Generating Plant, Units 1 and 2), ALAB-107, 6 AEC 188, 190 (1973), where, in a reactor licensing proceeding, the Appeal Board found that the proximity of petitioners living within 30 to 40 miles from the reactor established their standing to intervene. In Gulf States Utilities Company (River Bend Station, Units 1 and 2) ALAB-183, 7 AEC 222, 226 (1974), the proximity presumption was found applicable to interveners in a reactor construction project whose members' every day activities occurred within 25 miles. | ||
AmerGen asserts that "there is no recognized proximity presumption applicable to license renewal cases" (AmerGen's Answer at Page 10) to which the Petitioners reply that AmerGen is unreasonably narrow and selective in a re-interpretation so as to misconstrue or misinterpret the NRC's established rule of thumb for representational standing of the Petitioners. | |||
In the referenced matter of the license renewal proceeding for Turkey Point Units 3 & 4, the ASLB in fact found "And because it is the source of radioactivitythat produces the obvious potentialfor offsite consequences not the type ofproceeding, it is equally apparentthat the same 'obvious potentialfor offsite consequences' that initially led to the creation of the presumption in constructionpermit operatinglicense proceedings also present here. Finally, in the instance case, the distancefrom the 2 | |||
significantsource of radioactivitythat is presumed to affect the Petitionerslogically must be the same 50-mile distance thatforms the current basisfor the proximity presumption for reactor constructionpermit and initialoperating licenseproceedings. Because Mr. | |||
Oncavage lives considerably less that 50 miles from the Turkey Pointfacility, however, we need not conjure abstruse reasons why the 50-mile rule of thumb for the presumption is inapplicablebut need only to determine if the presumption is applicableto this Petitionerliving 15 miles downwind of the reactors. We find that it neither strainsthe credulity nor rationalityto conclude that the Petitionermay fairly be presumed to have an interest that may be affected over the course of the extended operatinglicense term of the Turkey Point reactorslocated 15 miles upwind of him. ''I The Petitioners reply that the ASLB's uses strong language in its Turkey Point Memorandum and Order to cite a difference between what "logically must be the same 50-mile radius" or to "conjure abstruse reasons why the 50-mile rule of thumb for the presumption is inapplicable." The Petitioners assert this to be supportive language for the application of the established rule of thumb in this particular instance. Since this proceeding is not about effectively shrinking the Emergency Planning Zone around Oyster Creek, AmerGen's assertion that the standard rule of thumb should not be applied to this densely populated coastal area of New Jersey around the site of the oldest operating nuclear power station in the United States that is demonstrated to have experienced severe corrosion and significant thinning of its radiation containment structure's wall would in deed require a "conjure of abstruse reasons" so as not to apply the NRC's established rule of the thumb for accepting the representational standing of the Petitioners. | |||
Furthermore, contrary to AmerGen assertion that the Petitioners have offered only "vague, generalized statements about a hypothetical future injuries" [AmerGen Answer at Page 11] the Petitioners have demonstrated in their Request for Hearing and Petition to Intervene that the subject component in particular to their aging management related contention, the drywell liner, is a vital safety-related component of Oyster Creek's radiation containment structure and that the corrosion event in particular to their | |||
' Florida Power and Light, Turkey Point Units 3 & 4, LBP-01-06, ASLB Memorandum and Order, February 26, 2001, page 9 3 | |||
contention has been identified by NRC as a "potentially significant safety problem." | |||
[Petitioners Exhibit 1, NRC Information Notice 86-99] | |||
It is therefore the clearly expressed and well founded concern of the Petitioners' members that reside, recreate and are employed within proximity and within the Emergency Planning Zone of Oyster Creek nuclear generating station that the failure of this very large and heavy radiation containment component due to age-related degradation threatens a radiological accident inflicting injury, sickness and death on themselves and their family members. | |||
Petitioners therefore request that the ASLB recognize that standing has been satisfied. | |||
Reply To NRC Staff Answer "Petitioners Have Demonstrated Representational Standing" In view of the NRC Staff s Answer that "Petitioners have met the requirements for standing to intervene in this proceeding" (Staff Answer at Page 10), the Petitioners request that the ASLB accept their collective standing in the above captioned proceeding. | Reply To NRC Staff Answer "Petitioners Have Demonstrated Representational Standing" In view of the NRC Staff s Answer that "Petitioners have met the requirements for standing to intervene in this proceeding" (Staff Answer at Page 10), the Petitioners request that the ASLB accept their collective standing in the above captioned proceeding. | ||
Combined Reply to AmerGen and NRC Staff Answers Asserting That "The Petitioners' Proposed Contention Is Inadmissible" 1. As stated in the background of AmerGen's Answer they claim that Petitioners' bases for supporting their contention "merely attempts to summarize over two decades of | Combined Reply to AmerGen and NRC Staff Answers Asserting That "The Petitioners' Proposed Contention Is Inadmissible" | ||
The same information is summarized in the Application..." (AmerGen Answer at Page 19)The Petitioners cannot develop their contention and address an observed deficiency in the application namely the absence of confirmatory UT measurements at all critical levels of the Oyster Creek containment component without establishing an historical account and specific references to the application. | : 1. As stated in the background of AmerGen's Answer they claim that Petitioners' bases for supporting their contention "merely attempts to summarize over two decades of historicalevents relatedto corrosionof the OCNGS drywell shell discussed in various publicly-availableNRC documents (some of which Petitioners include as Exhibits). The same information is summarized in the Application..." (AmerGen Answer at Page 19) | ||
The Petitioners assert that 4 such an effort is certainly more than mere parroting of the application and without it the applicant would assert to the contrary that the Petitioners contention would be void of context to the application. | The Petitioners cannot develop their contention and address an observed deficiency in the application namely the absence of confirmatory UT measurements at all critical levels of the Oyster Creek containment component without establishing an historical account and specific references to the application. The Petitioners assert that 4 | ||
: 2. Furthermore, AmerGen's background statement claims " | |||
Because the | such an effort is certainly more than mere parroting of the application and without it the applicant would assert to the contrary that the Petitioners contention would be void of context to the application. | ||
Test Method TM-00384: "Holiday Detection of Internal Tubular Coatings of 10 to 30 mils dry Film Thickness", or RP-028 1: "Discontinuity Testing of Protective Coatings." AmerGen has not provided any indication that the 5 inspection of the coating at the drywell liner sandbed region has employed any such procedures other than visually looking at the coating.Therefore, the Petitioners in fact allege that the applicant' sole reliance upon visual inspections that do not include comprehensive and recognized industry inspection procedures on evaluating coating integrity since the last UT measurements were taken at the sand bed region reasonably would not detect corrosion masked under the coating itself and thinning of already measured narrow margins in the containment wall to below ASME code.3. AmerGen's background statement answers that "The Petition does not define the term ' | : 2. Furthermore, AmerGen's background statement claims "Petitionersacknowledge that inspectionshave shown no failure of the epoxy coating in the sand bed region or signs of deterioration." [AmerGen Answer at Page 22] | ||
Simply stated, "all critical levels" is defined to be inclusive of the base of the containment wall at the sand bed region rather than to be excluded from UT inspections for the operational life of the reactor.The Application states "At Oyster Creek, the | To the contrary, the Petitioners reply that they have raised a genuine dispute with applicant's described coating inspection procedure of the epoxy coating at the sand bed region of the drywell liner as part of the supporting bases for their contention. "The Petitionerscontend that the applicantdoes not indicate whether visual coating inspectionssince the originalapplicationhave been made specificallyfor pinhole leaks in the coating which would allowfor water seepage behind the epoxy coating resultingin corrosion behind the coating on the exteriorsurface of the already degradedcomponent. | ||
The corrective actions include extensive UT measurements of the drywell shell thickness, removal of the sand in the sand bed 6 regions, cleaning and coating | Because the remainingmeasured margin of .064 inches [approximately 1/16 of an inch] | ||
A corrosion | in an unknown number of locations within the severely corrodedsand bed region is so extremely narrow, Petitionerscontend that the describedobservable blisters,flakes and discolorationdo not need to occur before the component is in fact outside safety tolerancesdue to ongoing corrosionbehind the coating." [Petition at Page 10] | ||
Moreover, Petitioners have submitted "that the applicanthas not provided reasonable assurance that the epoxy coating has been adequately monitoredfor allpossible methods of leakage behind the coating includingpinhole leaks that could provide a pathwayfor water intrusion andsubsequent corrosion." [Petition at Page 13] | |||
[Petitioners' Exhibit 6 Table 1 Code Required Sandbed Region (2) | In fact, there are specific testing procedures for evaluating protective coating integrity commonly used in industry, such as NACE (National Association of Corrosion Engineers, International) Test Method TM-00384: "Holiday Detection of Internal Tubular Coatings of 10 to 30 mils dry Film Thickness", or RP-028 1: "Discontinuity Testing of Protective Coatings." AmerGen has not provided any indication that the 5 | ||
[Petition at Page 8] The applicant's analysis for code required remaining wall thicknesses used to justify the removal of the support sand from this region of transition between the free standing portion of the 95' tall and heavy steel component and the embedded portion at the base establishes the critical minimum required drywell well wall thickness at 0.736 inches to prevent buckling. | |||
[Petitioners' Exhibit 6 Table 1.] The Petitioners note that in 1993 an evaluation of the drywell liner thickness measurements reported that "Bays 1 and 13 each have several locations where the | inspection of the coating at the drywell liner sandbed region has employed any such procedures other than visually looking at the coating. | ||
In another scenario, the buckling of the drywell liner could result in the movement of the large structure within the reactor building and impacts that create vibrations with adverse consequences on other safety-related equipment (i.e. chatter of relay switches between the on and positions resulting in spurious operations or the inoperability of safety-related equipment). | Therefore, the Petitioners in fact allege that the applicant' sole reliance upon visual inspections that do not include comprehensive and recognized industry inspection procedures on evaluating coating integrity since the last UT measurements were taken at the sand bed region reasonably would not detect corrosion masked under the coating itself and thinning of already measured narrow margins in the containment wall to below ASME code. | ||
Both AmerGen and NRC Staff Answers do not address the critical limiting factor of buckling of the wall due to thinning at the critical level of the drywell liner sandbed region as presented in the Petition.4. AmerGen asserts " | : 3. AmerGen's background statement answers that "The Petition does not define the term 'criticallevel. | ||
10 CFR2.309W(1)(vi). " [AmerGen Answer at Footnote 12 Page 23.] AmerGen asserts that the Petitioners misidentify a section number in the application in reference to a quote excerpted from the application that is germane to the contention. | The Petitioners reply that the focus of the contention as stated the Application for a twenty year extension of the Oyster Creek operating license must reasonable provide for a Corrosion Monitoring Program at all critical levels of the containment component to include the sand bed region which experienced the severest level of corrosion and measured thinning of the containment wall where UT measurements were discontinued as well as the several elevations above the sand bed region which continue to receive periodic UT measurements. Simply stated, "all critical levels" is defined to be inclusive of the base of the containment wall at the sand bed region rather than to be excluded from UT inspections for the operational life of the reactor. | ||
8 The Petitioners reply with reference to the Application's Table 3.5.1 "Summary of Aging | The Application states "At Oyster Creek, the potentialloss of material, due to corrosion, in inaccessibleareas of the containmentdrywell shell was first recognized in 1980 when water was discovered in the sand bed region drains. Corrosionwas later confirmed by ultrasonic thickness (UT) measurements taken during the 1986 refueling outage. As a result several correctiveactions were initiatedto determine the extent of the corrosion, evaluate the integrity of the drywell, mitigate acceleratedcorrosion, and monitor the condition of containment surfaces. The corrective actions include extensive UT measurements of the drywell shell thickness, removal of the sand in the sand bed 6 | ||
AmerGen asserts "Petitioners also reference Subsection 3.5.2.2.1.4 as the source for normal drywell operating temperatures, but those temperatures are not listed there."[AmerGen Answer at Footnote 12 Page 23.]The Petitioners reply that the reference for Oyster Creek's drywell operating temperatures are located in the AmerGen Application at Subsection 3.5.2.2.1.3 on Page 3.5-17.AmerGen further asserts " | |||
'the Application' in | regions, cleaning and coating exteriorsurfaces where the sand was removed, and an engineeringevaluation to confirm the drywell structuralintegrity. A corrosion monitoringprogram was establishedin 1987for the drywell shell above the sand bed region to ensure that the containment vessel is capable ofperforming its intended functions. Elementsfor the program have been incorporatedinto ASME Section XI, Subsection IWE, (B.J.27) andprovidefor. | ||
[Petition at Page 8]9 as extrapolated from the Application at Section 3 "Age Management Review Results" specifically where the Petitioners reference; | . PeriodicUT inspections of the shell thickness at criticallocations," | ||
: 1) "The | [Application at Page 3.5-18] | ||
[Petitioners' Exhibit 6 Table 1.]B. The Applicant asserts "AmerGen has committed to use ASME Section XI, Subsection IWE and IO CFR | The Petitioners' contention asserts that the drywell liner at sand bed region is in fact a critical level to age management in the license renewal application process in particular to the control of buckling of the component under the heavy load of the containment bearing down on the thinned walls at this bathtub ring of corrosion at the base of the component. [Petitioners' Exhibit 6 Table 1 Code Required Sandbed Region (2) Controlledby buckling] | ||
It is there reasonable to require the appropriate number of UT measurements to be made at the drywell liner sandbed region at previously measured areas and new areas.D. Both NRC staff and AmerGen assert " | The Petitioners have raised the issue of buckling of the dry well liner at the sand bed region as a defining issue for the critical nature of performing confirmatory UT testing of this level of the component. [Petition at Page 8] The applicant's analysis for code required remaining wall thicknesses used to justify the removal of the support sand from this region of transition between the free standing portion of the 95' tall and heavy steel component and the embedded portion at the base establishes the critical minimum required drywell well wall thickness at 0.736 inches to prevent buckling. [Petitioners' Exhibit 6 Table 1.] The Petitioners note that in 1993 an evaluation of the drywell liner thickness measurements reported that "Bays 1 and 13 each have several locations where the measuredthickness is below 0.736 inch. These locationsare isolated." [Petitioners' Exhibit 5 Page 12.] | ||
are extremely narrow.Id. at 8. Petitioners' however, overlook an amendment to the OCNGS Technical Specifications that ' | In fact, buckling of the containment component due to thinning of the wall from corrosion, the prior removal of the supporting sand bed and the tremendous weight of the component structure above the damage area, defines the sand bed region as an extremely 7 | ||
Again, the Petitioners point to the 0.736 inches Code required wall thickness at the sand bed region of the drywell liner as "Controlled by buckling" as referenced in the text in Petition at Page 10 and as provided by Petitioners' Exhibit 6 Table 1 Reference (2) " | critical level for insuring the continued integrity of this already damaged component and the public's health and safety. The Application states "The primary containment is penetrated at several locations by piping, instrumentation lines, ventilation ducts and electrical leads." [AmerGen Application at Page 2.4.3] Were the containment structure to buckle at this thinned wall during the extended operational period, the Petitioners contend that the vast bulk of the carbon steel containment structure above the buckling zone could fall or shift acting like a large guillotine or pincer to cut, rupture, constrict or dislodge the steam and reactor coolant lines, other safety-related pipes and conduits that pass through penetrations in the steel drywell liner and penetrations in the concrete shield wall. The Petitioners contend that such an event not only breaches primary containment but could simultaneously result in a Loss-of-Coolant-Accident. In another scenario, the buckling of the drywell liner could result in the movement of the large structure within the reactor building and impacts that create vibrations with adverse consequences on other safety-related equipment (i.e. chatter of relay switches between the on and positions resulting in spurious operations or the inoperability of safety-related equipment). | ||
In fact, AmerGen's Exhibit 1 is dated December 9, 2005 at the time of filing of Petitioners Combined Reply is still not posted to ADAMS. The December 9 document dated more than three weeks after the Petitioners' filing deadline and the same date as the establishment of the Atomic Safety and Licensing Board might as easily be assumed to have been influenced by the Petitioners' filing the Request for a Hearing and Petition to Intervene as AmerGen was not required by NRC to resume UT measurements of the drywell liner at the sand bed region, to the best of the Petitioners' knowledge. | Both AmerGen and NRC Staff Answers do not address the critical limiting factor of buckling of the wall due to thinning at the critical level of the drywell liner sandbed region as presented in the Petition. | ||
Documents available to the public through ADAMS on the Age Management Review of the Oyster Creek License Renewal Process from the October 2005 timeframe do not identify that the AmerGen's Structures Monitoring Program made any changes to the Drywell Liner Corrosion Monitoring Program.Furthermore, AmerGen does not give any indication whatsoever of the number of UT measurements to be taken at a still uncertain date which will adequately capture the remaining wall thicknesses at enough locations so as to reasonably assure component integrity to include a number of those locations previously measured (and as the Petitioners Exhibit 5 several locations measured thicknesses that were already below ASME Code in Bays 1 and 13) and new locations in and around the sand bed region, particularly in and around areas of the "bath tub ring" of corrosion that may have never been protectively coated due to inaccessibility. | : 4. AmerGen asserts "PetitionersContention Does Not Raise A Genuine Dispute of Law or Fact, Lacks An Adequate Basis andFails to ProvideSupporting Expert Opinion." | ||
13 Petitioners Exhibit 3 provides the NRC Safety Evaluation which emphasizes"The measurements should cover not only | A. AmerGen asserts that "The burden is on the Petitionersto identify those portions of the application that are defective and explain why they are defective. 10 CFR2.309W(1)(vi). " [AmerGen Answer at Footnote 12 Page 23.] AmerGen asserts that the Petitioners misidentify a section number in the application in reference to a quote excerpted from the application that is germane to the contention. | ||
The red lead paint was not protective of the steel surface when in contact with the sand. Petitioners' therefore contend that the concrete would offer no corrosion protection and that expansion and contraction of the liner vessel no doubt would have generated some cracks at the steel/concrete base boundary for water intrusion. | 8 | ||
The UT inspection and measurement of remaining wall thicknesses of the steel drywell liner just below the concrete is obviously another critical level that has not been described by AmerGen vague commitment of drywell liner areas at the sandbed to be UT inspected. | |||
The Petitioners contend that it is grossly insufficient for AmerGen to merely reference a vague and undefined commitment to "one-time measurements" and assume this to provide reasonable assure that component integrity is preserved for an additional twenty-year extension. | The Petitioners reply with reference to the Application's Table 3.5.1 "Summary of Aging ManagementEvaluationsin ChaptersII and III of NUREG -1801 for Structures and Component Supports" Item 3.5.1-13 which under the heading of Discussion references Subsection 3.5.2.2.1.4 in the application at Page 3.5-35 regarding the "Loss of material due to corrosion in the sand bed and on the exteriorsurfaces of the upper region of the drywell liner was identified as a potential concern in the early 1990's. As a result the sand was removed from the sand bed region and a protective coating was applied to the drywell exterior surfaces in that region. The upper regions of the dry are examined by ultrasonictesting (UIT) measurements and evaluated to ensure that the actual thickness meets ASME requirements" [Petition at Page 7] as indicative and particular to the Petitioners' contention of a significantly deficient application where the age management review for the 20-year extension suspends and excludes adequate UT measurements being taken at the critical level of the already damaged (corrosion induced wall thinning) sand bed region of Oyster Creek's containment structure. | ||
Assuming that AmerGen does not intend as a single test procedure to conduct and provide a continuous UT scan of the sand bed region of the entire dry well liner to the width of at least 18 inches wide, Petitioners assert that AmerGen can not as it states in Exhibit 1 "take these additional measurements to provide a high degree of assurance that the surface coating applied to the liner has arrested corrosion that was already planned as part of the aging management program for the 14 containment, will ensure the long-term integrity of the drywell shell in the sand bed region" without providing the specific number and locations of measurements to be actually be taken. Petitioners do not know if AmerGen might settle for 5, 10, 25 or some other number of UT measurements as presumably providing in its view adequate assurance of the integrity of the component without any verifiable engineering basis.The Petitioners also take issue with the "one-time only" UT measurement for this already damaged component. | AmerGen asserts "Petitioners also reference Subsection 3.5.2.2.1.4 as the source for normal drywell operating temperatures, but those temperatures are not listed there." | ||
As stated in the Petitioners' Exhibit 3, previous NRC Safety Evaluations of Oyster Creek's Drywell Liner Integrity identified the importance that "it is essential that GPUN continue UT thickness measurements at refueling outages and at outages of opportunity for the life of the plant." [Petition at Page 3] Petitioners argue that it is unreasonable that when UT measurement equipment is brought into Oyster Creek's containment for the measurements of the upper levels during subsequent inspections during the renewal period that the operator would ignore the opportunity to confirm projections as to coating performance at the sand bed with UT measurements. | [AmerGen Answer at Footnote 12 Page 23.] | ||
The Petitioners reply that the reference for Oyster Creek's drywell operating temperatures are located in the AmerGen Application at Subsection 3.5.2.2.1.3 on Page 3.5-17. | |||
AmerGen further asserts "Petitionersalso ambiguously reference 'the Application' in severalplaces in the text of the Petition with no other information to guide the reader." [AmerGen Answer at Footnote 12 Page 23.] | |||
The Petitioners reply that while certain historical and operational accounts that are not in dispute in the Petition and as such are not cited by a specific page number in the Application, Petitioners' provide their references to the Application [Petition at Page 8] | |||
9 | |||
as extrapolated from the Application at Section 3 "Age Management Review Results" specifically where the Petitioners reference; | |||
: 1) "The applicationstates that leakage was observedfrom the sand bed drains as early as 1980 with mitigation efforts beginning in 1983." [From Application at Page 3.5-18 and 3.5-19] and; | |||
: 2) "The applicationfurtherstates that it was concluded that the optimal methodfor arrestingthe corrosion was (1) removal of the sand to break up the galvanic cell; (2) removal of the corrosionfrom the drywell liner at the sand bed region and; (3) applicationof a protective coating." [From Application at Page 3.5-20] and; | |||
: 3) "Removal of sandwas startedin 1988 by cutting access holes in the concrete shield wall and completed in 1992. " [From Application at Page 3.5-20] and; | |||
: 4) "The applicationstates that core samples taken in seven locations of the dry well liner validated UT measurements and confirmed that the corrosion of the drywell liner was due to the presence of oxygenated wet sand and exacerbatedby the presence of chloride and sulfate in the sand bed region." [From Application at Page 3.5-19] and; | |||
: 5) "The applicationstates that corrective actions taken at this time included cleaning loose rustfrom the drywell shellfollowed by an application of a coating of an epoxy material. " [From Application at Page 3.5-20] and; | |||
: 6) "The application then states that UT measurements were taken after cleaning." | |||
[From Application at Page 3.5-20] and; | |||
: 7) "The applicationnotes that "There were, however, some areas thinner than projected" but were still within ASME code requirements." [From Application at Page 3.5-20] | |||
10 | |||
The Petitioners takes exception to this assertion by AmerGen that all UT measurements were "still within ASME code requirements." As Petitioners have identified and provided in Petitioners' Exhibit 5 at Page 12 "Evaluation of Shell Thickness (UT) Measurements" which states "Bays 1 and 13 have several locations where the measured thickness is below 0. 736 inch. " [Petitioners' Exhibit 5 at Page 12.] | |||
The 0.736 inch code requirement is the aforementioned control on buckling. [Petitioners' Exhibit 6 Table 1.] | |||
B. The Applicant asserts "AmerGen has committed to use ASME Section XI, Subsection IWE and IO CFR Part50 Appendix J to 'manage loss of materialfor steel elements of the containment includingthe drywell liner'forthe license renewalperiod. | |||
Application at 3.5-18. While Petitionersacknowledge this commitment, Petition at 7, they simultaneously ignore thefact that the ASME Section XI, Subsection IWE aging managementprogramfor OCNGS specifically includesperformingperiodic UT inspections at criticallocations of the drywell shell. Application at 3.5-18 and 4-55." | |||
[AmerGen Answer at Page 24] | |||
The Petitioners reply that in the context of a twenty-year license extension it is reasonable to view the damaged sand bed region as a critical level particularly in light of the Petitioners' concern for the buckling issue which neither the applicant nor the NRC have addressed in their Answers. The Petitioners have contended that the containment, much like a chain, is only as strong as its weakest link and therefore it is the original Application that ignored a potential weak link at a critical location, in particular at the base of the large and heavy containment structure, and as such, a genuine dispute of material fact is reasonably in doubt without adequate confirmatory UT measurements for the life of the reactor. | |||
C. AmerGen asserts "Petitioners' contention also lacks an adequate basis. | |||
Petitionersdo not allege thatASME Section Xl7 is deficient or that AmerGen is not complying with that Section. No do Petitionersallege that AmerGen is violating any NRC regulation or other requirement." [AmerGen Answer at Page 25] | |||
11 | |||
Petitioners reply as they have already stated in the Petition that the amendment granted AmerGen was for the current 40-year license and did not necessarily contemplate at that the time of approval an additional 20-year extension. It is there reasonable to require the appropriate number of UT measurements to be made at the drywell liner sandbed region at previously measured areas and new areas. | |||
D. Both NRC staff and AmerGen assert "Petitionersmisinterpret the Application regardingminimum allowable thicknessfor the steel in the upper region of the drywell. | |||
Petitioners include a table compiledfrom a 1993 public document and allege that it shows that 'marginsof safety left by severe corrosion damage... are extremely narrow. | |||
Id. at 8. Petitioners' however, overlook an amendment to the OCNGS Technical Specifications that 'reducedthe drywell design pressurefrom 62 psig to 44 psig. | |||
Application at 3.5-20. "' [AmerGen Answer at Page 25.] The referenced Footnote 13 in the AmerGen Answer states "These margins accordingto the table are: 0.032 inchesfor the cylinder portion of the drywell; 0.0412for the upper sphericalportion of the drywell; and 0.073 for the middle sphericalportionof the drywell." AmerGen goes on to state, "The failure of the Petitionersto readthe Application or reference otherpublicly availablefacts related to this aspect of theirproposedcontentionfurther demonstrates that Petitioners lack an adequate basisfor the contention. " | |||
The Petitioners reply that it is the NRC and AmerGen that have misinterpreted the contention by attempting to misplace the Petitioners' concerns on the amended pressure and temperature specifications. Again, the Petitioners point to the 0.736 inches Code required wall thickness at the sand bed region of the drywell liner as "Controlled by buckling" as referenced in the text in Petition at Page 10 and as provided by Petitioners' Exhibit 6 Table 1 Reference (2) "Controlledby buckling. " The Petitioners re-assert that the differences between the as found condition of 0.806 inches [Petitioners' Exhibit 6 Table 1] or 0.800 inches [Petitioners' Exhibit 5 at Page 8] and the Code required thickness of 0.736 inches is an extremely narrow in the range of 0.064 and 0.070 inches. | |||
12 | |||
The Petitioners therefore assert that a genuine dispute with the original Application in fact does exist. | |||
E. AmerGen asserts "Petitioners'contention is similarly deficient with respect to AmerGen 's aging managementprogramfor the sand bed region of the drywell shell. | |||
First, AmerGen has, in fact, committed to the NRC Aging Management ProgramAudits in early October 2005, to perform one-time UT measurements in the sand bed region. See AmerGen Exhibit 1. " [AmerGen Answer at Page 26] | |||
The Petitioners reply that any AmerGen commitments made to NRC after the submission of the application are not necessarily available to the public record. As Oyster Creek's referenced limited commitment is not in the original application, the Petition can not be assumed to be deficient. In fact, AmerGen's Exhibit 1 is dated December 9, 2005 at the time of filing of Petitioners Combined Reply is still not posted to ADAMS. The December 9 document dated more than three weeks after the Petitioners' filing deadline and the same date as the establishment of the Atomic Safety and Licensing Board might as easily be assumed to have been influenced by the Petitioners' filing the Request for a Hearing and Petition to Intervene as AmerGen was not required by NRC to resume UT measurements of the drywell liner at the sand bed region, to the best of the Petitioners' knowledge. Documents available to the public through ADAMS on the Age Management Review of the Oyster Creek License Renewal Process from the October 2005 timeframe do not identify that the AmerGen's Structures Monitoring Program made any changes to the Drywell Liner Corrosion Monitoring Program. | |||
Furthermore, AmerGen does not give any indication whatsoever of the number of UT measurements to be taken at a still uncertain date which will adequately capture the remaining wall thicknesses at enough locations so as to reasonably assure component integrity to include a number of those locations previously measured (and as the Petitioners Exhibit 5 several locations measured thicknesses that were already below ASME Code in Bays 1 and 13) and new locations in and around the sand bed region, particularly in and around areas of the "bath tub ring" of corrosion that may have never been protectively coated due to inaccessibility. | |||
13 | |||
Petitioners Exhibit 3 provides the NRC Safety Evaluation which emphasizes "The measurements should cover not only areaspreviously inspected but include accessible areas which have not been previously inspectedso as to confirm that the thickness of the corrodedareas are aspredicted and the corrodedareas are localized." | |||
[Petition at Page 7.] Again, AmerGen Exhibit 1 does not provide a number of actual UT measurements to be made at the sand bed region and only makes vague reference to take UT measurements at locations already tested in the 1990s with no provision to test per the Safety Evaluation guidance in "areas notpreviously inspected" in the resumption of UT testing at the sand bed region. | |||
In the Petitioners' view as to new locations in need of UT measurements at and around the sand bed region, there is nothing to exclude the possibility that at the base of the drywell liner there have long been crevices between the concrete and the outer surface of the drywell liner at the margins just below the sand bed region that would allow past, present and future water intrusion enough to afford a destructively corrosive environment. The red lead paint was not protective of the steel surface when in contact with the sand. Petitioners' therefore contend that the concrete would offer no corrosion protection and that expansion and contraction of the liner vessel no doubt would have generated some cracks at the steel/concrete base boundary for water intrusion. The UT inspection and measurement of remaining wall thicknesses of the steel drywell liner just below the concrete is obviously another critical level that has not been described by AmerGen vague commitment of drywell liner areas at the sandbed to be UT inspected. | |||
The Petitioners contend that it is grossly insufficient for AmerGen to merely reference a vague and undefined commitment to "one-time measurements" and assume this to provide reasonable assure that component integrity is preserved for an additional twenty-year extension. Assuming that AmerGen does not intend as a single test procedure to conduct and provide a continuous UT scan of the sand bed region of the entire dry well liner to the width of at least 18 inches wide, Petitioners assert that AmerGen can not as it states in Exhibit 1 "take these additional measurements to provide a high degree of assurance that the surface coating applied to the liner has arrested corrosion that was already planned as part of the aging management program for the 14 | |||
containment, will ensure the long-term integrity of the drywell shell in the sand bed region" without providing the specific number and locations of measurements to be actually be taken. Petitioners do not know if AmerGen might settle for 5, 10, 25 or some other number of UT measurements as presumably providing in its view adequate assurance of the integrity of the component without any verifiable engineering basis. | |||
The Petitioners also take issue with the "one-time only" UT measurement for this already damaged component. As stated in the Petitioners' Exhibit 3, previous NRC Safety Evaluations of Oyster Creek's Drywell Liner Integrity identified the importance that "it is essential that GPUN continue UT thickness measurements at refueling outages and at outages of opportunity for the life of the plant." [Petition at Page 3] Petitioners argue that it is unreasonable that when UT measurement equipment is brought into Oyster Creek's containment for the measurements of the upper levels during subsequent inspections during the renewal period that the operator would ignore the opportunity to confirm projections as to coating performance at the sand bed with UT measurements. | |||
The Petitioners find no reassurance in AmerGen's "don't look, don't find" approach to projecting the integrity of this vital radiation containment component over the proposed 20-year extension. | The Petitioners find no reassurance in AmerGen's "don't look, don't find" approach to projecting the integrity of this vital radiation containment component over the proposed 20-year extension. | ||
F. AmerGen further asserts " | F. AmerGen further asserts "Petitionersare aware, but overlook the significance, of the drywell inspection program that NRC approvedfor OCNGS on November 1, 1995. | ||
The Petitioners' assert that the error is not fatal to the admissibility of the contention in as much as Petitioners' Exhibit 6 documents their awareness that UT measurements at the sand bed region were conducted in September 1994 with the Petitioners stating "Oyster Creek's | Petitioners'Exh.9. That Programdoes not requireAmerGen to take UT measurements of the drywell liner shell in the sand bed region. Instead, it requiresAmerGen to take UT measurements in the upper region of the drywell, and to perform visual inspections of the epoxy coating in the sand bed region. " [AmerGen Answer at Page 27] | ||
The Petitioners' review of all publicly available documents from the NRC ADAMS Legacy File for 1996 inspection reports and Drywell Monitoring Program does not provide any indication or substantive documents regarding the results of the referenced 1996 inspection per Oyster Creek's Drywell Monitoring Program commitment and more particularly any UT measurements made at the sand bed region. The NRC Legacy File is assisted by the librarians at the NRC Public Document Room for identifying and pulling up microfiche files. The PDR librarian's search did not provide any Drywell Monitoring Program inspection reports for 1996. Therefore, at the time of this reply, Petitioners are unaware of any specific measurements made during 1996 16th Refueling Outage inspection to ascertain the extent and findings of the ultrasonic 16 thickness measurements taken at the drywell liner wall at the sandbed region and assertions that corrosion had been arrested.H. AmerGen asserts in "2. Unsupported Wet Conditions" that " | The Petitioners reply that the November 1 1995 NRC approved drywell inspection program was for the 40-year license and in particular to suspend confirmatory UT measurements being taken at the sand bed region. The Petitioners assert that no safety analysis for this approval contemplated a 41 to 60-year operational period for Oyster Creek. | ||
could | 15 | ||
'Petition at 11. | |||
They identify no document which | G. AmerGen asserts "Wrong Date for the last UT inspection" claiming that the "Petitionersappearto be under the impression that no UT measurements were conducted after the epoxy coating was applied, implicitly calling into question the efficacy of the coating to prevent corrosion of the underlying shell. Specifically, they state that 'no UT measurements have been made at the severely corrodedsand bed region... | ||
However, the Petitioners note that Exhibit 12 identifies that cracking in the reactor building and in the drywell shield wall above the dry well liner and sand bed region has provided the potential for water intrusion and collection potentially impacting the areas of concern. Just as the Petitioners are not aware of documents that would have publicly indicated at the time the past operational and outage spillages at Oyster Creek that resulted in the severe corrosion at the dry well liner sand bed region, similarly the Petitioners are not aware at the present time of any publicly available source documents that would indicate water spillages occurring during future operation periods and outages that would provide insights into the number or the extent of such water intrusion events. However, spillages have occurred resulting in severe corrosion and potential could re-occur during the requested extension that Petitioners contend should be addressed through confirmatory UT measurements at the most damaged area of the component, the sand bed region of the drywell liner, for the life of the plant.Again, the Petitioners assert that it is AmerGen who has not provided the confirmatory tests (either through UT measurements of the wall thicknesses or thorough inspections for cracking and pinhole leaks in the epoxy coating) other than a sampling of 2 "Response to NRC Request for Additional Information (RAI 2.5.1.19-1), dated September 28, 2005, Related to Oyster Creek License Renewal Application (TAC No. MC7624), Appendix D, Page 10 of 19, Accession No. ML052910091. | since the epoxy coating was originallyapplied in 1992. 'Petition at 13. This is factually incorrect." | ||
18 visual inspections in these very difficult and tight quarters and of further concern with no visual inspections over an undefined inaccessible area of the component through makeshift access man ways into the sand bed region to assure that the epoxy coating will perform as projected over the requested 20-year license extension. | Petitioners reply that the "1992" date is an editing error not subsequently captured in editing of the original Petition. The Petitioners' assert that the error is not fatal to the admissibility of the contention in as much as Petitioners' Exhibit 6 documents their awareness that UT measurements at the sand bed region were conducted in September 1994 with the Petitioners stating "Oyster Creek's 15 th refueling outage in September 1994 was the last time that UT measurements were taken at the sandbedregion of the drywell liner." [Petition at Page 10] | ||
I. AmerGen asserts " | Petitioners reply to AmerGen assertions that UT measurements were taken in at the sand bed region in 1996. AmerGen does not provide any reference to Oyster Creek inspection reports or drywell liner corrosion monitoring reports for 1996 that verify its assertion. The Petitioners' review of all publicly available documents from the NRC ADAMS Legacy File for 1996 inspection reports and Drywell Monitoring Program does not provide any indication or substantive documents regarding the results of the referenced 1996 inspection per Oyster Creek's Drywell Monitoring Program commitment and more particularly any UT measurements made at the sand bed region. The NRC Legacy File is assisted by the librarians at the NRC Public Document Room for identifying and pulling up microfiche files. The PDR librarian's search did not provide any Drywell Monitoring Program inspection reports for 1996. Therefore, at the time of this reply, Petitioners are unaware of any specific measurements made during 1996 16th Refueling Outage inspection to ascertain the extent and findings of the ultrasonic 16 | ||
As discussed above | |||
As this component is safety-related as it is the all important radiation containment component, the Petitioners reassert their call for the results of any and all UT measurements made of the drywell liner wall to be made public via reporting such findings to the NRC so that such findings can be independently corroborated in the future.J. NRC and AmerGen assert that the Petitioners' Expert, Dr. Rudolph Hausler is qualified. | thickness measurements taken at the drywell liner wall at the sandbed region and assertions that corrosion had been arrested. | ||
The Petitioners reviewed of the .pdf version of Dr. Hausler's expert opinion provided by his memo which was posted to ADAMS and discovered that the electronic signature of Dr. Hausler did not optically transmit. | H. AmerGen asserts in "2. Unsupported Wet Conditions" that "Petitionersalso state that wet conditions continue in the sand bed region of the drywell. They contend that 'pinhole leaks in the coating... could allowfor water seepage behind the epoxy coating resultingin corrosion behind the coating, 'Petition at IO, and that 'wet conditionsoccurringover the past 12 years behind the epoxy coating can reasonable contributeto corrosion. 'Petition at 11. Petitionersprovide no supportfor these statements. They identify no document which reportswater beingpresentin the sand bed region." [AmerGen Answer at Page 29.] | ||
Attached again is Dr. Hausler's 19 electronically signed memorandum dated November 10, 2005 as provided in the original filing where Dr. Hausler's signature is clearly legible. [PETITIONERS' EXHIBIT 13]The Petitioners are also attaching a copy of Dr. Hausler's Curriculum Vitae.[PETITIONERS' EXHIBIT 14]AmerGen asserts "Dr. Hausler | The Petitioners reply that on December 15, 1995, GPU Nuclear corresponded with NRC regarding "Changes in the Oyster Creek Drywell Monitoring Program" exempting water "leakage associated with normal refueling activities" up to 12 gallons per minute from its commitment to perform additional inspections on the drywell liner at the sand bed region within 3 months of the discovery of water leakage from pools above the reactor cavity. [PETITIONERS' EXHIBIT 10]. NRC responded in February, 1996 to allow GPUN a leak rate up to 12 gallons per minute from pools above the reactor cavity during subsequent refueling outages. [PETITIONERS' EXHIBIT 11.1 Furthermore, Petitioners reply that they are aware that on October 12, 2005 AmerGen provided its "Response to NRC Request for Additional Information (RAI 2.5.1.19-1), dated September 28, 2005, Related to Oyster Creek License Renewal Application (TAC No. MC7624) [PETITIONERS' EXHIBIT 121 which contains an account of the operating experience of Oyster Creek. In Appendix D of AmerGen's response to the NRC RAI, they state: | ||
Apparently the temperatures inside the drywell | "The review ofprogram documentation, and otherplant operatingexperience before the program was implemented, identified cracking of reinforcedof exterior walls of the reactorbuilding, drywell shield wall above elevation 95 and the spentfuelpool support beam. Cracking of the reactorbuilding exterior wall was generally minor and 17 | ||
[Application at Subsection 3.5.2.2.1.3 on Page 3.5-17.]Conclusion The Petitioners assert that they have in fact raised a genuine dispute in their contention. | |||
attributedto early shrinkage of concrete and temperature changes. Engineering evaluation concluded that the structuralintegrity of the walls is unaffected by cracks. | |||
Repairs to areasof concern were made to prevent water intrusion and corrosionof concrete rebar. The cracks and repairedareas are monitored under the program to detect any changes that would requirefurther evaluation andcorrective action. | |||
Crackingof the drywell shield wall was attributedto high temperature in the upper elevation of the containment drywell. ,2 Petitioners reply that it is not necessarily the burden of the Petitioner to be able to monitor, identify and report all events of water intrusion/leakage that may have occurred over the operational period of Oyster Creek to date or can be projected to occur over the proposed 20-year license extension. However, the Petitioners note that Exhibit 12 identifies that cracking in the reactor building and in the drywell shield wall above the dry well liner and sand bed region has provided the potential for water intrusion and collection potentially impacting the areas of concern. Just as the Petitioners are not aware of documents that would have publicly indicated at the time the past operational and outage spillages at Oyster Creek that resulted in the severe corrosion at the dry well liner sand bed region, similarly the Petitioners are not aware at the present time of any publicly available source documents that would indicate water spillages occurring during future operation periods and outages that would provide insights into the number or the extent of such water intrusion events. However, spillages have occurred resulting in severe corrosion and potential could re-occur during the requested extension that Petitioners contend should be addressed through confirmatory UT measurements at the most damaged area of the component, the sand bed region of the drywell liner, for the life of the plant. | |||
Again, the Petitioners assert that it is AmerGen who has not provided the confirmatory tests (either through UT measurements of the wall thicknesses or thorough inspections for cracking and pinhole leaks in the epoxy coating) other than a sampling of 2 "Response to NRC Request for Additional Information (RAI 2.5.1.19-1), dated September 28, 2005, Related to Oyster Creek License Renewal Application (TAC No. MC7624), Appendix D, Page 10 of 19, Accession No. ML052910091. | |||
18 | |||
visual inspections in these very difficult and tight quarters and of further concern with no visual inspections over an undefined inaccessible area of the component through makeshift access man ways into the sand bed region to assure that the epoxy coating will perform as projected over the requested 20-year license extension. | |||
I. AmerGen asserts "Petitionersnext ask that the results of such measurements (UT taken at the sandbed region and new areas) be made publicly available. As discussed above infootnote 16, such a request does not raise a litigableissue. " [AmerGen Answer at Page 31.] | |||
Petitioners reply that no such reference exists at footnote 16 in the AmerGen Answer. | |||
Petitioners further reply that the operator provided to NRC in previous assessments of the severe corrosion of this safety component and therefore publicly available documents actual measurements of remaining wall thicknesses indicating the remaining margins to ASME Code as presented in the Petitioners' Exhibits 5 and 6. The operator suspended the practice of providing the NRC and therefore publicly available documents with the actual measured remaining wall thickness on this safety-related component. | |||
As this component is safety-related as it is the all important radiation containment component, the Petitioners reassert their call for the results of any and all UT measurements made of the drywell liner wall to be made public via reporting such findings to the NRC so that such findings can be independently corroborated in the future. | |||
J. NRC and AmerGen assert that the Petitioners' Expert, Dr. Rudolph Hausler is qualified. | |||
The Petitioners reviewed of the .pdf version of Dr. Hausler's expert opinion provided by his memo which was posted to ADAMS and discovered that the electronic signature of Dr. Hausler did not optically transmit. Attached again is Dr. Hausler's 19 | |||
electronically signed memorandum dated November 10, 2005 as provided in the original filing where Dr. Hausler's signature is clearly legible. [PETITIONERS' EXHIBIT 13] | |||
The Petitioners are also attaching a copy of Dr. Hausler's Curriculum Vitae. | |||
[PETITIONERS' EXHIBIT 14] | |||
AmerGen asserts "Dr. Hausler alsoprovides numerousfactualstatements about the temperature of the drywell and makes various assumptions about water entering the drywell andaffecting the epoxy coating in the sandbed region. Each of these statements and assumptions lacks a reference to the Application, industrypublicationor academic article." [AmerGen Answer at Page 28] | |||
The Petitioners' reply that Dr. Hausler' Memo to Paul Gunter, NIRS with regard to the referenced temperatures of the operational drywell states "It turns out, however, that newer information indicates the conditionsspecified in 1994 were not strictly maintained.Apparently the temperatures inside the drywell varyfrom 135° F at the 55ft elevation to 2500 at 95ft. This temperaturegradientwould certainlyallowfor liquid waterpresent at the lI ft elevation (Sand bed), i.e. in the annualspace were previously the sand bed was located." [Memorandum of Dr. Rudolph Hausler to Paul Gunter, NIRS, November 10, 2005, now PETITIONERS' EXHIBIT 13] | |||
The reference temperature of 1350 F that would allow water to remain liquid at the former sand bed region are provided in the AmerGen Application. [Application at Subsection 3.5.2.2.1.3 on Page 3.5-17.] | |||
Conclusion The Petitioners assert that they have in fact raised a genuine dispute in their contention. | |||
Neither NRC nor AmerGen have raised in an answer to contradict the fact that the contention is within the scope of this proceeding. | Neither NRC nor AmerGen have raised in an answer to contradict the fact that the contention is within the scope of this proceeding. | ||
20 The Petitioners assert that with respect to their contention there are many factual conundrums which must be resolved by means of a hearing. All that is required for a contention to be acceptable is that it be specific and have basis. Whether or not the contention is true is left to litigation. | 20 | ||
Respectfully submitted, Michelle Donato, sq.Date: 12/19/2005 21 UNITED STATE OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION OFFICE OF THE SECRETARY: )In the Matter of) Docket No. 50-0219 AMERICAN ENERGY COMPANY, LLC (ALSO KNOWN AS AMERGEN) )OYSTER CREEK NUCLEAR )GENERATING STATION) December 19, 2005 Regarding the Renewal of Facility Operating License No. DPR-16 for a 20-Year Period )CERTIFICATE OF SERVICE FOR COMBINED REPLY OF PETITIONERS I hereby certify that copies of the following Combined Reply of the Petitioners (Nuclear Information and Resource Service, New Jersey Sierra Club, New Jersey Public Interest Research Group, New Jersey Environmental Federation, Jersey Shore Nuclear Watch and Grandmothers, Mothers and Others for Energy Safety) was served this day upon the persons listed below by E-mail, First Class Mail, or Federal Express: Secretary of the Commission* | |||
US Nuclear Regulatory Commission Attn: Rulemaking and Adjudications Staff One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Email: HEARINGDOCKETidnrc.gov E. Roy Hawkins, Chair Administrative Law Judge Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: erh()nrc.gov 22 | The Petitioners assert that with respect to their contention there are many factual conundrums which must be resolved by means of a hearing. All that is required for a contention to be acceptable is that it be specific and have basis. Whether or not the contention is true is left to litigation. | ||
Respectfully submitted, Michelle Donato, sq. | |||
* Original and two copies Michelle Donato, Esq.Date: 12/19/2005 24 Michele R. Donato A Profess~ | Date: 12/19/2005 21 | ||
December 19, 2005 VIA FEDERAL EXPRESS Annette L. Vietti-Cook, Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
UNITED STATE OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION OFFICE OF THE SECRETARY | |||
: ) | |||
In the Matter of | |||
) Docket No. 50-0219 AMERICAN ENERGY COMPANY, LLC (ALSO KNOWN AS AMERGEN) ) | |||
OYSTER CREEK NUCLEAR ) | |||
GENERATING STATION | |||
) December 19, 2005 Regarding the Renewal of Facility Operating License No. DPR-16 for a 20-Year Period ) | |||
CERTIFICATE OF SERVICE FOR COMBINED REPLY OF PETITIONERS I hereby certify that copies of the following Combined Reply of the Petitioners (Nuclear Information and Resource Service, New Jersey Sierra Club, New Jersey Public Interest Research Group, New Jersey Environmental Federation, Jersey Shore Nuclear Watch and Grandmothers, Mothers and Others for Energy Safety) was served this day upon the persons listed below by E-mail, First Class Mail, or Federal Express: | |||
Secretary of the Commission* | |||
US Nuclear Regulatory Commission Attn: Rulemaking and Adjudications Staff One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Email: HEARINGDOCKETidnrc.gov E. Roy Hawkins, Chair Administrative Law Judge Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: erh()nrc.gov 22 | |||
Paul Abramson Administrative Law Judge Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba(anrc.gov Anthony Barratta Administrative Law Judge Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5(a)nrc.gov Office of General Counsel One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Email: OGCmailcenteranrc.gov Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hrb()nrc.gov John A. Covino Deputy Attorney General Division of Law Environmental Permitting and Counseling Section Hughes Justice Complex Trenton, NJ 08625 Email: john.covino(a).dol.lps.state.ni.us Alex Polonsky Morgan, Lewis, Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Email: apolonsky(imorganlewis.com Kathryn Sutton Morgan, Lewis, Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Email: ksutton(a),morganlewis.com 23 | |||
J. Bradley Fewell Exelon Corporation 200 Exelon Way, Suite 200 Kennett Square, PA 19348 Email: bradley.fewell(~exeloncom.com Donald Silverman Morgan, Lewis, Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Email: dsilverman(~imorganlewis.com Paul Gunter Nuclear Information and Resource Service 1424 16th St. NW Suite 404 Washington, DC 20036 Email: pgunter(anirs.org Michelle R. Donato PO Box 145 106 Grand Central Avenue Lavallette, NJ 08735 Email: mdonato,),michelledonatoesq.com | |||
* Original and two copies Michelle Donato, Esq. | |||
Date: 12/19/2005 24 | |||
Michele R. Donato A Profess~onalCorporation Attorney at Law P. 0. Box 145 Phone: (732) 830-0777 106 Grand Central Avenue Telefax: (732) 830-0778 I.avallette, NJ 08735 Email: mdonato(~~MicheleDonatoEsq.con~ | |||
December 19, 2005 VIA FEDERAL EXPRESS Annette L. Vietti-Cook, Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
==Subject:== | ==Subject:== | ||
American Energy Company, LLC Oyster Creek Nuclear Generating Station | American Energy Company, LLC Oyster Creek Nuclear Generating Station | ||
==Dear Madam Secretary:== | ==Dear Madam Secretary:== | ||
On behalf of Nuclear Information and Resource Service, Jersey Shore Nuclear Watch, the New Jersey Public Interest Research Group, the New Jersey Environmental Federation, Grandmothers, Mothers and Others for Energy Safety, the New Jersey Sierra Club, I am enclosing an original and one copy of the Combined Reply of Petitioners. Please file these documents. | On behalf of Nuclear Information and Resource Service, Jersey Shore Nuclear Watch, the New Jersey Public Interest Research Group, the New Jersey Environmental Federation, Grandmothers, Mothers and Others for Energy Safety, the New Jersey Sierra Club, I am enclosing an original and one copy of the Combined Reply of Petitioners. | ||
The exhibits are being posted this day and will be delivered by separate cover. If you have any questions or problems with regard to this petition, please advise immediately. | Please file these documents. The exhibits are being posted this day and will be delivered by separate cover. | ||
Otherwise, I await your confirmation as to the receipt of this information and its filing. Thank you. Very truly yours, Michele R. Donato MRD : sb Encs . CC: (by VIA EMAIL | If you have any questions or problems with regard to this petition, please advise immediately. Otherwise, I await your confirmation as to the receipt of this information and its filing. | ||
Thank you. | |||
Very truly yours, Michele R. Donato MRD : sb Encs . | |||
CC: (by VIA EMAIL T W S M I S S I O N ONLY) | |||
Nuclear Information and Resource Service Jersey Shore Nuclear Watch New Jersey Public Interest Research Group New Jersey Environmental Federation (with encs.) | |||
The New Jersey Sierra Club (with encs.) | |||
F:\W?30CS\Oyster Creei\NRC Petltlon for Hearing\NRC letter2.doc}} |
Latest revision as of 10:30, 14 March 2020
ML053560168 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 12/19/2005 |
From: | Donato M Jersey Shore Nuclear Watch, New Jersey Environmental Federation, New Jersey Public Interest Research Group (NJPIRG), Nuclear Information & Resource Service (NIRS), Sierra Club, New Jersey Chapter |
To: | NRC/SECY |
Byrdsong A T | |
References | |
50-219-LR, ASLBP 06-844-01-LR, RAS 10864 | |
Download: ML053560168 (25) | |
Text
UNITED STATES OF AMERICA DOCKETED BEFORE THE NUCLEAR REGULATORY COMMISSION USNRC OFFICE OF THE SECRETARY December 19, 2005 (4:30pm)
OFFICE OF SECRETARY
) RULEMAKINGS AND In the Matter of ADJUDICATIONS STAFF
-) Docket No. 50-0219 AMERICAN ENERGY COMPANY,LLC (ALSO KNOWN AS AMERGEN) )
OYSTER CREEK NUCLEAR )
GENERATING STATION
) December 19, 2005 Regarding the Renewal of Facility Operating License No. DPR-16 for a 20-Year Period )
COMBINED REPLY OF PETITIONERS NUCLEAR INFORMATION AND RESOURCE SERVICE, NEW JERSEY SIERRA CLUB, NEW JERSEY PUBLIC INTEREST RESEARCH GROUP, GRANDMOTHERS, MOTHERS AND OTHERS FOR ENERGY SAFETY, JERSEY SHORE NUCLEAR WATCH AND NEW JERSEY ENVIRONMENTAL FEDERATION TO THE ANSWERS OF AMERGEN AND U.S. NUCLEAR REGULATORY COMMISSION STAFF Now come Petitioners Nuclear Information and Resource Service, New Jersey Sierra Club, New Jersey Public Interest and Research Group, Jersey Shore Nuclear Watch, New Jersey Environmental Federation and Grandmothers, Mothers and Others for Energy Safety, through counsel and reply to the Answer of AmerGen "Opposing NIRS ET AL. Request for Hearing and Petition to Intervene" (hereinafter referred to as "Amergen Answer") and the Answer of the United States Nuclear Regulatory Commission Staff "Opposing NIRS ET AL. Petition Requesting a Hearing and Petition to Intervene" (hereinafter referred to as the "Staff Answer.") Petitioners respond in opposition to those portions of the proffered respective answers which seek to deny admissibility of the Petitioners' proffered contention. e -
-T l PL I'_ T Srs(-ca3 4 1
ARGUMENT Reply to AmerGen Answer that the "Petitioners Have Not Demonstrated Standing Based on Geographic Proximity" AmerGen seeks to demonstrate that the Petitioners do not have standing in this re-licensing proceeding. The Petitioners reply in opposition to this assertion recognizing that an organization may satisfy the standing criteria of 10 CFR 2.309(d)(1) based either on its own interests or that of it members. Under the long-standing "proximity presumption" principle, an individual petitioner, or member of an organization, may base its standing upon showing that his or her residence, or that of its members, is within the geographical area that might be affected by an accidental release of radiation from the facility seeking licensing. The presumption first appears to have been applied in Northern States Power Company (Prairie Island Nuclear Generating Plant, Units 1 and 2), ALAB-107, 6 AEC 188, 190 (1973), where, in a reactor licensing proceeding, the Appeal Board found that the proximity of petitioners living within 30 to 40 miles from the reactor established their standing to intervene. In Gulf States Utilities Company (River Bend Station, Units 1 and 2) ALAB-183, 7 AEC 222, 226 (1974), the proximity presumption was found applicable to interveners in a reactor construction project whose members' every day activities occurred within 25 miles.
AmerGen asserts that "there is no recognized proximity presumption applicable to license renewal cases" (AmerGen's Answer at Page 10) to which the Petitioners reply that AmerGen is unreasonably narrow and selective in a re-interpretation so as to misconstrue or misinterpret the NRC's established rule of thumb for representational standing of the Petitioners.
In the referenced matter of the license renewal proceeding for Turkey Point Units 3 & 4, the ASLB in fact found "And because it is the source of radioactivitythat produces the obvious potentialfor offsite consequences not the type ofproceeding, it is equally apparentthat the same 'obvious potentialfor offsite consequences' that initially led to the creation of the presumption in constructionpermit operatinglicense proceedings also present here. Finally, in the instance case, the distancefrom the 2
significantsource of radioactivitythat is presumed to affect the Petitionerslogically must be the same 50-mile distance thatforms the current basisfor the proximity presumption for reactor constructionpermit and initialoperating licenseproceedings. Because Mr.
Oncavage lives considerably less that 50 miles from the Turkey Pointfacility, however, we need not conjure abstruse reasons why the 50-mile rule of thumb for the presumption is inapplicablebut need only to determine if the presumption is applicableto this Petitionerliving 15 miles downwind of the reactors. We find that it neither strainsthe credulity nor rationalityto conclude that the Petitionermay fairly be presumed to have an interest that may be affected over the course of the extended operatinglicense term of the Turkey Point reactorslocated 15 miles upwind of him. I The Petitioners reply that the ASLB's uses strong language in its Turkey Point Memorandum and Order to cite a difference between what "logically must be the same 50-mile radius" or to "conjure abstruse reasons why the 50-mile rule of thumb for the presumption is inapplicable." The Petitioners assert this to be supportive language for the application of the established rule of thumb in this particular instance. Since this proceeding is not about effectively shrinking the Emergency Planning Zone around Oyster Creek, AmerGen's assertion that the standard rule of thumb should not be applied to this densely populated coastal area of New Jersey around the site of the oldest operating nuclear power station in the United States that is demonstrated to have experienced severe corrosion and significant thinning of its radiation containment structure's wall would in deed require a "conjure of abstruse reasons" so as not to apply the NRC's established rule of the thumb for accepting the representational standing of the Petitioners.
Furthermore, contrary to AmerGen assertion that the Petitioners have offered only "vague, generalized statements about a hypothetical future injuries" [AmerGen Answer at Page 11] the Petitioners have demonstrated in their Request for Hearing and Petition to Intervene that the subject component in particular to their aging management related contention, the drywell liner, is a vital safety-related component of Oyster Creek's radiation containment structure and that the corrosion event in particular to their
' Florida Power and Light, Turkey Point Units 3 & 4, LBP-01-06, ASLB Memorandum and Order, February 26, 2001, page 9 3
contention has been identified by NRC as a "potentially significant safety problem."
[Petitioners Exhibit 1, NRC Information Notice 86-99]
It is therefore the clearly expressed and well founded concern of the Petitioners' members that reside, recreate and are employed within proximity and within the Emergency Planning Zone of Oyster Creek nuclear generating station that the failure of this very large and heavy radiation containment component due to age-related degradation threatens a radiological accident inflicting injury, sickness and death on themselves and their family members.
Petitioners therefore request that the ASLB recognize that standing has been satisfied.
Reply To NRC Staff Answer "Petitioners Have Demonstrated Representational Standing" In view of the NRC Staff s Answer that "Petitioners have met the requirements for standing to intervene in this proceeding" (Staff Answer at Page 10), the Petitioners request that the ASLB accept their collective standing in the above captioned proceeding.
Combined Reply to AmerGen and NRC Staff Answers Asserting That "The Petitioners' Proposed Contention Is Inadmissible"
- 1. As stated in the background of AmerGen's Answer they claim that Petitioners' bases for supporting their contention "merely attempts to summarize over two decades of historicalevents relatedto corrosionof the OCNGS drywell shell discussed in various publicly-availableNRC documents (some of which Petitioners include as Exhibits). The same information is summarized in the Application..." (AmerGen Answer at Page 19)
The Petitioners cannot develop their contention and address an observed deficiency in the application namely the absence of confirmatory UT measurements at all critical levels of the Oyster Creek containment component without establishing an historical account and specific references to the application. The Petitioners assert that 4
such an effort is certainly more than mere parroting of the application and without it the applicant would assert to the contrary that the Petitioners contention would be void of context to the application.
- 2. Furthermore, AmerGen's background statement claims "Petitionersacknowledge that inspectionshave shown no failure of the epoxy coating in the sand bed region or signs of deterioration." [AmerGen Answer at Page 22]
To the contrary, the Petitioners reply that they have raised a genuine dispute with applicant's described coating inspection procedure of the epoxy coating at the sand bed region of the drywell liner as part of the supporting bases for their contention. "The Petitionerscontend that the applicantdoes not indicate whether visual coating inspectionssince the originalapplicationhave been made specificallyfor pinhole leaks in the coating which would allowfor water seepage behind the epoxy coating resultingin corrosion behind the coating on the exteriorsurface of the already degradedcomponent.
Because the remainingmeasured margin of .064 inches [approximately 1/16 of an inch]
in an unknown number of locations within the severely corrodedsand bed region is so extremely narrow, Petitionerscontend that the describedobservable blisters,flakes and discolorationdo not need to occur before the component is in fact outside safety tolerancesdue to ongoing corrosionbehind the coating." [Petition at Page 10]
Moreover, Petitioners have submitted "that the applicanthas not provided reasonable assurance that the epoxy coating has been adequately monitoredfor allpossible methods of leakage behind the coating includingpinhole leaks that could provide a pathwayfor water intrusion andsubsequent corrosion." [Petition at Page 13]
In fact, there are specific testing procedures for evaluating protective coating integrity commonly used in industry, such as NACE (National Association of Corrosion Engineers, International) Test Method TM-00384: "Holiday Detection of Internal Tubular Coatings of 10 to 30 mils dry Film Thickness", or RP-028 1: "Discontinuity Testing of Protective Coatings." AmerGen has not provided any indication that the 5
inspection of the coating at the drywell liner sandbed region has employed any such procedures other than visually looking at the coating.
Therefore, the Petitioners in fact allege that the applicant' sole reliance upon visual inspections that do not include comprehensive and recognized industry inspection procedures on evaluating coating integrity since the last UT measurements were taken at the sand bed region reasonably would not detect corrosion masked under the coating itself and thinning of already measured narrow margins in the containment wall to below ASME code.
- 3. AmerGen's background statement answers that "The Petition does not define the term 'criticallevel.
The Petitioners reply that the focus of the contention as stated the Application for a twenty year extension of the Oyster Creek operating license must reasonable provide for a Corrosion Monitoring Program at all critical levels of the containment component to include the sand bed region which experienced the severest level of corrosion and measured thinning of the containment wall where UT measurements were discontinued as well as the several elevations above the sand bed region which continue to receive periodic UT measurements. Simply stated, "all critical levels" is defined to be inclusive of the base of the containment wall at the sand bed region rather than to be excluded from UT inspections for the operational life of the reactor.
The Application states "At Oyster Creek, the potentialloss of material, due to corrosion, in inaccessibleareas of the containmentdrywell shell was first recognized in 1980 when water was discovered in the sand bed region drains. Corrosionwas later confirmed by ultrasonic thickness (UT) measurements taken during the 1986 refueling outage. As a result several correctiveactions were initiatedto determine the extent of the corrosion, evaluate the integrity of the drywell, mitigate acceleratedcorrosion, and monitor the condition of containment surfaces. The corrective actions include extensive UT measurements of the drywell shell thickness, removal of the sand in the sand bed 6
regions, cleaning and coating exteriorsurfaces where the sand was removed, and an engineeringevaluation to confirm the drywell structuralintegrity. A corrosion monitoringprogram was establishedin 1987for the drywell shell above the sand bed region to ensure that the containment vessel is capable ofperforming its intended functions. Elementsfor the program have been incorporatedinto ASME Section XI, Subsection IWE, (B.J.27) andprovidefor.
. PeriodicUT inspections of the shell thickness at criticallocations,"
[Application at Page 3.5-18]
The Petitioners' contention asserts that the drywell liner at sand bed region is in fact a critical level to age management in the license renewal application process in particular to the control of buckling of the component under the heavy load of the containment bearing down on the thinned walls at this bathtub ring of corrosion at the base of the component. [Petitioners' Exhibit 6 Table 1 Code Required Sandbed Region (2) Controlledby buckling]
The Petitioners have raised the issue of buckling of the dry well liner at the sand bed region as a defining issue for the critical nature of performing confirmatory UT testing of this level of the component. [Petition at Page 8] The applicant's analysis for code required remaining wall thicknesses used to justify the removal of the support sand from this region of transition between the free standing portion of the 95' tall and heavy steel component and the embedded portion at the base establishes the critical minimum required drywell well wall thickness at 0.736 inches to prevent buckling. [Petitioners' Exhibit 6 Table 1.] The Petitioners note that in 1993 an evaluation of the drywell liner thickness measurements reported that "Bays 1 and 13 each have several locations where the measuredthickness is below 0.736 inch. These locationsare isolated." [Petitioners' Exhibit 5 Page 12.]
In fact, buckling of the containment component due to thinning of the wall from corrosion, the prior removal of the supporting sand bed and the tremendous weight of the component structure above the damage area, defines the sand bed region as an extremely 7
critical level for insuring the continued integrity of this already damaged component and the public's health and safety. The Application states "The primary containment is penetrated at several locations by piping, instrumentation lines, ventilation ducts and electrical leads." [AmerGen Application at Page 2.4.3] Were the containment structure to buckle at this thinned wall during the extended operational period, the Petitioners contend that the vast bulk of the carbon steel containment structure above the buckling zone could fall or shift acting like a large guillotine or pincer to cut, rupture, constrict or dislodge the steam and reactor coolant lines, other safety-related pipes and conduits that pass through penetrations in the steel drywell liner and penetrations in the concrete shield wall. The Petitioners contend that such an event not only breaches primary containment but could simultaneously result in a Loss-of-Coolant-Accident. In another scenario, the buckling of the drywell liner could result in the movement of the large structure within the reactor building and impacts that create vibrations with adverse consequences on other safety-related equipment (i.e. chatter of relay switches between the on and positions resulting in spurious operations or the inoperability of safety-related equipment).
Both AmerGen and NRC Staff Answers do not address the critical limiting factor of buckling of the wall due to thinning at the critical level of the drywell liner sandbed region as presented in the Petition.
- 4. AmerGen asserts "PetitionersContention Does Not Raise A Genuine Dispute of Law or Fact, Lacks An Adequate Basis andFails to ProvideSupporting Expert Opinion."
A. AmerGen asserts that "The burden is on the Petitionersto identify those portions of the application that are defective and explain why they are defective. 10 CFR2.309W(1)(vi). " [AmerGen Answer at Footnote 12 Page 23.] AmerGen asserts that the Petitioners misidentify a section number in the application in reference to a quote excerpted from the application that is germane to the contention.
8
The Petitioners reply with reference to the Application's Table 3.5.1 "Summary of Aging ManagementEvaluationsin ChaptersII and III of NUREG -1801 for Structures and Component Supports" Item 3.5.1-13 which under the heading of Discussion references Subsection 3.5.2.2.1.4 in the application at Page 3.5-35 regarding the "Loss of material due to corrosion in the sand bed and on the exteriorsurfaces of the upper region of the drywell liner was identified as a potential concern in the early 1990's. As a result the sand was removed from the sand bed region and a protective coating was applied to the drywell exterior surfaces in that region. The upper regions of the dry are examined by ultrasonictesting (UIT) measurements and evaluated to ensure that the actual thickness meets ASME requirements" [Petition at Page 7] as indicative and particular to the Petitioners' contention of a significantly deficient application where the age management review for the 20-year extension suspends and excludes adequate UT measurements being taken at the critical level of the already damaged (corrosion induced wall thinning) sand bed region of Oyster Creek's containment structure.
AmerGen asserts "Petitioners also reference Subsection 3.5.2.2.1.4 as the source for normal drywell operating temperatures, but those temperatures are not listed there."
[AmerGen Answer at Footnote 12 Page 23.]
The Petitioners reply that the reference for Oyster Creek's drywell operating temperatures are located in the AmerGen Application at Subsection 3.5.2.2.1.3 on Page 3.5-17.
AmerGen further asserts "Petitionersalso ambiguously reference 'the Application' in severalplaces in the text of the Petition with no other information to guide the reader." [AmerGen Answer at Footnote 12 Page 23.]
The Petitioners reply that while certain historical and operational accounts that are not in dispute in the Petition and as such are not cited by a specific page number in the Application, Petitioners' provide their references to the Application [Petition at Page 8]
9
as extrapolated from the Application at Section 3 "Age Management Review Results" specifically where the Petitioners reference;
- 1) "The applicationstates that leakage was observedfrom the sand bed drains as early as 1980 with mitigation efforts beginning in 1983." [From Application at Page 3.5-18 and 3.5-19] and;
- 2) "The applicationfurtherstates that it was concluded that the optimal methodfor arrestingthe corrosion was (1) removal of the sand to break up the galvanic cell; (2) removal of the corrosionfrom the drywell liner at the sand bed region and; (3) applicationof a protective coating." [From Application at Page 3.5-20] and;
- 3) "Removal of sandwas startedin 1988 by cutting access holes in the concrete shield wall and completed in 1992. " [From Application at Page 3.5-20] and;
- 4) "The applicationstates that core samples taken in seven locations of the dry well liner validated UT measurements and confirmed that the corrosion of the drywell liner was due to the presence of oxygenated wet sand and exacerbatedby the presence of chloride and sulfate in the sand bed region." [From Application at Page 3.5-19] and;
- 5) "The applicationstates that corrective actions taken at this time included cleaning loose rustfrom the drywell shellfollowed by an application of a coating of an epoxy material. " [From Application at Page 3.5-20] and;
- 6) "The application then states that UT measurements were taken after cleaning."
[From Application at Page 3.5-20] and;
- 7) "The applicationnotes that "There were, however, some areas thinner than projected" but were still within ASME code requirements." [From Application at Page 3.5-20]
10
The Petitioners takes exception to this assertion by AmerGen that all UT measurements were "still within ASME code requirements." As Petitioners have identified and provided in Petitioners' Exhibit 5 at Page 12 "Evaluation of Shell Thickness (UT) Measurements" which states "Bays 1 and 13 have several locations where the measured thickness is below 0. 736 inch. " [Petitioners' Exhibit 5 at Page 12.]
The 0.736 inch code requirement is the aforementioned control on buckling. [Petitioners' Exhibit 6 Table 1.]
B. The Applicant asserts "AmerGen has committed to use ASME Section XI, Subsection IWE and IO CFR Part50 Appendix J to 'manage loss of materialfor steel elements of the containment includingthe drywell liner'forthe license renewalperiod.
Application at 3.5-18. While Petitionersacknowledge this commitment, Petition at 7, they simultaneously ignore thefact that the ASME Section XI, Subsection IWE aging managementprogramfor OCNGS specifically includesperformingperiodic UT inspections at criticallocations of the drywell shell. Application at 3.5-18 and 4-55."
[AmerGen Answer at Page 24]
The Petitioners reply that in the context of a twenty-year license extension it is reasonable to view the damaged sand bed region as a critical level particularly in light of the Petitioners' concern for the buckling issue which neither the applicant nor the NRC have addressed in their Answers. The Petitioners have contended that the containment, much like a chain, is only as strong as its weakest link and therefore it is the original Application that ignored a potential weak link at a critical location, in particular at the base of the large and heavy containment structure, and as such, a genuine dispute of material fact is reasonably in doubt without adequate confirmatory UT measurements for the life of the reactor.
C. AmerGen asserts "Petitioners' contention also lacks an adequate basis.
Petitionersdo not allege thatASME Section Xl7 is deficient or that AmerGen is not complying with that Section. No do Petitionersallege that AmerGen is violating any NRC regulation or other requirement." [AmerGen Answer at Page 25]
11
Petitioners reply as they have already stated in the Petition that the amendment granted AmerGen was for the current 40-year license and did not necessarily contemplate at that the time of approval an additional 20-year extension. It is there reasonable to require the appropriate number of UT measurements to be made at the drywell liner sandbed region at previously measured areas and new areas.
D. Both NRC staff and AmerGen assert "Petitionersmisinterpret the Application regardingminimum allowable thicknessfor the steel in the upper region of the drywell.
Petitioners include a table compiledfrom a 1993 public document and allege that it shows that 'marginsof safety left by severe corrosion damage... are extremely narrow.
Id. at 8. Petitioners' however, overlook an amendment to the OCNGS Technical Specifications that 'reducedthe drywell design pressurefrom 62 psig to 44 psig.
Application at 3.5-20. "' [AmerGen Answer at Page 25.] The referenced Footnote 13 in the AmerGen Answer states "These margins accordingto the table are: 0.032 inchesfor the cylinder portion of the drywell; 0.0412for the upper sphericalportion of the drywell; and 0.073 for the middle sphericalportionof the drywell." AmerGen goes on to state, "The failure of the Petitionersto readthe Application or reference otherpublicly availablefacts related to this aspect of theirproposedcontentionfurther demonstrates that Petitioners lack an adequate basisfor the contention. "
The Petitioners reply that it is the NRC and AmerGen that have misinterpreted the contention by attempting to misplace the Petitioners' concerns on the amended pressure and temperature specifications. Again, the Petitioners point to the 0.736 inches Code required wall thickness at the sand bed region of the drywell liner as "Controlled by buckling" as referenced in the text in Petition at Page 10 and as provided by Petitioners' Exhibit 6 Table 1 Reference (2) "Controlledby buckling. " The Petitioners re-assert that the differences between the as found condition of 0.806 inches [Petitioners' Exhibit 6 Table 1] or 0.800 inches [Petitioners' Exhibit 5 at Page 8] and the Code required thickness of 0.736 inches is an extremely narrow in the range of 0.064 and 0.070 inches.
12
The Petitioners therefore assert that a genuine dispute with the original Application in fact does exist.
E. AmerGen asserts "Petitioners'contention is similarly deficient with respect to AmerGen 's aging managementprogramfor the sand bed region of the drywell shell.
First, AmerGen has, in fact, committed to the NRC Aging Management ProgramAudits in early October 2005, to perform one-time UT measurements in the sand bed region. See AmerGen Exhibit 1. " [AmerGen Answer at Page 26]
The Petitioners reply that any AmerGen commitments made to NRC after the submission of the application are not necessarily available to the public record. As Oyster Creek's referenced limited commitment is not in the original application, the Petition can not be assumed to be deficient. In fact, AmerGen's Exhibit 1 is dated December 9, 2005 at the time of filing of Petitioners Combined Reply is still not posted to ADAMS. The December 9 document dated more than three weeks after the Petitioners' filing deadline and the same date as the establishment of the Atomic Safety and Licensing Board might as easily be assumed to have been influenced by the Petitioners' filing the Request for a Hearing and Petition to Intervene as AmerGen was not required by NRC to resume UT measurements of the drywell liner at the sand bed region, to the best of the Petitioners' knowledge. Documents available to the public through ADAMS on the Age Management Review of the Oyster Creek License Renewal Process from the October 2005 timeframe do not identify that the AmerGen's Structures Monitoring Program made any changes to the Drywell Liner Corrosion Monitoring Program.
Furthermore, AmerGen does not give any indication whatsoever of the number of UT measurements to be taken at a still uncertain date which will adequately capture the remaining wall thicknesses at enough locations so as to reasonably assure component integrity to include a number of those locations previously measured (and as the Petitioners Exhibit 5 several locations measured thicknesses that were already below ASME Code in Bays 1 and 13) and new locations in and around the sand bed region, particularly in and around areas of the "bath tub ring" of corrosion that may have never been protectively coated due to inaccessibility.
13
Petitioners Exhibit 3 provides the NRC Safety Evaluation which emphasizes "The measurements should cover not only areaspreviously inspected but include accessible areas which have not been previously inspectedso as to confirm that the thickness of the corrodedareas are aspredicted and the corrodedareas are localized."
[Petition at Page 7.] Again, AmerGen Exhibit 1 does not provide a number of actual UT measurements to be made at the sand bed region and only makes vague reference to take UT measurements at locations already tested in the 1990s with no provision to test per the Safety Evaluation guidance in "areas notpreviously inspected" in the resumption of UT testing at the sand bed region.
In the Petitioners' view as to new locations in need of UT measurements at and around the sand bed region, there is nothing to exclude the possibility that at the base of the drywell liner there have long been crevices between the concrete and the outer surface of the drywell liner at the margins just below the sand bed region that would allow past, present and future water intrusion enough to afford a destructively corrosive environment. The red lead paint was not protective of the steel surface when in contact with the sand. Petitioners' therefore contend that the concrete would offer no corrosion protection and that expansion and contraction of the liner vessel no doubt would have generated some cracks at the steel/concrete base boundary for water intrusion. The UT inspection and measurement of remaining wall thicknesses of the steel drywell liner just below the concrete is obviously another critical level that has not been described by AmerGen vague commitment of drywell liner areas at the sandbed to be UT inspected.
The Petitioners contend that it is grossly insufficient for AmerGen to merely reference a vague and undefined commitment to "one-time measurements" and assume this to provide reasonable assure that component integrity is preserved for an additional twenty-year extension. Assuming that AmerGen does not intend as a single test procedure to conduct and provide a continuous UT scan of the sand bed region of the entire dry well liner to the width of at least 18 inches wide, Petitioners assert that AmerGen can not as it states in Exhibit 1 "take these additional measurements to provide a high degree of assurance that the surface coating applied to the liner has arrested corrosion that was already planned as part of the aging management program for the 14
containment, will ensure the long-term integrity of the drywell shell in the sand bed region" without providing the specific number and locations of measurements to be actually be taken. Petitioners do not know if AmerGen might settle for 5, 10, 25 or some other number of UT measurements as presumably providing in its view adequate assurance of the integrity of the component without any verifiable engineering basis.
The Petitioners also take issue with the "one-time only" UT measurement for this already damaged component. As stated in the Petitioners' Exhibit 3, previous NRC Safety Evaluations of Oyster Creek's Drywell Liner Integrity identified the importance that "it is essential that GPUN continue UT thickness measurements at refueling outages and at outages of opportunity for the life of the plant." [Petition at Page 3] Petitioners argue that it is unreasonable that when UT measurement equipment is brought into Oyster Creek's containment for the measurements of the upper levels during subsequent inspections during the renewal period that the operator would ignore the opportunity to confirm projections as to coating performance at the sand bed with UT measurements.
The Petitioners find no reassurance in AmerGen's "don't look, don't find" approach to projecting the integrity of this vital radiation containment component over the proposed 20-year extension.
F. AmerGen further asserts "Petitionersare aware, but overlook the significance, of the drywell inspection program that NRC approvedfor OCNGS on November 1, 1995.
Petitioners'Exh.9. That Programdoes not requireAmerGen to take UT measurements of the drywell liner shell in the sand bed region. Instead, it requiresAmerGen to take UT measurements in the upper region of the drywell, and to perform visual inspections of the epoxy coating in the sand bed region. " [AmerGen Answer at Page 27]
The Petitioners reply that the November 1 1995 NRC approved drywell inspection program was for the 40-year license and in particular to suspend confirmatory UT measurements being taken at the sand bed region. The Petitioners assert that no safety analysis for this approval contemplated a 41 to 60-year operational period for Oyster Creek.
15
G. AmerGen asserts "Wrong Date for the last UT inspection" claiming that the "Petitionersappearto be under the impression that no UT measurements were conducted after the epoxy coating was applied, implicitly calling into question the efficacy of the coating to prevent corrosion of the underlying shell. Specifically, they state that 'no UT measurements have been made at the severely corrodedsand bed region...
since the epoxy coating was originallyapplied in 1992. 'Petition at 13. This is factually incorrect."
Petitioners reply that the "1992" date is an editing error not subsequently captured in editing of the original Petition. The Petitioners' assert that the error is not fatal to the admissibility of the contention in as much as Petitioners' Exhibit 6 documents their awareness that UT measurements at the sand bed region were conducted in September 1994 with the Petitioners stating "Oyster Creek's 15 th refueling outage in September 1994 was the last time that UT measurements were taken at the sandbedregion of the drywell liner." [Petition at Page 10]
Petitioners reply to AmerGen assertions that UT measurements were taken in at the sand bed region in 1996. AmerGen does not provide any reference to Oyster Creek inspection reports or drywell liner corrosion monitoring reports for 1996 that verify its assertion. The Petitioners' review of all publicly available documents from the NRC ADAMS Legacy File for 1996 inspection reports and Drywell Monitoring Program does not provide any indication or substantive documents regarding the results of the referenced 1996 inspection per Oyster Creek's Drywell Monitoring Program commitment and more particularly any UT measurements made at the sand bed region. The NRC Legacy File is assisted by the librarians at the NRC Public Document Room for identifying and pulling up microfiche files. The PDR librarian's search did not provide any Drywell Monitoring Program inspection reports for 1996. Therefore, at the time of this reply, Petitioners are unaware of any specific measurements made during 1996 16th Refueling Outage inspection to ascertain the extent and findings of the ultrasonic 16
thickness measurements taken at the drywell liner wall at the sandbed region and assertions that corrosion had been arrested.
H. AmerGen asserts in "2. Unsupported Wet Conditions" that "Petitionersalso state that wet conditions continue in the sand bed region of the drywell. They contend that 'pinhole leaks in the coating... could allowfor water seepage behind the epoxy coating resultingin corrosion behind the coating, 'Petition at IO, and that 'wet conditionsoccurringover the past 12 years behind the epoxy coating can reasonable contributeto corrosion. 'Petition at 11. Petitionersprovide no supportfor these statements. They identify no document which reportswater beingpresentin the sand bed region." [AmerGen Answer at Page 29.]
The Petitioners reply that on December 15, 1995, GPU Nuclear corresponded with NRC regarding "Changes in the Oyster Creek Drywell Monitoring Program" exempting water "leakage associated with normal refueling activities" up to 12 gallons per minute from its commitment to perform additional inspections on the drywell liner at the sand bed region within 3 months of the discovery of water leakage from pools above the reactor cavity. [PETITIONERS' EXHIBIT 10]. NRC responded in February, 1996 to allow GPUN a leak rate up to 12 gallons per minute from pools above the reactor cavity during subsequent refueling outages. [PETITIONERS' EXHIBIT 11.1 Furthermore, Petitioners reply that they are aware that on October 12, 2005 AmerGen provided its "Response to NRC Request for Additional Information (RAI 2.5.1.19-1), dated September 28, 2005, Related to Oyster Creek License Renewal Application (TAC No. MC7624) [PETITIONERS' EXHIBIT 121 which contains an account of the operating experience of Oyster Creek. In Appendix D of AmerGen's response to the NRC RAI, they state:
"The review ofprogram documentation, and otherplant operatingexperience before the program was implemented, identified cracking of reinforcedof exterior walls of the reactorbuilding, drywell shield wall above elevation 95 and the spentfuelpool support beam. Cracking of the reactorbuilding exterior wall was generally minor and 17
attributedto early shrinkage of concrete and temperature changes. Engineering evaluation concluded that the structuralintegrity of the walls is unaffected by cracks.
Repairs to areasof concern were made to prevent water intrusion and corrosionof concrete rebar. The cracks and repairedareas are monitored under the program to detect any changes that would requirefurther evaluation andcorrective action.
Crackingof the drywell shield wall was attributedto high temperature in the upper elevation of the containment drywell. ,2 Petitioners reply that it is not necessarily the burden of the Petitioner to be able to monitor, identify and report all events of water intrusion/leakage that may have occurred over the operational period of Oyster Creek to date or can be projected to occur over the proposed 20-year license extension. However, the Petitioners note that Exhibit 12 identifies that cracking in the reactor building and in the drywell shield wall above the dry well liner and sand bed region has provided the potential for water intrusion and collection potentially impacting the areas of concern. Just as the Petitioners are not aware of documents that would have publicly indicated at the time the past operational and outage spillages at Oyster Creek that resulted in the severe corrosion at the dry well liner sand bed region, similarly the Petitioners are not aware at the present time of any publicly available source documents that would indicate water spillages occurring during future operation periods and outages that would provide insights into the number or the extent of such water intrusion events. However, spillages have occurred resulting in severe corrosion and potential could re-occur during the requested extension that Petitioners contend should be addressed through confirmatory UT measurements at the most damaged area of the component, the sand bed region of the drywell liner, for the life of the plant.
Again, the Petitioners assert that it is AmerGen who has not provided the confirmatory tests (either through UT measurements of the wall thicknesses or thorough inspections for cracking and pinhole leaks in the epoxy coating) other than a sampling of 2 "Response to NRC Request for Additional Information (RAI 2.5.1.19-1), dated September 28, 2005, Related to Oyster Creek License Renewal Application (TAC No. MC7624), Appendix D, Page 10 of 19, Accession No. ML052910091.
18
visual inspections in these very difficult and tight quarters and of further concern with no visual inspections over an undefined inaccessible area of the component through makeshift access man ways into the sand bed region to assure that the epoxy coating will perform as projected over the requested 20-year license extension.
I. AmerGen asserts "Petitionersnext ask that the results of such measurements (UT taken at the sandbed region and new areas) be made publicly available. As discussed above infootnote 16, such a request does not raise a litigableissue. " [AmerGen Answer at Page 31.]
Petitioners reply that no such reference exists at footnote 16 in the AmerGen Answer.
Petitioners further reply that the operator provided to NRC in previous assessments of the severe corrosion of this safety component and therefore publicly available documents actual measurements of remaining wall thicknesses indicating the remaining margins to ASME Code as presented in the Petitioners' Exhibits 5 and 6. The operator suspended the practice of providing the NRC and therefore publicly available documents with the actual measured remaining wall thickness on this safety-related component.
As this component is safety-related as it is the all important radiation containment component, the Petitioners reassert their call for the results of any and all UT measurements made of the drywell liner wall to be made public via reporting such findings to the NRC so that such findings can be independently corroborated in the future.
J. NRC and AmerGen assert that the Petitioners' Expert, Dr. Rudolph Hausler is qualified.
The Petitioners reviewed of the .pdf version of Dr. Hausler's expert opinion provided by his memo which was posted to ADAMS and discovered that the electronic signature of Dr. Hausler did not optically transmit. Attached again is Dr. Hausler's 19
electronically signed memorandum dated November 10, 2005 as provided in the original filing where Dr. Hausler's signature is clearly legible. [PETITIONERS' EXHIBIT 13]
The Petitioners are also attaching a copy of Dr. Hausler's Curriculum Vitae.
[PETITIONERS' EXHIBIT 14]
AmerGen asserts "Dr. Hausler alsoprovides numerousfactualstatements about the temperature of the drywell and makes various assumptions about water entering the drywell andaffecting the epoxy coating in the sandbed region. Each of these statements and assumptions lacks a reference to the Application, industrypublicationor academic article." [AmerGen Answer at Page 28]
The Petitioners' reply that Dr. Hausler' Memo to Paul Gunter, NIRS with regard to the referenced temperatures of the operational drywell states "It turns out, however, that newer information indicates the conditionsspecified in 1994 were not strictly maintained.Apparently the temperatures inside the drywell varyfrom 135° F at the 55ft elevation to 2500 at 95ft. This temperaturegradientwould certainlyallowfor liquid waterpresent at the lI ft elevation (Sand bed), i.e. in the annualspace were previously the sand bed was located." [Memorandum of Dr. Rudolph Hausler to Paul Gunter, NIRS, November 10, 2005, now PETITIONERS' EXHIBIT 13]
The reference temperature of 1350 F that would allow water to remain liquid at the former sand bed region are provided in the AmerGen Application. [Application at Subsection 3.5.2.2.1.3 on Page 3.5-17.]
Conclusion The Petitioners assert that they have in fact raised a genuine dispute in their contention.
Neither NRC nor AmerGen have raised in an answer to contradict the fact that the contention is within the scope of this proceeding.
20
The Petitioners assert that with respect to their contention there are many factual conundrums which must be resolved by means of a hearing. All that is required for a contention to be acceptable is that it be specific and have basis. Whether or not the contention is true is left to litigation.
Respectfully submitted, Michelle Donato, sq.
Date: 12/19/2005 21
UNITED STATE OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION OFFICE OF THE SECRETARY
- )
In the Matter of
) Docket No. 50-0219 AMERICAN ENERGY COMPANY, LLC (ALSO KNOWN AS AMERGEN) )
OYSTER CREEK NUCLEAR )
GENERATING STATION
) December 19, 2005 Regarding the Renewal of Facility Operating License No. DPR-16 for a 20-Year Period )
CERTIFICATE OF SERVICE FOR COMBINED REPLY OF PETITIONERS I hereby certify that copies of the following Combined Reply of the Petitioners (Nuclear Information and Resource Service, New Jersey Sierra Club, New Jersey Public Interest Research Group, New Jersey Environmental Federation, Jersey Shore Nuclear Watch and Grandmothers, Mothers and Others for Energy Safety) was served this day upon the persons listed below by E-mail, First Class Mail, or Federal Express:
Secretary of the Commission*
US Nuclear Regulatory Commission Attn: Rulemaking and Adjudications Staff One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Email: HEARINGDOCKETidnrc.gov E. Roy Hawkins, Chair Administrative Law Judge Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: erh()nrc.gov 22
Paul Abramson Administrative Law Judge Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba(anrc.gov Anthony Barratta Administrative Law Judge Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5(a)nrc.gov Office of General Counsel One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Email: OGCmailcenteranrc.gov Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hrb()nrc.gov John A. Covino Deputy Attorney General Division of Law Environmental Permitting and Counseling Section Hughes Justice Complex Trenton, NJ 08625 Email: john.covino(a).dol.lps.state.ni.us Alex Polonsky Morgan, Lewis, Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Email: apolonsky(imorganlewis.com Kathryn Sutton Morgan, Lewis, Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Email: ksutton(a),morganlewis.com 23
J. Bradley Fewell Exelon Corporation 200 Exelon Way, Suite 200 Kennett Square, PA 19348 Email: bradley.fewell(~exeloncom.com Donald Silverman Morgan, Lewis, Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Email: dsilverman(~imorganlewis.com Paul Gunter Nuclear Information and Resource Service 1424 16th St. NW Suite 404 Washington, DC 20036 Email: pgunter(anirs.org Michelle R. Donato PO Box 145 106 Grand Central Avenue Lavallette, NJ 08735 Email: mdonato,),michelledonatoesq.com
- Original and two copies Michelle Donato, Esq.
Date: 12/19/2005 24
Michele R. Donato A Profess~onalCorporation Attorney at Law P. 0. Box 145 Phone: (732) 830-0777 106 Grand Central Avenue Telefax: (732) 830-0778 I.avallette, NJ 08735 Email: mdonato(~~MicheleDonatoEsq.con~
December 19, 2005 VIA FEDERAL EXPRESS Annette L. Vietti-Cook, Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
American Energy Company, LLC Oyster Creek Nuclear Generating Station
Dear Madam Secretary:
On behalf of Nuclear Information and Resource Service, Jersey Shore Nuclear Watch, the New Jersey Public Interest Research Group, the New Jersey Environmental Federation, Grandmothers, Mothers and Others for Energy Safety, the New Jersey Sierra Club, I am enclosing an original and one copy of the Combined Reply of Petitioners.
Please file these documents. The exhibits are being posted this day and will be delivered by separate cover.
If you have any questions or problems with regard to this petition, please advise immediately. Otherwise, I await your confirmation as to the receipt of this information and its filing.
Thank you.
Very truly yours, Michele R. Donato MRD : sb Encs .
CC: (by VIA EMAIL T W S M I S S I O N ONLY)
Nuclear Information and Resource Service Jersey Shore Nuclear Watch New Jersey Public Interest Research Group New Jersey Environmental Federation (with encs.)
The New Jersey Sierra Club (with encs.)
F:\W?30CS\Oyster Creei\NRC Petltlon for Hearing\NRC letter2.doc