DCL-09-017, Submittal of Core Operating Limits Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Pacific Gas and Electric CompanyJames R. Becker Site Vice President Diablo Canyon Power Plant Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 805.545.3462 Internal:
{{#Wiki_filter:PacificGas and ElectricCompany                                                James R. Becker     Diablo Canyon Power Plant Site Vice President  Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 805.545.3462 March 23, 2009                                                                      Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-09-017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Diablo Canyon Unit 1 Core Operating Limits Report for Unit 1
691.3462 Fax: 805.545.6445 March 23, 2009 PG&E Letter DCL-09-017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Diablo Canyon Unit 1 Core Operating Limits Report for Unit 1 Dear Commissioners and Staff: In accordance with Diablo Canyon Power Plant Technical Specification 5.6.5.d, enclosed is the Core Operating Limits Report (COLR) for Unit 1. The COLR has been revised for Unit 1, Cycle 16, consistent with NRC-approved License Amendment 195.There are no new or revised regulatory commitments in this report.If there are any questions regarding the COLR, please contact Mr. Steve Hamilton at (805) 545-3449.dd m/2254/50040450 Enclosure cc: Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRR Project Manager 4oo!A member of the STARS (Strategic Teaming and Resource Sharing) ALliance Catlaway
 
==Dear Commissioners and Staff:==
 
In accordance with Diablo Canyon Power Plant Technical Specification 5.6.5.d, enclosed is the Core Operating Limits Report (COLR) for Unit 1. The COLR has been revised for Unit 1, Cycle 16, consistent with NRC-approved License Amendment 195.
There are no new or revised regulatory commitments in this report.
If there are any questions regarding the COLR, please contact Mr. Steve Hamilton at (805) 545-3449.
dd m/2254/50040450 Enclosure cc:       Diablo Distribution cc/enc:     Elmo E. Collins, NRC Region IV Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRR Project Manager A member of the STARS   (Strategic Teaming   and Resource     Sharing) ALliance 4oo!
Catlaway
* Comanche Peak
* Comanche Peak
* Diabto Canyon
* Diabto Canyon
Line 23: Line 30:
* San Onofre
* San Onofre
* South Texas Project
* South Texas Project
* Wolf Creek Enclosure PG&E Letter DCL-09-017 CORE OPERATING LIMITS REPORT (COLR)DIABLO CANYON POWER PLANT UNIT 1, CYCLE 16, EFFECTIVE DATE MARCH 6, 2009 ISSUED FOR USE BY:__PACIFIC GAS AND ELECTRIC COMPANY NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT CORE OPERATING LIMITS REPORT DATE: EXPIRES:____
* Wolf Creek
NUMBER COLR 1 REVISION 1 PAGE 1 OF 12 UNIT TITLE: COLR for* Diablo Canyon Unit 1 Cycle 16 1 03/06/09 EFFECTIVE DATE PROCEDURE CLASSIFICATION:
 
QUALITY RELATED 1. CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Diablo Canyon Unit 1 Cycle 16 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.5..The Technical Specifications affected by this report are listed below: 3.1.1 Shutdown Margin (MODE 2 with kff < 1.0, MODES 3, 4, and 5)3.1.3 Moderator Temperature Coefficient 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor -FQ(Z)3.2.2 Nuclear Enthalpy Rise Hot Channel Factor -F N AH 3.2.3 Axial Flux Difference  
Enclosure PG&E Letter DCL-09-017 CORE OPERATING LIMITS REPORT (COLR)
-(AFD)3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.3.9.1 Boron Concentration
DIABLO CANYON POWER PLANT UNIT 1, CYCLE 16, EFFECTIVE DATE MARCH 6, 2009
: 2. OPERATING LIMITS The cycle-specific parameter limits for the TS listed in Section 1 are presented in the following subsections.
 
These limits have been developed using the NRC-approved methodologies specified in TS 5.6.5.2.1 Shutdown Margin (SDM) (TS 3.1.1)The SDM limit for MODE 2 with klff < 1.0, MODES 3 and 4 is: 2.1.1 The shutdown margin with Safety Injection enabled shall be greater than or equal to 1.6% Ak/k.2.1.2 In Modes 3 or 4 the shutdown margin with Safety Injection blocked shall be greater than or equal to 1.6% Ak/k calculated at a temperature of 200 0 F.The SDM limit for MODE 5 is: 2.1.3 The shutdown margin shall be greater than or equal to 1.0% Ak/k. However, an administrative value of 1.6 % Ak/k will be used to address concerns of NSAL-02-014.
ISSUED FOR USE BY:__                                DATE:                    EXPIRES:____
I COLR_lulr01.DOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 2 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 2.2 Shutdown Margin (SDM) (TS 3.1.4, 3.1.5, 3.1.6)The SDM for MODE 1 and MODE 2 with keff > 1.0 is: 2.2.1 The shutdown margin shall be greater than or equal to 1.6% Ak/k.2.3 Moderator Temperature Coefficient (MTC) (TS 3.1.3)The MTC limit for MODES 1, 2, and 3 is: 2.3.1 The MTC shall be less negative than -3.9xl0-4 Ak/k/&deg;F for all rods withdrawn, end of cycle life (EOL), RATED THERMAL POWER condition.
PACIFIC GAS AND ELECTRIC COMPANY                                                     NUMBER          COLR 1 NUCLEAR POWER GENERATION                                                             REVISION 1 DIABLO CANYON POWER PLANT                                                           PAGE            1 OF 12 CORE OPERATING LIMITS REPORT                                                         UNIT TITLE:       COLR for *Diablo Canyon Unit 1 Cycle 16                                       1 03/06/09 EFFECTIVE DATE PROCEDURE CLASSIFICATION: QUALITY RELATED
2.3.2 The MTC 300 ppm surveillance limit is -3.0xl 0 4 Ak/k/&deg;F (all rods withdrawn, RATED THERMAL POWER condition).
: 1.       CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Diablo Canyon Unit 1 Cycle 16 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.5..
2.3.3 The MTC 60 ppm surveillance limit is -3.72xl104 Ak/k/&deg;F (all rods withdrawn, RATED THERMAL POWER condition).
I The Technical Specifications affected by this report are listed below:
2.4 Shutdown Bank Insertion Limits (TS 3.1.5)2.4. 1 Each shutdown bank shall be withdrawn to at least 225 steps.2.5 Control Bank Insertion Limits (TS 3.1.6)2.5.1 The control banks shall be limited in physical insertion as shown in Figure 1.2.6 Heat Flux Hot Channel Factor -FQ(Z) (TS 3.2.1)FRTP 2.6.1 FQ(Z)<-- *K(Z) forP>0.5 FP FQ(Z)<L.5*K(Z) for P___0.5 0.5 THERMAL POWER where: P =RATED THERMAL POWER FR TP = 2.58 Q K(Z) = 1.0 NOTE: The W(Z) data is appropriate for use only if the predicted axial offset is within+/-3% of the measured value.2.6.2 The W(Z) data for Relaxed Axial Offset Control (RAOC) operation, provided in Tables 2A and 2B are sufficient to determine the RAOC W(Z) versus core height for Cycle 16 bumups through the end of full power reactivity plus a power coast down of up to 1000 MWD/MTU.Table 1 shows FQ margin decreases that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase F W (Z) per SR 3.2.1.2. A 2% penalty factor shall be used at all cycle burnups that are outside the range of Table 1.COLR luIrODOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 3 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 2.6.3 FQ(Z) shall be evaluated to determine if it is within its limits by verifying that F C (Z) and F W (Z) satisfy the following:
3.1.1     Shutdown Margin (MODE 2 with kff < 1.0, MODES 3, 4, and 5) 3.1.3     Moderator Temperature Coefficient 3.1.4     Rod Group Alignment Limits 3.1.5     Shutdown Bank Insertion Limits 3.1.6     Control Bank Insertion Limits 3.2.1     Heat Flux Hot Channel Factor - FQ(Z) 3.2.2     Nuclear Enthalpy Rise Hot Channel Factor - F N AH 3.2.3     Axial Flux Difference - (AFD) 3.4.1     RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.
: a. Using the moveable incore detectors to obtain a power distribution map in MODE 1.b. Increasing the measured FQ(Z) component of the power distribution map by 3% to account for manufacturing tolerances and further increasing the value by 5% to account for measurement uncertainties.
3.9.1     Boron Concentration
: 2.       OPERATING LIMITS The cycle-specific parameter limits for the TS listed in Section 1 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in TS 5.6.5.
2.1       Shutdown Margin (SDM) (TS 3.1.1)
The SDM limit for MODE 2 with klff < 1.0, MODES 3 and 4 is:
2.1.1     The shutdown margin with Safety Injection enabled shall be greater than or equal to 1.6% Ak/k.
2.1.2     In Modes 3 or 4 the shutdown margin with Safety Injection blocked shall be greater than or equal to 1.6% Ak/k calculated at a temperature of 200 0 F.
The SDM limit for MODE 5 is:
2.1.3     The shutdown margin shall be greater than or equal to 1.0% Ak/k. However, an administrative value of 1.6 % Ak/k will be used to address concerns of NSAL-02-014.
COLR_lulr01.DOC   04B       0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY                                               NUMBER         COLR 1 DIABLO CANYON POWER PLANT                                                     REVISION       1 PAGE           2 OF 12 TITLE:     COLR for Diablo Canyon Unit 1 Cycle 16                             UNIT           1 2.2   Shutdown Margin (SDM) (TS 3.1.4, 3.1.5, 3.1.6)
The SDM for MODE 1 and MODE 2 with keff > 1.0 is:
2.2.1     The shutdown margin shall be greater than or equal to 1.6% Ak/k.
2.3   Moderator Temperature Coefficient (MTC) (TS 3.1.3)
The MTC limit for MODES 1, 2, and 3 is:
2.3.1     The MTC shall be less negative than -3.9xl0-4 Ak/k/&deg;F for all rods withdrawn, end of cycle life (EOL), RATED THERMAL POWER condition.
2.3.2     The MTC 300 ppm surveillance limit is -3.0xl   0 4 Ak/k/&deg;F (all rods withdrawn, RATED THERMAL POWER condition).
2.3.3     The MTC 60 ppm surveillance limit is -3.72xl104 Ak/k/&deg;F (all rods withdrawn, RATED THERMAL POWER condition).
2.4   Shutdown Bank Insertion Limits (TS 3.1.5) 2.4. 1   Each shutdown bank shall be withdrawn to at least 225 steps.
2.5   Control Bank Insertion Limits (TS 3.1.6) 2.5.1     The control banks shall be limited in physical insertion as shown in Figure 1.
2.6   Heat Flux Hot Channel Factor - FQ(Z) (TS 3.2.1)
FRTP 2.6.1     FQ(Z)<--       *K(Z)     forP>0.5 FP FQ(Z)<L.5*K(Z)           for P___0.5
 
===0.5 where===
P =         THERMAL POWER RATED THERMAL POWER FR TP = 2.58 Q
K(Z) = 1.0 NOTE: The W(Z) data is appropriate for use only if the predicted axial offset is within
              +/-3% of the measured value.
2.6.2     The W(Z) data for Relaxed Axial Offset Control (RAOC) operation, provided in Tables 2A and 2B are sufficient to determine the RAOC W(Z) versus core height for Cycle 16 bumups through the end of full power reactivity plus a power coast down of up to 1000 MWD/MTU.
Table 1 shows FQ margin decreases that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase F W(Z) per SR 3.2.1.2. A 2% penalty factor shall be used at all cycle burnups that are outside the range of Table 1.
COLR luIrODOC 04B       0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY                                                   NUMBER         COLR 1 DIABLO CANYON POWER PLANT                                                         REVISION       1 PAGE           3 OF 12 TITLE:       COLR for Diablo Canyon Unit 1 Cycle 16                               UNIT           1 2.6.3     FQ(Z) shall be evaluated to determine if it is within its limits by verifying that F C (Z) and F W (Z) satisfy the following:
: a. Using the moveable incore detectors to obtain a power distribution map in MODE 1.
: b. Increasing the measured FQ(Z) component of the power distribution map by 3% to account for manufacturing tolerances and further increasing the value by 5% to account for measurement uncertainties.
: c. Satisfying the following relationship:
: c. Satisfying the following relationship:
c FT *K(Z)F (Z)< forP>0.5 Q P FC(Z\< FRTP *K(Z)Q() .5 for0P..5 W ' FRTP F (Z) < Q *K(Z) for P > 0.5 Q P FRTP F (Z) 0 Q *K(Z) for P__ 0.5 Q 0.5 where: F C (Z) is the measured FQ(Z) increased by the allowances for manufacturing tolerances and measurement uncertainty.
c (Z)<  FT *K(Z)
F RTP is the FQ limit Q F K(Z;) is the normalized FQ(Z) as a function of core height P is. the relative THERMAL POWER, and F W (Z) is the total peaking factor, F (Z), multiplied by W(Z) which QQ gives the maximum FQ(Z) calculated to occur in normal operation.
FQ              P      forP>0.5 FC(Z\< FRTP *K(Z)
Q()         .5       for0P..5 W   ' FRTP F     (Z) < Q *K(Z)             for P > 0.5 Q           P FRTP F     (Z)*
Q 0Q 0.5 *K(Z) for P*__ 0.5 where:
F C (Z) is the measured FQ(Z) increased by the allowances for manufacturing tolerances and measurement uncertainty.
F RTP is the FQ limit Q             F K(Z;) is the normalized FQ(Z) as a function of core height P is.the relative THERMAL POWER, and F W(Z) is the total peaking factor, F   (Z), multiplied by W(Z) which QQ gives the maximum FQ(Z) calculated to occur in normal operation.
W(z) is the cycle dependent function that accounts for power distribution transients encountered during normal operation.
W(z) is the cycle dependent function that accounts for power distribution transients encountered during normal operation.
F RTP and K(Z) are specified in 2.6.1 and W(Z) is specified in. 2.6.2.QI COLR luIrOl.DOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 4 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 2.7 Nuclear Enthalpy Rise Hot Channel Factor -F M (TS 3.2.2)FN _<FRTP *[I+ * (1-P)]AH -AH where: THERMAL POWER P =RATED THERMAL POWER FN esrdvle fFN ot FAMeasured values of F N m obtained by using the moveable incore detectors to obtain a power distribution map.F RTP = 1.59 (includes the 4% measurement uncertainty)
F RTP and K(Z) are specified in 2.6.1 and W(Z) is specified in. 2.6.2.
AH PFAI = 0.3 = Power Factor Multiplier 2.8 Power Distribution Measurement Uncertainty (TS 3.2.1. and TS 3.2.2): If the Power Distribution Monitoring System (PDMS) is OPERABLE, the uncertainty, UFAN, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor, F N shall be calculated by the following formula: UFAH =1.0+ AUl 100.0 where: UQ = Uncertainty for power peaking factor as defined in equation (5-19) in Reference 6.2 and F RTP = 1.65 for PDMS (in the above Section 2.7 AH equation).
QI COLR luIrOl.DOC 04B       0306.1024
If the PDMS is OPERABLE, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor, FQ(z), shall be calculated by the following formula: UFQ= 1.0+ U&deg; J*Ue where: UQ = Uncertainty for power peaking factor as defined in equation (5-19) in Reference 6.2.Ue = Engineering uncertainty factor= 1.03 If the PDMS is inoperable, the Nuclear Enthalpy Rise Hot Channel Factor, F N shall be AH, calculated as specified in Section 2.7.If the PDMS is inoperable, the Heat Flux Hot Channel Factor, FQ(Z), shall be calculated as specified in Section 2.6.COLR luIrOLDOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER REVISION PAGE UNIT COLR 1 1 5 OF 12 1 2.9 Axial Flux Difference (TS 3.2.3)2.9.1 The Axial Flux Difference (AFD) Limits are provided in Figure 2.2.10 Boron Concentration (TS 3.9.1)The refueling boron concentration of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained within the more restrictive of the following limits: 2.10.1 A kff of 0.95 or less, with the most reactive control rod assembly completely withdrawn, or 2.10.2 A boron concentration of greater than or equal to 2000 ppm.2.11 RCS Pressure and Temperature Departure from Nucleate Boiling (DNB) Limit (TS 3.4.1)2.11.1 Pressurizer pressure is greater than or equal to 2175 psig..2.11.2 RCS average temperature is less than or equal to 581.7&deg;F.NOTE: The DNBR RCS Tavg limit is based on the slightly lower and bounding value associated with Unit 1 in order to have the same surveillance limits for both Unit 1 and Unit 2.3. TABLES 3.1 Table 1, "FQ Margin Decreases in Excess of 2% Per 31 EFPD" 3.2 Table 2A, "Load Follow W(Z) Factors at 150 and 4,000 MWD/MTU as a Function of Core Height" 3.3 Table 2B, "Load Follow W(Z) Factors at 12,000 and 20,000 MWD/MTU as a Function of Core Height" I 4. FIGURES 4.1 Figure 1, "Control Bank Insertion Limits Versus Rated Thermal Power" 4.2 r lgure z, ArL) Limits as a r unction or Rated inermal rower" 5. RECORDS None 6. REFERENCES 6.1 "Diablo Canyon Unit 1 Cycle 16 Final Reload Evaluation," December, 2008 6.2 WCAP-12473-A (Non-Proprietary), "BEACON Core Monitoring and Operations Support System," August, 1994 COLRIuir01.DOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER REVISION PAGE COLR 1 1 6 OF 12 1 UNIT Table 1: FQ Margin Decreases in Excess of 2% Per 31 EFPD Cycle Max. % Decrease Burnup in FQ Margin (MWD/MTU)0 2.01 150 2.01 313 2.33 475 2.57 638 2.69 801 2.64 963 2.41 1126 2.06 1288 2.00 4866 2.00 5029 2.48 5191 2.93 5354 3.39 5517 3.85 5679 4.26 5842 4.55 6005 4.30 6167 4.05 6330 3.80 6493 3.52 6655 3.24 6818 2.96 6980 2.66 7143 2.37 7306 2.07 7468 2.00 18527 2.00 18690 2.03 18852 2.00 NOTE: All cycle burnups outside the range of this table shall use a 2% decrease in FQ margin for compliance with SR 3.2.1.2. Linear interpolation is adequate for intermediate cycle burnups.COLRluIrOLDOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER COLR 1 REVISION 1 PAGE 7 OF 12 UNIT 1 Table 2A: Load Follow W(Z) Factors at 150 and 4000 MWD/MTU as a Function of Core Height HEIGHT (FEET)*0.0000*0.2000*0.4000*0.6000*0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000 150 MWD/MTU W(Z)1.5977 1.5923 1.5834 1.5722 1.5587 1.5424 1.5234 1.5023 1.4795 1.4553 1.4299 1.4035 1.3765 1.3490 1.3191 1.2987 1.2891 1.2813 1.2755 1.2687 1.2603 1.2508 1.2401 1.2283 1.2155 1.2019 1.1876 1.1726 1.1585 1.1557 HEIGHT (FEET)*0.0000*0.2000*0.4000*0.6000*0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000 4000 MWD/MTU W(Z)1.5792 1.5745 1.5659 1.5548 1.5410 1.5242 1.5043 1.4820 1.4576 1.4315 1.4040 1.3755 1.3463 1.3166 1.2889 1.2674 1.2535 1.2438 1.2342 1.2282 1.2229 1.2158 1.2078 1.1988 1.1889 1.1781 1.1668 1.1546 1.1411 1.1368* Top and Bottom 8% Excluded COLRluIrOLDOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER COLR 1 REVISION 1 PAGE 8 OF 12 UNIT 1 Table 2A: Load Follow W(Z) Factors at 150 and 4000 MWD/MTU as a Function of Core Height (Continued)
 
HEIGHT (FEET)6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 9.6000 9.8000 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000'11.2000"11.4000"11.6000*11.8000* 12.0000 150 MWD/MTU W(Z)1.1581 1.1643 1.1693 1.1731 1.1758 1.1770 1.1768 1.1753 1.1719 1.1665 1.1590 1.1491 1.1368 1.1254 1.1131 1.1097 1.1164 1.1370 1.1654 1.1942 1.2207 1.2464 1.2707 1.2928 1.3122 1.3283 1.3425 1.3582 1.3736 1.3882 1.4024 HEIGHT (FEET)6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 9.6000 9.8000 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000"11.2000"11.4000"11.6000"11.8000"12.0000 4000 MWD/MTU W(Z)1.1394 1.1508 1.1608 1.1697 1.1775 1.1838 1.1886 1.1915 1.1924 1.1912 1.1876 1.1817 1.1732 1.1603 1.1545 1.1512 1.1504 1.1709 1.1932 1.2135 1.2300 1.2400 1.2479 1.2581 1.2672 1.2761 1.2873 1.2948 1.2980 1.2974 1.2977* Top and Bottom 8% Excluded COLR luIrOLDOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER COLR 1 REVISION 1 PAGE 9 OF 12 UNIT 1 Table 2B: Load Follow W(Z) Factors at 12000 and 20000 MWD/MTU as a Function of Core Height HEIGHT (FEET)*0.0000*0.2000*0.4000*0.6000*0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000 12000 MWD/MTU W(Z)1.2730 1.2651 1.2556 1.2450 1.2337 1.2203 1.2058 1.1931 1.1841 1.1752 1.1659 1.1566 1.1475 1.1385 1.1278 1.1253 1.1298 1.1321 1.1360 1.1434 1.1515 1.1581 1.1638 1.1684 1.1716 1.1742 1.1748 1.1747 1.1875 1.2063 HEIGHT (FEET)*0.0000*0.2000*0.4000*0.6000*0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000 20000 MWD/MTU W(Z)1.3639 1.3510 1.3365 1.3213 1.3057 1.2876 1.2709 1.2582 1.2447 1.2311 1.2176 1.2039 1.1903 1.1765 1.1619 1.1587 1.1620 1.1694 1.1779 1.1889 1.1996 1.2083 1.2171 1.2265 1.2349 1.2383 1.2467 1.2716 1.2936 1.3124* Top and Bottom 8% Excluded COLRluIrODOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER COLR 1 REVISION 1 PAGE 10 OF 12 UNIT 1 Table 2B: Load Follow W(Z) Factors at 12000 and 20000 MWD/MTU as a Function of Core Height (continued)
PACIFIC GAS AND ELECTRIC COMPANY                                               NUMBER       COLR 1 DIABLO CANYON POWER PLANT                                                     REVISION 1 PAGE         4 OF 12 TITLE:     COLR for Diablo Canyon Unit 1 Cycle 16                             UNIT         1 2.7   Nuclear Enthalpy Rise Hot Channel Factor     -F M (TS 3.2.2)
HEIGHT (FEET)6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 9.6OOO 9.8000 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000"11.2000"11.4000"11.6000'11.8000"12.0000 ,12000 MWD/MTU W(Z)1.2245 1.2409 1.2555 1.2682 1.2786 1.2870 1.2932 1.2968 1.2974 1.2949 1.2893 1.2802 1.2678 1.2561 1.2571 1.2737 1.2971 1.3178 1.3368 1.3549 1.3723 1.3882 1.4011 1.4095 1.4198 1.4324 1.4423 1.4489 1.4475 1.4378 1.4300 HEIGHT (FEET)6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 9.6000 9.8000 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000"11.2000"11.4000*11.6000*11.8000*12.0000 20000 MWD/MTU W(Z)1.3292 1.3431 1.3542 1.3624 1.3673 1.3693 1.3682 1.3634 1.3548 1.3423.1.3257 1.3052 1.2808 1.2539 1.2466 1.2450 1.2397 1.2365 1.2268 1.2316 1.2519 1.2719 1.2906 1.3080 1.3247 1.3407 1.3555 1.3682 1.3730 1.3694 1.3678* Top and Bottom 8% Excluded 'COLRIulr01.DOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER COLR 1 REVISION 1 PAGE 11 OF 12 UNIT 1 C 0 ,-a (0 c.0 0 0 m 225 200 175 150 125 100-75.. .. ...__, -_ I_ ... .. ... .(0.17,225)
FN _<FRTP *[I+ PF*I * (1-P)]
.68 --225(068 ...... .---- -------------
AH -AH where:
SBANKB E-- --- ------~..- --I--- -7.. .-F -------F- -.. ..I /. ... --- ... .. 3- --- ---B--- K ------ -- ------ -. ---1.(0.0,183) " .. .. ... ...1, --...( ., 7 )-- -T--- ---- -------I I I" -- ------- - ------ ---- --- ---T ---.-I--- T-- ---I 4I I I I I I-" ---...... --"- -. .---------. ." ---.L ----.. .. ../ _ --. .L --i ..... ._- --_I I I I --------- -- --.-.-.-.-.
THERMAL POWER P           =
I I I I I I I I I I I I I I" --- -- .--.-.-.-.
RATED THERMAL POWER FN FAMeasured    esrdvle values offFN F N ot    m by using the moveable incore detectors to obtained obtain a power distribution map.
----- --.. .. ------*-- ------ -.__I ----.. .. L ------I/II I I I I---I- --------I-- ---- ---------
F RTP     = 1.59 (includes the 4% measurement uncertainty)
------- ---N DT---- -- -- -- ------......- ----L --... _ / ---------- I------ L-- ---------  
AH PFAI       = 0.3 = Power Factor Multiplier 2.8   Power Distribution Measurement Uncertainty (TS 3.2.1. and TS 3.2.2):
-- -------------
If the Power Distribution Monitoring System (PDMS) is OPERABLE, the uncertainty, UFAN, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor, F N   shall be calculated by the following formula:
I II r I I II-----r ----- ---- -~----- 7----------L-  
UFAH =1.0+       AUl 100.0 where:     UQ = Uncertainty for power peaking factor as defined in equation (5-19) in Reference 6.2 and F RTP = 1.65 for PDMS (in the above Section 2.7 AH equation).
----- -- ---7---_ ! _ -...-L --- ---,-- --i- ---_-_ __- -_III4II I I I---- .. ..----------  
If the PDMS is OPERABLE, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor, FQ(z), shall be calculated by the following formula:
------- -.- ------ --- ----- -----------
UFQ=     1.0+ U&deg;       J*Ue where:     UQ = Uncertainty for power peaking factor as defined in equation (5-19) in Reference 6.2.
---- ----------
Ue = Engineering uncertainty factor
--- -- -....- f-----4----
                              = 1.03 If the PDMS is inoperable, the Nuclear Enthalpy Rise Hot Channel Factor, F N shall be AH, calculated as specified in Section 2.7.
------ ---- L-- -- i- -- -- "n <231 Steps--- ------- ------- -I FI BAN D _ --------- --.-- - -- -------....-- ---,4---IIII I 4II... .. .. ..... I- -- --I.. .T .... ..- ---- -h-- ------h .. .t-------..---
If the PDMS is inoperable, the Heat Flux Hot Channel Factor, FQ(Z), shall be calculated as specified in Section 2.6.
---4-i IIII-- -----1 - -- -"4 ... .. -----.......-
COLR luIrOLDOC 04B       0306.1024
----I I I- I step I... ..... .. .---- Valid for Fully Withdrawn Rod---------------------
 
..(02.0)11..
PACIFIC GAS AND ELECTRIC COMPANY                                                   NUMBER        COLR 1 DIABLO CANYON POWER PLANT                                                         REVISION      1 PAGE          5 OF 12 TITLE:       COLR for Diablo Canyon Unit 1 Cycle 16                               UNIT           1 2.9     Axial Flux Difference (TS 3.2.3) 2.9.1       The Axial Flux Difference (AFD) Limits are provided in Figure 2.
-.: '- -- Positions:
2.10     Boron Concentration (TS 3.9.1)
>225 Steps And <23"1 Ses.. ..(029 O)I I--'I -I- T '50 25 0 0.0 .0.1 0.2 .0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction of Rated Thermal Power Figure 1: Control Bank Insertion Limits Versus Rated Thermal Power COLRluirOiDOC 04B 0306.1024 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 NUMBER REVISION PAGE UNIT COLR 1 1 12 OF 12 1 120 0 ,C I-4-, 0-60 40 20 -10 0 10 20 30 40 50 60 Flux Difference (DELTA I) %Figure 2: AFD Limits as a Function of Rated Thermal Power COLRluIrOlDOC 04B 0306.1024}}
The refueling boron concentration of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained within the more restrictive of the following limits:
2.10.1     A kff of 0.95 or less, with the most reactive control rod assembly completely withdrawn, or 2.10.2     A boron concentration of greater than or equal to 2000 ppm.
2.11     RCS Pressure and Temperature Departure from Nucleate Boiling (DNB) Limit (TS 3.4.1) 2.11.1     Pressurizer pressure is greater than or equal to 2175 psig.
                .2.11.2     RCS average temperature is less than or equal to 581.7&deg;F.
NOTE: The DNBR RCS Tavg limit is based on the slightly lower and bounding value associated with Unit 1 in order to have the same surveillance limits for both Unit 1 and Unit 2.
: 3.     TABLES 3.1     Table 1, "FQ Margin Decreases in Excess of 2% Per 31 EFPD" 3.2     Table 2A, "Load Follow W(Z) Factors at 150 and 4,000 MWD/MTU as a Function of Core Height" I
3.3     Table 2B, "Load Follow W(Z) Factors at 12,000 and 20,000 MWD/MTU as a Function of Core Height"
: 4.     FIGURES 4.1     Figure 1, "Control Bank Insertion Limits Versus Rated Thermal Power" 4.2     r lgure z, ArL) Limits as a r unction or Rated inermal rower"
: 5.     RECORDS None
: 6.     REFERENCES 6.1       "Diablo Canyon Unit 1 Cycle 16 Final Reload Evaluation," December, 2008 6.2     WCAP-12473-A (Non-Proprietary), "BEACON Core Monitoring and Operations Support System," August, 1994 COLRIuir01.DOC   04B         0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY                                                 NUMBER        COLR 1 DIABLO CANYON POWER PLANT                                                       REVISION      1 PAGE          6 OF 12 TITLE:     COLR for Diablo Canyon Unit 1 Cycle 16                               UNIT          1 Table 1: FQ Margin Decreases in Excess of 2% Per 31 EFPD Cycle           Max. % Decrease Burnup             in FQ Margin (MWD/MTU) 0                   2.01 150                 2.01 313                   2.33 475                   2.57 638                   2.69 801                   2.64 963                   2.41 1126                 2.06 1288                 2.00 4866                   2.00 5029                   2.48 5191                   2.93 5354                   3.39 5517                   3.85 5679                   4.26 5842                   4.55 6005                   4.30 6167                   4.05 6330                   3.80 6493                   3.52 6655                   3.24 6818                   2.96 6980                   2.66 7143                   2.37 7306                   2.07 7468                   2.00 18527                 2.00 18690                 2.03 18852                 2.00 NOTE: All cycle burnups outside the range of this table shall use a 2% decrease in FQ margin for compliance with SR 3.2.1.2. Linear interpolation is adequate for intermediate cycle burnups.
COLRluIrOLDOC     04B     0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY                                       NUMBER        COLR 1 DIABLO CANYON POWER PLANT                                             REVISION 1 PAGE          7 OF 12 TITLE:       COLR for Diablo Canyon Unit 1 Cycle 16                   UNIT         1 Table 2A: Load Follow W(Z) Factors at 150 and 4000 MWD/MTU as a Function of Core Height HEIGHT         150 MWD/MTU                    HEIGHT        4000 MWD/MTU (FEET)             W(Z)                      (FEET)              W(Z)
          *0.0000           1.5977                    *0.0000            1.5792
          *0.2000            1.5923                    *0.2000           1.5745
          *0.4000           1.5834                    *0.4000            1.5659
          *0.6000            1.5722                    *0.6000            1.5548
          *0.8000           1.5587                    *0.8000            1.5410 1.0000            1.5424                      1.0000           1.5242 1.2000           1.5234                      1.2000            1.5043 1.4000            1.5023                      1.4000           1.4820 1.6000           1.4795                      1.6000            1.4576 1.8000            1.4553                      1.8000            1.4315 2.0000            1.4299                      2.0000            1.4040 2.2000            1.4035                     2.2000            1.3755 2.4000            1.3765                      2.4000            1.3463 2.6000            1.3490                      2.6000            1.3166 2.8000            1.3191                      2.8000            1.2889 3.0000            1.2987                      3.0000            1.2674 3.2000           1.2891                      3.2000           1.2535 3.4000           1.2813                      3.4000            1.2438 3.6000           1.2755                      3.6000            1.2342 3.8000            1.2687                      3.8000           1.2282 4.0000           1.2603                      4.0000            1.2229 4.2000            1.2508                      4.2000           1.2158 4.4000             1.2401                      4.4000           1.2078 4.6000            1.2283                      4.6000            1.1988 4.8000            1.2155                      4.8000            1.1889 5.0000            1.2019                      5.0000            1.1781 5.2000            1.1876                      5.2000            1.1668 5.4000            1.1726                      5.4000            1.1546 5.6000            1.1585                      5.6000            1.1411 5.8000            1.1557                      5.8000            1.1368
* Top and Bottom 8% Excluded COLRluIrOLDOC     04B     0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY                                         NUMBER        COLR 1 DIABLO CANYON POWER PLANT                                                 REVISION      1 PAGE          8 OF 12 TITLE:       COLR for Diablo Canyon Unit 1 Cycle 16                     UNIT         1 Table 2A: Load Follow W(Z) Factors at 150 and 4000 MWD/MTU as a Function of Core Height (Continued)
HEIGHT         150 MWD/MTU                      HEIGHT      4000 MWD/MTU (FEET)              W(Z)                        (FEET)          W(Z) 6.0000             1.1581                        6.0000          1.1394 6.2000            1.1643                        6.2000          1.1508 6.4000             1.1693                        6.4000          1.1608 6.6000            1.1731                        6.6000         1.1697 6.8000             1.1758                        6.8000          1.1775 7.0000            1.1770                        7.0000         1.1838 7.2000             1.1768                        7.2000          1.1886 7.4000            1.1753                        7.4000         1.1915 7.6000             1.1719                        7.6000          1.1924 7.8000            1.1665                        7.8000          1.1912 8.0000            1.1590                        8.0000          1.1876 8.2000            1.1491                        8.2000          1.1817 8.4000            1.1368                         8.4000          1.1732 8.6000            1.1254                        8.6000          1.1603 8.8000            1.1131                        8.8000          1.1545 9.0000            1.1097                        9.0000          1.1512 9.2000            1.1164                        9.2000          1.1504 9.4000            1.1370                        9.4000          1.1709 9.6000            1.1654                        9.6000         1.1932 9.8000             1.1942                        9.8000          1.2135 10.0000            1.2207                        10.0000         1.2300 10.2000             1.2464                        10.2000          1.2400 10.4000            1.2707                        10.4000         1.2479 10.6000             1.2928                        10.6000          1.2581 10.8000            1.3122                        10.8000         1.2672 11.0000             1.3283                        11.0000          1.2761
          '11.2000             1.3425                      "11.2000          1.2873 "11.4000            1.3582                      "11.4000         1.2948 "11.6000            1.3736                      "11.6000          1.2980
          *11.8000            1.3882                      "11.8000          1.2974
* 12.0000            1.4024                      "12.0000          1.2977
* Top  and Bottom 8% Excluded COLR luIrOLDOC      04B      0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY                                      NUMBER        COLR 1 DIABLO CANYON POWER PLANT                                              REVISION      1 PAGE          9 OF 12 TITLE:      COLR for Diablo Canyon Unit 1 Cycle 16                    UNIT          1 Table 2B: Load Follow W(Z) Factors at 12000 and 20000 MWD/MTU as a Function of Core Height 12000 MWD/MTU HEIGHT                                          HEIGHT      20000 MWD/MTU (FEET)              W(Z)                       (FEET)             W(Z)
        *0.0000             1.2730                      *0.0000            1.3639
        *0.2000            1.2651                      *0.2000            1.3510
        *0.4000            1.2556                      *0.4000            1.3365
        *0.6000             1.2450                      *0.6000            1.3213
        *0.8000            1.2337                      *0.8000             1.3057 1.0000             1.2203                      1.0000            1.2876 1.2000            1.2058                      1.2000             1.2709 1.4000             1.1931                      1.4000            1.2582 1.6000            1.1841                      1.6000             1.2447 1.8000             1.1752                      1.8000            1.2311 2.0000            1.1659                      2.0000            1.2176 2.2000            1.1566                      2.2000            1.2039 2.4000            1.1475                      2.4000            1.1903 2.6000            1.1385                       2.6000            1.1765 2.8000            1.1278                      2.8000            1.1619 3.0000            1.1253                      3.0000            1.1587 3.2000            1.1298                      3.2000            1.1620 3.4000            1.1321                      3.4000            1.1694 3.6000             1.1360                      3.6000            1.1779 3.8000            1.1434                      3.8000            1.1889 4.0000             1.1515                      4.0000            1.1996 4.2000            1.1581                      4.2000             1.2083 4.4000             1.1638                      4.4000            1.2171 4.6000             1.1684                      4.6000            1.2265 4.8000            1.1716                      4.8000             1.2349 5.0000             1.1742                      5.0000            1.2383 5.2000            1.1748                      5.2000            1.2467 5.4000              1.1747                      5.4000            1.2716 5.6000              1.1875                      5.6000            1.2936 5.8000              1.2063                      5.8000            1.3124
* Top and Bottom 8% Excluded COLRluIrODOC    04B      0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY                                        NUMBER        COLR 1 DIABLO CANYON POWER PLANT                                              REVISION 1 PAGE          10 OF 12 TITLE:        COLR for Diablo Canyon Unit 1 Cycle 16                    UNIT          1 Table 2B: Load Follow W(Z) Factors at 12000 and 20000 MWD/MTU as a Function of Core Height (continued)
HEIGHT        ,12000 MWD/MTU                    HEIGHT      20000 MWD/MTU (FEET)                W(Z)                       (FEET)            W(Z) 6.0000               1.2245                      6.0000          1.3292 6.2000              1.2409                      6.2000          1.3431 6.4000             1.2555                      6.4000          1.3542 6.6000              1.2682                      6.6000           1.3624 6.8000             1.2786                      6.8000          1.3673 7.0000              1.2870                      7.0000           1.3693 7.2000             1.2932                      7.2000          1.3682 7.4000              1.2968                      7.4000           1.3634 7.6000             1.2974                      7.6000          1.3548 7.8000              1.2949                      7.8000          1.3423.
8.0000              1.2893                      8.0000          1.3257 8.2000              1.2802                       8.2000          1.3052 8.4000              1.2678                      8.4000          1.2808 8.6000              1.2561                      8.6000          1.2539 8.8000              1.2571                      8.8000          1.2466 9.0000              1.2737                      9.0000          1.2450 9.2000              1.2971                      9.2000          1.2397 9.4000              1.3178                      9.4000          1.2365 9.6OOO              1.3368                      9.6000           1.2268 9.8000             1.3549                      9.8000          1.2316 10.0000              1.3723                      10.0000           1.2519 10.2000             1.3882                      10.2000          1.2719 10.4000              1.4011                      10.4000           1.2906 10.6000             1.4095                      10.6000          1.3080 10.8000              1.4198                      10.8000           1.3247 11.0000              1.4324                      11.0000           1.3407 "11.2000             1.4423                    "11.2000          1.3555 "11.4000             1.4489                    "11.4000          1.3682 "11.6000              1.4475                    *11.6000          1.3730
        '11.8000              1.4378                    *11.8000          1.3694 "12.0000              1.4300                    *12.0000          1.3678
* Top and Bottom 8% Excluded '
COLRIulr01.DOC    04B      0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY NUMBER                                        COLR 1 DIABLO CANYON POWER PLANT                                                                                                                                                                                                                          REVISION                                      1 PAGE                                          11 OF 12 TITLE:      COLR for Diablo Canyon Unit 1 Cycle 16                                                                                                                                                                                                  UNIT                                          1 225                                                        ..             ..                                   .             .         .                                               __, -_                    ...I_                              ..         .           ..         .
(0.17,225)                                                --                                     .68 225(068                ......                             .                               -
                --   ~..-           SBANKB
                                    ---                           E ------                                                                                                       -                 -I---                       -
200
                                                                                      -       ------         F-                           -..               /.        .. I          - --                             .          ..                              ... -           ..      3-
                                                    -F 7...
B---K                              -                    - --           -             ---                                             -         -----                         -. -                         -               -           1
              .(0.0,183) "..                                         ..                                     .         ..                    I        1,              ...                                     - -...                 I                      I  ( . , 7 )
175
              "  --         --       -------T---                       -           - - - ---                           - -----                                               -               -     -     -         --                   -     -     -----                       ---
C
                                                                                                                          - -                                                                                                         T            -.
I                                        4I                                                                                        I                          I                              I                                                    I
  ,-a                                                                                                                                                                                                -I---                           T-----
150                              I                                         I                                                                                         I                         I -         -          -                 -       -
I                                                                                  I                              I                              I                          I                      I                                        I                  I
              -" - -I . .-                      .           .         .. -- - -                                     ----           -       "-
I -.     -
                                                                                                                                              -.-.-.-.-.             .       I - - - -                 I                              I          -                              .- -"-. I - - -
(0 0
: c. 125        "--
I/II
                                      .L
                                                                                                  /        _      ..
I
                                                                                                                                                                    .- -. L
                                                                                                                                                                                                    - -_i. .
I I
I
                          .__I                                                                                                                    - - - -..         .. L                                                                - - - - - -
I. . .               .-                     II      - - -           -L -         -                 r .--                         I                            ..                              I                      II              _      /
0 100          -         -                       I-                             - - - - - -                                               - -I 0                    --
III4II    ---
                                                                            -~-----
                                                                                                                                    -------7----------L-I -                               -------     I    N           DT----       --     --       -- -         -- --     -----     7--
I
                                      --------                                   I------                   L--                   ---------                                                             --                       -------------
0                          ----
                                                                                                                                                                                                                                            - - - - -r- -
      -75 f-----4----                     ....-
m                                                                                FI I ------
                                                                                                          -- !i-L--
                                                                                                                -__- --           -L        "n . .- . --
BAN  ,--- - i- -
D          -
                                                                                                                                                                                                                                                          -_ <231                Steps
                  -                                 --- -             -   -.--     ------       ----- -     4                - --             ------       -     -           -           -       -       -           -....--                                         - -       -,4---
IIII                                                                                          I                              4II                                                                                                  ..-
                      ...    ..          ..              .        ....                                    I-             --         --                         .      TI..                                        ....                              --
50                --                     -h--                                     ------ h                                              ..                .      t-------..---                                                                                   ---           4-i      IIII
                                    --           --       -     -         -   1              -               4
                                                                                                                --         --             -"4...                  ..                  -         -       -       -           -.......-                                             -       ---
I        I                          I-                                                         I                                                                                                                I              step 25            ... . .                                .      ..                                    ..                              .----                     Valid for Fully Withdrawn Rod
                            ....                      (02.0)11..                                          -.                                :'-       --             Positions: >225                I--'I Steps And <23"1                      -
SesTI-             '
                                                .. (029                    O)I 0
0.0                .0.1                            0.2                        .0.3                        0.4                             0.5                      0.6                            0.7                            0.8                        0.9                      1.0 Fraction of Rated Thermal Power Figure 1: Control Bank Insertion Limits Versus Rated Thermal Power COLRluirOiDOC                04B                                0306.1024
 
PACIFIC GAS AND ELECTRIC COMPANY NUMBER  COLR 1 DIABLO CANYON POWER PLANT                                                    REVISION 1 PAGE    12 OF 12 TITLE:      COLR for Diablo Canyon Unit 1 Cycle 16                          UNIT      1 120 0
  ,C I-4-,
0
          -60  -50    -40    -30    -20   -10     0     10   20   30     40   50 60 Flux Difference (DELTA I) %
Figure 2: AFD Limits as a Function of Rated Thermal Power COLRluIrOlDOC   04B       0306.1024}}

Latest revision as of 15:20, 12 March 2020

Submittal of Core Operating Limits Report
ML090920409
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/23/2009
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-09-017
Download: ML090920409 (14)


Text

PacificGas and ElectricCompany James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 805.545.3462 March 23, 2009 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-09-017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Diablo Canyon Unit 1 Core Operating Limits Report for Unit 1

Dear Commissioners and Staff:

In accordance with Diablo Canyon Power Plant Technical Specification 5.6.5.d, enclosed is the Core Operating Limits Report (COLR) for Unit 1. The COLR has been revised for Unit 1, Cycle 16, consistent with NRC-approved License Amendment 195.

There are no new or revised regulatory commitments in this report.

If there are any questions regarding the COLR, please contact Mr. Steve Hamilton at (805) 545-3449.

dd m/2254/50040450 Enclosure cc: Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) ALliance 4oo!

Catlaway

  • Comanche Peak
  • Diabto Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek

Enclosure PG&E Letter DCL-09-017 CORE OPERATING LIMITS REPORT (COLR)

DIABLO CANYON POWER PLANT UNIT 1, CYCLE 16, EFFECTIVE DATE MARCH 6, 2009

ISSUED FOR USE BY:__ DATE: EXPIRES:____

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 NUCLEAR POWER GENERATION REVISION 1 DIABLO CANYON POWER PLANT PAGE 1 OF 12 CORE OPERATING LIMITS REPORT UNIT TITLE: COLR for *Diablo Canyon Unit 1 Cycle 16 1 03/06/09 EFFECTIVE DATE PROCEDURE CLASSIFICATION: QUALITY RELATED

1. CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Diablo Canyon Unit 1 Cycle 16 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.5..

I The Technical Specifications affected by this report are listed below:

3.1.1 Shutdown Margin (MODE 2 with kff < 1.0, MODES 3, 4, and 5) 3.1.3 Moderator Temperature Coefficient 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor - FQ(Z) 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor - F N AH 3.2.3 Axial Flux Difference - (AFD) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.

3.9.1 Boron Concentration

2. OPERATING LIMITS The cycle-specific parameter limits for the TS listed in Section 1 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in TS 5.6.5.

2.1 Shutdown Margin (SDM) (TS 3.1.1)

The SDM limit for MODE 2 with klff < 1.0, MODES 3 and 4 is:

2.1.1 The shutdown margin with Safety Injection enabled shall be greater than or equal to 1.6% Ak/k.

2.1.2 In Modes 3 or 4 the shutdown margin with Safety Injection blocked shall be greater than or equal to 1.6% Ak/k calculated at a temperature of 200 0 F.

The SDM limit for MODE 5 is:

2.1.3 The shutdown margin shall be greater than or equal to 1.0% Ak/k. However, an administrative value of 1.6 % Ak/k will be used to address concerns of NSAL-02-014.

COLR_lulr01.DOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 2 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 2.2 Shutdown Margin (SDM) (TS 3.1.4, 3.1.5, 3.1.6)

The SDM for MODE 1 and MODE 2 with keff > 1.0 is:

2.2.1 The shutdown margin shall be greater than or equal to 1.6% Ak/k.

2.3 Moderator Temperature Coefficient (MTC) (TS 3.1.3)

The MTC limit for MODES 1, 2, and 3 is:

2.3.1 The MTC shall be less negative than -3.9xl0-4 Ak/k/°F for all rods withdrawn, end of cycle life (EOL), RATED THERMAL POWER condition.

2.3.2 The MTC 300 ppm surveillance limit is -3.0xl 0 4 Ak/k/°F (all rods withdrawn, RATED THERMAL POWER condition).

2.3.3 The MTC 60 ppm surveillance limit is -3.72xl104 Ak/k/°F (all rods withdrawn, RATED THERMAL POWER condition).

2.4 Shutdown Bank Insertion Limits (TS 3.1.5) 2.4. 1 Each shutdown bank shall be withdrawn to at least 225 steps.

2.5 Control Bank Insertion Limits (TS 3.1.6) 2.5.1 The control banks shall be limited in physical insertion as shown in Figure 1.

2.6 Heat Flux Hot Channel Factor - FQ(Z) (TS 3.2.1)

FRTP 2.6.1 FQ(Z)<-- *K(Z) forP>0.5 FP FQ(Z)<L.5*K(Z) for P___0.5

0.5 where

P = THERMAL POWER RATED THERMAL POWER FR TP = 2.58 Q

K(Z) = 1.0 NOTE: The W(Z) data is appropriate for use only if the predicted axial offset is within

+/-3% of the measured value.

2.6.2 The W(Z) data for Relaxed Axial Offset Control (RAOC) operation, provided in Tables 2A and 2B are sufficient to determine the RAOC W(Z) versus core height for Cycle 16 bumups through the end of full power reactivity plus a power coast down of up to 1000 MWD/MTU.

Table 1 shows FQ margin decreases that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase F W(Z) per SR 3.2.1.2. A 2% penalty factor shall be used at all cycle burnups that are outside the range of Table 1.

COLR luIrODOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 3 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 2.6.3 FQ(Z) shall be evaluated to determine if it is within its limits by verifying that F C (Z) and F W (Z) satisfy the following:

a. Using the moveable incore detectors to obtain a power distribution map in MODE 1.
b. Increasing the measured FQ(Z) component of the power distribution map by 3% to account for manufacturing tolerances and further increasing the value by 5% to account for measurement uncertainties.
c. Satisfying the following relationship:

c (Z)< FT *K(Z)

FQ P forP>0.5 FC(Z\< FRTP *K(Z)

Q() .5 for0P..5 W ' FRTP F (Z) < Q *K(Z) for P > 0.5 Q P FRTP F (Z)*

Q 0Q 0.5 *K(Z) for P*__ 0.5 where:

F C (Z) is the measured FQ(Z) increased by the allowances for manufacturing tolerances and measurement uncertainty.

F RTP is the FQ limit Q F K(Z;) is the normalized FQ(Z) as a function of core height P is.the relative THERMAL POWER, and F W(Z) is the total peaking factor, F (Z), multiplied by W(Z) which QQ gives the maximum FQ(Z) calculated to occur in normal operation.

W(z) is the cycle dependent function that accounts for power distribution transients encountered during normal operation.

F RTP and K(Z) are specified in 2.6.1 and W(Z) is specified in. 2.6.2.

QI COLR luIrOl.DOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 4 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 2.7 Nuclear Enthalpy Rise Hot Channel Factor -F M (TS 3.2.2)

FN _<FRTP *[I+ PF*I * (1-P)]

AH -AH where:

THERMAL POWER P =

RATED THERMAL POWER FN FAMeasured esrdvle values offFN F N ot m by using the moveable incore detectors to obtained obtain a power distribution map.

F RTP = 1.59 (includes the 4% measurement uncertainty)

AH PFAI = 0.3 = Power Factor Multiplier 2.8 Power Distribution Measurement Uncertainty (TS 3.2.1. and TS 3.2.2):

If the Power Distribution Monitoring System (PDMS) is OPERABLE, the uncertainty, UFAN, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor, F N shall be calculated by the following formula:

UFAH =1.0+ AUl 100.0 where: UQ = Uncertainty for power peaking factor as defined in equation (5-19) in Reference 6.2 and F RTP = 1.65 for PDMS (in the above Section 2.7 AH equation).

If the PDMS is OPERABLE, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor, FQ(z), shall be calculated by the following formula:

UFQ= 1.0+ U° J*Ue where: UQ = Uncertainty for power peaking factor as defined in equation (5-19) in Reference 6.2.

Ue = Engineering uncertainty factor

= 1.03 If the PDMS is inoperable, the Nuclear Enthalpy Rise Hot Channel Factor, F N shall be AH, calculated as specified in Section 2.7.

If the PDMS is inoperable, the Heat Flux Hot Channel Factor, FQ(Z), shall be calculated as specified in Section 2.6.

COLR luIrOLDOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 5 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 2.9 Axial Flux Difference (TS 3.2.3) 2.9.1 The Axial Flux Difference (AFD) Limits are provided in Figure 2.

2.10 Boron Concentration (TS 3.9.1)

The refueling boron concentration of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained within the more restrictive of the following limits:

2.10.1 A kff of 0.95 or less, with the most reactive control rod assembly completely withdrawn, or 2.10.2 A boron concentration of greater than or equal to 2000 ppm.

2.11 RCS Pressure and Temperature Departure from Nucleate Boiling (DNB) Limit (TS 3.4.1) 2.11.1 Pressurizer pressure is greater than or equal to 2175 psig.

.2.11.2 RCS average temperature is less than or equal to 581.7°F.

NOTE: The DNBR RCS Tavg limit is based on the slightly lower and bounding value associated with Unit 1 in order to have the same surveillance limits for both Unit 1 and Unit 2.

3. TABLES 3.1 Table 1, "FQ Margin Decreases in Excess of 2% Per 31 EFPD" 3.2 Table 2A, "Load Follow W(Z) Factors at 150 and 4,000 MWD/MTU as a Function of Core Height" I

3.3 Table 2B, "Load Follow W(Z) Factors at 12,000 and 20,000 MWD/MTU as a Function of Core Height"

4. FIGURES 4.1 Figure 1, "Control Bank Insertion Limits Versus Rated Thermal Power" 4.2 r lgure z, ArL) Limits as a r unction or Rated inermal rower"
5. RECORDS None
6. REFERENCES 6.1 "Diablo Canyon Unit 1 Cycle 16 Final Reload Evaluation," December, 2008 6.2 WCAP-12473-A (Non-Proprietary), "BEACON Core Monitoring and Operations Support System," August, 1994 COLRIuir01.DOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 6 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 Table 1: FQ Margin Decreases in Excess of 2% Per 31 EFPD Cycle Max. % Decrease Burnup in FQ Margin (MWD/MTU) 0 2.01 150 2.01 313 2.33 475 2.57 638 2.69 801 2.64 963 2.41 1126 2.06 1288 2.00 4866 2.00 5029 2.48 5191 2.93 5354 3.39 5517 3.85 5679 4.26 5842 4.55 6005 4.30 6167 4.05 6330 3.80 6493 3.52 6655 3.24 6818 2.96 6980 2.66 7143 2.37 7306 2.07 7468 2.00 18527 2.00 18690 2.03 18852 2.00 NOTE: All cycle burnups outside the range of this table shall use a 2% decrease in FQ margin for compliance with SR 3.2.1.2. Linear interpolation is adequate for intermediate cycle burnups.

COLRluIrOLDOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 7 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 Table 2A: Load Follow W(Z) Factors at 150 and 4000 MWD/MTU as a Function of Core Height HEIGHT 150 MWD/MTU HEIGHT 4000 MWD/MTU (FEET) W(Z) (FEET) W(Z)

  • 0.0000 1.5977 *0.0000 1.5792
  • 0.2000 1.5923 *0.2000 1.5745
  • 0.4000 1.5834 *0.4000 1.5659
  • 0.6000 1.5722 *0.6000 1.5548
  • 0.8000 1.5587 *0.8000 1.5410 1.0000 1.5424 1.0000 1.5242 1.2000 1.5234 1.2000 1.5043 1.4000 1.5023 1.4000 1.4820 1.6000 1.4795 1.6000 1.4576 1.8000 1.4553 1.8000 1.4315 2.0000 1.4299 2.0000 1.4040 2.2000 1.4035 2.2000 1.3755 2.4000 1.3765 2.4000 1.3463 2.6000 1.3490 2.6000 1.3166 2.8000 1.3191 2.8000 1.2889 3.0000 1.2987 3.0000 1.2674 3.2000 1.2891 3.2000 1.2535 3.4000 1.2813 3.4000 1.2438 3.6000 1.2755 3.6000 1.2342 3.8000 1.2687 3.8000 1.2282 4.0000 1.2603 4.0000 1.2229 4.2000 1.2508 4.2000 1.2158 4.4000 1.2401 4.4000 1.2078 4.6000 1.2283 4.6000 1.1988 4.8000 1.2155 4.8000 1.1889 5.0000 1.2019 5.0000 1.1781 5.2000 1.1876 5.2000 1.1668 5.4000 1.1726 5.4000 1.1546 5.6000 1.1585 5.6000 1.1411 5.8000 1.1557 5.8000 1.1368
  • Top and Bottom 8% Excluded COLRluIrOLDOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 8 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 Table 2A: Load Follow W(Z) Factors at 150 and 4000 MWD/MTU as a Function of Core Height (Continued)

HEIGHT 150 MWD/MTU HEIGHT 4000 MWD/MTU (FEET) W(Z) (FEET) W(Z) 6.0000 1.1581 6.0000 1.1394 6.2000 1.1643 6.2000 1.1508 6.4000 1.1693 6.4000 1.1608 6.6000 1.1731 6.6000 1.1697 6.8000 1.1758 6.8000 1.1775 7.0000 1.1770 7.0000 1.1838 7.2000 1.1768 7.2000 1.1886 7.4000 1.1753 7.4000 1.1915 7.6000 1.1719 7.6000 1.1924 7.8000 1.1665 7.8000 1.1912 8.0000 1.1590 8.0000 1.1876 8.2000 1.1491 8.2000 1.1817 8.4000 1.1368 8.4000 1.1732 8.6000 1.1254 8.6000 1.1603 8.8000 1.1131 8.8000 1.1545 9.0000 1.1097 9.0000 1.1512 9.2000 1.1164 9.2000 1.1504 9.4000 1.1370 9.4000 1.1709 9.6000 1.1654 9.6000 1.1932 9.8000 1.1942 9.8000 1.2135 10.0000 1.2207 10.0000 1.2300 10.2000 1.2464 10.2000 1.2400 10.4000 1.2707 10.4000 1.2479 10.6000 1.2928 10.6000 1.2581 10.8000 1.3122 10.8000 1.2672 11.0000 1.3283 11.0000 1.2761

'11.2000 1.3425 "11.2000 1.2873 "11.4000 1.3582 "11.4000 1.2948 "11.6000 1.3736 "11.6000 1.2980

  • 11.8000 1.3882 "11.8000 1.2974
  • 12.0000 1.4024 "12.0000 1.2977
  • Top and Bottom 8% Excluded COLR luIrOLDOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 9 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 Table 2B: Load Follow W(Z) Factors at 12000 and 20000 MWD/MTU as a Function of Core Height 12000 MWD/MTU HEIGHT HEIGHT 20000 MWD/MTU (FEET) W(Z) (FEET) W(Z)

  • 0.0000 1.2730 *0.0000 1.3639
  • 0.2000 1.2651 *0.2000 1.3510
  • 0.4000 1.2556 *0.4000 1.3365
  • 0.6000 1.2450 *0.6000 1.3213
  • 0.8000 1.2337 *0.8000 1.3057 1.0000 1.2203 1.0000 1.2876 1.2000 1.2058 1.2000 1.2709 1.4000 1.1931 1.4000 1.2582 1.6000 1.1841 1.6000 1.2447 1.8000 1.1752 1.8000 1.2311 2.0000 1.1659 2.0000 1.2176 2.2000 1.1566 2.2000 1.2039 2.4000 1.1475 2.4000 1.1903 2.6000 1.1385 2.6000 1.1765 2.8000 1.1278 2.8000 1.1619 3.0000 1.1253 3.0000 1.1587 3.2000 1.1298 3.2000 1.1620 3.4000 1.1321 3.4000 1.1694 3.6000 1.1360 3.6000 1.1779 3.8000 1.1434 3.8000 1.1889 4.0000 1.1515 4.0000 1.1996 4.2000 1.1581 4.2000 1.2083 4.4000 1.1638 4.4000 1.2171 4.6000 1.1684 4.6000 1.2265 4.8000 1.1716 4.8000 1.2349 5.0000 1.1742 5.0000 1.2383 5.2000 1.1748 5.2000 1.2467 5.4000 1.1747 5.4000 1.2716 5.6000 1.1875 5.6000 1.2936 5.8000 1.2063 5.8000 1.3124
  • Top and Bottom 8% Excluded COLRluIrODOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 10 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 Table 2B: Load Follow W(Z) Factors at 12000 and 20000 MWD/MTU as a Function of Core Height (continued)

HEIGHT ,12000 MWD/MTU HEIGHT 20000 MWD/MTU (FEET) W(Z) (FEET) W(Z) 6.0000 1.2245 6.0000 1.3292 6.2000 1.2409 6.2000 1.3431 6.4000 1.2555 6.4000 1.3542 6.6000 1.2682 6.6000 1.3624 6.8000 1.2786 6.8000 1.3673 7.0000 1.2870 7.0000 1.3693 7.2000 1.2932 7.2000 1.3682 7.4000 1.2968 7.4000 1.3634 7.6000 1.2974 7.6000 1.3548 7.8000 1.2949 7.8000 1.3423.

8.0000 1.2893 8.0000 1.3257 8.2000 1.2802 8.2000 1.3052 8.4000 1.2678 8.4000 1.2808 8.6000 1.2561 8.6000 1.2539 8.8000 1.2571 8.8000 1.2466 9.0000 1.2737 9.0000 1.2450 9.2000 1.2971 9.2000 1.2397 9.4000 1.3178 9.4000 1.2365 9.6OOO 1.3368 9.6000 1.2268 9.8000 1.3549 9.8000 1.2316 10.0000 1.3723 10.0000 1.2519 10.2000 1.3882 10.2000 1.2719 10.4000 1.4011 10.4000 1.2906 10.6000 1.4095 10.6000 1.3080 10.8000 1.4198 10.8000 1.3247 11.0000 1.4324 11.0000 1.3407 "11.2000 1.4423 "11.2000 1.3555 "11.4000 1.4489 "11.4000 1.3682 "11.6000 1.4475 *11.6000 1.3730

'11.8000 1.4378 *11.8000 1.3694 "12.0000 1.4300 *12.0000 1.3678

  • Top and Bottom 8% Excluded '

COLRIulr01.DOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 11 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 225 .. .. . . . __, -_ ...I_ .. . .. .

(0.17,225) -- .68 225(068 ...... . -

-- ~..- SBANKB

--- E ------ - -I--- -

200

- ------ F- -.. /. .. I - -- . .. ... - .. 3-

-F 7...

B---K - - -- - --- - ----- -. - - - 1

.(0.0,183) ".. .. . .. I 1, ... - -... I I ( . , 7 )

175

" -- -- -------T--- - - - - --- - ----- - - - - -- - - ----- ---

C

- - T -.

I 4I I I I I

,-a -I--- T-----

150 I I I I - - - - -

I I I I I I I I

-" - -I . .- . . .. -- - - ---- - "-

I -. -

-.-.-.-.-. . I - - - - I I - .- -"-. I - - -

(0 0

c. 125 "--

I/II

.L

/ _ ..

I

.- -. L

- -_i. .

I I

I

.__I - - - -.. .. L - - - - - -

I. . . .- II - - - -L - - r .-- I .. I II _ /

0 100 - - I- - - - - - - - -I 0 --

III4II ---

-~-----


7----------L-I - ------- I N DT---- -- -- -- - -- -- ----- 7--

I


I------ L-- --------- -- -------------

0 ----

- - - - -r- -

-75 f-----4---- ....-

m FI I ------

-- !i-L--

-__- -- -L "n . .- . --

BAN ,--- - i- -

D -

-_ <231 Steps

- --- - - -.-- ------ ----- - 4 - -- ------ - - - - - - -....-- - - -,4---

IIII I 4II ..-

... .. .. . .... I- -- -- . TI.. .... --

50 -- -h-- ------ h .. . t-------..--- --- 4-i IIII

-- -- - - - 1 - 4

-- -- -"4... .. - - - - -.......- - ---

I I I- I I step 25 ... . . . .. .. .---- Valid for Fully Withdrawn Rod

.... (02.0)11.. -.  :'- -- Positions: >225 I--'I Steps And <23"1 -

SesTI- '

.. (029 O)I 0

0.0 .0.1 0.2 .0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction of Rated Thermal Power Figure 1: Control Bank Insertion Limits Versus Rated Thermal Power COLRluirOiDOC 04B 0306.1024

PACIFIC GAS AND ELECTRIC COMPANY NUMBER COLR 1 DIABLO CANYON POWER PLANT REVISION 1 PAGE 12 OF 12 TITLE: COLR for Diablo Canyon Unit 1 Cycle 16 UNIT 1 120 0

,C I-4-,

0

-60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 Flux Difference (DELTA I) %

Figure 2: AFD Limits as a Function of Rated Thermal Power COLRluIrOlDOC 04B 0306.1024