ML092170365: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML092170365
| number = ML092170365
| issue date = 08/03/2009
| issue date = 08/03/2009
| title = 2009-301 Written Exam Written Rd Exam & Answer Key
| title = 301 Written Exam Written Rd Exam & Answer Key
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DNMS
| author affiliation = NRC/RGN-II/DNMS
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:CO P Y U.S. Nuclear Regulatory Commission Site-Specific RO Written Examination Applicant Information Name: Date: 06-26-2009 Facility/Unit: Vogtle 1 & 2 Region: 1 0 11-III 0 IV 0 Reactor Type: W. CE D BW D GE D Start Time: Finish Time: Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination, you must achieve a final grade of at lea st 80.00 percent. Examination papers will be collected 6 hours after the examination begins. Applicant Certification All work done on this examination is my own. I have neither given nor received aid. Applicant's Signature Results Examination Value 75 Points Applicant's Score Points Applicant's Grade Percent Date: 06-26-2009 VEGP NRC RO Exam in a ti on Answer Sheet Stu d ent Name: 1. 26. 51. 2. 27. 52. 3. 28. 53. 4. 29. 54. 5. 30. 55. 6. 3 1. 56. 7. 32. 57. 8. 33. 58. 9. 3 4. 59. 10. 35. 60. 11. 36. 61. 1 2. 37. 1 3. 38. 63. 1 4. 39. 64. 1 5. 40. 65. 1 6. 4 1. 66. 1 7. 42. 67. 1 8. 43. 68. 19. 44. 69. 20. 45. 70. 21. 46. 7 1. 22. 4 7. 72. 23. 4 8. 73. 24. 4 9. 74. 25. 50. 75.
{{#Wiki_filter:CO PY U.S. Nuclear Regulatory Commission Site-Specific RO Written Examination Applicant Information Name:
Answers # ID 0 001A4.12 I A 2 002G2.1.31 I D 3 003AK2.05 I B 4 003K6.14 I B 5 004K5.11 I D 6 004K5.15 I B 7 005K2.03 I B 8 006A4.11 I B 9 007EA2.06 I B 10 007KI.OI I B II 008A4.02 I B 12 008AK2.022 D 13 008K3.03 I C 14 009EG2.4.34 I D 15 010K2.04 I A 16 010K6.01 I B 17 011 EG2.2.37 I D 18 012K3.041 B 19 013KI.071 D 20 015AG2.4.6 I D 2 1 015K2.01 1 C 22 022AI.02 1 C 23 022AAI.02 1 C 24 025AKI.Ol 1 D 25 026K4.01 1 C 26 027AK3.022 B 27 028K5.041 C 28 029EK2.06 I B 29 029KI.05 1 D 30 032AA2.092 C 31 033AI.Ol 1 B 32 035K6.01 1 B 33 039G2.2.25 2 A 34 051AAI.042 B 35 055EKI.O I I A 36 055K3.0 1 1 C 37 056AA2.391 D 38 057AAI.04 1 A 39 058AA2.01 1 D 40 059A3.04 1 A 41 061AI.012 D 42 061G2.1.71 C 43 062AK3.03 I B 44 062K4.021 A 45 063A2.01 1 C 6--e64*!I:'6 , e8 2 C 47 065AAI.03 1 D 48 068AG2.4.6 2 D Page: lof2 6126/2009 Answers # ID 0 4 9 071A2.08 1 B 50 073K5.01 1 A 51 076A2.012 B 52 076A2.021 B 53 076AA2.032 D 54 077AK2.041 A 55 078A3.01 1 A 56 078G2.4.31 1 D 57 086A3.01 1 C 58 103A1.01 1 C 59 103A4.03 2 D 60 G2.1.8 1 A 61 G2.1.29 1 D 62 G2.1.30 1 C 63 G2.2.132 C 6 4 G2.2.44 1 B 65 G2.3.11 1 C 66 G2.3.14 1 C 67 G2.4.13 1 B 68 G2.4.34 1 B 69 G2.4.43 1 D 70 WE03EA1.3 1 C 7 1 WE04EK 3.4 1 C 72 WE05EK1.32 D 73 WE06EK3.4 3 A 74 WE08EK2.1 1 B 75 WE09EK 1.2 1 A Page: 20f2 6/2612009 
Date: 06-26-2009                                     Facility/Unit: Vogtle 1 & 2 Region :         10 11-       III 0   IV 0           Reactor Type :   W.     CE D BW D GE D Start Time:                                           Finish Time:
: 1. Given the following: -A turbine runback occurred and the crew has now stabilzed the plant. -The UO is making minor turbine adjustments to control RCS Tave. -Control Rods are currently in AUTO. -Tave is currently
Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination, you must achieve a final grade of at least 80.00 percent. Examination papers will be collected 6 hours after the examination begins.
Applicant Certification All work done on this examination is my own. I have neither given nor received aid .
Applicant's Signature Results Examination Value                                                                     75       Points Applicant's Score                                                                               Points Applicant's Grade                                                                             Percent


===2.8 degrees===
Date: 06-26-2009 VEGP NRC RO Examination Answer Sheet Student Name:
higher than Tref. Which ONE of the following describes the current rod speed and when rod movement would stop? Current Rod Speed When Rod Motion Stops (In steps per minute) (temperature deviation)
: 1.                    26.        51.
A. 8 steps per minute Tave < 1.0 degrees> Tref B. 8 steps per minute Tave < 1.5 degrees> Tref C. > 8 steps per minute Tave < 1.0 degrees> Tref D. > 8 steps per minute Tave < 1.5 degrees> Tref Page: 1 of 75 6/22/2009
: 2.                    27.        52 .
: 2. Given the following:  
: 3.                    28.        53.
-All RCPs are de-energized. Based on RVLlS indication, which ONE of the following RCP hand switch positions would lead to a false CORE COOLING CSF status tree condition?
: 4.                    29.        54.
Rep 1 E handswitches Rep non-1 E handswitches A. Open Open B. Closed Open C. Open Closed D. Closed Closed P age: 2 0 f 75 6/22/2009
: 5.                    30.        55.
: 3. Given the following:  
: 6.                    3 1.      56.
-Dropped rod recovery in progress. -The OATC initiates rod withdrawal for the affected rod. -The ROD CONTROL URGENT FAILURE annunciator illuminates.
: 7.                    32.        57.
: 8.                    33.        58.
: 9.                    34.        59.
: 10.                    35.        60.
: 11.                    36.        61.
: 12.                    37.        62~
: 13.                    38.        63.
: 14.                    39.        64.
: 15.                    40.        65.
: 16.                    4 1.      66.
: 17.                    42.        67.
: 18.                    43.        68.
: 19.                    44.        69.
: 20.                    45.        70.
: 21.                    46.        71.
: 22.                    47.        72.
: 23.                    48.        73.
: 24.                    49.        74.
: 25.                    50.        75.
 
Answers
#      ID            0 001A4 .12 I    A 2      002G2.1.31 I  D 3      003AK2 .05 I  B 4      003K6.14 I    B 5      004K5 .11 I    D 6      004K5.15 I    B 7      005K2.03 I    B 8      006A4.11 I    B 9      007EA2.06 I    B 10      007KI.OI I    B II      008A4.02 I    B 12      008AK2.022    D 13      008K3.03 I    C 14      009EG2.4.34 I  D 15      010K2.04 I    A 16      010K6.01 I    B 17      011 EG2.2.37 I D 18      012K3.041      B 19      013KI.071      D 20      015AG2.4.6 I  D 21      015K2.01 1    C 22      022AI.02 1    C 23      022AAI.02 1    C 24      025AKI.Ol 1    D 25      026K4.01 1    C 26      027AK3.022    B 27      028K5.041      C 28      029EK2.06 I    B 29      029KI.05 1    D 30      032AA2.092    C 31      033AI.Ol 1    B 32      035K6.01 1    B 33      039G2.2.25 2  A 34      051AAI.042    B 35      055EKI.O I I  A 36      055K3.0 1 1    C 37      056AA2.391    D 38      057AAI.04 1    A 39      058AA2.01 1    D 40      059A3.04 1    A 41      061AI.012      D 42      061G2.1.71    C 43      062AK3.03 I    B 44      062K4.021      A 45      063A2.01 1    C 6- -e64*!I:'6,e8 2    C 47      065AAI.03 1    D 48      068AG2.4.6 2  D Page: lof2                      6126/2009
 
Answers
#      ID          0 49    071A2.08 1  B 50    073K5 .01 1  A 51    076A2.012    B 52    076A2.021    B 53    076AA2.032  D 54    077AK2.041  A 55    078A3.01 1  A 56    078G2.4.31 1 D 57    086A3.01 1  C 58    103A1.01 1  C 59    103A4.03 2  D 60    G2. 1.8 1    A 61    G2.1.29 1    D 62    G2.1.30 1    C 63    G2.2.132    C 64    G2.2.44 1    B 65    G2.3.11 1    C 66    G2.3.14 1    C 67    G2.4.13 1    B 68    G2.4.34 1    B 69    G2.4.43 1    D 70    WE03EA1.3 1  C 71    WE04EK3.4 1  C 72    WE05EK1.32  D 73    WE06EK3.4 3  A 74    WE08EK2.1 1  B 75    WE09EK 1.2 1 A Page: 20f2                    6/2612009
 
1.
Given the following:
          - A turbine runback occurred and the crew has now stabilzed the plant.
          - The UO is making minor turbine adjustments to control RCS Tave.
          - Control Rods are currently in AUTO.
          - Tave is currently 2.8 degrees higher than Tref.
Which ONE of the following describes the current rod speed and when rod movement would stop?
Current Rod Speed                   When Rod Motion Stops (In steps per minute)                 (temperature deviation)
A. 8 steps per minute                     Tave < 1.0 degrees> Tref B. 8 steps per minute                     Tave < 1.5 degrees> Tref C. > 8 steps per minute                   Tave < 1.0 degrees> Tref D. > 8 steps per minute                   Tave < 1.5 degrees> Tref Page: 1 of 75                                                                       6/22/2009
 
2.
Given the following:
          - All RCPs are de-energized .
Based on RVLlS indication, which ONE of the following RCP hand switch positions would lead to a false CORE COOLING CSF status tree condition?
Rep 1E handswitches               Rep non-1 E handswitches A.             Open                                   Open B.             Closed                               Open C.             Open                                   Closed D.             Closed                               Closed Page: 2 0f 75                                                                         6/22/2009
 
3.
Given the following:
        - Dropped rod recovery in progress.
        - The OATC initiates rod withdrawal for the affected rod.
        - The ROD CONTROL URGENT FAILURE annunciator illuminates.
Which ONE of the following completes the following statements?
Which ONE of the following completes the following statements?
This is due to a __ (a), __ failure in the unaffected rod group in the affected bank. Once rod withdrawal is complete , the OATC should reset the ROD CONTROL URGENT FAILURE alarm using the (b), __ A. (a) regulation (b) ROD CONTROL STARTUP switch B. (a) regulation (b) ROD CONTROL ALARM RESET switch C. (a) multiplexing (b) ROD CONTROL STARTUP switch D. (a) multiplexing (b) ROD CONTROL ALARM RESET switch Page: 30f75 6/22/2009
This is due to a_ _ (a),_ _ failure in the unaffected rod group in the affected bank.
: 4. Initial conditions:  
Once rod withdrawal is complete, the OATC should reset the ROD CONTROL URGENT FAILURE alarm using the             (b),_ _
-RCS heatup is in progress.  
A. (a) regulation (b) ROD CONTROL STARTUP switch B. (a) regulation (b) ROD CONTROL ALARM RESET switch C. (a) multiplexing (b) ROD CONTROL STARTUP switch D. (a) multiplexing (b) ROD CONTROL ALARM RESET switch Page: 30f75                                                                           6/22/2009
-Filling and venting of the RCS in progress.  
 
-The OATC is ready to start the first RCP. Which ONE of the following sets of parameters will ALLOW starting of the first RCP in accordance with SOP-13003, Reactor Coolant Pumps? RCS Pressure (psig) VCT Pressure (psig) Seal Injection Flow (gpm) A. 360 17 14 B. 340 19 10 C. 320 21 7 D. 300 15 11 Page: 4of75 6/22/2009
4.
: 5. Given the following:  
Initial conditions:
-AOP-18007-C, "Chemical Volume Control System Malfunction," Section A for "Total Loss of Letdown Flow" has been entered. -Seal injection flows are as follows: RCP # 1 -8.5 gpm RCP # 2 -9.0 gpm RCP # 3 -8.5 gpm RCP # 4 -9.0 gpm -Charg i ng flow is currently  
        - RCS heatup is in progress.
-120 gpm -The OATC is reducing charging flow using FIC-0121, Charging Flow Controller while maintaining the current seal injection flows using HC-0182, "Seal Water Controller." In accordance with 18007-C , which ONE of the following is the required action the OATC should take in accordance with 18007-C and the basis fo r the final charging flow rate? A. Reduce charging flow to -35 gpm. Prevent Regenerative Heat E x changer damage due to high thermal stress e s. B. Reduce charging flow to -45 gpm Prevent Regenerative Heat Exchanger damage due to high thermal stresses.
        - Filling and venting of the RCS in progress.
C. Reduce charging flow to -35 gpm. Prevent an additional high stress thermal cycle on the charging line nozzles. D. Reduce charging flow to -45 gpm. Prevent an additional high stress thermal cycle on the charging line nozzles. P age: 5 0 f75 6/22/2 00 9 
        - The OATC is ready to start the first RCP.
: 6. Initial conditions
Which ONE of the following sets of parameters will ALLOW starting of the first RCP in accordance with SOP-13003, Reactor Coolant Pumps?
: -The unit is at 100% power. -Control rods are in automatic.  
RCS Pressure (psig)       VCT Pressure (psig)   Seal Injection Flow (gpm)
-Boric Acid Potentiometer is required to be set at 3.69 -Boric Acid Potentiometer actual setting is 2.69 Current conditions:  
A.         360                         17                         14 B.         340                         19                         10 C.         320                         21                         7 D.         300                         15                         11 Page: 4of75                                                                           6/22/2009
-An automatic makeup to the VCT occurs. Which ONE of the choices completes the following statements?
 
To offset the reactivity change from the auto makeup control rods would need to be (a), __ At EOL , the effects of the Boric Acid Potentiometer setting error causes rods to move (b) than at BOL. A. (a) INSERTED (b) more B. (a) INSERTED (b) less C. (a) WITHDRAWN (b) more D. (a) WITHDRAWN (b) less. Pa g e: 60 f75 612 2/2009
5.
: 7. The Unit is in Mode 1. Regarding the following valve: -RHR PMP-A UPSTREAM SUCTION FROM HOT LEG LOOP 1, 1 HV-8701 B. Which ONE of the following CORRECTLY describes the power supply and the normal valve status for present plant conditions?
Given the following:
A. 125V DC Inverter C0115 , valve is normally energized.
          - AOP-18007-C, "Chemical Volume Control System Malfunction," Section A for "Total Loss of Letdown Flow" has been entered.
          - Seal injection flows are as follows:
RCP # 1- 8.5 gpm RCP # 2- 9.0 gpm RCP # 3- 8.5 gpm RCP # 4- 9.0 gpm
          - Charging flow is currently - 120 gpm
          - The OATC is reducing charging flow using FIC-0121, Charging Flow Controller while maintaining the current seal injection flows using HC-0182, "Seal Water Controller."
In accordance with 18007-C, which ONE of the following is the required action the OATC should take in accordance with 18007-C and the basis for the final charging flow rate?
A. Reduce charging flow to - 35 gpm.
Prevent Regenerative Heat Exchanger damage due to high thermal stresses.
B. Reduce charging flow to - 45 gpm Prevent Regenerative Heat Exchanger damage due to high thermal stresses.
C. Reduce charging flow to - 35 gpm.
Prevent an additional high stress thermal cycle on the charging line nozzles.
D. Reduce charging flow to - 45 gpm.
Prevent an additional high stress thermal cycle on the charging line nozzles.
Page: 5 0f75                                                                                6/22/2009
 
6.
Initial conditions:
        - The unit is at 100% power.
        - Control rods are in automatic.
        - Boric Acid Potentiometer is required to be set at 3.69
        - Boric Acid Potentiometer actual setting is 2.69 Current conditions:
        - An automatic makeup to the VCT occurs.
Which ONE of the choices completes the following statements?
To offset the reactivity change from the auto makeup control rods would need to be         (a),_ _
At EOL, the effects of the Boric Acid Potentiometer setting error causes rods to move           (b)   than at BOL.
A. (a) INSERTED (b) more B. (a) INSERTED (b) less C. (a) WITHDRAWN (b) more D. (a) WITHDRAWN (b) less.
Page: 60f75                                                                              612 2/2009
 
7.
The Unit is in Mode 1.
Regarding the following valve:
          - RHR PMP-A UPSTREAM SUCTION FROM HOT LEG LOOP 1, 1 HV-8701 B.
Which ONE of the following CORRECTLY describes the power supply and the normal valve status for present plant conditions?
A. 125V DC Inverter C0115, valve is normally energized.
B. 125V DC Inverter C0115 , valve is normally de-energized.
B. 125V DC Inverter C0115 , valve is normally de-energized.
C. 125V DC Inverter 00116, valve is normally energized.
C. 125V DC Inverter 00116, valve is normally energized.
O. 125V DC Inverter 00116, valve is normally de-energized. , Page: 7 of 75 6/22/2009
O. 125V DC Inverter 00116, valve is normally de-energized.
: 8. The plant is in Mode 5. The following annunciator is i lluminated and cannot be reset; -B COLD OP ACTU VLV HV-8000B NOT FULL OPEN Which ONE of the conditions below would require entry into the COPS LCO? (Assume all valve lift setpoints are set correctly)
Page: 7 of 75                                                                     6/22/2009
A. Train A RHR loop suction isolation valves open. PORV A handswitch in auto , Train A COPS in ARM. B. RHR Train A loop suction isolation valves open. PORV B handswitch in auto , Train B COPS in ARM. C. RHR T r ain A and Train B loop suction isolation valves open. PORV A handswitch in auto, Train A COPS in BLOCK D. RHR Train A and Train B loop suction isolation valves open. PORV B handswitch in auto , Train B COPS in BLOCK. Pa g e: 8 0f 75 6/2 21 200 9 
 
: 9. Initial conditions:  
8.
-The plant is at 100% power Current conditions
The plant is in Mode 5.
: During Reactor Trip Breaker "A" testing. the following indications occur. -Reactor Trip Breaker "A" green light is illuminated.  
The following annunciator is illuminated and cannot be reset;
-Reactor Trip Breaker "B" green light is illuminated.  
          - B COLD OP ACTU VLV HV-8000B NOT FULL OPEN Which ONE of the conditions below would require entry into the COPS LCO?
-Reactor Trip Bypass Breaker "A" red light is illuminated. -Reactor Trip Bypass Breaker "B" has no light indication.
(Assume all valve lift setpoints are set correctly)
No operator actions have been taken. Which ONE of the following is CORRECT regarding plant status and ne x t required operator actions (if any)? Plant Status Required Action (if any) A. The Reactor i s tripped. Check Turbine Tripped. B. The Reactor is tripped. Trip the Reactor using both trip handswitches.
A. Train A RHR loop suction isolation valves open.
C. The Reactor is at power. No action i s required. D. The Reactor is at power. Trip the Reactor using either trip handswitch.
PORV A handswitch in auto, Train A COPS in ARM .
Page: 9 0f 7 5 6/2 2/2009
B. RHR Train A loop suction isolation valves open .
: 10. Given the following conditions. -PRZR Safety Valve, PSV-8010A, is stuck slightly open. -RCS pressure is stable at 1920 psig. -PZR Vapor Space Temperature is 630 o F. -PRT pressure is 35 psig and slowly rising. -Containment pressure is 0 psig. -PSV-801 OA tailp i pe temperature is reading -281 o F. Select the correct choice for: (a) the tail pipe temperature reading, and (b) the expected response of the tailpipe temperature if the safety valve does not close. REFERENCE PROVIDED A. The tail pipe indication is reading correctly. The temperature should rise to -338 o F, then remain stable. B. The tail pipe indication is reading correctly. The temperature should rise to -338&deg;F, then quickly lower to -212 o F. C. The tail pipe indication should read -258&deg;F. The temperature should rise to -328&deg;F, then remain stable. D. The tail pipe indication should read -258&deg;F. The temperature should rise to -328&deg;F, then quickly lower to -212 o F. Page: 10 of 75 6/22/200 9 
PORV B handswitch in auto , Train B COPS in ARM.
: 11. Given the following:  
C. RHR Train A and Train B loop suction isolation valves open.
-Maintenance on CCW Train A is to be performed.
PORV A handswitch in auto, Train A COPS in BLOCK D. RHR Train A and Train B loop suction isolation valves open.
During draining of the CCW Train A system, drain flow would normally be routed to (a) __ When CCW Train A fill and vent is performed, an operator should be stationed at the CCW Hx vent point and the Control Room should (b) __ A. (a) the Radwaste Processing Facility (RPF) for processing and reuse. (b) start 2 CCW pumps simultaneously, remain in this configuration after fill & vent has been completed.
PORV B handswitch in auto, Train B COPS in BLOCK.
B. (a) the Clean Water Sump for disposal to the Waste Water Retention Basins. (b) start 2 CCW pumps simultaneously, remain in this configuration after fill & vent has been completed.
Page: 8 0f 75                                                                     6/2212009
C. (a) the Radwaste Processing Facility (RPF) for processing and reuse. (b) start 3 CCW pumps simultaneously, reduce to 2 CCW pumps after fill & vent has been completed.
 
D. (a) the Clean Water Sump for disposal to the Waste Water Retention Basins. (b) start 3 CCW pumps simultaneously, reduce to 2 CCW pumps after fill & vent has been completed.
9.
Page: 11 of 75 6/22/2009
Initial conditions:
: 12. Given the following plant conditions:  
          - The plant is at 100% power Current conditions:
-Unit 1 has a stuck open PRZR Code Safety Valve. -Appropriate operator response actions have been taken. -RCS pressure is stable at 1345 psig -Containment temperature is 160 0 F -Actual PRZR level is 50% The effect of RCS pressure at 1345 psig will cause the indicated PRZR level LI-459 to read...li!L actual level; the effect of containment temperature at 160 0 F tends to make the indicated PRZR level read than actual level. A. (a) below (b) lower B. (a) below (b) higher C. (a) above (b) lower D. (a) above (b) higher Page: 12 of 75 6/22/2009
During Reactor Trip Breaker "A" testing. the following indications occur.
: 13. Given the following:  
          - Reactor Trip Breaker "A" green light is illuminated.
-The unit is at full power. -A loss of ACCW occurs at 1432. -The crew has entered AOP-18022-C, "Loss of Auxiliary Component Cooling Water" and is attempting to restore ACCW flow. -RCP temperatures are below their immediate trip criteria but are slowly rising. -RCP seal injection flow is -9 gpm per RCP. Which one of the following correctly describes: (a) the MAXIMUM time allowed to trip the RCPs and (b) the MINIMUM temperature setpoint for the motor bearing that requires RCP trip. A. (a) 1437 (b) 195 0 F B. (a) 1437 (b) 311&deg;F C. (a) 1442 (b) 195 0 F D. (a) 1442 (b) 311&deg;F Page: 13 of 75 6122/2009
          - Reactor Trip Breaker "B" green light is illuminated.
: 14. Given the following:  
          - Reactor Trip Bypass Breaker "A" red light is illuminated .
-Small break LOCA in progress. -A loss of all offsite power has occurred.  
          - Reactor Trip Bypass Breaker "B" has no light indication.
-DG1 B is tagged out. -The SAT is unavailable.  
No operator actions have been taken.
-The crew transitions to 19012-C, "Post LOCA Cooldown and Depressurization".  
Which ONE of the following is CORRECT regarding plant status and next required operator actions (if any)?
-The step for "Isolate SI Accumulators" is being performed. -The UO has been dispatched to energize the SI Accumulator isolation valves (HV-BBOBA, B , C, D). Which ONE of the following is CORRECT regarding isolation of the SI Accumulators?
Plant Status                     Required Action (if any)
A. The Reactor is tripped.             Check Turbine Tripped.
B. The Reactor is tripped .           Trip the Reactor using both trip handswitches.
C. The Reactor is at power.           No action is required .
D. The Reactor is at power.           Trip the Reactor using either trip handswitch.
Page: 9 0f 75                                                                              6/2 2/2009
 
10.
Given the following conditions.
          - PRZR Safety Valve, PSV-8010A, is stuck slightly open.
          - RCS pressure is stable at 1920 psig.
          - PZR Vapor Space Temperature is 630 oF.
          - PRT pressure is 35 psig and slowly rising .
          - Containment pressure is 0 psig .
          - PSV-801 OA tailpipe temperature is reading - 281 o F.
Select the correct choice for:
(a) the tail pipe temperature reading, and (b) the expected response of the tailpipe temperature if the safety valve does not close.
REFERENCE PROVIDED A. The tail pipe indication is reading correctly.
The temperature should rise to - 338 oF, then remain stable.
B. The tail pipe indication is reading correctly.
The temperature should rise to - 338&deg;F, then quickly lower to - 212 oF.
C. The tail pipe indication should read - 258&deg;F.
The temperature should rise to - 328&deg;F, then remain stable.
D. The tail pipe indication should read - 258&deg;F.
The temperature should rise to - 328&deg;F, then quickly lower to - 212 oF.
Page: 10 of 75                                                                           6/22/2009
 
11.
Given the following:
          - Maintenance on CCW Train A is to be performed.
During draining of the CCW Train A system, drain flow would normally be routed to       (a) _ _
When CCW Train A fill and vent is performed, an operator should be stationed at the CCW Hx vent point and the Control Room should         (b) _ _
A. (a) the Radwaste Processing Facility (RPF) for processing and reuse.
(b) start 2 CCW pumps simultaneously, remain in this configuration after fill & vent has been completed.
B. (a) the Clean Water Sump for disposal to the Waste Water Retention Basins.
(b) start 2 CCW pumps simultaneously, remain in this configuration after fill & vent has been completed.
C. (a) the Radwaste Processing Facility (RPF) for processing and reuse.
(b) start 3 CCW pumps simultaneously, reduce to 2 CCW pumps after fill & vent has been completed.
D. (a) the Clean Water Sump for disposal to the Waste Water Retention Basins.
(b) start 3 CCW pumps simultaneously, reduce to 2 CCW pumps after fill & vent has been completed.
Page: 11 of 75                                                                             6/22/2009
 
12.
Given the following plant conditions:
          - Unit 1 has a stuck open PRZR Code Safety Valve.
          - Appropriate operator response actions have been taken.
          - RCS pressure is stable at 1345 psig
          - Containment temperature is 160 0 F
          - Actual PRZR level is 50%
The effect of RCS pressure at 1345 psig will cause the indicated PRZR level LI-459 to read...li!L actual level; the effect of containment temperature at 160 0 F tends to make the indicated PRZR level read ~ than actual level.
A. (a) below (b) lower B. (a) below (b) higher C. (a) above (b) lower D. (a) above (b) higher Page: 12 of 75                                                                               6/22/2009
 
13.
Given the following:
          - The unit is at full power.
          - A loss of ACCW occurs at 1432.
          - The crew has entered AOP-18022-C, "Loss of Auxiliary Component Cooling Water" and is attempting to restore ACCW flow.
          - RCP temperatures are below their immediate trip criteria but are slowly rising.
          - RCP seal injection flow is - 9 gpm per RCP.
Which one of the following correctly describes:
(a) the MAXIMUM time allowed to trip the RCPs and (b) the MINIMUM temperature setpoint for the motor bearing that requires RCP trip.
A. (a) 1437     (b) 1950 F B. (a) 1437     (b) 311&deg;F C. (a) 1442     (b) 195 0 F D. (a) 1442     (b) 311&deg;F Page: 13 of 75                                                                               6122/2009
 
14.
Given the following:
          - Small break LOCA in progress.
          - A loss of all offsite power has occurred.
          - DG1 B is tagged out.
          - The SAT is unavailable.
          - The crew transitions to 19012-C, "Post LOCA Cooldown and Depressurization".
          - The step for "Isolate SI Accumulators" is being performed .
          - The UO has been dispatched to energize the SI Accumulator isolation valves (HV-BBOBA, B, C, D).
Which ONE of the following is CORRECT regarding isolation of the SI Accumulators?
A. All accumulator isolation valves can be energized.
A. All accumulator isolation valves can be energized.
Close all accumulator isolation valves, leave the valves energized.
Close all accumulator isolation valves, leave the valves energized.
B. All accumulator isolation valves can be energized. Close all accumulator isolation valves , then de-energize the valves. C. Two accumulator isolation valves cannot be energ ized. Close energized accumulator isolation valves, vent all of the accumulators.
B. All accumulator isolation valves can be energized .
Close all accumulator isolation valves, then de-energize the valves.
C. Two accumulator isolation valves cannot be energized.
Close energized accumulator isolation valves, vent all of the accumulators.
D. Two accumulator isolation valves cannot be energized.
D. Two accumulator isolation valves cannot be energized.
Close energized accumulator isolation valves, vent two of the accumulators. Page: 14 of 75 6/22/2009
Close energized accumulator isolation valves, vent two of the accumulators.
: 15. Actual Pressurizer Code Safety Valve position indication can be read on the (a) which is I are powered from (b), __ A. (a) Plasma Displays A and B (b) AY1 A and BY1 B , 120V AC Vital Instrument Panels B. (a) Plasma Displays A and B (b) NYR and NYS , 120V AC Regulated Instrument Panels C. (a) Main Control Board Panel C (b) AY1A and BY1B, 120V AC Vital Instrument Panels D. (a) Main Control Board Panel C (b) NYR and NYS, 120V AC Regulated Instrument Panels Page: 15 of 7 5 6/22/200 9 
Page: 14 of 75                                                                           6/22/2009
: 16. Given the following conditions I events on Unit 1:
 
15.
Actual Pressurizer Code Safety Valve position indication can be read on the       (a)     which is I are powered from     (b), _ _
A. (a) Plasma Displays A and B (b) AY1 A and BY1 B, 120V AC Vital Instrument Panels B. (a) Plasma Displays A and B (b) NYR and NYS, 120V AC Regulated Instrument Panels C. (a) Main Control Board Panel C (b) AY1A and BY1B, 120V AC Vital Instrument Panels D. (a) Main Control Board Panel C (b) NYR and NYS, 120V AC Regulated Instrument Panels Page: 15 of 75                                                                  6/22/2009
 
16.
Given the following conditions I events on Unit 1:
* Reactor power is 100%.
* Reactor power is 100%.
* PRZR pressure control is selected to 457 I 456 position.
* PRZR pressure control is selected to 457 I 456 position.
* PRZR pressure is at 2235 psig.
* PRZR pressure is at 2235 psig.
* 1 PT-456 fails high. Which ONE of the following is the CORRECT plant I system response?
* 1PT-456 fails high.
A. PORV 1 PV-455 opens. Both spray valves remain closed and all PRZR heaters will energize.
Which ONE of the following is the CORRECT plant I system response?
Pressu r e w i ll stabilize near 2185 psig. B. PORV 1 PV-456 opens. Both spray valves remain closed and all PRZR heaters will energize.
A. PORV 1PV-455 opens.
Pressure will stabilize near 2185 psig. C. PORV 1 PV-455 opens. Both spray valves open and all PRZR heaters turn off. Pressure will continue to lower causing a Reactor Trip and Safety Injection. D. PORV 1 PV-456 opens. Both spray valves open and all PRZR heaters turn off. Pressure will continue to lower caus ing a Reactor Trip and Safety Injection. Page: 16 of 75 6/22/2009
Both spray valves remain closed and all PRZR heaters will energize.
: 17. Given the following: -A DBA LOCA i s in progress on Unit 2. -ECCS has been aligned for "cold leg recirculation". -RHR pump 2A tripped 5 minutes after completing the recirculation alignment.  
Pressure will stabilize near 2185 psig.
-All other components are functioning properly. Which ONE of the operator actions would be CORRECT regarding the Safety Injection pumps (SIPs) and the Centrifugal Charging pumps (CCPs)? A. Immediately stop both SIPs. B. Immediately stop both CCPs. C. Immediately stop CCP "A" and SIP " A". D. Allow all CCPs and SIPs to continue running. P age: 17 of 75 6/22/200 9 
B. PORV 1PV-456 opens.
: 18. Given the following:  
Both spray valves remain closed and all PRZR heaters will energize.
-A HIGH failure (offsca le high) of Pressurizer (PRZR) Pressure Channel PT-457 has occurred. -Immediate Operator Actions of AOP-18001-C for failure of a Pressurizer Pressure channel have been taken. -NO other actions have been taken. Which ONE of the following identifies the MINIMUM additional channels needed to cause a: a) Reactor Trip b) Safety Injection Reactor Trip Safety Injection A. 1 1 B. 1 2 C. 2 1 D. 2 2 Page: 18 of 75 6/22/2009
Pressure will stabilize near 2185 psig.
: 19. A Turbine Driven Auxiliary Feed Water (TDAFW) Actuation has been generated.  
C. PORV 1PV-455 opens.
-HV-5106, "TDAFW Pump Steam Supply Valve" has stroked open. Which ONE of the following conditions is necessary to RESET the TDAFW actuation and close HV-5106? A. At least ONE Main Feed Water Pump Turbine RESET. B. RESET Safety Injection using both QMCB handswitches.
Both spray valves open and all PRZR heaters turn off.
Pressure will continue to lower causing a Reactor Trip and Safety Injection .
D. PORV 1PV-456 opens.
Both spray valves open and all PRZR heaters turn off.
Pressure will continue to lower causing a Reactor Trip and Safety Injection .
Page: 16 of 75                                                                             6/22/2009
 
17.
Given the following :
          - A DBA LOCA is in progress on Unit 2.
          - ECCS has been aligned for "cold leg recirculation" .
          - RHR pump 2A tripped 5 minutes after completing the recirculation alignment.
          - All other components are functioning properly.
Which ONE of the operator actions would be CORRECT regarding the Safety Injection pumps (SIPs) and the Centrifugal Charging pumps (CCPs)?
A. Immediately stop both SIPs.
B. Immediately stop both CCPs.
C. Immediately stop CCP "A" and SIP "A".
D. Allow all CCPs and SIPs to continue running .
Page: 17 of 75                                                                         6/22/2009
 
18.
Given the following:
          - A HIGH failure (offscale high) of Pressurizer (PRZR) Pressure Channel PT-457 has occurred .
          - Immediate Operator Actions of AOP-18001-C for failure of a Pressurizer Pressure channel have been taken.
          - NO other actions have been taken.
Which ONE of the following identifies the MINIMUM additional channels needed to cause a:
a) Reactor Trip b) Safety Injection Reactor Trip     Safety Injection A.       1                 1 B.       1                 2 C.       2                 1 D.       2                 2 Page: 18 of 75                                                                         6/22/2009
 
19.
A Turbine Driven Auxiliary Feed Water (TDAFW) Actuation has been generated.
          - HV-5106, "TDAFW Pump Steam Supply Valve" has stroked open.
Which ONE of the following conditions is necessary to RESET the TDAFW actuation and close HV-5106?
A. At least ONE Main Feed Water Pump Turbine RESET.
B. RESET Safety Injection using both QMCB handswitches.
C. ALL Steam Generator levels above the Low-Low level setpoints.
C. ALL Steam Generator levels above the Low-Low level setpoints.
D. ATWS Mitigation System Actuation Circuit (AMSAC) signal CLEAR. Page: 19 of 75 6122/2009
D. ATWS Mitigation System Actuation Circuit (AMSAC) signal CLEAR.
: 20. Given the following: -A loss of all AC power has occurred. -The crew is performing 19102 , "Loss of All AC Power Recovery With SI Required".  
Page: 19 of 75                                                                       6122/2009
-Both CCPs are stopped. -All RCP Seal Injection Isolations are OPEN (HV-81 03A, B, C, D) -RCP seal temperatures are -465 0 F Which ONE of the following is the CORRECT mitigat i on strategy for restoration of charging flow and seal injection to cool the RCP seals? A. Take HC-0182 , Seal Injection Controller to m i nimum , start a CCP , throttle HC-0182 to establish a slow cooldown rate on the RCP seals. B. Close all the HV-8103 valves, start a CCP , slowly throttle open the HV-8103 valves one at a time to establish a slow cooldown rate on the RCP seals. C. Close the seal injection needle valves , start a CCP, slowly throttle open the seal injection needle valves to establish a slow cool down rate on the RCP seals. D. Close all the HV-8103 valves , start a CCP, perform a controlled cooldown of the RCS to cool the RCP seals , RCPs should not be started prior to a status evaluation.
 
P ag e: 20 o f 75 6/2212009
20.
: 21. Given the following:  
Given the following:
-The reactor is stable with critical data being taken. -The crew is preparing to raise power to the POAH. -1 BY1 B, 120V Vital Instrument bus de-energizes.
          - A loss of all AC power has occurred .
Wh i ch ONE of the following describes the effects on the Intermediate Range indications and the reason for the indications?
          - The crew is performing 19102, "Loss of All AC Power Recovery With SI Required".
A. IR N-35 , remains energized and indication decreases. IR N-36, remains energized and indication decreases.
          - Both CCPs are stopped .
          - All RCP Seal Injection Isolations are OPEN (HV-81 03A, B, C, D)
          - RCP seal temperatures are - 465 0 F Which ONE of the following is the CORRECT mitigation strategy for restoration of charging flow and seal injection to cool the RCP seals?
A. Take HC-0182 , Seal Injection Controller to minimum , start a CCP, throttle HC-0182 to establish a slow cooldown rate on the RCP seals.
B. Close all the HV-8103 valves, start a CCP, slowly throttle open the HV-8103 valves one at a time to establish a slow cooldown rate on the RCP seals.
C. Close the seal injection needle valves, start a CCP, slowly throttle open the seal injection needle valves to establish a slow cool down rate on the RCP seals.
D. Close all the HV-8103 valves, start a CCP, perform a controlled cooldown of the RCS to cool the RCP seals, RCPs should not be started prior to a status evaluation.
Page: 20 of 75                                                                           6/2212009
 
21.
Given the following:
          - The reactor is stable with critical data being taken.
          - The crew is preparing to raise power to the POAH.
          - 1BY1 B, 120V Vital Instrument bus de-energizes.
Which ONE of the following describes the effects on the Intermediate Range indications and the reason for the indications?
A. IR N-35, remains energized and indication decreases.
IR N-36, remains energized and indication decreases.
B. IR N-35, remains energized with indication stable.
B. IR N-35, remains energized with indication stable.
IR N-36 , remains energized with indication stable. C. IR N-35, remains energized and indication decreases. IR N-36, will de-energize. D. IR N-35, remains energized with indication stable. IR N-36, will de-energize.
IR N-36, remains energized with indication stable.
Page: 21 of 75 6/22/2009
C. IR N-35, remains energized and indication decreases.
: 22. Which of the following choices correctly identifies the expected equipment condition for the initial and current CNMT pressures?
IR N-36, will de-energize.
Assume no operator actions taken. Initial CNMT pressure:
D. IR N-35, remains energized with indication stable.
Ch I -3.5 ps i g Ch II -3.9 psig Ch III -3.7 psig Ch IV -3.6 psig Current CNMT pressure:
IR N-36, will de-energize.
Ch I -21.3 psig Ch II -21.7 psig Ch III -20.9 psig Ch IV -22.1 psig A. In i tial -Containment Cooler Lo Speed QMCB MLBs LIT. Current -Containment Spray Pump QMCB handswitch RED lights LIT. B. Initial -Containment Cooler Lo Speed QMCB MLBs LIT. Current -Containment Spray Pump QMCB handswitch GREEN lights LIT. C. Initial -Containment Cooler Lo Speed QMCB MLBs EXTINGUISHED. Current -Containment Spray Pump QMCB handswitch RED li ghts LIT. D. Initial -Containment Cooler Lo Speed QMCB MLBs EXTINGUISHED.
Page: 21 of 75                                                                     6/22/2009
Current -Containment Spray Pump QMCB handswitch GREEN lights LIT. P age: 22 of 75 6/22/2009
 
: 23. A failure of a flow transmitter has resulted in the following annunciators:  
22.
-RCP SEAL WATER INJ LO FLOW -REGEN HX LETDN HI TEMP -LETDN HX OUT HI TEMP -CHARGING LINE HIILO FLOW All other plant parameters are normal. Which ONE of the following actions would CORRECTLY mitigate this event? A. Throttle open HV-0182 (seal flow control).
Which of the following choices correctly identifies the expected equipment condition for the initial and current CNMT pressures? Assume no operator actions taken.
Initial CNMT pressure:
Ch I - 3.5 psig  Ch II - 3.9 psig Ch III - 3.7 psig   Ch IV - 3.6 psig Current CNMT pressure:
Ch I - 21.3 psig   Ch II - 21.7 psig Ch III - 20 .9 psig Ch IV - 22.1 psig A. In itial - Containment Cooler Lo Speed QMCB MLBs LIT.
Current - Containment Spray Pump QMCB handswitch RED lights LIT.
B. Initial - Containment Cooler Lo Speed QMCB MLBs LIT.
Current - Containment Spray Pump QMCB handswitch GREEN lights LIT.
C. Initial - Containment Cooler Lo Speed QMCB MLBs EXTINGUISHED.
Current - Containment Spray Pump QMCB handswitch RED lights LIT.
D. Initial - Containment Cooler Lo Speed QMCB MLBs EXTINGUISHED.
Current - Containment Spray Pump QMCB handswitch GREEN lights LIT.
Page: 22 of 75                                                                           6/22/2009
 
23.
A failure of a flow transmitter has resulted in the following annunciators:
          - RCP SEAL WATER INJ LO FLOW
          - REGEN HX LETDN HI TEMP
          - LETDN HX OUT HI TEMP
          - CHARGING LINE HIILO FLOW All other plant parameters are normal.
Which ONE of the following actions would CORRECTLY mitigate this event?
A. Throttle open HV-0182 (seal flow control).
B. Throttle closed HV-0182 (seal flow control).
B. Throttle closed HV-0182 (seal flow control).
C. Throttle open FV-0121 (charging flow control). D. Throttle closed FV-0121 (charging flow control).
C. Throttle open FV-0121 (charging flow control).
P age: 23 o f 75 6/22/2009
D. Throttle closed FV-0121 (charging flow control).
: 24. Given the following conditions
Page: 23 of 75                                                                       6/22/2009
: -The Reactor was shutdown to Mode 3 conditions 28 days ago. -Core reload has just been completed.  
 
-Unit 1 is in midloop operation.  
24.
-All HL and CL nozzle dams are in place. -A total loss of RHR cooling has occurred.  
Given the following conditions:
-RCS temperature was 1 OooF when the loss of cooling event initiated.
          - The Reactor was shutdown to Mode 3 conditions 28 days ago.
Calculate the amount of time it will take from the loss of RHR until saturated conditions are reached in the RCS AND the amount of time until core uncovery occurs. REFERENCE PROVIDED Time Until Saturated Time Until Core Uncovery A. 38 minutes 145 minutes B. 38 minutes 228 minutes C. 58 minutes 145 minutes D. 58 minutes 228 minutes Page: 24 of 75 6/22/2009
          - Core reload has just been completed.
: 25. Which ONE of the following describes the transition process for the Containment Spray system from the injection flow path to the recirculation flow path after a LOCA? A. At the RWST LO-LO Level of 29%, the operator manually realigns the flow path. B. At the RWST LO-LO Level of 29%, the flow path semi-automatically realigns. C. At the RWST EMPTY level of 8%, the operator manually realigns the flow path. D. At the RWST EMPTY level of 8%, the flow path semi-automatically realigns.
          - Unit 1 is in midloop operation.
Page: 25 of 75 6/22/2009
          - All HL and CL nozzle dams are in place.
: 26. Initial conditions
          - A total loss of RHR cooling has occurred.
: -457 / 456 position selected for PRZR pressure control. -All channels are reading 2235 psig. Current conditions:  
          - RCS temperature was 1OooF when the loss of cooling event initiated.
-PT-455(Ch I) 2190 psig PT -456( Ch II) 2190 psig PT-457(Ch III) Offscale High PT-458(Ch IV) 2285 psig -Immediate actions to stabilize PRZR pressure have been completed.  
Calculate the amount of time it will take from the loss of RHR until saturated conditions are reached in the RCS AND the amount of time until core uncovery occurs.
-AOP 18001-C , section C for PRZR Pressure Instrumentation, is in effect. -The step to select controlling channels and recorders is being performed.
REFERENCE PROVIDED Time Until Saturated         Time Until Core Uncovery A. 38 minutes                     145 minutes B. 38 minutes                     228 minutes C. 58 minutes                     145 minutes D. 58 minutes                     228 minutes Page: 24 of 75                                                                             6/22/2009
Which ONE of the following would be the CORRECT controlling channels to choose and the reason why? Channel Selection Reason for Channel Selection A. 455/456 Defeat input to the Reactor Protection System. B. 455/456 Swap to operable control channel inputs. C. 455/458 Defeat input to the Reactor Protection System. D. 455/458 Swap to operable control channel inputs. Pag e: 26 of 75 6/2212009
 
: 27. Given the following:  
25.
-CNMT H2 concentration has remained>
Which ONE of the following describes the transition process for the Containment Spray system from the injection flow path to the recirculation flow path after a LOCA?
4% following a LOCA. -An SO has been dispatched for local operation of 1-150B-U4-012, "POST LOCA PURGE CTB ISO VALVE". In accordance with SOP 13130-1, Post-Accident Hydrogen Control" , to protect the SO from radiation exposure, which one of the following correctly describes: The proper sequence of actions and the location where the SO will manipulate the local valve? A. First action -UO opens the Post LOCA valves on HVAC panel. Next action -SO opens the valve on the Equipment Building roof. B. First action -UO opens the Post LOCA valves on HVAC panel. Next action -SO opens the valve in the Equipment Building ground level. C. First action -SO opens the valve on the Equipment Building roof. Next action -UO opens the Post LOCA valves on HVAC panel. D. First action -SO opens the valve in the Equipment Building ground level. Next action -UO opens the Post LOCA valves on HVAC panel. Page: 27 of 7S 6/22/2009
A. At the RWST LO-LO Level of 29% , the operator manually realigns the flow path .
: 28. Given the following conditions
B. At the RWST LO-LO Level of 29%, the flow path semi-automatically realigns.
: -Both Reactor Tr i p Breaker red lights are illuminated. -Both Reactor Trip Breaker green lights are extinguished.  
C. At the RWST EMPTY level of 8%, the operator manually realigns the flow path .
-The OATC momentarily places the reactor trip handswitch in the TRIP position and Reactor Trip Breaker indications DO NOT CHANGE. Which of the following choices describes the actions that should have occurred when the OATC placed the handswitch to TRIP? A. The Undervoltage coils energized.
D. At the RWST EMPTY level of 8%, the flow path semi-automatically realigns.
Page: 25 of 75                                                                             6/22/2009
 
26.
Initial conditions:
          - 457 / 456 position selected for PRZR pressure control.
          - All channels are reading 2235 psig .
Current conditions:
          - PT-455(Ch I)       PT-456( Ch II)     PT-457(Ch III)       PT-458(Ch IV) 2190 psig          2190 psig          Offscale High        2285 psig
          - Immediate actions to stabilize PRZR pressure have been completed.
          - AOP 18001-C, section C for PRZR Pressure Instrumentation, is in effect.
          - The step to select controlling channels and recorders is being performed.
Which ONE of the following would be the CORRECT controlling channels to choose and the reason why?
Channel Selection                 Reason for Channel Selection A. 455/456                             Defeat input to the Reactor Protection System.
B. 455/456                             Swap to operable control channel inputs.
C. 455/458                             Defeat input to the Reactor Protection System.
D. 455/458                             Swap to operable control channel inputs.
Page: 26 of 75                                                                             6/2212009
 
27.
Given the following:
          - CNMT H2 concentration has remained> 4% following a LOCA.
            - An SO has been dispatched for local operation of 1-150B-U4-012, "POST LOCA PURGE CTB ISO VALVE".
In accordance with SOP 13130-1, Post-Accident Hydrogen Control", to protect the SO from radiation exposure, which one of the following correctly describes:
The proper sequence of actions and the location where the SO will manipulate the local valve?
A. First action - UO opens the Post LOCA valves on HVAC panel.
Next action - SO opens the valve on the Equipment Building roof.
B. First action - UO opens the Post LOCA valves on HVAC panel.
Next action - SO opens the valve in the Equipment Building ground level.
C. First action - SO opens the valve on the Equipment Building roof.
Next action - UO opens the Post LOCA valves on HVAC panel.
D. First action - SO opens the valve in the Equipment Building ground level.
Next action - UO opens the Post LOCA valves on HVAC panel.
Page: 27 of 7S                                                                         6/22/2009
 
28.
Given the following conditions:
          - Both Reactor Trip Breaker red lights are illuminated .
          - Both Reactor Trip Breaker green lights are extinguished.
          - The OATC momentarily places the reactor trip handswitch in the TRIP position and Reactor Trip Breaker indications DO NOT CHANGE.
Which of the following choices describes the actions that should have occurred when the OATC placed the handswitch to TRIP?
A. The Undervoltage coils energized.
The Shunt coils energized.
The Shunt coils energized.
B. The Undervoltage coils de-energized. The Shunt coils energized. C. The Undervoltage coils energized.
B. The Undervoltage coils de-energized .
The Shunt coils de-energized. D. The Undervoltage coils de-energized.
The Shunt coils energized .
The Shunt coils de-energized. Pa g e: 28 of 75 6/22/2009
C. The Undervoltage coils energized.
: 29. Given the following:  
The Shunt coils de-energized .
-The unit is at 100% power. -CNMT pressure is 0.2 psig. -CNMT Mini-Purge is in service for respirable air quality control. -A Safety Injection occurs. Which one of the following is correct regarding the Containment Purge System damper status prior to the SI and the signal that will close the dampers? A. Only the Mini-Purge exhaust dampers were open. The dampers would receive a direct auto close signal from CIA. B. Only the Mini-Purge exhaust dampers were open. The dampers would receive a direct auto close signal from CVI. C. The Mini-Purge exhaust and supply dampers were open. The dampers would receive a direct auto close signal from CIA. D. The Mini-Purge exhaust and supply dampers were open. The dampers would receive a direct auto close signal from CVI. Page: 29 of 75 6/22/2009
D. The Undervoltage coils de-energized.
: 30. Given the following conditions
The Shunt coils de-energized .
: -Unit 1 core reload is in progress.  
Page: 28 of 75                                                                         6/22/2009
-Source Ranges N-31 and N-32 are reading significantly different.  
 
-I & C determines the power supply for detector N-31 has failed high. -N-32 is selected for Audio Count Rate in Containment and Control Room. Due to this power supply failure , N-31 is reading, ___ ,(a), __ than it should. The Operator At The Controls is (b), __ A. (a) lower (b) required to suspend core alterations B. (a) lower (b) not required to suspend core alterations C. (b) higher (b) required to suspend core alterations D. (b) higher (b) not required to suspend core alterations Page: 30 of 75 6122/2009
29 .
: 31. Unit 2 Refueling Outage is in progress:  
Given the following:
-Fuel shuffle is in progress in the Spent Fuel Pool (SFP) with the gate to the Containment currently closed. -SPENT FUEL PIT LOW LEVEL annunciator illuminates in Control Room. -SFP level lowers to 22 feet 10 inches above the fuel due to a leak -The SS has directed a makeup to the SFP in accordance with SOP-13719-2 , "Spent Fuel Pool Cooling and Purification System". Which ONE of the following describes whether SFP level is above or below the Tech Spec limit , and the source of makeup for this condition , in accordance with SOP-13719-2.
          - The unit is at 100% power.
SFP level is ... A. BELOW the minimum required by Technical Specifications. Makeup from the Demin Water Storage Tank (DWST). B. BELOW the minimum required by Technical Specifications.
          - CNMT pressure is 0.2 psig.
Makeup from the Refueling Water Storage Tank (RWST). C. ABOVE the minimum required by Technical Specifications.
          - CNMT Mini-Purge is in service for respirable air quality control.
Makeup from the Demin Water Storage Tank (DWST). D. ABOVE the minimum required by Technical Specifications. Makeup from the Refueling Water Storage Tank (RWST). P age: 31 of 7 5 6/2 21 2009 
          - A Safety Injection occurs.
: 32. Given the following:  
Which one of the following is correct regarding the Containment Purge System damper status prior to the SI and the signal that will close the dampers?
-The unit is at 100% power. -Loop # 3 Inboard MSIV (HV-3016A) goes fully closed. Given this condition AND before manual or automatic operation of any other system. -Loop # 2 SG steam FLOW would (a) and -Loop # 3 SG LEVEL initially would rapidly (b), __ A. (a) rise (b) rise B. (a) rise (b) lower C. (a) lower (b) rise D. (a) lower (b) lower Page: 32 of 75 6/22/2009
A. Only the Mini-Purge exhaust dampers were open.
: 33. Which one of the following choices for the SG code safeties: (a) lists all the correct lift setpoints (psig), and (b) describes the technical specification bases for these valves? A. (a) 1185,1200,1210,1220,1235. (b) limits secondary pressure to :: 110% design pressure during a full power turbine trip without steam dump. B. (a) 1185, 1200, 1215 , 1225 , 1235. (b) limits secondary pressure to:: 110% design pressure during a full power turbine trip without steam dump. C. (a) 1185,1200,1210,1220,1235. (b) provide an alternate method for cooling the unit to RHR entry conditions whenever the preferred heat sink via the steam dumps to the condenser is unavailable. D. (a) 1185 , 1200 , 1215, 1225, 1235. (b) provide an alternate method for cooling the unit to RHR entry conditions whenever the preferred heat sink via the steam dumps to the condenser is unavailable.
The dampers would receive a direct auto close signal from CIA.
Page: 33 of 75 6/22/2009
B. Only the Mini-Purge exhaust dampers were open .
: 34. A rapid power reduction per AOP 18013-C was completed to stabilize condenser vacuum. Rods were inserted below the rod insertion limit (RIL) during the power reduction.
The dampers would receive a direct auto close signal from CVI.
An Emergency Boration is in progress and the OATC is withdrawing rods to restore rods above the RIL. Which ONE of the following is CORRECT regarding: a) whether SS permission is required for Control Rod insertion during the down power? and b) when Emergency Boration may be terminated?
C. The Mini-Purge exhaust and supply dampers were open.
Control Rod Insertion Emergency Boration Termination A. SS permission is NOT required. When Rod Bank LO Limit alarm clears. B. SS permission is NOT required.
The dampers would receive a direct auto close signal from CIA.
When Rod Bank LO-LO Limit alarm clears. C. SS permission IS required.
D. The Mini-Purge exhaust and supply dampers were open .
When Rod Bank LO Limit alarm clears. D. SS permission IS r equired. Bank LO-LO Limit alarm clears. P age: 34 of 7 S 6/22/200 9 
The dampers would receive a direct auto close signal from CVI.
: 35. Given the following:  
Page: 29 of 75                                                                         6/22/2009
-At 1330 hours a Loss of All AC Power occurred.  
 
-Restoration of AC power is not anticipated until 1730 hours. Which ONE of the following describes the CORRECT action required by 19100-C, "Loss of All AC Power" as 1 E bus battery voltage decays over time and why? A. When voltage < 105 VDC, open the battery breaker after its inverters are shutdown.
30 .
Given the following conditions:
          - Unit 1 core reload is in progress.
          - Source Ranges N-31 and N-32 are reading significantly different.
          - I & C determines the power supply for detector N-31 has failed high.
          - N-32 is selected for Audio Count Rate in Containment and Control Room.
Due to this power supply failure , N-31 is reading, ___,(a),_ _than it should.
The Operator At The Controls is         (b),_ _
A. (a) lower   (b) required to suspend core alterations B. (a) lower   (b) not required to suspend core alterations C. (b) higher (b) required to suspend core alterations D. (b) higher (b) not required to suspend core alterations Page: 30 of 75                                                                         6122/2009
 
31.
Unit 2 Refueling Outage is in progress:
          - Fuel shuffle is in progress in the Spent Fuel Pool (SFP) with the gate to the Containment currently closed .
          - SPENT FUEL PIT LOW LEVEL annunciator illuminates in Control Room.
          - SFP level lowers to 22 feet 10 inches above the fuel due to a leak
          - The SS has directed a makeup to the SFP in accordance with SOP-13719-2, "Spent Fuel Pool Cooling and Purification System" .
Which ONE of the following describes whether SFP level is above or below the Tech Spec limit, and the source of makeup for this condition , in accordance with SOP-13719-2.
SFP level is .. .
A. BELOW the minimum required by Technical Specifications.
Makeup from the Demin Water Storage Tank (DWST).
B. BELOW the minimum required by Technical Specifications.
Makeup from the Refueling Water Storage Tank (RWST).
C. ABOVE the minimum required by Technical Specifications.
Makeup from the Demin Water Storage Tank (DWST).
D. ABOVE the minimum required by Technical Specifications.
Makeup from the Refueling Water Storage Tank (RWST).
Page: 31 of 75                                                                            6/2212009
 
32.
Given the following:
          - The unit is at 100% power.
          - Loop # 3 Inboard MSIV (HV-3016A) goes fully closed.
Given this condition AND before manual or automatic operation of any other system.
          - Loop # 2 SG steam FLOW would           (a)     and
          - Loop # 3 SG LEVEL initially would rapidly   (b),_ _
A. (a) rise   (b) rise B. (a) rise   (b) lower C. (a) lower (b) rise D. (a) lower (b) lower Page: 32 of 75                                                                         6/22/2009
 
33.
Which one of the following choices for the SG code safeties:
(a) lists all the correct lift setpoints (psig), and (b) describes the technical specification bases for these valves?
A. (a) 1185,1200,1210,1220,1235.
(b) limits secondary pressure to :: 110% design pressure during a full power turbine trip without steam dump.
B. (a) 1185, 1200, 1215, 1225, 1235.
(b) limits secondary pressure to:: 110% design pressure during a full power turbine trip without steam dump.
C. (a) 1185,1200,1210,1220,1235.
(b) provide an alternate method for cooling the unit to RHR entry conditions whenever the preferred heat sink via the steam dumps to the condenser is unavailable.
D. (a) 1185, 1200, 1215, 1225, 1235.
(b) provide an alternate method for cooling the unit to RHR entry conditions whenever the preferred heat sink via the steam dumps to the condenser is unavailable.
Page: 33 of 75                                                                           6/22/2009
 
34.
A rapid power reduction per AOP 18013-C was completed to stabilize condenser vacuum. Rods were inserted below the rod insertion limit (RIL) during the power reduction. An Emergency Boration is in progress and the OATC is withdrawing rods to restore rods above the RIL.
Which ONE of the following is CORRECT regarding :
a) whether SS permission is required for Control Rod insertion during the down power?
and b) when Emergency Boration may be terminated?
Control Rod Insertion                 Emergency Boration Termination A. SS permission is NOT required .         When Rod Bank LO Limit alarm clears.
B. SS permission is NOT required.           When Rod Bank LO-LO Limit alarm clears.
C. SS permission IS required.               When Rod Bank LO Limit alarm clears.
D. SS permission IS required.               Wl1e~i(Rad  Bank LO-LO Limit alarm clears.
Page: 34 of 7S                                                                          6/22/2009
 
35.
Given the following:
          - At 1330 hours a Loss of All AC Power occurred.
          - Restoration of AC power is not anticipated until 1730 hours.
Which ONE of the following describes the CORRECT action required by 19100-C, "Loss of All AC Power" as 1E bus battery voltage decays over time and why?
A. When voltage < 105 VDC, open the battery breaker after its inverters are shutdown.
To prevent damaging the battery cells due to cell reversal.
To prevent damaging the battery cells due to cell reversal.
B. When voltage < 120 VDC, open the battery breaker after its inverters are shutdown.
B. When voltage < 120 VDC, open the battery breaker after its inverters are shutdown.
Line 169: Line 507:
D. When voltage < 120 VDC, open the battery breaker after its inverters are shutdown.
D. When voltage < 120 VDC, open the battery breaker after its inverters are shutdown.
To prevent a possible explosion due to excessive hydrogen production.
To prevent a possible explosion due to excessive hydrogen production.
Page: 35 of 75 6/22/2009
Page: 35 of 75                                                                         6/22/2009
: 36. Given the following:  
 
-The unit is at 100% power. -The loop seal between stages on the in-service SJAE has been lost. Which ONE of the following is CORRECT regarding the effect of losing the SJAE loop seal on Main Condenser pressure and Main Turbine MW Output? Main Condenser Pressure (psia) Main Turbine MW Output A. Rises Rises B. Lowers Rises C. Rises Lowers D. Lowers Lowers Page: 36 of 75 6/22/2009
36.
: 37. Initial Conditions:  
Given the following:
-Safety Injection occurs due to an RCS LOCA -Train "A" SI has been reset -Train "8" SI is still actuated -80th SI pumps are injecting Current conditions: -A loss of both RATs occurs -80th DG's re-energize their respective busses Which ONE of the following would be CORRECT regarding the SI pumps flow and amp responses?
          - The unit is at 100% power.
A. SIP "A" -flow and amps lower, then return to previous values automatically.
          - The loop seal between stages on the in-service SJAE has been lost.
SIP "8" -flow and amps lower , then return to previous values automatically.  
Which ONE of the following is CORRECT regarding the effect of losing the SJAE loop seal on Main Condenser pressure and Main Turbine MW Output?
: 8. SIP "A" -flow and amps lower, then have to be manually restored.
Main Condenser Pressure (psia)         Main Turbine MW Output A.             Rises                                 Rises B.             Lowers                                 Rises C.             Rises                                 Lowers D.           Lowers                                 Lowers Page: 36 of 75                                                                       6/22/2009
SIP "8" -flow and amps lower, then have to be manually restored.
 
C. SIP "A" -flow and amps lower, then return to previous values automatically. SIP "8" -flow and amps lower, then have to be manually restored.
37.
D. SIP "A" -flow and amps lower, then have to be manually restored.
Initial Conditions:
SIP "8" -flow and amps lower, then return to previous values automatically.
          - Safety Injection occurs due to an RCS LOCA
Page: 37 of 75 6/22/2009
          - Train "A" SI has been reset
: 38. Given the following: -The Unit is at 70% power. -VCT level is at 46%. -A loss of a 120VAC Essential bus has occurred.  
          - Train "8" SI is still actuated
-VCT auto makeup immediately starts on the bus failure. Which ONE of the following CORRECTLY describes  
          - 80th SI pumps are injecting Current conditions:
... a) The VCT level channel failure. b) The effects on VCT auto swapover capability.
          - A loss of both RATs occurs
A. a) L T-112 (VCT level) fails LOW. b) VCT auto swapover will occur on actual VCT 10-10 level. B. a) L T-185 (VCT level) fails LOW. b) VCT auto swapover will occur on actual VCT 10-10 level. C. a) L T-112 (VCT level) fails HIGH. b) VCT auto swapover will NOT occur on actual VCT 10-10 level. D. a) L T-185 (VCT Level) fa i ls HIGH. b) VCT auto swapover will NOT occur on actual VCT 10-10 level. Pag e: 38 of 75 6/22/2009
          - 80th DG's re-energize their respective busses Which ONE of the following would be CORRECT regarding the SI pumps flow and amp responses?
: 39. The plant is 100% power, all systems in normal alignment.  
A. SIP "A" - flow and amps lower, then return to previous values automatically.
-ALB04, window D04 for BAT CHARGERS 1 CD1 CA 1 CD1 CB TROUBLE illuminates. -1 CD1 B battery amperage reading is 0 amps -Channel III TSLB status lights are extinguished.
SIP "8" - flow and amps lower, then return to previous values automatically.
Which ONE of the following is CORRECT regarding the 125V DC bus 1 CD1 status? A. One battery charger tripped B. Both battery chargers tripped C. Both battery chargers tripped D. One battery charger tripped the battery is supplying 1CD1 the battery is supplying 1 CD1 1 CD1 is completely de-energized 1 CD1 is supplied by the other charger P a g e: 39 of 75 6/22/2009
: 8. SIP "A" - flow and amps lower, then have to be manually restored.
: 40. Given the following:  
SIP "8" - flow and amps lower, then have to be manually restored.
-The unit is at 90% power. -All Main Feedwater (MFW) system controls in AUTO. -A low failure of PT-508 (Feedwater Header Pressure) occurs. Both MFPT speeds should (a) due to the (b) A. (a) raise (b) lower indicated delta P B. (a) raise (b) higher indicated delta P c. (a) lower (b) lower indicated delta P D. (a) lower (b) higher indicated delta P Page: 40 of 75 6/22/2009
C. SIP "A" - flow and amps lower, then return to previous values automatically.
: 41. Initial conditions:  
SIP "8" - flow and amps lower, then have to be manually restored.
-MFPT "A" is operating.  
D. SIP "A" - flow and amps lower, then have to be manually restored.
-MFPT "8" is tripped. -All SG levels are stable, AFW flows to all SG's are -225 gpm -The following annunciator window is extinguished.  
SIP "8" - flow and amps lower, then return to previous values automatically.
-AL816, window F05 "AFW AUTO START MFPT TRIP RL Y CNTL PWR LOSS" Current conditions:  
Page: 37 of 75                                                                             6/22/2009
-The UO manually trips MFPT "A". Which ONE of the following is the CORRECT plant response and actions to take? A. AFW flows remain as is, SG levels remain stable. Reset MFPT "A", restart MFPT "A". B. AFW flows remain as is, SG levels remain stable. Reset MFPT "8", startup MFPT "8". C. AFW flows increase, SG levels begin to rise. Throttle AFW valves closed before they fully open. D. AFW flows increase, SG levels begin to rise. Allow AFW valves to stroke fully open, then throttle.
 
Page: 41 of 75 6/2212009
38.
: 42. The unit is at 100% power when a Reserve Auxiliary Transforme r (RAT) switcher trips open. Reactor power rises above 100%. Auxiliary Feedwater flow indications are: -SG # 1 -650 gpm SG # 2 -350 gpm SG # 3 -350 gpm SG # 4 -650 gpm The sequence of actions the UO should take in AOP-18031 , "Loss of Class 1 E Electrical Systems" is to ... A. Reduce Turbine load to reduce Reactor power to 100%. Then throttle TDAFW speed and MDAFW pump "A" discharge valves. 8. Reduce Turbine load to reduce Reactor power to 100%. Then throttle TDAFW speed and MDAFW pump "8" discharge valves. C. Throttle TDAFW speed and MDAFW pump "A" discharge valves. Then reduce Turbine load to reduce Reactor power to 100%. D. Throttle TDAFW speed and MDAFW pump "8" discharge valves. Then reduce Turbine load to reduce Reactor power to 100%. Page: 42 of 75 6/22/2009
Given the following :
: 43. Given the following: -Loss of All AC power occurs , 191 OO-C , "Loss of All AC Power" is in effect. -Power is restored to AA02 via DG1A. Which ONE of the following is the CORRECT action regarding restoration of the NSCW system to service? A. Verify NSCW discharge valves go closed to prevent water hammer. Manually start 2 pumps. B. Verify NSCW discharge valves go closed to prevent water hammer. Verify 2 pumps start automatically.
          - The Unit is at 70% power.
          - VCT level is at 46%.
          - A loss of a 120VAC Essential bus has occurred.
          - VCT auto makeup immediately starts on the bus failure .
Which ONE of the following CORRECTLY describes ...
a) The VCT level channel failure.
b) The effects on VCT auto swapover capability.
A. a) LT-112 (VCT level) fails LOW.
b) VCT auto swapover will occur on actual VCT 10-10 level.
B. a) LT-185 (VCT level) fails LOW.
b) VCT auto swapover will occur on actual VCT 10-10 level.
C. a) LT-112 (VCT level) fails HIGH.
b) VCT auto swapover will NOT occur on actual VCT 10-10 level.
D. a) LT-185 (VCT Level) fails HIGH .
b) VCT auto swapover will NOT occur on actual VCT 10-10 level.
Page: 38 of 75                                                             6/22/2009
 
39.
The plant is 100% power, all systems in normal alignment.
          - ALB04, window D04 for BAT CHARGERS 1 CD1 CA 1CD1 CB TROUBLE illuminates.
          - 1CD1 B battery amperage reading is 0 amps
        - Channel III TSLB status lights are extinguished.
Which ONE of the following is CORRECT regarding the 125V DC bus 1CD1 status?
A. One battery charger tripped           the battery is supplying 1CD1 B. Both battery chargers tripped           the battery is supplying 1CD1 C. Both battery chargers tripped         1CD1 is completely de-energized D. One battery charger tripped             1CD1 is supplied by the other charger Page: 39 of 75                                                                           6/22/2009
 
40.
Given the following:
          - The unit is at 90% power.
          - All Main Feedwater (MFW) system controls in AUTO.
          - A low failure of PT-508 (Feedwater Header Pressure) occurs.
Both MFPT speeds should         (a)   due to the     (b)
A. (a) raise (b) lower indicated delta P B. (a) raise (b) higher indicated delta P
: c. (a) lower (b) lower indicated delta P D. (a) lower (b) higher indicated delta P Page: 40 of 75                                                         6/22/2009
 
41.
Initial conditions:
          - MFPT "A" is operating.
          - MFPT "8" is tripped.
          - All SG levels are stable, AFW flows to all SG's are - 225 gpm
          - The following annunciator window is extinguished.
          - AL816, window F05 "AFW AUTO START MFPT TRIP RL Y CNTL PWR LOSS" Current conditions:
          - The UO manually trips MFPT "A".
Which ONE of the following is the CORRECT plant response and actions to take?
A. AFW flows remain as is, SG levels remain stable.
Reset MFPT "A", restart MFPT "A".
B. AFW flows remain as is, SG levels remain stable.
Reset MFPT "8", startup MFPT "8".
C. AFW flows increase, SG levels begin to rise.
Throttle AFW valves closed before they fully open.
D. AFW flows increase, SG levels begin to rise.
Allow AFW valves to stroke fully open, then throttle.
Page: 41 of 75                                                                     6/2212009
 
42 .
The unit is at 100% power when a Reserve Auxiliary Transformer (RAT) switcher trips open . Reactor power rises above 100%.
Auxiliary Feedwater flow indications are:
          - SG # 1 - 650 gpm     SG # 2 - 350 gpm SG # 3 - 350 gpm SG # 4 - 650 gpm The sequence of actions the UO should take in AOP-18031 , "Loss of Class 1E Electrical Systems" is to ...
A. Reduce Turbine load to reduce Reactor power to   ~ 100%.
Then throttle TDAFW speed and MDAFW pump "A" discharge valves.
8 . Reduce Turbine load to reduce Reactor power to ~ 100%.
Then throttle TDAFW speed and MDAFW pump "8" discharge valves.
C. Throttle TDAFW speed and MDAFW pump "A" discharge valves.
Then reduce Turbine load to reduce Reactor power to ~ 100%.
D. Throttle TDAFW speed and MDAFW pump "8" discharge valves.
Then reduce Turbine load to reduce Reactor power to ~ 100%.
Page: 42 of 75                                                                       6/22/2009
 
43.
Given the following :
          - Loss of All AC power occurs, 191 OO-C , "Loss of All AC Power" is in effect.
          - Power is restored to AA02 via DG1A.
Which ONE of the following is the CORRECT action regarding restoration of the NSCW system to service?
A. Verify NSCW discharge valves go closed to prevent water hammer.
Manually start 2 pumps.
B. Verify NSCW discharge valves go closed to prevent water hammer.
Verify 2 pumps start automatically.
C. Verify NSCW discharge valves are open to prevent high starting currents.
C. Verify NSCW discharge valves are open to prevent high starting currents.
Manually start 2 pumps. D. Verify NSCW discharge valves are open to prevent high starting currents Verify 2 pumps start automatically. Page: 43 of 75 6/22/2009
Manually start 2 pumps.
: 44. The "Maintenance I Normal" switch located on the QEAB for a 4160V AC bus has been placed in the "Maintenance" position to support bus inspection.
D. Verify NSCW discharge valves are open to prevent high starting currents Verify 2 pumps start automatically.
When placed in the "Maintenance" position, this switch ... A. bypasses the time delay on the overcurrent trips on the bus supply breakers.
Page: 43 of 75                                                                           6/22/2009
B. bypasses the time delay on the overcurrent trips on the bus load breakers. C. bypasses the instantaneous overcurrent trips on the bus supply breakers.
 
44.
The "Maintenance I Normal" switch located on the QEAB for a 4160V AC bus has been placed in the "Maintenance" position to support bus inspection.
When placed in the "Maintenance" position, this switch ...
A. bypasses the time delay on the overcurrent trips on the bus supply breakers.
B. bypasses the time delay on the overcurrent trips on the bus load breakers.
C. bypasses the instantaneous overcurrent trips on the bus supply breakers.
D. bypasses the instantaneous overcurrent trips on the bus load breakers.
D. bypasses the instantaneous overcurrent trips on the bus load breakers.
Page: 44 of 75 6/22/2009
Page: 44 of 75                                                                         6/22/2009
: 45. The plant is in Mode 3 controlling Tave with the ARVs when 125V DC panel1AD1 de-energizes due to a ground fault. Loop 4 ARV was -10% open. Regarding operation of the ARV, list: (a) the failure mode on loss of DC power, and (b) where the ARV can be operated.
 
A. (a) as is (b) locally using the hand pump station B. (a) as is (b) from Shutdown Panel A C. (a) closed (b) locally using the hand pump station D. (a) closed (b) from Shutdown Panel A Page: 45 of 75 6/2212009
45.
: 46. The plant is in Mode 1. A leak has developed in the DG1A Fuel Oil Storage Tank (FaST). The FaST level decrease is noted by the following times. -at 1730 level is 90.9% (78,200 gallons) -at 1745 level is 86.9% (74,800 gallons) -at 1800 level is 82.9% (71,350 gallons) -at 1815 level is 78.9% (67,900 gallons) -at 1830 level is 74.9% (64,500 gallons) Which ONE of the following is the EARLIEST discovery time that DG1A is inoperable in accordance with Technical Specifications?
The plant is in Mode 3 controlling Tave with the ARVs when 125V DC panel1AD1 de-energizes due to a ground fault. Loop 4 ARV was - 10% open .
A. 1745 B. 1800 C. 1815 D. 1830 Page: 46 of 75 6/22/2009
Regarding operation of the ARV, list:
: 47. Given the following initial conditions
(a) the failure mode on loss of DC power, and (b) where the ARV can be operated.
: -The unit is at 340 o F , RCS cooldown in progress. -RHR Train A is in the shutdown cooling mode. -A loss of instrument air occurs. -The RHR system AOVs all go to the failure mode for loss of air. Current conditions:  
A. (a) as is (b) locally using the hand pump station B. (a) as is (b) from Shutdown Panel A C. (a) closed (b) locally using the hand pump station D. (a) closed (b) from Shutdown Panel A Page: 45 of 75                                                                     6/2212009
-Instrument air has been restored.  
 
-No Control Room or local actions have been performed for RHR. Which ONE of the following is CORRECT regarding: -RCS cool down rate response after instrument air is restored.  
46.
-RHR system flow rate response after instrument air is restored.
The plant is in Mode 1.
A. B. C. D. RCS cooldown rate raises raises lowers lowers RHR system flow rate raises lowers raises lowers Page: 47 of75 6/22/2009
A leak has developed in the DG1A Fuel Oil Storage Tank (FaST). The FaST level decrease is noted by the following times.
: 48. Unit 1 Control Room has been evacuated due to a fire. -18038-1 , "Operation From Remote Shutdown Panels" is in effect. -Two ARVs have been placed in the "Fire Emergency" mode of operation.
          - at 1730 level is 90.9% (78,200 gallons)
Which ONE of the following are the fire event qualified ARVs and the method to control RCS temperature in the Fire Emergency mode? A. ARVs # 1 and # 4 are fire event qualified. Using the auto-manual controllers located on the front of the shutdown panels. B. ARVs # 2 and # 3 are fire event qualified.
          - at 1745 level is 86.9% (74,800 gallons)
Us i ng the auto-manual controllers located on the front of the shutdown panels. C. ARVs # 1 and # 4 are fire event qualified. Using a 4 to 20 mA current source connected with banana jacks inside the panels. D. ARVs # 2 and # 3 are fire event qualified. Using a 4 to 20 mA current source connected with banana jacks inside the panels. P a ge: 4 8 of 75 6/22/2 00 9 
          - at 1800 level is 82.9% (71,350 gallons)
: 49. A gaseous release is in progress in accordance with SOP-13202 , "Gaseous Releases".
          - at 1815 level is 78.9% (67,900 gallons)
Considering the following events which occur during the release, determine if the release would be allowed to continue or require termination for each of the following: a) A-RE-0014 Radiation Monitor fails low b) precipitation (rain, snow, sleet, etc.) is occuring.
          - at 1830 level is 74.9% (64,500 gallons)
A. a) terminate the release. b) terminate the release. B. a) terminate the release. b) continue the release. C. a) continue the release. b) terminate the release. D. a) continue the release. b) continue the release. Page: 49 of 7S 6/2212009
Which ONE of the following is the EARLIEST discovery time that DG1A is inoperable in accordance with Technical Specifications?
: 50. Given the following: -A rapid power reduction  
A. 1745 B. 1800 C. 1815 D. 1830 Page: 46 of 75                                                                       6/22/2009
(> 15% in 1 hour) is in progress to comply with the actions of AOP-18009-C, a "Steam Generator Tube Leakage". -Radiation is indicated on RE-0724 Steam Line monitor. Which ONE of the following is CORRECT regarding:  
 
-when RE-0724 would indicate a Steam Generator Tube leak -the source of radiation detected.
47.
A. only when the reactor is at power. N-16 B. only when the reactor is at power. 1-131 C. any time the SJAE is in service. N-16 D. any time the SJAE is in service. 1-131 Page: 50 of 75 6/22/2009
Given the following initial conditions:
: 51. Given the following:  
          - The unit is at 340 oF, RCS cooldown in progress.
-The plant is at 100% power. -NSCW Train B tagged out for repair. -NSCW Train A pump # 3 trips. -NSCW Train A pump # 5 cannot be started. -AOP-18021-C, "Loss of Nuclear Service Cooling Water" has been entered. -No other operator actions have been taken. Which ONE of the following is the CORRECT crew action(s)?
          - RHR Train A is in the shutdown cooling mode.
A. Place all Train A NSCW pumps in PTL, Emergency Trip DG1A. Shutdown to Mode 3 per UOP-12004-C, "Power Operations" within 72 hours. B. Place all Train A NSCW pumps in PTL, Emergency Trip DG1A. Trip the Reactor and go to E-O, align NSCW Train A for single pump operations.
          - A loss of instrument air occurs.
C. Allow NSCW Pump # 1 to continue running, DG1A should be left in AUTO. Shutdown to Mode 3 per UOP-12004-C, "Power Operations" within 72 hours. D. Allow NSCW Pump # 1 to continue running, DG1A should be left in AUTO. Trip the Reactor and go to E-O, align NSCW Train A for single pump operations.
          - The RHR system AOVs all go to the failure mode for loss of air.
Page: 51 of 75 6/22/2009
Current conditions:
: 52. The plant is at 100% power. -RHR pump A is running for an 1ST surveillance.  
          - Instrument air has been restored.
-CCP "A" is running. The following annunciator illuminates on the QMCB. -NSCW TRAIN A LO HDR PRESS -Various other Train A NSCW low flow annunciators illuminate.
          - No Control Room or local actions have been performed for RHR.
Approximately 10 seconds later the UO notes the following: -3 NSCW pumps on Train A red lights are illuminated.  
Which ONE of the following is CORRECT regarding :
-NSCW Train A return flow is 0 gpm. -NSCW Train A supply flow is significantly higher than 17,500 gpm. Which ONE of the following is the CORRECT initiating event and next action to take? Initiating Event A. Pump sheared shaft B. Catastrophic break C. Catastrophic break D. Pump sheared shaft Next action Stop one of the running Train A NSCW pumps. Place all NSCW Train A pump handwitches in PTL. Stop RHR pump A and CCP A, then isolate letdown. Verify the 3rd Train A NSCW pump discharge valve opens. Page: 52 of 75 , 6/2212009
          - RCS cool down rate response after instrument air is restored.
: 53. Following a controlled unit shutdown for a refueling outage , degassification of the RCS is in progress via chemical addition.
          - RHR system flow rate response after instrument air is restored.
RCS cooldown rate                 RHR system flow rate A.          raises                            raises B.        raises                            lowers C.        lowers                            raises D.        lowers                            lowers Page: 47 of75                                                               6/22/2009
 
48.
Unit 1 Control Room has been evacuated due to a fire.
          - 18038-1 , "Operation From Remote Shutdown Panels" is in effect.
          - Two ARVs have been placed in the "Fire Emergency" mode of operation.
Which ONE of the following are the fire event qualified ARVs and the method to control RCS temperature in the Fire Emergency mode?
A. ARVs # 1 and # 4 are fire event qualified .
Using the auto-manual controllers located on the front of the shutdown panels.
B. ARVs # 2 and # 3 are fire event qualified.
Using the auto-manual controllers located on the front of the shutdown panels.
C. ARVs # 1 and # 4 are fire event qualified .
Using a 4 to 20 mA current source connected with banana jacks inside the panels.
D. ARVs # 2 and # 3 are fire event qualified .
Using a 4 to 20 mA current source connected with banana jacks inside the panels.
Page: 48 of 75                                                                           6/22/2009
 
49.
A gaseous release is in progress in accordance with SOP-13202 , "Gaseous Releases".
Considering the following events which occur during the release, determine if the release would be allowed to continue or require termination for each of the following :
a) A-RE-0014 Radiation Monitor fails low b) precipitation (rain, snow, sleet, etc.) is occuring.
A. a) terminate the release.
b) terminate the release.
B. a) terminate the release.
b) continue the release .
C. a) continue the release.
b) terminate the release.
D. a) continue the release.
b) continue the release.
Page: 49 of 7S                                                                             6/2212009
 
50.
Given the following:
          - A rapid power reduction (> 15% in 1 hour) is in progress to comply with the actions of AOP-18009-C, a "Steam Generator Tube Leakage".
          - Radiation is indicated on RE-0724 Steam Line monitor.
Which ONE of the following is CORRECT regarding:
          - when RE-0724 would indicate a Steam Generator Tube leak
          - the source of radiation detected.
A. only when the reactor is at power.
N-16 B. only when the reactor is at power.
1-131 C. any time the SJAE is in service.
N-16 D. any time the SJAE is in service.
1-131 Page: 50 of 75                                                                             6/22/2009
 
51.
Given the following:
          - The plant is at 100% power.
          - NSCW Train B tagged out for repair.
          - NSCW Train A pump # 3 trips.
          - NSCW Train A pump # 5 cannot be started.
          - AOP-18021-C, "Loss of Nuclear Service Cooling Water" has been entered.
          - No other operator actions have been taken.
Which ONE of the following is the CORRECT crew action(s)?
A. Place all Train A NSCW pumps in PTL, Emergency Trip DG1A.
Shutdown to Mode 3 per UOP-12004-C, "Power Operations" within 72 hours.
B. Place all Train A NSCW pumps in PTL, Emergency Trip DG1A.
Trip the Reactor and go to E-O, align NSCW Train A for single pump operations.
C. Allow NSCW Pump # 1 to continue running, DG1A should be left in AUTO.
Shutdown to Mode 3 per UOP-12004-C, "Power Operations" within 72 hours.
D. Allow NSCW Pump # 1 to continue running, DG1A should be left in AUTO.
Trip the Reactor and go to E-O, align NSCW Train A for single pump operations.
Page: 51 of 75                                                                         6/22/2009
 
52.
The plant is at 100% power.
          - RHR pump A is running for an 1ST surveillance.
          - CCP "A" is running.
The following annunciator illuminates on the QMCB.
          - NSCW TRAIN A LO HDR PRESS
          - Various other Train A NSCW low flow annunciators illuminate.
Approximately 10 seconds later the UO notes the following:
          - 3 NSCW pumps on Train A red lights are illuminated.
          - NSCW Train A return flow is 0 gpm.
          - NSCW Train A supply flow is significantly higher than 17,500 gpm.
Which ONE of the following is the CORRECT initiating event and next action to take?
Initiating Event         Next action A. Pump sheared shaft       Stop one of the running Train A NSCW pumps.
B. Catastrophic break        Place all NSCW Train A pump handwitches in PTL.
C. Catastrophic break        Stop RHR pump A and CCP A, then isolate letdown .
D. Pump sheared shaft        Verify the 3rd Train A NSCW pump discharge valve opens.
Page: 52 of 75                                                                       , 6/2212009
 
53.
Following a controlled unit shutdown for a refueling outage, degassification of the RCS is in progress via chemical addition.
Shortly following the chemical addition, a crud burst occurs as expected.
Shortly following the chemical addition, a crud burst occurs as expected.
Which ONE of the following radiation monitors would be expected to alarm? A. RE-0005, Containment  
Which ONE of the following radiation monitors would be expected to alarm?
-High Range B. RE-0007A, Rad Chern Lab C. RE-00011 , Seal Table Room D. RE-48000, CVCS Letdown Page: 53 of 75 6/22/2009
A. RE-0005, Containment - High Range B. RE-0007A, Rad Chern Lab C. RE-00011 , Seal Table Room D. RE-48000, CVCS Letdown Page: 53 of 75                                                                             6/22/2009
: 54. Given the following initial conditions:  
 
-The unit is at 100% power. -DG1A is paralleled to the grid for surveillance testing at 6500 kW. Current condtions:  
54.
-AOP-18017-C, "Abnormal Grid Disturbances/Loss of Grid" section A has been entered. -Grid frequency has lowered below 60 Hz. Which ONE of the following would be CORRECT regarding  
Given the following initial conditions:
-the initial conditions of the DG. -the effects of the abnormal grid disturbance on the DG. A. DG speed is used to adjust kW. The governor would throttle open on the fuel racks to attempt to raise DG speed. B. DG speed is used to adjust kW. The governor would throttle closed on the fuel racks to attempt to lower DG speed. C. DG speed is used adjust kVARS. The governor would throttle open on the fuel racks to attempt to raise DG speed. D. DG speed is used adjust kVARS. The governor would throttle closed on the fuel racks to attempt to lower DG speed. Page: 54 of 75 6/22/2009
          - The unit is at 100% power.
: 55. Given the following:  
          - DG1A is paralleled to the grid for surveillance testing at 6500 kW.
-Unit 1 is at 100% power. -Air compressor  
Current condtions:
# 4 is tagged out. -An LOSP results in de-energization of 2 of the 3 remaining compressors. -A slow decrease in air header pressure has occurred.  
          - AOP-18017-C, "Abnormal Grid Disturbances/Loss of Grid" section A has been entered.
-Power has now been restored to the 2 previously de-energized compressors. -Instrument Air Header pressure dropped as low as 82 psig. -Instrument Air Header pressure is now 97 psig and slowly rising. Which ONE of the following is CORRECT regarding the current status of the Instrument Air system? A. PV-9375, Service Air Isolation valve is OPEN. All 3 available air compressors are running. B. PV-9375 , Service Air Isolation valve is OPEN. 2 of 3 available air compressors are running. C. PV-9375, Service Air Isolation valve is CLOSED. All 3 available air compressors are running. D. PV-9375, Service Air Isolation valve is CLOSED. 2 of 3 available air compressors are running. Page: 55 of 75 6/22/2009
          - Grid frequency has lowered below 60 Hz.
: 56. Given the following: -Unit 1 at 25% power, Unit 2 at 100% power. -The only two available air compressors on each unit are running (4 total). -Air compressor  
Which ONE of the following would be CORRECT regarding
# 4 is aligned to Unit 2. Unit 1 has the following indications:  
          - the initial conditions of the DG .
-SERVICE AIR LO PRESS annunciator lit. -QMCB Service Air Pressure meter -0 psig -QMCB Instrument Air Pressure meter -72 psig and lowering.
          - the effects of the abnormal grid disturbance on the DG.
Annunciator window INST AIR EQUIP LO PRESS illuminates several minutes later. Which ONE of the following is the CORRECT action the operators should perform in response to the annunciator?
A. DG speed is used to adjust kW .
A. Align the swing air compressor from Unit 2 to Unit 1. B. Open the cross tie valve to supply Unit 1 air header from Unit 2. C. Trip the Unit 1 Turbine and isolate Turbine Building Instrument Ai r. D. Trip the Unit 1 Reactor and enter E-O while taking actions to restore air pressure. Page: 56 of 75 6/22/2009
The governor would throttle open on the fuel racks to attempt to raise DG speed.
: 57. Given the following:  
B. DG speed is used to adjust kW.
-The fire alarm computer goes into alarm. -The Outside Area Operator reports a fire on RAT "A" You note the following on the QPCP. -Pressure gauge "Fire Pump CPI -7918" pressure lowers to 92 psig, then recovers.
The governor would throttle closed on the fuel racks to attempt to lower DG speed.
C. DG speed is used adjust kVARS.
The governor would throttle open on the fuel racks to attempt to raise DG speed.
D. DG speed is used adjust kVARS.
The governor would throttle closed on the fuel racks to attempt to lower DG speed.
Page: 54 of 75                                                                           6/22/2009
 
55.
Given the following:
          - Unit 1 is at 100% power.
          - Air compressor # 4 is tagged out.
          - An LOSP results in de-energization of 2 of the 3 remaining compressors.
          - A slow decrease in air header pressure has occurred.
          - Power has now been restored to the 2 previously de-energized compressors.
          - Instrument Air Header pressure dropped as low as 82 psig.
          - Instrument Air Header pressure is now 97 psig and slowly rising .
Which ONE of the following is CORRECT regarding the current status of the Instrument Air system?
A. PV-9375, Service Air Isolation valve is OPEN .
All 3 available air compressors are running.
B. PV-9375, Service Air Isolation valve is OPEN.
2 of 3 available air compressors are running .
C. PV-9375, Service Air Isolation valve is CLOSED.
All 3 available air compressors are running.
D. PV-9375, Service Air Isolation valve is CLOSED.
2 of 3 available air compressors are running.
Page: 55 of 75                                                                       6/22/2009
 
56.
Given the following :
          - Unit 1 at 25% power, Unit 2 at 100% power.
          - The only two available air compressors on each unit are running (4 total).
          - Air compressor # 4 is aligned to Unit 2.
Unit 1 has the following indications:
          - SERVICE AIR LO PRESS annunciator lit.
          - QMCB Service Air Pressure meter - 0 psig
          - QMCB Instrument Air Pressure meter - 72 psig and lowering.
Annunciator window INST AIR EQUIP LO PRESS illuminates several minutes later.
Which ONE of the following is the CORRECT action the operators should perform in response to the annunciator?
A. Align the swing air compressor from Unit 2 to Unit 1.
B. Open the cross tie valve to supply Unit 1 air header from Unit 2.
C. Trip the Unit 1 Turbine and isolate Turbine Building Instrument Air.
D. Trip the Unit 1 Reactor and enter E-O while taking actions to restore air pressure.
Page: 56 of 75                                                                           6/22/2009
 
57.
Given the following:
          - The fire alarm computer goes into alarm .
          - The Outside Area Operator reports a fire on RAT "A" You note the following on the QPCP.
          - Pressure gauge "Fire Pump CPI - 7918" pressure lowers to 92 psig, then recovers.
Which ONE of the following is CORRECT regarding how many fire pumps are running and WHERE this can be determined?
Which ONE of the following is CORRECT regarding how many fire pumps are running and WHERE this can be determined?
A. ONLY the Motor Driven Fire pump is running. QPCP and local observation. B. ONLY the Motor Driven Fire pump is running. Local observation ONLY. C. The Motor Driven pump and one Diesel Fire pump are running. QPCP and local observation.
A. ONLY the Motor Driven Fire pump is running .
D. The Motor Driven pump and one Diesel Fire pump are running. Local observation ONLY. P a ge: 57 of 75 6/22/2009
QPCP and local observation .
: 58. Given the following:  
B. ONLY the Motor Driven Fire pump is running .
-The unit is at full power. -A small air leak inside Containment is causing a slow rise in Containment pressure. -Containment pressure is currently reading 1.9 psig. Containment pressure is (a), __ _ To relieve Containment pressure, flow must pass through a restrictive orifice until containment pressure is (b) , then the normal flow path may be aligned. A. (a) within Technical Specification LCO limits. (b) less than +0.3 psig B. (a) within Technical Specification LCO limits. (b) less than -0.3 psig C. (a) in violation of Technical Specification LCO limits. (b) less than +0.3 psig D. (a) in violation of Technical Specification LCO limits. (b) less than -0.3 psig Page: 58 of 75 6/22/2009
Local observation ONLY.
: 59. Given the following conditions. -The OATC has manually actuated Containment Spray using, __ (a). __ on 1 of 2 QMCB locations.  
C. The Motor Driven pump and one Diesel Fire pump are running.
-As a result of the manual action, the annunciator window(s) for (b), __ should illuminate.
QPCP and local observation.
A. (a) 1 of 2 handswitChes (b) CNMT SPRAY ACTUATION only B. (a) 2 of 2 handswitches (b) CNMT SPRAY ACTUATION only C. (a) 1 of 2 handswitches (b) both CNMT SPRAY ACTUATION and CNMT VENT ISO ACTUATION D. (a) 2 of 2 handswitches (b) both CNMT SPRAY ACTUATION and CNMT VENT ISO ACTUATION Page: 59 of 75 6/2212009
D. The Motor Driven pump and one Diesel Fire pump are running.
: 60. Given the following:  
Local observation ONLY.
-Control Room is being evacuated due to a fire. The OATC (RO) should report to Remote Shutdown Panel ____ _ In accordance with 18038-1/2, "Operation From Remote Shutdown Panels" the preferred method of communications to co-ordinate in plant activities with personnel outside the control room is via ____ _ A. IIA" , sound powered phones plugged into dedicated channels (red jacks). B. 118 11 , bridge network phone extension  
Page: 57 of 75                                                                         6/22/2009
# 3145 using codes # 123 or # 234. C. "A" , bridge network phone extension  
 
# 3145 using codes # 123 or # 234. D. "8" , sound powered phones plugged into dedicated channels (red jacks). Page: 60 of 75 6/22/2009
58.
: 61. You are performing a lineup verification for valves in various positions:
Given the following:
Which ONE of the following is CORRECT performance of the lineup verification in accordance with NMP-OS-002 , "Verification Policy"? A. A valve is required to be closed. Turn valve slightly in the open direction , using reasonable force, reclose the valve. B. A valve is required to be throttled 2 turns open. Turn valve in closed direction , count turns to ensure correct, re-open valve 2 turns. c. A valve is found not in the required lineup position. Align valve in the required position, notify the SS once the valve is properly al i gned. D. A valve position cannot be determined by local observation. Leave valve as is , use remote handswitch light indications to verify valve position.
          - The unit is at full power.
P age: 61 of 75 6/22/2009
          - A small air leak inside Containment is causing a slow rise in Containment pressure.
: 62. Given the following:  
          - Containment pressure is currently reading 1.9 psig.
-Control Room has been evacuated.  
Containment pressure is         (a), _ __
-An LOSP has occurred. -The crew is preparing to close a DG1A output breaker (1AA02-19).
To relieve Containment pressure, flow must pass through a restrictive orifice until containment pressure is         (b)       , then the normal flow path may be aligned.
Which ONE of the following is CORRECT regarding where and how the DG output breaker is closed? A. At Remote Shutdown Panel A. Take local control of the DG output breaker, then close the breaker handswitch.
A. (a) within Technical Specification LCO limits.
B. On the front of DG1A Generator panel. Take the handswitch located on the front of DG1A Generator panel to close. C. At the 4160V 1 E Switchgear local control panel (1 AA02-00).
(b) less than +0 .3 psig B. (a) within Technical Specification LCO limits.
Take local control of the DG output breaker, then close the breaker handswitch. D. On the front of the DG output breaker at 4160V 1 E Switchgear 1 AA02. Take the handswitch located on the front of the DG output breaker to close. Page: 62 of 75 6/22/2009
(b) less than -0 .3 psig C. (a) in violation of Technical Specification LCO limits.
: 63. Which one of the following describes the meaning of an OPERATING PERMIT TAG hanging on a component as described in NMP-AD-003 , Equipment Clearance and Tagging? A.
(b) less than +0 .3 psig D. (a) in violation of Technical Specification LCO limits.
(b) less than -0.3 psig Page: 58 of 75                                                                             6/22/2009
 
59.
Given the following conditions.
          - The OATC has manually actuated Containment Spray using,_ _ (a)._ _on 1 of 2 QMCB locations.
          - As a result of the manual action, the annunciator window(s) for (b), _ _
should illuminate.
A. (a) 1 of 2 handswitChes (b) CNMT SPRAY ACTUATION only B. (a) 2 of 2 handswitches (b) CNMT SPRAY ACTUATION only C. (a) 1 of 2 handswitches (b) both CNMT SPRAY ACTUATION and CNMT VENT ISO ACTUATION D. (a) 2 of 2 handswitches (b) both CNMT SPRAY ACTUATION and CNMT VENT ISO ACTUATION Page: 59 of 75                                                                       6/2212009
 
60.
Given the following:
          - Control Room is being evacuated due to a fire.
The OATC (RO) should report to Remote Shutdown Panel _ _ _ __
In accordance with 18038-1/2, "Operation From Remote Shutdown Panels" the preferred method of communications to co-ordinate in plant activities with personnel outside the control room is via _ _ _ __
A. IIA" ,     sound powered phones plugged into dedicated channels (red jacks).
B. 118 11 bridge network phone extension # 3145 using codes # 123 or # 234.
C. "A" ,     bridge network phone extension # 3145 using codes # 123 or # 234.
D. "8" ,     sound powered phones plugged into dedicated channels (red jacks).
Page: 60 of 75                                                                           6/22/2009
 
61.
You are performing a lineup verification for valves in various positions:
Which ONE of the following is CORRECT performance of the lineup verification in accordance with NMP-OS-002 , "Verification Policy"?
A. A valve is required to be closed .
Turn valve slightly in the open direction, using reasonable force, reclose the valve.
B. A valve is required to be throttled 2 turns open.
Turn valve in closed direction, count turns to ensure correct, re-open valve 2 turns.
: c. A valve is found not in the required lineup position .
Align valve in the required position, notify the SS once the valve is properly aligned .
D. A valve position cannot be determined by local observation.
Leave valve as is, use remote handswitch light indications to verify valve position.
Page: 61 of 75                                                                               6/22/2009
 
62.
Given the following:
          - Control Room has been evacuated.
          - An LOSP has occurred .
          - The crew is preparing to close a DG1A output breaker (1AA02-19).
Which ONE of the following is CORRECT regarding where and how the DG output breaker is closed?
A. At Remote Shutdown Panel A.
Take local control of the DG output breaker, then close the breaker handswitch.
B. On the front of DG1A Generator panel.
Take the handswitch located on the front of DG1A Generator panel to close.
C. At the 4160V 1E Switchgear local control panel (1 AA02-00).
Take local control of the DG output breaker, then close the breaker handswitch .
D. On the front of the DG output breaker at 4160V 1E Switchgear 1AA02.
Take the handswitch located on the front of the DG output breaker to close.
Page: 62 of 75                                                                           6/22/2009
 
63.
Which one of the following describes the meaning of an OPERATING PERMIT TAG hanging on a component as described in NMP-AD-003, Equipment Clearance and Tagging?
A.
* The component position can NOT be changed until the tag is cleared .
* The component is under the control of a Tagout Holder.
B.
* The component position can NOT be changed until the tag is cleared.
* The component position can NOT be changed until the tag is cleared.
* The component is under the control of a Tagout Holder. B.
* The component has been designated as an isolation boundary for personnel safety.
* The component position can NOT be changed until the tag is cleared.
C.* The component position can ONLY be changed with permission of the Tagout Holder.
* The component has been designated as an isolation boundary for personnel safety. C .* The component position can ONLY be changed with permission of the Tagout Holder.
* The component is under the control of a Tagout Holder.
* The component is under the control of a Tagout Holder. D .* The component position can ONLY be changed with permission of the Tagout Holder.
D.* The component position can ONLY be changed with permission of the Tagout Holder.
* The component has been designated as an isolation boundary for personnel safety. Page: 63 of 75 6/22/2009
* The component has been designated as an isolation boundary for personnel safety.
: 64. Given the following: -Reactor power is 30% -A reactor shutdown is in progress -A high failure of IR NIS channel N-36 occurs Which ONE of the following is CORRECT regarding the effects of this failure as reactor shutdown progresses?
Page: 63 of 75                                                                       6/22/2009
Power < P-10 Power < P-6 A. Reactor trip occurs SR High flux trip automatically unblocks B. Reactor trip occurs SR High flux trip must be manually unblocked  
 
: c. Reactor does NOT trip SR High flux trip automatically unblocks D. Reactor does NOT trip SR High flux trip must be manually unblocked Pag e: 64 of 75 6/22/2009
64.
: 65. Given the following: -Waste Monitor Tank (WMT) # 9 release is in progress.  
Given the following :
-The control room HIGH RADIATION annunciator illuminates. RE-0018 , Liquid Waste Effluent radiation monitor , has failed high. -WMT 9 discharge flow transmitter , FT-1085A, indicates 35 gpm. Per ARP 17213-1 for the PLPP annunciator window for WATER DISCH LINE HI RAD , the Au x iliary Building SO should ... A. fail air to RV-0018. OR close manual discharge valves to the environment.
          - Reactor power is 30%
B. fa i l air to RV-0018. OR using the local manual handwheel , close RV-0018. C. close RV-0018 locally on the PLPP. OR close manual discharge valves to the environment.
          - A reactor shutdown is in progress
D. close RV-0018 locally on the PLPP. OR using the local manual handwheel , close RV-0018. P age: 65 o f 75 6/2 21 200 9 
          - A high failure of IR NIS channel N-36 occurs Which ONE of the following is CORRECT regarding the effects of this failure as reactor shutdown progresses?
: 66. Given the following: -The unit is at 100% power. -A containment entry is to be performed per 00303-C, "Containment Entry" for an RCS leak inspection.
Power < P-10                         Power < P- 6 A. Reactor trip occurs             SR High flux trip automatically unblocks B. Reactor trip occurs             SR High flux trip must be manually unblocked
The area i nside the bioshield should be posted as a (a), __ Entry into __ (b) __ is prohibited.
: c. Reactor does NOT trip         SR High flux trip automatically unblocks D. Reactor does NOT trip           SR High flux trip must be manually unblocked Page: 64 of 75                                                                         6/22/2009
A. (a) Very High Radiation Area (Grave Danger) (b) the Preaccess Filter Unit area (260 ft elevation).
 
65.
Given the following :
          - Waste Monitor Tank (WMT) # 9 release is in progress.
          - The control room HIGH RADIATION annunciator illuminates.
RE-0018, Liquid Waste Effluent radiation monitor, has failed high .
          - WMT 9 discharge flow transmitter, FT-1085A, indicates 35 gpm .
Per ARP 17213-1 for the PLPP annunciator window for WATER DISCH LINE HI RAD, the Auxiliary Building SO should ...
A. fail air to RV-0018.
OR close manual discharge valves to the environment.
B. fa il air to RV-0018.
OR using the local manual handwheel , close RV-0018.
C. close RV-0018 locally on the PLPP.
OR close manual discharge valves to the environment.
D. close RV-0018 locally on the PLPP.
OR using the local manual handwheel, close RV-0018.
Page: 65 of 75                                                                     6/2212009
 
66.
Given the following :
          - The unit is at 100% power.
          - A containment entry is to be performed per 00303-C, "Containment Entry" for an RCS leak inspection.
The area inside the bioshield should be posted as a         (a),_ _
Entry into _ _ (b)__ is prohibited.
A. (a) Very High Radiation Area (Grave Danger)
(b) the Preaccess Filter Unit area (260 ft elevation).
B. (a) High Radiation Area (b) the Preaccess Filter Unit area (260 ft elevation).
B. (a) High Radiation Area (b) the Preaccess Filter Unit area (260 ft elevation).
C. (a) Very High Radiation Area (Grave Danger) (b) The elevator.
C. (a) Very High Radiation Area (Grave Danger)
D. (a) High Radiation Area (b) The elevator. Page: 66 of 75 6/2212009
(b) The elevator.
: 67. Given the following:  
D. (a) High Radiation Area (b) The elevator.
-IPC computer is unavailable , CSFST monitoring must be performed manually. -You are assigned 19200-C, "Critical Safety Function Status Tree" monitoring and are making your first pass through the CSFSTs. Critical Safety Function Status Trees indicate the following:  
Page: 66 of 75                                                                         6/2212009
-Subcriticality  
 
-Core Cooling -Heat Sink -Integrity
67.
-Containment
Given the following:
-Inventory GREEN ORANGE Not performed yet Not performed yet Not performed yet Not performed yet Which ONE of the following describes the: (a) proper performance of CSFST monitoring on the first pass through. (b) your responsibilities for CSFST monitoring in accordance with 19200-C and A. (a) Immediately tell the SS to transition to Core Cooling , then continue the first pass through the status trees. (b) Continuous monitoring is required.
          - IPC computer is unavailable, CSFST monitoring must be performed manually.
B. (a) Complete the first pass through the status trees , then inform the SS to transition to the highest priority FRP. (b) Continuous monitoring is required.
          - You are assigned 19200-C, "Critical Safety Function Status Tree" monitoring and are making your first pass through the CSFSTs.
C. (a) Immediately tell the SS to transition to Core Cooling , then continue the first pass through the status trees. (b) Monitor every 10 to 15 minutes unless a change in status occurs. D. (a) Complete the first pass through the status trees, then inform the SS to transition to the highest priority FRP. (b) Monitor every 10 to 15 minutes unless a change in status occurs. Page: 67 of 75 6/22/2009
Critical Safety Function Status Trees indicate the following:
: 68. Given the following:  
          - Subcriticality   GREEN
-Control Room has been evacuated due to a fire. -AOP-18038-1 , "Operation From Remote Shutdown Panels" is in effect. -The operators have just aligned components per Attachment I, "Control Switch Required Positions". Attachment I is performed at __ (a), __ in order to align __ (b) __ A. (a) both Remote Shutdown Panels (b) Fire event qualified equipment to prevent spurious actuations.  
          - Core Cooling     ORANGE
          - Heat Sink       Not performed yet
          - Integrity      Not performed yet
          - Containment    Not performed yet
          - Inventory      Not performed yet Which ONE of the following describes the:
(a) proper performance of CSFST monitoring on the first pass through.
(b) your responsibilities for CSFST monitoring in accordance with 19200-C and A. (a) Immediately tell the SS to transition to Core Cooling , then continue the first pass through the status trees.
(b) Continuous monitoring is required.
B. (a) Complete the first pass through the status trees, then inform the SS to transition to the highest priority FRP.
(b) Continuous monitoring is required.
C. (a) Immediately tell the SS to transition to Core Cooling, then continue the first pass through the status trees.
(b) Monitor every 10 to 15 minutes unless a change in status occurs.
D. (a) Complete the first pass through the status trees, then inform the SS to transition to the highest priority FRP.
(b) Monitor every 10 to 15 minutes unless a change in status occurs.
Page: 67 of 75                                                                               6/22/2009
 
68.
Given the following:
          - Control Room has been evacuated due to a fire .
          - AOP-18038-1 , "Operation From Remote Shutdown Panels" is in effect.
          - The operators have just aligned components per Attachment I, "Control Switch Required Positions".
Attachment I is performed at _ _ (a),_ _ in order to align _ _(b) _ _
A. (a) both Remote Shutdown Panels (b) Fire event qualified equipment to prevent spurious actuations.
: 8. (a) both Remote Shutdown Panels (b) switches with maintained contacts to prevent changing status on transfer.
: 8. (a) both Remote Shutdown Panels (b) switches with maintained contacts to prevent changing status on transfer.
C. (a) Remote Shutdown Panel "8" only (b) Fire event qualified equipment to prevent spurious actuations. D. (a) Remote Shutdown Panel "8" only (b) switches with maintained contacts to prevent changing status on transfer. Page: 68 of 75 6/2212 00 9 
C. (a) Remote Shutdown Panel "8" only (b) Fire event qualified equipment to prevent spurious actuations.
: 69. The Emergency Director (ED) has directed you to perform an ENN roll call in accordance with 91 002-C , "Emergency Notifications", checklist 4 "Directions fo r ENN Communicators". . -Burke County and State of Georgia have failed to respond to the initial roll call. Which ONE of the following is the CORRECT actions to perform? A. Transmit the notification message to the agencies that responded, inform the ED that two agencies couldn't be notified.
D. (a) Remote Shutdown Panel "8" only (b) switches with maintained contacts to prevent changing status on transfer.
Page: 68 of 75                                                                             6/2212009
 
69.
The Emergency Director (ED) has directed you to perform an ENN roll call in accordance with 91 002-C, "Emergency Notifications", checklist 4 "Directions for ENN Communicators".                                                                   .
          - Burke County and State of Georgia have failed to respond to the initial roll call.
Which ONE of the following is the CORRECT actions to perform?
A. Transmit the notification message to the agencies that responded, inform the ED that two agencies couldn 't be notified.
Southern Linc would be the next priority to establish communications.
Southern Linc would be the next priority to establish communications.
B. Transmit the notification message to the agencies that responded, inform the ED that two agencies couldn't be notified. The Back-up ENN Bridge would be ne x t priority to establish communications.
B. Transmit the notification message to the agencies that responded, inform the ED that two agencies couldn't be notified .
C. Promptly notify the ED of the agencies that failed to respond to the initial roll call. Southern Linc would be the next priority to establish communications. D. Promptly notify the ED of the agencies that failed to respond to the initial roll call. The Back-up ENN Bridge would be ne x t priority to establish communications.
The Back-up ENN Bridge would be next priority to establish communications.
Page: 69 of 75 6/22 12 009 
C. Promptly notify the ED of the agencies that failed to respond to the initial roll call.
: 70. Given the following plant conditions
Southern Linc would be the next priority to establish communications.
: -The Reactor has tripped and Safety Injection has actuated. -19012-C , "Post LOCA Cooldown and Depressurization" is in progress. -The crew is performing an RCS cooldown in accordance with the procedure.
D. Promptly notify the ED of the agencies that failed to respond to the initial roll call.
The Back-up ENN Bridge would be next priority to establish communications.
Page: 69 of 75                                                                               6/2212009
 
70 .
Given the following plant conditions:
          - The Reactor has tripped and Safety Injection has actuated .
          - 19012-C, "Post LOCA Cooldown and Depressurization" is in progress.
          - The crew is performing an RCS cooldown in accordance with the procedure.
The following is a plot of the cooldown:
The following is a plot of the cooldown:
Time RCS Tcold Time RCS Tcold 1400 549&deg;F 1545 427&deg;F 1415 532&deg;F 1600 397 0 F 1430 522 0 F 1615 384 0 F 1445 507&deg;F 1630 366 0 F 1500 500 0 F 1645 342&deg;F 1515 480 0 F 1700 312 0 F 1530 449&deg;F 1715 282&deg;F Which ONE of the following is CORRECT regarding the Tech Spec cooldown limits? A. The crew is in compliance with Tech Spec cooldown limits. B. The Tech Spec cooldown limits were first exceeded at 1530. C. The Tech Spec cooldown limits were first e x ceeded at 1600. D. The Tech Spec cool down limits were first exceeded at 1715. P age: 7 0 o f 75 6/2212009
Time     RCS Tcold                 Time   RCS Tcold 1400       549&deg;F                   1545     427&deg;F 1415       532&deg;F                   1600     397 0 F 1430       522 0 F                 1615     384 0 F 1445       507&deg;F                   1630     366 0 F 1500       500 0 F                 1645     342&deg;F 1515       480 0 F                 1700     312 0 F 1530       449&deg;F                   1715     282&deg;F Which ONE of the following is CORRECT regarding the Tech Spec cooldown limits?
: 71. Which ONE of the following are components I parameters for a potential source of RCS leakage that are specifically checked for in 19112-C , "LOCA Outside Containment" and the main concern if this flow path is not isolable?
A. The crew is in compliance with Tech Spec cooldown limits.
A. Safety Injection pump Cold Leg injection valves and RHUT level. Loss of emergency coolant recirculation due to rupture of low pressure piping. B. Safety Injection pump Cold Leg injection valves and RHUT level. Unmonitored radioactive release to environment via the Auxiliary Building HVAC. C. RHR pump Cold Leg injection valves and Reactor Coolant System pressure.
B. The Tech Spec cooldown limits were first exceeded at 1530.
Loss of emergency coolant recirculation due to rupture of low pressure piping. D. RHR pump Cold Leg injection valves and Reactor Coolant System pressure.
C. The Tech Spec cooldown limits were first exceeded at 1600.
Unmonitored radioactive release to environment via the Auxiliary Building HVAC. Page: 71 of 75 6122/2009
D. The Tech Spec cool down limits were first exceeded at 1715.
: 73. Initial conditions
Page: 70 of 75                                                                       6/2212009
: -Core Cooling CSFST is ORANGE. -19222-C , "FRP-C.2 Degraded Core Cooling" has been implemented.  
 
-Steam Generator depressurization to 200 psig per 19222-C is in progress. Current conditions:  
71.
-RCS Integrity CSFST RED status has been validated.  
Which ONE of the following are components I parameters for a potential source of RCS leakage that are specifically checked for in 19112-C, "LOCA Outside Containment" and the main concern if this flow path is not isolable?
-The CSFST status tree path points to 19241-C, "Response to Imminent Pressurized Thermal Shock (PTS). -The SS continues with the actions of 19222-C. Which ONE of the following is CORRECT regarding the SS decision during performance of this procedure?
A. Safety Injection pump Cold Leg injection valves and RHUT level.
A. The RED condition on Integrity is expected due to the SI accumulators injecting causing rapid lowering of cold leg temperatures, the SS should complete 19222-C. B. Transitions from FRPs cannot be made until completed or procedurally directed.
Loss of emergency coolant recirculation due to rupture of low pressure piping.
C. Transitions to other procedures is prohibited until ECCS termination criteria is met. D. The RED condition on Integrity is expected due to the SI accumulators injecting, causing a rapid rise in RCS pressure, the SS should complete 19222-C. P a ge: 7 3 of 7 5 6/22/2009
B. Safety Injection pump Cold Leg injection valves and RHUT level.
: 74. Given the following:  
Unmonitored radioactive release to environment via the Auxiliary Building HVAC.
-19241-C, "Pressurized Thermal Shock (PTS)", is in effect. -An RCS temperature instrument failure occurs. -The OATC places both trains of COPS to the ARM position without noticing the instrument failure. -PORV-455 opens. The temperature instrument which failed is a ... A. NR Thot B. WR Thot C. NR Tcold D. WRTcoid Page: 74 of 75 6122/2009
C. RHR pump Cold Leg injection valves and Reactor Coolant System pressure.
: 75. Given the following:  
Loss of emergency coolant recirculation due to rupture of low pressure piping.
-Reactor trip with LOSP in progress.  
D. RHR pump Cold Leg injection valves and Reactor Coolant System pressure.
-The SS has directed the crew to perform a natural circulation cooldown using one of the two following procedures.  
Unmonitored radioactive release to environment via the Auxiliary Building HVAC.
-19002-C , "Natural Circulation Cooldown" OR -19003-C , "Natural Circulation Cooldown With Void In Vessel (With RVLlS)" Which ONE of the following is CORRECT regarding cooldown rate, the procedure to utilize, and why? A. If a coo l down rate of 50 0 F per hour is preferred, use 19002-C. A lower cooldown rate will help prevent reactor vessel head void fo r mation. B. If a cooldown rate of 50 0 F per hour is preferred, use 19003-C. A lower cooldown rate will help prevent reactor vessel head void formation. C. If a cooldown rate of 100 0 F per hour is preferred, use 19002-C. A higher cooldown rate will help prevent reactor vessel head void formation.
Page: 71 of 75                                                                           6122/2009
D. If a cooldown rate of 100 0 F per hour is preferred, use 19003-C. A higher cooldown rate will help prevent reactor vessel head void formation.
 
Page: 75 of 75 6/2212009}}
73.
Initial conditions:
          - Core Cooling CSFST is ORANGE.
          - 19222-C, "FRP-C.2 Degraded Core Cooling" has been implemented.
          - Steam Generator depressurization to 200 psig per 19222-C is in progress.
Current conditions:
          - RCS Integrity CSFST RED status has been validated.
          - The CSFST status tree path points to 19241-C, "Response to Imminent Pressurized Thermal Shock (PTS).
          - The SS continues with the actions of 19222-C.
Which ONE of the following is CORRECT regarding the SS decision during performance of this procedure?
A. The RED condition on Integrity is expected due to the SI accumulators injecting causing rapid lowering of cold leg temperatures, the SS should complete 19222-C.
B. Transitions from FRPs cannot be made until completed or procedurally directed.
C. Transitions to other procedures is prohibited until ECCS termination criteria is met.
D. The RED condition on Integrity is expected due to the SI accumulators injecting, causing a rapid rise in RCS pressure, the SS should complete 19222-C.
Page: 73 of 75                                                                            6/22/2009
 
74.
Given the following:
          - 19241-C, "Pressurized Thermal Shock (PTS)", is in effect.
          - An RCS temperature instrument failure occurs.
          - The OATC places both trains of COPS to the ARM position without noticing the instrument failure.
          - PORV-455 opens.
The temperature instrument which failed is a ...
A. NR Thot B. WR Thot C. NR Tcold D. WRTcoid Page: 74 of 75                                                                         6122/2009
 
75.
Given the following:
          - Reactor trip with LOSP in progress.
          - The SS has directed the crew to perform a natural circulation cooldown using one of the two following procedures.
          - 19002-C, "Natural Circulation Cooldown" OR
          - 19003-C, "Natural Circulation Cooldown With Void In Vessel (With RVLlS)"
Which ONE of the following is CORRECT regarding cooldown rate, the procedure to utilize, and why?
A. If a cooldown rate of 50 0 F per hour is preferred, use 19002-C.
A lower cooldown rate will help prevent reactor vessel head void formation.
B. If a cooldown rate of 50 0 F per hour is preferred, use 19003-C.
A lower cooldown rate will help prevent reactor vessel head void formation .
C. If a cooldown rate of 1000 F per hour is preferred, use 19002-C.
A higher cooldown rate will help prevent reactor vessel head void formation.
D. If a cooldown rate of 1000 F per hour is preferred, use 19003-C.
A higher cooldown rate will help prevent reactor vessel head void formation.
Page: 75 of 75                                                                           6/2212009}}

Latest revision as of 10:13, 12 March 2020

301 Written Exam Written Rd Exam & Answer Key
ML092170365
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/03/2009
From:
Division of Nuclear Materials Safety II
To:
Southern Nuclear Operating Co
References
Download: ML092170365 (78)


Text

CO PY U.S. Nuclear Regulatory Commission Site-Specific RO Written Examination Applicant Information Name:

Date: 06-26-2009 Facility/Unit: Vogtle 1 & 2 Region : 10 11- III 0 IV 0 Reactor Type : W. CE D BW D GE D Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination, you must achieve a final grade of at least 80.00 percent. Examination papers will be collected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the examination begins.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid .

Applicant's Signature Results Examination Value 75 Points Applicant's Score Points Applicant's Grade Percent

Date: 06-26-2009 VEGP NRC RO Examination Answer Sheet Student Name:

1. 26. 51.
2. 27. 52 .
3. 28. 53.
4. 29. 54.
5. 30. 55.
6. 3 1. 56.
7. 32. 57.
8. 33. 58.
9. 34. 59.
10. 35. 60.
11. 36. 61.
12. 37. 62~
13. 38. 63.
14. 39. 64.
15. 40. 65.
16. 4 1. 66.
17. 42. 67.
18. 43. 68.
19. 44. 69.
20. 45. 70.
21. 46. 71.
22. 47. 72.
23. 48. 73.
24. 49. 74.
25. 50. 75.

Answers

  1. ID 0 001A4 .12 I A 2 002G2.1.31 I D 3 003AK2 .05 I B 4 003K6.14 I B 5 004K5 .11 I D 6 004K5.15 I B 7 005K2.03 I B 8 006A4.11 I B 9 007EA2.06 I B 10 007KI.OI I B II 008A4.02 I B 12 008AK2.022 D 13 008K3.03 I C 14 009EG2.4.34 I D 15 010K2.04 I A 16 010K6.01 I B 17 011 EG2.2.37 I D 18 012K3.041 B 19 013KI.071 D 20 015AG2.4.6 I D 21 015K2.01 1 C 22 022AI.02 1 C 23 022AAI.02 1 C 24 025AKI.Ol 1 D 25 026K4.01 1 C 26 027AK3.022 B 27 028K5.041 C 28 029EK2.06 I B 29 029KI.05 1 D 30 032AA2.092 C 31 033AI.Ol 1 B 32 035K6.01 1 B 33 039G2.2.25 2 A 34 051AAI.042 B 35 055EKI.O I I A 36 055K3.0 1 1 C 37 056AA2.391 D 38 057AAI.04 1 A 39 058AA2.01 1 D 40 059A3.04 1 A 41 061AI.012 D 42 061G2.1.71 C 43 062AK3.03 I B 44 062K4.021 A 45 063A2.01 1 C 6- -e64*!I:'6,e8 2 C 47 065AAI.03 1 D 48 068AG2.4.6 2 D Page: lof2 6126/2009

Answers

  1. ID 0 49 071A2.08 1 B 50 073K5 .01 1 A 51 076A2.012 B 52 076A2.021 B 53 076AA2.032 D 54 077AK2.041 A 55 078A3.01 1 A 56 078G2.4.31 1 D 57 086A3.01 1 C 58 103A1.01 1 C 59 103A4.03 2 D 60 G2. 1.8 1 A 61 G2.1.29 1 D 62 G2.1.30 1 C 63 G2.2.132 C 64 G2.2.44 1 B 65 G2.3.11 1 C 66 G2.3.14 1 C 67 G2.4.13 1 B 68 G2.4.34 1 B 69 G2.4.43 1 D 70 WE03EA1.3 1 C 71 WE04EK3.4 1 C 72 WE05EK1.32 D 73 WE06EK3.4 3 A 74 WE08EK2.1 1 B 75 WE09EK 1.2 1 A Page: 20f2 6/2612009

1.

Given the following:

- A turbine runback occurred and the crew has now stabilzed the plant.

- The UO is making minor turbine adjustments to control RCS Tave.

- Control Rods are currently in AUTO.

- Tave is currently 2.8 degrees higher than Tref.

Which ONE of the following describes the current rod speed and when rod movement would stop?

Current Rod Speed When Rod Motion Stops (In steps per minute) (temperature deviation)

A. 8 steps per minute Tave < 1.0 degrees> Tref B. 8 steps per minute Tave < 1.5 degrees> Tref C. > 8 steps per minute Tave < 1.0 degrees> Tref D. > 8 steps per minute Tave < 1.5 degrees> Tref Page: 1 of 75 6/22/2009

2.

Given the following:

- All RCPs are de-energized .

Based on RVLlS indication, which ONE of the following RCP hand switch positions would lead to a false CORE COOLING CSF status tree condition?

Rep 1E handswitches Rep non-1 E handswitches A. Open Open B. Closed Open C. Open Closed D. Closed Closed Page: 2 0f 75 6/22/2009

3.

Given the following:

- Dropped rod recovery in progress.

- The OATC initiates rod withdrawal for the affected rod.

- The ROD CONTROL URGENT FAILURE annunciator illuminates.

Which ONE of the following completes the following statements?

This is due to a_ _ (a),_ _ failure in the unaffected rod group in the affected bank.

Once rod withdrawal is complete, the OATC should reset the ROD CONTROL URGENT FAILURE alarm using the (b),_ _

A. (a) regulation (b) ROD CONTROL STARTUP switch B. (a) regulation (b) ROD CONTROL ALARM RESET switch C. (a) multiplexing (b) ROD CONTROL STARTUP switch D. (a) multiplexing (b) ROD CONTROL ALARM RESET switch Page: 30f75 6/22/2009

4.

Initial conditions:

- RCS heatup is in progress.

- Filling and venting of the RCS in progress.

- The OATC is ready to start the first RCP.

Which ONE of the following sets of parameters will ALLOW starting of the first RCP in accordance with SOP-13003, Reactor Coolant Pumps?

RCS Pressure (psig) VCT Pressure (psig) Seal Injection Flow (gpm)

A. 360 17 14 B. 340 19 10 C. 320 21 7 D. 300 15 11 Page: 4of75 6/22/2009

5.

Given the following:

- AOP-18007-C, "Chemical Volume Control System Malfunction," Section A for "Total Loss of Letdown Flow" has been entered.

- Seal injection flows are as follows:

RCP # 1- 8.5 gpm RCP # 2- 9.0 gpm RCP # 3- 8.5 gpm RCP # 4- 9.0 gpm

- Charging flow is currently - 120 gpm

- The OATC is reducing charging flow using FIC-0121, Charging Flow Controller while maintaining the current seal injection flows using HC-0182, "Seal Water Controller."

In accordance with 18007-C, which ONE of the following is the required action the OATC should take in accordance with 18007-C and the basis for the final charging flow rate?

A. Reduce charging flow to - 35 gpm.

Prevent Regenerative Heat Exchanger damage due to high thermal stresses.

B. Reduce charging flow to - 45 gpm Prevent Regenerative Heat Exchanger damage due to high thermal stresses.

C. Reduce charging flow to - 35 gpm.

Prevent an additional high stress thermal cycle on the charging line nozzles.

D. Reduce charging flow to - 45 gpm.

Prevent an additional high stress thermal cycle on the charging line nozzles.

Page: 5 0f75 6/22/2009

6.

Initial conditions:

- The unit is at 100% power.

- Control rods are in automatic.

- Boric Acid Potentiometer is required to be set at 3.69

- Boric Acid Potentiometer actual setting is 2.69 Current conditions:

- An automatic makeup to the VCT occurs.

Which ONE of the choices completes the following statements?

To offset the reactivity change from the auto makeup control rods would need to be (a),_ _

At EOL, the effects of the Boric Acid Potentiometer setting error causes rods to move (b) than at BOL.

A. (a) INSERTED (b) more B. (a) INSERTED (b) less C. (a) WITHDRAWN (b) more D. (a) WITHDRAWN (b) less.

Page: 60f75 612 2/2009

7.

The Unit is in Mode 1.

Regarding the following valve:

- RHR PMP-A UPSTREAM SUCTION FROM HOT LEG LOOP 1, 1 HV-8701 B.

Which ONE of the following CORRECTLY describes the power supply and the normal valve status for present plant conditions?

A. 125V DC Inverter C0115, valve is normally energized.

B. 125V DC Inverter C0115 , valve is normally de-energized.

C. 125V DC Inverter 00116, valve is normally energized.

O. 125V DC Inverter 00116, valve is normally de-energized.

Page: 7 of 75 6/22/2009

8.

The plant is in Mode 5.

The following annunciator is illuminated and cannot be reset;

- B COLD OP ACTU VLV HV-8000B NOT FULL OPEN Which ONE of the conditions below would require entry into the COPS LCO?

(Assume all valve lift setpoints are set correctly)

A. Train A RHR loop suction isolation valves open.

PORV A handswitch in auto, Train A COPS in ARM .

B. RHR Train A loop suction isolation valves open .

PORV B handswitch in auto , Train B COPS in ARM.

C. RHR Train A and Train B loop suction isolation valves open.

PORV A handswitch in auto, Train A COPS in BLOCK D. RHR Train A and Train B loop suction isolation valves open.

PORV B handswitch in auto, Train B COPS in BLOCK.

Page: 8 0f 75 6/2212009

9.

Initial conditions:

- The plant is at 100% power Current conditions:

During Reactor Trip Breaker "A" testing. the following indications occur.

- Reactor Trip Breaker "A" green light is illuminated.

- Reactor Trip Breaker "B" green light is illuminated.

- Reactor Trip Bypass Breaker "A" red light is illuminated .

- Reactor Trip Bypass Breaker "B" has no light indication.

No operator actions have been taken.

Which ONE of the following is CORRECT regarding plant status and next required operator actions (if any)?

Plant Status Required Action (if any)

A. The Reactor is tripped. Check Turbine Tripped.

B. The Reactor is tripped . Trip the Reactor using both trip handswitches.

C. The Reactor is at power. No action is required .

D. The Reactor is at power. Trip the Reactor using either trip handswitch.

Page: 9 0f 75 6/2 2/2009

10.

Given the following conditions.

- PRZR Safety Valve, PSV-8010A, is stuck slightly open.

- RCS pressure is stable at 1920 psig.

- PZR Vapor Space Temperature is 630 oF.

- PRT pressure is 35 psig and slowly rising .

- Containment pressure is 0 psig .

- PSV-801 OA tailpipe temperature is reading - 281 o F.

Select the correct choice for:

(a) the tail pipe temperature reading, and (b) the expected response of the tailpipe temperature if the safety valve does not close.

REFERENCE PROVIDED A. The tail pipe indication is reading correctly.

The temperature should rise to - 338 oF, then remain stable.

B. The tail pipe indication is reading correctly.

The temperature should rise to - 338°F, then quickly lower to - 212 oF.

C. The tail pipe indication should read - 258°F.

The temperature should rise to - 328°F, then remain stable.

D. The tail pipe indication should read - 258°F.

The temperature should rise to - 328°F, then quickly lower to - 212 oF.

Page: 10 of 75 6/22/2009

11.

Given the following:

- Maintenance on CCW Train A is to be performed.

During draining of the CCW Train A system, drain flow would normally be routed to (a) _ _

When CCW Train A fill and vent is performed, an operator should be stationed at the CCW Hx vent point and the Control Room should (b) _ _

A. (a) the Radwaste Processing Facility (RPF) for processing and reuse.

(b) start 2 CCW pumps simultaneously, remain in this configuration after fill & vent has been completed.

B. (a) the Clean Water Sump for disposal to the Waste Water Retention Basins.

(b) start 2 CCW pumps simultaneously, remain in this configuration after fill & vent has been completed.

C. (a) the Radwaste Processing Facility (RPF) for processing and reuse.

(b) start 3 CCW pumps simultaneously, reduce to 2 CCW pumps after fill & vent has been completed.

D. (a) the Clean Water Sump for disposal to the Waste Water Retention Basins.

(b) start 3 CCW pumps simultaneously, reduce to 2 CCW pumps after fill & vent has been completed.

Page: 11 of 75 6/22/2009

12.

Given the following plant conditions:

- Unit 1 has a stuck open PRZR Code Safety Valve.

- Appropriate operator response actions have been taken.

- RCS pressure is stable at 1345 psig

- Containment temperature is 160 0 F

- Actual PRZR level is 50%

The effect of RCS pressure at 1345 psig will cause the indicated PRZR level LI-459 to read...li!L actual level; the effect of containment temperature at 160 0 F tends to make the indicated PRZR level read ~ than actual level.

A. (a) below (b) lower B. (a) below (b) higher C. (a) above (b) lower D. (a) above (b) higher Page: 12 of 75 6/22/2009

13.

Given the following:

- The unit is at full power.

- A loss of ACCW occurs at 1432.

- The crew has entered AOP-18022-C, "Loss of Auxiliary Component Cooling Water" and is attempting to restore ACCW flow.

- RCP temperatures are below their immediate trip criteria but are slowly rising.

- RCP seal injection flow is - 9 gpm per RCP.

Which one of the following correctly describes:

(a) the MAXIMUM time allowed to trip the RCPs and (b) the MINIMUM temperature setpoint for the motor bearing that requires RCP trip.

A. (a) 1437 (b) 1950 F B. (a) 1437 (b) 311°F C. (a) 1442 (b) 195 0 F D. (a) 1442 (b) 311°F Page: 13 of 75 6122/2009

14.

Given the following:

- Small break LOCA in progress.

- A loss of all offsite power has occurred.

- DG1 B is tagged out.

- The SAT is unavailable.

- The crew transitions to 19012-C, "Post LOCA Cooldown and Depressurization".

- The step for "Isolate SI Accumulators" is being performed .

- The UO has been dispatched to energize the SI Accumulator isolation valves (HV-BBOBA, B, C, D).

Which ONE of the following is CORRECT regarding isolation of the SI Accumulators?

A. All accumulator isolation valves can be energized.

Close all accumulator isolation valves, leave the valves energized.

B. All accumulator isolation valves can be energized .

Close all accumulator isolation valves, then de-energize the valves.

C. Two accumulator isolation valves cannot be energized.

Close energized accumulator isolation valves, vent all of the accumulators.

D. Two accumulator isolation valves cannot be energized.

Close energized accumulator isolation valves, vent two of the accumulators.

Page: 14 of 75 6/22/2009

15.

Actual Pressurizer Code Safety Valve position indication can be read on the (a) which is I are powered from (b), _ _

A. (a) Plasma Displays A and B (b) AY1 A and BY1 B, 120V AC Vital Instrument Panels B. (a) Plasma Displays A and B (b) NYR and NYS, 120V AC Regulated Instrument Panels C. (a) Main Control Board Panel C (b) AY1A and BY1B, 120V AC Vital Instrument Panels D. (a) Main Control Board Panel C (b) NYR and NYS, 120V AC Regulated Instrument Panels Page: 15 of 75 6/22/2009

16.

Given the following conditions I events on Unit 1:

  • Reactor power is 100%.
  • PRZR pressure control is selected to 457 I 456 position.
  • PRZR pressure is at 2235 psig.

Which ONE of the following is the CORRECT plant I system response?

A. PORV 1PV-455 opens.

Both spray valves remain closed and all PRZR heaters will energize.

Pressure will stabilize near 2185 psig.

B. PORV 1PV-456 opens.

Both spray valves remain closed and all PRZR heaters will energize.

Pressure will stabilize near 2185 psig.

C. PORV 1PV-455 opens.

Both spray valves open and all PRZR heaters turn off.

Pressure will continue to lower causing a Reactor Trip and Safety Injection .

D. PORV 1PV-456 opens.

Both spray valves open and all PRZR heaters turn off.

Pressure will continue to lower causing a Reactor Trip and Safety Injection .

Page: 16 of 75 6/22/2009

17.

Given the following :

- A DBA LOCA is in progress on Unit 2.

- ECCS has been aligned for "cold leg recirculation" .

- RHR pump 2A tripped 5 minutes after completing the recirculation alignment.

- All other components are functioning properly.

Which ONE of the operator actions would be CORRECT regarding the Safety Injection pumps (SIPs) and the Centrifugal Charging pumps (CCPs)?

A. Immediately stop both SIPs.

B. Immediately stop both CCPs.

C. Immediately stop CCP "A" and SIP "A".

D. Allow all CCPs and SIPs to continue running .

Page: 17 of 75 6/22/2009

18.

Given the following:

- A HIGH failure (offscale high) of Pressurizer (PRZR) Pressure Channel PT-457 has occurred .

- Immediate Operator Actions of AOP-18001-C for failure of a Pressurizer Pressure channel have been taken.

- NO other actions have been taken.

Which ONE of the following identifies the MINIMUM additional channels needed to cause a:

a) Reactor Trip b) Safety Injection Reactor Trip Safety Injection A. 1 1 B. 1 2 C. 2 1 D. 2 2 Page: 18 of 75 6/22/2009

19.

A Turbine Driven Auxiliary Feed Water (TDAFW) Actuation has been generated.

- HV-5106, "TDAFW Pump Steam Supply Valve" has stroked open.

Which ONE of the following conditions is necessary to RESET the TDAFW actuation and close HV-5106?

A. At least ONE Main Feed Water Pump Turbine RESET.

B. RESET Safety Injection using both QMCB handswitches.

C. ALL Steam Generator levels above the Low-Low level setpoints.

D. ATWS Mitigation System Actuation Circuit (AMSAC) signal CLEAR.

Page: 19 of 75 6122/2009

20.

Given the following:

- A loss of all AC power has occurred .

- The crew is performing 19102, "Loss of All AC Power Recovery With SI Required".

- Both CCPs are stopped .

- All RCP Seal Injection Isolations are OPEN (HV-81 03A, B, C, D)

- RCP seal temperatures are - 465 0 F Which ONE of the following is the CORRECT mitigation strategy for restoration of charging flow and seal injection to cool the RCP seals?

A. Take HC-0182 , Seal Injection Controller to minimum , start a CCP, throttle HC-0182 to establish a slow cooldown rate on the RCP seals.

B. Close all the HV-8103 valves, start a CCP, slowly throttle open the HV-8103 valves one at a time to establish a slow cooldown rate on the RCP seals.

C. Close the seal injection needle valves, start a CCP, slowly throttle open the seal injection needle valves to establish a slow cool down rate on the RCP seals.

D. Close all the HV-8103 valves, start a CCP, perform a controlled cooldown of the RCS to cool the RCP seals, RCPs should not be started prior to a status evaluation.

Page: 20 of 75 6/2212009

21.

Given the following:

- The reactor is stable with critical data being taken.

- The crew is preparing to raise power to the POAH.

- 1BY1 B, 120V Vital Instrument bus de-energizes.

Which ONE of the following describes the effects on the Intermediate Range indications and the reason for the indications?

A. IR N-35, remains energized and indication decreases.

IR N-36, remains energized and indication decreases.

B. IR N-35, remains energized with indication stable.

IR N-36, remains energized with indication stable.

C. IR N-35, remains energized and indication decreases.

IR N-36, will de-energize.

D. IR N-35, remains energized with indication stable.

IR N-36, will de-energize.

Page: 21 of 75 6/22/2009

22.

Which of the following choices correctly identifies the expected equipment condition for the initial and current CNMT pressures? Assume no operator actions taken.

Initial CNMT pressure:

Ch I - 3.5 psig Ch II - 3.9 psig Ch III - 3.7 psig Ch IV - 3.6 psig Current CNMT pressure:

Ch I - 21.3 psig Ch II - 21.7 psig Ch III - 20 .9 psig Ch IV - 22.1 psig A. In itial - Containment Cooler Lo Speed QMCB MLBs LIT.

Current - Containment Spray Pump QMCB handswitch RED lights LIT.

B. Initial - Containment Cooler Lo Speed QMCB MLBs LIT.

Current - Containment Spray Pump QMCB handswitch GREEN lights LIT.

C. Initial - Containment Cooler Lo Speed QMCB MLBs EXTINGUISHED.

Current - Containment Spray Pump QMCB handswitch RED lights LIT.

D. Initial - Containment Cooler Lo Speed QMCB MLBs EXTINGUISHED.

Current - Containment Spray Pump QMCB handswitch GREEN lights LIT.

Page: 22 of 75 6/22/2009

23.

A failure of a flow transmitter has resulted in the following annunciators:

- RCP SEAL WATER INJ LO FLOW

- REGEN HX LETDN HI TEMP

- LETDN HX OUT HI TEMP

- CHARGING LINE HIILO FLOW All other plant parameters are normal.

Which ONE of the following actions would CORRECTLY mitigate this event?

A. Throttle open HV-0182 (seal flow control).

B. Throttle closed HV-0182 (seal flow control).

C. Throttle open FV-0121 (charging flow control).

D. Throttle closed FV-0121 (charging flow control).

Page: 23 of 75 6/22/2009

24.

Given the following conditions:

- The Reactor was shutdown to Mode 3 conditions 28 days ago.

- Core reload has just been completed.

- Unit 1 is in midloop operation.

- All HL and CL nozzle dams are in place.

- A total loss of RHR cooling has occurred.

- RCS temperature was 1OooF when the loss of cooling event initiated.

Calculate the amount of time it will take from the loss of RHR until saturated conditions are reached in the RCS AND the amount of time until core uncovery occurs.

REFERENCE PROVIDED Time Until Saturated Time Until Core Uncovery A. 38 minutes 145 minutes B. 38 minutes 228 minutes C. 58 minutes 145 minutes D. 58 minutes 228 minutes Page: 24 of 75 6/22/2009

25.

Which ONE of the following describes the transition process for the Containment Spray system from the injection flow path to the recirculation flow path after a LOCA?

A. At the RWST LO-LO Level of 29% , the operator manually realigns the flow path .

B. At the RWST LO-LO Level of 29%, the flow path semi-automatically realigns.

C. At the RWST EMPTY level of 8%, the operator manually realigns the flow path .

D. At the RWST EMPTY level of 8%, the flow path semi-automatically realigns.

Page: 25 of 75 6/22/2009

26.

Initial conditions:

- 457 / 456 position selected for PRZR pressure control.

- All channels are reading 2235 psig .

Current conditions:

- PT-455(Ch I) PT-456( Ch II) PT-457(Ch III) PT-458(Ch IV) 2190 psig 2190 psig Offscale High 2285 psig

- Immediate actions to stabilize PRZR pressure have been completed.

- AOP 18001-C, section C for PRZR Pressure Instrumentation, is in effect.

- The step to select controlling channels and recorders is being performed.

Which ONE of the following would be the CORRECT controlling channels to choose and the reason why?

Channel Selection Reason for Channel Selection A. 455/456 Defeat input to the Reactor Protection System.

B. 455/456 Swap to operable control channel inputs.

C. 455/458 Defeat input to the Reactor Protection System.

D. 455/458 Swap to operable control channel inputs.

Page: 26 of 75 6/2212009

27.

Given the following:

- CNMT H2 concentration has remained> 4% following a LOCA.

- An SO has been dispatched for local operation of 1-150B-U4-012, "POST LOCA PURGE CTB ISO VALVE".

In accordance with SOP 13130-1, Post-Accident Hydrogen Control", to protect the SO from radiation exposure, which one of the following correctly describes:

The proper sequence of actions and the location where the SO will manipulate the local valve?

A. First action - UO opens the Post LOCA valves on HVAC panel.

Next action - SO opens the valve on the Equipment Building roof.

B. First action - UO opens the Post LOCA valves on HVAC panel.

Next action - SO opens the valve in the Equipment Building ground level.

C. First action - SO opens the valve on the Equipment Building roof.

Next action - UO opens the Post LOCA valves on HVAC panel.

D. First action - SO opens the valve in the Equipment Building ground level.

Next action - UO opens the Post LOCA valves on HVAC panel.

Page: 27 of 7S 6/22/2009

28.

Given the following conditions:

- Both Reactor Trip Breaker red lights are illuminated .

- Both Reactor Trip Breaker green lights are extinguished.

- The OATC momentarily places the reactor trip handswitch in the TRIP position and Reactor Trip Breaker indications DO NOT CHANGE.

Which of the following choices describes the actions that should have occurred when the OATC placed the handswitch to TRIP?

A. The Undervoltage coils energized.

The Shunt coils energized.

B. The Undervoltage coils de-energized .

The Shunt coils energized .

C. The Undervoltage coils energized.

The Shunt coils de-energized .

D. The Undervoltage coils de-energized.

The Shunt coils de-energized .

Page: 28 of 75 6/22/2009

29 .

Given the following:

- The unit is at 100% power.

- CNMT pressure is 0.2 psig.

- CNMT Mini-Purge is in service for respirable air quality control.

- A Safety Injection occurs.

Which one of the following is correct regarding the Containment Purge System damper status prior to the SI and the signal that will close the dampers?

A. Only the Mini-Purge exhaust dampers were open.

The dampers would receive a direct auto close signal from CIA.

B. Only the Mini-Purge exhaust dampers were open .

The dampers would receive a direct auto close signal from CVI.

C. The Mini-Purge exhaust and supply dampers were open.

The dampers would receive a direct auto close signal from CIA.

D. The Mini-Purge exhaust and supply dampers were open .

The dampers would receive a direct auto close signal from CVI.

Page: 29 of 75 6/22/2009

30 .

Given the following conditions:

- Unit 1 core reload is in progress.

- Source Ranges N-31 and N-32 are reading significantly different.

- I & C determines the power supply for detector N-31 has failed high.

- N-32 is selected for Audio Count Rate in Containment and Control Room.

Due to this power supply failure , N-31 is reading, ___,(a),_ _than it should.

The Operator At The Controls is (b),_ _

A. (a) lower (b) required to suspend core alterations B. (a) lower (b) not required to suspend core alterations C. (b) higher (b) required to suspend core alterations D. (b) higher (b) not required to suspend core alterations Page: 30 of 75 6122/2009

31.

Unit 2 Refueling Outage is in progress:

- Fuel shuffle is in progress in the Spent Fuel Pool (SFP) with the gate to the Containment currently closed .

- SPENT FUEL PIT LOW LEVEL annunciator illuminates in Control Room.

- SFP level lowers to 22 feet 10 inches above the fuel due to a leak

- The SS has directed a makeup to the SFP in accordance with SOP-13719-2, "Spent Fuel Pool Cooling and Purification System" .

Which ONE of the following describes whether SFP level is above or below the Tech Spec limit, and the source of makeup for this condition , in accordance with SOP-13719-2.

SFP level is .. .

A. BELOW the minimum required by Technical Specifications.

Makeup from the Demin Water Storage Tank (DWST).

B. BELOW the minimum required by Technical Specifications.

Makeup from the Refueling Water Storage Tank (RWST).

C. ABOVE the minimum required by Technical Specifications.

Makeup from the Demin Water Storage Tank (DWST).

D. ABOVE the minimum required by Technical Specifications.

Makeup from the Refueling Water Storage Tank (RWST).

Page: 31 of 75 6/2212009

32.

Given the following:

- The unit is at 100% power.

- Loop # 3 Inboard MSIV (HV-3016A) goes fully closed.

Given this condition AND before manual or automatic operation of any other system.

- Loop # 2 SG steam FLOW would (a) and

- Loop # 3 SG LEVEL initially would rapidly (b),_ _

A. (a) rise (b) rise B. (a) rise (b) lower C. (a) lower (b) rise D. (a) lower (b) lower Page: 32 of 75 6/22/2009

33.

Which one of the following choices for the SG code safeties:

(a) lists all the correct lift setpoints (psig), and (b) describes the technical specification bases for these valves?

A. (a) 1185,1200,1210,1220,1235.

(b) limits secondary pressure to :: 110% design pressure during a full power turbine trip without steam dump.

B. (a) 1185, 1200, 1215, 1225, 1235.

(b) limits secondary pressure to:: 110% design pressure during a full power turbine trip without steam dump.

C. (a) 1185,1200,1210,1220,1235.

(b) provide an alternate method for cooling the unit to RHR entry conditions whenever the preferred heat sink via the steam dumps to the condenser is unavailable.

D. (a) 1185, 1200, 1215, 1225, 1235.

(b) provide an alternate method for cooling the unit to RHR entry conditions whenever the preferred heat sink via the steam dumps to the condenser is unavailable.

Page: 33 of 75 6/22/2009

34.

A rapid power reduction per AOP 18013-C was completed to stabilize condenser vacuum. Rods were inserted below the rod insertion limit (RIL) during the power reduction. An Emergency Boration is in progress and the OATC is withdrawing rods to restore rods above the RIL.

Which ONE of the following is CORRECT regarding :

a) whether SS permission is required for Control Rod insertion during the down power?

and b) when Emergency Boration may be terminated?

Control Rod Insertion Emergency Boration Termination A. SS permission is NOT required . When Rod Bank LO Limit alarm clears.

B. SS permission is NOT required. When Rod Bank LO-LO Limit alarm clears.

C. SS permission IS required. When Rod Bank LO Limit alarm clears.

D. SS permission IS required. Wl1e~i(Rad Bank LO-LO Limit alarm clears.

Page: 34 of 7S 6/22/2009

35.

Given the following:

- At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> a Loss of All AC Power occurred.

- Restoration of AC power is not anticipated until 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br />.

Which ONE of the following describes the CORRECT action required by 19100-C, "Loss of All AC Power" as 1E bus battery voltage decays over time and why?

A. When voltage < 105 VDC, open the battery breaker after its inverters are shutdown.

To prevent damaging the battery cells due to cell reversal.

B. When voltage < 120 VDC, open the battery breaker after its inverters are shutdown.

To prevent damaging the battery cells due to cell reversal.

C. When voltage < 105 VDC, open the battery breaker after its inverters are shutdown.

To prevent a possible explosion due to excessive hydrogen production.

D. When voltage < 120 VDC, open the battery breaker after its inverters are shutdown.

To prevent a possible explosion due to excessive hydrogen production.

Page: 35 of 75 6/22/2009

36.

Given the following:

- The unit is at 100% power.

- The loop seal between stages on the in-service SJAE has been lost.

Which ONE of the following is CORRECT regarding the effect of losing the SJAE loop seal on Main Condenser pressure and Main Turbine MW Output?

Main Condenser Pressure (psia) Main Turbine MW Output A. Rises Rises B. Lowers Rises C. Rises Lowers D. Lowers Lowers Page: 36 of 75 6/22/2009

37.

Initial Conditions:

- Safety Injection occurs due to an RCS LOCA

- Train "A" SI has been reset

- Train "8" SI is still actuated

- 80th SI pumps are injecting Current conditions:

- A loss of both RATs occurs

- 80th DG's re-energize their respective busses Which ONE of the following would be CORRECT regarding the SI pumps flow and amp responses?

A. SIP "A" - flow and amps lower, then return to previous values automatically.

SIP "8" - flow and amps lower, then return to previous values automatically.

8. SIP "A" - flow and amps lower, then have to be manually restored.

SIP "8" - flow and amps lower, then have to be manually restored.

C. SIP "A" - flow and amps lower, then return to previous values automatically.

SIP "8" - flow and amps lower, then have to be manually restored.

D. SIP "A" - flow and amps lower, then have to be manually restored.

SIP "8" - flow and amps lower, then return to previous values automatically.

Page: 37 of 75 6/22/2009

38.

Given the following :

- The Unit is at 70% power.

- VCT level is at 46%.

- A loss of a 120VAC Essential bus has occurred.

- VCT auto makeup immediately starts on the bus failure .

Which ONE of the following CORRECTLY describes ...

a) The VCT level channel failure.

b) The effects on VCT auto swapover capability.

A. a) LT-112 (VCT level) fails LOW.

b) VCT auto swapover will occur on actual VCT 10-10 level.

B. a) LT-185 (VCT level) fails LOW.

b) VCT auto swapover will occur on actual VCT 10-10 level.

C. a) LT-112 (VCT level) fails HIGH.

b) VCT auto swapover will NOT occur on actual VCT 10-10 level.

D. a) LT-185 (VCT Level) fails HIGH .

b) VCT auto swapover will NOT occur on actual VCT 10-10 level.

Page: 38 of 75 6/22/2009

39.

The plant is 100% power, all systems in normal alignment.

- ALB04, window D04 for BAT CHARGERS 1 CD1 CA 1CD1 CB TROUBLE illuminates.

- 1CD1 B battery amperage reading is 0 amps

- Channel III TSLB status lights are extinguished.

Which ONE of the following is CORRECT regarding the 125V DC bus 1CD1 status?

A. One battery charger tripped the battery is supplying 1CD1 B. Both battery chargers tripped the battery is supplying 1CD1 C. Both battery chargers tripped 1CD1 is completely de-energized D. One battery charger tripped 1CD1 is supplied by the other charger Page: 39 of 75 6/22/2009

40.

Given the following:

- The unit is at 90% power.

- All Main Feedwater (MFW) system controls in AUTO.

- A low failure of PT-508 (Feedwater Header Pressure) occurs.

Both MFPT speeds should (a) due to the (b)

A. (a) raise (b) lower indicated delta P B. (a) raise (b) higher indicated delta P

c. (a) lower (b) lower indicated delta P D. (a) lower (b) higher indicated delta P Page: 40 of 75 6/22/2009

41.

Initial conditions:

- MFPT "A" is operating.

- MFPT "8" is tripped.

- All SG levels are stable, AFW flows to all SG's are - 225 gpm

- The following annunciator window is extinguished.

- AL816, window F05 "AFW AUTO START MFPT TRIP RL Y CNTL PWR LOSS" Current conditions:

- The UO manually trips MFPT "A".

Which ONE of the following is the CORRECT plant response and actions to take?

A. AFW flows remain as is, SG levels remain stable.

Reset MFPT "A", restart MFPT "A".

B. AFW flows remain as is, SG levels remain stable.

Reset MFPT "8", startup MFPT "8".

C. AFW flows increase, SG levels begin to rise.

Throttle AFW valves closed before they fully open.

D. AFW flows increase, SG levels begin to rise.

Allow AFW valves to stroke fully open, then throttle.

Page: 41 of 75 6/2212009

42 .

The unit is at 100% power when a Reserve Auxiliary Transformer (RAT) switcher trips open . Reactor power rises above 100%.

Auxiliary Feedwater flow indications are:

- SG # 1 - 650 gpm SG # 2 - 350 gpm SG # 3 - 350 gpm SG # 4 - 650 gpm The sequence of actions the UO should take in AOP-18031 , "Loss of Class 1E Electrical Systems" is to ...

A. Reduce Turbine load to reduce Reactor power to ~ 100%.

Then throttle TDAFW speed and MDAFW pump "A" discharge valves.

8 . Reduce Turbine load to reduce Reactor power to ~ 100%.

Then throttle TDAFW speed and MDAFW pump "8" discharge valves.

C. Throttle TDAFW speed and MDAFW pump "A" discharge valves.

Then reduce Turbine load to reduce Reactor power to ~ 100%.

D. Throttle TDAFW speed and MDAFW pump "8" discharge valves.

Then reduce Turbine load to reduce Reactor power to ~ 100%.

Page: 42 of 75 6/22/2009

43.

Given the following :

- Loss of All AC power occurs, 191 OO-C , "Loss of All AC Power" is in effect.

- Power is restored to AA02 via DG1A.

Which ONE of the following is the CORRECT action regarding restoration of the NSCW system to service?

A. Verify NSCW discharge valves go closed to prevent water hammer.

Manually start 2 pumps.

B. Verify NSCW discharge valves go closed to prevent water hammer.

Verify 2 pumps start automatically.

C. Verify NSCW discharge valves are open to prevent high starting currents.

Manually start 2 pumps.

D. Verify NSCW discharge valves are open to prevent high starting currents Verify 2 pumps start automatically.

Page: 43 of 75 6/22/2009

44.

The "Maintenance I Normal" switch located on the QEAB for a 4160V AC bus has been placed in the "Maintenance" position to support bus inspection.

When placed in the "Maintenance" position, this switch ...

A. bypasses the time delay on the overcurrent trips on the bus supply breakers.

B. bypasses the time delay on the overcurrent trips on the bus load breakers.

C. bypasses the instantaneous overcurrent trips on the bus supply breakers.

D. bypasses the instantaneous overcurrent trips on the bus load breakers.

Page: 44 of 75 6/22/2009

45.

The plant is in Mode 3 controlling Tave with the ARVs when 125V DC panel1AD1 de-energizes due to a ground fault. Loop 4 ARV was - 10% open .

Regarding operation of the ARV, list:

(a) the failure mode on loss of DC power, and (b) where the ARV can be operated.

A. (a) as is (b) locally using the hand pump station B. (a) as is (b) from Shutdown Panel A C. (a) closed (b) locally using the hand pump station D. (a) closed (b) from Shutdown Panel A Page: 45 of 75 6/2212009

46.

The plant is in Mode 1.

A leak has developed in the DG1A Fuel Oil Storage Tank (FaST). The FaST level decrease is noted by the following times.

- at 1730 level is 90.9% (78,200 gallons)

- at 1745 level is 86.9% (74,800 gallons)

- at 1800 level is 82.9% (71,350 gallons)

- at 1815 level is 78.9% (67,900 gallons)

- at 1830 level is 74.9% (64,500 gallons)

Which ONE of the following is the EARLIEST discovery time that DG1A is inoperable in accordance with Technical Specifications?

A. 1745 B. 1800 C. 1815 D. 1830 Page: 46 of 75 6/22/2009

47.

Given the following initial conditions:

- The unit is at 340 oF, RCS cooldown in progress.

- RHR Train A is in the shutdown cooling mode.

- A loss of instrument air occurs.

- The RHR system AOVs all go to the failure mode for loss of air.

Current conditions:

- Instrument air has been restored.

- No Control Room or local actions have been performed for RHR.

Which ONE of the following is CORRECT regarding :

- RCS cool down rate response after instrument air is restored.

- RHR system flow rate response after instrument air is restored.

RCS cooldown rate RHR system flow rate A. raises raises B. raises lowers C. lowers raises D. lowers lowers Page: 47 of75 6/22/2009

48.

Unit 1 Control Room has been evacuated due to a fire.

- 18038-1 , "Operation From Remote Shutdown Panels" is in effect.

- Two ARVs have been placed in the "Fire Emergency" mode of operation.

Which ONE of the following are the fire event qualified ARVs and the method to control RCS temperature in the Fire Emergency mode?

A. ARVs # 1 and # 4 are fire event qualified .

Using the auto-manual controllers located on the front of the shutdown panels.

B. ARVs # 2 and # 3 are fire event qualified.

Using the auto-manual controllers located on the front of the shutdown panels.

C. ARVs # 1 and # 4 are fire event qualified .

Using a 4 to 20 mA current source connected with banana jacks inside the panels.

D. ARVs # 2 and # 3 are fire event qualified .

Using a 4 to 20 mA current source connected with banana jacks inside the panels.

Page: 48 of 75 6/22/2009

49.

A gaseous release is in progress in accordance with SOP-13202 , "Gaseous Releases".

Considering the following events which occur during the release, determine if the release would be allowed to continue or require termination for each of the following :

a) A-RE-0014 Radiation Monitor fails low b) precipitation (rain, snow, sleet, etc.) is occuring.

A. a) terminate the release.

b) terminate the release.

B. a) terminate the release.

b) continue the release .

C. a) continue the release.

b) terminate the release.

D. a) continue the release.

b) continue the release.

Page: 49 of 7S 6/2212009

50.

Given the following:

- A rapid power reduction (> 15% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) is in progress to comply with the actions of AOP-18009-C, a "Steam Generator Tube Leakage".

- Radiation is indicated on RE-0724 Steam Line monitor.

Which ONE of the following is CORRECT regarding:

- when RE-0724 would indicate a Steam Generator Tube leak

- the source of radiation detected.

A. only when the reactor is at power.

N-16 B. only when the reactor is at power.

1-131 C. any time the SJAE is in service.

N-16 D. any time the SJAE is in service.

1-131 Page: 50 of 75 6/22/2009

51.

Given the following:

- The plant is at 100% power.

- NSCW Train B tagged out for repair.

- NSCW Train A pump # 3 trips.

- NSCW Train A pump # 5 cannot be started.

- AOP-18021-C, "Loss of Nuclear Service Cooling Water" has been entered.

- No other operator actions have been taken.

Which ONE of the following is the CORRECT crew action(s)?

A. Place all Train A NSCW pumps in PTL, Emergency Trip DG1A.

Shutdown to Mode 3 per UOP-12004-C, "Power Operations" within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

B. Place all Train A NSCW pumps in PTL, Emergency Trip DG1A.

Trip the Reactor and go to E-O, align NSCW Train A for single pump operations.

C. Allow NSCW Pump # 1 to continue running, DG1A should be left in AUTO.

Shutdown to Mode 3 per UOP-12004-C, "Power Operations" within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

D. Allow NSCW Pump # 1 to continue running, DG1A should be left in AUTO.

Trip the Reactor and go to E-O, align NSCW Train A for single pump operations.

Page: 51 of 75 6/22/2009

52.

The plant is at 100% power.

- RHR pump A is running for an 1ST surveillance.

- CCP "A" is running.

The following annunciator illuminates on the QMCB.

- NSCW TRAIN A LO HDR PRESS

- Various other Train A NSCW low flow annunciators illuminate.

Approximately 10 seconds later the UO notes the following:

- 3 NSCW pumps on Train A red lights are illuminated.

- NSCW Train A return flow is 0 gpm.

- NSCW Train A supply flow is significantly higher than 17,500 gpm.

Which ONE of the following is the CORRECT initiating event and next action to take?

Initiating Event Next action A. Pump sheared shaft Stop one of the running Train A NSCW pumps.

B. Catastrophic break Place all NSCW Train A pump handwitches in PTL.

C. Catastrophic break Stop RHR pump A and CCP A, then isolate letdown .

D. Pump sheared shaft Verify the 3rd Train A NSCW pump discharge valve opens.

Page: 52 of 75 , 6/2212009

53.

Following a controlled unit shutdown for a refueling outage, degassification of the RCS is in progress via chemical addition.

Shortly following the chemical addition, a crud burst occurs as expected.

Which ONE of the following radiation monitors would be expected to alarm?

A. RE-0005, Containment - High Range B. RE-0007A, Rad Chern Lab C. RE-00011 , Seal Table Room D. RE-48000, CVCS Letdown Page: 53 of 75 6/22/2009

54.

Given the following initial conditions:

- The unit is at 100% power.

- DG1A is paralleled to the grid for surveillance testing at 6500 kW.

Current condtions:

- AOP-18017-C, "Abnormal Grid Disturbances/Loss of Grid" section A has been entered.

- Grid frequency has lowered below 60 Hz.

Which ONE of the following would be CORRECT regarding

- the initial conditions of the DG .

- the effects of the abnormal grid disturbance on the DG.

A. DG speed is used to adjust kW .

The governor would throttle open on the fuel racks to attempt to raise DG speed.

B. DG speed is used to adjust kW.

The governor would throttle closed on the fuel racks to attempt to lower DG speed.

C. DG speed is used adjust kVARS.

The governor would throttle open on the fuel racks to attempt to raise DG speed.

D. DG speed is used adjust kVARS.

The governor would throttle closed on the fuel racks to attempt to lower DG speed.

Page: 54 of 75 6/22/2009

55.

Given the following:

- Unit 1 is at 100% power.

- Air compressor # 4 is tagged out.

- An LOSP results in de-energization of 2 of the 3 remaining compressors.

- A slow decrease in air header pressure has occurred.

- Power has now been restored to the 2 previously de-energized compressors.

- Instrument Air Header pressure dropped as low as 82 psig.

- Instrument Air Header pressure is now 97 psig and slowly rising .

Which ONE of the following is CORRECT regarding the current status of the Instrument Air system?

A. PV-9375, Service Air Isolation valve is OPEN .

All 3 available air compressors are running.

B. PV-9375, Service Air Isolation valve is OPEN.

2 of 3 available air compressors are running .

C. PV-9375, Service Air Isolation valve is CLOSED.

All 3 available air compressors are running.

D. PV-9375, Service Air Isolation valve is CLOSED.

2 of 3 available air compressors are running.

Page: 55 of 75 6/22/2009

56.

Given the following :

- Unit 1 at 25% power, Unit 2 at 100% power.

- The only two available air compressors on each unit are running (4 total).

- Air compressor # 4 is aligned to Unit 2.

Unit 1 has the following indications:

- SERVICE AIR LO PRESS annunciator lit.

- QMCB Service Air Pressure meter - 0 psig

- QMCB Instrument Air Pressure meter - 72 psig and lowering.

Annunciator window INST AIR EQUIP LO PRESS illuminates several minutes later.

Which ONE of the following is the CORRECT action the operators should perform in response to the annunciator?

A. Align the swing air compressor from Unit 2 to Unit 1.

B. Open the cross tie valve to supply Unit 1 air header from Unit 2.

C. Trip the Unit 1 Turbine and isolate Turbine Building Instrument Air.

D. Trip the Unit 1 Reactor and enter E-O while taking actions to restore air pressure.

Page: 56 of 75 6/22/2009

57.

Given the following:

- The fire alarm computer goes into alarm .

- The Outside Area Operator reports a fire on RAT "A" You note the following on the QPCP.

- Pressure gauge "Fire Pump CPI - 7918" pressure lowers to 92 psig, then recovers.

Which ONE of the following is CORRECT regarding how many fire pumps are running and WHERE this can be determined?

A. ONLY the Motor Driven Fire pump is running .

QPCP and local observation .

B. ONLY the Motor Driven Fire pump is running .

Local observation ONLY.

C. The Motor Driven pump and one Diesel Fire pump are running.

QPCP and local observation.

D. The Motor Driven pump and one Diesel Fire pump are running.

Local observation ONLY.

Page: 57 of 75 6/22/2009

58.

Given the following:

- The unit is at full power.

- A small air leak inside Containment is causing a slow rise in Containment pressure.

- Containment pressure is currently reading 1.9 psig.

Containment pressure is (a), _ __

To relieve Containment pressure, flow must pass through a restrictive orifice until containment pressure is (b) , then the normal flow path may be aligned.

A. (a) within Technical Specification LCO limits.

(b) less than +0 .3 psig B. (a) within Technical Specification LCO limits.

(b) less than -0 .3 psig C. (a) in violation of Technical Specification LCO limits.

(b) less than +0 .3 psig D. (a) in violation of Technical Specification LCO limits.

(b) less than -0.3 psig Page: 58 of 75 6/22/2009

59.

Given the following conditions.

- The OATC has manually actuated Containment Spray using,_ _ (a)._ _on 1 of 2 QMCB locations.

- As a result of the manual action, the annunciator window(s) for (b), _ _

should illuminate.

A. (a) 1 of 2 handswitChes (b) CNMT SPRAY ACTUATION only B. (a) 2 of 2 handswitches (b) CNMT SPRAY ACTUATION only C. (a) 1 of 2 handswitches (b) both CNMT SPRAY ACTUATION and CNMT VENT ISO ACTUATION D. (a) 2 of 2 handswitches (b) both CNMT SPRAY ACTUATION and CNMT VENT ISO ACTUATION Page: 59 of 75 6/2212009

60.

Given the following:

- Control Room is being evacuated due to a fire.

The OATC (RO) should report to Remote Shutdown Panel _ _ _ __

In accordance with 18038-1/2, "Operation From Remote Shutdown Panels" the preferred method of communications to co-ordinate in plant activities with personnel outside the control room is via _ _ _ __

A. IIA" , sound powered phones plugged into dedicated channels (red jacks).

B. 118 11 bridge network phone extension # 3145 using codes # 123 or # 234.

C. "A" , bridge network phone extension # 3145 using codes # 123 or # 234.

D. "8" , sound powered phones plugged into dedicated channels (red jacks).

Page: 60 of 75 6/22/2009

61.

You are performing a lineup verification for valves in various positions:

Which ONE of the following is CORRECT performance of the lineup verification in accordance with NMP-OS-002 , "Verification Policy"?

A. A valve is required to be closed .

Turn valve slightly in the open direction, using reasonable force, reclose the valve.

B. A valve is required to be throttled 2 turns open.

Turn valve in closed direction, count turns to ensure correct, re-open valve 2 turns.

c. A valve is found not in the required lineup position .

Align valve in the required position, notify the SS once the valve is properly aligned .

D. A valve position cannot be determined by local observation.

Leave valve as is, use remote handswitch light indications to verify valve position.

Page: 61 of 75 6/22/2009

62.

Given the following:

- Control Room has been evacuated.

- An LOSP has occurred .

- The crew is preparing to close a DG1A output breaker (1AA02-19).

Which ONE of the following is CORRECT regarding where and how the DG output breaker is closed?

A. At Remote Shutdown Panel A.

Take local control of the DG output breaker, then close the breaker handswitch.

B. On the front of DG1A Generator panel.

Take the handswitch located on the front of DG1A Generator panel to close.

C. At the 4160V 1E Switchgear local control panel (1 AA02-00).

Take local control of the DG output breaker, then close the breaker handswitch .

D. On the front of the DG output breaker at 4160V 1E Switchgear 1AA02.

Take the handswitch located on the front of the DG output breaker to close.

Page: 62 of 75 6/22/2009

63.

Which one of the following describes the meaning of an OPERATING PERMIT TAG hanging on a component as described in NMP-AD-003, Equipment Clearance and Tagging?

A.

  • The component position can NOT be changed until the tag is cleared .
  • The component is under the control of a Tagout Holder.

B.

  • The component position can NOT be changed until the tag is cleared.
  • The component has been designated as an isolation boundary for personnel safety.

C.* The component position can ONLY be changed with permission of the Tagout Holder.

  • The component is under the control of a Tagout Holder.

D.* The component position can ONLY be changed with permission of the Tagout Holder.

  • The component has been designated as an isolation boundary for personnel safety.

Page: 63 of 75 6/22/2009

64.

Given the following :

- Reactor power is 30%

- A reactor shutdown is in progress

- A high failure of IR NIS channel N-36 occurs Which ONE of the following is CORRECT regarding the effects of this failure as reactor shutdown progresses?

Power < P-10 Power < P- 6 A. Reactor trip occurs SR High flux trip automatically unblocks B. Reactor trip occurs SR High flux trip must be manually unblocked

c. Reactor does NOT trip SR High flux trip automatically unblocks D. Reactor does NOT trip SR High flux trip must be manually unblocked Page: 64 of 75 6/22/2009

65.

Given the following :

- Waste Monitor Tank (WMT) # 9 release is in progress.

- The control room HIGH RADIATION annunciator illuminates.

RE-0018, Liquid Waste Effluent radiation monitor, has failed high .

- WMT 9 discharge flow transmitter, FT-1085A, indicates 35 gpm .

Per ARP 17213-1 for the PLPP annunciator window for WATER DISCH LINE HI RAD, the Auxiliary Building SO should ...

A. fail air to RV-0018.

OR close manual discharge valves to the environment.

B. fa il air to RV-0018.

OR using the local manual handwheel , close RV-0018.

C. close RV-0018 locally on the PLPP.

OR close manual discharge valves to the environment.

D. close RV-0018 locally on the PLPP.

OR using the local manual handwheel, close RV-0018.

Page: 65 of 75 6/2212009

66.

Given the following :

- The unit is at 100% power.

- A containment entry is to be performed per 00303-C, "Containment Entry" for an RCS leak inspection.

The area inside the bioshield should be posted as a (a),_ _

Entry into _ _ (b)__ is prohibited.

A. (a) Very High Radiation Area (Grave Danger)

(b) the Preaccess Filter Unit area (260 ft elevation).

B. (a) High Radiation Area (b) the Preaccess Filter Unit area (260 ft elevation).

C. (a) Very High Radiation Area (Grave Danger)

(b) The elevator.

D. (a) High Radiation Area (b) The elevator.

Page: 66 of 75 6/2212009

67.

Given the following:

- IPC computer is unavailable, CSFST monitoring must be performed manually.

- You are assigned 19200-C, "Critical Safety Function Status Tree" monitoring and are making your first pass through the CSFSTs.

Critical Safety Function Status Trees indicate the following:

- Subcriticality GREEN

- Core Cooling ORANGE

- Heat Sink Not performed yet

- Integrity Not performed yet

- Containment Not performed yet

- Inventory Not performed yet Which ONE of the following describes the:

(a) proper performance of CSFST monitoring on the first pass through.

(b) your responsibilities for CSFST monitoring in accordance with 19200-C and A. (a) Immediately tell the SS to transition to Core Cooling , then continue the first pass through the status trees.

(b) Continuous monitoring is required.

B. (a) Complete the first pass through the status trees, then inform the SS to transition to the highest priority FRP.

(b) Continuous monitoring is required.

C. (a) Immediately tell the SS to transition to Core Cooling, then continue the first pass through the status trees.

(b) Monitor every 10 to 15 minutes unless a change in status occurs.

D. (a) Complete the first pass through the status trees, then inform the SS to transition to the highest priority FRP.

(b) Monitor every 10 to 15 minutes unless a change in status occurs.

Page: 67 of 75 6/22/2009

68.

Given the following:

- Control Room has been evacuated due to a fire .

- AOP-18038-1 , "Operation From Remote Shutdown Panels" is in effect.

- The operators have just aligned components per Attachment I, "Control Switch Required Positions".

Attachment I is performed at _ _ (a),_ _ in order to align _ _(b) _ _

A. (a) both Remote Shutdown Panels (b) Fire event qualified equipment to prevent spurious actuations.

8. (a) both Remote Shutdown Panels (b) switches with maintained contacts to prevent changing status on transfer.

C. (a) Remote Shutdown Panel "8" only (b) Fire event qualified equipment to prevent spurious actuations.

D. (a) Remote Shutdown Panel "8" only (b) switches with maintained contacts to prevent changing status on transfer.

Page: 68 of 75 6/2212009

69.

The Emergency Director (ED) has directed you to perform an ENN roll call in accordance with 91 002-C, "Emergency Notifications", checklist 4 "Directions for ENN Communicators". .

- Burke County and State of Georgia have failed to respond to the initial roll call.

Which ONE of the following is the CORRECT actions to perform?

A. Transmit the notification message to the agencies that responded, inform the ED that two agencies couldn 't be notified.

Southern Linc would be the next priority to establish communications.

B. Transmit the notification message to the agencies that responded, inform the ED that two agencies couldn't be notified .

The Back-up ENN Bridge would be next priority to establish communications.

C. Promptly notify the ED of the agencies that failed to respond to the initial roll call.

Southern Linc would be the next priority to establish communications.

D. Promptly notify the ED of the agencies that failed to respond to the initial roll call.

The Back-up ENN Bridge would be next priority to establish communications.

Page: 69 of 75 6/2212009

70 .

Given the following plant conditions:

- The Reactor has tripped and Safety Injection has actuated .

- 19012-C, "Post LOCA Cooldown and Depressurization" is in progress.

- The crew is performing an RCS cooldown in accordance with the procedure.

The following is a plot of the cooldown:

Time RCS Tcold Time RCS Tcold 1400 549°F 1545 427°F 1415 532°F 1600 397 0 F 1430 522 0 F 1615 384 0 F 1445 507°F 1630 366 0 F 1500 500 0 F 1645 342°F 1515 480 0 F 1700 312 0 F 1530 449°F 1715 282°F Which ONE of the following is CORRECT regarding the Tech Spec cooldown limits?

A. The crew is in compliance with Tech Spec cooldown limits.

B. The Tech Spec cooldown limits were first exceeded at 1530.

C. The Tech Spec cooldown limits were first exceeded at 1600.

D. The Tech Spec cool down limits were first exceeded at 1715.

Page: 70 of 75 6/2212009

71.

Which ONE of the following are components I parameters for a potential source of RCS leakage that are specifically checked for in 19112-C, "LOCA Outside Containment" and the main concern if this flow path is not isolable?

A. Safety Injection pump Cold Leg injection valves and RHUT level.

Loss of emergency coolant recirculation due to rupture of low pressure piping.

B. Safety Injection pump Cold Leg injection valves and RHUT level.

Unmonitored radioactive release to environment via the Auxiliary Building HVAC.

C. RHR pump Cold Leg injection valves and Reactor Coolant System pressure.

Loss of emergency coolant recirculation due to rupture of low pressure piping.

D. RHR pump Cold Leg injection valves and Reactor Coolant System pressure.

Unmonitored radioactive release to environment via the Auxiliary Building HVAC.

Page: 71 of 75 6122/2009

73.

Initial conditions:

- Core Cooling CSFST is ORANGE.

- 19222-C, "FRP-C.2 Degraded Core Cooling" has been implemented.

- Steam Generator depressurization to 200 psig per 19222-C is in progress.

Current conditions:

- RCS Integrity CSFST RED status has been validated.

- The CSFST status tree path points to 19241-C, "Response to Imminent Pressurized Thermal Shock (PTS).

- The SS continues with the actions of 19222-C.

Which ONE of the following is CORRECT regarding the SS decision during performance of this procedure?

A. The RED condition on Integrity is expected due to the SI accumulators injecting causing rapid lowering of cold leg temperatures, the SS should complete 19222-C.

B. Transitions from FRPs cannot be made until completed or procedurally directed.

C. Transitions to other procedures is prohibited until ECCS termination criteria is met.

D. The RED condition on Integrity is expected due to the SI accumulators injecting, causing a rapid rise in RCS pressure, the SS should complete 19222-C.

Page: 73 of 75 6/22/2009

74.

Given the following:

- 19241-C, "Pressurized Thermal Shock (PTS)", is in effect.

- An RCS temperature instrument failure occurs.

- The OATC places both trains of COPS to the ARM position without noticing the instrument failure.

- PORV-455 opens.

The temperature instrument which failed is a ...

A. NR Thot B. WR Thot C. NR Tcold D. WRTcoid Page: 74 of 75 6122/2009

75.

Given the following:

- Reactor trip with LOSP in progress.

- The SS has directed the crew to perform a natural circulation cooldown using one of the two following procedures.

- 19002-C, "Natural Circulation Cooldown" OR

- 19003-C, "Natural Circulation Cooldown With Void In Vessel (With RVLlS)"

Which ONE of the following is CORRECT regarding cooldown rate, the procedure to utilize, and why?

A. If a cooldown rate of 50 0 F per hour is preferred, use 19002-C.

A lower cooldown rate will help prevent reactor vessel head void formation.

B. If a cooldown rate of 50 0 F per hour is preferred, use 19003-C.

A lower cooldown rate will help prevent reactor vessel head void formation .

C. If a cooldown rate of 1000 F per hour is preferred, use 19002-C.

A higher cooldown rate will help prevent reactor vessel head void formation.

D. If a cooldown rate of 1000 F per hour is preferred, use 19003-C.

A higher cooldown rate will help prevent reactor vessel head void formation.

Page: 75 of 75 6/2212009