ML11111A097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301                              Control Room/In-Plant Systems Outline                                      Form ES-301-2 Facility: Point Beach                                                          Date of Examination: 04/25-5/6/2011 Exam Level: RO                SRO-I          SRO-U                            Operating Test No.: 2011301
{{#Wiki_filter:ES-301                              Control Room/In-Plant Systems Outline                                      Form ES-301-2 Facility: Point Beach                                                          Date of Examination: 04/25-5/6/2011 Exam Level: RO                SRO-I          SRO-U                            Operating Test No.: 2011301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
                              @
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                        Type Code*                Safety Function
System / JPM Title                                        Type Code*                Safety Function
: a. CRD / Recovery of a Dropped Rod                                                            A/N/S                    1
: a. CRD / Recovery of a Dropped Rod                                                            A/N/S                    1
Line 26: Line 24:
: f. RHR / Respond to a Shutdown LOCA                                                            D/L/S                  4P
: f. RHR / Respond to a Shutdown LOCA                                                            D/L/S                  4P
: g. CCW / Switch Operating CCW Pumps                                                              D/S                    8
: g. CCW / Switch Operating CCW Pumps                                                              D/S                    8
: h. RPS / Monthly RPS Surveillance                                                              A/N/S                    7
: h. RPS / Monthly RPS Surveillance                                                              A/N/S                    7 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
                      @
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. EDG / Local Manual Start of an EDG                                                          A/N/P                    6
: i. EDG / Local Manual Start of an EDG                                                          A/N/P                    6
: j. RHR / Transfer to Containment Sump Recirculation                                              D/P                  4P
: j. RHR / Transfer to Containment Sump Recirculation                                              D/P                  4P

Latest revision as of 04:27, 11 March 2020

2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 RO JPMs Form.Pdf
ML11111A097
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
Operations Branch III
To:
References
Download: ML11111A097 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Date of Examination: 04/25-5/6/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: 2011301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. CRD / Recovery of a Dropped Rod A/N/S 1
b. CVCS / Respond to Failure of Normal Boration Path D/S 2
c. SI / Restore 1A Accumulator Pressure D/S 3
d. TG / Synchronize Turbine Generator with Grid D/S 4S
e. HVAC / Perform Accident Recirc Fan-Cooler Surveillance D/L/S 5
f. RHR / Respond to a Shutdown LOCA D/L/S 4P
g. CCW / Switch Operating CCW Pumps D/S 8
h. RPS / Monthly RPS Surveillance A/N/S 7 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. EDG / Local Manual Start of an EDG A/N/P 6
j. RHR / Transfer to Containment Sump Recirculation D/P 4P
k. AFW / Perform Designated AOP 10 A Steps D/P 4S

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator