ML11111A097

From kanterella
Jump to navigation Jump to search
2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 RO JPMs Form.Pdf
ML11111A097
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
Operations Branch III
To:
References
Download: ML11111A097 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Date of Examination: 04/25-5/6/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: 2011301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. CRD / Recovery of a Dropped Rod A/N/S 1
b. CVCS / Respond to Failure of Normal Boration Path D/S 2
c. SI / Restore 1A Accumulator Pressure D/S 3
d. TG / Synchronize Turbine Generator with Grid D/S 4S
e. HVAC / Perform Accident Recirc Fan-Cooler Surveillance D/L/S 5
f. RHR / Respond to a Shutdown LOCA D/L/S 4P
g. CCW / Switch Operating CCW Pumps D/S 8
h. RPS / Monthly RPS Surveillance A/N/S 7

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. EDG / Local Manual Start of an EDG A/N/P 6
j. RHR / Transfer to Containment Sump Recirculation D/P 4P
k. AFW / Perform Designated AOP 10 A Steps D/P 4S All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1

- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1