Line 1,018: Line 1,018:
                                                                         ~4LLZ                        041
                                                                         ~4LLZ                        041


                                                                                                            ;
Al  IACHtvENI  'A Letdown Cooler Nozzt- Lo Channel Body                                                    PASE    5Or 1/7z-,
Al  IACHtvENI  'A Letdown Cooler Nozzt- Lo Channel Body                                                    PASE    5Or 1/7z-,
V'eldNo. : .1-t~m -I - 31tit- k/I                                                    Item No.:    ot, *5    . 15o- o0o3 CQqEE-EA-5rý-    &Y-USL                                                          ( ova    r((/_ AV-(A r  n.t4            -      - ICPA                                                      ARC-,          7 2Nozzle rp S2Z          ff~7'6            ("J    Lz0.1,
V'eldNo. : .1-t~m -I - 31tit- k/I                                                    Item No.:    ot, *5    . 15o- o0o3 CQqEE-EA-5rý-    &Y-USL                                                          ( ova    r((/_ AV-(A r  n.t4            -      - ICPA                                                      ARC-,          7 2Nozzle rp S2Z          ff~7'6            ("J    Lz0.1,
Line 1,431: Line 1,430:
System ID:            51A Component ID: 1-51A-04-1C                                                                                                              Size/Length:          N/A      Thickness/Diameter:        0.67414.01SS Limitations:          Yes - See attached Limitation Report                                                                                          Start Time:  1208          Finish Time:        1240 Examination Surface:                Inside EJ                      Outside [                          Surface Condition:      AS GROUND Lo Location:                          9.1.1.1                            Wo Location:              Centerline of Weld              Couplant:          ULTRAGEL 1i        Batch No.:            09125 Temp. Tool Mfg.:                          FISHER                              Serial No.:              MCNDE32770                  Surface Temp.:          69  °F Cal. Report No.:                                                                CAL-09-355, 356, 357 Angle Used              -0      I45                45T1          6013,              1, Scanning dB4.2                                      10633                    9 Indication(s):        Yes    MV          No    LI                                          Scan Coverage:          Upstream []      Downstream E]        CW []    CCW 2 Comments:
System ID:            51A Component ID: 1-51A-04-1C                                                                                                              Size/Length:          N/A      Thickness/Diameter:        0.67414.01SS Limitations:          Yes - See attached Limitation Report                                                                                          Start Time:  1208          Finish Time:        1240 Examination Surface:                Inside EJ                      Outside [                          Surface Condition:      AS GROUND Lo Location:                          9.1.1.1                            Wo Location:              Centerline of Weld              Couplant:          ULTRAGEL 1i        Batch No.:            09125 Temp. Tool Mfg.:                          FISHER                              Serial No.:              MCNDE32770                  Surface Temp.:          69  °F Cal. Report No.:                                                                CAL-09-355, 356, 357 Angle Used              -0      I45                45T1          6013,              1, Scanning dB4.2                                      10633                    9 Indication(s):        Yes    MV          No    LI                                          Scan Coverage:          Upstream []      Downstream E]        CW []    CCW 2 Comments:
NIA Results:        Accept      LI          Reject []                      Info    LI Percent Of Coverage Obtained > 90%:                                      No                    Reviewed Previous Data:                    Yes IExaminer          Level    ,,_,.            ~                /J 2"/  *        ....
NIA Results:        Accept      LI          Reject []                      Info    LI Percent Of Coverage Obtained > 90%:                                      No                    Reviewed Previous Data:                    Yes IExaminer          Level    ,,_,.            ~                /J 2"/  *        ....
                                                                              .*;..                                      .........                                              ..          ".. ..    ......          ..
Reviewer                                    Signature                                  " Date Koster, Rickey Date 10/26/2009
Reviewer                                    Signature                                  " Date Koster, Rickey Date 10/26/2009
                                                                                                                                                                                                 /o~~-'9-=
                                                                                                                                                                                                 /o~~-'9-=

Latest revision as of 13:55, 10 March 2020

Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 11-ON-001
ML12009A091
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/23/2011
From: Gillespie T
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RR 11-ON-001
Download: ML12009A091 (239)


Text

Duke T. PRESTON GILLESPIE, JR.

Vice President SEnergy. Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.

Seneca, SC 29672 864-873-4478 864-873-4208 fax T.Gillespie@duke-energy.com December 23, 2011 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Units 1 and 2 Docket No. 50-269, -270 Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 11-ON-001 Pursuant to 10 CFR 50.55a(g)(5)(iii), attached is a Request for Relief from the requirement to examine 100% of the volume specified by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section Xl, Rules for Inservice Inspection of Nuclear Power Plant Components, 1998 Edition with 2000 Addenda (as modified by Code Case N-460).

The attached Request for Relief 1 1-ON-001 is to allow Duke Energy to take credit for the enclosed Table 1 list of limited ultrasonic examinations on welds associated with various systems and components during Unit 1 EOC25 and Unit 2 EOC24 refueling outages. The ultrasonic examination coverage of the subject Unit 1 and 2 welds did not meet the 90%

examination requirements of Code Case N-460. The obtainable volume coverage for weld examination is indicated on Attachments A and B of the relief request. Achievement of greater examination coverage for these welds is impractical due to piping/valve geometry and interferences. Therefore, Duke Energy requests that the NRC grant relief as authorized under 10 CFR 50.55(g)(6)(i).

If there are any questions or further information is needed you may contact Corey Gray at (864)-873-6325.

Sincerely, leston Gillespie Jr.,

Site Vice President Attachment A Attachment B www. duke-energy.corn

U. S. Nuclear Regulatory Commission December 23, 2011 Page 2 Xc w/att: Victor Mcree Region II Administrator U. S. Nuclear Regulatory Commission Marquis One Tower 245 Preachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 John Stang Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 0-8 G9A Washington, DC 20555 Xc w/o attachment Andy Sabisch NRC Senior Resident Inspector Oconee Nuclear Station Susan Jenkins Section Manager Division of Waste Management Bureau of Land and Waste Management SC Dept. of Health & Environment Control 2600 Bull St.

Columbia, SC 29201

[OCONEE RELIEF REQUEST # 11 ON 001]

1.0 Scope of Relief Request Relief is requested pursuant to 10 CFR 50.55a(g)(5)(iii) for welds listed in Table 1.

These welds were required to be examined in accordance with Inservice Inspection Plans for the following Units.

Oconee Nuclear Station - Unit 1 Fourth 10-Year Inservice Inspection Interval Interval Start Date: 01/01/2004 Oconee Nuclear Station - Unit 2 Fourth 10-Year Inservice Inspection Interval Interval Start Date: 09/09/2004 Table 1 Relief Oconee Examination Weld ID Item/Summary Examination Request Jnit Performed Number Number Data Section ýIumber (Refueling Number _ Outaqe)_

2.0 1 1EOC25 1-PZR- 01.B3.110.0006 See Attachment WP26-4 A Pages 1-8 3.0 1 1EOC25 1-PZR- 01..B3.110.0007 See Attachment WP26-5 A Pages 9-16 4.0 1 1EOC25 1-PZR- 01..B3.110.0008 See Attachment WP26-6 A Pages 17-24 5.0 1 1EOC25 1-PZR- O1.B3.110.0009 See Attachment WP26-1 A Pages 25-32 6.0 1 1EOC25 1-PZR- 01.B3.110.0010 See Attachment WP26-2 A Pages 33-40 7.0 1 1EOC25 1-51A 01.B3.150.0003 See Attachment 53755-Vl A Pages 41-48 8.0 1 1EOC25 1-51A O1.B3.150.0004 See Attachment 53755-V2 A Pages 49-56 Page 1 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 9.0 1 1EOC25 1LP-209-8L 01.B9.11.0003 See Attachment A

Pages 57-60 10.0 1 1EOC25 1PIA2-9 O1.B9.11.0050 See Attachment A

Pages 61-68 11.0 1 1EOC25 1PDA2-1 O1.B9.11.0062 See Attachment A

Pages 69-76 12.0 1 1EOC25 1-53A Ol.C5.11.0028 See Attachment 65L A Pages 77-81 13.0 1 1EOC25 1-51A O1.C5.21.0004 See Attachment 1C A Pages 82-88 14.0 1 1EOC25 1HP-387- O1.C5.21.0027 See Attachment 118A A Pages 89-93 15.0 1 1EOC25 1HP-193-17 O1.C5.21.0040 See Attachment A

Pages 94-97 16.0 1 1EOC25 1-51A O1.C5.21.0051 See Attachment 16BH A Pages98-102 17.0 1 1EOC25 1-HP-0187- PRESERVICE See Attachment 184 A Pages 103-107 18.0 1 1EOC25 1-HP-0187- PRESERVICE See Attachment 185 A Pages 108-112 19.0 2 2EOC24 2-PZR- 02.B3.110.0002 See Attachment WP34 B Pages 1-10 20.0 2 2EOC24 2-PZR- 02.B3.110.0003 See Attachment WP33-3 B Pages 11-20 Page 2 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 21.0 2 2EOC24 2-PZR- 02.B3.110.0005 See Attachment WP33-1 B Pages 21-30 22.0 2 2EOC24 2-PIA1-8 02.B9.11.0046 See Attachment B

Pages 31-37 23.0 2 2EOC24 2-PDA2-1 02.B9.11.0053 See Attachment B

Pages 38-44 24.0 2 2EOC24 2-PDB2-1 02.B9.11.0063 See Attachment B

Pages 45-51 25.0 2 2EOC24 2LP-215-27 02.C5.11.0038 See Attachment B

Pages 52-55 26.0 2 2EOC24 2HP-341- 02.C5.21.0035 See Attachment VI B Pages 56-58 27.0 2 2EOC24 2-51A- PRESERVICE See Attachment 0029-94 B Pages 59-64 28.0 2 2EOC24 2-HP-0396- PRESERVICE See Attachment 23 B I _ I Pages 65-68 Page 3 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 2.0 Weld #1-PZR-WP26-4 2.1. ASME Code Component(s) Affected Unit 1 Pressurizer Upper Shell to Sampling Nozzle Weld, Weld #1-PZR-WP26-4, Summary Number 01 .B3.110.0006 2.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 2.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 2.4. Impracticality of Compliance

  • Surface 1: Shell - Carbon steel
  • Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Weld coverage using 350, 450& 600 shear waves for axial scans (S1, S2),

and 350 & 450 shear waves for circ. scans (CW, CCW) obtained 15.4%

coverage.

Base material coverage using 350, 450& 600 shear wave for axial scans

($1) and 350& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.

  • 00 scan coverage obtained 33.9% coverage.
  • The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the design of the sampling nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the nozzle would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. The achieved coverage did not meet the acceptance criteria of this Code Case.

Page 4 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 2.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

2.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 2.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01 .B3.110.0006 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 5 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 3.0 Weld #1-PZR-WP26-5 3.1. ASME Code Component(s) Affected Unit 1 Pressurizer Upper Shell to Sampling Nozzle Weld, Weld #1-PZR-WP26-5, Summary Number 01 .B3.110.0007 3.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 3.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 3.4. Impracticality of Compliance

  • Surface 1: Shell - Carbon steel
  • Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

  • Weld coverage using 350, 450& 600 shear waves for axial scans (S1, S2),

and 350 & 450 shear waves for circ. scans (CW, CCW) obtained 15.4%

coverage.

  • Base material coverage using 350, 450& 600 shear wave for axial scans (51) and 350& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.
  • 00 scan coverage obtained 33.9% coverage.
  • The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the design of the sampling nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the nozzle would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. The achieved coverage did not meet the acceptance criteria of this Code Case.

Page 6 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 3.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

3.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

3.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01 .B3.110.0007 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 7 of 57

[OCONEE RELIEF REQUEST # 11 ON 001l 4.0 Weld #1-PZR-WP26-6 4.1. ASME Code Component(s) Affected Unit 1 Pressurizer Upper Shell to Sampling Nozzle Weld, Weld #1-PZR-WP26-6, Summary Number 01 .B3.110.0008 4.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 4.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 4.4. Impracticality of Compliance

  • Surface 1: Shell - Carbon steel
  • Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Weld coverage using 350, 45°& 600 shear waves for axial scans (S1, S2),

and 35° & 450 shear waves for circ. scans (CW, CCW) obtained 15.4%

coverage.

Base material coverage using 350, 450& 600 shear wave for axial scans (SI) and 350& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.

  • 00 scan coverage obtained 33.9% coverage.
  • The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the design of the sampling nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the nozzle would have to be redesigned, which is impractical.

Page 8 of 57

IOCONEE RELIEF REQUEST # 11 ON 0011 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-l. The achieved coverage did not meet the acceptance criteria of this Code Case.

4.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

4.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

4.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number O11.B3.110.0008 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 9 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

5.0 Weld #1-PZR-WP26-1 5.1. ASME Code Component(s) Affected Unit 1 Pressurizer Heater Belt Shell to Sampling Nozzle Weld, Weld #1-PZR-WP26-1, Summary Number O1..B3.110.0009 5.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 5.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 5.4. Impracticality of Compliance

  • Surface 1: Shell - Carbon steel 0 Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

  • Weld coverage using 350, 450& 600 shear waves for axial scans (S1, S2),

and 350 & 450 shear waves for circ. scans (CW, CCW) obtained 15.4%

coverage.

  • Base material coverage using 350, 45°& 600 shear wave for axial scans (51) and 350& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.
  • 00 scan coverage obtained 33.9% coverage.
  • The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the design of the sampling nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the nozzle would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. The achieved coverage did not meet the acceptance criteria of this Code Case.

Page 10 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 5.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

5.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 5.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01 .B3.110.0009 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 11 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

6.0 Weld #1-PZR-WP26-2 6.1. ASME Code Component(s) Affected Unit 1 Pressurizer Heater Belt Shell to Sampling Nozzle Weld, Weld #1-PZR-WP26-2, Summary Number O1..B3.110.0010 6.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 6.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 6.4. Impracticality of Compliance

  • Surface 1: Shell - Carbon steel
  • Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

  • Weld coverage using 350, 450& 600 shear waves for axial scans (S1, S2),

and 350 & 450 shear waves for circ. scans (CW, CCW) obtained 15.4%

coverage.

  • Base material coverage using 350, 450& 600 shear wave for axial scans (S1) and 350& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.
  • 00 scan coverage obtained 33.9% coverage.
  • The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the design of the sampling nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the nozzle would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. The achieved coverage did not meet the acceptance criteria of this Code Case.

Page 12 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 6.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

6.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

6.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01 .B3.110.00010 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 13 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 7.0 Weld #1-51A-1-53755-V1 7.1. ASME Code Component(s) Affected Unit 1 Letdown Cooler 1 B Nozzle to Channel Body Weld, Weld #1-51A-1-53755-V1, Summary Number 01..B3.150.0003 7.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 7.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.150 Figure IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 7.4. Impracticality of Compliance The Letdown Cooler Channel Body to Nozzle material is stainless steel. This weld has a diameter of NPS 3.0 inches and a wall thickness of 0.875 inches.

The ultrasonic examination of this weld obtained 54.6% coverage of the required examination volume. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

Letdown Cooler Nozzle to Channel Body Item No. 01.B3.150.0003 / Weld No. .-SIA-l-53755-VI Base Material Coverage Scan Radius View Non-Radius View Axial 68.2% 52.7%

Circ 65.2% 154.4%

Aggregate @ 68.2 + 52.7 + 65.2 + 54.4 = 240.5/4 = 60.1%

Weld Material Coverage Scan Radius View Non-Radius View Axial-Si 45.9% 26.0%

Axial-S2 0.0% 0.0%

Circ-S2 94.1% 66.3%

Circ-S2 94.1% 66.3%

Aggregate @ 45.9 + 26.0 + 0.0 + 0.0 + 94.1 + 66.3 + 94.1 + 66.3 = 392.7/8 = 49.1%

Total Aggregate @ 60.1 + 49.1 = 109.2/2 = 54.6%

The individual scan results are recorded on the table above. The limitation was caused by the weld taper configuration created by the attachment of the nozzle to the channel body. In order to scan all of the required volume for this weld, the nozzle to channel body would have to be redesigned to allow scanning from both sides of the weld, which is impractical. There were no recordable indications found during the examination of this weld. This weld was examined using Page 14 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 procedures and personnel qualified in accordance with ASME Section XI, Appendix Ill.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. The achieved coverage did not meet the acceptance criteria of this Code Case.

7.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because there is no access for film placement.

No other substitution alternative for this weld is available which would provide better coverage.

7.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

7.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number O1.B3.150.0003 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 15 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

8.0 Weld #1-51A-1-53755-V2 8.1. ASME Code Component(s) Affected Unit 1 Letdown Cooler 1B Nozzle to Channel Body Weld, Weld #1-51A-1-53755-V2, Summary Number 01 .B3.150.0004 8.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 8.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.150 Figure IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 8.4. Impracticality of Compliance The Letdown Cooler Channel Body to Nozzle material is stainless steel. This weld has a diameter of NPS 3.0 inches and a wall thickness of 0.875 inches.

The ultrasonic examination of this weld obtained 54.6% coverage of the required examination volume. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

Letdown Cooler Nozzle to Channel Body Item No. 01.B3.150.0004 / Weld No. 1-S1A-1-53755-V2 Base Material Coverage Sca - Radius View

`w- Non-Radius View Axial 68.2% 52.7%

Circ 65.2% 54.4%

Aggregate @68.2 + 52.7 + 65.2 + 54.4 = 240.5/4 = 60.1%

Weld Material Coverage Scan Radius View Non-Radius View Axial-Si 45.9% 26.0o Axial-S2 0.0% 0.0%

Circ-S2 94.1% 66.3%

Circ-S2 94.1% 66.3%

Aggregate @ 45.9 + 26.0 + 0.0 + 0.0 + 94.1 + 66.3 + 94.1 + 66.3 = 392.7/8 49.1%

Total Aggregate @ 60.1 + 49.1 = 109.2/2 = 54.6%

The individual scan results are recorded on the table above. The limitation was caused by the weld taper configuration created by the attachment of the nozzle to the channel body configuration. In order to scan all of the required volume for this weld, the nozzle to channel body would have to be redesigned to allow scanning from both sides of the weld, which is impractical. There were no recordable indications found during the examination of this weld. This weld was Page 16 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix Il1.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. The achieved coverage did not meet the acceptance criteria of this Code Case.

8.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because there is no access for film placement.

No other substitution alternative for this weld is available which would provide better coverage.

8.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

8.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01 .B3.150.0004 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 17 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 9.0 Weld #1 LP-209-8L 9.1. ASME Code Component(s) Affected Unit 1 Valve 1CF-13 to Elbow Piping Weld, Weld #1LP-209-8L, Summary Number 01..B9.11.0003 9.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 9.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 9.4. Impracticality of Compliance The valve material is cast stainless steel and the elbow material is stainless steel. This weld has a diameter of NPS 14.0 inches and a wall thickness of 1.25 inches.

The ultrasonic examination of this weld obtained 37.500% coverage of the required examination volume. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

  • 450 obtained 50% coverage in one axial direction (S1 - elbow)
  • 450 obtained 0% coverage in one axial direction (S2 - valve)
  • 450 shear waves obtained 50% coverage in one circ. directions (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. directions (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.500%.

The individual scan results are recorded on the form labeled "Determination of Percent Coverage for UT Examinations - Pipe. The limitation was caused by the cast stainless material and the weld taper configuration created by the attachment of the valve to elbow configuration. In order to scan all of the required volume for this weld, the valve would have to be replaced with forged stainless steel and would have to be redesigned to allow scanning from both sides of the weld, which is impractical. There were no recordable indications found during the examination of this weld. This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII.

Page 18 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. The achieved coverage did not meet the acceptance criteria of this Code Case.

9.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

9.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

9.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01 .B9.11.0003 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 19 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 10.0 Weld #1PIA2-9 10.1. ASME Code Component(s) Affected Unit 1 Reactor Coolant Pump 1A2 Casing Nozzle to Safe-End Piping Weld, Weld #1PIA2-9, Summary Number O1.B9.11.0050 10.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 10.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 10.4. Impracticality of Compliance The Pump Casing Nozzle material is cast stainless steel and the pipe material is stainless steel. This weld has a diameter of 36.50 inches and a wall thickness of 2.330 inches.

The ultrasonic examination of this weld obtained 36.275% coverage of the required examination volume. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

60° shear waves obtained 0% coverage in one axial direction (S1 -

nozzle) 600 shear waves obtained 45.10% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. directions (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. directions (S4 -

CCW)

  • The aggregate coverage was calculated to be (0% + 45.10% + 50% +

50%)/4 = 36.275%.

  • In addition, a best effort examination was performed in axial direction (51) using 600 and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The individual scan results are recorded on the form labeled "Determination of Percent Coverage for UT Examinations - Pipe. The limitation was caused by the cast stainless material and the weld taper configuration created by the attachment of the nozzle to safe end configuration. In order to scan all of the required volume for this weld, the pump would have to be replaced with forged stainless steel and would have to be redesigned to allow scanning from both sides of the weld, which is impractical. There were no recordable indications found during the examination of this weld. This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII.

Page 20 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. The achieved coverage did not meet the acceptance criteria of this Code Case.

10.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

10.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

10.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number O1..B9.11.0050 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 21 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 11.0 Weld #1PDA2-1 11.1. ASME Code Component(s) Affected Unit 1 Reactor Coolant Pump 1A2 Casing Nozzle to Safe-End Weld, Weld

  1. 1 PDA2-1, Summary Number 01.B9.11.0062 11.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 11.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 11.4. Impracticality of Compliance The Pump Casing Nozzle material is cast stainless steel and the pipe material is stainless steel. This weld has a diameter of 33.50 inches and a wall thickness of 2.33 inches.

The ultrasonic examination of this weld obtained 37.500% coverage of the required examination volume. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

  • 45 shear waves obtained 50% coverage in one axial direction (SI - pipe)
  • 45 shear waves obtained 0% coverage in one axial direction (S2 - nozzle)
  • 450 shear waves obtained 50% coverage in one circ. directions (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. directions (S4 -

CCW)

The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.500%.

In addition, a best effort examination was performed in axial direction ($1) using 600 and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The individual scan results are recorded on the form labeled "Determination of Percent Coverage for UT Examinations - Pipe. The limitation was caused by the cast stainless material and the weld taper configuration created by the attachment of the nozzle to safe end configuration. In order to scan all of the required volume for this weld, the pump would have to be replaced with forged stainless steel and would have to be redesigned to allow scanning from both sides of the weld, which is impractical. There were no recordable indications found during the examination of this weld. This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII.

Page 22 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. The achieved coverage did not meet the acceptance criteria of this Code Case.

11.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

11.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

11.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number O1.B9.11.0062 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 23 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 12.0 Weld #1-53A-02-65L 12.1. ASME Code Component(s) Affected Unit 1 Pipe to Valve 1LP-47 Weld, Weld #1-53A-02-65L, Summary Number O1.C5.11.0028 12.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 12.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-I, Item Number C5.11 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 12.4. Impracticality of Compliance The valve material is cast stainless steel and the pipe material is stainless steel.

This weld has a diameter of NPS 10.0 inches and a wall thickness of 1.125 inches.

During the ultrasonic examination of this weld, 37.50% coverage of the required examination volume was obtained. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 450 shear waves obtained 0% coverage in one axial direction (S1 - valve)
  • 450 shear waves obtained 50% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

The aggregate coverage was calculated to be (0% + 50% +50% + 50%)/4

= 37.5%

In order to scan all of the required volume for this weld, the valve would have to be replaced with forged stainless steel, which is impractical. There were no recordable indications found during the examination of this weld.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 24 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 12.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface.

Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

12.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

12.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01.C5.11.0028 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.11 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 25 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 13.0 Weld #1-51A-04-1C 13.1. ASME Code Component(s) Affected Unit 1 Pipe to Valve 1HP-194 Weld, Weld #1-51A-04-1C, Summary Number O1 .C5.21.0004 13.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 13.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-I, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 13.4. Impracticality of Compliance The valve material is forged stainless steel and the pipe material is stainless steel seamless pipe. This weld has a diameter of NPS 4.0 inches and a wall thickness of .674 inches.

  • 450 shear waves obtained 50% coverage in one axial direction (S1 -

pipe)

  • 450 shear waves obtained 0% coverage in one axial direction (S2 - valve)
  • 380 shear waves obtained 50% coverage in one circ direction (S3 - CW)
  • 380 shear waves obtained 50% coverage in one circ direction (S4 - CCW)
  • The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the valve would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

13.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface.

Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

Page 26 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

13.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

13.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number O1 .C5.21.0004 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 27 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 14.0 Weld #1HP-387-118A 14.1. ASME Code Component(s) Affected Unit 1 Elbow to Valve 1HP-1 18 Weld, Weld #1 HP-387-118A, Summary Number O1 .C5.21.0027 14.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 14.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 14.4. Impracticality of Compliance The valve material is forged stainless steel and the elbow material is stainless steel seamless pipe. This weld has a diameter of NPS 4.0 inches and a wall thickness of .531 inches.

During the ultrasonic examination of this weld, 75% coverage of the required examination volume was obtained. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 100% coverage in one axial direction (S1 -

pipe)

  • 600 shear waves obtained 100% coverage in one axial direction (S2 -

valve)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (100% +100% +50% +

50%)/4 = 75%

In order to scan all of the required volume for this weld, the valve would have to be redesigned. There were no recordable indications found during the examination of this weld.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 28 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 14.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface.

Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

14.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

14.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number O1.C5.21.0027 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 29 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 15.0 Weld #lHP-193-17 15.1. ASME Code Component(s) Affected Unit 1 Pipe to Tee Weld, Weld #1 HP-1 93-17, Summary Number O1.C5.21.0040 15.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 15.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 15.4. Impracticality of Compliance The pipe and tee material is stainless steel. This weld has a diameter of NPS 2.5 inches and a wall thickness of .375 inches.

During the ultrasonic examination of this weld, 37.50% coverage of the required examination volume was obtained. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

600 shear waves obtained 50% coverage in one axial direction (S1 -

pipe)

  • 600 shear waves obtained 0% coverage in one axial direction (52 - tee)
  • 450 shear waves obtained 50% coverage in one circ. direction (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% +0% +50% + 50%)/4

= 37.5%

In order to scan all of the required volume for this weld, the tee would have to be redesigned, which is impractical. There were no recordable indications found during the examination of this weld.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 30 of 57

[OCONEE RELIEF REQUEST # 11 ON 00 11 15.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface.

Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

15.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

15.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 01 .C5.21.0040 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 31 of 57

IOCONEE RELIEF REQUEST # 11 ON 0011 16.0 Weld #1-51A-02-16BH 16.1. ASME Code Component(s) Affected Unit 1 Pipe to Flange Weld, Weld #1-51A-02-16BH, Summary Number O1 .C5.21.0051 16.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 16.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 16.4. Impracticality of Compliance The pipe to flange material is stainless steel. This weld has a diameter of NPS 4.0 inches and a wall thickness of .531 inches.

  • 600 shear waves obtained 0% coverage in one axial direction (S1 -

flange)

  • 600 shear waves obtained 50% coverage in one axial direction (S2 - pipe)
  • 450 shear waves obtained 50% coverage in one axial direction (S3 - CW)
  • 450 shear waves obtained 50% coverage in one axial direction (S4 -

CCW)

  • The limitation was caused by the taper on the flange side of the weld.
  • The aggregate coverage was calculated to be (0% + 50% + 50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the flange would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

16.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface.

Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

Page 32 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 16.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

16.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number O1.C5.21.0051 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 33 of 57

FOCONEE RELIEF REQUEST # 11 ON 001]

17.0 Weld #1HP-0187-184 17.1. ASME Code Component(s) Affected Unit 1 Pipe to Valve 1HP140 Weld, Weld #1HP-0187-184, Summary Number PSI 17.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 17.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 17.4. Impracticality of Compliance The valve material is cast stainless steel and the pipe material is stainless steel seamless pipe. This weld has a diameter of NPS 4.0 inches and a wall thickness of .531 inches.

During the ultrasonic examination of this weld, 37.5% coverage of the required examination volume was obtained. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 50% coverage in one axial direction (S1 -

pipe)

  • 600 shear waves obtained 0% coverage in one axial direction (S2 - valve)
  • 450 shear waves obtained 50% coverage in one circ. direction (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% +0% +50% + 50%)/4

= 37.5%

In order to scan all of the required volume for this weld, the valve would have to be redesigned. There were no recordable indications found during the examination of this weld.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 34 of 57

[OCONEE RELIEF REQUEST # 11 ON 001l 17.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface.

Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

17.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

17.7. Justification for Granting Relief Ultrasonic examination of the weld for the Pre Service Inspection was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 35 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 18.0 Weld #1HP-0187-185 18.1. ASME Code Component(s) Affected Unit 1 Pipe to Valve 1HP139 Weld, Weld #1HP-0187-185, Summary Number PSI 18.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 18.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-I, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 18.4. Impracticality of Compliance The valve material is forged stainless steel and the pipe material is stainless steel seamless pipe. This weld has a diameter of NPS 4.0 inches and a wall thickness of .531 inches.

During the ultrasonic examination of this weld, 37.5% coverage of the required examination volume was obtained. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 0% coverage in one axial direction (S1 - valve)
  • 600 shear waves obtained 50% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 - CW)
  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (0% +50% +50% + 50%)/4

= 37.5%

In order to scan all of the required volume for this weld, the valve would have to be redesigned. There were no recordable indications found during the examination of this weld.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 36 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

18.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface.

Additionally, radiography has not been qualified through performance demonstration.

No substitution alternative for this weld is available which would provide better coverage.

18.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

18.7. Justification for Granting Relief Ultrasonic examination of the weld for the Pre Service Inspection was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 37 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 19.0 Weld #2-PZR-WP34 19.1. ASME Code Component(s) Affected Unit 2 Pressurizer Upper Head to Spray Nozzle Weld, Weld #2-PZR-WP34, Summary Number 02.B3.110.0002 19.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 19.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 19.4. Impracticality of Compliance Component:

  • Surface 1: Upper Head - Carbon steel
  • Surface 2: Spray nozzle - Carbon steel
  • Diameter: 7.750 in.
  • Thickness: 4.750 in.

Scan requirements are described in ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6. The aggregate coverage was calculated from the following base and weld metal scan results:

  • Base material coverage provided an aggregate coverage of 77.1%
  • Weld metal coverage provided an aggregate coverage of 75.0%
  • The total obtained aggregate coverage was (77.1 + 75.0 = 152.1)/2 =

76.1%

The limitation was caused by the design of the spray nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the spray nozzle would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 38 of 57

IOCONEE RELIEF REQUEST # 11 ON 0011 19.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because there is no access for film placement.

No other substitution alternative for this weld is available which would provide better coverage.

19.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 19.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B3.1110.0002 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 39 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

20.0 Weld #2-PZR-WP33-3 20.1. ASME Code Component(s) Affected Unit 2 Pressurizer Upper Head to Relief Nozzle Weld, Weld #2-PZR-WP33-3, Summary Number 02.B3.1110.0003 20.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 20.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 20.4. Impracticality of Compliance Component:

  • Surface 1: Upper Head - Carbon steel
  • Surface 2: Relief nozzle - Carbon steel
  • Diameter: 6.875 in.
  • Thickness: 4.750 in.

Scan requirements are described in ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6. The aggregate coverage was calculated from the following base and weld metal scan results:

  • Base material coverage provided an aggregate coverage of 69.3%
  • Weld metal coverage provided an aggregate coverage of 73.1%
  • The total obtained aggregate coverage was (69.3 + 73.1 = 142.4)/2 =

71.2%

The limitation was caused by the design of the relief nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the relief nozzle would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 40 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 20.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because there is no access for film placement.

No other substitution alternative for this weld is available which would provide better coverage.

20.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 20.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B3.110.0003 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 41 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 21.0 Weld #2-PZR-WP33-1 21.1. ASME Code Component(s) Affected Unit 2 Pressurizer Upper Head to Relief Nozzle Weld, Weld #2-PZR-WP33-1, Summary Number 02.B3.110.0005 21.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 21.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 21.4. Impracticality of Compliance Component:

  • Surface 1: Upper Head - Carbon steel
  • Surface 2: Relief nozzle - Carbon steel 0 Diameter: 6.875 in.
  • Thickness: 4.750 in.

Scan requirements are described in ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6. The aggregate coverage was calculated from the following base and weld metal scan results:

  • Base material coverage provided an aggregate coverage of 69.3%
  • Weld metal coverage provided an aggregate coverage of 73.1%
  • The total obtained aggregate coverage was (69.3 + 73.1 = 142.2)/2 =

71.2%

The limitation was caused by the design of the relief nozzle not allowing for scanning from the nozzle side of the weld. In order to scan all of the required volume for this weld, the relief nozzle would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume A-B-C-D-E-F-G-H-I. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 42 of 57

IOCONEE RELIEF REQUEST # 11 ON 0011 21.5. Proposed Alternative and Basis for Use Radiography (RT) is not a desired option because there is no access for film placement.

No other substitution alternative for this weld is available which would provide better coverage.

21.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 21.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.1B3.110.0005 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 43 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 22.0 Weld #2-PIA1-8 22.1. ASME Code Component(s) Affected Unit 2 Reactor Coolant Pump 2A1 Casing Nozzle to Safe-End Piping Weld, Weld #2-PIA1-8, Summary Number 02.B9.11.0046 22.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 22.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 22.4. Impracticality of Compliance Component configuration:

  • Surface 1: Cast stainless steel pump casing
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

600 shear waves obtained 0.0% coverage in one axial direction (S1 -

pump casing) 600 shear waves obtained 50% coverage in one axial direction (32 - safe end)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 459 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (0.0% + 50.0% + 50% +

50%)/4 = 37.5%.

In addition, a best effort examination was performed using 600 and 70*

longitudinal waves to the extent possible from the cast stainless side in the upper 2/3 area of interest.

The limitation was caused by the cast stainless steel pump casing material. In order to scan all of the required volume for this weld, the pump casing would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 44 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 22.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

22.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 22.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B9.111.0046 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 45 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 23.0 Weld #2-PDA2-1 23.1. ASME Code Component(s) Affected Unit 2 Reactor Coolant Pump 2A2 Casing Nozzle to Safe-End Piping Weld, Weld #2-PDA2-1, Summary Number 02.B9.11.0053 23.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 23.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 23.4. Impracticality of Compliance Component configuration:

  • Surface 2: Cast stainless steel pump casing
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

a 600 shear waves obtained 54.8% coverage in one axial direction (S1 -

safe end)

  • 600 shear waves obtained 0.0% coverage in one axial direction (S2 -

pump casing)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (54.8% + 0.0% + 50% +

50%)/4 = 38.7%.

  • In addition, a best effort examination was performed using 600 and 700 longitudinal waves to the extent possible from the cast stainless side in the upper 2/3 area of interest.

The limitation was caused by the pump casing material. In order to scan all of the required volume for this weld, the pump casing would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 46 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 23.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

23.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 23.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B9.11.0053 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 47 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 24.0 Weld #2-PDB2-1 24.1. ASME Code Component(s) Affected Unit 2 Reactor Coolant Pump 2B2 Casing Nozzle to Safe-End Piping Weld, Weld #2-PDB2-1, Summary Number 02.89.11.0063 24.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 24.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 24.4. Impracticality of Compliance Component configuration:

  • Surface 2: Cast stainless steel pump casing
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

  • 600 shear waves obtained 58% coverage in one axial direction (S1 - safe end)
  • 600 shear waves obtained 0.0% coverage in one axial direction (S2 -

pump casing)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (58.0% + 0.0% + 50% +

50%)/4 = 39.5%.

  • In addition, a best effort examination was performed using 600 and 70' longitudinal waves to the extent possible from the cast stainless side in the upper 2/3 area of interest.

The limitation was caused by the pump casing material. In order to scan all of the required volume for this weld, the pump casing would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 48 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 24.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

24.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 24.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B9.11.0063 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 49 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 25.0 Weld #2LP-215-27 25.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2LP-177 Weld, Weld #2LP-215-27, Summary Number 02.C5.11.0038 25.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 25.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.11 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 25.4. Impracticality of Compliance Component configuration:

  • Surface 1: Forged stainless steel valve
  • Surface 2: Stainless steel pipe
  • NPS: 10.0 in.
  • Thickness: 1.0 in.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

  • 600 shear waves obtained 100% coverage in one axial direction (S1 -

valve)

  • 450 shear waves obtained 99.4% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (100.0% + 99.4% + 50% +

50%)/4 = 74.9%.

The limitation was caused by the taper of the valve body, and a weld-o-let. In order to scan all of the required volume for this weld, the valve would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 50 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 25.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

25.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 25.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.11.0038 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 51 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

26.0 Weld #2HP-341-V1 26.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2HP-120 Weld, Weld #2HP-341-V1, Summary Number 02.C5.21.0035 26.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 26.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 26.4. Impracticality of Compliance Component configuration:

  • Surface 1: Forged stainless steel valve
  • Surface 2: Stainless steel pipe
  • NPS: 2.5 in.
  • Thickness: 0.375 in.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

  • 600 shear waves obtained 0.0% coverage in one axial direction (S1 -

valve)

  • 600 shear waves obtained 50% coverage in one axial direction (S2 - pipe)
  • 450 shear waves obtained 100% coverage in one circ. direction (CW).
  • 450 shear waves obtained 100% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (0.0% + 50% + 100% +

100%)/4 = 62.5%.

The limitation was caused by the taper of the valve body. In order to scan all of the required volume for this weld, the valve would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 52 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

26.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

26.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 26.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.21.0035 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 53 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 27.0 Weld #2-51A-0029-94 27.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2HP-139 Weld, Weld #2-51A-0029-94, PSI 27.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 27.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 27.4. Impracticality of Compliance Component configuration:

  • Surface 1: Forged stainless steel valve
  • Surface 2: Stainless steel pipe
  • NPS: 4.0 in.
  • Thickness: 0.531 in.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following data:

  • 600 shear waves obtained 0.0% coverage in one axial direction (S1 -

valve)

  • 600 shear waves obtained 50% coverage in one axial direction (S2 - pipe)
  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (0.0% + 50% + 50% +

50%)/4 = 37.5%.

The limitation was caused by the taper of the valve body. In order to scan all of the required volume for this weld, the valve would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 54 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

27.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

27.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 27.7. Justification for Granting Relief Ultrasonic examination of the weld for the PSI was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this PSI item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 55 of 57

[OCONEE RELIEF REQUEST # 11 ON 001]

28.0 Weld #2-HP-0396-23 28.1 ASME Code Component(s) Affected Unit 2 Pipe to Valve 2HP-140 Weld, Weld #2-HP-0396-23, PSI 28.2 Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 28.3 Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-I, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 28.4 Impracticality of Compliance Component configuration:

  • Surface 1: Cast stainless steel valve
  • Surface 2: Stainless steel pipe
  • NPS: 4.0 in.
  • Thickness: 0.531 in.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

  • 600 shear waves obtained 0.0% coverage in one axial direction (SI -

valve)

  • 600 shear waves obtained 50% coverage in one axial direction (S2 - pipe)
  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (0.0% + 50% + 50% +

50%)/4 = 37.5%.

The limitation was caused by the valve material and taper of the body. In order to scan all of the required volume for this weld, the valve would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage of examination volume C-D-E-F. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 56 of 57

[OCONEE RELIEF REQUEST # 11 ON 0011 28.5 Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

28.6 Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014 28.7 Justification for Granting Relief Ultrasonic examination of the weld for the PSI was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this PSI item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1, Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 57 of 57

VASE / QF UT Vessel Examination Site/Unit: Oconee / Procedure: NDE-820 Outage No.: 01-25.

Summary No.: O1.B3.110.0006 Procedure Rev.: 4 Report No.: UT-09-323 Workscope: .IS! Work Order No.: 01846474 Page: 1 of 2 Code: 199812000A Cat./Item: 13-. 1B3.1.10 Location:

Drawing No.: ISI-O.N1-0O02

Description:

Nozzle to Shell System ID: 50 Component ID: 1-PZR-WP26-4 Size/Length: NIA Thickness/Diameter: 6.1987/5.751CS Limitations: Due to nozzle configuration- see supplemental sheet Start Time: 0835 Finish Time: 1135 Examination Surface: Inside [] Outside [ Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL I1 Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32768 Surface Temp.: 67 'F Cal. Report No.: CAL-09-411. 412. 413 & 414 Angle Used 0 45 f45T j60 60T. 6ORL Scanning dB 57.6 57.6 71.8 71.8 72 Indication(s): Yes [ No 21 Scan Coverage: Upstream [] Downstream [] CW 21 CCW []

.Comments:

35' - 57.8 db; 35T° - 57.8 db Additional Examiner - Dave Griebel, Level i1, 10/28/09 Results: Accept j Reject W] Info [J Additional Examiner n Level Ii, 10/28/09 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

A11ACHMENT A PAGE OF /)2-DUKE POWER COMPANY ISI LIMITATION REPORT Lr-c$-~

Dq-- -

Component/Weid ID: 1-PZR-WP26-4 Item No: 01.B3.110.0006 remarks:

[ NO SCAN SURFACE BEAM DIRECTION *35 & 60RL angles El LIMITED SCAN 1 1] [ 2 [1 ] 2 [ cw Z ccw nozzle configuration FROM L N/A to L N/A INCHES FROM WO -1" to Beyond ._.......... ...... ..

ANGLE: [ 0 M 45 Z 60 other

  • FROM 0 DEG to 360 DEG

[" NO SCAN SURFACE BEAM DIRECTION ELIMITED SCAN 1 E] 2 n I [] 2 C] cw E] ccw FROM L to L INCHES FROM WO to ANGLE: 0l 0 Dl 45 El 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN El 1 E2 El 1 El 2 cw n ccw FROM L to L INCHES FROM WO to ANGLE: E] 0 El 45 E3 60 other FROM DEG to DEG Ei NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN Eli [] 2 El 1 - 2 [ cw n cow FROM L to L INCHES FROM WO to Sketch(s) attached 4

DEG to DEG

[Z yes El No uate:

I

,u/16,0 Sneet 2 2 Authorized Inspector: Date:

D

PZR Sampling Nozzle to Shell % of Coverage Ct-3 uco Item No.: 01.B3.110.0006 Weld No. : WP26-4 Weld Coverage I

Scan An3, &e  % Coverage Obtained S1 350,450 & 600 61.46 S2 350450 & 600 0 Cw 350 & 450 0 CCw 350 & 450 0 Total 61.46 61.46 +4= 15.4  % Coverage Base Material Coverape S1 350,450 & 600 67.2 Cw& CCw 450&350 42.4 Total 109.6 109.6 ÷2= 54.8  % Coverage 00 Scan Coverage 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 + 3 34.7  % Coverage Inspector / Date : /i/LJI~ y Page t_ of K~I

Al! ACHMEN TA

0. 1 C1.11PAWF of'-

Item No.: 01.B3.110.0006 -rressunzerSamplng rNozzAe to n1CII - '1~ -- ~~

Weld No.: WP26-4 Inspector/Date : Steven Dean 10/28/09 N, Total Weld Metal Examined with at least 2 angles from one direction. Sur A combination of 350,45', and 60' angles were used to obtain coverage.

% Examined from Surface 1 = 7.015 / 11.413 x 100 61.46%.

% Examined from Surface 2, CW, and CCW = 0%.

350 600 450 Shell Surface 1 7.015 sq. in. T -

A11ACHMENT A PA6E 5 OF//2-Item No. : 01.B3.110.0006 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 Lii Base Metal Examined with 350 and 45' angles.

% Examined 35°and 45' = 19.03 / 44.87 x 100 = 42.4%.

35°and 45°Circ. scan 19.03 sq. in.

Shell Surface I 1~Cg,~ezC

A11ACHMENTV A PA BE (ýý OlF//z..

Item No.: 01.B3.110.0006 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 Base and Weld Metal Examined with 0° angle.

% Examined 0' = 19.03 / 56.16 x 100 = 33.9%.

0p 19.03 sq. in.

Shell Surface 1

-TD FEZ0,C;ý' 0-r- Cq-3Z-S ?A L4 oý: iýv

ATTACHMENT A?

PA6E 7 OF//.z-.

Item No.: 01.B3.110.0006 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 L1 Total Base Metal Examined with at least 2 angles forom one direction.

A combination of 350,450, and 600 angles were used to obtain coverage.

% Examined = (24.45 + 5.705) / 44.87 x 100 = 67.2%.

350 600 24.45 sq. in.

Shell Surface 1 A-rmum~-, -m DC 4XC ri33

ATTACHMENT A PAGE 8 OF //2, Item No.: 01.B3.110.0006 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 LIZ 600 RL 600 RL Shell Surface 1

AJIACHMENT A PAGE q aF / 2_.I UT Vessel Examination Site/Unit: Oconee I 1 Procedure: NDE-820 Outage No.: 01-25 Summary No.: O1.B3.110.0007 Procedure Rev.: 4 Report No.: UT-09-325 Workscope: ISI Work Order No.: 01846474 Page: 1 of 2 Code: 1998/2000A Cat./item: B-D 113.110 Location:

Drawing No.: ISI-OCNI-002

Description:

Nozzle to Shel.

System ID: 50 Component ID: 1-PZR-WP26-5 Size/Length: NIA Thickness/Diameter: 6.18715.751CS Limitations: Due to nozzle configuration- see supplemental sheet Start Time: 0335 Finish Time: 1135 Examination Surface: Inside fl Outside [ Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 W0 Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32768 Surface Temp.: 67 -F Cal. Report No.: CAL-09-411. 412. 413 &414 Angle Used 10 1 45 f4r-5T 60 J60T 6ORL Scanning dB 57.6 157. 71.8 71.8 72 Indication(s): Yes C] No 0 Scan Coverage: Upstream R1 Downstream F2 CW [] CCW E]

Comments:

35' - 57.8 db; 35T° - 57.8 db Additional Examiner- Dave Griebel, Level II, 10/28109 Results: Accept CQ Reject 2] Info E] Additional Examiner- . 'evel II, 10/28109 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level li-N Signaturg Date ReveWer Signature Date Hollis, Jacob W44$ N,10"4OI-iOO 1. -o4 Examiner Level Il-N Date Site Review Signature Date Dean, Steven W10128/2009 NIA Other Level NIA Signature Date ANII Review , Signature Date NIA 10128/2009

ATTACHMENT /

PA GF / 0 11F /12-DUKE POWER COMPANY I I ISI LIMITATION REPORT Component/Weld ID: 1-PZR-WP26-5 Item No: O1.B3.110.0007 Remarks:

[ NO SCAN SURFACE BEAM DIRECTION *35 & 60RL angles Li LIMITED SCAN 1 1 [ 2 0 1 0 2 0 cw ccw nozzle configuration FROM L N/A to L N/A INCHES FROMWO -1V to Beyond ANGLE: 0 0 N 45 0 60 other

  • FROM 0 DEG to 360 DEG LI NO SCAN SURFACE BEAM DIRECTION L-] LIMITED SCAN L--i 1 212 1 [1 2E] cw - ccw FROM L to L INCHES FROM WO to ANGLE: Ej 0 E] 45 LI 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN LI E] 2 LI 1 L- 2 EL cw El ccw FROM L to L INCHES FROM WO to ANGLE: EL 0 LI 45 LI 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN EL-I L1 2 l- 1 L2 [ cw E] ccw FROM L to L INCHES FROM WO to Sketch(s) attached 4 [] yes '-]No.

ANGLE: LI 0 [L 5 LI 60 other FROM DEG to DEG Prepared By: Jacob Hollis t , Level: Date: 10/28/09 Sheet 2 2 Reviewed By: Date: -Atorized Inspector: Date:

PZR Sampling Nozzle to Shell % of Coverage LL- c=

Item No. : 01.B3.110.0007 Weld No. : WP26-5 Weld Coverage Scan Angle  % Coverage Obtained S1 350,450 & 600 61.46 S2 350,450 & 600 0 Cw 350 & 450 0 CCw 350 & 450 0 61.46 Total 61.46 -4 = 15.4  % Coverage Base Material Coverage Si 350,450 & 600 67.2 Cw & CCw 450&3:50 42.4 Total 109.6 109.,6 +2= 54.8  % Coverage 00 Scan Coverage 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 + 3 34.7  % Coverage 0-r- CA)ý- 3z S Inspector / Date 42143 .. .. 0? PPage I of ý

.. IACHMENT

~

A

  • ~ ~~~~~~~~~

,,C .,,  !*P A.-I: /.- " /.  ?'.-,

Item No.: 01.B3.110.0007....... 'ressurizer Sampling Nozzle to shell . - t Weld No.: WP26-5 Inspector/Date : Steven Dean 10/28/09 Nozzle

-- '] Total Weld Metal Examined with at least 2 angles from one direction. Surface 2 A combination of 35',45', and 600 angles were used to obtain coverage.

% Examined from Surface 1 = 7.015 / 11.413 x 100 =61.46%.

% Examined from Surface 2, CW, and CCW = 0%.

35° 600 450

.Shell Surface I

.'-\"\,\\,.NS'"*N\'x'*.*\'\\,,.\.*\ *\*AT\\\m\\ k\\-\\,,r -,n ,.o,;

7.015 sq. in.

A1 IACHMENTA\

PAGE /3 OF//..

Item No.: 01.B3.110.0007 Pressurizer Sampling Nozzle to Shell Weld No. : WP26-5 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2

= Base Metal Examined with 350 and 45' angles.

% Examined 35°and 45' = 19.03 / 44.87 x 100 = 42.4%.

35°and 45°Circ. scan 19.03 sq. in.

Shell Surface 1 AiTA(,iAyACX-j- -rO 0-r-Oq--37,5 Vai-CC

,..iI AC HME NTA PA6E 1/7/ QF //2 Item No. : 01.B3.110.0007 Pressurizer Sampling Nozzle to Shell Weld No.: Wf"26-5 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 L--Z Base and Weld Metal Examined with 00 angle.

% Examined 0' = 19.03 / 56.16 x 100 = 33.9%.

O0 19.03* sq. in.

Shell Surffice 1 A*Amy&~kM~rxr -rD UT-ro'y3VjZ ?AUS Lqc*L,

ATTlACHIMENT Al PAGE 15' OF //2, Item No.: 01.B3.110.0007 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-5 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 Li Total Base Metal Examined with at least 2 angles from one direction.

A combination of 35',450, and 600 angles were used to obtain coverage.

% Examined = (24.45 + 5.705) / 44.87 x 100 = 67.2%.

350.

600 24.45 sq. in.

Shell Surface 1 5.705 sq. in. N AT"(ýC"wGXC -ro 0-r-Ol-3-7-5 ?AýcC- 5or6,

-,J1ACHMENT A PAGE /( OF I1Z, Item No.: 01.B3.110.0007 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-5 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 LI.

600 RL 600. RL Shell Stuface 1 ATTACkmQ5,7- 17-0 0-r-0q-3V5 ?CtL-%C(o6V(o

A~HACHMENT A MAE J-7 OF 1/2,.

UT Vessel Examination Procedure: NDE-820 Outage No.: 01-25 Site/Unit: Oconee I I Summary No.: O1.13.110.0008 Procedure Rev.: 4 Report No.: UT-09-326 IS1 Work Order No.: 018946474 Page: 1 of 2 Workscope:

Code: 199812000A Cat.lltem: B-D /B3.110 Location:

Drawing No.: ISI-OCN1-002

Description:

Nozzle to Shell System ID: 50.

Component ID: 1-PZR-WP26-6 Size/Length: N/A Thickness/Diameter: 6.187/5.75/CS Limitations: Due to nozzle configuration- see supplemenhta sheet Start Time: 0835 Finish Time: 1135 Examination Surface: Inside 0 Outside 91 Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: U LTRAGEL 11 Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32768 Surface Temp.: 67 F Cal. Report No.: CAL-09-411, 412, 413 & 414 Angie Used 0 0o 45 R. L OTT6o00Tso Scanning d8 57.6] 57.6 718 71.8 72 Indication(s): Yes [ No

  • Scan Coverage: Upstream f] Downstream 2] CW 21 CCW 2 Comments:

35° - 57.8 db; 35T° - 57.8 db Additional Examiner Dave Griebel, Level Ii, 10/28/09 Results: Accept E] Reject R] Info Ej Additionalexaminer- C. Vei II, 10/28/09 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

ATTACHMENT /ý Component/Weld ID:

DUKE POWER COMPANY ISI LIMITATION REPORT 1-PZR-WP26-6 Item No: O1.B3.110.0008 IRemarks:

uxr_ DA - -J I(

[ NO SCAN SURFACE BEAM DIRECTION *35 & 60RL angles L-I LIMITED SCAN 1 2 1 0 2 0 cw 0 ccW nozzle configuration FROM L N/A to L N/A INCHES FROM WO -1" to Beyond..

ANGLE: Z 0 Z 45 0 60 other

  • FROM 0 DEG to 360 DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITEDSCAN El I [1 2 [1 1 [1 2 ] cw El ccw FROM L to L INCHES FROM WO to ANGLE: [1 0 El 45 El 60 other. FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN E3 I [E 2 El 1 F1 2 El cw E-I ccw FROM L to L INCHES FROM WO to:

ANGLE: 0l 0 El 45 Dl 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN Ei- 1 [ 2 1 IEl 2 - cw E- ccw FROM L to L INCHES FROM WO to Sketch(s) attached 4

ANGLE: Fj 0 E) 5 [] 60 other FROM DEG to DEG 21 yes E No Date: 10/28/09 I

Authorized Inspector:

Sheet. 2 2 Date:

4

/-K- J

PZR Sampling Nozzle to Shell % of Coverage LAJJ Item No.: 0!.B3.10.0008 Weld No.: WP26-6 Weld Coverage Scan Angle  % Coverage Obtained Si 350,450 & 600 61.46 S2 350,450 & 600 0 Cw 350 & 450 0 CCw 350 & 450 0 Total 61.46 61.46 +4= 15.4  % Coverage Base Material Coverage S1 350,450 & 600 67.2 Cw &CCw 450&350 42.4 Total 109.6 109.6 +2= 54.8  % Coverage 00 Scan Coverage 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 + 3 34.7  % Coveraie A-AuYjr-o-. -M f4-?Q A Inspector / Date : Inspcto / Dte:£cLVO LOjw() ý Page of &

I,0ACHMENT A

~~~1

~ ~ ~ ~PAGE-2o OF 112--

Item No.. O1.B3.110.0008 rressurzer Sanmpnng N*ozzle to Snen Weld No..: WP26-6 Inspector/Date : Steven Dean 10/28/09 Nozzle Total Weld Metal Examined with at least 2 angles from one direction. Surface 2 A combination of 350,450, and 60' angles were used to obtain coverage.

% Examined from Surface 1 = 7.015 / 11.413 x 100 =61.46%.

% Examined from Surface 2, CW, and CCW = 0%.

35" 600P A-r-~c-~v~r,->- -TV U -0L1?Z(

Shell Surface I 7.015 sq. in.

AIIACHMENT A MAE 21 OF /12--

Item No.: 01.B3.110.0008 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 LBase Metal Examined with 350 and 45' angles.

% Examined 35°and 45' = 19.03 /44.87 x 100 = 42.4%.

35°and 450 Circ. scan 19.03 sq. in.

Shell Stuface 1 2a(Ki 3 oC~O

-r-o UTF4-ZL

1ACHMENTA Id PAGE22_ OF /Z..-

Item No.: 01.B3.110.0008 I-essurizer Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 LIII Base and Weld Metal Examined with 0' angle.

% Examined 00 = 19.03 / 56.16 x 100 = 33.9%.

o0 19.03-sq. in.

Shell Surface 1 Aiv L-k vvC-Tr -rv U-C- 0 41- 3 V. VA 4\c Hoc(,

L<C LoC.

MI1ACHMENT A MAE 2-3 OF 11,2 Item No.: 01.1B3.110.0008 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 L1 Total Base Metal Examined with at least 2 angles from one direction.

A combination of 35°,45', and 60' angles were used to obtain coverage.

% Examined = (24.45 + 5.705) / 44.87 x 100 = 67.2%.

350 60045 24.45 sq. in.

Shell Surface. 1 5.705 sq. in.-

A-&TACVMra.-V n-0~ fXZCA- OV -cE

-s UTc),qj.~~

A1IACHMENT A 2 1 PAGE~qO 1 Item No.: 01.B3.110.0008 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 LIZ 600 RL 600 RL Shell Surface 1 An-MCAk V"19P17- Oq - 3 U0

AlTACHMENT.A UT Vessel Exa ination Site/Unit: Oconee I Pro edure: NDE-820 Outage No.: 01-25 Summary No.: 01.13.110.0009 Procedur Rev.: 4 Report No.: UT-09-327 Workscope: . ISI.... . . . ...

.... Work Ord r No.: 01846474 Page: 1 of 2 Code: 1998/2000A Calt.1tem: B-D 183.110 Location:

Drawing No.: ISI-OCN1-Q02

Description:

Nlzzle to Shell System ID: 50 Component ID: 1-PZR-WP26-1 Size/Length: N/A Thickness/Diameter: 6.187/5.75/CS Limitations: Due to nozzle configuration, see supptemental sheet Start Time: 0835 Finish Time: 1135 Examination Surface: Inside Q Outside [] Surface Condit!on: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32768 Surface Temp.: 67 'F Cal. Report No.: CAL-09-411, 412, 413 &414 Angle Used 0 "0 45 45T 60 I60T 6ORLI Scanning dB 1 57.6 -57.6 71.8 71.8 72 Indication(s): Yes EJ No [ Scan Coverage: Upstream [] Downstream W] CW [] CCW []

Comments: 4, 350 - 57.8 db; 35T' - 57.8 db Additional Examiner - ave Grie e II, 10/28/09 Results: Accept E Reject R] Info [] Additional Examiner :C. Da'y, Level 1I,10128109 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 11-N Signature Date Review.' Signature Date Hollis, Jacob 102/009 __________________________

Examiner Level i1-N * .S..ue Date Site Reviev/ ' " Signature Date Dean, Steven 10/28/2009 N/A Other Level N/A Signature Date. ANII Review . Signature Date N/A 1012812009 1 /

Al IACHMENT A PAPF a-~' nOF12 DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: I-PZR-WP26-1 Item No: O1.B3.110.0009 Remarks:

[ NO SCAN SURFACE BEAM DIRECTION *35 &60RL angles Li LIMITED SCAN 0 1 Z 2 [1 0 2 [ cw ccw nozzle configuration FROM L N/A to L N/A INCHES FROMWO -1" to Beyond ANGLE: 30 0 45 E 60 other

  • FROM 0 DEG to 360 DEG Li NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN - 1 Ei 2 i1 [2 -] cw iccw FROM L to L INCHES FROM WO to ANGLE: Li0 Li45 Li60 other FROM DEG to DEG L NO SCAN SURFACE BEAM DIRECTION LIMITED SCAN 1 2 1 El 2 E] ew R ccw FROM L to L INCHES FROM WO to ANGLE: []0 El 45 El 60 other FROM DEG to -DEG f[] NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN El 1 R 2 1 E- 2 El cw [] ccw FROM L to L INCHES FROM We to Sketch(s) attached ANGLE: []0 [] 5 [] 60 other FROM DEG to DEG ]ys- o Pr'epared BY: Jacob Hollis
  • t" , L*

Lvel: iI Date: 10/28/09 Sheet 22

PZR Sampling Nozzle to Shell % of Coverage LJJc:

Item No. : 01.B3.110.0009 Weld No. : WP26-1 Weld Coverage Scan An3&le  % Coverage Obtained S1 350,450 & 600 61.46 S2 350,450 & 600 0 Cw 350 & 450 0 CCw 350 & 450 0 Total 61.46 61.46 ÷4= 15.4  % Coverage Base Material Coverage S1 350,450 & 600 67.2 Cw & CCw 450&35.0 42.4 Tot*al 109.6 109-.6 + 2 = 54.8  % Coverage

0. Scan Coverage 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 + 3 34.7  % Coverage o'rt'- ae -:P'3-o Inspector / Date : 1044qlb Page of

'I1 AI1ArUUrUT

/ii I I /M*U IIPILI_ ]I A

Item No.. 01.B3.110.0009 Pressurizer Sanmpling Nozzle to Shell PAGE OF Weld No.: WP26-1 Inspector/Date : Steven Dean 10/28/09 Nozzle Total Weld Metal Examined with at least 2 angles from one direction. Surface 2 A combination of 350,45', and 60' angles were used to obtain coverage.

%Examined from Surface 1 = 7.015/ 11.413 x 100 =61.46%.

%Examined from Surface 2, CW, and CCW = 0%.

350 600 450-Shell Surface 1 N \ \ . \ \ x , \

X '\ \ N \ A' * \ \ \ .\ \ \\.~ \ *,\ N N N\ \\ ' \ \

7.015 sq. in.

AI-M( ,,A - o-A-o- 3V7'- PA*kt f_-Z ,

ATTACHMENT A PA6Eg2- OF //2-Item No.: 01.B3.110.0009 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-1 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 MI Base Metal Examined with 350 and 45' angles.

% Examined 35 0 and 450 = 19.03 / 44.87 x 100 = 42.4%.

35'and 45°Circ. scan 19.03 sq. in.

Shell Surface I ArrMuA vv,"-c -r-b 0-r-0 1 - -3 L-1 PA,4c -3og,

A11ACUHENTA-PAGE3'o OF /2~

  • at'NI ftem No.: 01.113.110.0009 Y-ressurzer Sar] ipling Nozzle to Shell Weld No.: WP26-1 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 L Base and Weld Metal Examined with 00 angle.

% Examined 00 = 19.03 / 56.16 x 100 =33.9%.

00 19.03 sq. in.

Shell Surface I AnPCt~%W -rb U'r- 0A- 3'11 ?GC~ LlOC:(

AIIACHMENT A~

PA 6E ) Of /2, Item No. : 01.B3.110.0009 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-1 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 LIII Total Base Metal Examined with at least 2 angles from one direction.

A combination of 35',45', and 600 angles were used to obtain coverage.

% Examined = (24.45 + 5.705) / 44.87 x 100 = 67.2%.

350 600 450 24.45 sq. in.

Shell Surface 1 sq.o' 5.70 37n. NA~E

Al1IACHMENT A Item No.: 01.B3.110.0009 Pressurizer Sampling Nozzle to Shell MAE3j2- OF 1/-2--

Weld No.: WP26-1 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 600 RL 600 RL

- ~ _________

A1'TAC"MC,-Xr J-iD T-'

orcý3z-j~Corc

A11ACHiMENT /

MAE3 3 OF 112-,

UT Vessel Examination Site/Unit: Oconee I 1 Procedure: NDE-820 Outage No.: 01-25 Summary No.: O1.B3.110.0010 Procedure Rev.: 4 Report No.: UT-09-324 Workscope: ISI Work Order No.: 01846474 Page: 1 of 2 Code: 1998/2000A Cat./Item: B-D /B3.110 Location' Drawing No.: IS)-OCN1-002

Description:

Nozzle to Shell System ID: 50 Component ID: 1-PZR-WP26-2 Size/Length: NIA Thickness/Diameter: 6.18715.751CS Limitations: Due to nozzle configuration- see supplemental sheet Start Time: 0835 Finish Time: 1135 Examination Surface: Inside Outside 21 Surface Condition: GR,OUN SMOOTH Lo Lucatio.n 9.2.3 We Location: Centerline of Weld Coupiant: ULTRAGEL I1 Batch No.: 09125 Temp. Tocl Mfg.: FISHER Serial No.: MCNDE3276841.4 Surface Temp.: 67 -F 4t3 &

  • ,L-09-411,412, Cal. Report No.: . CAL-09-411. 412, 413 & 41.4 AngleUsed E0 145 4T 0 oOT 6ORL Scar:ning dB 1 57.6 57.6 71.8 71.8 *2 Indicaticn(s): Yes Q] No W] Scan Coverage: Upstream 21 Downstream R] CW P] CCW 2]

Comr.merits:

350 - 57.8 db; 35T° - 57.8 db Additional Examiner -

D~ave

ýGrieel, Level I1,10/28/09 Results Accept C] Reject 21 Info E] Additional Examiner John Level II, 10/28/09 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

Al IACHMENT DUKE POWER COMPANY ~ OF 112-ISI LIMITATION REPORT U~- cA~31Lk Component/Weld ID: 1-PZR-WP26-2 Item No: O1.B3.110.0010 Remarks:

[ NO SCAN SURFACE BEAM DIRECTION *35 & 6ORL angles

[3 LIMITED SCAN 0 1 0 2 0 1 0 2 N cw Z ccw nozzle configuration FROM L N/A to L N/A INCHES FROM WO -1" to Beyond ANGLE: 0 0:.:.........0.. .. .

45. . .. . 0~: . 60 other FROM 0 DEG to 360 DEG

[3 NO SCAN SURFACE BEAM DIRECTION

[3 LIMITED SCAN [1 E] 2 [E 1 [2 [] cw [] ccw FROM L to L INCHES FROM WO to ANGLE: Ej 0 [3 45 [] 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION

[R LIMITED SCAN E] 1 [E 2 [31 [ 2 ] cw E] ccw FROM L. to L INCHES FROM WO to ANGLE: LI 0 El 45 [] 60 other FROM DEGto DEG

-I NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN [-1 [32 1 3 2 [-] cw []ccw FROM L to L INCHES FROM WO to Sketch(s) attached 4

ANGLE: El 0 [3 5 [360 other FROM DEG to DEG yes LI No Prepared By: Jacob Hollis Level: ii Date: .0/28109 Sheet 2 2 Reviewed By: Date: Authorized Inspector.: Date:

PZR Sampling Nozzle to Shell % of Covera2e tLu C Item No.: 01.B3.110.0010 Weld No. : WP26-2

.4 a3 Weld Coverage Scan Angle  % Coverage Obtained S1 350,450 & 600 61.46 S2 350,450 & 600 0 Cw 350 & 450 0 CCw 350 & 450 0 Total 61.46 61.46 +4= 15.4  % Coverage Base Material Coverage Sl 350,450 & 600 67.2 Cw & CCw 450&350 42.4 Total 109.6 109.6 +2) 54.8  % Coverage 00 Scan Coveraye 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 - 3 34.7  % Coverage

~ALrcA vv%C,7r -ri'7 0-r- c's- 3V.4i Inspector / Date: Page

  • of 6

Al IACHMEHIA Pressurzer Sampnng Nozzle to Spnen

/.....-

Item No.: 01.B3.110.0010 PABE 5(p u1r h Weld No.: WP26-2 Inspector/Date: Steven Dean 10/28/09 Nozzle L -] Total Weld Metal Examined with at least 2 angles from one direction. Surface 2 A combination of 350,45', and 600 angles were used to obtain coverage.

% Examined from Surface 1 = 7.015 / 11.413 x 100 =61.46%.

% Examined from Surface 2, CW, and CCW = 0%.

350 60P Shell.

Surnface 1 7.015 sq. in.

ATTACHMENT A PASE-37 aF //2.--

Item No.; 01.B3.110.0010 Pressurizer Sanpling Nozzle to Shell Weld No.: WP26-2 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2

[Base Metal Examined with 350 and 45' angles.

% Examined 35°and 450 = 19.03 / 44.87 x 100 = 42.4%.

35°and 45°Circ. scan 19.03 sq. in..

Shell Surface 1 A1TA1"AYA**-1-r -17D OT-- Oq - 37,1-1 ?A L<C- *5 Or(,-

AIIACHMENT A OW38 F //2.-

Item No.: 01.B3.110.0010 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-2 Inspector/Date: Steven Dean 10/28/09 Nozzle Surface 2 I Base and Weld Metal Examined with 0' angle.

% Examined 0' = 19.03 / 56.16 x 100 =-33.9%.

0o 1-9.03 sq. in.

Shell Surface 1 A1-MVCRm9-,rj-T -Ze, -Fouft %)-,o9937jvpc~eqt.

AIIACHMENT A PAGE 3' OF //0.

Item No.; 01.B3.110.0010 Pressurizer Sanmpling Nozzle to Shell Weld No.: WP26-2 Inspector/Date: Steven Dean 10/28/09 Nozzi

[e eý2 Surfac Total Base Metal Examined with at least 2 angles from one direction.

A combination of 350,45', and 600 angles were used to obtain coverage.

% Examined (24.45 + 5.705) / 44.87 x 100 = 67.2%.

350 600 450 24.45 sq. in.

Shell Surface 1 5.705 sq. in,-. -/ N A -Mr orwtr*--- . S ct "ttf. D~ ' o0 r'-o

AT TAC.UMENT i PAME qo OF /12-'

Item No.. O1.B3.110.0010 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-2 Inspector/Date : Steven Dean 10/28/09 Nozzle Surface 2 600 600 RL Shell Surface I 11A, -r~c vx.J VAG11 tDOV-Oqc-73ZN 'PLj.,6oc&z

A11ACHMENTA UT Vessel Examination PAGE q' OF /212-Site/Unit: Oconee I I Procedure: NDE-3630 Outage No.: 01-25 Summary No.: 0!.@3.150.0003 Procedure Rev.: 1 Report No.: UT-09-335 01.838272 Page: 1 of * * " "i Workscope: ISI Work Order No.:

-/

Code: 1998/2000A Cat./item: B-D /83.150 Location: ts'01 Drawing No.: 1-53755

Description:

Nozzle to Channel Body System ID: 51A Component ID: 1-51A-1-53755-VI Size/Length: NIA Thickness/Diameter: 0.875/3.0/SS Limitations: Yes - See supplemental sheet Start Time: 1415 Finish Time: 1.520.

Examination Surface: Inside E Outside n./ Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32770 Surface Temp.: 71 'F Cal. Report No.: CAL-09-419, 420, 421, 422 & 423 Angle Used 0 45 45T 60f 60T 7.0L Scanning dB 43.0 61.7 50.2 .. 61.0 46.0 Indication(s): Yes El No 2 Scan Coverage: Upstream [] Downstream [] CW [] CCW []

Comments:

Scanning db lowered from +14db to maintain 2:1 signal to noise ratio Results: Accept E) Reject n% Info __

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level I1-N l..ture Date Reviewer Signature Date Griebet, David M. 10/29/2009 j/ //- -oy Examiner Level II-N 4ature Date Site Review Signature Date Dean, Steven 10/2912009 Other Level N/A Signature Date ANII Review . Signature Date N/A -,)o

AITACHMENT A PA E. 1/2_a ~F j-Letdown Cooler Nozzi- to Channel Body Item No.: o. s. io.,

Weld No.: i - 51 A, - I - ý5 -ý -, -ý -V I i

- vJF-( D- AJWA QP7 r-ýsf-At3( D"~SL(d~f? 1 zn-,

(51 j

Channel Body - S i C D Scale: I"= I"

~4LLZ 041

Al IACHtvENI 'A Letdown Cooler Nozzt- Lo Channel Body PASE 5Or 1/7z-,

V'eldNo. : .1-t~m -I - 31tit- k/I Item No.: ot, *5 . 15o- o0o3 CQqEE-EA-5rý- &Y-USL ( ova r((/_ AV-(A r n.t4 - - ICPA ARC-, 7 2Nozzle rp S2Z ff~7'6 ("J Lz0.1,

(~cf~j~ i-I L 4'." - -.. c ý AL 5,; -4,7 -7,.'

A tChannel Body - S I I

S cal e.: "Z I"I S.'. '__1

<0

'N

, k Z 0:,:

Letdown Cooler Nozzi, o Channel Body ATI/TACHMENT PA5E qj A

0 F //iz--

Weld No." I - t /. - - T__ .-

2 Z, Item No. (it, 83. /*.o, 0ooS

ŽIsL6( P (,A~jt-Q:

AfSCTh_______

j:L7 ILL ___

/

---r

________Q*LL2 V

Channel Body

. - SJ I -

Scale- I'- 1" j-,"

,0

- ar IQA/O49

I-TACHMENT ,

Letuown CooLr Nozzle to Channel Body ( Radius View) PE fl'l" Item No. ' i.J3,/53,/ Ooo03 eld No.

  • __- _________-______

-70 - -.

,7-1)

Lý,

-I

.*A~X 7Ot I.,

JK -.

u, p

0 Scale: I" = I" Olt

MIIACHMENT A MAE q(, Of /2 Letown Co0o0 Nozzle to Chainel .Body (Radius View)

Md No. : i5Pf'3*- Item No.

  • 13'3,150 ofjoo3 01,F

(~h~%~A(~SI~..4M~TIO.L

- SL) 14VC -A\<IAA

-T,-(,q .

3,;,.

ilf 1.t L.2 A a

-to

.77k zI

~17i~ALJi*~4 W ~

a 0

- -- (1.qt;&

.~2S~LL~/L3*hl~LUo Scale: I" = 1" 7 r

Body (Radius d .... ceB*o View ACHMENT kPAGEq-7 Lt-c. own Cool1 Nozzle to ChaK ( R i _ _) OF /12--,

Item No. . o~ 1339 . lt~h .ooa3

-1d No. : I-t-IA 5,3TtS-- \/(I

, tL' (C)%r-ýJtA~rfz& 1Z

, ( e,~ r - ('I rc

_*3_a_*__. k'I~

c-i

~ai1-Iliu: 3o 0

,L- x -3

-7

. . .. .. - QL  ?

~ 1 .8P~X

~5~f do i r;..-

., c . 6t;,- ) __0

/

'.i<,*'~..~§*k 2~ I'

./.

I *, 1ýo

/I

/ Scale: I" = P"

/)~,42LfŽ2L /oaf o

LUJC3 Letdown Cooler Nozzle to Channel Body Item No. 01.B3.150.0003 / Weld No. 1-51A-1-53755-V1 Base Material Coverage Scan Radius View Non-Radius View Axial 68.2%9j 52.7%

Circ 65.2% ____54.4%

Aggregate @ 68.2 + 52.7 + 65.2 + 54.4 = 240.5/4 = 60.1%

Weld Material Coverage Scan Radius View Non-Radius View Axial-S 1 45.5% 26.0%

Axial-S2 0.0% 0.0%

Circ-S2 94.1% 66.3%

Cite-S2 94.1% 66.3%

Aggregate @ 45.9 + 26.0 + 0.0 + 0.0 + 94.1 + 66.3 + 94.1 + 66.3 = 392.7/8 49.1%

Total Aggregate @ 60.1 + 49.1 = 109.2/2 = 54.6%

Level III4,JC Date o cr~~Ž

'1 1 Sc.'

"--S.

A11ACHMENT A UT Vessel Examination PAME 91 QF //2-Site/Unit: Oconee / Procedure: NDE-3630 Outage No.: 01-25 Summary No.: 01.B3.150.0004 Procedure Rev.: 1 Report No.: UT-09-336 Workscope: ISI Work Order No.: 01838272 Page: 1 of ___

!1;.o1 Code: 199812000A Cat./Item: B-D /83.150 Location: __"

Drawing No.: 1-53755

Description:

Nozzle to Channel Body System ID: 51A Component ID: 1-51A-1-53755-V2 Size/Length: N/A Thickness/Diameter: 0.87513.0/SS Limitations: Yes -See supplemental sheet Start Time: 1415 Finish Time: 1520 Examination Surface: Inside i- Outside [ Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL !1 Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32770 Surface Temp.: 71 T Cal. Report No.: CAL-09-419, 4l20,421,.422 & 423 Angle Used 0 45 145T 60 160T 70L Scanning dB 43.0 61.7 50.2 61.0 46.0 Indication(s): Yes El No [] Scan Co*verage: Upstream [] Downstream E[: CW 21 CCW n Comments:

Scanning db lowered from +14db to maintain 2:1 signal to noise ratio Results: Accept E] Reject n] Info El Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

ATTACHMENTA PA EE -o c F //2_.

Letdown Cooler Nozzih to Channel Body Item No.: o____,,t__._ _,____

Welcd No. : :5)& - I - 6'11-3 _,-z -W

. 1. .

19" s~~L ____ Z. J7L A.5( L; )

Cs I .

L Channel Body - S I C

Scale: I'"= )"

I(I/? -

AT TACHMEHT A PAGE*/OF //2.-

Letdown Cooler Nozzie-to Channel Body

'eld No. : .1 -5A - - !37!*6- 071 Item No.": oji.S.* 1 00 4 c prý~ (h~Ar A~~hW cIU.V -

4 74 k ijAL 2-72h 1p P - z I ~~-* ~ 0 01 7- 7

~25Za2i~~

/

A 1*

I S

Channel Body - SI --.0 coo Scale: 1" 1=

Al TACHMENT A Letdown Cooler Nozzi,* .o Channel Body POSý QF /]Z,.

Veld No.: __ _ _ __ _ _ _ Item No. - 33 b 0 *,.ý 00 0 V 1

-A,:W--fA-1 - ,, /"ýp "I /,:::- - K f17,1 LI2Aa~L~4CieLzCi~

2. ____

.~iiE~i~.____

______ ~1 __

U _____________________

1 JK4

- 45 -- i--

3O~ e4

,q/ffl ,.CeiIJ$f60O>~ ~LiiK fChannelý. Body

.{,,

-Si I 0 4' Scale: I"=

0 V

AlITACHMEKT/A PAHE5.

3 OF 1/2-Letdown Coolfw Nozzle to Channel Body (Radius View j Item N-No. : 0 1. 53, 45150.0oV V IdNo.:. Ite-51A, I 70. - --k A

  • (nt~. ~7-- -a AAOLt.

14 ~I?~* 1k, L~J CY4

/

q q, L-0 Scale: 1"= 1" Channel Body S.1

~P8 I . - -'

AT ACHMENTA (Radius View) /12-Lemdown Coola Nozzle to Chai-nel Body PAGE5t OF d No. : 1-.-51 tA,- f 7-ý!:ý- VF- Item No. : 01. 13-,ý .1-5o. oon C/

?~.V~AA 'Jt~) C0 ~?Lk(r( A\(IAL

~3k~-~-f ~ (CJ~A(-,i-~ -

a. IL.1.~

AfLiij~{kL~~.

-to

.1 ,- .. z ,_ *

-'Z 3~' z

'7

- ~ --

Scale: I"= I" 0 C) s~e- t1,5 -- o

.:.,.:to Chaiix*i Body (Radius .View . . PA _TAcHMENT/*

SE '5"5 OF //Z -

L-cc*jwn Coo1tr Nozzle* . ...

dNo.: Item No. : o 1,33. 1tgo,L 6L

ý tjtA -2 4 A4< A-A t C iA (~,II K

- i t);L-f ir. r) r:-- F:-' Z-A- C .

-I--.

-t rjii~.L~zili.

1APLJI 6: )

i2L*

~0x

/

SI I.

Ii 1ý1.

12 Scale: 1" = 1"

/

/

C.. - 0

UJ cs Letdown Cooler Nozzle to Channel Body Item No. O1.B3.150.0004 / Weld No. 1-51A-1-53755-V2 cjý Base Material Coverage Scan) Radius View Non-Radius View Axial - =68.2% 52.7%

Circ 65.2% 54.4%

Aggregate @ 68.2 + 52.7 + 65.2 + 54.4 = 240.5/4 = 60.1%

Weld Material Coverage Scan Radius View Non-Radius View Axial-Si 45.9% 26.0%

Axial-S2 0.0% 0.0%

Circ-SZ 94.1% 66.3%

Circ-S2 94.1% 66.3%

Aggregate @ 45.9 + 26.0 + 0.0 + 0.0 + 94.1 + 66.3 + 94.1 + 66.3 ="392.7/8 = 49.1%

Total Aggregate @ 60.1 + 49.1= 109.2/2 = 54.6%

Level III /O  !,. /l.*

Date__ __________________

1 (3.-ý ý ý_

AITACHMENT '

PA6 E '7 UF //2 UT Pipe Wtid Examination Site/Unit: Oconee / I Procedure: PDI-UT-2 Outage No.: 01-25 Summary No.: 01.B9.11.0003 Procedure Rev.: C Report No.: UT-09-315 Workscope: ISI Work Order No.: 01841875 Page: 1 of 4 Code: 199812000A Cat./item: B-J 1B9.11 Location:

Drawing No.: ILP-209

Description:

Elbow to Valve 1CF-13 (Cast SS)

System ID: 53A Component ID: 1LP-209-8L Size/Length: N/A Thickness/Diameter: 1.25114.0/SS Limitations: See attached report Start Time: 1449 Finish Time: 1527 Examination Surface: Inside j Outside f] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Fluke Serial No.: OCQUA33090 Surface Temp.: 72 -F Cal. Report No.: CAL-09-390 & CAL-09-391 Angle Used 0 45 1 45T 60 Scanning dB 40.31 40.3 58.2 Indication(s): Yes E] No [] Scan Coverage: Upstream E] Downstream [] CW I] CCW R]

Comments:

N/A Results: Accept E] Reject [Z Info n_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level Il-N SignatUr Date Reviewer Signature Date Ellis II, Kenneth R. - 10127/2009 ,"* _..-

Examiner Level II-N Snatur Date Site Review Signature Date Day. John, C. N*iture 10/2712009 Other Level NIA Signature Date ANII Review Signature Date N/A . </ýVW

ATTACHMENT A~

?AGE_5a OF /J Ultrasonic Indication Report Site/Unit: OconeeI 1 Procedure: PoI-UT-2 Outage No.: 01-25 Summary No.: 0 .l.B9.11-0003 Procedure Rev.: C1* Report No.: UT-09-315 Workscope: 'SI Work Order No.: 01841875 Page: 2 of 4 Search Unit Angle: 450 & 60"RL (ý) Piping Welds Wo Location: Weld Centerline 0 Ferritic Vessels > 2"T Lo Location: 9.1.1.1 0 Other MP Metal Path Wmax Distance From Wo To S.U. At Maximum Response RBR Remaining Back Reflection W1 Distance From Wo At Of Max (Forward)

L Distance From Datum W2 Distance From Wo At Of Max (Forward)

Comments: NIA

ATIACHMENTA PAGE*~ 0tF .2 DUKE POWER COMPANY ISI LIMITATION REPORT q 3 %,5 Component/Weld ID: 1LP-209-8L Item No: 01.89.11.0003 remarks:

I NO SCAN SURFACE BEAM DIRECTION No coverage due to pipe Li LIMITED SCAN D] 1 0 2 Z 1 L- 2 [- cw [I ccw configuration FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: Li 0 R 45 Li 60 other 60L FROM 0 DEG to 360 DEG Li NO SCAN SURFACE BEAM DIRECTION DLIMITED SCAN D1 2 D-2 2[i1 cw E ccw FROM L to L INCHES FROM WO to ANGLE: F-1 0 Ei 45 E] 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION D1 LIMITED SCAN -1 -]2 i 1 -2 - cw n ccw FROM L to L INCHES FROM WO to ANGLE: El 0 El 45 F1 60 other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION I EL LIMITED SCAN D -2 -1I [1 L2 cw n ccw FROM L to L INCHES FROM WO to Sketch(s) attached 4

ANGLE: D 0 [1 5 [1 60 other FROM DEG to X yes -]No DEG

Axial Scan Coverage Item No. O13B9.11.0003 Weld No. 1LP-209--SL

ýýlbow-S 1 Valve-S2

.451S1, arc. Scan Coverage 45* Shear Elbow-SI Valve-S2 Scale: 1"= 1"

% Coverage Calculations Si = Elbow = 50% (100% of the length x 50% of the volume)

S2 = Valve 0% ( 0% of the length x 0% of the volume)

S3 = CW 50% (100% of the length x 50% of the volume)

S4 = CCW = 50% (100% of the length x 50% of the volume)

Total = 150 / 4 = 37.5 % Aggregate Coverage Inspector / Date9ýeýý Page _f-of _J/

ATTACHMENT PAGE (0 OF //2-UT Pipe Weld Examination Site/Unit: Oconee / 1 Procedure: PDI-UT-2 Outage No.: 01-25 Summary No.: 011.B9.111.0050 Procedure Rev.: C Report No.: UT-09-261 Workscope: ISI Work Order No.: 01841933 Page: 1 of 5 Code: 199812000A Cat./Item: B-J /B9.11 Location:

Drawing No.: ISI-OCNI-008

Description:

Safe end to RC Pump 1A2 System ID: 50 Component ID: 1-PIA2-9 Size/Length: N/A Thickness/Diameter: 2.330/.36.5/SS Limitations: Yes Start Time: 0958 Finish Time: 1043 Examination Surface: Inside 0 Outside M- Surface Condition: AS GROUND Lo Location: RT stamp #1 Wo Location: WELD CENTERLINE Couplant: ULTRAGEL I[ Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32768 Surface Temp.: 67 °F Cal. Report No.: CAL-09-327, CAL-09-328, CAL-09-329 Angle Used 0 45 45T 60 60L Scanning dB 52.5 52.5 62.5 63.8 Indication(s): Yes E No [] Scan Coverage: Upstream 0] Downstream El CW [] CCW []

Comments:

FC 08-01, 08-04, 09-02 Results: Accept F] Reject Fj Info f_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes ExamineriLevel II-N Sig .,eu Date Reviewer Signature Date Tucker,DaiK.1/820 Examiner Level II.N S/ Date Site Review Signature Date NIA Level NIA' "Signature Date ANII Review Signature Date

ATTACHMENT A PAGE '62- OF I72-7-

DUKE POWER COMPANY ISI LIMITATION REPORT t,.rC -v'~- WI Component/Weld ID: IPIA2-9 Item No: O1.B9.11.0050 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Pipe to pump configuration Li LIMITED SCAN E I E] 2 El 1 Z 2 E] cw L]ccw FROM L N/A to L. N/A INCHES FROM WO CL to Beyond ANGLE: El 0 0 45 0 60 other 60L. FROM 0. .DEG to *360 DEG Fii NO SCAN SURFACE BEAM DIRECTION

[lLIMITED SCAN: [-1 [ 2 - I E 2 n cw [] ccw FROM L to L. INCHES FROM WO to _ _

ANGLE: 0. 0 LI 45 0]60 other FROM DEGto DEG LI NO SCAN SURFACE BEAM DIRECTION LF- LIMITED SCAN I [E 2 EL I [1 2 [] cw L- ccw FROM L to L INCHES FROM WO to ANGLE: LI 0 LI 45 ED 60 other FROM DEG to DEG I2-, NO SCAN SURFACE BEAM DIRECTION I I

[L LIMITED SCAN El1 El2 Ii 1 [1 2 [3 cw LI ccw FROM L to L INCHES FROM Wo to Sketch(s) attached 4

ANGLE: I- 0 [L 5 LI 60 other FROM DEG to DEG 9 yes [] No Prepared By: David TuckerT .

Reviewed By: ,

DDuke: Deter mination of Percent Coverage for UT Examinations - Pipe

,-Z,,- Site/Unit: Oconee I1 Procedure: PDI-UT-2 Outage No.: 01-25

" dummary No.: O1.B9.11.0050 Procedure Rev.: C Report No.: UT-09-261

" Workscope: ISl Work Order No.; 01841933 Page: 3 of 5 45 deg Scan 1  % Length X  % volume of length /100 =  % total for Scan 1 Scan 2 " Length X 0 volume of length /100 =  % total for Scan 2 Scan 3 100.000 " Length X 50.000 / volume of length /100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length /100 = 50.000 %total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deq - (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 0.000 " volume of length /100 = 0.000  % total for Scan 1 Scan 2  % Length X .45.100 / volume of length /100 = 45.100  % total for Scan 2 100.000 Scan 3 / Length X " volume of length /100 = %total for Scan 3 Scan 4  % Length X 0% volume of length / 100 = %total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 36.275  % Total for complete exam Site Field Supervisor: Rodney Sheffield Date: /.J- 2 -0o

A11ACHMENT ii PASE IA OF /12-SupplemeiLal Report Report No.: UT-09-261 Page: 4 of 5 Summary No.: O1.B9.11.0050 Examiner: TuckerxDaVmd K. Level: 11-N Reviewer: Date: /o0 -Z -

Examiner: Hollls, Jacob £ Level: Il-N Site Review: Date:

O~ther: NIA _ Level: NIA ANll Review: Date: _1Y_-_/a Comments: Axial exam 450 shear, 60* shear & 60*L Sketch or Photo:

'p2 P11-4r AIJ

.2 I

ISf'/`402 - (Sfl/S)j/Z __

ZP71

/11

Al IACHMENT /A PASE '5UQF /(2_

Suppleme,,,al Report Ae Report No.: UT-09-261 Page: 5 of 5 Summary No.: O1.89.11.0050 Date: /0- 0-Examiner: Tucker, David K. Level: I1-N Reviewer:

Date:

Examiner: Hollis, Jacob Level: II-N Site Review:

Other: NIA Level: NIA ANII Review: Date:

Comments: CW & CCW Circ 45° shear exam Sketch or Photo:

~~qPXA2

'52 Xf,- I C 70-717~2

=27 2.

P

A 1ACHMENTA UT Pipe Weid Examination MAE 6ýOF 7/?-,

Site/Unit: Oconee I1 Procedure: NDE-830 Outage No.: 01-25 Summary No.: O1.B9.11.0050 Procedure Rev.: 1 Report No.: UT-09-260 Workscope: ISi Work Order No.: 0:1841933 Page: 1 of 3 Code: 1.998/2000A Cat./item: B-J /89.11 Location:

Drawing No.: .Si-OCN1-008

Description:

Safe end to RC Pump 1A2 System ID: 50 Component ID: 1-PIA2-9 Size/Length: N/A Thickness/Diameter: 330/36.5/SS ca.

Limitations: Single side exam - see attached limitations sheet Start Time: 1001 Finish Time: 1028 Examination Surface: Inside [] Outside f] Surface Condition: AS GROUND Lo Location: N/A Wo Location: N/A Couplant: ULTRAGEL Il Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32768 Surface Temp.: 67 °F Cal. Report No.: CAL-09-325 & CAL-09-326 Angle Used 0 45 45T 60 " 70 Scanning dB 72.0 73.0 Indication(s): Yes [( No 21 Scan Coverage: Upstream 0 Downstream [ CW E/ CCW 21 Comments:

Non-code exam Results: Accept [] Reject El Info .21 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level II-N ." Sig at.*... . Date Reviewe ,Signature ...... Da....

Date:

.Griebel, David M. 10/18/2009 "..-..0?

Examiner Level li-N

  • c.0,,=200 1 S:Ig jjýure Date :Site Revie .......... ...

Signature pte Leeper, Winfred C, 10/1.8/200.9

.Other Level NIA ire Dale Da'tiSi*ANII Review . " Signature Date:

N.A . Signatur /. 6

t1 TIACHMENT /

PASEE4 OF /12-Supplemental Report Report No.:

UT-09-260 Page: 2 of 3. ..

Summ.ay No.: O1.B9.11.0050 Examiner: Grieb.el, David M. Level: I1-N Reviewer: Date:

Examiner: Leepar, Winfredc. . Level: IM-N Site Review: Date: _____

Other: N/A Level: NIA ANII Review: Date:

Comments: Best effort exam using 60°RL & 70=RL per NDE 830 for upper 213 of area of interest.

r-z PV I

I I

I Rc P I; p/pg f *2.

L

AT TACHMENTA pF DUKE POWER COMPANY I ISI LIMITATION REPORT Component/Weld 0I-PIA-2 ID: Item No: 01.9.11.0050 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Procedure alows scanning Fi LIMITED SCAN 0] 1 Z 2 i 1 Li 2 El cw 0 ccw from cast side only FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: El 0 [] 45 10 60 other 70 FROM 0 DEG to 360 DEG Li NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning DLIMITED SCAN Ei I N 2 El 1 [1 2 N cw Z ccw from castsideonly FROM L ..N/A to L N_A INCHES FROM WO CL to Beyond ANGLE: [] 0 El 45 Li 60 other 70 FROM. 0 DEG to 360 DEG

[] NO SCAN SURFACE BEAM DIRECTION F] LIMITED SCAN El 1 El 2 El I El 2 E] cw [I ccw FROM L to L INCHES FROM WO to ANGLE: []0 n] 45 []6. other FROM DEG to .. DEG Z NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN Eli 1 -12 L]i1 i2 0 cw Dccw FROM L to L INCHES FROM WO to Sketch(s) attached 1 ANGLE: f00 5 Li 60 [ other__ FROM.. DEG to .. DEG EL yes, L- No f

Al IACHMENTAI UT Pipe Wetd Examination MAE (0 F //>7 Site/Unit: Oconee I Procedure: PDI-UT-2 Outage No.: 01-25 Summary No.: 01.E39.11.0062 Procedure Rev.: C Report No.: UT-09-349 Workscope: iS' Work Order No.: 01841924 Page: 1 of 5 Code: 199812000A Cat./item: B-J 1B9.11 Location:

Drawing No.: ISI-OCNI-012

Description:

RC Pump 1A2 to Safe end System ID: 50 Component ID: 1-PDA2-1 Size/Length: N/A Thickness/Diameter: 2.33/33.51SS Limitations: Yes - See attached limitation.report Start Time: 1100 Finish Time: 1230 Examination Surface: Inside [ Outside [ Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Fluke Serial No.: OCQUA33090 Surface Temp.: 72 'F Cal. Report No.: CAL-09-44'3, 444& 445 Angle Used 0 45 45T 60I60RL Scanning dB 42.2 42.2 60 64 Indication(s): Yes = No [] Scan Coverage: Upstream LI Downstream R] CW 0" CCW 9 Comments:

NIA Results: Accept E) Reject R] Info E]

Percent Of Coverage Obtained > 90%: No . Reviewed :Previous Data: - Yes Examiner Level li-N ignature Date Reviewer, nature, Date Koster, Rickey 10/30/2009 Examiner Level Il-N Sgntugre Date Site Review Signature Date Day. John. C. '.,..-.. 10/30/2009 Ot'hera Level NA Sig.tuF* Date ANII Review Signature Date NIA .

ATTACHMENT A 1t--

DUKE POWER COMPANY ISI LIMITATION REPORT f .3 Component/Weld ID: I.PDA2-1 Item No: O1.19.11.0062 Iremarks:

[ NO SCAN SURFACE BEAM DIRECTION Due to component E] LIMITED SCAN LI 1 N] 2 Z I El 2 N] cw [] ccw configuration FROM L N/A to L N/A INCHES FROM WO CI to Beyond ANGLE: El 0 M 45 12 60 other FROM 0 DEG to 360 DEG f-I NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN [I I Ei 2 L 1 LI 2 LI cw LI ccw FROM L to L INCHES FROM WO to ANGLE: U 0 E] 45 E] 60 other. FROM DEG to DEC L- NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN 1L[I 2 1i 1[ 2 EI cw L] ccw[

FROM L to .L INCHES FROM WO to ANGLE: El 0 0 45 U 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION LILIMITED SCAN L E- 22 L ] cw -- ccw FROM L to L: INCHES FROM WO to Sketch(s) attached 4

ANGLE: U 0 0 :5 3. 60 0

AT TACHMENT/q S" '--'1/ F 1I2-Suppleme,,cal Report

-j Nf~e~ Report No.: UT.09-349 Page: 3 of 5 Summary No.: O1.B9.11.0062 Examiner: Koster, Rickey Level: Il-N Reviewer: Date: //3r,5' Examiner: Day, John, C. Level: 1i-N Site Review: Date: .

Other: N/A Level: N/A ANII Review: Date:

Exam lii'mitation

& CCW CW circ. .. . .

Comments:

Comments: CW & CCW circ. Exam lilmitation i / /

/

/

I

.7,

-- I I _________________

C,

  • IT ACHMENT A Suppleme,,cal Report PA6E QF1( -

Report No.: UT-09-34.9 Page: 4 of 5 Summary No.: O1.B9.11.0062 Examiner: Koster, Rickey Level: I1-N Reviewer: Date: /1 0, z~-~

Examiner: Day,..Jh,. C. Level: Il-N Site Review: Date:

Other. NIA Level: N/A ANII Review: Date: __,. ____

Commen .. ......

Comments: Axial exam limitation

', I

\ I

/

/

i 7

  • kel uDeteri ruination of Percent Coverage for UT Examinations - Pipe N- Site/Unit: Oconee I . Procedure: PDI-UT-2 Outage No.: 01-25 SLummary No.: O1.B9.11.0062 Procedure Rev.: C Report No.: UT-09-349

,.. Workscope: ISI Work Order No.: 01841924 Page: 5. of 5 45 deg Scan 1 109.000 0 Length X 50.000  % volume of length / 100 = 50.000 %total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume of length I 100 = 0.000  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000 %total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 37.500  % total for 45 deg Other deg - _ (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1  % Length X  % volume of length /100 =  % total for Scan 1 Scan 2  % Length X  % volume of length /100 = / total for Scan 2 Scan 3  % Length X  % volume of length 1100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 = " total for Scan 4 Percent complete. coverage Add totals for each scan required and divide by # of scans to determine; 37.500 %Total for complete exam Site Field Supervisor Rodney Sheffield Date: //-,?-  ?

AIIACHMENT gq UT Pipe Weld Examination PA6E 7qOF 11-Site/Unit: Oconee . Procedure: NDE-830 Outage No.: 01-25 Summary No.: 01.89.11.0062 Procedure Rev.: I Report No.: UT-09-337 Workscope: ISI Work Order No.: 01841924 Page: 1 of 3, Code: 1998/2000A Cat./Item: B-J /B9.11 Location:

Drawing No.: ISI-OCN1-012

Description:

RC Pump 1A2 to Safe end System ID: 50 Component ID: 1-PDA2-1 Size/Length: NIA Thickness/Diameter: 2.33133.5/SS Limitations: Single side exam - see attached limitations sheet Start Time: 0910 Finish Time: 0942 Examination S urface: Inside El Outside j] Surface Condition: AS GROUND Lo Location: NIA Wo Location: N/A Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mf g.: FISHER Serial No.: MCNDE32768 Surface Temp.: 77 °F Cal. Report No ........... CAL- -q q.- L4 171 V2)

Angle Used 0 J45 5 60. 7 Scanning dB 7,2.0 7ý3.0 Indication(s): Yes C] No [] Scan Coverage: Upstream W] Downstream [] CW r/ CCW 11 Comments:

Non-code exairn Results: Accept ED Reject El Info []

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

ATIACHMENT A1 1r DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 1-PIA-2 Item No: O1.B9.11.0062 rem.arks:

[ NO SCAN SURFACE BEAM DIRECTION Procedure allo.ws scanning D] LIMITED SCAN I1 [] 2 LI1 Z] 2 M cw Z ccw from castsideonly FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: C) 0 Ej 45 2) 60 other 70 FROM 0 DEG to 360 DEG E] NO SCAN SURFACE BEAM DIRECTION r-1 LIMITED SCAN E] 1 r 2 El 1 0 2 n cw ccw FROM L to L INCHES FROM Wo to .

ANGLE: E] 0 E] 45 fl 60 other FROM DEG to DEG

[

E NO SCAN SURFACE BEAM DiRECTION i*LIMITED SCAN I*

1 *- 2 E-] 1 r]2 E-] cw F] ccw

!iFROM L to L INCHES FROM W0 to ANGLE: []0 E] 45 El 60 .other .FROM -DEG to DEG El N( ) SCAN SURFACE BEAM DIRECTION .!,

I fil LjNILII# vITED SCAN to L LI [-12 INCHES FROM WO EL 1 0I 2 C1 cw to EI ccw

-~

Sketch(:s) attached I!

FROM L ANGLE: El 0 LI [3 60 5t..oL:- otherIN FROM DEG to DEGyes 9 [- No

  • ___ HE FRM"O __"_t

WI 1ACHMENT ,7 PAGE 7(p QF I/-

Supplemental Report Alt Agy Report No.:

UT-09-337 Page: 3 of 3 Summary No.: O1.B9.11.0062 Examiner: Leeper, Winfred C..- - Level: I1-N Reviewer: Date: //" ?- 97 Examiner: Foss,. Steven Y_ ,*-- Level: Il-N Site Review: Date:

Other: N/A Level: N/A ANII Review: Date: /,//oy Comments: Best effort exam using 60"RL & 70ORL per NDE 830 for upper 2/3 of area of interest.

1--L 0V/

(D

/00 I

I I I t

1

/qcP I PIPE I

'IA ACHMENTA UT Pipe Weid Examination PA E 717 OF 12 Site/Unit: Oconee I Procedure: PDI-UT-2 Outage No.: 01-25 Summary No.: 01.C5.11.0028 Procedure Rev.: C Report No.: UT-09-267 Workscope: ISI Work Order No.: 01845470 Page: 1 of 5 Code: 1998/2000A Cat./Item: C-F-1/C5.11 Location:

Drawing No.: 1-53A-02(i)

Description:

Valve 1LP-47 (Cast SS) to Pipe System ID: 53A Component ID: 1-53A-02-65L Size/Length: NIA Thickness/Diameter: 1.125/10.0/SS Limitations: Yes - Single sided exam, see coverage sheet Start Time: 1551 Finish Time: 1607 Examination Surface: Inside ED Outside [] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: . Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32770 Surface Temp.: 69 'F Cal. Report No.: . ... , ....... . ... ..  ;. . . ......... ..... . . . CAL-09-336 & CAL-O9-337 Angle Used 0 45 45T 60 .

Scanning dB 37.8 37.8 48.5 Indication(s): Yes ED No 2 Scan Coverage: Upstream 21 Downstream ED CW [] CCW 2I Comments:

N/A Results: Accept E] Reject [] Info ED Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

Deterr ruination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee / 1 Procedure: PDI-UT-2 Outage No.: 01-25 Summary No.: O1.C5.11.0028 Procedure Rev.: C Report No.: UT-0.9-267

  • Workscope: ISI Work Order No.: 01:845470 Page: 2 of 5 45 deg Scan 1 100.000  % Length X 0.000  % volume of length / 100 = 0.000 %total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length / 100 = 50.000 %total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 37.500  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan i 100.000 " Length X 0.000  % volume of length / 100 = 0.000  % total for Scan I Scan 2 " Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 2 100.000 Scan 3 100 .000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 '100.000  % Length X 50.000 %volume of length /100 = 50.000  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor Date.:. ./Z- O

rIACHMENT A PACE 7? OF /12-DUKE POWER COMPANY ISI LIMITATION REPORT. 0-- 01 -Z(,-7 Component/Weld ID: 1-53A-02-65L Item No: O1.C5.11.0028 remarks:

NO SCAN SURFACE BEAM DIRECTION No scan dueto valve D LIMITED SCAN [ 1 E] 2 [I1 [] 2 0 cw Z ccw configuration. No landing FROM L 0 to L 33.75 INCHES FROM WO CL to Beyond on value side and it's cast ANGLE: E 0 Z 45 0 60 other FROM o DEG to 360 DEG .hlaterial.

LI NO SCAN SURFACE BEAM DIRECTION Limited scan due to valve f* LIMITED SCAN ']1 I0 2 1 E-l- 2 rI cw l- ccw configuration FROM L 0 to L 33.75 INCHES FROM WO .45 to Beyond ANGLE: 0I 0 Z 45 0J 60 other FROM 0 DEG to 360 DEG LI NO SCAN SURFACE BEAM DIRECTION LILIMITED SCAN El 1 [- 2 LI LI2l cw L ccw FROM L _ to L INCHES FROM WO to _ _

ANGLE: LI 0 0I 45 0] 60 other FROM. DEG to DEG L.I NO SCAN SURFACE BEAM DIRECTION I I EL LIMITED SCAN 1I I 2 1 [1 2 El cw 0 ccw I1 FROM L to L INCHES FROM WO .... to Sketch(s) attached El 0 U 45 LI 60 0o ANGLE: ther FROM DEG to. DEG N yes LINo.

Prepared By: Jacob R. Hollis Level: Date: 10/20/09 f She ReviewedBy:

ly

,,I IACHMENT /9 PAGE Bo OF I?1-Supplemeucal Report Report No.:

UT-09-.267 MAI 4 of 5 Page:

Summary No.: O1.C5.11.0028 Examiner: Hollis, Jacob *s< Level: I-JN Reviewer: Dale; /C.*-03-0o Examiner: Grtebel. avid..(**' /*..<*z .2 Level: II-N. Site Review: Date:

Other: NIA Level: NIA ANJI Review: Date: ____ ,____

Comments: Axial exam 45* shear & 60RL 51 5z

-40 o,

AIIACHMENT A~

Supplemental Report PABE 9 OF Ii'--

A Report No.:

UT-09-267 Page: 5 of 5:

Summary No.: O1.C5.11.0028 Examiner: Hollis, Jacob Level: 1I-N Reviewer: ~ 2 Date: ,603-OF Examiner: Gri.bel. David. ... ' Level: .A.M-N Site Review: Date:

Other: NIA Level: NIA ANII Review: _ _ _ _ _ '_.. .. Date:__ _ _

Comments: CW & CCW Circ. exam 45* shear; Scan 1 Ax.

Sketch or Photo: Z:\UT\IDDEAL\ProfileLine2.jpg Si -,i~L a52 V,&LVE PIPEF I

ATTACHMENTA UT Pipe Weid Examination PAGE F2- Of(/~

Site/Unit: Oconee / Procedure: PDI-UT-2 Outage No.: 01-25 Summary No.: O1.C5.21.0004 Procedure Rev.: C Report No.: UT-09-296 Workscope: Is' Work Order No.: 01846023 Page: 1 of 7

.=~...=. .. ..... .. ....*. ... ...

Code: 199.812000A Cat./Item: C-F-11C5.21 Location:

Drawing No.: 1-51A-04

Description:

Pipe to Valve 1HP-194 (Forged SS)

System ID: 51A Component ID: 1-51A-04-1C Size/Length: N/A Thickness/Diameter: 0.67414.01SS Limitations: Yes - See attached Limitation Report Start Time: 1208 Finish Time: 1240 Examination Surface: Inside EJ Outside [ Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL 1i Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32770 Surface Temp.: 69 °F Cal. Report No.: CAL-09-355, 356, 357 Angle Used -0 I45 45T1 6013, 1, Scanning dB4.2 10633 9 Indication(s): Yes MV No LI Scan Coverage: Upstream [] Downstream E] CW [] CCW 2 Comments:

NIA Results: Accept LI Reject [] Info LI Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes IExaminer Level ,,_,. ~ /J 2"/ * ....

Reviewer Signature " Date Koster, Rickey Date 10/26/2009

/o~~-'9-=

Examiner Level Il-N ..

Date Site Review Signature Date Bowne, Lowell V. 10J26/2009 IOther Level NiA Signature Date: ANII Review Signature Date N/A

mIIIACHMENET A Ii' A Site/Unit: Oconee /

Ultrasonic Indication Report Procedure: PDI-UT-2 Outage No.: 01-25 PA8E 95 DFIj-I..

.. . C5.21.0004 .

Summary No.: Procedure Rev.: C Report No.: UT-09-296 Workscope: ISI Work Order No.: 01846023 Page: 2 of 7 Wo Wniax Search Unit Angle: 45's & 60ORL o (G Piping Welds C.L

.W2I Wo Location: Weld Centerline 0 Ferritic Vessels > 2"T Lo Location: 9.1.1.1 C) Other MP Metal Path Wmax Distance From Wo To S.U. At Maximum Response RBR Remaining Back Reflection W1 Distance From Wo At Of Max (Forward)

L Distance From Datum W2 Distance From Wo At Of Max (Forward)

Comments: N/A Int IDGeometry - 360° Int ID Geometry - 360'

IACHMENTT DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 1-51A-04-1C Item No: O1.C5.21.0004 remarks:

[ NO SCAN SURFACE BEAM DIRECTION No scan due to valve LI LIMITED SCAN Li E] 2 Li I [ 2 cw M cOw onfiguration FROM L o to L 14.13 INCHES FROM WO CL to Beyond ANGLE: [] 000 45 0 60 other 380 FROM 0 DEG to 360 DEG L-i NO SCAN SURFACE BEAM DIRECTION

[L LIMITED SCAN Li 1 E] 2 -] 1 [] 2 El cw 0 ccw FROM L to L *INCHES FROM WO to ANGLE: 1Z 0 0J 45 [E 60 other FROM DEG to DEG i-L NO SCAN SURFACE BEAM DIRECTION A i LIMITED SCAN L] I [E 2 "] 1 ] 2 E] cw 0 ccw FROM L to L INCHES FROM WO to .........

ANGLE: Li 0 E) 45 0l 60 other FROM DEG to DEG

.MNO SCAN SURFACE BEAM DIRECTION ij FFROM L LIMITED SCAN to L LTI 0 2 INCHES FROM WO Li 1 0 2 Fj cw El to cOw 1~ Sketch(s) attached 5 M 6ý9, /at j- FROM DEG to DEG [ yes i No

Al TACHMENT /A Supplemb..caa Report EA695 OF /12-Report No.: UT-09-296 Page: 4 of 7 Summary No.: O1.C5.21.0004 Examiner: Koster, Rickey j

  • Level: ll-N Reviewer: Date: /c0_-2Zy-o Examiner: BowneA Lowell V. Level: IlN Site Review: Date:_

Other: N/A Level: N/A ANII Review:

Comments: CW & CCW Circ. Exam limitation Sketch or Photo:

ATTACHMENT A PAGE g'(, OF I/-,-

Supplemernial Report Report No.:

UT-09-296 Page: 5 of 7 Summary No.: Ol.CS.21.0004 Examiner: Koster, Ri~ckey Level: 11-N Reviewer: Date: /L' -29.,'

Examiner: Bowne. Lowell Level: Il-N Site Review: Date:

Other: N/A Level: N/A ANII Review: DaIe: .T/,/OT Comments: Axial exam limitation Sketch or Photo:

ATTACHMENT 7q Supplemental Report PASE S7 OF 11V2-Report No.: UT-09-296 Page: 6 of 7 Summary No.: O1.C5.21.0004 Examiner: Koster, Rickey Level:er Level: i-N 1/ Reviewer:. Dae Date: /c 1: -

Examiner: Bowne, Lowell V Level: II-N Site Review: Date:.

Other: N/A Level: N/A. ANII Review: __Date: Al/..5o,'

Comments: Ind. # 1 - 45° & Ind. # 2 60°RL are geometric reflectors from weld root configuration. These reflectors are intermittent 360°. This was verified by reviewing previous data.

Sketch or Photo: ZAUT\*IDDEAL\ProfileLine2.jpg S2 S

'44

.1. V .- 4~

f

Detert nination of Percent Coverage for h- *..

UT Examinations - Pipe 0o Site/Unit: Oconee I i Procedure: PDIWUT-2 Outage No.: 01-25

- L ummary No.: 01..C5.21.0004 Procedure Rev.: Report No.: UT-09-296

.c Workscope: ISl Work Order No.: 01846023 Page: 7 of 7 45 deg/38A5 Scan 1 100,000  % Length X 50.000  % volume of length /100 = 50.000 4 total for Scan I Scan 2 100.000  % Length X 0.000  % volume of length I 100 = 0.000 " total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length /100 = 50.000 " total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 37.500  % total for 45 deg Other deq - _ (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1  % Length X  % volume of length 1100 =  % total for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2

% Length X " volume of length /100 =  % total for Scan 3 Scan 3

% Length X 0 volume of length / 100 = %total for Scan 4 Scan 4 Percent complete coveraqe Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: Date: /

ATTACHMENT A~

PAIBE? OF I/12-.

UT Pipe Weid Examination

- libb' Site/Unit: Oconee It Procedure: NDE-600 Outage No.: 01-25 Summary No.: O1.C5.21.0027 Procedure Rev.: 17 Report No,: UT-09-234 Workscope: .S. Work Order No.: 01850931 Page: 1 of 5 Code: 1998/200QA Cat./item: C-F-11C5.21 Location:

Drawing No.: 1HP-387

Description:

Valve IHP-118 (Forged SS) to Elbow System ID: 51A Component ID: 1HP-387-1"i8A Size/Length: N/A Thickness/Diameter: 0.531 / 4.000 Limitations: Yes, see attached limitation Start Time: 1356 Finish Time: 1409 Examination Surface: Inside [ Outside [] Surface Condition: AS GROUND Lo Location: 9.1.1.2 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07225 Temp. Tool Mfg.: Fluke Serial No.: OCQUA33090 Surface Temp.: 82 °F Cal. Report No.: CAL.09-3.01. CAL-09-302, CAL-09-303 AngleUsed .0 .45 I45Ti 60 60L Scanning dB 40 45..0 Indication(s): Yes E No Ov Scan Coverage: Upstream [] Downstream t] CW [] CCW []

Comments:

FC 08-03 Results: Accep, .. Reject E Info [3 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

ATTACHMENT A PA6E '7o OIF /12._

DUKE POWER COMPANY ISI LIMITATION REPORT L3-r'* oq ...

Component/Weld ID: 1-51A-01-118A. Item No: O1.C5.21.0027 Iremarks:

NO SCAN SURFACE BEAM DIRECTION Due to valve configuration

[LIMITED SCAN E-] 1 2 [:1 1 E 2 0 cw N ccw FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: [] 0 Z 45 D" 60 other FROM o DEG to 360 DEG Li NO SCAN SURFACE BEAM DIRECTION Valve configuration LIMITEDSCAN 1 [2 [ 1 E) 2 L cw n ccw FROM L N/A to L N/A INCHES FROM WO CL to 0.9 ANGLE: Li 0 Li 45 [ 60 other FROM 0 DEG to 360 DEG Li NO SCAN SURFACE BEAM DIRECTION DLIMITED SCAN Li1 Li2 L i2Licw 0 ccw FROM L to L INCHES FROM WO to ANGLE: [] 0 C] 45 E] 60 other FROM DEG to DEG i NO SCAN SURFACE BEAM DIRECTION I Li LIMITED SCAN El 1 L 2 L i2i] cw n ccw I

FROM L to L INCHES FROM WO to Sketch( s) attached ANGLE: Q0 El 45 Dl 60 other FROM DEG to DEG Li yes LiNo Prepared By: Winfred Leeper /y i ,,Level: ii Date: 7128/09 I Sheet 2 c -II By:

ATI ACHMENT /A PAGE q9 OF l/z.

Suppleme,,al Report Report No.. UT-09-234 Page: 3 of 5 Summary No.: O1.C5.21.0027 q~, AAA Date:

Examiner: Leeper, Winfred C. Level: II-N Reviewer:

Examiner: NIA Level: N/A Site Review: Date:

Other: N/A Level: N/A ANti Review: Date: ./,,&

Comments:

Sketch or Photo: ZAUT\lDDEAL\ProfleLine2.jpg

AITACHNENT/A D Suppleme.,cal Report Report No.:

PFA6E 'L-QF OF2..

UT-09-234 Page: 4 of 5; Summary No.: O1.C5.21.0027 Examiner: LeeperA Winfred C.nl-N Level: Reviewer: Date:

Examiner: N/A Level: N/A Site Review: Date:

Other: N/A Level: N/A ANII Review: Date: /____

Comments: CW & CCW Sketch or Photo: Z:\UT\ID0EAL\ProfileUne2.jpq i

.3 I

=

I I.

Deterr nination of Percent Coverage for UT Examinations - Pipe

  • Site/Unit: Oconee / I Procedure: NDE-600 Outage No.:. 01-25 Summary No.: O1.C5.21.0027 Procedure Rev.: 17 Report No.: UT-09-234
c. Workscope: ISI Work Order No.: 01850931 Page: 5 of 5 Scan 1 100.000  % Length X 100.000 " volume of length / 100 = 100.000  % total for Scan 1 Scan 2 100.000  % Length X 100.000 0 volume of length 1100 = 10p0.000  % total for Scan 2 Scan 3 100.000  % Length X 50.000 / volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 0 volume of length / 100 =

50.000 50.000  % total for Scan 4 Add totals and divide by # scans = 75.000  % total for 45 deg Other deg - _ (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

" Length X O volume of length / 100 =  % total for Scan 1 Scan 1 Scan 2 " Length X " volume of lenigth / 100 =  % total for Scan 2

" Length X  % volume of length / 100 =  % total for Scan 3 Scan 3

" volume of length I 100.=  % total for Scan 4 SCan 4  % Length X Percent complete coverane Add totals for each scan required and divide by ft of scans to determine; 75.000  % Total for complete exam Site Field Supervisor: Date: 14 - -'.Y - 9

AIIACHMENT A UT Pipe We,u Examination PAGE c/V OF //Z, SitelUnit: Oconee / 1. Procedure: NDE-600 Outage No.: 01-25 Summary No.: 01. ;5.21..0040 Procedure Rev.: 17 Report No.: UT-09-235 Page: 1 of 4 Workscope: Ist...

Work Order No.:

Code: 1998/2000A Cat./Iltem: C-F-1/C5.21 Location:

Drawing No.: IH1*P-193

Description:

Tee to Pipe System ID: 51A Component ID: 1HP-193-17 Size/Length: N/A Thickness/Diameter: 0.375/ 2.500 Limitations: Yes Start Time: 0916 Finish Time: 0927 Examination Surface: Inside [ Outside f] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL ii Batch No.: 07225 Temp. Tool Mfg.: Fluke Serial No.: OCQUA33090 Surface Temp.: 90 -F Cal. Report No.: CAL-09-304, CAL-09-305, CAL-09-306 Angle Used 0 45 J45T 60 70 Scanning dB 47 47 47 Indication(s): Yes n No [ Scan Coverage: Upstream C] Downstream R] CW I/1 CCW P]

Comments:

FC 08-03 Results; Accept 0 Reject W Info El Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level II-N -- , a *re . Date ýReviewer Signature Daie Leeper, Winfred C. 7122/2009 Examiner Level N/A Signature*4 Date Site Review Signature Date N/A Other Level NIA Signature Date ANII Review Signature Date S i n a ur . . D a te/..

N I A.

AIIACHMENT /4

ý_*

5 ;Z DUKE POWER COMPANY L) -.- - Z . .

ISI LIMITATION REPORT Component/Weld ID: 1HP-193-17 Item No: S oo-qo C-05-021.-O6t----,. remarks: IV~~~5

[I NO SCAN SURFACE BEAM DIRECTION Due to tee configuration LI LIMITED SCAN 1 R 2 Z 1 E] 2 EL cw El ccw FROM L N/A to L N/A INCHES FROM Wo .05" to. Beyond ANGLE: [3 0 E] 45 Z 60 other FROM 0 DEG to 360 DEG LI NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN EL i LI 2 [] 1 I] 2 [] cw [- ccw FROM L to L INCHES FROM Wo to ___

ANGLE: El 0 [E 45 Ej 60 other _. FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION I LIMITED SCAN 01 [jj2 [ 1 [1 2 [] cw ] ccw _

FROM L to L INCHES FROM Wo to ANGLE: El 0 [E 45 [] 6,0: other FROM DEG to DEG i] NO SCAN SURFACE BEAM DIRECTION I

El LIMITED SCAN 01 [022 El 1 - 2 l cw [ ccw I FROM L to L INCHES FROM WO t_0 Sketch(s) attached 4

ANGLE: [ 0 [3 5 [060 other FROM DEGto M yes I No DEG V

oU~ti1mw1 A FA&E6 -%0F j1)]Z.,

Suppleme...al Report Report No.:

II&"W. Page: 3 Ul-09-235 of 4 Summary No.: O1.CS.21.0040 Examiner: Leeper, Winfred C. Level: Reviewer: Date:

I1-N Examiner: NIA Level: NIA Site Review: Date:

Other: NIA Level: N/A ANII Review: Date:

Comments:

Sketch or Photo: Z:IU'RDIDEAL\ProfIeLine2.jpg WELD '-I 11-1s I

11111. /I ! i/./1111/111 111/3

,-)I &/"o, AP7A T-j *ii'Z*r~I 4 I -Z i

&ý7- --------------

Determination of Percent Coverage for Udz UT Examinations - Pipe u3-j Site/Unit: Oconee. I I Procedure: NDE-600 Outage No.: 01-25 Summary No.: O1.C5.21.0040 Procedure Rev.: 17 Report No.: UT-09-235 Workscope: ISt Work Order No.: 01850941 Page: 4 of 4.

4Sadng Scan I  % Length X " volume of length 1100 =  % total for Scan 1 Scan 2  % Length X " volume of length 1100 =  % total for Scan 2 Scan 3 50.000  % Length X 100.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 50.000  % Length X 100.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000 . % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 50.000  % Length X 100.000  % volume of length 100 = 50.000  % total for Scan 1 Scan 2 0.000  % Length X 100.000  % volume of length /100 = 0.00.0 %total for Scan 2 Scan 3  % Length X  % volume of length 100 =  % total for Scan 3 Scan 4  % Length X _ 04 volume of length /100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: 162,,J " . Date: ý-22

Al IACHMENT /7 UT Pipe Weld Examination PAGE 178 OlF //7-Z-,,

Site/Unit: Oconee I Procedure: PDI-UT-2 Outage No.: 01-25 Summary No.: O1.C5.21.0051 Procedure Rev.: C Report No.: UT-09-322 Workscope: ISI Work Order No.: 01848378 Page: 1 of 5 Code: 1998/2000A Cat./Item: C-F-1/C5.21 Location:

Drawing No.: 1-51A-02

Description:

Pipe to Flange System ID: 51A Component ID: 1-51A-02-16BH Size/Length: NIA Thickness/Diameter: 0.531/4.OSS Limitations: Yes - See attached limitation r.eport Start Time: 0955 Finish Time: 1028 Examination Surface: Inside [] Outside [ Surface Condition: AS GROUND Lo Location: 9.1.1.1, Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32770 Surface Temp.: 72 'F Cal. Report No.: CAL-09-400, 401 & 402 Angle Used 0 45 45T 60 70L Scanning dB 26.7 26.7 54.5 36.7 Indication(s): Yes E) No [] Scan Coverage: Upstream 2 Downstream ED CW [] CCW []

Comments:

NIA Results: Accept E) Reject [] Info E]

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 11-N gn*. Date Reviewer signhur Date Hendrickson, Matthew 10/29/2009 /1 C,,'

Examiner Level 11-N S*n Date Site Review Signature Date:

Day, John, C./.4A 10/29/2009 Other LeVel N/A Signatur Date ANII Review Signalure Date N/A ___ __/___ ___ __ ___ ___ ___ __

.,11ACHMENI /

DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 1-51A-02-16BH Item No: O1.C5.21.0051 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Due to flange.

[] LIMITED SCAN 1 [] 2 [ 1 [] 2 N cw 0 ccw configuration FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: ED 0 2 45 IZ 60 other 70L FROM 0 DEG to 360 DEG D NO SCAN SURFACE BEAM DIRECTION L-] LIMITED SCAN 1 -]2 [i 1 El 2 [] cw F] ccw FROM L toLL INCHES FROM WO to ANGLE: El 0 El 45 E] 60 other ._ FROM DEG. to .DEG E] NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN 1 -j 2 1 2 ncw 1 ccw FROM L to L_ INCHES FROM Wo to ANGLE: F-1 0 []45.. 0]60 other FROM DEG to. DEG '

r-]NO SCAN SURFACE BEAM DIRECTION

[*LIMITED SCAN E-- 1 E] 2 [] 1 E] 2 El cw El ccw FROM L to.L INCHES FROM Wo to Sketch(s) attached 4

ANGLE: El 0 EL 5 I. 60 other FROM DEG to DEG yes E-] No Prepared By: John Day Level: ii Date: 10129/09 ShR.t 2 nf .1

AT IACHMENT A SuppJeme..,al Report PA6E /oO OF /2-Report No.: UT-09-322 ii~~y; Page: 3 of 5 Summary No.: 01.C5.21.0051 Examiner: Hendrickson, Matthew 'Level: Il-N Reviewer: Date: /- * - 07 Examiner: bay,:Jbhn, -b Level: I1-N Site Review: Date: .........

Other: N/A Level: N/A ANII Review: Date: ....

Comments: CW & CCW Circ. exam limitation Sketch or Photo:

s2. 3-Z F-0ijG. e

ATIACHMENT/ý Suppleme...al Report PAME /ol UF /)2-Report No.: UT-09-322 Page: 4 of 5 Summaiy No.: O1.C5,21.0051 Examiner: Hendrickson, Matthew vet: Il-N Reviewer: Date: 11-2""

Examiner: Day,.John, Q Level: li-N Site Review: Date:

Other: NIA Level: N/A ANII Review: Date: ___,___

Comments: Axial exam limitation Sketch or Photo:

-51 5S2.

bo FPs ,

Eft 1) Determination of Percent Coverage for UT Examinations - Pipe

-. Site/Unit: Oconee I Procedure: PDI-UT-2 Outage No.: 01-25

, '*ummary No.: 01I.C5.21.0051 Procedure Rev.: C Report No.:- UT-09-322 o Workscope: ISI Work Order No.: 01848378 Page: 5 of 5

,-J.

45 deg Scan 1  % Length X  % volume of length /100 = 1/total for Scan 1 Scan 2  % Length X " volume of length 1100 = %total for Scan 2 Scan 3 .1100.000  % Length X 50.000 " volume of length / 100 = 50.000 " total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 0.000  % volume of length /100 = 0.000 %total for Scan I

% volume of length / 100 =

Scan 2 100.000  % Length X 50.000 50.000  % total for Scan 2 Scan 3 %LengthX  % volume of length / 100 = %total for Scan 3 Scan 4  % Length X ......  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by 1 of scans to determine; 37.500 %Total for complete exam Site Field Supervisor:. Date: /1 09

A11ACHMENT A~

UT Pipe Wt-.d Examination Site/Unit: Oconee / Procedure: NDE-600 Outage No.: N/A Summary No.: 1-HP-0187-184 Procedure Rev.: 17 Report No.: BOP-UT-09-082 Workscope: BOP Work Order No.: 01.859555 Page: I of 5 Code: N/A Cat./Item: N/A Location: N/A Drawing No.: N/A

Description:

N/A System ID: NIA Component ID: N/A Size/Length: NIA Thickness/Diameter: .531"14.0" Limitations: Yes Start Time: 1314 Finish Time: 1328 Examination Surface: Inside E] Outside f] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE32770 Surface Temp.: 72 °F Cal. Report No.: CAL-09-331, CAL-09-332, CAL-09-333 Angle Used 014 14 5T61 Scanning dB 49 49 57 Indication(s): Yes C] No0J Scan Coverage: Upstreamr Downstream IZ CW [] CCW f;J Comments:

FC 08-03 Results: Accept [ Reject [J Info f1 Initial PSI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level Ii-N re Date Rview&r Signature Date

  • Leeper, Winfred C. . 1011 9/2009 .

Examiner Level N/A Signature""/- Date Site Review Signature Date N/A Other Level N/A Signature Date ANII Review Signature Date N/A ~-cZZ £

~Puke Determination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee 1 1 Procedure: NDE-600 Outage No.: N/A

<:.Summary No.: 1-HP-0187.184 Procedure Rev.: 17 Report No.: BOP-UT-09-082

, Workscope: BOP Work Order No.: 01859555 Page: 2 of 5 C6 45 dea Scan 1  % Length X  % volume of length 1100 =  % total for Scan 1 Scan 2  % Length X  % volume of length 1100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000 %volume of length 1100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length 1100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 1 Scan 2 100.000.  % Length X .0.000. ~% volume of length / 100 = 0.000  % total for Scan 2 Scan 3  % Length X  % volume of length /100 =  % total for Scan 3

% volume of length / 100 =  % total for Scan 4 Scan 4  % Length X Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: /__ __ __._ __ Date: 1d-26-O

A11ACUMENT /ý PA6E /DS OF //2-DUKE P()WER COMPANY ISI LIMi[TATION REPORT M, ~ ~ ~ 1 - -IIA1 Ai-i-A

- t-4IA~I 0.I*Y , ,... .....

..... i rmm~rwrt-

[ NO SCAN SURFA,CE BEAM DIRECTION Due to valve configuration

[E LIMITED SCAN 4/*1 S 2 E] *2w 2 ccw to L N/A o/

FROM L N/A INCHES FROM WO .4" to j___.ond ANGLE: [ 0 [ 45 [(] 60 other FROM N/A DEG to N/A DEG El NO SCAN SURFACE BEAM DIRECTION

[I 'LIMITED SCAN L1 1 2 Ei 1 EL2 [] cw E] ccw I -

FROM L t oLL INCHES FROM WO to ANGLE: [L 0 El z15 F] 60 Qther FROM DEG to DE01 0II NO SCAN SURFACE BEAM DIRECTION I

[]

FROM L LIMITED SCAN

_ toL

[ 1 F1i2 Li 1 lNCI-IES FROM *W0 __

El 2 E3 cw E] c]w to K

I________________________________________

ANGLE.: 0 [] 45 [0160 o thee FROM DEG to DEG Ei NO SCAN SURFACE BEAM DIRECTION i LIMITED SCAN El L i2 Eli i 2 L cw EL ccw f0P-ur-.oo2 FROM L to L INCHES FROM Wo to Sketch(s) attached ANGLE: -L 0 E] 45 Li 60 other FROM DEC to DEG 0 yes 0 No Preae. By:. Winfred Leepe r / --. -'. .cVet: .1 Date: Sheet 3 of * '- z Ay:hozize Inspector: Date:

Rev. ....

I2Authorized npcý ._,Dae

ATTACHMENT A PA6Er0 4 OF Ij?-

Suppleme. -ai Report Report No.: BOP-UT-09-082 Page: 4 of 5 Summary No.: 1-HP-0187-184 4 Examiner: Leeper, Winfred C. *t Level: II-N Reviewer:

Date:

Examiner: N/A Level: N/A Site Review:

Level: N/A ANtI Review: Date: '1/4.?/'c7 Other: N/A Comments: Area of Interest and Axial Coverage AVIA( -OVe;-:174-rC Sketch or Photo: Z:\UTXlDOEAL\ProfiteLine2.jpg 7 Z-~

+ + ,,- i.- I

+ 17 A

ZA15(

AIIACHMENT '

PASE /o07 aE //F Ife_- Supplem, -al Report Report No.: BOP-UT-09-082 ro. A lip 11-0 Page: 5 of 5 Summary No.: 1-HP-0187-184 Examiner: Leeper, Winfred C. Level: i1-N Reviewer: Date: /0 -22.,y Examiner: N/A Level: N/A Site Review: Date:

Other: NIA Level: N/A ANII Review: Date:

Comments: Circ. Coverage 01 f?

SXetch or Photo: Z:\UT'IDDEAL\ProuIieLine2.jpg LbI E/,

AIIA CHME1NT A' IT Pipe W.-.J Examination PASE/o~f 1F/27-Site/Unit: Oconele I Procedure: NDE-600 Outage No., WqA Summary No.: 1-HP-O187-iB5 Procedure Rev.: 17 Report No.: SOP-UT-09-089 VEuiA 3JIUwi Nu..

Ccde: 5C-c-714 ~

-A101:NT ~ c Cat.ltern: N/A Location: N/A Drawing.No.: R/A

Description:

Pipq to valve System iD): HIP Component 0D: 1-HP-0187-18.5 Size/Length: NIA Thickness/Diameter: .531/4"/SS Limitations: Yes Start Time: 1351 Finish Time: 1507 Examination Surface: Inside fl Outside Surface Condition: AS GROUND Lo Location: RT - 0 We Location: Centez line of Weld Couplant: ULTRAGEL 11 Batch No.: Q9125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE- 27228. Surface Temnp.: 72 F Cal. Report No.: CALý09-376, 377 & 378 Angle Used 10 45 45T 60 GOL Scanning dB 42 42 52 IndicationMs: Yes El No 26j Scan Coverage: Upstream Lv] Downstream fJ CW C") CCW Comments:

FC 08-03 Results: Accept jJ Reject R) Info I Initial PSI Exam Percent 0f Coverage Obtai ned > g0%: No Reviewed Previous Data: No Examiner Level n-n ~irture, 1 , Date Reviewer /Signature Dotec Jotty, B. Dale 5 1012712009 /0.

Exmne evlN/A Sign-attA* Date Site Rovidw Signature Date Exmn er L veA Other Level N/A Signature.......... ~. -.ANtI Review Signature DateOI NIA

Determination of Percent Coverage for wvm UT Examinations - Pipe Site/Unit: Oconee I i Procedure: NDE-600 Outage No.: NIA Summary No.: 1-HP-0187-185 Procedure Rev.: 17 Report No.: BOP-UT.09-089

  • . Workscope: PSI Work Order No.: 01859555 Page: 2 of 5 45Sdeg Scan 1  % Length X  % volume of length / 100 = " total for Scan 1 Scan 2  % Length X / volume of length / 100 =  % total for Scan 2 Scan 3 100.000.  % Length X 50.000  % volume of length 1 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.00.0  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % LengthX 0.000 %volume of length /100 = 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length /100 = 50.000 %total for Scan 2 Scan 3  % Length X  % volume of length /100 = %total for Scan 3 Scan 4  % Length X ..% volume of length /100 =  % total for Scan 4 Percent.complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: Rodney Sheffiel Date: 10129/2009

A11ACHMENTA/

PAGE I/o, GOf /Z--

DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 1-HP-O187-1,85 Item No: N/A remarks:

[ NO SCAN SURFACE BEAM DIRECTION Valve configuratiOn M LI:MITEDSCAN (E E] 2 0 1 Z 2 fU cw f] ccw FROM L NIA to:L N/A INCHES FROM WO N/A to N/A ANGLE: 0Oj 45

  • 5 6.0 other *FROM .0 DEG to 360 DEG

[Z NO SCAN SURFACE BEAM DIRECTION Valve configuration

[] LIMITED SCAN []I E 2 [1 1 n 2 N] cw F ccw FROM L N/A to L NIA INCHES FROM WO CL to Beyond ANGLE: [] 0 fJI 45 E) 60. other FROM 0 DEG to 360 DEG U NO"SCAN SURFACE BEAM DIRECTION F- LIMITED SCAN LI E 2 U-1 I[] 2 El cw f] ccw FROM L ,to L _INCHES FROM WO to ANGLE: U) 0 .-. 45 El 6.0 other FROM DEG to DEG f- NO SCAN SURFACE BEAM DIRECTION I I U] LIMITED.SCAN *j I E 2 El 1 El 2 n cw n ccw I

FROM L .. to L INCHES FROM WO .to Sketch(s) attached 4

ANGLE: .1-00 1 FE360 65 other FROM DEG to DEG Z yes El No

ATIACHMENT A PA6E /// Of I'?-

Suppleme,.Lal Report Report No.: BOP-UT-09-0.89.

Page: 4 of 5 Summary No.: 1-HP-0187-185 Examiner: Jolly, S. Date

, Level: Il-N Reviewer: Date: /)ID . o*

Examiner: NIA . " . Level: N/A Site Review: Date: _---- - -

Date:-,-.., z.

Other: N/A Level: N/A ANII Review:

Comments: CW & CCW Circ. Exam limitation Sketch or Photo: -5 S"7 is

AlITACHMENT/A PARE 11'2 OF 112_

Suppleme. -..ai Report Report No.: BOP-UT-09-089 Page: 5 of 5 Summary No.; 1-HP-0187-185 Examiner Jolly, B. Dale Level: 1i-N Reviewer:

Date:

Examiner NIA Level: N/A Site Review:

Other: N/A Level: NIA ANII Review: Date: 4_,__-z____

Comments: Axial exam limtiation Sketch or Photo: s"I 52.

Vc,,dve- a

ATTACHMENT Fi UT Vessel E.-,mination PAGE /-'OF (01 Site/Unit: Oconee I 2 Procedure: NDE-640 Outage No.: 02-24 Summary No.: 02.B3.110.0002 Procedure Rev.: 5 Report No.: UT-1 0-444 Workscope: ISi Work Order No.: 01869776 Page: 1 of I Code: 199812000A Cat./ltem: B-D 1B3.110 Location:

Drawing No.: ISI-OCN2-002

Description:

Nozzle to Head System ID: 50 Component ID: 2-PZR-WP34 SizelLength: N/A Thickness/Diameter: 4.75017.7501CS Limitations: Yes - See Attached UT Report UT-10-452 Start Time: 1029 Finish Time: 1051 Examination Surface: Inside E] Outside RJ Surface Condition: AS GROUND Lo Location: 9.2.3 W o Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32804 Surface Temp.: 73 "F Cal. Report No.: CAL-10-550 Angle Used 0 45 45T 660 60T Scanning dB 42.7 Indication(s): Yes W] No 2] Scan Coverage: Upstream ED Downstream 2 CW 6d CCW 91 Comments:

N/A Results: Accept El Reject &5 Info El Winston. Bull Level II 5/3110 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

ATIACHMENT B UT Vessel L..amination PAGE - OF Site/Unit: Oconee / 2 Procedure: NDE-820 Outage No.: 02-24 Summary No.: 02.B3.110.0002 Procedure Rev.: 5 Report No.: UT-10-452 Workscope: ISI Work Order No.: 01869776 Page: 1 of 9 Code: 199812000A Cat./item: B-D 1B3.1t0 Location:

Drawing No.: ISI-OCN2-002

Description:

Nozzle to Head System ID: 50 Component ID: 2-PZR-WP34 Size/Length: NIA Thickness/Diameter: 4.750/7.7501CS Limitations: Yes - See Attached Limitation Sheet Start Time: 1052 Finish Time: 1233 Examination Surface: Inside El Outside 2 Surface Condition: AS GRROUND Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: - 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32804 Surface Temp.: 73 °F Cal. Report No.: CAL-10-547. 548, 549 Angle Used Scanning dB Indication(s):

0 Yes El 45 63.0 45T No []

63.0 60 70.0 60T1 70.0 71.7 3 Scan Coverage: Upstream E] Downstream 2] CW R CCW 91 Comments:

  • 60° near surface examination Results: Accept E- Reject R] Info E- Winston Bull Level II 5/3/10 No Reviewed Previous Data: Yea Percent Of Coverage Obtained > 90%:

ATTACHMENT P SA6E -3aF 6 DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 2-PRZ-WP34 Item No: 02.B3.110.0002 remarks:

0 NO SCAN SURFACE BEAM DIRECTION Limitation due to nozzle El LIMITED SCAN E] I ] 2 [D I [] 2 j] cw [D ccw configuration.

FROM L N/A to L N/A INCHES FROM WO 1.75" to Beyond ANGLE: 0 [ 45 0 60 other FROM 0 DEG to 360 DEG

-- NO SCAN SURFACE BEAM DIRECTION U LIMITED SCAN E l [] 2 1 [ 21cw El ccw FROM L to L INCHES FROM WO to ANGLE: 0E 0 45 El 60 other FROM DEG to DEG Il NO SCAN SURFACE BEAM DIRECTION OLIMITED SCAN 03 1 [D 2 l1 2 [] -cw ccw.

FROM L to L INCHES FROM WO to ANGLE: 0 0 0] 45 fl 60 other FROM DEG to DEG

[3 NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN - I1 02 El I [02 OC wc cw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: 0 0 0 45 0- 6p t FROM DEG to . DEG 0 yes El No Prepared By:. David -: 05/03/10 Sheet 2 of 9 Reviewed Date: . (" I Authorized inspector:.

  • Gate:

ýT

AI IAC HE NT 5, Supplemei..al Report MAE 1- 0F *-:93 Report No.: UT-10-452 MUQW. 3 of 4,4 Page:

Summary No.: 02.83.110.0002 1 Examiner:

r o-N f

Level:P. Reviewer: / e - .77- Date: 0 Examiner: Tucker, David K. ~. .#~Level: Il-N Site Review: Date:

Other: Mauldin, Larr E Level: I1-N ANII Review: Date: ___

Comments: See attachments 1-5 for graphic plotting of coverage.

Sketch or Photo:

Pressurizer Spray Nozzle Item No. OZ.B3.110.0002 / Weld No. 2-PZR-WP34 Base Material Coverage Scan Coverage 00 74.9%

450 Axial 79.6%

60 Axial 82.5%

450 CW/CCW 74.2%

600 CW/CCW 74.2%

Aggregate @ 74.9 + 79.6 + 82.5 + 74.2 + 74.2% = 385.4/5 77.1%

Weld Material Coverage Scan Coverage 00 98.7%

450 SI Axial 95.1%

450 S2 Axial 0.0%

.450 CW 96.3%

450 CCW 96.3%

600 S Axial 96.3%

600 S2 Axial 0.0%

600 CW 96.3%

600 COW 96.3%

Aggregate @ 98.7+ 95.1+ 0.0 +96.3+ 96.3+ 96.3+ 0.0 + 96.3 + 96.3 675.3/9 75.0%

Total Aggregate @ 77.1 + 75.0 = 152.1/2 = 76.1%

Level ill 6 -:; ý%.

Date ..5)/~3 ~

Page 4 of 3

AI'TACHMENT J

PASE-4 OF  %

+Jk -ýL/MN:

09 ,CZ)+ q - C6IA'11W.3STit V6h+

.2. q 8. 4

/ y- ( I -q+AX-)

V LA b 1.I 2

soAt //

I I,

AI IACHME NT MAE .7 aF I ZVgm- A/fdd V~,~

2As& Jf~,A

(/%A .4/207v C '77(S' gm. .9s 1v

-~0 6xq..59.,1w

)~o~C~j/s~r~3A~e

<~~~~'I5 ~~~ ~ ~ ~ In N&~

- £s-s /cA'.rtj

/Sg COV*n 41e

/

S/t O---,

~

AK Axe1

Eý'

____ ___AI1ACHMENT PA6E.q OF

/8 "AX?3" + Tr X /k4d"~ __ _

ro-f&AwA-c Qe." o Los s /U-5 C+/-2ý*b A&-z A Age Y.C /

1 *4- 4'0 Aea o? 4.ss 1u /~ p- __

AllACHMENT 73 o'/jVSP&C-floll PABE-c7 0F 24-Se M~AKPeJd6: ,-(Aeep J) Lacs)

--'o -A(L tc-E4~ e~c-d (osý : /R,3 Pe cr6 n tzAe 7.5-s V A so l~,

d ,ktý= 9s~a eveg. o K

7 V - L.L I~J

'I? /.3" K.5d _ N

.1 aL - -6 L-/- 1w.s 7..84S&l

. 1*j

.1 I. C I

I i S6~4~c~. /

a SL~de'/IJCJ

Oc/,vALled ~(j4 S~o T CHEHM NT Off

/ ~J4s~2~~ieM47a(e~Ji 0~

  • ~ '/ ~ 4.

/ 6) .

A PJ~

7?A d4e.,AL (- k &/ 7r)TA s-c

0. 7 ____d ____

I) 0./2?

.31A7.6 S.31A +/-g ifv g.1 e R C94E1t-/O 04 'd, - A0

A1IACHMENT UT Vessel Lamination PAgf-j 1 -)aF Site/Unit: Oconee / 2 Procedure: NDE-640 Outage No.: 02-24 Summary No.: 02.B3.110.0003 Procedure Rev.: 5 Report No.: UT-10-446 Workscope: ISI Work Order No.: 01869776 Page: 1 of 1 Code: 199812000A CatJItem: B-D 1B3.1110 Location:

Drawing No.: ISI-OCN2-002

Description:

Nozzle to Head System ID: 50 Component ID: 2-PZR-WP33-3 Size/Length: NIA Thickness/Diameter: 4.75016.8751CS Limitations: Yes - See Attached UT Report UT-10-447 Start Time:, 1029 Finish Time: 1051 Examination Surface: Inside El Outside R) Surface Condition: AS GIROUND Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32804 Surface Temp.: 73 °F Cal. Report No.: CAL-10-550 Angle Used 0 45 45T 60 GOT Scanning dB 42.7 Indication(s): Yes El No I Scan Coverage: Upstream 0] Downstream 21 CW R) CCW R3 Comments:

N/A Results: Accept r- Reject Sa Info -] Winston Bull Level II 513110 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

AT 1ACHMENT E3 UT Vessel Lamination PA6E .,2 aF  :

Site/Unit: Oconee I 2 Procedure: NDE-820 Outage No.: 02-24 Summary No.: 02.B.3.110.0003 Procedure Rev.: 5 Report No.: UT-10-447 Workscope: ISI Work Order No.: 01869776 Page: 1 of 9 Code: 1998/2000A Cat./Item: B-D /B3.110 Location:

Drawing No.: ISI-OCN2-002

Description:

Nozzle to Head System ID: 50 Component ID: 2-PZR-WP33-3 Size/Length: N/A Thickness/Diameter: 4.75016.875/CS Limitations: Yes - See Attached Limitation Sheet Start Time: 1052 Finish Time: 1233 Examination Surface: Inside [ Outside Mv Surface Condition: AS GROUND Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: ICAifron Serial No.: MCNDE32804 Surface Temp.: 73 "F Cal. Report No.: CAL-10-547, 548, 549 Angle Used 0 45 45T 60 60T I Scanning dB 63.0 63.0 70.0 70.0 71.7 Indication(s): Yes E No W] Scan Coverage: Upstream E Downstream [ CW [ CCW R]

Comments:

  • 60* near surface examination.

Results: Accept E] Reject 2 Info C] Winston Bull Level II 5/3/10 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level ll..N S )i4Date Reviewe /1signature Date Griebel, David M. 51/3/2010 '"- l --Ii Examiner Level lI-N ure Date Site Review Signature Date Tucker, David K. 5/3/2010 Other Level u1-N ,..rnature i- Date ANII Review Signature Date Mauldin, Larry E. ýK ",A I 513/20101

Al IACHMENTB PAS6E )3 0F >

DUKE POWER COMPANY Aii: ISI LIMITATION REPORT Component/Weld ID: 2PZR-WP-33-3 Item No: 02.B3.110.0003 remarks:

Z NO SCAN SURFACE BEAM DIRECTION Due to nozzle configuration

-- LIMITED SCAN E] I Z 2 [D 1 [-- 2 Z cw Z ccw FROM L N/A to'L N/A INCHES FROM WO 1.75" to Beyond ANGLE: 0 0 Z 44, Z 60 other FROM 0 DEG to 360 DEG

-j NO SCAN SURFACE BEAM DIRECTION

-- LIMITED SCAN E] 1 [] 2 1 [] 2 -] cw F-- ccw FROM L to L_ INCHES FROM WO to ANGLE: E] 0 [] 45 [] 60 other FROM DEG to DEG U- NO SCAN SURFACE BEAM DIRECTION

[-] LIMITED SCAN' - [-] 2 r1 - 2 -] cw D-] ccw FROM L to L INCHES FROM WO to ANGLE: D 0 El 45 0I 60 other FROM DEG to DEG U- NO SCAN SURFACE BEAM DIRECTION

" LIMITED SCAN DI-I [1 2 ED- 1 [- 2 [1cw [-1 ccw FROM L t6'L INCHES FROM WO to Sketch(s) attached ANGLE: E] 0 [] 45 []60_,, o FROM _ DEG to DEG Z yes -1 No Prepared By: David Date: 05/03/10 Sheet 2 of 9 Date*

Date: 5-15-.1 0 Authorized Inspector:

AI 1ACHMENT Supplemek.-al Report PASE '!OF Report No.: UT-10-447 Page: 3 of /q Summary No.: 02.53.110.0003 Examiner: Griebel, David M.

e Date: <l ,~

Level ___- Reviewer:

Date:

Examiner: Tucker, David K.evel: I-N Site Review:

Other: Mauldin, Larry E. , Level: 1-N ANII Review: Date: z__/__C_

Comments: See attachments 1-5 for graphic plotting of coverage.

Sketch or Photo:

Pressurizer Relief Nozzle Item No. 02.B3.110.0003 / Weld No. 2-PZR-WP33-3 Base Material Coverage Scan Coverage 00 68.1%

450 Axial 74.0%

600 Axial 78.4%

450 CW/CCW 63.0%

600 CW/CCW 63.0%

Aggregate @ 68.1 + 74.0 + 78.4 + 63.0 + 63.0% = 346.5/5 = 69.3%

Weld Material Coverage Scan Coverage 00 98.7%

450 S1 Axial 93.7%

450 S2 Axial 0.0%

450 CW 92.4%

450 CCW 92.4%

600 S1 Axial 96.2%

600 S2 Axial 0.0%

600 CW 92.4%

600 CCW 92.4%

Aggregate @ 98.7+ 93.7+ 0.0 + 92.4+ 92.4+ 96.2+ 0.0 + 92.4+ 92.4= 658.2/9 = 73.1%

Total Aggregate @ 69.3 + 73.1 = 142.4/2 = 71.2%

-7rr Level III/~ .~-----

Date *1/ <1 c:)

/

Page 4 of 9

ATIArNMrNT ;R r

1 AC-bAL __~

~iAge/ 2.7')= L2, 74-Sq.Z1.

i~'.3 A )+ (2.o-IX .7"v÷.rIo~.

.;4 \L-1D MA-fEkW~c=

-o*ALC et.

&Islip-, I -I I

AT TACHMENT 2) eFC ý*D A.; (1r= 2 ý4 C PASE /7 OF A ýAlýZ 1A fe (f)

'S t

103s) ______ . Z 1-2 7LX2e)sS./ .

101fl ~ 7

)Ard-R(Ac - kkI-A &I tLoss I~T~9A2 e-(COV6714cc

-S(2AS 9. 1A/

/.-ql 11 e

.1f

i 6 AlITACHMENTb PA5E / 6 OF I /'Y .. 2 +26 2, . "i?.o 72 7.s /AV.

'(o1AL ISS& W Aff,/ u - A/4twA &f. L&Ss = /IxsPc~c'&IJZ. "Al~

~8I A# 2I 0v'). 0- ~AS AV/. C-o EVA6E I

WELD'~

.9"-

X,1 q

<H),AL. Uezo Uk1 re:mwc - Aeev J oss ~i~rfdc1'l

4)'2c;,

I oI I

/

I I /

I I I

/ ScLAL I. J I, I

/

k*

I

/

.0

AI [ACHMENT E OF b+ ( 67/4- E rG -

-. +9( r l oLx'&?A SURA

'Z-. CA r/-

34~ZA 7~Ths,~

- ~1AA I.

t MTACHMENT PAGE 20 OF 1 15s 42.aeAe

( IAI. lss X/0e 4-

.~~~i 45 a/,V,/4X

/2YAX29A kIA e ( d yLioS4X ei rMbA

- /7~~~62 ______

-<'-fL ~V4U-0 -MA r6V(ALaa6toss~

/1  !

/

A I

/

/ /

1.

,S CALe- 1,0~ J

Al1IACHMENT UT Vessel E.. mination PA&E-21 OF /

Site/Unit: Oconee / 2 Procedure: NDE-640 Outage No.: 02-24 Summary No.: -02.1B 3.110.0005 Procedure Rev.: 5 Report No.: UT-10-450 Workscope: 'SI Work Order No.: 01869776 Page: 1 of I Code: 199812000A Cat./ltem: B-D /B3.110 Location:

Drawing No.: ISI-OCN2-002

Description:

Nozzle to Head System ID: 50 Component ID: 2-PZR-WP33-1 Size/Length: NIA Thickness/Diameter: 4.75016.8751CS

.r -

Limitations: Yes - See Attacl!ed UT Report UT-10-451 Start Time: 1029 Finish Time: 1051 Examination Surface: Insde Outside &9 Surface Condition: AS GROUND Lo Location: ,2;3; Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32804 Surface Temp.: 73 -F Cal. Report No.: CAL-I 0-550 Angle Used 0 45 45T 60 60T Scanning dB 42.7 Indication(s): Yes

  • Scan Coverage: Upstream El Downstream R] CW ] CCW Comments:

NIA4t%

Results: Accept " Reject Wj Info El Winston Bull Level. II 5/3/10 Percent Of Coverage Obtained >,.90%: No Reviewed Previous Data: Yes Examiner Level 1, N Date Reviewer Signature Date Griebel, David M. 5/312010 -/-'C Examiner Level '> - 6-N.

l nat Date Site Review Signature Date Tucker, David K. ' 5/3/2010 Other Level i1-N S igngre Date ANII Review Signature Date Mauldln, Larry E. . . 2" 513/2010

AI IACHME NT 'S UT Vessel E.-dmination PA6E.--2_ OF -

SitelUnilt &6 2 Procedure: NDE-820 Outage No.: 02-24 Summary No.: 02.B3.110.0005 Procedure Rev.: 5 Report No.: UT-1 0-451 Workscoper* ,YZ

" ISI Work Order No.
01869776 Page: 1 of 9 Code: 199812000A Cat./ltem: B-D 1B3.110 Location:

Drawing No.: ISI,',OCN2-002

Description:

Nozzle to Head System ID: s50 Component ID: 2-PZR-WP33-f Size/Length: N/A Thickness/Diameter: 4.750/6.8751CS Limitations: Yes *Jed'AttAqhtd1dlmltation Sheet Start Time: 1052 Finish Time: 1233 Examination Surface: Inside [ Outside Rj Surface Condition: AS GROUND Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: .lutron Serial No.: MCNDE32804 Surface Temp.: 73 -F Cal. Repot No.: CAL-10-547, 548, 549 Angle Used 0 45 45T 60 60IT Scanning dB " 3 ,I .3*Q 70.0 70.0 71.7 Indication(s): Yes No []

N7 Scan Coverage: Upstream E] Downstream [ CW [ CCW []

Comments:

600 near surface examination Results: Accept }J Reject I] Info Ej Winston Bull Level II 513110 Percent Of Coverag.*Obtir ;90%: No Reviewed Previous Data: Yes Examiner Lovel Il-N ,f 7Sgu6Date Reviewe 5S3200natureiJ '~a~

SintA Date Griebel, David M.

Examiner Level I-Nture Date Site Review Signature Date Tucker, David K. 5/3/2010 Other Level I-N - .,fSature 4 ,,, Date ANII Review Signature Date Mauldin, Larry E. 5/3/2010

ATTACHMENT S PA6-[FS- C /--'--

Vc . DUKE POWER COMPANY ISI LIMITATION REPORT ComponentlWejd ID',,*R-WP-33-1 Item No: O2.B3.110.0005 remarks:

0 NO SCAN SURFACE BEAM DIRECTION Due to nozzJe configuration C] LMITEISCI*gt [] 22 2

[1 cw E ccw FROM L N/Ar t'".k 4 N/A INCHES FROM WO .5" to Beyond ANGLE: 0 0 0 15 .t0 60 other FROM 0 DEG to 360 DEG E] NO SCAN SURFACE BEAM DIRECTION I] LIMITEDSCAN IC'1 El 2 0] 1 [1 2 Li cw E] ccw FROM L

  • INCHES FROM WO to ANGLE: 50 1] *5 " 60 other FROM DEG to DEG O NO SCAN. SURFACE BEAM DIRECTION 0 LIMITEDSCAi.f' L1 [3 2 0 1 (] 2 E] cw 0 ccw FROM L ____ LC INCHES FROM WO to ANGLE:. ]i. .,60 other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION
  • 'ELIMITEI***CA9* El 02 Li 1 li 2 Li cw E] ccw FROM L _______ INCHES FROM WO to Sketch(s) attached ANGLE: 0 q0;. ,,451Z 6Q 91 DEGto __DEG 0 yes 0 No 05W103/I Sheet 2 of 9 Date:' (5' (-) j Authorized Inspecto:,

Date'~~~

~4

AIIACHMENT S PAME I]F! -5 3upplemet,.dl Report Report No.: UT-1 0-451 Page: 3 of 14 i i, Iw Summary No.:

Examiner: Grebel, David/ M. Level: II-N Reviewer: Date: sgl O Examiner: Tuc'.ker, Da.d K. Level: Il-N Site Review: Date: 7 Level: I.. N ANII Review: Date:

Other: Mh;uIIn.,

-.0-,-- 7 "

"a71yE __ __

Commets:

Se attchmen1-5 for graphic plotting of coverage.

Sketch or Photo:

Th. ~'

  • ~

...... L I.-

.~

  • <~r~*' ~,

!7.

Pressurizer Relief Nozzle Item No. 02.B3.110.0005 / Weld No. 2-PZR-WP33-1 Base Material Coverage Scan Coverage 00 68.1%

450 Axial 74.0%

600 Axial 78.4%

450 CW/CCW 63.0%

600 CW/CCW 63.0%

Aggregate @ 68.1 + 74.0 + 78.4 + 63.0 + 63.0% = 346.5/5 = 69.3%

Weld Material Coverage Scan Coverage 00 98.7%

450 S1 Axial 93.7%

450 S2 Axial 0.0%

450 CW 92.4%

450 CCW 92.4%

600 S1 Axial 96.2%

600 S2 Axial 0.0%

600 CW 92.4%

600 CCW 92.4%

Aggregate @ 98.7+ 93.7+ 0.0 + 92.4+ 92.4+ 96.2+0.0 + 92.4+ 92.4= 658.2/9 = 73.1%

Total Aggregate @ 69.3 + 73.1 = 142.4/2 = 71.2%

Level Ill i& JA Date 5 ,

Page 4 of 9

ii ATTACHMENT "

. 1AI5P6Cf'OAIk fASE-L;§! OF

A343 M rF1214IL:

A 9Cb(2.61 2.7')= 27 sy. 1/

,eFG + FGIO-GHI=

/3' A x~ 'j t/3'1, -. - . .

T- M + J rqo +P /(t +q

2. - X.'2.*X.

~ 2i" . "

4 IA _s

,irt-..rl.;r -Ae-MA</ L .3 r~

I-!

~1' A/ LoAC 1

~i)

  • - -. ~ ~.

ATTACHMENT I K. a-F F S ~S ~fDi COV2,-~

IA

-<o1lr. &4.5e- 7Mffl,04/- 0eA- LOSS /A*9AeCC-7&P A12074,

."'I I.

I I

'I I

  • WL~t, /IIaf ..-

I I

.I I

I, 5

~ '

0ý1

I1 AITAC RMENTT 4..

",,45 7.J/,/ ,-7-/

C PA6E.ý, OF

,ýJ--0 Lye-I C-Ib l+ &"= Cesg /

2.4 X2- 14,.1v o 1.0.Ix/PJ. = s

  • & #. 2),3Se./,u 7.1/ v.w./

.,. s =fL .. C ..,,' =-2r.me .

F W4'eZDn U02A1iAL .( ,q&A d~o

/i ".i* x.q"

, =4 s~.

(-\A:7-0 7) 9~EZIA C- 4Qý LoSS ~b/A C-f Akc~

/

I * .,U

-7.9 s

5 . q zvm1~t

a. .oV41r

/

% I /

__ 1o4-A

.1L.~ I /

/

/

I

/

r* /

IIV'"W /

ii,, &.ALE [f I.

'M:

.if'}*

A,IIACHMENT OF 0S-~ -

7(~fZ;m)ýOQ.( +/ 7.'s(-.I" of'q)j r.. 0 27.3r. -3 /9,v- ;I/. V SQAk ZA e A.A

~~~~71 s ofW av.A -,ftft~~RA dlx !55s 6 7.A~v~

I I

w,_ r I

/

'.Seib -rlo<A Loss l

ij4~f~, I* /

I

/,

.1

/ .1 l

'I ~3 C~AE~)&

V4 I /

/

I I.

A14i d-~

I PFý .

~I ~ ATIACHMENT

~.

I.

4~

. -~ C,(&. /A/ rc7%us c s cc i PA6L:-

E . rF;.

EFm. . 4 1

.BCb + C G,

/O9. _z*t, 1(o V ,L., Li./IJ-.

it,.L. -

  • ,aic l i~~.

o!7.**,,,.-7/. /./S* ,,,.U

{*LOSn 7,.2_d zo~

  • . VP,"r/-M ) ,4*-b
A, _,,

~1'

-4

" ~J~A L . o-,.toss) .

4hi.&~

i~c A( iA~ r crtoss  :-A, Jp6c ~

/I

'4..

.' , .. /. 41 c*

A*.,,,*,,,,,,c o v. a.'

"I.

I rkiýlx . I A.,

V 0 t4 K.

t

'T 4

A11ACHMENT£ UT Pipe W Examination PA 6 E fF Site/Unit: Oconee 1 2 Procedure: PDI-UT-2 Outage No.: 02-24 Summary No.: 02.B9.111.0046 Procedure Rev.: C Report No.: UT-10-499 Workscope: ISI Work Order No.: 01869982 Page: 1 of 4 Code: 1998 Cat./item: B-J 1B9.11 Location:

Drawing No.: ISI-OCN2-007

Description:

Casing to Safe End System ID: 50 Component ID: 2-PIAI-8 Size/Length: N/A Thickness/Diameter: 2.33/33.50/SS Limitations: See limitation report Start Time: 1105 Finish Time: 1145 Examination Surface: Inside E] Outside 2] Surface Condition: AS GROUND Lo Location: 9.1.1.2 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32804 Surface Temp.: 74 9F Cal. Report No.: CAL-1 0-617, 618, 619 Angle Used 0 45 45T 60 60L Scanning dB 44.7 44.7 62.9 95.0 Indication(s): Yes El No R3 Scan Coverage: Upstream 21 Downstream C] CW 2] CCW 2]

Comments:

FC 08-04, 09-02, 09-08, 10-09 Results: Accept El Reject [] Info Initial Section XI Exam Il Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level i-N _Slgoa Date Revi Signature Date Tucker, David K.

Hollis, JacobK.

511612010 5/16/2010 /*.A /

-9/

4-8/

0t~Z Examiner Level II-N Signature Date Site Review Y Signature Date Other Level N*' Signature Date ANII Review Signature Date N/A_ _______

Al I ACHENT DUKE POWER COM.ANY 181 LBTATION REPORT Component/Weld ID: 2PIAI Item No: - 02.19.11.0046 r.marks:

NO SCAN SURFACE - Bt_.

_EAM DIRECTION Single sided pipe to pump C] UMITEDSCAN 01 02 1 ]O2Oc cw c ura* wi.

FROML N/A to L NI/A INCHES FROM WO CL to Re ANGLE: ] 0 10 45 680 other, FROM .0 DEG to 380 DEG

(] NO SCAN SURFACE BEAM DIRECTION 0 UMITEDSCAN Q 1 Q] 2 0 1 Q 2 0 -w 0 cow FROM L ____.oL. . INCHES FROM WO 1o_.

ANGLE: (3 0 03 45 [3860 other FROM . D*G-.o OEG O. NO-SCAN SURFACE BEAM DIRECTION Q' UMfrED'SCAN 01 0 2 0 1 [3 2 cw[1C0 cw FROM L _.___toL.. INCHES FROM WO . __

ANGLE: 00045 E346o, 0 other FROM ..DEG to 'EG' SNO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN E-01 02 0j 1 O2 Ccw 3ccw 'UT-g0481 PROML .. to L .... INCHES FROM WO .t_ Sketch(s) attached

__.._.FROM __ EGI'EO". _ 2 yes

'ANGLE: C] 00 45 ] 60 other

ATIACHMENT 3 Supplem6...-al Report PA6E33 OF Report No.: UT-10-499 Page: 3 of 4 Summary No.: ,02.B9.11.0046 Examiner: Tucker, David K. Level: i1-N Reviewer: D ate:

Date:

T ,o l/

Examiner: Hollis, Jacob Level: Il-N Site Review: Date: _______

Other NIA Level: NIA ANII Review:

Comments:

Sketch or Photo:

Ag&44 (7), /?Cir-'60f AR~nn 3 1A,--, 293,~.

ACzt(&CvfJ)

Coi*-Q%/i5,- ?Z cC~a) q 3,

,X A

Dete, -mination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee I 2 Procedure: PDI-UT-2 Outage No.: 02-24 C , Pummary No.: 02.B9.11.0046 Procedure Rev.: C Report No.: UT-10-499

- Workscope: ISI Work Order No.: 01869982 Page: 4 of 4 45 dee Scan 1  % Length X  % volume of length / 100 =  % total for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length 1 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other dee - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan I 100.000  % Length X 0.000  % volume of length (100 = 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length 1100 = 50.000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Sie ied uprv'o Dte Site Field Supervisor Date:

AIIACJMENT PAGE -

UT Pipe We, Examination Site/Unit: Oconee / 2 Procedure: NDE-830 Outage No.: 02-24 Summary No.: 02.59.11.0046 Procedure Rev.: 1 Report No.: UT-10-498 Workscope: ISI Work Order No.: 01869982 Page: I of 3 Code: 1998 Cat./Item: B-J /B9.11 Location:

Drawing No.: ISI-OCN2-007

Description:

Casing to Safe End System ID: 50 Component ID: 2-PIAI-8 Size/Length: NIA Thickness/Diameter: 2.33133.50/SS Limitations: Yes - Single sided exam. See limitation sheet. Start Time: 1310 Finish Time: 1335 Examination Surface: Inside [ Outside 2] Surface Condition: AS GRtOUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Lutron Se rial No.: MCNDE32804 Surface Temp.: 66 "F Cal. Report No.: cCAL-10-615 & 616 Angle Used 0 45 45T 60 60T 7S Scanning dB 57.6 61.9 73.0 Scan Coverage: Upstream [-] Downstream [

Indication(s): Yes E] No R] CW R CCw RJ Comments:

Non- code exam 70*T=73.0 DB Scanned at reference level due to signal noise ratio.

Results: Accept E: Reject [E Info [ Initial Section XI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No

AII1ACHMENT5 P A6E 3_,ýaF-F DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 2-PIA1-8 Item No: 02.B9.11.0046 remarks:

Z NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from ED LIMITED SCAN -"1 Z 2 [ 1 [] 2 [1 cw ccw cast sideonly.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: El 0 E) 45 Z 60 other 700 FROM 0 DEG to 360 DEG

[ NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from

[] LIMITED SCAN Ii1 Z 2 rj1 [-1 2 Z cw ccw cast sideonly.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: El 0 El 45 Z 60 other 70° FROM 0 DEG to 360 DEG E- NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN D-I El 2 ED- 1 2 El cw -- ccw FROM L to L INCHES FROM WO to ANGLE: El 0 [1 45 [: 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION E- LIMITED SCAN Ei 1 [] 2 I- 1l1 2 El cw F- ccw FROM L to L INCHES FROM W0 to Sketch(s) attached ANGLE: C3 0 El 45 [] 60 oher . FROM DEG to DEG [ yes - No F: David Griebel 05/15+/10 Sheet 2 of 3 Authorized Inspector:

ATTACHMENT -

Supplemendi Report PA6Eý .7OF. -'i5 MP Report No.

Page 3 UT-10-498 of 3 Summary No.: 02.59.11.0046 Examiner: Griebel, David M./f' -~Level: iI-N Reviewer: Date: 3"-"7?/

c Examiner: Hendrickson, MattheW4 Lvl liI-N Site Review: Date:

Other: NIA Level: N/A ANII Review: -

  • Date: _

Comments: Best effort exam using 60ORL & 70' RL per NDE 830 for upper 2/3 area of Interest.

60 I

7 15"Z

UT Pipe W6.-,- Examination PASE-:23 OF ~

Site/Unit: Oconee / 2 . Procedure: NDE-600 Outage No.: 02-24 Summary No.: 02.B9.11.0053 Procedure Rev.: 18 Report No.: UT-10-480 Workscope: ISI Work Order No.: 01870445 Page: 1 of 4 Code: 1998 Cat./Item: B-J /B9.11 Location:

Drawing No.: ISI-OCN2-012

Description:

Casing to Safe End System ID: 50 Component ID: 2-PDA2-1 Size/Length: N/A Thickness/Diameter: 2.33/33.5/SS Limitations: Yes - See attached report Start Time: 1247 Finish Time: 1308 Examination Surface: Inside E] Out side W Surface Condition: AS GF tOUND Lo Location: 9.1.1.1 Wo Location: Cente dine of Weld Couplant: ULTRAGEI .11 Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MC:NDE32804 'F Surface Temp.: 66.2 Cal. Report No.: CAL-10-606, 607 & 608 Angle Used 0 45 45T 60 Scanning dB 60.7 72.2 67.8 Indication(s): Yes [. No I] Scan Coverage: Upstream E] Downstream 2] CW 25 1 CCW [Z Comments:

N/A Results: Accept [ Reject EZ Info [ Initial Section XI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No

AIIACIIMENT.3 PA6E 3,? 0F DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 2-PDA2-1 Item No: 02.B9.11.0053 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Limitation due to casing E] LIMITED SCAN 'l1 0 2 [ 1 El 2 0 cw (Z ccw configuration.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: E] 0 [] 45 0 60 other 60L FROM 0 DEG to 360 DEG E- NO SCAN SURFACE BEAM DIRECTION R- LIMITED SCAN Il [--] 2 -]1 [-] 2 [] cw ccw FROM L to L INCHES FROM WO to ANGLE: E) 0 E] 45 El 60 other FROM DEG to DEG

-- NO SCAN SURFACE BEAM DIRECTION

-- LIMITED SCAN -l1 I[- 2 -l1 [] 2 E] cw El ccw FROM L to L INCHES FROM WO to ANGLE: E] 0 E] 45 E] 60 other FROM DEG to DEG

-'ElNO SCAN SURFACE BEAM DIRECTION

[- LIMITED SCAN []i Elj2 [] IEl2 El CW [1CCW UT-1 0-480 FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: E] 0 Fl 45 0/A0 other FROM DEG to _ DEG 0 yes E' No Prepared By: Larry Mauldir 05113/10 Reviewed By: or:

I

AlIACHMENT PASE--40 OF Supplemei...A Report Report No.: UT-10-480 Page: 3 of 4 Summary No.: O2.B9.11.0053 Examiner: Muuldln, Larry E. Reviewer: Date:

aAd Examiner: Hendrickson, Matthew Site Review: Date:

Other: NIA ANtI Review: Date:

Comments*.

Sketch or Photo:

Go 9 L AtLeA 0 0 X.

q&

C-XAA1 COMeAnce A 86-O - -f H -r7 9-.0- 6x ,7 tA.

9 Ac 1,743I/O5A 4

S CA C.1 C

Deter mination of Percent Coverage for UT Examinations - Pipe R:_ Site/Unit: Oconee I 2 Procedure: NDE-600 Outage No.: 02-24

  • *'Summary No.: 02.B9.11.0053 Procedure Rev.: 18 Report No.: UT-1 0-480
  • Workscope: ISI Work Order No.: 01870445 Page: 4 of 4 45 den Scan 1  % Length X  % volume of length / 100 = %total for Scan I Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000 %total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other den - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan I 100.000  % LengthX 54.800  % volume of length/ 100 = 54.800  % total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume of length / 100 = 0.000  % total for Scan 2 Scan 3  % Length X  % volume of length /100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 38.700  % Total for complete exam Site Field Supervisor Site Field Suparvisor-~ Date: S//U/h)

S lb C0 e)

ATTACHMENT z PA6E~4'2 OF -

UT Pipe We, v Examination Site/Unit: Oconee I 2 Procedure: NDE-830 Outage No.: 02-24 Summary No.: O2.B9.11.0053 Procedure Rev.: I Report No.: UT-1 0-487 workscope: ISI Work Order No.: 01870445 Page: 1 of 3 Code: 1998 Cat./Item: B-J IB9.tl Location:

Drawing No.: ISI-OCN2-012

Description:

Casing to Safe End System ID: 50 Component ID: 2-PDA2-1 Size/Length: NIA Thickness/Diameter: 2.33/33.51SS Limitations: Yes-Single sided exam. See limitation sheet. Start Time: 1241 Finish Time: 1315 Examination Surface: Inside [] Outside W Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32804 Surface Temp.: 66 "F Cal. Report No.: CAL-10-603 & 604 Angle Used 0 45 45T 60 60T 70 Scanning dB I 57.6 61.9 73.0 Indication(s): Yes C) No 2 Scan Coverage: Upstream C) Downstream I] CWI J CCW! J Comments:

Non- code exam 70°T=73.0 DB Scanned at reference level due to signal noise ratio.

Results: Accept E] Reject [] Info E] Initial Section Xl Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No

ATTACHMENT E PA6E /-/Z F."

DUKE POWER COMPANY ISI LIMITATION REPORT ComponentiWeld ID: 2-PDA2-1 Item No: 02.B9.11.0053 remarks:

Z NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from

[I LIMITED SCAN 1 [1 2 ]1 IZ 2 [1 CW C]

CW cast sideonly.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: CJ 0 EU 45 E 60 other 70° FROM 0 DEG to 360 DEG I NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from U LIMITED SCAN [1 -U 2 U1I 1 [] 2 E CW Z CCW cast side only.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: U 0 U 45 [9 60 other 70° FROM 0 DEG to 360 DEG r NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN I E-2 I" I 2 [1CW ElCCW FROM L to L INCHES FROM WO to ANGLE: - 0 C3 45 [] 60 other FROM DEG to DEG U NO SCAN SURFACE BEAM DIRECTION U LIMITED SCAN L--I U 2 L 1 0 2 [-Ucw F1cCw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: [] 0 Ul 45 U1 60 o- FROM DEG to DEG Z yes El No Prepared By: David Griet ': 05/13110 Sheet 2 of 3 By: Date: 5-,,. fy-- ICAuthorized Inspector: Date:

n~ I I M* illI1'l11 I1 -

Supplemerfal Report PA E E6'-/

4q F Report No.: U, 487 it' VAF 3 of 3 Page:

Summary No.: 02.B9.11.0053 Examiner: Griebel, David M. Level: Il-N Reviewer: Date: 5A (.A-/'*

Examiner: NIA Level: N/A Site Review: Date:

Other: NIA Level: N/A ANII Review: Date: _______0 Comments: Best effort exam using 60°RL & 70°RL per NDE 830 for upper 213 area of Interest.

4ý60 . c-~L 6 &f/ r=.

r~,

I 1

I I

_____ /P Ic.2-

AtI IMMI'V PAG6E OF 0jc UT Pipe We.., Examination Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: 02-24 Summary No.: 02.139.11.0063 Procedure Rev.: 18 Report No.: UT-1 0-481 Workscope: ISI Work Order No.: 01870552 Page: 1 of 4 Code: 1998i. Cat./Item: B.-J /B9.11 Location:

Drawing No.: ISI-OCN2-014

Description:

Casing to Pipe Safe End System ID: 50 Component ID: 2-PDB2-1 Size/Length: N/A Thickness/Diameter: 2.33/33.50/SS Limitations: Yes - See attached sheet. Start Time: 1321 Finish Time: 1342 Examination Surface: Inside E Outside [ Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL I1 Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32804 Surface Temp.: 66.2 °F Cal. Report No.: CAL-10-606, 607 & 608 Angle Used 0 45 45T1 60 60LL Scanning dB 60.7 72.2 67.8 Indication(s): Yes [] No [] Scan Coverage: Upstream ni Downstream [] CW [ CCW []

Comments:

NIA Results: Accept ED Reject R] Info nJ Initial Section XI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level Il-N 5nawre Date Reviewerq~ Signature / Date Mauldin, Larry E. . 5113/2010 v'// // .. '

Examiner Level II-N 0 Date Site Review Signature Date Hendrickson, Matthew 5/13/2010 Other Level NIA SignatureW Date ANII Review Signature Date N/A _ ____ ____

ATTACHMENT 2 PAGE L OF DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 2PDB2-1 Item No: 02.B9.11.0063 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Limitation due to casing r] LIMITED SCAN l- I Z 2 Z 1 [1 2 Z cw Z ccw configuration.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: E] 0 0 46- 0 60 other 60L FROM 0 DEG to 360 DEG

[- NO SCAN SURFACE BEAM DIRECTION L" LIMITED SCAN I 1 -2 -- 1 I2 I] cw -1ccw FROM L to L INCHES FROM WO to ANGLE: L] 0 (D 45 F] 60 other FROM DEG to DEG

-I NO SCAN SURFACE BEAM DIRECTION

-'LIMITED SCAN '1 2I2 - [-2r] cw L ccw FROM L to L INCHES FROM WO to ANGLE: LI 0 E] 45 LI 60 other FROM DEG to DEG I LI NO SCAN SURFACE BEAM DIRECTION

[I LIMITED SCAN D 1 [L2 R 1 [-1 2 L[ CW [w CCW UT-1 0-481 FROM L to L INCHES FROM WO to Sketch(s) attached

, ANGLE: [] 0 [-] 45 F-1/0 other FROM DEG to DEG Z yes El No

AIIACHMENT

';-" ~~~PABE-"-, F' Supplemer.-aal Report .... -

Report No.: UT-1 0-481 Page: 3 of 4 Summary No.: O2.B9.11.0063 Examiner: Mauldin, Larry E.vel: Il-N Reviewer: ] , . Date:

Examiner: Hendrickson, Matthew evel II-N Site Review: Date:

Other: NIA i E WLevel: N/A ANII Review:

  • Date: -

Comments:

Sketch or Photo:

0(*

,qDE7F--&i 3.,:,.0 -. 1v

  • + + - t.,7 .+l -,,

.c-, "S IV

¶1; *ZC~L4~7*QLL

Deter mination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: 02-24

- Summary No.: 02.B9.11.0063 Procedure Rev.: 18 Report No.: UT-1 0-481 Workscope: ISI Work Order No.: 01870552 Page: 4 of 4 45 deg Scan I  % Length X  % volume of length /100 =  % total for Scan 1 Scan 2  % Length X  % volume of length 100 = %total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 58.000  % volume of length / 100 = 58.000  % total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume of length / 100 = 0.000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 39.5060  % Total for complete exmin Site Field Supervisor:. Date: _______

)

A11ACHMENT 'E PAGI--:.' DF " ý UT Pipe Wi-, Examination Site/Unit: Oconee / 2 Procedure: NDE-830 Outage No.: 02-24 Summary No.: 02.B9.11.0063 Procedure Rev.: 1 Report No.: UT-10-486 Workscope: ISl Work Order No.: 01870552 Page: 1 of 3 Code: 1998 Cat./Item: B-J /B9.1I Location:

Drawing No.: iSrIoCN2-014

Description:

Casing to Pipe Safe End System ID: 50 Component ID: 2-PDB2-1 Size/Length: N/A Thickness/Diameter: 2.33133.501SS Limitations: Yes-Single sided exam. See limitation sheet Start Time: 1320 Finish Time: 1350 Examination Surface: Inside LI Outside [W] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: .iktron Serial No.: MCNDE32804 Surface Temp.: 66 'F Cal. Report No.: CAL-10-603 & 604 Angle Used 0 45 45T 60 60T 70 Scanning dB 57.6 61.9 73.0 Indication(s): Yes LI No [] Scan Coverage: Upstream LI Downstream [ CW [ CCW []

Comments:

Non- code exam 70°T=73.0 dB Scanned at reference level due to signal noise ratio.

Results: Accept [ Reject [] Info n Initial Section Xl Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level I.N~ Date Reviewerg,,.. Signature Date Griebel, David M. 5113/2010 V"-- .*--

Examiner Level NIA f Signature Date Site Review Signature Date N/A Signature Date ANII Review Signature Date N/A I

AITACHMENI S PA6E 5-0 F GS DUKE POWER COMPANY ISI LIMITATION REPORT ComponentiWeld ID: 2-PDB2-1 Item No: 02.B9.11.0063 remarks:

0 NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from SLIMITED SCAN 1 El 2 El I ID 2 El cw [] ccw cast sideonly.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: C1 0 [] .4 [ 60 other 700 FROM 0 DEG to 360 DEG 0 NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from El LIMITED SCAN M I El 2 El1 [E 2 G3 cw 0 ccw cast sideonly.

FROM L N/A to L -NA INCHES FROM WO CL to Beyond ANGLE: E] 0 C3 45 Z] 60 other 700 FROM 0 DEG to 360 DEC

[] NO SCAN SURFACE BEAM DIRECTION El LIMITEDSCAN"I'" F] 1 El2 [1 1 n 2 n cw [1 ccw FROM L to L INCHES FROM WO to ANGLE: El 0 E] 45 El 60 other FROM DEC to DEC El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN E) IEl 2 El I [1 2 [1 Cw El ccw FROM L _t_ _ _ INCHES FROM WO to. Sketch(s) attached ANGLE: O]

0 El 45 E 60 . 01 FROM DEC to DEG 9 yes [] No Prepared By: David G Reviewed By:

Suppleme* "I Report A11ACHMENT "

Report No.: P AS bJ..1 .4jjC>

Page: 3 of 3 Summary No.: 02.B9.11.0063 ( /

Examiner: Griebel, David M. Level: I1-N Reviewer: Date:______

Examiner: NIA Level: NIA Site Review: Date:

Other: N/A Level: NIA ANII Review: Date: ___U Comments: Best effort exam using 80RL & TORL per NDE 830 for upper 2/3 area of Interest.

FL C).W 900 70' jý.

I I

RCP

<- ppg

AItACHM>N UT Pipe WM.,J Examination P A6E 0F jj Site/Unit: Oconee 1 2 Procedure: PDI-UT-2 Outage No.: 02-24 Summary No.: 02.C5.11.0038 Procedure Rev.: C Report No.: UT-1 0-466 Workscope: ISI Work Order No.: 01870261 Page: 1 of 4 Code: 1998 Cat./Item: C-F-1/C5.11 Location:

Drawing No.: 2LP.215

Description:

Pipe to Valve 2LP-177 System ID: 53A Component ID: 2LP.215-27 Size/Length: N/A Thickness/Diameter: 1.0/10.0SS Limitations: Yes - See attached limitation sheet Start Time: 1030 Finish Time: 1115 Examination Surface: Inside [ Outside [ Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL Ii Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32824 Surface Temp.: 69 °F Cal. Report No.: CAL-1 0-541, 563, 564 & 528 Angle Used 0 45 45T 60 1  :

Scanning dB 22.5 22.5 33.9 Indication(s): Yes [ No I] Scan Coverage: Upstream [] Downstream [ CW [] CCW []

Comments:

NIA Results: Accept E] Reject [] Info C] FC 08-04, 09-02, 09-08, 10-09 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level U-N -. Date Reviewer Signature Date Hendrickson, Matthew Is51912010. 5!

Examiner Level ISiqture Date Site Revile Signature Date Hollis, Jacob. :t!5'2 A? 519/2010 Other Level I* Signature Date ANII Review Signature Date NIA_ _______

ATIIA CIME%* 1 `

DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 2LP-0215-27 Item No: 02.C5.11.0038 remarks:

M- NO SCAN SURFACE BEAM DIRECTION Weld-o-let

[LIMITED SCAN Li 1 2 1 [] 2 [1 cw ccw FROM L 7.5 to L 10.0 INCHES FROM WO 1.7 to Beyond ANGLE: El 0 0 45 0 60 other _ FROM N/A DEG to NIA DEG

[ NO SCAN SURFACE BEAM DIRECTION No scan due to pipe to valve El LIMITED SCAN [ 1 El 2 - 1 - 2 E cw Z ccw configuration FROM L 0 to L 360 INCHES FROM WO CL to Beyond ANGLE: E) 0 N 45 [] 60 other FROM N/A DEG to N/A DEG r- NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN LI1 ['1 2 [l 1 -] 2 [-] cw E[- ccw FROM L to L INCHES FROM WO to ANGLE: El 0 E] 45 El 60 other FROM DEG to DEG E] NO SCAN SURFACE BEAM DIRECTION Rl LIMITED SCAN E-'I [1 2 l 1 E] 2 E] cw I] ccw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: l 0 [0 45 El 60 other, FROM DEG to DEG [Z yes E] No Prepared By: Matthew Hendrick vel: 11 Date: 05109/10 Sheet 2 of Reviewed By: / ate: Authorized Inspector: Date:

,/ I/ lie)-'-/I

Axial Scan ove Item No. 02.C5.1.0038 VNId IL~ 2LP-0215-27 6(r Shra

  • -S2 Nblve-Sl 45° Shm LAJ I (Forged)

L~J

\T Coverage of VlMume Claimed = 92% for Scan 2.

(Limitation shown due to weld-o-let representing 2.5" oftotal wld length.)

arm Scan Co PIPE-S2 Valve-Sl (Forged)

Coveag ofVolinme Claimed = 50%

Scale: 1"= I"

% Coverage Calculations Total Weld Length = (10.75in. dia.)iT = 33.8in.

Total Area of Examination = 1.95 in. x 0.33 in. = 0.64 in.(sq.)

Total Volume of Examination = 33.8 in. x 0.64 in.(sq.) = 21.63 in.(cu.)

Scan Length Area Volume Percent Obtained -

Scanned - Obtained - Obtained - Volume Obtained/Total Volume(100) in. in.(sq.) in.(cu.)

S1 - Valve 33.8 in. 0.64 in.(sq.) 21.63 in.(cu.) 21.63/21.63(100) = 100%

S2 - Pipe 2.5 in. 0.59 in.(sq.) 1.48 in.(cu.) 1.48/ 21.63(100) = 6.8%

S2 - Pipe 31.3 in. 0.64 in.(sq.) 20.03 in.(cu.) 20.03/21.63(100) z92.6%

S3 - CW 33.8 in. 0.32 in.(sq.) 10.82 in.(cu.) 10.82/21.63(100) = 50%

54 - CCW 33.8 in. 0.32 in.(sq.) 10.82 in.(cu.) 10.82/21.63(100) =.50%

Total Aggregate = (Sl + S2 + 53 + S4) = 100% + 99.4%(6.8% + 92.6%) + 50% + 50%= 299.4%/4 = 74.9%

Inspector/Date *6 .., ; T4!.

v Page..5- of..6.3110 Page of 4,

-- I Determination of Percent Coverage for I..-

00M., UT Examinations - Pipe

  • /

Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-24 A.J CD Summary No.: 02.C5.11.0038 Procedure Rev.: C Report No.: UT-10-466 C-Workscope: ISI Work Order No.: 01870261 Page: 4 of 4 45 deo Scan 1  % Length X  % volume of length 1 100 =  % total for Scan 1 Scan 2 99.400  % Length X 100.000  % volume of length 1 100 = 99.400  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length 1 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 66.467  % total for 45 deg Other de.:- _ (to be used for supplemental scans)

The data to be listed below Is for coverage that was not obtained with the 45 deg scans.

Scan I 100.000  % Length X 100.000  % volume of length 1100 = 100.000  % total for Scan 1 Scan 2  % Length X  % volume of length /100 =  % total for Scan 2 Scan 3  % Length X  % volume of length! 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length/ 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 74.850  % Total for complete exam Site Field Supervisor: ,__,, ________._._ Date: - Z . /1 (

AITACHMEHNT B UT Pipe Wt-., Examination , ",>

SitelUnit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-24 Summary No.: 02.C5.21.0035 Procedure Rev.: C Report No.: UT-09-362 Workscope: ISl Work Order No.: 01874477 Page: 1 of 3 Code: 1998 Cat./Item: C-F-11C5.21 Location:

Drawing No.: 2HP-341

Description:

Valve 2HP-120 to Pipe System ID: fiA Component ID: 2HP-341-V1 SizelLength: NIA ThicknesslDiameter: 0.375/2.5ISS Limitations: See attached limitation sheet Start Time: 1214 Finish Time: 1304 Examination Surface: Inside [J Outside [ Surface Condition: AS GROUND Lo Location: 9,1.1.5 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 08125 Temp. Tool Mfg.: Fluke Serial No.: OCQUA33090 Surface Temp.: 82 "F Cal. Report No.: CAL-09-472, 473, 474 Angle Used 0 45 45T 60 70 Scanning dB 34.0 34.0 52.5 59.3 Indication(s): Yes C] No &D Scan Coverage: Upstream [] Downstream 11 CW [] CCW [

Comments:

NIA Results: Accept 0] Reject R] Info 5] FC 08-01, 08-04, 09.02, 09-08 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

ATTACHMENT f PA6E ' OF 0'F *-*

DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 2HP-341-V1 Item No: 02.C5.21.0035 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Due to valve configuration U LIMITED SCAN Z I [1 2 U 1 Z 2 El cw U ccw FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: E] 0 0 45 (g 60 other FROM 0 DEG to 360 DEG U NO SCAN SURFACE BEAM DIRECTION U LIMITED SCAN 1 E] 2 Uj 1 E] 2 [] cw ccw FROM L to L INCHES FROM WO to ANGLE: U 0 U 45 0 60 other FROM DEG to DEG U NO SCAN SURFACE BEAM DIRECTION U LIMITED SCAN U: 1 Ul 2 U1 I- 2 U- cw U ccw FROM L to L INCHES FROM WO to ANGLE: U] 0 0 45 0 60 other FROM DEG to DEG U NO SCAN SURFACE BEAM DIRECTION U LIMITED SCAN U1 U2 U7 I U] 2 U- cw U1 ccw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: [1 0 0 45 Q 60 other __ FROM DEG to DEG 0 yes [U1 No Prepared By. Kenneth Ellis

  • n Reviewed By. h 7 V(

q

-- -- I J r .......

,AxialScan Coverage Item-No. O2.ca.21.OO35 Weld No. 2-P-34,1-V1 70 Shear---

I"O C&-. _ I Valve-SI

a. * *.

(Forged)

Coverage of Volume Claimed = 500%

are. Scan Coverage 450 Shear PIPE-S2 Valve-SI (Forged)

I In? I Coverage of Volume Claimed = 1000/o--i Scale: 1"= P

% Coverage Calculations Si = Pipe - 0% ( 0% of the length x 0% of the volume)

S2 = Valve - 500/ (100% of the length x 50% of the volume)

S3 = CW = 100% (100% of the length x 50% of the volume)

S4 = CCW = 100% (100% of the length x 50% of the volume)

Total = 250 / 4 = 62.5 % Aggregate Coverage

) Inspector / Date: 4 4C 9/2 -/0ae3of page! of -3

A11ACHMENT 5 PAGE e5 OF ~

UT Pipe Wt..j Examination Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: N/A Summary No.: 2-51 A-0029-94 Procedure Rev.: C Report No.: BOP-UT-10-149 Workscope: PSI Work Order No.: 01895070 Page: 1 of 4 Code: N/A CatJItem: NIA Location: N/A Drawing No.: N/A

Description:

Pipe to valve System ID: HP Component ID: 2-51A-0029-94 Size/Length: N/A Thickness/Diameter: .53114.0/SS Limitations: See limitation report Start Time: 1038 Finish Time: 1052 Examination Surface: Inside D Outside [] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Fluke Serial No.: MCNDE40127 Surface Temp.: 73 °F Cal. Report No.: CAL-10-586, 587, 588 Angle Used 0 45 45T 60 1 6OL Scanning dB 36.3 36.3 52.8 86.0 Indication(s): Yes [ No [ Scan Coverage: Upstream 2] Downstream El CW R] CCW R]

Comments:

FC 08-04, 09-02, 09-08, 10-09 Results: Accept El Reject W Info E] PSI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level II.N . ...Jgpature Date Reviewer., /Signature Date Tucker, David K. 5/11/2010 V S: " 'r-t Examiner Level llN ., Signature Date Site Review Signature Date Foss, Steven 5111/2010 Other Level N/A Signature Date ANII Review . Signature Date N/A ___1

A11ACHMEKBI PA6E ('ýO 0F DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 251A-0029-94 Item No: 01895070 remarks:

I NO SCAN SURFACE BEAM DIRECTION Single sided pipe to valve El LIMITED SCAN Z 1 El 2 El1 Z} 2 [ cw Z ccw configuration.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: El 0 E 45 Z 60 other FROM 0 DEG to 360 DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN E1 I -E] 2 i1 "] 2 [] cw [-]' ccw FROM L to L INCHES FROM WO to ANGLE: El 0 Rl 45 El 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN -1 [] 2 l1 [] 2 [ cw E] ccw FROM L to L INCHES FROM WO to ANGLE: El 0 E] 45 E] 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION E' LIMITED SCAN [-11 -El2 [E l E 2 0l cw ccw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: [] 0 [E 45 [3 60 other FROM DEG to DEG Z yes [I No Sheet 2 of 4 Date:

.Z>-//h,/

AITACHMEEKT PAGE OF O -

Suppleme...ail Report Report No.:

&A96 Page:

BOP-UT-1 0-149 3 of 4 Summary No.: 2-51A-0029-94 Examiner: Tucker, David K. Level: 1i-N Reviewer:

/1 ,/~2j Date:

Examiner: Foss, Steven c*<* / Level: II-N Site Review: Date:.

Other: NIA Level: NIA ANII Review: DaW.

Comments:

'EMAI AMA 1,1.1& X /At.

Sketch or Photo:

XI . ;2 1 '11f. VW I, C /12d. ý-OVExjce AL 1AI. 2/,V >ýOL-)

1ý5 0 61

Deter mination of Percent Coverage for UT Examinations - Pipe

-- . Site/Unit: Oconee I 2 Procedure: PDI-UT-2 Outage No.: NIA Summary No.: 2-51A-0029-94 Procedure Rev.: C Report No.: BOP-UT-10-149 Workscope: PSI Work Order No.:, 01895070 Page: 4 of 4 45 den Scan 1  % Length X  % volume of length / 100 =  % total for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000 %total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - _ (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan I 100.000  % Length X 0.000  % volume of length /100 = 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length/ 100 = 50.000  % total for Scan 2 Scan 3  % Length X  % volume of length /100 = %total for Scan 3 Scan 4 %Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor Site Field Supervisor~ Ile Date:

Date: s4a S/,/ bn

ATTACHME.hi ffiakft. UT Calibration Report PAGE/ 7Z OF Site: Oconee Procedure: PDI-UT-2 Rev.: C Cal. Report No.: CAL-1 0-586 Instrument: Transducer: Couplant: Calibration Block:

Manufacturer: KRAUTKRAMER Manufacturer: GE Type: ULTRAGEL II Serial No.: PDI-UT-2A-O Model: USN-60 Serial No.: SB0253 Batch No.: 09125 Thickness: .25-1.25" Serial No.: 011MBT Size: .25 Freq.: 2.25 Search Unit Cable: Calibration Block Temp.: 73 °F Linearity Report No.: L-10-091 Model: Comp - G Shape: Round Cable Type: RG-174 Reference/Simulator Block:

Temp. Tool: # of Elements: Single Mode: Shear Cable Length: 6' Serial No.:

Manufacturer: Lutron Wedge Index to Nose .35 97-5590 Serial No.: MCNDE32828 Nom. Angle: 45

  • Meas. Angle: 45 # of Connectors: 0 Type: ROMPAS Instrument Settings Axial Orientated Search Unit Circumferential Orientated Search Unit S.U. Orientation Axlal/Clrc .Calibration Signal Sweep Sound Path Calibration Signal Sweep Sound Path Gain 30.3 Reflector Amplitude % Division Reflector Amplitude-% Division Range 2.0 .75 IDNotch 80 5.3 1.004 See Axial Delay/Offset 4.3725 Velocity/Mat. Cal. .1241 Frequency 2.25 MHz Rep. Rate Autohlgh Reference/Simulator Block I Date Time Initials T L, .... ____ ,E_____- -i ___

Pulser High Gail Signal Screeni Sound tererencel

+

Int. Cal. 511112010 0805

  • 4 dB Reflector Amplitude % Sweep Path Simulator 4 4-9 =-'-~..-----

Filter Fixed Dlivision Block Cal. Vet. 511112010 1017 Damping 1K 25.4 1" Radius 80 5.0 1.00 .97.5590 Cal. Ver.

DisplayNide0/Rectif. Full Cal. Ver. 511112010 1038 Reject Off Final Cal. 511112010 1455 I t Voltage Fixed Comments: FC 08-04, 09-02. 09-08, 10-09 I Screen Divisions = .2 in. of Sound Path Summary No.(s): 2-HP-0396-25, 2.51A-0029-94 Examiner Level °NJ .. ,...Sna re r Date Reviewer Signature Date Tucker, David K. 5/11/2010 Examiner Level II N Signature Date Site Review Signature Date Foss, Steven - 5/11/2010 Other Level N/A 'Signature Date ANII Review Signature Date NIA _

A1] AlHMMiIl 3, UT Calibration Report PAGE/' OF UZI Site: Oconee Procedure: PDI.UT.2 Rev.: C Cal. Report No.: CAL.10-587 t -

Instrument: Transducer: Couplant: Calibration Block:

Manufacturer: KRAUTKRAMER Manufacturer: GE Type: ULTRAGEL II Serial No.: PDI-UT-2A-O Model: USN-60 Serial No.: SB0482 Batch No.: 09125 Thickness: .25 -1.25" Serial No.: 011MBT Size: .25 Freq.: 2.25 MHz Search Unit Cable: Calibration Block Temp.: 73 °F Linearity Report No.: L-10-091 Model: Comp-G Shape: Round

  1. of Elements: Single Cable Type: RG-174 Reference/Simulator Block:

Temp. Tool: Mode: Shear Manufacturer: Lutron Wedge Index to Nose .25 Cable Length: 6' Serial No.: 97.5590 Serial No.: MCNDE32828 Nom. Angle: 60 o Meas. Angle: 60 # of Connectors: 0 Type: ROMPAS Instrument Settings Axial Orientated Search Unit Circumferential Orientated Search Unit S.U. Orientation Axial Calibration Signal Sweep Sound Path Calibration Signal Sweep Sound Path Gain 46.8 Reflector Amplitude% Division Reflector Amplitude % Division Range 2.5 .75 IDTip 80 5.3 1.333 NIA Delay/Offset 5.4994 Velocity/Mat. Cal.. .1241 Frequency 2.25 MHz Rep. Rate Autohigh Reference/Simulator Block Date TimeInitials Pulser High ,an olignal Sound Rererencei Int. Cal.. 511112010 0810 9 I 9 dB Reflector Amplitude % Sweep Path Simulator Filter Fixed "liukinn Rileck Cal. Vet. 5111/2010 11023 i I I 1 Block 11Cal Ver . I 5111/2010 1023 Damping 1K 26.8 1 1" Radius 1 80 1 4 1 .1197 1 97-5590 1Cal. Ver.

Display/Video/Rectif. Full Cal. Ver. 511112010 1044 I I 9 .4 & .4 II .4 Reject Off Final Cal. 1511112010 1458 1 .9 4 ~1 .1. L L ii I A. J ~.

Voltage Fixed Comments: FC 08-04, 09-02, 09-08, 10-09 I Screen Divisions = .25 in. of Sound Path Summary No.(s): 2-HP-0396-25, 2-51A-0029-94 Examiner Level II-N i" ign*pture Date Reviewer Signature Date Tucker, David K. , 5/11/2010 Examiner Level II-N ignature Date Site Review Signature Date Foss, Steven L 5/11/2010 N/A Signature Date ANII Review Signature Date Other Level -

N/A

AT1ACHMBI MAE /c OF UT Pipe Wb.-A Examination Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: N/A Summary No.: 2-HP-0396-23 Procedure Rev.: 18 Report No.: BOP-UT-09-125 Workscope: PSI Work Order No.: 01895070 Page: 1 of 4 Code: N/A Cat./Item: N/A Location: N/A Drawing No.: 2HP-0396

Description:

Pipe to Valve System ID: HP Component ID: 2-HP-0396-23 Size/Length: N/A Thickness/Diameter: .53114"1SS Limitations: See Limitation Report Start Time: 0940 Finish Time: 1025 Examination Surface: Inside Ml Outside Mv Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 09125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32828 Surface Temp.: 76 OF Cal. Report No.: CAL-10-485, 486 & 487 Angle Used 0 45 45T 60 60L Scanning dB 51.0 50.0 55.0 Indication(s): Yes j No [ Scan Coverage: Upstream  !] Downstream E] CW [] CCW R]

Comments:

N/A Results: Accept n Reject [] Info M Initial PSI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: N/A Examiner Level II-N QSi.ature Date Reviewe Signature Date Leeper, Winfred C. j 4 . 4/28/2010 - 1',

Examiner Level II-N .g n. _ ure Date Site Review Signature Date Tucker, David K. 4128/2010 Other Level N/A Signature Date ANII Review Signature Date

  • N/A _ ___ ___ __

PAGE ""~ OF -

DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 2-HP-0396-23 Item No: 01895070 remarks:

Z NO SCAN SURFACE BEAM DIRECTION Single sided pipe to valve El LIMITED SCAN Z 1 [] 2 1] Z [ 2 Z cw [Z ccw configuration. No scan from FROM L N/A to L N/A INCHES FROM WO CL to Beyond surface I due to SA 351 ANGLE: E] 0 Z 45 E 60 other FROM 0 DEG to 360 DEG (cast) material.

E] NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN -1 [] 2 ii 1-2 - cw [jccw FROM L to L INCHES FROM Wo to ANGLE: El 0 [] 45 E] 60 other _ FROM DEG to DEG

- NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN EI [] 2 Ei [-2 E-] cw [ ccw FROM L to L INCHES FROM Wo to ANGLE: El 0 [] 45 El 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN L] 1 El2 Eli f2 L]cw Elccw FROM L to L INCHES FROM WO to Sketch(s) attached 4

ANGLE: El 0 El 5 El 60 other FROM DEG to DEG Z yes El No Prepared By: David Tucker Level: II Date: 04/28/10 4/2/107Shet Sheet 2of 2 of 4 ReviwedBy:

eviewed :Date: Authorized Inspector: Date:

I

ATTACHM4 i PAGE el? OF .W" Suppleme._al Report Mjhj6- Report No.:

Page:

BOP-UT-,0-125 3 of 4 Summary No.: 2-HP-0396-23 Examiner: Leeper, Winfred C. Level: I-N Reviewer: /&1,( ~ Date:

Date:

Examiner: Tucker, David K. Level: II-N Site Review:

Other: N/A Level: N/A ANII Review: Date: ________

Comments:

Sketch or Photo: ,.%, . , 2/.,,z 605 A*i v-i6..

ýXlvs- -,5f a:

4 t'f6 "*6'

Deter mination of Percent Coverage for UT Examinations - Pipe

,. Site/Unit: Oconee I 2 Procedure: NDE-600 Outage No.: NIA Iummary No.: 2-HP-0396-23 Procedure Rev.: 18 Report No.: BOP-UT,0J-125 Workscope: PSI Work Order No.:' 01895070 Page: 4 of 4 45 deA Scan 1  % Length X  % volume of length 1 100 =  % total for Scan I Scan 2  % Lehgth X  % volume of length / 100 =  % total for Scan 2 Scan 3 50.000  % Length X 100.000  % volume of length (100 = 50.000  % total for Scan 3 Scan 4 50.000  % Length X 100.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - _ (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 0.000  % Length X 100.000  % volume of length 1 100 = 0.000  % total for Scan 1 Scan 2 50.000  % Length X 100.000  % volume of length / 100 = 50.000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor:

Site ield uperisor:Date Date: -;-.1 ) z A