ML17114A004: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17114A004 | | number = ML17114A004 | ||
| issue date = 04/21/2017 | | issue date = 04/21/2017 | ||
| title = LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, Control Block Instrumentation - CAC No. MF9494 | | title = NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, Control Block Instrumentation - CAC No. MF9494 | ||
| author name = Chawla M | | author name = Chawla M | ||
| author affiliation = NRC/NRR/DORL/LPLIII | | author affiliation = NRC/NRR/DORL/LPLIII | ||
| addressee name = Davis J | | addressee name = Davis J | ||
| addressee affiliation = Nextera Energy | | addressee affiliation = Nextera Energy | ||
| docket = 05000331 | | docket = 05000331 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Friday, April 21, 2017 5:51 PM To: Davis, J.Michael (J.Michael.Davis@nexteraenergy.com) | ||
Cc: laura.swenzinski@nexteraenergy.com; Catron, Steve (Steve.Catron@fpl.com) | Cc: laura.swenzinski@nexteraenergy.com; Catron, Steve (Steve.Catron@fpl.com) | ||
==Subject:== | ==Subject:== | ||
LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, " | LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, "Control Block Instrumentation" - CAC No. | ||
MF9494 | MF9494 | ||
==Dear Mr. Davis:== | ==Dear Mr. Davis:== | ||
By letter dated March 24, 2017 (ADAMS Accession No. ML17086A442), NextEra Energy Duane Arnold, LLC (NextEra)(the licensee) submitted a license amendment request for Duane Arnold Energy Center (DAEC). The proposed amendment request would revise DAEC Technical Specifications (TS) Table 3.3.2.1-1, | By letter dated March 24, 2017 (ADAMS Accession No. ML17086A442), NextEra Energy Duane Arnold, LLC (NextEra)(the licensee) submitted a license amendment request for Duane Arnold Energy Center (DAEC). The proposed amendment request would revise DAEC Technical Specifications (TS) Table 3.3.2.1-1, Control Rod Block Instrumentation. The proposed change would relocate cycle specific Minimum Critical Power Ratio (MCPR) values to the DAEC Core Operating Limits Report (COLR). The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | ||
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::280 hours]] to complete. The NRC staff expects to complete this review in approximately 12 months, which is March 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. | |||
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. If you have any questions, please contact me. Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 1 | |||
Fax: 301-415-1222 mahesh.chawla@nrc.gov 2 | |||
Hearing Identifier: | Hearing Identifier: NRR_PMDA Email Number: 3462 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20170421175100) | ||
==Subject:== | ==Subject:== | ||
LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, "Control Block Instrumentation" - CAC No. MF9494 | LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, "Control Block Instrumentation" - CAC No. MF9494 Sent Date: 4/21/2017 5:51:03 PM Received Date: 4/21/2017 5:51:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients: | ||
"laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com> | |||
Options | Tracking Status: None "Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com> | ||
Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 3379 4/21/2017 5:51:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 22:58, 8 March 2020
ML17114A004 | |
Person / Time | |
---|---|
Site: | Duane Arnold |
Issue date: | 04/21/2017 |
From: | Mahesh Chawla Plant Licensing Branch III |
To: | Jennifer Davis Nextera Energy |
References | |
MF9494 | |
Download: ML17114A004 (3) | |
Text
NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Friday, April 21, 2017 5:51 PM To: Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)
Cc: laura.swenzinski@nexteraenergy.com; Catron, Steve (Steve.Catron@fpl.com)
Subject:
LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, "Control Block Instrumentation" - CAC No.
MF9494
Dear Mr. Davis:
By letter dated March 24, 2017 (ADAMS Accession No. ML17086A442), NextEra Energy Duane Arnold, LLC (NextEra)(the licensee) submitted a license amendment request for Duane Arnold Energy Center (DAEC). The proposed amendment request would revise DAEC Technical Specifications (TS) Table 3.3.2.1-1, Control Rod Block Instrumentation. The proposed change would relocate cycle specific Minimum Critical Power Ratio (MCPR) values to the DAEC Core Operating Limits Report (COLR). The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 280 hours11.667 days <br />1.667 weeks <br />0.384 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is March 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. If you have any questions, please contact me. Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 1
Fax: 301-415-1222 mahesh.chawla@nrc.gov 2
Hearing Identifier: NRR_PMDA Email Number: 3462 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20170421175100)
Subject:
LIC-109 Acceptance of Duane Arnold Energy Center LAR (TSCR-169) - Revision to Technical Specification Table 3.3.2.1-1, "Control Block Instrumentation" - CAC No. MF9494 Sent Date: 4/21/2017 5:51:03 PM Received Date: 4/21/2017 5:51:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:
"laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>
Tracking Status: None "Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>
Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 3379 4/21/2017 5:51:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: