ML13234A385: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13234A385
| number = ML13234A385
| issue date = 08/19/2013
| issue date = 08/19/2013
| title = 08/19/2013 Calvert Cliffs Nuclear Power Plant NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff
| title = NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff
| author name =  
| author name =  
| author affiliation = Calvert Cliffs Nuclear Power Plant, LLC, Constellation Energy Nuclear Group, LLC, EDF Group
| author affiliation = Calvert Cliffs Nuclear Power Plant, LLC, Constellation Energy Nuclear Group, LLC, EDF Group
Line 9: Line 9:
| docket = 05000317, 05000318
| docket = 05000317, 05000318
| license number =  
| license number =  
| contact person = Morgan N S
| contact person = Morgan N
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 19
| page count = 19
| project =
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:----a joint venture of------__.
{{#Wiki_filter:CENG~
Constellation Energy' ..* Calvert Cliffs Nuclear Power Plant -., .... -'7-C-'.II, "'.-0-_
a joint venture of------__.
License Amendment Request" , ., . ' ,... ...: Pre-Application Meeting with NRC August 19, Introd CENG Representatives  
Constellation                       ..* ~ eDF Energy'                               ~,.
-Elliott Flick Gen'l Manager, Fleet Engineering  
Calvert Cliffs Nuclear Power Plant
-Dave Dellario  
            ~
: Manager, Engineering Services  
              - ~.,....~-                                             NFPA80S
-Jim McQuighan Project Manager, NFPA 805 -Paul Darby Principal  
          ~:~
: Engineer, NFPA 805 -Pat Furio Principal  
          -C-'.II,               _~
: Engineer, Licensing  
                                            '7
-Jeff Stone Supervisor, PRA -Jim Landale Principal  
          "'-:'-~-
: Engineer, PRA -Bret Colby Supervisor, Engineering  
            ~- " ---..>
-Ch ris Dobry Principal  
_ ...............                 License Amendment Request
: Engineer, Engineering Project NFPA Consultants  
    ~<).~
-Mark Crompton EPM, NFPA 805 Project Manager CENG.. a )CIn1-nure 01.______ -c-:  
Pre-Application Meeting with NRC Staff August 19, 2013
-=.wE "'" -2 Overview of CCN PP Current Fire Protection Licensing Basis NFPA 805 Transition Project Overview Compliance with NFPA 805 Probabilistic Risk Assessment Implementation Overview Summary /;...;7CENGI a joont ventum of--___, -"!-'eor:-.r 3 Overview of Two PWRs, each rated @ 2737 MWth Combustion Engineering NSSS Commercial operations began in 1975/1977 Renewed Operating License issued -expires in 2034/2036  
 
-'7CENGI -8)oint VEWTlure 011-_ ____
Introd uctions
.."<'"" -..... ...... -:*t -..f"eOF-.,. ..." 4 Current Fire Protection Licensing Fire Protection Program License Condition 10 CFR 50.48(a) and (b) Draft General Design Criterion 3 10 CFR 50, Appendix R Branch Technical Position APCSB 9.5-1, Appendix Current exemptions  
* CENG Representatives
.. CENGI -,,)001II8I'I1U19
  - Elliott Flick                       Gen'l Manager, Fleet Engineering
"'
  - Dave Dellario                       Manager, Engineering Services
..:..---'
  - Jim McQuighan                       Project Manager, NFPA 805
*k -'.Iii---.' -f"'eDf.. -" 5
  - Paul Darby                         Principal Engineer, NFPA 805
---NFPA 805 Transition Project License Amendment Request (LAR) committed submittal date -September 30, 2013 Using the Nuclear Energy Institute (NEI) LAR template Web portal will be established to support NRC review CENGI a joini venliml 01 ____ _ -,'\:.:" -..*..eDF.;.' --..&.w " 6 NFPA 805 Transi,tion Project Fire Protection Program Transition  
  - Pat Furio                           Principal Engineer, Licensing
-License Condition being revised -Technical Specifications being revised -Reviewed existing exemptions  
  - Jeff Stone                         Supervisor, PRA
-Three exemptions will be credited post-NFPA 805 transition
  - Jim Landale                         Principal Engineer, PRA
_ 19".:-" CENGI . -..... -".s-: .'.B ' ---7 Compliance with NFPA NFPA 805 Chapter 3 Compliance  
  - Bret Colby                         Supervisor, Engineering
-Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036 Review documented in B-1 Table (Attachment A of LAR) Results of review -3 Code compliance  
  - Ch ris Dobry                       Principal Engineer, Engineering
-7 sections are addressed via Attachment L of -96 Sections/sub-sections -43 Comply with clarifications/EEEEs/required  
* Project NFPA Consultants
-16 Comply by previous NRC I " . .-CENG..
  - Mark Crompton                         EPM, NFPA 805 Project Manager
a joInI venture 01'____--, " -c""': . -.,y <1-.J ..*..eDf -8 Compliance with NFPA Non-Power Operations  
                      ~    --
-Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0040 -Fire modeling not used to eliminate or reduce pinch points -Recovery actions are not credited  
                -~ f~~"':: -
-Results of review
CENG..
a )CIn1-nure 01._ _ _ _ __  ~-:-l-
                ~-  -c-: --- - ~
                                                =.wE "'"
I)~: ~::.      - --                       ':.*~ eDF 2
 
Agenda Overview of CCN PP
* Current Fire Protection Licensing Basis
* NFPA 805 Transition Project Overview
* Compliance with NFPA 805
* Probabilistic Risk Assessment Development/Results
* Implementation Overview Summary
                  /;...;7-
                <~-
CENG..                            I a joont ventum o f - -_ _ _,
                                                              ~-"- k
            ~;J ~~ -~ --:~~~-        - .r
                                      -             "!-'eor:
01' 3
 
Overview of CCNPP
* Two PWRs, each rated @ 2737 MWth
* Combustion Engineering NSSS Commercial operations began in 1975/1977
* Renewed Operating License issued - expires in 2034/2036
              -'7-
          - --~--
          ...:>-~
CENG.
8)oint VEWTlure 011- _ _ _ __
I
                                                                  ...... -:*t
              <'"" .- . . .."-~-
J~.- "                   -.,.
                                                          ~f " eOF 4
 
Current Fire Protection Licensing Basis
* Fire Protection Program License Condition
* 10 CFR 50.48(a) and (b)
* Draft General Design Criterion 3 10 CFR 50, Appendix R
* Branch Technical Position APCSB 9.5-1, Appendix A
* Current exemptions
                  .. ~7~        CENG..                                    I
              - --~-                                            ..:..---'*k Iii ~~- - -.' ----
                            '. ,,)001II8I'I1U19 "'- - - - - - ,
            ~
                                    ~                ..f"' eDf
                                    ~                -"                   5
 
NFPA 805 Transition Project Overview
* License Amendment Request (LAR) committed submittal date - September 30, 2013
* Using the Nuclear Energy Institute (NEI) LAR template
* Web portal will be established to support NRC review
            --~~-
                    ~~7---        CENG_
a joini venliml 01_ _ __ _ -,
I
                                                                ~~ - k
            '\:.:" ~: --""- ,,~
                  ~-
              .;.'   - '    ~. -       -
                                        &.w            ..*..eDF
                                                        ~~
6
 
NFPA 805 Transi,t ion Project Overview
* Fire Protection Program Transition
  - License Condition being revised
  - Technical Specifications being revised
  - Reviewed existing exemptions
      - Three exemptions will be credited post-NFPA 805 transition
            ~.
_ 19".:-"
                  ,~-
              ,~~-..
s-:
                        ._.~!z,;;.
CENG_
B lOinI\llllltura af- ~
                                          - ".~eDf
                                                          ~'"
I
                                                                        .'. 7
 
Compliance with NFPA 80S NFPA 805 Chapter 3 Compliance
- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036 Review documented in B-1 Table (Attachment A of LAR)
Results of review
  - 3 Code compliance modifications
  - 7 sections are addressed via Attachment L of LAR.
  - 96 Sections/sub-sections comply
  - 43 Comply with clarifications/EEEEs/required actions
  - 16 Comply by previous NRC approval
                . ~-,-        -  CENG..                            I ".
            ,-::.-'~---
              "    -c""': -.~--~-.
a joInI venture 01'_ _ _ _--,   ~~-k 1 ~'- ~      .           ~              <1-.
                        -        J       - .,y          ..*.. eDf 8
 
Compliance with NFPA 805
* Non-Power Operations
  - Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0040
  - Fire modeling not used to eliminate or reduce pinch points
  - Recovery actions are not credited
  - Results of review
* All success paths identified
* All success paths identified
* Pinch points identified
* Pinch points identified
* Component list associated with maintaining Key Safety Functions
* Component list associated with maintaining Key Safety Functions
* Recommendations to manage Fire Risk CENGI -ajant ventuteo!
* Recommendations to manage Fire Risk ci:~'
_ ---..' ....eDf -9
CENGw                                I
--Compliance with NFPA Radioactive Release -Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ  
                "';.'~-
-Plant evaluated on a room by room -Credit engineering controls and CENG offsite calculation for gaseous and liquid effluents  
                ~.            -
-Reviewed Pre-Fire Plan and training materials to clarify monitoring and control requirements Minor Pre-Fire Plan/procedure changes and training program revisions in progress.
                  ~ - -.~ - -.;,.. ajant ventuteo! _ ~          '~-'
CENGIa joint venture of _ _. :-c:-* -., --EI-wY 4' -..;;.. -10 Compliance with Nuclear Safety Capability Assessment Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054 -Safe and Stable defined as Hot Standby -Common Enclosure review (Protection)  
* k
-Common Power Supply review (Coordination)
              ;~-   .                -             ..' ....eDf
Fire Area review -Multiple Spurious Operations review -Effects of suppression activities Results of
                                                      .-~
9
 
Compliance with NFPA 805
* Radioactive Release
  - Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 09-0056
  - Plant evaluated on a room by room basis
  - Credit engineering controls and CENG offsite dose calculation for gaseous and liquid effluents
  - Reviewed Pre-Fire Plan and training materials to clarify monitoring and control requirements
* Minor Pre-Fire Plan/procedure changes and training program revisions in progress.
4#9:"'::'
                  -~.,-              CENG.                        ..; . ~-wI
              *i~"':~'*
j~.-'
:-c:- * -., -~~
                                ~ - -
a joint venture of _ ~
                                            -EI-wY         ~'''eDF
                          --                               4' 10
 
Compliance with NFPA-80S
* Nuclear Safety Capability Assessment Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054
    - Safe and Stable defined as Hot Standby
    - Common Enclosure review (Protection)
    - Common Power Supply review (Coordination)
Fire Area review
    - Multiple Spurious Operations review
    - Effects of suppression activities review Results of review
* 21 Fire Areas to be transitioned deterministically
* 21 Fire Areas to be transitioned deterministically
* 46 Fire Areas to be transitioned using Fire Risk Evaluations
* 46 Fire Areas to be transitioned using Fire Risk Evaluations
* All VFDRs addressed I '* CENG.. a joht _01,--___ ('-., *Cn
* All VFDRs addressed
* Enefn r 11 Compliance with NFPA Recovery Actions Feasibility Assessment  
                        ..,~~
-Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0030 -Primary Control Station (Other than main Control Room)
CENG..                    I '*
* Alternate Shutdown Panels 1(2)C43 -Recovery actions listed in LAR Attachment G -There was over 85% reduction in operator recovery actions --,;J#Z7-, _ CENG.
                  ~~-
apot venture 011-___---, .:;; -, , -__ 12
                    ~        --~-
__ Compliance with NFPA
a joht _01,- -___     ~~ - -.t
* Monitoring Program -Following FAQ 10-0059, Revision 5 guidance NSCA and Fire PRA components  
('-., *Cn
-If any new functions, will be added to Maintenance Rule Program Non-Power Operation components, radioactive release systems, Fire Protection program components  
* j~-:- _    r            Enefn     ~~eDF 11
-To be included in normal system and program health monitoring Fire Protection systems and features  
 
-Low Safety Significant  
Compliance with NFPA 805 Recovery Actions Feasibility Assessment
-normal system/program health monitoring  
- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0030
-High Safety Significant  
- Primary Control Station (Other than main Control Room)
-NFPA 805 specific monitoring program that uses the Maintenance Rule program software CENG* ajanl..,lUf1l at____<. ----.r. ....':.-. eoF5 13 PRA Internal Events PRA -Fire PRA built on a quality Internal Events model -Full Internal Events peer review to RG 1.200, Revision 2 in 2010 Fire PRA -Fire PRA followed guidance in NUREG/CR 6850 as supplemented by -Full peer review to RG 1.200, Revision 2 in January -Total of 41 Facts & Observations
* Alternate Shutdown Panels 1(2)C43
- Recovery actions listed in LAR Attachment G
- There was over 85% reduction in operator recovery actions
                    ;J#Z7-
                  -~-,~-
                    ~:
1-~-  -__
                                ~
CENG.
a pot venture 011- _ _ _---,
                                      ~
                                      ~
                                                      -'~
                                                      ~~
eDF
                                                              ~-" , .
12
 
Compliance with NFPA 805
* Monitoring Program
    - Following FAQ 10-0059, Revision 5 guidance NSCA and Fire PRA components
    - If any new functions, will be added to Maintenance Rule Program Non-Power Operation components, radioactive release systems, Fire Protection program components
    - To be included in normal system and program health monitoring Fire Protection systems and features
    - Low Safety Significant - normal system/program health monitoring
    - High Safety Significant - NFPA 805 specific monitoring program that uses the Maintenance Rule program software CENG*                             ~-~- f
                    ,,~7 __
                  --~-              a janl..,lUf1l at_ _ _ _        ~
                <.   ~ - --~ - .:~-
5 ~:- - ~                -- .r.         ....':.-. eoF 13
 
PRA Development/Results
* Internal Events PRA
  - Fire PRA built on a quality Internal Events model
  - Full Internal Events peer review to RG 1.200, Revision 2 in 2010
* Fire PRA
  - Fire PRA followed guidance in NUREG/CR 6850 as supplemented by FAQs.
  - Full peer review to RG 1.200, Revision 2 in January 2012
  - Total of 41 Facts & Observations (F&Os)
* 17 Findings
* 17 Findings
* 23 Suggestions
* 23 Suggestions
* 1 Best  
* 1 Best Practice
-All F&Os subsequently
  - All F&Os subsequently dispositioned
* No un-reviewed methods used --, -
* No un-reviewed methods used
__________
      - -        - -~..:-
, ,..,. -"'-'-..---'->. ...*4eDF-...-J' 14 PRA Overall Plant Risk Post-NFPA 805 Transition  
                  '- .::~ ~~. ---'- >.
-Sufficient margin to account for non-quantified hazards Unit 1 .JL Unit 2 Comments CoF LERF CoF LERF Fire PRA quantification with NFPA 3.2E-OS 3.0E-06 3.6E-OS 4.2E-06 80S modifications credited.
CENG~
Internal Events PRA quantification 1.3E-OS 1.3E-06 1.0E-OS with NFPA 80S modifications credited.
8~1~~ofl __________,
IPEEE for COF. Estimate for LERF 1.7E-06 1.SE-OS 2.0E-06 based on 13% of Tornadoes/High IPEEE for CoF. Estimate for 4.4E-06 S.7E-07 4.4E-06 S.7E-07based on 13% of CoF. Plant-Level Total 6.2E-OS 6.6E-06 6.SE-OS 8.1E-06 Overall risk meets Reg. Guide 1.174 guidance for total plant risk of CDF < 1E-4 / year and LERF < 1E-S / year. _....
                                                            ,..,. -"'-.t J~---::'" -
CENGwr't_. 1. 1I)oont wrdUre 01'-----,
                                          ~        ...*4eDF
--
                                          -...-     J' 14
-----.,. ..'" 15
 
---PRA
PRA Development/Results
* Risk improvement from NFPA 805 modifications Total delta risk for B.65E-6/ryr 6.39E-7/ryr B.B7E-6/ryr plant fire Internal Events risk 1.74E-6/ryr 2.10E-B/ryr 2.26E-6/ryr 4.60E-B/ryr improvement from modifications Plant delta risk with 6.91E-6/ryr 6.1BE-7/ryr 6.61E-6/ryr B.62E-7/ryr plant modifications  
* Overall Plant Risk Post-NFPA 805 Transition
-Total risk increases  
  - Sufficient margin to account for non-quantified hazards Unit 1         .JL             Unit 2 Comments CoF         LERF             CoF               LERF Fire PRA quantification with NFPA 3.2E-OS     3.0E-06         3.6E-OS           4.2E-06 80S modifications credited.
<lE-S for CDF and <lE-6 for LERF -Delta risk meets criteria for RG 1.174 and NFPA 805 application --
Internal Events PRA quantification 1.3E-OS     1.3E-06         1.0E-OS           1.3E~06 with NFPA 80S modifications credited.
CENG. a IC*l1 ..",ture 01-----, ....... -".*
IPEEE for COF. Estimate for LERF 1.7E-06         1.SE-OS           2.0E-06 based on 13% of CoF.
.. -..* eOF--..r ......1"-'+*-"
Tornad oes/H igh                                                                      IPEEE for CoF. Estimate for LERF 4.4E-06     S.7E-07         4.4E-06           S.7E-07 Winds                                                                                  based on 13% of CoF.
':"-' 16 Implementation Modifications Planned -15 Fire PRA related modifications  
Plant-Level Total             6.2E-OS     6.6E-06         6.SE-OS           8.1E-06 Overall risk meets Reg. Guide 1.174 guidance for total plant risk of CDF < 1E-4 / year and LERF < 1E-S / year.
-3 NFPA Code compliance modifications Process/Procedure Changes -Fire Brigade response  
CENG..                                            1
-Design change process -Training  
_.... ~;.I*7~~
-Operations alarm procedures, Fire Fighting Strategy Manual, hot work, lower mode (refueling outage),
                          ~-                        1I)oont wrdUre 01'- - - - - ,
AOPs/recovery  
                                                                                              ~  wr't _.
: actions, etc.
                    .~"    .:?~. -- -"'~
CENGI ::--....... --.... -c;---.;..; -".,1 " 17 RCP Loss of Seal Cooling alarm and local 13 kV trip of RCPs Electrical modifications:  
                    "i ~ -     - -- -                     -
(hot short, grounds, -Reactor vessel head and Pressurizer -Main Steam Isolation Valve  
                                                                          "*~eOF
-Steam Generator blowdown control -Normal sump motor operated -Hydrogen purge -Component cooling water heat exchanger flow control -Pressurizer Power Operated Relief Auxiliary Feedwater steam admission -Reactor Coolant Pump breaker 4kV breaker  
                                                                              '"                                           15
-Cable Spreading Room Cable replacement and lighting transformer protection CENGI -WI'"' _.eo " L  
 
..:.-' 18 Complete LAR to be submitted on or before September 30, 2013 No un-reviewed methods or deviations from approved Fire PRA methods Modifications will be required and are being Transition Schedule  
PRA Development/Results
-Assumes 2 year NRC review -Consistent with other submittals  
* Risk improvement from NFPA 805 modifications Total delta risk for       B.65E-6/ryr 6.39E-7/ryr                           B.B7E-6/ryr      9.0BE-7/ryr plant fire scenarios Internal Events risk       1.74E-6/ryr 2.10E-B/ryr                           2.26E-6/ryr       4.60E-B/ryr improvement from modifications Plant delta risk with     6.91E-6/ryr 6.1BE-7/ryr                           6.61E-6/ryr       B.62E-7/ryr plant modifications
-Implement procedure/process changes 6 months after SER -Completion of modifications for both units following SER approval-April 2018 CENG-, .-
    - Total risk increases <lE-S for CDF and <lE-6 for LERF
8 jcont 1IeI1tuJ8 01'-------, --...*:-eoF -... .6.--19}}
    - Delta risk meets criteria for RG 1.174 and NFPA 805 application
                      ~
                            ~~
                      - - ~"""-----
                      ,~"..~~.~ -.-.-~;. ..
1"-'+*-" ':"-'
CENG.
a IC*l1 ..",ture
                                                  --..r 01- - - - -,
                                                                  ..* ... eOF
                                                                  ~ ...
I 16
 
Implementation Overview
* Modifications Planned
  - 15 Fire PRA related modifications
  - 3 NFPA Code compliance modifications
* Process/Procedure Changes
  - Fire Brigade response
  - Design change process
  - Training
  - Operations alarm procedures, Fire Fighting Strategy Manual, hot work, lower mode (refueling outage),
AOPs/recovery actions, etc.
            ,::- - ~
1
_r~'
                      -~- -
                          -c;- - - -~'
CENG..
I
                                                          -" " 17
 
Modifications
* RCP Loss of Seal Cooling alarm and local 13 kV trip of RCPs Electrical modifications: (hot short, grounds, etc)
  - Reactor vessel head and Pressurizer vents
  - Main Steam Isolation Valve control
  - Steam Generator blowdown control valves
  - Normal sump motor operated valves
  - Hydrogen purge valves
  - Component cooling water heat exchanger flow control valve
  - Pressurizer Power Operated Relief Valves Auxiliary Feedwater steam admission valves
  - Reactor Coolant Pump breaker control 4kV breaker control
  - Cable Spreading Room dampers
* Cable replacement and lighting transformer protection
                  -       .-~..:-    CENG.        ..,. WI'"'
I
_.eo L
                ~";'~ ..:.- ~; ------~
j~.'   '                                      18
 
Summary
* Complete LAR to be submitted on or before September 30, 2013
* No un-reviewed methods or deviations from approved Fire PRA methods
* Modifications will be required and are being planned
* Transition Schedule
  - Assumes 2 year NRC review
      - Consistent with other submittals
  - Implement procedure/process changes 6 months after SER
  - Completion of modifications for both units following SER approval- April 2018
                      .;,1;
                      -z~
                    --\.~- ~
CENG.                        .      -,
                                                                      ~-"- .
                  -'  .&#xa2;;~ ---:-~'. 8 jcont 1IeI1tuJ8 01'-------,
              'i~:--- '      --          -
                                            - . . .-        ...*:-eoF
                                                              .6.
19}}

Latest revision as of 20:07, 25 February 2020

NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff
ML13234A385
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/19/2013
From:
Calvert Cliffs, Constellation Energy Nuclear Group, EDF Group
To:
Office of Nuclear Reactor Regulation
Morgan N
References
Download: ML13234A385 (19)


Text

CENG~

a joint venture of------__.

Constellation ..* ~ eDF Energy' ~,.

Calvert Cliffs Nuclear Power Plant

~

- ~.,....~- NFPA80S

~:~

-C-'.II, _~

'7

"'-:'-~-

~- " ---..>

_ ............... License Amendment Request

~<).~

Pre-Application Meeting with NRC Staff August 19, 2013

Introd uctions

  • CENG Representatives

- Elliott Flick Gen'l Manager, Fleet Engineering

- Dave Dellario Manager, Engineering Services

- Jim McQuighan Project Manager, NFPA 805

- Paul Darby Principal Engineer, NFPA 805

- Pat Furio Principal Engineer, Licensing

- Jeff Stone Supervisor, PRA

- Jim Landale Principal Engineer, PRA

- Bret Colby Supervisor, Engineering

- Ch ris Dobry Principal Engineer, Engineering

  • Project NFPA Consultants

- Mark Crompton EPM, NFPA 805 Project Manager

~ --

-~ f~~"':: -

CENG..

a )CIn1-nure 01._ _ _ _ __ ~-:-l-

~- -c-: --- - ~

=.wE "'"

I)~: ~::. - -- ':.*~ eDF 2

Agenda Overview of CCN PP

  • Current Fire Protection Licensing Basis
  • Implementation Overview Summary

/;...;7-

<~-

CENG.. I a joont ventum o f - -_ _ _,

~-"- k

~;J ~~ -~ --:~~~- - .r

- "!-'eor:

01' 3

Overview of CCNPP

  • Two PWRs, each rated @ 2737 MWth
  • Combustion Engineering NSSS Commercial operations began in 1975/1977
  • Renewed Operating License issued - expires in 2034/2036

-'7-

- --~--

...:>-~

CENG.

8)oint VEWTlure 011- _ _ _ __

I

...... -:*t

<'"" .- . . .."-~-

J~.- " -.,.

~f " eOF 4

Current Fire Protection Licensing Basis

  • Branch Technical Position APCSB 9.5-1, Appendix A
  • Current exemptions

.. ~7~ CENG.. I

- --~- ..:..---'*k Iii ~~- - -.' ----

'. ,,)001II8I'I1U19 "'- - - - - - ,

~

~ ..f"' eDf

~ -" 5

NFPA 805 Transition Project Overview

  • License Amendment Request (LAR) committed submittal date - September 30, 2013
  • Using the Nuclear Energy Institute (NEI) LAR template
  • Web portal will be established to support NRC review

--~~-

~~7--- CENG_

a joini venliml 01_ _ __ _ -,

I

~~ - k

'\:.:" ~: --""- ,,~

~-

.;.' - ' ~. - -

&.w ..*..eDF

~~

6

NFPA 805 Transi,t ion Project Overview

- License Condition being revised

- Technical Specifications being revised

- Reviewed existing exemptions

- Three exemptions will be credited post-NFPA 805 transition

~.

_ 19".:-"

,~-

,~~-..

s-:

._.~!z,;;.

CENG_

B lOinI\llllltura af- ~

- ".~eDf

~'"

I

.'. 7

Compliance with NFPA 80S NFPA 805 Chapter 3 Compliance

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036 Review documented in B-1 Table (Attachment A of LAR)

Results of review

- 3 Code compliance modifications

- 7 sections are addressed via Attachment L of LAR.

- 96 Sections/sub-sections comply

- 43 Comply with clarifications/EEEEs/required actions

- 16 Comply by previous NRC approval

. ~-,- - CENG.. I ".

,-::.-'~---

" -c""': -.~--~-.

a joInI venture 01'_ _ _ _--, ~~-k 1 ~'- ~ . ~ <1-.

- J - .,y ..*.. eDf 8

Compliance with NFPA 805

  • Non-Power Operations

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0040

- Fire modeling not used to eliminate or reduce pinch points

- Recovery actions are not credited

- Results of review

  • All success paths identified
  • Pinch points identified
  • Component list associated with maintaining Key Safety Functions
  • Recommendations to manage Fire Risk ci:~'

CENGw I

"';.'~-

~. -

~ - -.~ - -.;,.. ajant ventuteo! _ ~ '~-'

  • k
~- . - ..' ....eDf

.-~

9

Compliance with NFPA 805

  • Radioactive Release

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 09-0056

- Plant evaluated on a room by room basis

- Credit engineering controls and CENG offsite dose calculation for gaseous and liquid effluents

- Reviewed Pre-Fire Plan and training materials to clarify monitoring and control requirements

  • Minor Pre-Fire Plan/procedure changes and training program revisions in progress.

4#9:"'::'

-~.,- CENG. ..; . ~-wI

  • i~"':~'*

j~.-'

-c:- * -., -~~

~ - -

a joint venture of _ ~

-EI-wY ~eDF

-- 4' 10

Compliance with NFPA-80S

  • Nuclear Safety Capability Assessment Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054

- Safe and Stable defined as Hot Standby

- Common Enclosure review (Protection)

- Common Power Supply review (Coordination)

Fire Area review

- Multiple Spurious Operations review

- Effects of suppression activities review Results of review

  • 21 Fire Areas to be transitioned deterministically
  • 46 Fire Areas to be transitioned using Fire Risk Evaluations
  • All VFDRs addressed

..,~~

CENG.. I '*

~~-

~ --~-

a joht _01,- -___ ~~ - -.t

('-., *Cn

  • j~-:- _ r Enefn ~~eDF 11

Compliance with NFPA 805 Recovery Actions Feasibility Assessment

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0030

- Primary Control Station (Other than main Control Room)

  • Alternate Shutdown Panels 1(2)C43

- Recovery actions listed in LAR Attachment G

- There was over 85% reduction in operator recovery actions

J#Z7-

-~-,~-

~:

1-~- -__

~

CENG.

a pot venture 011- _ _ _---,

~

~

-'~

~~

eDF

~-" , .

12

Compliance with NFPA 805

  • Monitoring Program

- Following FAQ 10-0059, Revision 5 guidance NSCA and Fire PRA components

- If any new functions, will be added to Maintenance Rule Program Non-Power Operation components, radioactive release systems, Fire Protection program components

- To be included in normal system and program health monitoring Fire Protection systems and features

- Low Safety Significant - normal system/program health monitoring

- High Safety Significant - NFPA 805 specific monitoring program that uses the Maintenance Rule program software CENG* ~-~- f

,,~7 __

--~- a janl..,lUf1l at_ _ _ _ ~

<. ~ - --~ - .:~-

5 ~:- - ~ -- .r. ....':.-. eoF 13

PRA Development/Results

  • Internal Events PRA

- Fire PRA built on a quality Internal Events model

- Full Internal Events peer review to RG 1.200, Revision 2 in 2010

- Fire PRA followed guidance in NUREG/CR 6850 as supplemented by FAQs.

- Full peer review to RG 1.200, Revision 2 in January 2012

- Total of 41 Facts & Observations (F&Os)

  • 17 Findings
  • 23 Suggestions
  • 1 Best Practice

- All F&Os subsequently dispositioned

  • No un-reviewed methods used

- - - -~..:-

'- .::~ ~~. ---'- >.

CENG~

8~1~~ofl __________,

,..,. -"'-.t J~---::'" -

~ ...*4eDF

-...- J' 14

PRA Development/Results

  • Overall Plant Risk Post-NFPA 805 Transition

- Sufficient margin to account for non-quantified hazards Unit 1 .JL Unit 2 Comments CoF LERF CoF LERF Fire PRA quantification with NFPA 3.2E-OS 3.0E-06 3.6E-OS 4.2E-06 80S modifications credited.

Internal Events PRA quantification 1.3E-OS 1.3E-06 1.0E-OS 1.3E~06 with NFPA 80S modifications credited.

IPEEE for COF. Estimate for LERF 1.7E-06 1.SE-OS 2.0E-06 based on 13% of CoF.

Tornad oes/H igh IPEEE for CoF. Estimate for LERF 4.4E-06 S.7E-07 4.4E-06 S.7E-07 Winds based on 13% of CoF.

Plant-Level Total 6.2E-OS 6.6E-06 6.SE-OS 8.1E-06 Overall risk meets Reg. Guide 1.174 guidance for total plant risk of CDF < 1E-4 / year and LERF < 1E-S / year.

CENG.. 1

_.... ~;.I*7~~

~- 1I)oont wrdUre 01'- - - - - ,

~ wr't _.

.~" .:?~. -- -"'~

"i ~ - - -- - -

"*~eOF

'" 15

PRA Development/Results

  • Risk improvement from NFPA 805 modifications Total delta risk for B.65E-6/ryr 6.39E-7/ryr B.B7E-6/ryr 9.0BE-7/ryr plant fire scenarios Internal Events risk 1.74E-6/ryr 2.10E-B/ryr 2.26E-6/ryr 4.60E-B/ryr improvement from modifications Plant delta risk with 6.91E-6/ryr 6.1BE-7/ryr 6.61E-6/ryr B.62E-7/ryr plant modifications

- Total risk increases <lE-S for CDF and <lE-6 for LERF

- Delta risk meets criteria for RG 1.174 and NFPA 805 application

~

~~

- - ~"""-----

,~"..~~.~ -.-.-~;. ..

1"-'+*-" ':"-'

CENG.

a IC*l1 ..",ture

--..r 01- - - - -,

..* ... eOF

~ ...

I 16

Implementation Overview

  • Modifications Planned

- 15 Fire PRA related modifications

- 3 NFPA Code compliance modifications

  • Process/Procedure Changes

- Fire Brigade response

- Design change process

- Training

- Operations alarm procedures, Fire Fighting Strategy Manual, hot work, lower mode (refueling outage),

AOPs/recovery actions, etc.

,::- - ~

1

_r~'

-~- -

-c;- - - -~'

CENG..

I

-" " 17

Modifications

  • RCP Loss of Seal Cooling alarm and local 13 kV trip of RCPs Electrical modifications: (hot short, grounds, etc)

- Reactor vessel head and Pressurizer vents

- Main Steam Isolation Valve control

- Steam Generator blowdown control valves

- Normal sump motor operated valves

- Hydrogen purge valves

- Component cooling water heat exchanger flow control valve

- Pressurizer Power Operated Relief Valves Auxiliary Feedwater steam admission valves

- Reactor Coolant Pump breaker control 4kV breaker control

- Cable Spreading Room dampers

  • Cable replacement and lighting transformer protection

- .-~..:- CENG. ..,. WI'"'

I

_.eo L

~";'~ ..:.- ~; ------~

j~.' ' 18

Summary

  • Complete LAR to be submitted on or before September 30, 2013
  • No un-reviewed methods or deviations from approved Fire PRA methods
  • Modifications will be required and are being planned
  • Transition Schedule

- Assumes 2 year NRC review

- Consistent with other submittals

- Implement procedure/process changes 6 months after SER

- Completion of modifications for both units following SER approval- April 2018

.;,1;

-z~

--\.~- ~

CENG. . -,

~-"- .

-' .¢;~ ---:-~'. 8 jcont 1IeI1tuJ8 01'-------,

'i~:--- ' -- -

- . . .- ...*:-eoF

.6.

19