Line 2: Line 2:
| number = ML13234A385
| number = ML13234A385
| issue date = 08/19/2013
| issue date = 08/19/2013
| title = 08/19/2013 Calvert Cliffs Nuclear Power Plant NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff
| title = NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff
| author name =  
| author name =  
| author affiliation = Calvert Cliffs Nuclear Power Plant, LLC, Constellation Energy Nuclear Group, LLC, EDF Group
| author affiliation = Calvert Cliffs Nuclear Power Plant, LLC, Constellation Energy Nuclear Group, LLC, EDF Group
Line 22: Line 22:
Calvert Cliffs Nuclear Power Plant
Calvert Cliffs Nuclear Power Plant
             ~
             ~
                ----
               - ~.,....~-                                            NFPA80S
               - ~.,....~-                                            NFPA80S
           ~:~
           ~:~
Line 28: Line 27:
                                             '7
                                             '7
           "'-:'-~-
           "'-:'-~-
            "'.                        --:
             ~- " ---..>
             ~- " ---..>
_ ...............                License Amendment Request
_ ...............                License Amendment Request
     ~<).~
     ~<).~
,... .,
    ...:
          .        .--
                          ,      '
Pre-Application Meeting with NRC Staff August 19, 2013
Pre-Application Meeting with NRC Staff August 19, 2013


Line 57: Line 51:
                 ~-  -c-: --- - ~
                 ~-  -c-: --- - ~
                                                 =.wE "'"
                                                 =.wE "'"
                        -
I)~: ~::.      - --                        ':.*~ eDF 2
I)~: ~::.      - --                        ':.*~ eDF 2


Line 87: Line 80:
               <'"" .- . . .."-~-
               <'"" .- . . .."-~-
J~.- "                    -.,.
J~.- "                    -.,.
                                      -                    ...
                                                           ~f " eOF 4
                                                           ~f " eOF
                                                        ..
4


Current Fire Protection Licensing Basis
Current Fire Protection Licensing Basis
Line 119: Line 109:
                                         &.w            ..*..eDF
                                         &.w            ..*..eDF
                                                         ~~
                                                         ~~
                  "    --- .
                          -
6
6


Line 129: Line 117:
   - Reviewed existing exemptions
   - Reviewed existing exemptions
       - Three exemptions will be credited post-NFPA 805 transition
       - Three exemptions will be credited post-NFPA 805 transition
              .
             ~.
             ~.
                -
_ 19".:-"
_ 19".:-"
                   ,~-
                   ,~-
               ,~~-..
               ,~~-..
s-:
s-:
                      '
                         ._.~!z,;;.
                         ._.~!z,;;.
                            -
CENG_
CENG_
B
B lOinI\llllltura af- ~
                                          ---
lOinI\llllltura af- ~
                                           - ".~eDf
                                           - ".~eDf
                                                           ~'"
                                                           ~'"
                                                              ..... -".*
I
I
                                                                         .'. 7
                                                                         .'. 7
Line 174: Line 155:
* Recommendations to manage Fire Risk ci:~'
* Recommendations to manage Fire Risk ci:~'
CENGw                                I
CENGw                                I
                                        -
                 "';.'~-
                 "';.'~-
                 ~.            -
                 ~.            -
Line 193: Line 173:
                   -~.,-              CENG.                        ..; . ~-wI
                   -~.,-              CENG.                        ..; . ~-wI
               *i~"':~'*
               *i~"':~'*
              ' _.
j~.-'
j~.-'
                            --
:-c:- * -., -~~
:-c:- * -., -~~
                                 ~ - -
                                 ~ - -
Line 213: Line 191:
* 46 Fire Areas to be transitioned using Fire Risk Evaluations
* 46 Fire Areas to be transitioned using Fire Risk Evaluations
* All VFDRs addressed
* All VFDRs addressed
                    ;.;-.
                         ..,~~
                         ..,~~
CENG..                    I '*
CENG..                    I '*
Line 228: Line 205:
- Recovery actions listed in LAR Attachment G
- Recovery actions listed in LAR Attachment G
- There was over 85% reduction in operator recovery actions
- There was over 85% reduction in operator recovery actions
            ,
:;;
                     ;J#Z7-
                     ;J#Z7-
                   -~-,~-
                   -~-,~-
                     ~:
                     ~:
1-~-  -__
1-~-  -__
                            ,
                          -,
_
                                 ~
                                 ~
CENG.
CENG.
Line 246: Line 218:
eDF
eDF
                                                               ~-" , .
                                                               ~-" , .
                                                                  --,
12
12


Line 278: Line 249:
CENG~
CENG~
8~1~~ofl __________,
8~1~~ofl __________,
                                                                      ,
                                                             ,..,. -"'-.t J~---::'" -
                                                             ,..,. -"'-.t
                                                                          -
J~---::'" -
                                           ~        ...*4eDF
                                           ~        ...*4eDF
                                           -...-    J' 14
                                           -...-    J' 14
Line 293: Line 261:
Plant-Level Total              6.2E-OS    6.6E-06          6.SE-OS            8.1E-06 Overall risk meets Reg. Guide 1.174 guidance for total plant risk of CDF < 1E-4 / year and LERF < 1E-S / year.
Plant-Level Total              6.2E-OS    6.6E-06          6.SE-OS            8.1E-06 Overall risk meets Reg. Guide 1.174 guidance for total plant risk of CDF < 1E-4 / year and LERF < 1E-S / year.
CENG..                                            1
CENG..                                            1
                    .
_.... ~;.I*7~~
_.... ~;.I*7~~
                           ~-                        1I)oont wrdUre 01'- - - - - ,
                           ~-                        1I)oont wrdUre 01'- - - - - ,
Line 299: Line 266:
                     .~"    .:?~. -- -"'~
                     .~"    .:?~. -- -"'~
                     "i ~ -      - -- -                      -
                     "i ~ -      - -- -                      -
                                                            -.,.          ..
                                                                           "*~eOF
                                                                           "*~eOF
                                                                               '"                                            15
                                                                               '"                                            15
Line 312: Line 278:
                       ,~"..~~.~ -.-.-~;. ..
                       ,~"..~~.~ -.-.-~;. ..
1"-'+*-" ':"-'
1"-'+*-" ':"-'
                              ---
CENG.
CENG.
a IC*l1 ..",ture
a IC*l1 ..",ture
                                                   --..r
                                                   --..r 01- - - - -,
                                                  -
01- - - - -,
                                                                   ..* ... eOF
                                                                   ..* ... eOF
                                                                   ~ ...
                                                                   ~ ...
                                                                                  ....... -".*
I 16
I 16


Line 334: Line 296:
AOPs/recovery actions, etc.
AOPs/recovery actions, etc.
             ,::- - ~
             ,::- - ~
                ....
1
1
_r~'
_r~'
                       -~- -
                       -~- -
                        .
                            .......
                           -c;- - - -~'
                           -c;- - - -~'
                                    .
                                      - - .-.
CENG..
CENG..
                                                    .;..;
I
I
                                                           -" " 17
                                                           -" " 17
Line 362: Line 317:
* Cable replacement and lighting transformer protection
* Cable replacement and lighting transformer protection
                   -        .-~..:-    CENG.        ..,. WI'"'
                   -        .-~..:-    CENG.        ..,. WI'"'
                                                              "
I
I
_.eo L
_.eo L
Line 382: Line 336:
CENG.                        .      -,
CENG.                        .      -,
                                                                       ~-"- .
                                                                       ~-"- .
              .-
                   -'  .&#xa2;;~ ---:-~'. 8 jcont 1IeI1tuJ8 01'-------,
                   -'  .&#xa2;;~ ---:-~'. 8 jcont 1IeI1tuJ8 01'-------,
               'i~:--- '      --          -
               'i~:--- '      --          -

Latest revision as of 20:07, 25 February 2020

NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff
ML13234A385
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/19/2013
From:
Calvert Cliffs, Constellation Energy Nuclear Group, EDF Group
To:
Office of Nuclear Reactor Regulation
Morgan N
References
Download: ML13234A385 (19)


Text

CENG~

a joint venture of------__.

Constellation ..* ~ eDF Energy' ~,.

Calvert Cliffs Nuclear Power Plant

~

- ~.,....~- NFPA80S

~:~

-C-'.II, _~

'7

"'-:'-~-

~- " ---..>

_ ............... License Amendment Request

~<).~

Pre-Application Meeting with NRC Staff August 19, 2013

Introd uctions

  • CENG Representatives

- Elliott Flick Gen'l Manager, Fleet Engineering

- Dave Dellario Manager, Engineering Services

- Jim McQuighan Project Manager, NFPA 805

- Paul Darby Principal Engineer, NFPA 805

- Pat Furio Principal Engineer, Licensing

- Jeff Stone Supervisor, PRA

- Jim Landale Principal Engineer, PRA

- Bret Colby Supervisor, Engineering

- Ch ris Dobry Principal Engineer, Engineering

  • Project NFPA Consultants

- Mark Crompton EPM, NFPA 805 Project Manager

~ --

-~ f~~"':: -

CENG..

a )CIn1-nure 01._ _ _ _ __ ~-:-l-

~- -c-: --- - ~

=.wE "'"

I)~: ~::. - -- ':.*~ eDF 2

Agenda Overview of CCN PP

  • Current Fire Protection Licensing Basis
  • Implementation Overview Summary

/;...;7-

<~-

CENG.. I a joont ventum o f - -_ _ _,

~-"- k

~;J ~~ -~ --:~~~- - .r

- "!-'eor:

01' 3

Overview of CCNPP

  • Two PWRs, each rated @ 2737 MWth
  • Combustion Engineering NSSS Commercial operations began in 1975/1977
  • Renewed Operating License issued - expires in 2034/2036

-'7-

- --~--

...:>-~

CENG.

8)oint VEWTlure 011- _ _ _ __

I

...... -:*t

<'"" .- . . .."-~-

J~.- " -.,.

~f " eOF 4

Current Fire Protection Licensing Basis

  • Branch Technical Position APCSB 9.5-1, Appendix A
  • Current exemptions

.. ~7~ CENG.. I

- --~- ..:..---'*k Iii ~~- - -.' ----

'. ,,)001II8I'I1U19 "'- - - - - - ,

~

~ ..f"' eDf

~ -" 5

NFPA 805 Transition Project Overview

  • License Amendment Request (LAR) committed submittal date - September 30, 2013
  • Using the Nuclear Energy Institute (NEI) LAR template
  • Web portal will be established to support NRC review

--~~-

~~7--- CENG_

a joini venliml 01_ _ __ _ -,

I

~~ - k

'\:.:" ~: --""- ,,~

~-

.;.' - ' ~. - -

&.w ..*..eDF

~~

6

NFPA 805 Transi,t ion Project Overview

- License Condition being revised

- Technical Specifications being revised

- Reviewed existing exemptions

- Three exemptions will be credited post-NFPA 805 transition

~.

_ 19".:-"

,~-

,~~-..

s-:

._.~!z,;;.

CENG_

B lOinI\llllltura af- ~

- ".~eDf

~'"

I

.'. 7

Compliance with NFPA 80S NFPA 805 Chapter 3 Compliance

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036 Review documented in B-1 Table (Attachment A of LAR)

Results of review

- 3 Code compliance modifications

- 7 sections are addressed via Attachment L of LAR.

- 96 Sections/sub-sections comply

- 43 Comply with clarifications/EEEEs/required actions

- 16 Comply by previous NRC approval

. ~-,- - CENG.. I ".

,-::.-'~---

" -c""': -.~--~-.

a joInI venture 01'_ _ _ _--, ~~-k 1 ~'- ~ . ~ <1-.

- J - .,y ..*.. eDf 8

Compliance with NFPA 805

  • Non-Power Operations

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0040

- Fire modeling not used to eliminate or reduce pinch points

- Recovery actions are not credited

- Results of review

  • All success paths identified
  • Pinch points identified
  • Component list associated with maintaining Key Safety Functions
  • Recommendations to manage Fire Risk ci:~'

CENGw I

"';.'~-

~. -

~ - -.~ - -.;,.. ajant ventuteo! _ ~ '~-'

  • k
~- . - ..' ....eDf

.-~

9

Compliance with NFPA 805

  • Radioactive Release

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 09-0056

- Plant evaluated on a room by room basis

- Credit engineering controls and CENG offsite dose calculation for gaseous and liquid effluents

- Reviewed Pre-Fire Plan and training materials to clarify monitoring and control requirements

  • Minor Pre-Fire Plan/procedure changes and training program revisions in progress.

4#9:"'::'

-~.,- CENG. ..; . ~-wI

  • i~"':~'*

j~.-'

-c:- * -., -~~

~ - -

a joint venture of _ ~

-EI-wY ~eDF

-- 4' 10

Compliance with NFPA-80S

  • Nuclear Safety Capability Assessment Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054

- Safe and Stable defined as Hot Standby

- Common Enclosure review (Protection)

- Common Power Supply review (Coordination)

Fire Area review

- Multiple Spurious Operations review

- Effects of suppression activities review Results of review

  • 21 Fire Areas to be transitioned deterministically
  • 46 Fire Areas to be transitioned using Fire Risk Evaluations
  • All VFDRs addressed

..,~~

CENG.. I '*

~~-

~ --~-

a joht _01,- -___ ~~ - -.t

('-., *Cn

  • j~-:- _ r Enefn ~~eDF 11

Compliance with NFPA 805 Recovery Actions Feasibility Assessment

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0030

- Primary Control Station (Other than main Control Room)

  • Alternate Shutdown Panels 1(2)C43

- Recovery actions listed in LAR Attachment G

- There was over 85% reduction in operator recovery actions

J#Z7-

-~-,~-

~:

1-~- -__

~

CENG.

a pot venture 011- _ _ _---,

~

~

-'~

~~

eDF

~-" , .

12

Compliance with NFPA 805

  • Monitoring Program

- Following FAQ 10-0059, Revision 5 guidance NSCA and Fire PRA components

- If any new functions, will be added to Maintenance Rule Program Non-Power Operation components, radioactive release systems, Fire Protection program components

- To be included in normal system and program health monitoring Fire Protection systems and features

- Low Safety Significant - normal system/program health monitoring

- High Safety Significant - NFPA 805 specific monitoring program that uses the Maintenance Rule program software CENG* ~-~- f

,,~7 __

--~- a janl..,lUf1l at_ _ _ _ ~

<. ~ - --~ - .:~-

5 ~:- - ~ -- .r. ....':.-. eoF 13

PRA Development/Results

  • Internal Events PRA

- Fire PRA built on a quality Internal Events model

- Full Internal Events peer review to RG 1.200, Revision 2 in 2010

- Fire PRA followed guidance in NUREG/CR 6850 as supplemented by FAQs.

- Full peer review to RG 1.200, Revision 2 in January 2012

- Total of 41 Facts & Observations (F&Os)

  • 17 Findings
  • 23 Suggestions
  • 1 Best Practice

- All F&Os subsequently dispositioned

  • No un-reviewed methods used

- - - -~..:-

'- .::~ ~~. ---'- >.

CENG~

8~1~~ofl __________,

,..,. -"'-.t J~---::'" -

~ ...*4eDF

-...- J' 14

PRA Development/Results

  • Overall Plant Risk Post-NFPA 805 Transition

- Sufficient margin to account for non-quantified hazards Unit 1 .JL Unit 2 Comments CoF LERF CoF LERF Fire PRA quantification with NFPA 3.2E-OS 3.0E-06 3.6E-OS 4.2E-06 80S modifications credited.

Internal Events PRA quantification 1.3E-OS 1.3E-06 1.0E-OS 1.3E~06 with NFPA 80S modifications credited.

IPEEE for COF. Estimate for LERF 1.7E-06 1.SE-OS 2.0E-06 based on 13% of CoF.

Tornad oes/H igh IPEEE for CoF. Estimate for LERF 4.4E-06 S.7E-07 4.4E-06 S.7E-07 Winds based on 13% of CoF.

Plant-Level Total 6.2E-OS 6.6E-06 6.SE-OS 8.1E-06 Overall risk meets Reg. Guide 1.174 guidance for total plant risk of CDF < 1E-4 / year and LERF < 1E-S / year.

CENG.. 1

_.... ~;.I*7~~

~- 1I)oont wrdUre 01'- - - - - ,

~ wr't _.

.~" .:?~. -- -"'~

"i ~ - - -- - -

"*~eOF

'" 15

PRA Development/Results

  • Risk improvement from NFPA 805 modifications Total delta risk for B.65E-6/ryr 6.39E-7/ryr B.B7E-6/ryr 9.0BE-7/ryr plant fire scenarios Internal Events risk 1.74E-6/ryr 2.10E-B/ryr 2.26E-6/ryr 4.60E-B/ryr improvement from modifications Plant delta risk with 6.91E-6/ryr 6.1BE-7/ryr 6.61E-6/ryr B.62E-7/ryr plant modifications

- Total risk increases <lE-S for CDF and <lE-6 for LERF

- Delta risk meets criteria for RG 1.174 and NFPA 805 application

~

~~

- - ~"""-----

,~"..~~.~ -.-.-~;. ..

1"-'+*-" ':"-'

CENG.

a IC*l1 ..",ture

--..r 01- - - - -,

..* ... eOF

~ ...

I 16

Implementation Overview

  • Modifications Planned

- 15 Fire PRA related modifications

- 3 NFPA Code compliance modifications

  • Process/Procedure Changes

- Fire Brigade response

- Design change process

- Training

- Operations alarm procedures, Fire Fighting Strategy Manual, hot work, lower mode (refueling outage),

AOPs/recovery actions, etc.

,::- - ~

1

_r~'

-~- -

-c;- - - -~'

CENG..

I

-" " 17

Modifications

  • RCP Loss of Seal Cooling alarm and local 13 kV trip of RCPs Electrical modifications: (hot short, grounds, etc)

- Reactor vessel head and Pressurizer vents

- Main Steam Isolation Valve control

- Steam Generator blowdown control valves

- Normal sump motor operated valves

- Hydrogen purge valves

- Component cooling water heat exchanger flow control valve

- Pressurizer Power Operated Relief Valves Auxiliary Feedwater steam admission valves

- Reactor Coolant Pump breaker control 4kV breaker control

- Cable Spreading Room dampers

  • Cable replacement and lighting transformer protection

- .-~..:- CENG. ..,. WI'"'

I

_.eo L

~";'~ ..:.- ~; ------~

j~.' ' 18

Summary

  • Complete LAR to be submitted on or before September 30, 2013
  • No un-reviewed methods or deviations from approved Fire PRA methods
  • Modifications will be required and are being planned
  • Transition Schedule

- Assumes 2 year NRC review

- Consistent with other submittals

- Implement procedure/process changes 6 months after SER

- Completion of modifications for both units following SER approval- April 2018

.;,1;

-z~

--\.~- ~

CENG. . -,

~-"- .

-' .¢;~ ---:-~'. 8 jcont 1IeI1tuJ8 01'-------,

'i~:--- ' -- -

- . . .- ...*:-eoF

.6.

19