ML18153C636: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 25: Line 25:


                                                                                                                         ~
                                                                                                                         ~
TABLE 3.7-2
TABLE 3.7-2 ENGINEERED SAFEGUARDS ACTION INSTRUMENT OPERATING CONDITIONS MINIMUM TOTAL NUMBER        OPERABLE      CHANNELS        PERMISSIBLE          OPERATOR FUNCTIONAL UNIT                  OF CHANNELS        CHANNELS        TO TRIP    BYPASS CONDITIONS        ACTIONS
                                                                                                                          ;.
ENGINEERED SAFEGUARDS ACTION INSTRUMENT OPERATING CONDITIONS MINIMUM TOTAL NUMBER        OPERABLE      CHANNELS        PERMISSIBLE          OPERATOR FUNCTIONAL UNIT                  OF CHANNELS        CHANNELS        TO TRIP    BYPASS CONDITIONS        ACTIONS
: 1. SAFETY INJECTION
: 1. SAFETY INJECTION
: a. Manual                                2                  2              1                                  21
: a. Manual                                2                  2              1                                  21
Line 53: Line 51:
: a.              2. four volume percent oxygen, balance nitrogen.
: a.              2. four volume percent oxygen, balance nitrogen.
3 111
3 111
::::,
~    D - Daily
~    D - Daily
;z    M - Monthly 0
;z    M - Monthly 0
Ill  a - Quarterly
Ill  a - Quarterly t-'
* t-'
I I.C}}
I I.C}}

Latest revision as of 03:18, 23 February 2020

Proposed Tech Specs Correcting Pages Re Engineered Safeguards Action Instrument Operating Conditions & Surveillance Requirements
ML18153C636
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/31/1991
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153C635 List:
References
NUDOCS 9106070232
Download: ML18153C636 (4)


Text

e e ATTACHMENT SURRY POWER STATION TECHNICAL SPECIFICATION CHANGE REQUEST CORRECTED PAGES

- 9106070232 '::1:Ci:>::):3-1~-~,

PDR ADOCK 05000:;~::::o p PDR

e The following pages should deleted from the original submittal and replaced with the corrected pages, as noted below:

DELETE INSERT 3.7-14 3.7-14 4.1-8f 4.1-9 4.1-9

~

TABLE 3.7-2 ENGINEERED SAFEGUARDS ACTION INSTRUMENT OPERATING CONDITIONS MINIMUM TOTAL NUMBER OPERABLE CHANNELS PERMISSIBLE OPERATOR FUNCTIONAL UNIT OF CHANNELS CHANNELS TO TRIP BYPASS CONDITIONS ACTIONS

1. SAFETY INJECTION
a. Manual 2 2 1 21
b. High containment pressure 4 3 3 17
c. High differential pressure 3/steam line 2/steam line 2/steam line Primary pressure less 20 between any steam line
  • on any than 2000 psig, except and the steam header steam line when reactor is critical
d. Pressurizer low-low pressure 3 2 2 Primary pressure less 20 than 2000 psig, except when reactor is critical
e. High steam flow in 2/3 steam lines coincident with low Tavg or low steam line pressure
1) Steam line flow 2/steam line 1/steam line 1/steam line Reactor coolant Tavg 20 any two lines less than 543° during heatup and cooldown e
2) T avg 1/loop 1/loop 1/loop Reactor coolant T avg 20 any two loops any two loops less than 543° during heatup and cooldown
3) Steam line pressure 1/line 1/line any 1/line any Reactor coolant Tavg 20 8 two loops two loops less than 543° during Cfl heatup and cooldown w I

14 -.J

f. Automatic actuation logic 2 2 I I-'

,i=.

\

TABLE 4.1-1A EXPLOSIV[ r,As MONITORING INSTRUMENTATION REQIIIREMENTS CHANNEL CHANNEL CHANNEL 1.

CHANNEL DESCRIPTION Waste Gas Holdup System Explosive Gas Monitoring System CHECK CALIBRATION FUNCTIONAL TEST e

(a) Hydrogen Monitor D Q( 1) M (b) Oxygen Monitor D 0(2) M (1) The chamel calbration shaN include the use of standard gas samples containing a nominal:

1. one volume percent hydrogen, balance nitrogen, and
2. four volume percenl hydrogen, balance nitrogen.

~ (2) The chamel calibration shall include the use of standard gas samples containing a nominal:

111

, 1. one voh.lme percent oxygen, balance nilrogen, and
a. 2. four volume percent oxygen, balance nitrogen.

3 111

~ D - Daily

z M - Monthly 0

Ill a - Quarterly t-'

I I.C