ML18153C636
| ML18153C636 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/31/1991 |
| From: | VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML18153C635 | List: |
| References | |
| NUDOCS 9106070232 | |
| Download: ML18153C636 (4) | |
Text
e ATTACHMENT SURRY POWER STATION e
TECHNICAL SPECIFICATION CHANGE REQUEST CORRECTED PAGES 9106070232 PDR ADOCK p
'::1:Ci:>::):3-1~-~,
05000:;~::::o PDR
e The following pages should deleted from the original submittal and replaced with the corrected pages, as noted below:
DELETE 3.7-14 4.1-8f 4.1-9 INSERT 3.7-14 4.1-9
~
TABLE 3.7-2 ENGINEERED SAFEGUARDS ACTION INSTRUMENT OPERATING CONDITIONS MINIMUM TOTAL NUMBER OPERABLE CHANNELS PERMISSIBLE OPERATOR FUNCTIONAL UNIT OF CHANNELS CHANNELS TO TRIP BYPASS CONDITIONS ACTIONS
- 1. SAFETY INJECTION
- a.
Manual 2
2 1
21
- b. High containment pressure 4
3 3
17
- c.
High differential pressure 3/steam line 2/steam line 2/steam line Primary pressure less 20 between any steam line
- on any than 2000 psig, except and the steam header steam line when reactor is critical
- d. Pressurizer low-low pressure 3
2 2
Primary pressure less 20 than 2000 psig, except when reactor is critical
- e. High steam flow in 2/3 steam lines coincident with low T avg or low steam line pressure
- 1) Steam line flow 2/steam line 1/steam line 1/steam line Reactor coolant T avg 20 any two lines less than 543° during e
heatup and cooldown
- 2) T avg 1/loop 1/loop 1/loop Reactor coolant T avg 20 any two loops any two loops less than 543° during heatup and cooldown
- 3) Steam line pressure 1/line 1/line any 1/line any Reactor coolant T avg 20 two loops two loops less than 543° during 8
Cfl heatup and cooldown w
I
- f.
Automatic actuation logic 2
2 14
-.J I
I-'
,i=.
~
111
- a.
3 111
~
- z 0
Ill TABLE 4.1-1A EXPLOSIV[ r,As MONITORING INSTRUMENTATION REQIIIREMENTS CHANNEL CHANNEL DESCRIPTION CHECK
- 1.
Waste Gas Holdup System Explosive Gas Monitoring System (a)
Hydrogen Monitor D
(b)
Oxygen Monitor D
(1)
The chamel calbration shaN include the use of standard gas samples containing a nominal:
1. one volume percent hydrogen, balance nitrogen, and
(2)
The chamel calibration shall include the use of standard gas samples containing a nominal:
- 1. one voh.lme percent oxygen, balance nilrogen, and
D - Daily M - Monthly a - Quarterly CHANNEL CALIBRATION Q( 1) 0(2)
CHANNEL FUNCTIONAL TEST M
M
\\
- t-'
I I.C e