| issue date = 09/26/2018
| issue date = 09/26/2018
| title = Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update
| title = Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update
| author name = Ginn M A
| author name = Ginn M
| author affiliation = Pacific Gas & Electric Co
| author affiliation = Pacific Gas & Electric Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:m -., Pacific Gas and Electric Campany"'
{{#Wiki_filter:mPacific Gas and Electric Campany"'
Michael A. Ginn Manager Emergency Planning Diablo Canyon Power Plant P.O. Box 56' Avila Beach, CA 93424 805.545.3446 Internal:
Michael A. Ginn Manager Emergency Planning Diablo Canyon Power Plant P.O. Box 56' Avila Beach, CA 93424 805.545.3446 Internal: 691.3446 Fax: 805.545.6265 .
691.3446 Fax: 805.545.6265 . September 26, 2018 PG&E Letter DCL-18-074 PG&E Letter DIL-18-012 U.S. Nuclear Regulatory Commission ) 10 CFR 50.54, 10 CFR 72.32 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 .;., DocRet No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update Dear Commissioners and Staff: In accordance with 10 CFR 50.54(q)(5) and the requirements of 10 CFR 72.32, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Plan) and its Implementing Procedures.
September 26, 2018 PG&E Letter DCL-18-074 PG&E Letter DIL-18-012 U.S. Nuclear Regulatory Commission
The revised documents and the associated enclosures  
                            )
*are listed below:
10 CFR 50.54, 10 CFR 72.32 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 DocRet No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update
* Enclosure 1 -Diablo Canyoo Power Plant Emergency Plan Revision Numbers for Emergency Plan Sections and Appendixes
 
* Enclosure 2 -Summary of the Analysis of Changes to Em~rgency Plan Section 4, Revision 4.17, "Emergency Conditions" "
==Dear Commissioners and Staff:==
* Enclosure 3 -Summary of the Analysis of Changes to Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
 
* Enclosure 4 -Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.01, "EAL Technical Basis Manual"
In accordance with 10 CFR 50.54(q)(5) and the requirements of 10 CFR 72.32, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Plan) and its Implementing Procedures. The revised documents and the associated enclosures *are listed below:
* Enclosure 5 -Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
* Enclosure 1 - Diablo Canyoo Power Plant Emergency Plan Revision Numbers for Emergency Plan Sections and Appendixes
* Enclosure 6 -Summary of the Analysis of Changes 'to Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report" A member of the STARS Alliance Callaway*
-.,
Diablo Canyon* Palo Verde* Wolf Creek At-45 NJt.-1 ~s z /p fl)lfd-, tJH 5 s Document Control Desk September 26, 2018 Page 2 / PG&E Letter DCL-18-074 PG&E-Letter DIL-18-012
* Enclosure 2 - Summary of the Analysis of Changes to Em~rgency Plan Section 4, Revision 4.17, "Emergency Conditions"                           "
* Enclosure 7 -Summary of the Analysis of Changes to Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR) Strategy Bases"
* Enclosure 3 - Summary of the Analysis of Changes to Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
* Enclosure 8 -Emergency Plan Section 4, Revision 4.17, "Emergency Conditions"
* Enclosure 4 - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.01, "EAL Technical Basis Manual"
* Enclosure 9 -Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
* Enclosure 5 - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
* Enclosure 10 -Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
* Enclosure 6 - Summary of the Analysis of Changes 'to Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report" At-45 A member of the STARS Alliance                                     NJt.-1 ~s z /p Callaway* Diablo Canyon* Palo Verde* Wolf Creek fl)lfd- ,
* Enclosure 11 -Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report"
tJH 5 s
* Enclosure 12 -Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR) Strategy Bases"
 
* Enclosure 13-Diablo Canyon Power Plant Emergency Plan Implementing Procedures, Revision Numbers for Emergency Plan Implementing Procedures
Document Control Desk                                           PG&E Letter DCL-18-074 September 26, 2018                                              PG&E-Letter DIL-18-012 Page 2      /
* Enclosure 14 -Summary of the Analysis, of Changes to Emergency Plan Implementing Procedure EP G-1, Revision 45, "Emergency Classification and Emergency Plan Activation"
* Enclosure 7 - Summary of the Analysis of Changes to Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR)
* Enclosure 15 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-2, Revision 51, "Interim Emergency Response Organization"
Strategy Bases"
* Enclosure 16 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-3, Revision 60, "Emergency Notification of Site Agencies"
* Enclosure 8 - Emergency Plan Section 4, Revision 4.17, "Emergency Conditions"
* Enclosure 17 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-10, Revision 21, "Protective Action Recommendations"
* Enclosure 9 - Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
* Enclosure 18 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-14A, Revision 3, "Initial Detection of Fuel Cladding Damage" A member of the STARS Alliance Callaway*
* Enclosure 10 - Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
Diablo Canyon
* Enclosure 11 - Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report"
* Palo Verde* Wolf Creek Document Control Desk September 26, 2018 Page 3 PG&E Letter DCL-18-074 PG&E Letter DIL-18-012
* Enclosure 12 - Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR) Strategy Bases"
* Enclosure 19 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-16, Revision 16, "Operating Instructions for the EARS Computer Program" \
* Enclosure 13- Diablo Canyon Power Plant Emergency Plan Implementing Procedures, Revision Numbers for Emergency Plan Implementing Procedures
* Enclosure 20 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-17, Revision 1, "Operating Instructions for QuickDose"
* Enclosure 14 - Summary of the Analysis, of Changes to Emergency Plan Implementing Procedure EP G-1, Revision 45, "Emergency Classification and Emergency Plan Activation"
* Enclosure 21 -S,ummary of the Analysis of Changes to Emergency Plan Implementing Procedure EP R-2, Revision 36, "Release of Airborne Radioactive Materials Initial Assessment"
* Enclosure 15 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-2, Revision 51, "Interim Emergency Response Organization"
* Enclosure 22 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-1, Revision 55, "Activation and Operation of the Technical Support Center"
* Enclosure 16 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-3, Revision 60, "Emergency Notification of Off-Site Agencies"
* Enclosure 23 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-3, Revision 46, "Activation and Operation of the Emergency Operations Facility" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Plan. The E-Plan continues to meet the requirements in Appendix E of 10 CFR 50 and the planning standards of 10 CFR 50.47(b).
* Enclosure 17 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-10, Revision 21, "Protective Action Recommendations"
* Enclosure 18 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-14A, Revision 3, "Initial Detection of Fuel Cladding Damage" A member of the STARS Alliance Callaway* Diablo Canyon
* Palo Verde* Wolf Creek
 
Document Control Desk                                               PG&E Letter DCL-18-074 September 26, 2018                                                  PG&E Letter DIL-18-012 Page 3
* Enclosure 19 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-16, Revision 16, "Operating Instructions for the EARS Computer Program"
                                                                          \
* Enclosure 20 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-17, Revision 1, "Operating Instructions for QuickDose"
* Enclosure 21 - S,ummary of the Analysis of Changes to Emergency Plan Implementing Procedure EP R-2, Revision 36, "Release of Airborne Radioactive Materials Initial Assessment"
* Enclosure 22 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-1, Revision 55, "Activation and Operation of the Technical Support Center"
* Enclosure 23 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-3, Revision 46, "Activation and Operation of the Emergency Operations Facility" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Plan. The E-Plan continues to meet the requirements in Appendix E of 10 CFR 50 and the planning standards of 10 CFR 50.47(b).
Therefore, prior NRC approval of the associated changes was not required.
Therefore, prior NRC approval of the associated changes was not required.
This update does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans." PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If there are questions regarding this update, please contact me at (805) 545-3446.
This update does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans."
Sincerely, __;__ A G---. Michael A. Ginn Emergency Planning Manager A member of the STARS Alliance Callaway
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If there are questions regarding this update, please contact me at (805) 545-3446.
Sincerely,
~        __;__ A G---.
Michael A. Ginn Emergency Planning Manager A member of the STARS Alliance Callaway
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* Wolf Creek Document Control Desk September 26, 2018 Page4 armb/4743/50960128 Enclosures cc/enc: William C. Allen, NMSS Project Manager PG&E Letter DCL-18-074 PG&E Letter DIL-18-012 Kriss M. Kennedy, NRG Region IV Administrator Christopher W. Newport, NRG Senior Resident Inspector Balwant K. Singal, NRG Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)
* Wolf Creek
 
Document Control Desk                                           PG&E Letter DCL-18-074 September 26, 2018                                                 PG&E Letter DIL-18-012 Page4 armb/4743/50960128 Enclosures cc/enc: William C. Allen, NMSS Project Manager Kriss M. Kennedy, NRG Region IV Administrator Christopher W. Newport, NRG Senior Resident Inspector Balwant K. Singal, NRG Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)
A member of the STARS Alliance Callaway
A member of the STARS Alliance Callaway
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* Wolf Creek}}
* Wolf Creek}}

Latest revision as of 23:45, 22 February 2020

Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update
ML18276A248
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/26/2018
From: Ginn M
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
PG&E Letter DCL-18-074, PG&E Letter DIL-18-012
Download: ML18276A248 (4)


Text

mPacific Gas and Electric Campany"'

Michael A. Ginn Manager Emergency Planning Diablo Canyon Power Plant P.O. Box 56' Avila Beach, CA 93424 805.545.3446 Internal: 691.3446 Fax: 805.545.6265 .

September 26, 2018 PG&E Letter DCL-18-074 PG&E Letter DIL-18-012 U.S. Nuclear Regulatory Commission

)

10 CFR 50.54, 10 CFR 72.32 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 DocRet No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update

Dear Commissioners and Staff:

In accordance with 10 CFR 50.54(q)(5) and the requirements of 10 CFR 72.32, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Plan) and its Implementing Procedures. The revised documents and the associated enclosures *are listed below:

-.,

  • Enclosure 2 - Summary of the Analysis of Changes to Em~rgency Plan Section 4, Revision 4.17, "Emergency Conditions" "
  • Enclosure 3 - Summary of the Analysis of Changes to Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
  • Enclosure 4 - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.01, "EAL Technical Basis Manual"
  • Enclosure 5 - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
  • Enclosure 6 - Summary of the Analysis of Changes 'to Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report" At-45 A member of the STARS Alliance NJt.-1 ~s z /p Callaway* Diablo Canyon* Palo Verde* Wolf Creek fl)lfd- ,

tJH 5 s

Document Control Desk PG&E Letter DCL-18-074 September 26, 2018 PG&E-Letter DIL-18-012 Page 2 /

  • Enclosure 7 - Summary of the Analysis of Changes to Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR)

Strategy Bases"

  • Enclosure 8 - Emergency Plan Section 4, Revision 4.17, "Emergency Conditions"
  • Enclosure 9 - Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
  • Enclosure 10 - Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
  • Enclosure 11 - Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report"
  • Enclosure 12 - Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR) Strategy Bases"
  • Enclosure 14 - Summary of the Analysis, of Changes to Emergency Plan Implementing Procedure EP G-1, Revision 45, "Emergency Classification and Emergency Plan Activation"
  • Enclosure 15 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-2, Revision 51, "Interim Emergency Response Organization"
  • Enclosure 16 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-3, Revision 60, "Emergency Notification of Off-Site Agencies"
  • Enclosure 17 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-10, Revision 21, "Protective Action Recommendations"
  • Enclosure 18 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-14A, Revision 3, "Initial Detection of Fuel Cladding Damage" A member of the STARS Alliance Callaway* Diablo Canyon
  • Palo Verde* Wolf Creek

Document Control Desk PG&E Letter DCL-18-074 September 26, 2018 PG&E Letter DIL-18-012 Page 3

  • Enclosure 19 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-16, Revision 16, "Operating Instructions for the EARS Computer Program"

\

  • Enclosure 20 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-17, Revision 1, "Operating Instructions for QuickDose"
  • Enclosure 21 - S,ummary of the Analysis of Changes to Emergency Plan Implementing Procedure EP R-2, Revision 36, "Release of Airborne Radioactive Materials Initial Assessment"
  • Enclosure 23 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-3, Revision 46, "Activation and Operation of the Emergency Operations Facility" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Plan. The E-Plan continues to meet the requirements in Appendix E of 10 CFR 50 and the planning standards of 10 CFR 50.47(b).

Therefore, prior NRC approval of the associated changes was not required.

This update does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans."

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If there are questions regarding this update, please contact me at (805) 545-3446.

Sincerely,

~ __;__ A G---.

Michael A. Ginn Emergency Planning Manager A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E Letter DCL-18-074 September 26, 2018 PG&E Letter DIL-18-012 Page4 armb/4743/50960128 Enclosures cc/enc: William C. Allen, NMSS Project Manager Kriss M. Kennedy, NRG Region IV Administrator Christopher W. Newport, NRG Senior Resident Inspector Balwant K. Singal, NRG Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek