LICENSEE EVENT REPORT (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l    lh
LICENSEE EVENT REPORT (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l    lh CONTROL BLOCK: l                    l    l      l        l I                                      ti
      '
CONTROL BLOCK: l                    l    l      l        l I                                      ti
   . Io Iii 10 I n I o I B I S l 1 l@l 010 l- UCENSE                                        l 010wP.!bEH l0 lo l0 l- l010 l@l                    41    il 11                    l      Ig 25    2ti      ucENSt  t y s> 1l E J3jlgl$1 LA f te 3          8 9            LICENSEE CODE              14    15 CON'T T
   . Io Iii 10 I n I o I B I S l 1 l@l 010 l- UCENSE                                        l 010wP.!bEH l0 lo l0 l- l010 l@l                    41    il 11                    l      Ig 25    2ti      ucENSt  t y s> 1l E J3jlgl$1 LA f te 3          8 9            LICENSEE CODE              14    15 CON'T T
l L j@l 0 l 5 l 0 l0 l0 l 3 l 4 l668 @]l                              1011        l7 l 7 19 l@l0 l3 HEPORT            l3 li l8 l1 80l@
l L j@l 0 l 5 l 0 l0 l0 l 3 l 4 l668 @]l                              1011        l7 l 7 19 l@l0 l3 HEPORT            l3 li l8 l1 80l@
Line 28: Line 26:
lo is I lto the health and safety of the public or station personnel. The containment radia-l l
lo is I lto the health and safety of the public or station personnel. The containment radia-l l
strings associated with the other three SFAS Channels were operable                                                                          .
strings associated with the other three SFAS Channels were operable                                                                          .
l 0 l 7 l l tion instrument
l 0 l 7 l l tion instrument l
                                                                                                                                                                                                          <
f o la l Iwhich meets the minimum operational requirements.                                                              (NP-33-79-118)
l f o la l Iwhich meets the minimum operational requirements.                                                              (NP-33-79-118)
        '                                                                                                                                        '
                                               'EM"                '^MC            S&^EE                  Co PoNENTCoDE                      SUsWoE          SMME O 9                              l Il Bl@ [ c,j@ j A l@ l I l N l S l T l R l U l@ y@ y @
                                               'EM"                '^MC            S&^EE                  Co PoNENTCoDE                      SUsWoE          SMME O 9                              l Il Bl@ [ c,j@ j A l@ l I l N l S l T l R l U l@ y@ y @
12                              to          19              20 9          10            in'            12                                                                                    REVISION
12                              to          19              20 9          10            in'            12                                                                                    REVISION
Line 39: Line 35:
                                                                                                             - 27 iei3I N        2J W
                                                                                                             - 27 iei3I N        2J W
30 B3' L1_J 32
30 B3' L1_J 32
_ 21          21            23 F f i      B. SLPPL1 [          *9A N FACTLNER
_ 21          21            23 F f i      B. SLPPL1 [          *9A N FACTLNER oN L T                    ETH                HoVRS            S    iT EN A          N
                                                                                                                                                                              .
oN L T                    ETH                HoVRS            S    iT EN A          N
                                                                                               !0f0f01Di                  l41Y l@          LYJg              l43Nlg lVl1l1l5lg
                                                                                               !0f0f01Di                  l41Y l@          LYJg              l43Nlg lVl1l1l5lg
[C  _
[C  _
Line 52: Line 46:
                                                                                                       -D$        fY                            DISCOVERY DESCRIPTION STA                  *.POWER                            OTHER STA fUS l
                                                                                                       -D$        fY                            DISCOVERY DESCRIPTION STA                  *.POWER                            OTHER STA fUS l
,          5 5    .[D J_ @-l0l0l0l@l NA                      'l . [__jA @l Operator observation                                                        80 I                12.      Il 44      45          46
,          5 5    .[D J_ @-l0l0l0l@l NA                      'l . [__jA @l Operator observation                                                        80 I                12.      Il 44      45          46
*
     ,7          8 9 LOCATION oF PELEASE PELEASED OF RELEASE                            AMOUNT OF ACTIVsTY NA                                                                    l NA                                        l        'l 1 6 IZ I @ l ZMl
     ,7          8 9 LOCATION oF PELEASE PELEASED OF RELEASE                            AMOUNT OF ACTIVsTY NA                                                                    l
,
NA                                        l        'l
;-
          '
1 6
                  "
IZ I @ l ZMl
                       ' ' PERSONNEL EXPOS              ES NU'38 E R            TYPE          DESCRIPTION                                                                                                                      j.
                       ' ' PERSONNEL EXPOS              ES NU'38 E R            TYPE          DESCRIPTION                                                                                                                      j.
i 7      l 0 l 0 l 0 l@[ Zj@l                        .NA
i 7      l 0 l 0 l 0 l@[ Zj@l                        .NA
Line 66: Line 52:
                           ' PEHSoNNEL NJNHIES                            '
                           ' PEHSoNNEL NJNHIES                            '
NUveER            - DESCn!PTION                                                                                                                                    i-mg10i0iG-l@i n                          12 30 8  9.                                            .
NUveER            - DESCn!PTION                                                                                                                                    i-mg10i0iG-l@i n                          12 30 8  9.                                            .
'
7                            .ll LOSS OF oR DAMAGE To FACILITY                          .
7                            .ll LOSS OF oR DAMAGE To FACILITY                          .
j i o
j i o
                  ,,
                     .yTYPE @lDESCRIPitcN
                     .yTYPE @lDESCRIPitcN
                                     ,a NA.                                                                                          -                                                    **
                                     ,a NA.                                                                                          -                                                    **
Line 76: Line 60:
                     ,ssu$""'o'En:nioN @ -                                                                                                                  l.;IIIIIIIIIII-Ili N^                                                                                                                                            ****
                     ,ssu$""'o'En:nioN @ -                                                                                                                  l.;IIIIIIIIIII-Ili N^                                                                                                                                            ****
Im      L,N_1 8so.        1                                                                                                                    '* **
Im      L,N_1 8so.        1                                                                                                                    '* **
        .,    _ .,        .
DVR 79-153-- 9 Q ,j [ gQ,{                                                    David T. Eldred                                          pgoyg;WM4M, M. m                                            {
DVR 79-153-- 9 Q ,j [ gQ,{                                                    David T. Eldred                                          pgoyg;WM4M, M. m                                            {


                       .          . _ _ .          _      .-          .      . _.. - ~ ._- ~    _ .
                       .          . _ _ .          _      .-          .      . _.. - ~ ._- ~    _ .
&
J
J
         .,. t
         .,. t
                 ^?
                 ^?
       .6 TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-118
       .6 TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-118 DATE OF EVENT: 0ctober 17, 1979 FACILITY: ravis-Besse Unit 1 IDENTIFICATION OF-0CCURRENCE: -Safety Features Actuation System (SFAS) Channel 2 Con-
                                                                                                                                .
DATE OF EVENT: 0ctober 17, 1979 FACILITY: ravis-Besse Unit 1 IDENTIFICATION OF-0CCURRENCE: -Safety Features Actuation System (SFAS) Channel 2 Con-
  >
                 -tainment Radiation Detector RE 2005 inoperable i
                 -tainment Radiation Detector RE 2005 inoperable i
i The unit was in Mode 3, with Power (MWT) = 0, and
i The unit was in Mode 3, with Power (MWT) = 0, and
                 -Conditions Prior to Occurrence:
                 -Conditions Prior to Occurrence:
Load (Cross MWe) = 0.
Load (Cross MWe) = 0.
,
Description of Occurrence: On October 17, 1979 at 1410 hours, SFAS Channel 2 Radia-tion-Detector RE 2005 spiked (tripping SFAS Channel 2 containment radiation bistable) and' returned to normal. The          spiking was ovar full range of the readout and RE 2005 l
* Description of Occurrence: On October 17, 1979 at 1410 hours, SFAS Channel 2 Radia-tion-Detector RE 2005 spiked (tripping SFAS Channel 2 containment radiation bistable) and' returned to normal. The          spiking was ovar full range of the readout and RE 2005 l
was declared inoperable.            This    placed the nait in the Action Statement of Technical Specification 3.3.3.1.b9 which requires the operability of all four SFAS containment radiation instrument strings in all modes. The SFAS channel 2 containment radiation            The-
was declared inoperable.            This    placed the nait in the Action Statement of Technical Specification 3.3.3.1.b9 which requires the operability of all four SFAS containment radiation instrument strings in all modes. The SFAS channel 2 containment radiation            The-
                 . bistable was lef t in the tripped state as required by the Action Statement.
                 . bistable was lef t in the tripped state as required by the Action Statement.
containment' radiation instrument strings associated with the other three SFAS channels
containment' radiation instrument strings associated with the other three SFAS channels t
            .
were operable, meeting the minimum operational requirements, f
-
t were operable, meeting the minimum operational requirements, f
e  The apparent cause of this occurrence Designation of Apparent Cause of Occurrence: Ext.mination by the Instrument and Control shop-
e  The apparent cause of this occurrence Designation of Apparent Cause of Occurrence: Ext.mination by the Instrument and Control shop-
       .1            is component failure of the detector.                                          ~
       .1            is component failure of the detector.                                          ~
i
i found that the low: range board and the auxiliary board in the detector were defect ve,
;
found that the low: range board and the auxiliary board in the detector were defect ve,
                   -Analysis of Occurrence: There was'no' danger to the health and safety of the public i
                   -Analysis of Occurrence: There was'no' danger to the health and safety of the public i
i or to station personnel. . The- containment radiatio 1 monitoring                instrument strings RE 2005 failed in the associated with the other ,three SFAS channels are operable.
i or to station personnel. . The- containment radiatio 1 monitoring                instrument strings RE 2005 failed in the associated with the other ,three SFAS channels are operable.
                                               ~
                                               ~
: i.                  hi d (safe) direction.
: i.                  hi d (safe) direction.
;
Corrective Action: Under Maintenance Work Order IC-464-79, . the detector' was                replaced.
Corrective Action: Under Maintenance Work Order IC-464-79, . the detector' was                replaced.
!
'
5031.01 at
5031.01 at
                   -The new detector.was declared operable by.the successful performance of ST 0515 hours on October 120, 1979. Maintenance Work              Order IC-466-79 was issued to i
                   -The new detector.was declared operable by.the successful performance of ST 0515 hours on October 120, 1979. Maintenance Work              Order IC-466-79 was issued to i
The low range board and the auxiliary
The low range board and the auxiliary
'
                     . troubleshoot and repair the f ailed ~ detector.              These boards were replaced and a board detectorincalibration the-detector'were            found to be defective.The detector was returned to stoc was accomplished.
;
                     . troubleshoot and repair the f ailed ~ detector.              These boards were replaced and a
                                                                                        .
board detectorincalibration the-detector'were            found to be defective.The detector was returned to stoc
    '
was accomplished.
f                    spare. The. maintenance work order was closed on November.7, 1979.
f                    spare. The. maintenance work order was closed on November.7, 1979.
f, Failure Data: Previous ' failures 'of RE '2005 were reported in Licensee Event Reports t.
f, Failure Data: Previous ' failures 'of RE '2005 were reported in Licensee Event Reports t.
l:
l:
NP-33-78-140, NP-33-79-92, and NP-33-79-103.
NP-33-78-140, NP-33-79-92, and NP-33-79-103.
_
i LER #79-101
i LER #79-101
:~
:~
                            ,
(-
(-
           ,}}
           ,}}

Latest revision as of 05:53, 18 February 2020

LER 79-101/03X-1:on 791017,safety Features Actuation Sys Channel 2 Radiation Detector Re 2005 Spiked,Tripping Channel 2 Radiation Bistable.Caused by Defective Low Range & Auxiliary Boards in Detector.Detector Replaced
ML19345G599
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/31/1981
From: Eldred D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19345G598 List:
References
LER-79-101-03X, LER-79-101-3X, NUDOCS 8104070580
Download: ML19345G599 (2)


Text

- - . _

3C FORP.! 36G (7 77) .

LICENSEE EVENT REPORT (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l lh CONTROL BLOCK: l l l l l I ti

. Io Iii 10 I n I o I B I S l 1 l@l 010 l- UCENSE l 010wP.!bEH l0 lo l0 l- l010 l@l 41 il 11 l Ig 25 2ti ucENSt t y s> 1l E J3jlgl$1 LA f te 3 8 9 LICENSEE CODE 14 15 CON'T T

l L j@l 0 l 5 l 0 l0 l0 l 3 l 4 l668 @]l 1011 l7 l 7 19 l@l0 l3 HEPORT l3 li l8 l1 80l@

l0l1l- 63 EVENT OATE 14 75 DATE 7 8 60 61 COCKET NLP.*BER EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h J, Safety Features Actuation Systcm (SFAS) Channel 2 _ j lo 12 l lOn October 17. 1979 at 1410 hou l

lola) 1 Radiation' Detector RE 2005 spiked tripping SFAS Channel 2 ccntainment radiation bi-0 4 Istable. This placed the unit in the Action Statement of T.S. 3.3.3.1.b9 which require l There was no danger l lals) Ithe failed section of the channel be icft'in the tripped state.

lo is I lto the health and safety of the public or station personnel. The containment radia-l l

strings associated with the other three SFAS Channels were operable .

l 0 l 7 l l tion instrument l

f o la l Iwhich meets the minimum operational requirements. (NP-33-79-118)

'EM" '^MC S&^EE Co PoNENTCoDE SUsWoE SMME O 9 l Il Bl@ [ c,j@ j A l@ l I l N l S l T l R l U l@ y@ y @

12 to 19 20 9 10 in' 12 REVISION

8. OCCURRENCE PEPORT SEoVENTIAL TYPE N O.

REPORT No. CODE ll @ ,atgr tf H/RO u

,,, EVENT YEAR I7I9I [. --J . I1ieIi1 24 26 M

- 27 iei3I N 2J W

30 B3' L1_J 32

_ 21 21 23 F f i B. SLPPL1 [ *9A N FACTLNER oN L T ETH HoVRS S iT EN A N

!0f0f01Di l41Y l@ LYJg l43Nlg lVl1l1l5lg

[C _

J@LDJ@ IZ l@ I36Z I@ 37 40 42 44 47 33 34 35 CAUSE DEtCRIPTION AND CORRECTIVE ACTIONS h -

Under Maintenance l g lThe cause of the occurrence was component failure of the. detector.

I l ,1 : 1 j'Jork Order (MUO) IC-464-79, the failed detector was replaced. The new detector was 5031.01 at 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br /> on 0ctoberl.

g,g,1 l declared operable by the successful performance of ST the low l20, 1979. MNO IC-466-79, issued to repair the failed detector, found that l

l g l range board and' the auxiliary board in the detector were defective. 80

.7 -8 9

-D$ fY DISCOVERY DESCRIPTION STA *.POWER OTHER STA fUS l

, 5 5 .[D J_ @-l0l0l0l@l NA 'l . [__jA @l Operator observation 80 I 12. Il 44 45 46

,7 8 9 LOCATION oF PELEASE PELEASED OF RELEASE AMOUNT OF ACTIVsTY NA l NA l 'l 1 6 IZ I @ l ZMl

' ' PERSONNEL EXPOS ES NU'38 E R TYPE DESCRIPTION j.

i 7 l 0 l 0 l 0 l@[ Zj@l .NA

~

' PEHSoNNEL NJNHIES '

NUveER - DESCn!PTION i-mg10i0iG-l@i n 12 30 8 9. .

7 .ll LOSS OF oR DAMAGE To FACILITY .

j i o

.yTYPE @lDESCRIPitcN

,a NA. - **

., NRC USE ONLY ,

c

,ssu$""'o'En:nioN @ - l.;IIIIIIIIIII-Ili N^ ****

Im L,N_1 8so. 1 '* **

DVR 79-153-- 9 Q ,j [ gQ,{ David T. Eldred pgoyg;WM4M, M. m {

. . _ _ . _ .- . . _.. - ~ ._- ~ _ .

J

.,. t

^?

.6 TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-118 DATE OF EVENT: 0ctober 17, 1979 FACILITY: ravis-Besse Unit 1 IDENTIFICATION OF-0CCURRENCE: -Safety Features Actuation System (SFAS) Channel 2 Con-

-tainment Radiation Detector RE 2005 inoperable i

i The unit was in Mode 3, with Power (MWT) = 0, and

-Conditions Prior to Occurrence:

Load (Cross MWe) = 0.

Description of Occurrence: On October 17, 1979 at 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br />, SFAS Channel 2 Radia-tion-Detector RE 2005 spiked (tripping SFAS Channel 2 containment radiation bistable) and' returned to normal. The spiking was ovar full range of the readout and RE 2005 l

was declared inoperable. This placed the nait in the Action Statement of Technical Specification 3.3.3.1.b9 which requires the operability of all four SFAS containment radiation instrument strings in all modes. The SFAS channel 2 containment radiation The-

. bistable was lef t in the tripped state as required by the Action Statement.

containment' radiation instrument strings associated with the other three SFAS channels t

were operable, meeting the minimum operational requirements, f

e The apparent cause of this occurrence Designation of Apparent Cause of Occurrence: Ext.mination by the Instrument and Control shop-

.1 is component failure of the detector. ~

i found that the low: range board and the auxiliary board in the detector were defect ve,

-Analysis of Occurrence: There was'no' danger to the health and safety of the public i

i or to station personnel. . The- containment radiatio 1 monitoring instrument strings RE 2005 failed in the associated with the other ,three SFAS channels are operable.

~

i. hi d (safe) direction.

Corrective Action: Under Maintenance Work Order IC-464-79, . the detector' was replaced.

5031.01 at

-The new detector.was declared operable by.the successful performance of ST 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br /> on October 120, 1979. Maintenance Work Order IC-466-79 was issued to i

The low range board and the auxiliary

. troubleshoot and repair the f ailed ~ detector. These boards were replaced and a board detectorincalibration the-detector'were found to be defective.The detector was returned to stoc was accomplished.

f spare. The. maintenance work order was closed on November.7, 1979.

f, Failure Data: Previous ' failures 'of RE '2005 were reported in Licensee Event Reports t.

l:

NP-33-78-140, NP-33-79-92, and NP-33-79-103.

i LER #79-101

~

(-

,