ML13248A111: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13248A111 | | number = ML13248A111 | ||
| issue date = 09/04/2013 | | issue date = 09/04/2013 | ||
| title = | | title = Initial Exam 2013-301 Final Administrative JPMs | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II | | author affiliation = NRC/RGN-II | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Admin-130 2.1S Page 1 of 12 | {{#Wiki_filter:Admin-130 2.1S Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-130 Perform Manual RCS Leakage Calculation and TS Determination (SRO Only) | ||
CANDIDATE EXAMINER | |||
Admin-130 2.1S Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Perform Manual RCS Leakage Calculation and TS Determination Alternate Path: | |||
N/A Facility JPM #: | |||
N/A | CRO-43 K/A Rating(s): | ||
CRO-43 | System: Gen K/A: 2.1.7 Rating: 4.4/4.7 Task Standard: | ||
System: Gen | |||
RCS Leakage is calculated per the attached key. | RCS Leakage is calculated per the attached key. | ||
TS 3.4.13 Condition B entered. Preferred Evaluation Location: | TS 3.4.13 Condition B entered. | ||
Preferred Evaluation Method: | Preferred Evaluation Location: Preferred Evaluation Method: | ||
Simulator _____ In-Plant __ ___ Classroom __X___ | Simulator _____ In-Plant __ ___ Classroom __X___ Perform __X___ Simulate __ __ | ||
__ __ | |||
==References:== | ==References:== | ||
PT/O/A/0600/001A (Loss Of Computer | PT/O/A/0600/001A (Loss Of Computer) | ||
) | |||
PT/1/A/0600/010 (Reactor Coolant Leakage) | PT/1/A/0600/010 (Reactor Coolant Leakage) | ||
TS 3.4.13 (RCS Operational LEAKAGE) | |||
Validation Time: 18 minutes Time Critical: NO | |||
===================================================================================== | |||
Candidate: _______________________________________ Time Start: ____________ | |||
NAME Time Finish: ___________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time ___________ | |||
Examiner: ______________________________ ____________________________________/_________ | |||
NAME SIGNATURE DATE | |||
===================================================================================== | |||
COMMENTS | |||
Admin-130 2.1S Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS NONE | |||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | Admin-130 2.1S Page 4 of 12 Tools/Equipment/Procedures Needed: | ||
INITIAL CONDITIONS | PT/1/A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) | ||
Technical Specifications READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | |||
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress; however an RCS Leakage Calculation has not been performed during this shift. | |||
INITIATING CUES The OSM directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below. | |||
Evaluate leakage and determine if any Tech Spec Conditions that apply. | |||
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 75.2 inches Power Range NI 100.0% 100.1% | |||
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7% | |||
Admin-130 2.1S Page 5 of 12 START TIME: _______ | |||
STEP 1: Step 2.1 Record Initial Data in "Table #1". | |||
Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches - = | |||
RCS Temp 579.0°F - = | |||
QT Level 86.5 inches - = ____Sat LDST Level 76.7 inches - = | |||
Rx Power 100.0% - = | |||
RCS Press 2150 psig - = ____Unsat CR Pos 92.7% - = | |||
STANDARD: Candidate enters initial set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue. | |||
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________ | |||
____Sat STANDARD: Candidate enters 0015 (from initiating cue) | |||
COMMENTS ____Unsat | |||
Admin-130 2.1S Page 6 of 12 STEP 3: Step 2.3 After 1 hour, record Final Data in "Table #1". | |||
Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches = | |||
RCS Temp 579.0°F - 579.1°F = | |||
QT Level 86.5 inches - 86.5 inches = | |||
LDST Level 76.7 inches - 75.2 inches = ____Sat Rx Power 100.0% - 100.1% = | |||
RCS Press 2150 psig - 2150 psig = | |||
CR Pos 92.7% - 92.7% = ____Unsat STANDARD: Candidate enters final set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue) | |||
COMMENTS STEP 4: Step 2.4 Record time Final Data recorded: ____________ | |||
____Sat STANDARD: Candidate enters 0115 COMMENTS ____Unsat STEP 5: Step 2.5 CRITICAL STEP Record time elapsed time: ____________ minutes STANDARD: Candidate enters 60 minutes | |||
____Sat COMMENTS | |||
____Unsat | |||
Admin-130 2.1S Page 7 of 12 STEP 6: Step 2.6 CRITICAL STEP Calculate and record "Change" values in "Table # 1".. | |||
Admin-130 2.1S Page | Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F ____Sat QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches - 75.2 inches = +1.5 inches Rx Power 100.0% - 100.1% = -.1% ____Unsat RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0% | ||
STANDARD: Candidate calculates the change in data and fills in Table 1 change column. | |||
COMMENTS STEP :7 Step 2.7 CRITICAL STEP Calculate Corrected Pzr Level Change: | |||
STANDARD: -0.5 inches - (6.831 inches/°F X -.1°F) = +.1831 inches ____Sat | |||
(+.18 to +.2) | |||
____Unsat COMMENTS STEP :8 Step 2.8 CRITICAL STEP Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch = +2.63 gallons | |||
____Sat | |||
(+.18 to +.2) ( 2.585 to 2.873) | |||
COMMENTS ____Unsat | |||
STANDARD: -0.5 inches - (6.831 inches/°F X | |||
-.1°F) = +.1831 inches | |||
+2.63 gallons | |||
Admin-130 2.1S Page 8 of 12 | Admin-130 2.1S Page 8 of 12 STEP :9 Step 2.9 CRITICAL STEP Convert QT Level Change to gallons: | ||
STANDARD: No change | STANDARD: No change | ||
____Sat | ____Sat COMMENTS | ||
____Unsat STEP :10 Step 2.10 Convert LDST Level Change to gallons STANDARD: +1.5 inches X 30.956 gallons / inch = | ____Unsat STEP :10 Step 2.10 CRITICAL STEP Convert LDST Level Change to gallons STANDARD: +1.5 inches X 30.956 gallons / inch = +46.434 gallons | ||
____Sat | ____Sat | ||
____Unsat STEP : | (+46.4 to +46.5) | ||
COMMENTS ____Unsat STEP :11 Step 2.11 CRITICAL STEP Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 46.434 gallons = 49.064 gallons | |||
____Sat | ____Sat | ||
____Unsat | ( 2.585 to 2.873) (+46.4 to +46.5) (48.98 to 49.37) | ||
COMMENTS ____Unsat STEP :12 Step 2.12 CRITICAL STEP Calculate "RCS Unidentified Leakage Rate" STANDARD: 49.064 gallons / 60 minutes = .818 gpm | |||
____Sat (48.98 to 49.37) (.816 to .823) | |||
COMMENTS ____Unsat | |||
Admin-130 2.1S Page 9 of 12 | Admin-130 2.1S Page 9 of 12 STEP :13 Refer to TS 3.4.13 RCS Operational LEAKAGE STANDARD: Candidate determines that the Tech Spec limit for Unidentified Leakage ____Sat is 1 gpm therefore entry into the Actions Table is NOT required. | ||
. | ____Unsat COMMENTS STEP :14 Refer to TS 3.4.13 RCS Operational LEAKAGE CRITICAL STEP EXAMINER CUE: Hand the candidate Cue sheet #2 | ||
____Unsat STEP :14 Refer to TS 3.4.13 RCS Operational LEAKAGE EXAMINER CUE: | ____Sat STANDARD: | ||
NOTE: After second cue sheet handed to candidate, he/she | |||
____Unsat determines the leakage is pressure boundary leakage (see below) | |||
Pressure Boundary: Determine that leakage exceeds the 0 gpm Pressure Boundary leakage limit and TS 3.4.13 Condition B applies. This required Mode 3 in 12 hours and Mode 5 in 36 hours. | Pressure Boundary: Determine that leakage exceeds the 0 gpm Pressure Boundary leakage limit and TS 3.4.13 Condition B applies. This required Mode 3 in 12 hours and Mode 5 in 36 hours. | ||
COMMENTS | COMMENTS END TASK STOP TIME: ____________ | ||
Admin-130 2.1S Page 10 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate. | |||
6 Necessary data calculation to properly determine manual RCS leakage rate. | |||
7 Necessary data calculation to properly determine manual RCS leakage rate. | |||
8 Necessary data calculation to properly determine manual RCS leakage rate. | |||
9 Necessary data calculation to properly determine manual RCS leakage rate. | |||
10 Necessary data calculation to properly determine manual RCS leakage rate. | |||
11 Necessary data calculation to properly determine manual RCS leakage rate. | |||
12 Necessary data calculation to properly determine manual RCS leakage rate. | |||
13 Necessary to refer to correct TS and conclude limits are not exceeded. | |||
14 Necessary to refer to correct TS and conclude limits are exceeded. | |||
1.1S CANDIDATE CUE SHEET #1 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
1.1S | |||
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress; however an RCS Leakage Calculation has not been performed during this shift. | INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress; however an RCS Leakage Calculation has not been performed during this shift. | ||
INITIATING CUES | INITIATING CUES The OSM directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below. | ||
Evaluate leakage and determine if any Tech Spec Conditions that apply. | |||
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 75.2 inches Power Range NI 100.0% 100.1% | |||
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7% | |||
1.1S CANDIDATE CUE SHEET #2 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIATING CUES Since completing the RCS Manual Leakage calculation, the RCS leak rate has increased to 2.17 gpm and the location of the leak has been determined to be the weld that connects the 1A1 HPI injection nozzle to the RCS piping. | |||
1.1S | |||
Indicate below what (if any) Tech Spec Conditions, Required Actions, and Completion Times that apply. | Indicate below what (if any) Tech Spec Conditions, Required Actions, and Completion Times that apply. | ||
Admin-131 1.1R Page 1 of 10 | Admin-131 1.1R Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-131 Perform Manual RCS Leakage Calculation (RO Only) | ||
CANDIDATE EXAMINER | |||
Admin-131 | |||
CANDIDATE EXAMINER | |||
N/A | Admin-131 1.1R Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | ||
CRO-43 | Perform Manual RCS Leakage Calculation Alternate Path: | ||
System: Gen | N/A Facility JPM #: | ||
CRO-43 K/A Rating(s): | |||
System: Gen K/A: 2.1.7 Rating: 4.4/4.7 Task Standard: | |||
RCS Leakage is calculated per the attached key. | RCS Leakage is calculated per the attached key. | ||
Preferred Evaluation Location: | Preferred Evaluation Location: Preferred Evaluation Method: | ||
Preferred Evaluation Method: | Simulator _____ In-Plant __ ___ Classroom __X___ Perform __X___ Simulate __ __ | ||
Simulator _____ In-Plant __ ___ Classroom __X___ | |||
__ __ | |||
==References:== | ==References:== | ||
PT/O/A/0600/001A (Loss Of Computer | PT/O/A/0600/001A (Loss Of Computer) | ||
PT/1/A/0600/010 (Reactor Coolant Leakage) | |||
Validation Time: 18 minutes Time Critical: NO | |||
18 minutes Time Critical: | ===================================================================================== | ||
Candidate: _______________________________________ Time Start: ____________ | |||
Candidate: | NAME Time Finish: ___________ | ||
_______________________________________ | Performance Rating: SAT ______ UNSAT ______ Performance Time ___________ | ||
Time Start: ____________ | Examiner: ______________________________ ____________________________________/_________ | ||
NAME SIGNATURE DATE | |||
SAT ______ UNSAT ______ | ===================================================================================== | ||
Performance Time ___________ | COMMENTS | ||
Examiner: | |||
______________________________ | |||
COMMENTS | |||
Admin-131 1.1R Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE | |||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | Admin-131 1.1R Page 4 of 10 Tools/Equipment/Procedures Needed PT/1/A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) | ||
INITIAL CONDITIONS | READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress, however an RCS Leakage Calculation has not been performed during this shift. | |||
INITIATING CUES The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below. | |||
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% | |||
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7% | |||
Admin-131 1.1R Page 5 of 10 START TIME: _______ | |||
STEP 1: Step 2.1 Record Initial Data in "Table #1". | |||
Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches - = | |||
RCS Temp 579.0°F - = | |||
QT Level 86.5 inches - = ____Sat LDST Level 76.7 inches - = | |||
Rx Power 100.0% - = | |||
RCS Press 2150 psig - = ____Unsat CR Pos 92.7% - = | |||
STANDARD: Student enters initial set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue. | |||
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________ | |||
____Sat STANDARD: Student enters 0015 (from initiating cue) | |||
COMMENTS ____Unsat | |||
Admin-131 1.1R Page 6 of 10 STEP 3: Step 2.3 After 1 hour, record Final Data in "Table #1". | |||
Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches = | |||
RCS Temp 579.0°F - 579.1°F = | |||
QT Level 86.5 inches - 86.5 inches = | |||
LDST Level 76.7 inches - 74.0 inches = ____Sat Rx Power 100.0% - 100.1% = | |||
RCS Press 2150 psig - 2150 psig = | |||
CR Pos 92.7% - 92.7% = ____Unsat STANDARD: Student enters final set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue) | |||
COMMENTS STEP 4: Step 2.4 Record time Final Data recorded: ____________ | |||
____Sat STANDARD: Student enters 0115 COMMENTS ____Unsat STEP 5: Step 2.5 CRITICAL STEP Record time elapsed time: ____________ minutes STANDARD: Student enters 60 minutes | |||
____Sat COMMENTS | |||
____Unsat | |||
Admin-131 1.1R Page 7 of 10 STEP 6: Step 2.6 CRITICAL STEP Calculate and record "Change" values in "Table # 1".. | |||
Admin-131 1.1R Page | Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F ____Sat QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches - 74.0 inches = +2.7 inches Rx Power 100.0% - 100.1% = -.1% ____Unsat RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0% | ||
STEP | STANDARD: Student calculates the change in data and fills in Table 1 change column. | ||
COMMENTS STEP :7 Step 2.7 CRITICAL STEP Calculate Corrected Pzr Level Change: | |||
COMMENTS STEP | ____Sat STANDARD: -0.5 inches - (6.831 inches/°F X -.1°F) = +.1831 inches | ||
(+.18 to +.2) | |||
____Unsat COMMENTS STEP :8 Step 2.8 CRITICAL STEP Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch = +2.63 gallons | |||
____Sat | |||
(+.18 to +.2) ( 2.585 to 2.873) | |||
COMMENTS | COMMENTS | ||
____Unsat | |||
Admin-131 1.1R Page | Admin-131 1.1R Page 8 of 10 STEP :9 Step 2.9 CRITICAL STEP Convert QT Level Change to gallons: | ||
STANDARD: No change | |||
____Sat COMMENTS | |||
____Unsat STEP :10 Step 2.10 CRITICAL STEP Convert LDST Level Change to gallons STANDARD: +2.7 inches X 30.956 gallons / inch = +83.5812 gallons | |||
STANDARD: | |||
____Sat | |||
CRITICAL STEP | |||
____Sat | ____Sat | ||
(+83.5 to +83.6) | |||
COMMENTS ____Unsat STEP :11 Step 2.11 CRITICAL STEP Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 83.5812 gallons = 86.2112 gallons | |||
____Sat (2.585 to 2.873) (+83.5 to +83.6) (86.08 to 86.47) | |||
COMMENTS | |||
____Unsat STEP :12 Step 2.12 CRITICAL STEP Calculate "RCS Unidentified Leakage Rate" STANDARD: 86.2112 gallons / 60 minutes = 1.437 gpm | |||
____Sat (86.08 to 86.47) (1.434 to 1.441) | |||
COMMENTS ____Unsat END TASK STOP TIME: ____________ | |||
COMMENTS | |||
____Unsat STEP :11 Step 2.11 Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 83.5812 gallons = | |||
86.2112 gallons | |||
____Unsat STEP :12 Step 2.12 Calculate "RCS Unidentified Leakage Rate" STANDARD: 86.2112 gallons / 60 minutes = | |||
1.437 gpm | |||
) | |||
Admin-131 1.1R Page 9 of 10 | Admin-131 1.1R Page 9 of 10 CRITICAL STEP EXPLANATIONS: | ||
STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate. | STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate. | ||
6 Necessary data calculation to properly determine manual RCS leakage rate. | 6 Necessary data calculation to properly determine manual RCS leakage rate. | ||
7 Necessary data calculation to properly determine manual RCS leakage rate. | 7 Necessary data calculation to properly determine manual RCS leakage rate. | ||
8 Necessary data calculation to properly determine manual RCS leakage rate. | 8 Necessary data calculation to properly determine manual RCS leakage rate. | ||
9 Necessary data calculation to properly determine manual RCS leakage rate. | 9 Necessary data calculation to properly determine manual RCS leakage rate. | ||
10 Necessary data calculation to properly determine manual RCS leakage rate. | 10 Necessary data calculation to properly determine manual RCS leakage rate. | ||
11 Necessary data calculation to properly determine manual RCS leakage rate. | 11 Necessary data calculation to properly determine manual RCS leakage rate. | ||
12 Necessary data calculation to properly determine manual RCS leakage rate. | 12 Necessary data calculation to properly determine manual RCS leakage rate. | ||
1.1R | 1.1R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress, however an RCS Leakage Calculation has not been performed during this shift. INITIATING CUES | INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress, however an RCS Leakage Calculation has not been performed during this shift. | ||
INITIATING CUES The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below. | |||
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% | |||
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7% | |||
Admin-142 - 1.2B Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-142 Determine Time for SFP to reach 180ºF CANDIDATE EXAMINER | |||
Admin-142 - 1.2B Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Admin-142 - 1.2B Page | Determine Time for SFP to reach 180ºF Alternate Path: | ||
N/A Facility JPM #: | |||
New K/A Rating(s): | |||
System: GEN K/A: 2.1.25 Rating: 3.9/4.2 Task Standard: | |||
Tables in AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) are used to determine total time required for SFP temperature to reach 180ºF Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator _____ In-Plant _____ Classroom __ X ___ Perform __X___ Simulate ____ | |||
==References:== | |||
AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) | |||
Validation Time: 15 minutes Time Critical: NO | |||
==================================================================================== | |||
-2/A/1700/035 (Loss of | Candidate: _______________________________________ Time Start: _________ | ||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
==================================================================================== | |||
COMMENTS | |||
Admin-142 - 1.2B Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS: | |||
NONE | |||
Admin-142 - 1.2B Page 4 of 9 Tools/Equipment/Procedures Needed: | |||
AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) | AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) | ||
READ TO OPERATOR DIRECTION TO TRAINEE: | READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 is at 100% stable Unit 1 EFPD = 278 Unit 2 EFPD = 47 Unit 2 was operating at 100% when it experienced a Unit blackout SSF has been activated for Unit 2 Unit 2 RCMUP is aligned and operating 2HP-426 is being cycled to maintain Pressurizer Level as directed by AP/25 AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) has been initiated Unit 1 & 2 SFP level = 0 | * Unit 1 is at 100% stable | ||
* Unit 1 EFPD = 278 | |||
* Unit 2 EFPD = 47 | |||
* Unit 2 was operating at 100% when it experienced a Unit blackout | |||
* SSF has been activated for Unit 2 | |||
* Unit 2 RCMUP is aligned and operating | |||
* 2HP-426 is being cycled to maintain Pressurizer Level as directed by AP/25 | |||
* AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) has been initiated | |||
* Unit 1 & 2 SFP level = 0 stable | |||
* Unit 1 & 2 SFP temperature = 102 ºF INITIATING CUES: | |||
CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF | CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF | ||
Admin-142 - 1.2B Page 5 of 9 | Admin-142 - 1.2B Page 5 of 9 START TIME: _______ | ||
STEP 1: | STEP 1: CRITICAL STEP | ||
: 2. ONLY one row from one table below applies | : 1. Refer to tables A, B, and C below. | ||
: 3. Check the row in Table A, B, or C that applies to current conditions, and then use Tables listed on subsequent pages of Encl 5.4, as directed, to calculate SFP heat up times. STANDARD: Candidate selects Table B and then chooses to use Table 10 based on | : 2. ONLY one row from one table below applies ___ SAT | ||
: 1. SSF Event in progress for U1 or U2 with Unit letdown going to SFP AND | : 3. Check the row in Table A, B, or C that applies to current conditions, and then use Tables listed on subsequent pages of Encl 5.4, as directed, to calculate SFP heat up ___ UNSAT times. | ||
STANDARD: Candidate selects Table B and then chooses to use Table 10 based on | |||
: 1. SSF Event in progress for U1 or U2 with Unit letdown going to SFP AND | |||
: 2. U1 and U2 each have 177 Fuel Assemblies in RB Candidate proceeds to Table 10 (page 33 of 63) | |||
COMMENTS: | COMMENTS: | ||
Admin-142 - 1.2B Page 6 of 9 STEP 2: Determine the Time (in days) row based on direction from CRITICAL STEP page 5 of 63 | |||
___ SAT STANDARD: | |||
* Candidate selects the lower EFPD unit and adds 20 which results in 67 days. | |||
___ UNSAT | ___ UNSAT | ||
* Determine that 67 days is between 60 and 70 days on the far left column of Table 10 | |||
* Based on guidance in Step 7 on Page 7 of 63, elects to use 60 days (the shorter time). | |||
Note: Step 2 and Step 3 can be performed in any order COMMENTS: | |||
STEP 3: Determine initial Spent Fuel Pool Temperature column CRITICAL STEP based on directions from page 7 of 63 Step 6. | |||
___ SAT STANDARD: | |||
* Actual SFP temp = 102ºF | |||
* Temperature columns available are 100 and 105 ___ UNSAT | |||
* Based on directions in step 6, elects to use the 105 (higher) column Note: Step 2 and Step 3 can be performed in any order COMMENTS: | |||
Admin-142 - 1.2B Page | Admin-142 - 1.2B Page 7 of 9 STEP 4: Find the Time in hours based on the intersection of the 60 CRITICAL STEP day row and the 105 degree column. | ||
___ SAT STANDARD: Based on the intersection of the 60 day row and the 105 degree column, determine that 16.4 hours is the time to reach 180ºF | |||
___ UNSAT COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
Admin-142 - 1.2B Page 8 of 9 CRITICAL STEP EXPLANATIONS: | |||
STEP # Explanation 1 Required to determine the time to reach 180 ºF 2 Required to determine the time to reach 180 ºF 3 Required to determine the time to reach 180 ºF 4 Required to determine the time to reach 180 ºF | |||
Admin-142 - 1.2B Page 8 of 9 | |||
STEP # Explanation 1 Required to determine the time to reach 180 | |||
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 is at 100% stable Unit 1 EFPD = | * Unit 1 is at 100% stable | ||
* Unit 1 EFPD = 278 | |||
* Unit 2 EFPD = 47 | |||
* Unit 2 was operating at 100% when it experienced a Unit blackout | |||
* SSF has been activated for Unit 2 | |||
* Unit 2 RCMUP is aligned and operating | |||
* 2HP-426 is being cycled to maintain Pressurizer Level as directed by AP/25 | |||
* AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) has been initiated | |||
* Unit 1 & 2 SFP level = 0 stable | |||
* Unit 1 & 2 SFP temperature = 102 ºF INITIATING CUES: | |||
CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF | CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF | ||
Admin-240 2R Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE | Admin-240 2R Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-240 Perform SG Downcomer Temperature Surveillance CANDIDATE EXAMINER | ||
Admin-240 | Admin-240 2R Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | ||
Perform SG Downcomer Temperature Surveillance Alternate Path: | |||
N/A Facility JPM #: | |||
Admin-237 K/A Rating(s): | |||
System: Gen K/A: 2.2.12 Rating: 3.7/4.1 Task Standard: | |||
Perform SG Downcomer Temperature Surveillance by procedure for the 1A (ONLY) SG and determine that the surveillance requirement is NOT met for either of the specified computer points. | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator ___ __ In-Plant __ ___ Classroom __X__ Perform __X__ Simulate _____ | |||
==References:== | |||
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl 4.1 (Mode 1 & 2) | |||
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.19 (Channel Check Of OTSG Downcomer Temperatures) | |||
Validation Time: 18 minutes Time Critical: NO | |||
==================================================================================== | |||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
==================================================================================== | |||
COMMENTS | |||
Admin-240 2R Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS NONE | |||
Admin-240 2R Page 4 of 9 Tools/Equipment/Procedures Needed: | |||
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) | OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) | ||
OAC Screen capture image for SG information READ TO OPERATOR DIRECTION TO TRAINEE: | OAC Screen capture image for SG information READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Reactor power = | Reactor power = 75% | ||
75% | OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 & 2) in progress. | ||
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. | |||
4.1 (Mode 1 & 2) in progress. | |||
INITIATING CUES: | INITIATING CUES: | ||
CR SRO directs you to perform OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. | CR SRO directs you to perform OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature. | ||
4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature. | |||
Admin-240 2R Page 5 of 9 | Admin-240 2R Page 5 of 9 START TIME: _______ | ||
STEP 1: | STEP 1: Enclosure 4.1 (page 6 of 15) CRITICAL STEP Verify All SG Downcomer Temperature computer points agree within 3°F of each other. | ||
Verify All SG Downcomer Temperature computer points agree within 3°F of each other. | ___ SAT IF All SG Downcomer Temperatures DO NOT agree within 3°F of each other, then perform Enclosure "Channel Check Of OTSG Downcomer Temperatures". | ||
IF All SG Downcomer Temperatures DO NOT agree within 3°F of each other, then perform Enclosure "Channel Check Of OTSG Downcomer Temperatures". | ___ UNSAT O1E2008 - 528.87°F O1E2009 - 538.97°F O1E2012 - 532.78°F O1E2013 - 533.65°F STANDARD: Determine that the above OAC points do NOT agree within 3°F of each other, and perform Enclosure 4.19 "Channel Check of OTSG Downcomer Temperatures". | ||
O1E2008 - 528.87°F O1E2009 - 538.97°F O1E2012 - 532.78°F O1E2013 - 533.65°F | COMMENTS: | ||
STEP 2: Step 3.1 (Enclosure 4.19) | |||
Determine saturation temperature for 1A OTSG based on power level and 1A OTSG outlet pressure as follows: | |||
___ SAT Step 3.1.1 Determine 1A OTSG outlet pressure using any one of the following computer points: | |||
___ UNSAT | |||
* O1E2281 - 888.5 psig | |||
* O1E2283 - 888.5 psig | |||
* O1E2031 - 888.5 psig | |||
* O1E2032 - 888.5 psig STANDARD: Using the OAC determine that 1A OTSG pressure is 888.5. | |||
COMMENTS: | COMMENTS: | ||
Admin-240 2R Page 6 of 9 STEP 3: Step 3.1.2 CRITICAL STEP Using table in Section 4, determine the 1A OTSG saturation temperature based on power level and 1A OTSG Outlet Pressure obtained in step 3.1.1. | |||
___ SAT | ___ SAT | ||
___ UNSAT | ____________ 1A OTSG saturation temperature STANDARD: Determine that 1A OTSG saturation temperature is 533.9ºF (533.8 - ___ UNSAT 534.0) by using the table in section 4. | ||
COMMENTS: | |||
STEP 4: Step 3.1.3 CRITICAL STEP Compare O1E2008 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2: | |||
___ SAT Step 3.1.4 IF O1E2008 SG Lower Downcomer Temperature Loop A is NOT within | |||
+/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable. ___ UNSAT STANDARD: Determine that O1E2008 SG Lower Downcomer Temperature Loop A (528.87°F) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°F), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required. | |||
COMMENTS: | |||
Admin-240 2R Page | Admin-240 2R Page 7 of 9 STEP 5: Step 3.1.5 CRITICAL STEP Compare O1E2009 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2: | ||
COMMENTS: | ___ SAT Step 3.1.6 IF O1E2009 SG Lower Downcomer Temperature Loop A is NOT within | ||
+/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable. ___ UNSAT STANDARD: Determine that O1E2009 SG Lower Downcomer Temperature Loop A (538.97) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required. | |||
Cue: Inform the candidate that another operator will complete this procedure. | |||
COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
CRITICAL STEP | Admin-237 Page 8 of 9 CRITICAL STEP EXPLANATIONS: | ||
STEP # Explanation 1 Step is required to complete the surveillance. | |||
3 Step is required to complete the surveillance. | |||
4 Determining that the computer points in both Step 4 and Step 5 are out of the allowable band is critical to ensure that SLC 16.7.5 Condition A is not exited prior to BOTH computer points being repaired. | |||
5 Determining that the computer points in both Step 4 and Step 5 are out of the allowable band is critical to ensure that SLC 16.7.5 Condition A is not exited prior to BOTH computer points being repaired. | |||
2R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | |||
Reactor power = 75% | |||
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 & | |||
: 2) in progress. | |||
INITIATING CUES: | |||
CR SRO directs you to perform OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature. | |||
ADMIN-241 2S Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-241 Complete a Surveillance Evaluation (SRO ONLY) | |||
CANDIDATE EXAMINER | |||
ADMIN-241 2S Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation) | |||
Alternate Path: | |||
N/A Facility JPM #: | |||
New K/A Rating(s): | |||
System: Gen K/A: 2.2.12 Rating: 3.7/4.1 Task Standard: | |||
Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation) | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator __ ___ In-Plant ___ ___ Classroom __ X___ Perform __ X__ Simulate_ __ | |||
==References:== | |||
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 25 of 26 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification) | |||
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation) | |||
Validation Time: 20 min. Time Critical: No | |||
===================================================================================== | |||
3 | Candidate: _______________________________________ Time Start: _________ | ||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ___________________________________/_________ | |||
NAME SIGNATURE DATE | |||
===================================================================================== | |||
Comments | |||
ADMIN-241 2S Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS NONE | |||
ADMIN-241 2S Page 4 of 9 Tools/Equipment/Procedures Needed: | |||
ADMIN-241 2S | |||
: | |||
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 25 of 26 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification) | PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 25 of 26 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification) | ||
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation) | PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation) | ||
Surveillance Frequency List READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | Surveillance Frequency List READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Time/Date = | Time/Date = 0830 on Saturday, June 8. | ||
0830 on Saturday, June 8. RCS Temperature = 298 | RCS Temperature = 298 °F. | ||
°F. 1/0 RCP operation in progress (1A1 RCP in operation). | 1/0 RCP operation in progress (1A1 RCP in operation). | ||
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress. | PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress. | ||
SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed. | SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed. | ||
Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available. | Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available. | ||
INITIATING CUE: | INITIATING CUE: | ||
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation) | Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) | ||
Encl. 13.12 (Surveillance Evaluation) | |||
ADMIN-241 2S | ADMIN-241 2S Page 5 of 9 START TIME: _______ | ||
STEP 1: Surveillance | STEP 1: Surveillance | ||
== Description:== | == Description:== | ||
STANDARD: Documents that this is a Tech Spec required verification of correct RCP breaker alignment of power available to the required pump this is not in operation COMMENTS: | STANDARD: Documents that this is a Tech Spec required verification of correct RCP ___ SAT breaker alignment of power available to the required pump this is not in operation | ||
___ UNSAT COMMENTS: | |||
STANDARD: Determines that Tech Spec 3.4.5 (RCS Loops Mode 3) is applicable and documents in Step 2 COMMENTS: | STEP 2: Applicable TS(s)/SLC(s)/Site Directive(s), etc.: CRITICAL STEP STANDARD: Determines that Tech Spec 3.4.5 (RCS Loops Mode 3) is applicable and documents in Step 2 ___ SAT COMMENTS: | ||
___ UNSAT STEP 3: Description of discrepancy/deficiency: | |||
STANDARD: Documents that the required RCP Breaker alignment does not exist. | STANDARD: Documents that the required RCP Breaker alignment does not exist. ___ SAT NOTE: TS 3.4.5 requires that either the 1B1 or 1B2 have power available | ||
NOTE: TS 3.4.5 requires that either the 1B1 or 1B2 have power available COMMENTS: | ___ UNSAT COMMENTS: | ||
STEP 4: Is surveillance applicable for present plant conditions? CRITICAL STEP STANDARD: Marks yes | |||
___ SAT COMMENTS: | |||
___ SAT | |||
___ UNSAT | ___ UNSAT | ||
ADMIN-241 2S | ADMIN-241 2S Page 6 of 9 STEP 5: If surveillance is applicable, what is the latest due date for surveillance CRITICAL STEP OR applicable LCO? | ||
STANDARD: Documents that the latest due date is 0830 on Tuesday | STANDARD: Documents that the latest due date is 0830 on Tuesday, June 11 (72 ___ SAT hours from discovery) per Condition A of TS 3.4.5 COMMENTS: | ||
, June 11 (72 hours from discovery) per Condition A of TS 3.4.5 COMMENTS: | ___ UNSAT STEP 6: Is applicable TS(s)/SLC(s)/Site Directive(s), etc. satisfied with existing *CRITICAL STEP discrepancy/deficiency? | ||
STANDARD: ___ SAT | |||
* *Marks no | |||
* Explains in justification that TS 3.4.5 requires both RCS loops be Operable and with no power available to the 1B1 and 1B2 RCPs, the B RCS loop is NOT operable ___ UNSAT COMMENTS: | |||
___ UNSAT | STEP 7: Support personnel/groups contacted (if any) AND information provided: | ||
STANDARD: Candidate may indicate requesting SPOC assistance to determine why ___ SAT neither of the required RCP breakers are racked in however since there is no indication of mechanical failures it would not be required. | |||
STEP 6: Is applicable TS(s)/SLC(s)/Site Directive(s), etc. satisfied with existing discrepancy/deficiency? | ___ UNSAT COMMENTS: | ||
STANDARD: | |||
STANDARD: Candidate may indicate requesting SPOC assistance to determine why neither of the required RCP breakers are racked in however since there is no indication of mechanical failures it would not be required. | |||
COMMENTS: | |||
ADMIN-241 2S | ADMIN-241 2S Page 7 of 9 STEP 8: Describe corrective/compensatory actions being taken (procedure change, WR, PIP, etc.), and resolution date for those actions. ___ SAT STANDARD: | ||
STANDARD: | *Corrective/Compensatory Action: ___ UNSAT Candidate should indicate that actions will commence to establish the required breaker alignment. This could be by issuing a Work Request, writing a PIP, or dispatching personnel to determine why the breakers are open and if the breakers could be racked in. | ||
Candidate should indicate that actions will commence to establish the required breaker alignment. This could be by issuing a Work Request, writing a PIP, or dispatching personnel to determine why the breakers are open and if the breakers could be racked in. | |||
Resolution Date: | Resolution Date: | ||
This blank may be left open at this time since the investigation is just beginning however in no case should a date and time that would result in exceeding the 72 hour completion time be entered. | This blank may be left open at this time since the investigation is just beginning however in no case should a date and time that would result in exceeding the 72 hour completion time be entered. | ||
COMMENTS: | COMMENTS: | ||
STEP 9: Approval: | |||
STANDARD: Signs and Dates either of the blanks provided COMMENTS: | STANDARD: Signs and Dates either of the blanks provided ___ SAT COMMENTS: | ||
___ UNSAT END OF TASK | |||
ADMIN-241 2S | ADMIN-241 2S Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Required to determine the applicable Tech Spec 4 Required to determine if this Tech Spec is applicable in Mode 3 5 Incorrect documentation could lead to exceeding allowed time to complete Tech Spec Required Actions. | ||
6 Required to determine if the LCO is met | 6 Required to determine if the LCO is met | ||
2S | 2S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Time/Date = | Time/Date = 0830 on Saturday, June 8. | ||
°F. 1/0 RCP operation in progress (1A1 RCP in operation). | RCS Temperature = 298 °F. | ||
1/0 RCP operation in progress (1A1 RCP in operation). | |||
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress. | PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress. | ||
SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed. | SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed. | ||
Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be | Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available. | ||
INITIATING CUE: | INITIATING CUE: | ||
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation) | Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) | ||
Encl. 13.12 (Surveillance Evaluation) | |||
Admin-306 3B Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE | Admin-306 3B Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-306 Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (EDL) | ||
CANDIDATE EXAMINER | |||
Admin-306 3B Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits. | |||
Alternate Path: | |||
: | N/A Facility JPM #: | ||
Admin 305 K/A Rating(s) | Admin 305 K/A Rating(s): | ||
System: Gen K/A: 2.3.4 Rating: 3.2/3.7 Task Standard: | |||
Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits. | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator _____ In-Plant ______ Classroom _ _X_ Perform __X__ Simulate _____ | |||
==References:== | |||
: | |||
NSD-507 (Radiation Protection) | |||
OMP 1-18 (Implementation Standard During Abnormal And Emergency Events) | |||
Validation Time: 20 min. Time Critical: No | |||
===================================================================================== | |||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time _________ | |||
Examiner: ______________________________ ____________________________________/_________ | |||
NAME SIGNATURE DATE | |||
===================================================================================== | |||
= | |||
COMMENTS | |||
Admin-306 3B Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS NONE | |||
Admin-306 3B Page 4 of 8 Tools/Equipment/Procedures Needed: | |||
Calculator Note tablet READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | |||
INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO A has received 1.26 Rem TEDE this year The following tasks are required to be performed: | |||
0B TASK 1B TIME REQUIRED 2B DOSE RATE 3B 1 | |||
4B Close 3C-573 5B 11 min 6B 6.15 R/hr 7B 2 | |||
8B Open 3FDW-313 9B 6 min 10B 18.25 R/hr 1B 3 | |||
12B Open all Unit 3s ADVs 13B 4.65 R/hr 14B Note: Assume no dose is received while traveling between tasks. | |||
INITIATING CUE Refer to the above information. NEO A has completed tasks 1 and 2 in the time required. | |||
Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits. | Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits. | ||
STANDARD: Determine dose received while performing task 2. | Admin-306 3B Page 5 of 8 START TIME: _______ | ||
18.25 R/hr X 1hr/60 min X 6 min = 1.825 R | Examiner Note: | ||
COMMENTS: | * Candidate may perform these steps in a different order; however, the calculated stay time must be correct. | ||
* EDL is 5 Rem per event (LOCA or SGTR). | |||
___ SAT | * Current exposure for the year is not counted toward the Emergency Dose Limits (EDL). | ||
STEP 1: Determine dose received while performing task 1. CRITICAL STEP STANDARD: Determine dose received while performing task 1. ___ SAT 6.15 R/hr X 1hr/60 min X 11 min = 1.1275 R (1.12 to 1.13 R) ___ UNSAT COMMENTS: | |||
STEP 2: Determine dose received while performing task 2. CRITICAL STEP | |||
___ SAT STANDARD: Determine dose received while performing task 2. | |||
18.25 R/hr X 1hr/60 min X 6 min = 1.825 R | |||
___ UNSAT (1.82 to 1.83 R) | |||
COMMENTS: | |||
STEP 3: Determine dose remaining from EDLs. CRITICAL STEP | |||
___ SAT STANDARD: Determine dose remaining from EDLs. | |||
5R - 1.1275R - 1.825R = 2.0475 R | |||
___ UNSAT (2.04 to 2.06 R) | |||
COMMENTS: | |||
Admin-306 3B Page 6 of 8 STEP 4: Determine time available for the NEO to complete task 3 without CRITICAL STEP exceeding EDL. | |||
___ SAT STANDARD: Stay time is calculated to be: | |||
Available Dose = 2.0475 R = .44 hr X 60 min = 26.42 min Dose Rate 4.65 R/hr 1hr ___ UNSAT (26 to 27 Minutes) | |||
COMMENTS: | COMMENTS: | ||
END OF TASK STOP TIME: ________ | |||
Admin-306 3B Page | Admin-306 3B Page 7 of 8 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Required to calculate stay time. | ||
. | 2 Required to calculate stay time. | ||
3 Required to calculate stay time. | |||
4 Required to calculate stay time. | |||
3B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO A has received 1.26 Rem TEDE this year The following tasks are required to be performed: | |||
15B TASK 16B TIME REQUIRED 17B DOSE RATE 18B 1 | |||
19B Close 3C-573 20B 11 min 21B 6.15 R/hr 2B 2 | |||
23B Open 3FDW-313 24B 6 min 25B 18.25 R/hr 26B 3 | |||
27B Open all Unit 3s ADVs 28B 4.65 R/hr 29B Note: Assume no dose is received while traveling between tasks. | |||
INITIATING CUE Refer to the above information. NEO A has completed tasks 1 and 2 in the time required. | |||
Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits. | |||
ADMIN-412 4S Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-412 Determine Emergency Classification and complete the initial Emergency Notification form (SRO Only) | |||
CANDIDATE EXAMINER | |||
ADMIN-412 4S Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Determine Emergency Classification and complete the initial Emergency Notification form Alternate Path: | |||
N/A Facility JPM #: | |||
N/A K/A Rating(s): | |||
System: Gen K/A: 2.4.38 Rating: 2.4/4.4 Task Standard: | |||
Appropriate classification is determined and associated Emergency Notification Form is completed with the time critical criteria. | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator __ ___ In-Plant ___ ___ Classroom __ X___ Perform __ X__ Simulate_ __ | |||
==References:== | |||
RP/0/B/1000/001 (Emergency Classification) | |||
RP/0/B/1000/002 (Control Room Emergency Coordinator Procedure) | |||
Nuclear Power Plant Emergency Notification Form 4.1.A.1 Validation Time: 20 min. Time Critical: Yes | |||
===================================================================================== | |||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ___________________________________/_________ | |||
NAME SIGNATURE DATE | |||
===================================================================================== | |||
Comments | |||
ADMIN-412 4S Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS NONE | |||
ADMIN-412 4S Page 4 of 11 Tools/Equipment/Procedures Needed: | |||
RP/0/B/1000/001 (Emergency Classification) | |||
RP/0/B/1000/002 (Control Room Emergency Coordinator Procedure) | |||
RP/0/B/1000/ | |||
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant. | 0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant. | ||
0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam | 0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam. | ||
0806 1B SG has been isolated and RCS Temperature stabilized at 520°F CETCs. | |||
. 1RIA-40 = 1,245 cps and increasing. | 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing. | ||
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. | 0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. | ||
INITIATING CUE: | INITIATING CUE: | ||
Perform the required actions of the Emergency Coordinator: | Perform the required actions of the Emergency Coordinator: | ||
: 1. Determine Emergency Classification at Time = 0816 2. Complete appropriate Emergency Notification Form | : 1. Determine Emergency Classification at Time = 0816 | ||
: 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event. When required, other operators will maintain the Emergency Coordinators Log and perform the duties of the Control Room Offsite Communicator. | |||
ADMIN-412 4S Page 5 of 11 START TIME: _______ | |||
(Actual time) | |||
ADMIN-412 4S | STEP 1: Classify the Event CRITICAL STEP STANDARD: Refer to RP/0/B/1000/01 (Emergency Classification) Enclosure 4.1 (Fission Product Barrier Matrix) ___ SAT Classify as an ALERT due to: | ||
* RCS Barriers - 4 points due to SGTR >160 gpm | |||
STEP 1: Classify the Event STANDARD: Refer to RP/0/B/1000/01 (Emergency Classification) Enclosure 4. | ___ UNSAT Time of Classification: _________________ | ||
1 (Fission Product Barrier Matrix) | Examiner Note: The criteria for getting 3 points for a SGTL in one S/G and the other S/G faulted is not met because the faulted S/G (1B) has been isolated. | ||
Classify as an ALERT due to: | COMMENTS: | ||
RCS Barriers - 4 points due to SGTR | STEP 2: Commence the Off-Site Notification Form. | ||
>160 gpm | STANDARD: Go to RP/0/B/1000/002 (Control Room Emergency Coordinator ___ SAT Procedure) and initiate procedure by determining symptoms for entry exist and check Step 1.1 | ||
Examiner Note: | ___ UNSAT COMMENTS: | ||
COMMENTS: | STEP 3: Step 2.1. | ||
STANDARD: Determine step 2.1 does not apply ___ SAT COMMENTS: | |||
___ UNSAT | |||
STANDARD: Determine step 2.1 does not apply COMMENTS: | |||
ADMIN-412 4S | ADMIN-412 4S Page 6 of 11 NOTE: | ||
-plan declaration, Classification upgrades, and Protective Action Recommendations. | State and County agencies shall be notified within 15 minutes of E-plan declaration, Classification upgrades, and Protective Action Recommendations. | ||
STEP 4: Step 2.2 Declare the appropriate Emergency Classification level. | ___ SAT STEP 4: Step 2.2 Declare the appropriate Emergency Classification level. | ||
Classification __ALERT_____ (UE, ALERT, SAE, GE) | Classification __ALERT_____ (UE, ALERT, SAE, GE) | ||
Time Declared: _________ | Time Declared: _________ ___ UNSAT STANDARD: Declare an ALERT due to: | ||
STANDARD: Declare an ALERT due to: | 1A SGTR > 160 gpm ( 4 pts.) and the SG with an open path to the environment (1B SG) is NOT being fed by the affected unit nor does it contain a SG Tube Leak | ||
* Time ALERT Declared documented in Step 1 | |||
* (SAT is < Start Time + 15 minutes) | |||
COMMENTS: | COMMENTS: | ||
STEP 5: Step 2.3 & 2.4 STANDARD: Determine Steps 2.3 and 2.4 do not apply ___ SAT COMMENTS: | |||
___ UNSAT STEP 6: Step 2.5 Appoint Control Room Offsite Communicator(s) and perform the following: N/A | |||
___ UNSAT STEP 6: Step 2.5 Appoint Control Room Offsite Communicator(s) and perform the following: | ___ SAT STANDARD: Any name (real or imaginary) is acceptable. | ||
Note: Initiating Cue indicates these actions will be performed by another operator. | Note: Initiating Cue indicates these actions will be performed by another operator. | ||
COMMENTS: | ___ UNSAT COMMENTS: | ||
ADMIN-412 4S | ADMIN-412 4S Page 7 of 11 STEP 7: Step 2.6 IAAT Changing plant conditions require an emergency classification upgrade, | ||
-progress notifications per RP/0/B/1000/15A, (Offsite Communications From The CR) AND Re-initiate a clean copy of this procedure for the upgraded classification and stop this procedure. | ___ SAT THEN Notify Offsite Communicator to complete the in-progress notifications per RP/0/B/1000/15A, (Offsite Communications From The CR) | ||
AND Re-initiate a clean copy of this procedure for the upgraded | |||
___ UNSAT classification and stop this procedure. | |||
STANDARD: An Upgrade is not expected. | STANDARD: An Upgrade is not expected. | ||
COMMENTS: | COMMENTS: | ||
CRITICAL STEP | STEP 8: Step 2.7 CRITICAL STEP Obtain the appropriate Offsite Notification form from the Emergency | ||
___ SAT | ___ SAT Plan cart. | ||
STANDARD: Initial ALERT form # 4.1.A.1 is selected and candidate continues to fill- | |||
___ UNSAT | ___ UNSAT out form per the Step 2.7 substeps. | ||
COMMENTS: | |||
ADMIN-412 4S | ADMIN-412 4S Page 8 of 11 STEP 9: Step 2.7 (continued) *CRITICAL STEP 2.7.1. Ensure EAL # as determined by RP/0/B/1000/001 matches Line 4. | ||
(#1) 2.7.4. *Line 2 - Mark Initial (INITIAL marked) 2.7.5. *Line 6 - ( | (4.1.A.1) 2.7.2. Line 1 - Mark appropriate box "Drill" or "Actual Event" (DRILL) 2.7.3. *Line 1 - Enter Message # (#1) 2.7.4. *Line 2 - Mark Initial (INITIAL marked) ___ SAT 2.7.5. *Line 6 - (Is Occurring marked) | ||
A. Mark "Is Occurring" if any of the following are true: | A. Mark "Is Occurring" if any of the following are true: | ||
RIAs 40, 45, or 46 are increasing or in alarm If containment is breached Containment pressure | * RIAs 40, 45, or 46 are increasing or in alarm ___ UNSAT | ||
* If containment is breached | |||
2.7.6. *Line 7 - If Line 6 Box B or C is marked, mark Box D. Otherwise mark Box A ( | * Containment pressure > 1 psig B. Mark "None" if none of the above is applicable. | ||
Refer to Enclosure 4.9, (Event Prognosis Definitions) 2.7.8. *Line 10 - Military time and date of declaration (Refer to date/time in Step 2.2) | 2.7.6. *Line 7 - If Line 6 Box B or C is marked, mark Box D. Otherwise mark Box A (D marked) 2.7.7. *Line 8 - Mark "Stable" unless an upgrade or additional PARs are anticipated within an hour. | ||
, military time is not critical as long as time is specific and accurate.) | * Refer to Enclosure 4.9, (Event Prognosis Definitions) 2.7.8. *Line 10 - Military time and date of declaration (Refer to date/time in Step 2.2) (Insert time from STEP 1 and todays date, military time is not critical as long as time is specific and accurate.) | ||
2.7.9. Line 11 - If more than one unit affected, mark "All" (Unit 1 marked) 2.7.10. Line 12 - Mark affected unit(s) (reference Line 11) AND enter power level of affected unit(s) or time/date of shutdown (Unit 1 - 0% power, Shutdown at 0800 with | 2.7.9. Line 11 - If more than one unit affected, mark "All" (Unit 1 marked) 2.7.10. Line 12 - Mark affected unit(s) (reference Line 11) AND enter power level of affected unit(s) or time/date of shutdown (Unit 1 - 0% power, Shutdown at 0800 with todays date.) | ||
2.7.11. Line 13 - If the OSM has no remarks, write "None" (indicate NONE) 2.7.12. If Condition "A" exists ensure following PARs are included Line 5. | 2.7.11. Line 13 - If the OSM has no remarks, write "None" (indicate NONE) 2.7.12. If Condition "A" exists ensure following PARs are included Line 5. | ||
A. Evacuate: Move residents living downstream of the Keowee Hydro Project dams to higher ground B. Other: Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed. | A. Evacuate: Move residents living downstream of the Keowee Hydro Project dams to higher ground B. Other: Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed. (Condition A does not exist. No PAR required) | ||
STANDARD: Correctly fills out Emergency Notification Form in accordance with Key. | |||
STANDARD: Correctly fills out Emergency Notification Form in accordance with Key. COMMENTS: | COMMENTS: | ||
ADMIN-412 4S | ADMIN-412 4S Page 9 of 11 STEP 10: Step 2.7 (Continued) CRITICAL STEP 2.7.13. Line 17 - OSM signature, CURRENT Time/Date (MUST SIGN) | ||
) | STANDARD: Indicate that OSM signature will be obtained on the completed Emergency Notification Form within 15 minutes of classification time recorded in step 1. | ||
STANDARD: Indicate that OSM signature will be obtained on the completed Emergency Notification Form within 15 minutes of classification time recorded in step 1. | STOP TIME #2: Time for Notification __________ | ||
STOP TIME #2: Time for Notification __________ | (SAT is < Step 1 Time + 15 minutes) | ||
COMMENTS: | |||
COMMENTS: | END OF TASK | ||
ADMIN-412 4S | ADMIN-412 4S Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 The candidate needs to be able to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes. | ||
8 The correct form that matches the EAL # is selected. | |||
9 The emergency notification form is filled-out with each line entry identified as | 9 The emergency notification form is filled-out with each line entry identified as critical complete and accurate. | ||
10 This is a time critical step. The Candidate needs to complete the notification form within 15 minutes from the time the EAL was declared. (Declaration time is the time recorded in JPM step 4) | 10 This is a time critical step. The Candidate needs to complete the notification form within 15 minutes from the time the EAL was declared. (Declaration time is the time recorded in JPM step 4) | ||
4S | 4S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant. | 0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant. | ||
0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam | 0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam. | ||
0806 1B SG has been isolated and RCS Temperature stabilized at 520°F CETCs. | |||
. 1RIA-40 = 1,245 cps and increasing. | 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing. | ||
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. | 0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. | ||
INITIATING CUE: | INITIATING CUE: | ||
Perform the required actions of the Emergency Coordinator: | Perform the required actions of the Emergency Coordinator: | ||
: 1. Determine Emergency Classification at Time = 0816 | : 1. Determine Emergency Classification at Time = 0816 | ||
: 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency | : 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event. When required, other operators will maintain the Emergency Coordinators Log and perform the duties of the Control Room Offsite Communicator.}} |
Latest revision as of 01:55, 6 February 2020
ML13248A111 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 09/04/2013 |
From: | NRC/RGN-II |
To: | Duke Energy Carolinas |
References | |
50-269/13-301, 50-270/13-301, 50-287/13-301 | |
Download: ML13248A111 (68) | |
Text
Admin-130 2.1S Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-130 Perform Manual RCS Leakage Calculation and TS Determination (SRO Only)
CANDIDATE EXAMINER
Admin-130 2.1S Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Perform Manual RCS Leakage Calculation and TS Determination Alternate Path:
N/A Facility JPM #:
CRO-43 K/A Rating(s):
System: Gen K/A: 2.1.7 Rating: 4.4/4.7 Task Standard:
RCS Leakage is calculated per the attached key.
TS 3.4.13 Condition B entered.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator _____ In-Plant __ ___ Classroom __X___ Perform __X___ Simulate __ __
References:
PT/O/A/0600/001A (Loss Of Computer)
PT/1/A/0600/010 (Reactor Coolant Leakage)
TS 3.4.13 (RCS Operational LEAKAGE)
Validation Time: 18 minutes Time Critical: NO
=========================================================================
Candidate: _______________________________________ Time Start: ____________
NAME Time Finish: ___________
Performance Rating: SAT ______ UNSAT ______ Performance Time ___________
Examiner: ______________________________ ____________________________________/_________
NAME SIGNATURE DATE
=========================================================================
COMMENTS
Admin-130 2.1S Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS NONE
Admin-130 2.1S Page 4 of 12 Tools/Equipment/Procedures Needed:
PT/1/A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)
Technical Specifications READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress; however an RCS Leakage Calculation has not been performed during this shift.
INITIATING CUES The OSM directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.
Evaluate leakage and determine if any Tech Spec Conditions that apply.
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 75.2 inches Power Range NI 100.0% 100.1%
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
Admin-130 2.1S Page 5 of 12 START TIME: _______
STEP 1: Step 2.1 Record Initial Data in "Table #1".
Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches - =
RCS Temp 579.0°F - =
QT Level 86.5 inches - = ____Sat LDST Level 76.7 inches - =
Rx Power 100.0% - =
RCS Press 2150 psig - = ____Unsat CR Pos 92.7% - =
STANDARD: Candidate enters initial set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________
____Sat STANDARD: Candidate enters 0015 (from initiating cue)
COMMENTS ____Unsat
Admin-130 2.1S Page 6 of 12 STEP 3: Step 2.3 After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, record Final Data in "Table #1".
Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches =
RCS Temp 579.0°F - 579.1°F =
QT Level 86.5 inches - 86.5 inches =
LDST Level 76.7 inches - 75.2 inches = ____Sat Rx Power 100.0% - 100.1% =
RCS Press 2150 psig - 2150 psig =
CR Pos 92.7% - 92.7% = ____Unsat STANDARD: Candidate enters final set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)
COMMENTS STEP 4: Step 2.4 Record time Final Data recorded: ____________
____Sat STANDARD: Candidate enters 0115 COMMENTS ____Unsat STEP 5: Step 2.5 CRITICAL STEP Record time elapsed time: ____________ minutes STANDARD: Candidate enters 60 minutes
____Sat COMMENTS
____Unsat
Admin-130 2.1S Page 7 of 12 STEP 6: Step 2.6 CRITICAL STEP Calculate and record "Change" values in "Table # 1"..
Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F ____Sat QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches - 75.2 inches = +1.5 inches Rx Power 100.0% - 100.1% = -.1% ____Unsat RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0%
STANDARD: Candidate calculates the change in data and fills in Table 1 change column.
COMMENTS STEP :7 Step 2.7 CRITICAL STEP Calculate Corrected Pzr Level Change:
STANDARD: -0.5 inches - (6.831 inches/°F X -.1°F) = +.1831 inches ____Sat
(+.18 to +.2)
____Unsat COMMENTS STEP :8 Step 2.8 CRITICAL STEP Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch = +2.63 gallons
____Sat
(+.18 to +.2) ( 2.585 to 2.873)
COMMENTS ____Unsat
Admin-130 2.1S Page 8 of 12 STEP :9 Step 2.9 CRITICAL STEP Convert QT Level Change to gallons:
STANDARD: No change
____Sat COMMENTS
____Unsat STEP :10 Step 2.10 CRITICAL STEP Convert LDST Level Change to gallons STANDARD: +1.5 inches X 30.956 gallons / inch = +46.434 gallons
____Sat
(+46.4 to +46.5)
COMMENTS ____Unsat STEP :11 Step 2.11 CRITICAL STEP Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 46.434 gallons = 49.064 gallons
____Sat
( 2.585 to 2.873) (+46.4 to +46.5) (48.98 to 49.37)
COMMENTS ____Unsat STEP :12 Step 2.12 CRITICAL STEP Calculate "RCS Unidentified Leakage Rate" STANDARD: 49.064 gallons / 60 minutes = .818 gpm
____Sat (48.98 to 49.37) (.816 to .823)
COMMENTS ____Unsat
Admin-130 2.1S Page 9 of 12 STEP :13 Refer to TS 3.4.13 RCS Operational LEAKAGE STANDARD: Candidate determines that the Tech Spec limit for Unidentified Leakage ____Sat is 1 gpm therefore entry into the Actions Table is NOT required.
____Unsat COMMENTS STEP :14 Refer to TS 3.4.13 RCS Operational LEAKAGE CRITICAL STEP EXAMINER CUE: Hand the candidate Cue sheet #2
____Sat STANDARD:
NOTE: After second cue sheet handed to candidate, he/she
____Unsat determines the leakage is pressure boundary leakage (see below)
Pressure Boundary: Determine that leakage exceeds the 0 gpm Pressure Boundary leakage limit and TS 3.4.13 Condition B applies. This required Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
COMMENTS END TASK STOP TIME: ____________
Admin-130 2.1S Page 10 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate.
6 Necessary data calculation to properly determine manual RCS leakage rate.
7 Necessary data calculation to properly determine manual RCS leakage rate.
8 Necessary data calculation to properly determine manual RCS leakage rate.
9 Necessary data calculation to properly determine manual RCS leakage rate.
10 Necessary data calculation to properly determine manual RCS leakage rate.
11 Necessary data calculation to properly determine manual RCS leakage rate.
12 Necessary data calculation to properly determine manual RCS leakage rate.
13 Necessary to refer to correct TS and conclude limits are not exceeded.
14 Necessary to refer to correct TS and conclude limits are exceeded.
1.1S CANDIDATE CUE SHEET #1 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress; however an RCS Leakage Calculation has not been performed during this shift.
INITIATING CUES The OSM directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.
Evaluate leakage and determine if any Tech Spec Conditions that apply.
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 75.2 inches Power Range NI 100.0% 100.1%
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
1.1S CANDIDATE CUE SHEET #2 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIATING CUES Since completing the RCS Manual Leakage calculation, the RCS leak rate has increased to 2.17 gpm and the location of the leak has been determined to be the weld that connects the 1A1 HPI injection nozzle to the RCS piping.
Indicate below what (if any) Tech Spec Conditions, Required Actions, and Completion Times that apply.
Admin-131 1.1R Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-131 Perform Manual RCS Leakage Calculation (RO Only)
CANDIDATE EXAMINER
Admin-131 1.1R Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Perform Manual RCS Leakage Calculation Alternate Path:
N/A Facility JPM #:
CRO-43 K/A Rating(s):
System: Gen K/A: 2.1.7 Rating: 4.4/4.7 Task Standard:
RCS Leakage is calculated per the attached key.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator _____ In-Plant __ ___ Classroom __X___ Perform __X___ Simulate __ __
References:
PT/O/A/0600/001A (Loss Of Computer)
PT/1/A/0600/010 (Reactor Coolant Leakage)
Validation Time: 18 minutes Time Critical: NO
=========================================================================
Candidate: _______________________________________ Time Start: ____________
NAME Time Finish: ___________
Performance Rating: SAT ______ UNSAT ______ Performance Time ___________
Examiner: ______________________________ ____________________________________/_________
NAME SIGNATURE DATE
=========================================================================
COMMENTS
Admin-131 1.1R Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE
Admin-131 1.1R Page 4 of 10 Tools/Equipment/Procedures Needed PT/1/A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress, however an RCS Leakage Calculation has not been performed during this shift.
INITIATING CUES The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1%
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
Admin-131 1.1R Page 5 of 10 START TIME: _______
STEP 1: Step 2.1 Record Initial Data in "Table #1".
Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches - =
RCS Temp 579.0°F - =
QT Level 86.5 inches - = ____Sat LDST Level 76.7 inches - =
Rx Power 100.0% - =
RCS Press 2150 psig - = ____Unsat CR Pos 92.7% - =
STANDARD: Student enters initial set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________
____Sat STANDARD: Student enters 0015 (from initiating cue)
COMMENTS ____Unsat
Admin-131 1.1R Page 6 of 10 STEP 3: Step 2.3 After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, record Final Data in "Table #1".
Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches =
RCS Temp 579.0°F - 579.1°F =
QT Level 86.5 inches - 86.5 inches =
LDST Level 76.7 inches - 74.0 inches = ____Sat Rx Power 100.0% - 100.1% =
RCS Press 2150 psig - 2150 psig =
CR Pos 92.7% - 92.7% = ____Unsat STANDARD: Student enters final set of data into Table #1 of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)
COMMENTS STEP 4: Step 2.4 Record time Final Data recorded: ____________
____Sat STANDARD: Student enters 0115 COMMENTS ____Unsat STEP 5: Step 2.5 CRITICAL STEP Record time elapsed time: ____________ minutes STANDARD: Student enters 60 minutes
____Sat COMMENTS
____Unsat
Admin-131 1.1R Page 7 of 10 STEP 6: Step 2.6 CRITICAL STEP Calculate and record "Change" values in "Table # 1"..
Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches - 219.5 inches = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F ____Sat QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches - 74.0 inches = +2.7 inches Rx Power 100.0% - 100.1% = -.1% ____Unsat RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0%
STANDARD: Student calculates the change in data and fills in Table 1 change column.
COMMENTS STEP :7 Step 2.7 CRITICAL STEP Calculate Corrected Pzr Level Change:
____Sat STANDARD: -0.5 inches - (6.831 inches/°F X -.1°F) = +.1831 inches
(+.18 to +.2)
____Unsat COMMENTS STEP :8 Step 2.8 CRITICAL STEP Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch = +2.63 gallons
____Sat
(+.18 to +.2) ( 2.585 to 2.873)
COMMENTS
____Unsat
Admin-131 1.1R Page 8 of 10 STEP :9 Step 2.9 CRITICAL STEP Convert QT Level Change to gallons:
STANDARD: No change
____Sat COMMENTS
____Unsat STEP :10 Step 2.10 CRITICAL STEP Convert LDST Level Change to gallons STANDARD: +2.7 inches X 30.956 gallons / inch = +83.5812 gallons
____Sat
(+83.5 to +83.6)
COMMENTS ____Unsat STEP :11 Step 2.11 CRITICAL STEP Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 83.5812 gallons = 86.2112 gallons
____Sat (2.585 to 2.873) (+83.5 to +83.6) (86.08 to 86.47)
COMMENTS
____Unsat STEP :12 Step 2.12 CRITICAL STEP Calculate "RCS Unidentified Leakage Rate" STANDARD: 86.2112 gallons / 60 minutes = 1.437 gpm
____Sat (86.08 to 86.47) (1.434 to 1.441)
COMMENTS ____Unsat END TASK STOP TIME: ____________
Admin-131 1.1R Page 9 of 10 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate.
6 Necessary data calculation to properly determine manual RCS leakage rate.
7 Necessary data calculation to properly determine manual RCS leakage rate.
8 Necessary data calculation to properly determine manual RCS leakage rate.
9 Necessary data calculation to properly determine manual RCS leakage rate.
10 Necessary data calculation to properly determine manual RCS leakage rate.
11 Necessary data calculation to properly determine manual RCS leakage rate.
12 Necessary data calculation to properly determine manual RCS leakage rate.
1.1R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress, however an RCS Leakage Calculation has not been performed during this shift.
INITIATING CUES The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1%
RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
Admin-142 - 1.2B Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-142 Determine Time for SFP to reach 180ºF CANDIDATE EXAMINER
Admin-142 - 1.2B Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Determine Time for SFP to reach 180ºF Alternate Path:
N/A Facility JPM #:
New K/A Rating(s):
System: GEN K/A: 2.1.25 Rating: 3.9/4.2 Task Standard:
Tables in AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) are used to determine total time required for SFP temperature to reach 180ºF Preferred Evaluation Location: Preferred Evaluation Method:
Simulator _____ In-Plant _____ Classroom __ X ___ Perform __X___ Simulate ____
References:
AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level)
Validation Time: 15 minutes Time Critical: NO
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
Admin-142 - 1.2B Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
NONE
Admin-142 - 1.2B Page 4 of 9 Tools/Equipment/Procedures Needed:
AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- Unit 1 is at 100% stable
- Unit 1 EFPD = 278
- Unit 2 EFPD = 47
- Unit 2 was operating at 100% when it experienced a Unit blackout
- SSF has been activated for Unit 2
- Unit 2 RCMUP is aligned and operating
- 2HP-426 is being cycled to maintain Pressurizer Level as directed by AP/25
- AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) has been initiated
- Unit 1 & 2 SFP level = 0 stable
- Unit 1 & 2 SFP temperature = 102 ºF INITIATING CUES:
CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF
Admin-142 - 1.2B Page 5 of 9 START TIME: _______
STEP 1: CRITICAL STEP
- 1. Refer to tables A, B, and C below.
- 2. ONLY one row from one table below applies ___ SAT
- 3. Check the row in Table A, B, or C that applies to current conditions, and then use Tables listed on subsequent pages of Encl 5.4, as directed, to calculate SFP heat up ___ UNSAT times.
STANDARD: Candidate selects Table B and then chooses to use Table 10 based on
- 1. SSF Event in progress for U1 or U2 with Unit letdown going to SFP AND
- 2. U1 and U2 each have 177 Fuel Assemblies in RB Candidate proceeds to Table 10 (page 33 of 63)
COMMENTS:
Admin-142 - 1.2B Page 6 of 9 STEP 2: Determine the Time (in days) row based on direction from CRITICAL STEP page 5 of 63
___ SAT STANDARD:
- Candidate selects the lower EFPD unit and adds 20 which results in 67 days.
___ UNSAT
- Determine that 67 days is between 60 and 70 days on the far left column of Table 10
- Based on guidance in Step 7 on Page 7 of 63, elects to use 60 days (the shorter time).
Note: Step 2 and Step 3 can be performed in any order COMMENTS:
STEP 3: Determine initial Spent Fuel Pool Temperature column CRITICAL STEP based on directions from page 7 of 63 Step 6.
___ SAT STANDARD:
- Actual SFP temp = 102ºF
- Temperature columns available are 100 and 105 ___ UNSAT
- Based on directions in step 6, elects to use the 105 (higher) column Note: Step 2 and Step 3 can be performed in any order COMMENTS:
Admin-142 - 1.2B Page 7 of 9 STEP 4: Find the Time in hours based on the intersection of the 60 CRITICAL STEP day row and the 105 degree column.
___ SAT STANDARD: Based on the intersection of the 60 day row and the 105 degree column, determine that 16.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is the time to reach 180ºF
___ UNSAT COMMENTS:
END TASK STOP TIME: ____________
Admin-142 - 1.2B Page 8 of 9 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Required to determine the time to reach 180 ºF 2 Required to determine the time to reach 180 ºF 3 Required to determine the time to reach 180 ºF 4 Required to determine the time to reach 180 ºF
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- Unit 1 is at 100% stable
- Unit 1 EFPD = 278
- Unit 2 EFPD = 47
- Unit 2 was operating at 100% when it experienced a Unit blackout
- SSF has been activated for Unit 2
- Unit 2 RCMUP is aligned and operating
- 2HP-426 is being cycled to maintain Pressurizer Level as directed by AP/25
- AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) has been initiated
- Unit 1 & 2 SFP level = 0 stable
- Unit 1 & 2 SFP temperature = 102 ºF INITIATING CUES:
CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF
Admin-240 2R Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-240 Perform SG Downcomer Temperature Surveillance CANDIDATE EXAMINER
Admin-240 2R Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Perform SG Downcomer Temperature Surveillance Alternate Path:
N/A Facility JPM #:
Admin-237 K/A Rating(s):
System: Gen K/A: 2.2.12 Rating: 3.7/4.1 Task Standard:
Perform SG Downcomer Temperature Surveillance by procedure for the 1A (ONLY) SG and determine that the surveillance requirement is NOT met for either of the specified computer points.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator ___ __ In-Plant __ ___ Classroom __X__ Perform __X__ Simulate _____
References:
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl 4.1 (Mode 1 & 2)
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.19 (Channel Check Of OTSG Downcomer Temperatures)
Validation Time: 18 minutes Time Critical: NO
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
Admin-240 2R Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS NONE
Admin-240 2R Page 4 of 9 Tools/Equipment/Procedures Needed:
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information)
OAC Screen capture image for SG information READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Reactor power = 75%
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 & 2) in progress.
INITIATING CUES:
CR SRO directs you to perform OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature.
Admin-240 2R Page 5 of 9 START TIME: _______
STEP 1: Enclosure 4.1 (page 6 of 15) CRITICAL STEP Verify All SG Downcomer Temperature computer points agree within 3°F of each other.
___ SAT IF All SG Downcomer Temperatures DO NOT agree within 3°F of each other, then perform Enclosure "Channel Check Of OTSG Downcomer Temperatures".
___ UNSAT O1E2008 - 528.87°F O1E2009 - 538.97°F O1E2012 - 532.78°F O1E2013 - 533.65°F STANDARD: Determine that the above OAC points do NOT agree within 3°F of each other, and perform Enclosure 4.19 "Channel Check of OTSG Downcomer Temperatures".
COMMENTS:
STEP 2: Step 3.1 (Enclosure 4.19)
Determine saturation temperature for 1A OTSG based on power level and 1A OTSG outlet pressure as follows:
___ SAT Step 3.1.1 Determine 1A OTSG outlet pressure using any one of the following computer points:
___ UNSAT
- O1E2281 - 888.5 psig
- O1E2283 - 888.5 psig
- O1E2031 - 888.5 psig
- O1E2032 - 888.5 psig STANDARD: Using the OAC determine that 1A OTSG pressure is 888.5.
COMMENTS:
Admin-240 2R Page 6 of 9 STEP 3: Step 3.1.2 CRITICAL STEP Using table in Section 4, determine the 1A OTSG saturation temperature based on power level and 1A OTSG Outlet Pressure obtained in step 3.1.1.
___ SAT
____________ 1A OTSG saturation temperature STANDARD: Determine that 1A OTSG saturation temperature is 533.9ºF (533.8 - ___ UNSAT 534.0) by using the table in section 4.
COMMENTS:
STEP 4: Step 3.1.3 CRITICAL STEP Compare O1E2008 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:
___ SAT Step 3.1.4 IF O1E2008 SG Lower Downcomer Temperature Loop A is NOT within
+/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable. ___ UNSAT STANDARD: Determine that O1E2008 SG Lower Downcomer Temperature Loop A (528.87°F) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°F), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required.
COMMENTS:
Admin-240 2R Page 7 of 9 STEP 5: Step 3.1.5 CRITICAL STEP Compare O1E2009 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:
___ SAT Step 3.1.6 IF O1E2009 SG Lower Downcomer Temperature Loop A is NOT within
+/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable. ___ UNSAT STANDARD: Determine that O1E2009 SG Lower Downcomer Temperature Loop A (538.97) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required.
Cue: Inform the candidate that another operator will complete this procedure.
COMMENTS:
END TASK STOP TIME: ____________
Admin-237 Page 8 of 9 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Step is required to complete the surveillance.
3 Step is required to complete the surveillance.
4 Determining that the computer points in both Step 4 and Step 5 are out of the allowable band is critical to ensure that SLC 16.7.5 Condition A is not exited prior to BOTH computer points being repaired.
5 Determining that the computer points in both Step 4 and Step 5 are out of the allowable band is critical to ensure that SLC 16.7.5 Condition A is not exited prior to BOTH computer points being repaired.
2R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Reactor power = 75%
OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 &
- 2) in progress.
INITIATING CUES:
CR SRO directs you to perform OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature.
ADMIN-241 2S Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-241 Complete a Surveillance Evaluation (SRO ONLY)
CANDIDATE EXAMINER
ADMIN-241 2S Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Alternate Path:
N/A Facility JPM #:
New K/A Rating(s):
System: Gen K/A: 2.2.12 Rating: 3.7/4.1 Task Standard:
Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ ___ In-Plant ___ ___ Classroom __ X___ Perform __ X__ Simulate_ __
References:
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 25 of 26 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification)
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Validation Time: 20 min. Time Critical: No
=========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ___________________________________/_________
NAME SIGNATURE DATE
=========================================================================
Comments
ADMIN-241 2S Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS NONE
ADMIN-241 2S Page 4 of 9 Tools/Equipment/Procedures Needed:
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 25 of 26 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification)
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Surveillance Frequency List READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Time/Date = 0830 on Saturday, June 8.
RCS Temperature = 298 °F.
1/0 RCP operation in progress (1A1 RCP in operation).
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress.
SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed.
Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available.
INITIATING CUE:
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance)
Encl. 13.12 (Surveillance Evaluation)
ADMIN-241 2S Page 5 of 9 START TIME: _______
STEP 1: Surveillance
Description:
STANDARD: Documents that this is a Tech Spec required verification of correct RCP ___ SAT breaker alignment of power available to the required pump this is not in operation
___ UNSAT COMMENTS:
STEP 2: Applicable TS(s)/SLC(s)/Site Directive(s), etc.: CRITICAL STEP STANDARD: Determines that Tech Spec 3.4.5 (RCS Loops Mode 3) is applicable and documents in Step 2 ___ SAT COMMENTS:
___ UNSAT STEP 3: Description of discrepancy/deficiency:
STANDARD: Documents that the required RCP Breaker alignment does not exist. ___ SAT NOTE: TS 3.4.5 requires that either the 1B1 or 1B2 have power available
___ UNSAT COMMENTS:
STEP 4: Is surveillance applicable for present plant conditions? CRITICAL STEP STANDARD: Marks yes
___ SAT COMMENTS:
___ UNSAT
ADMIN-241 2S Page 6 of 9 STEP 5: If surveillance is applicable, what is the latest due date for surveillance CRITICAL STEP OR applicable LCO?
STANDARD: Documents that the latest due date is 0830 on Tuesday, June 11 (72 ___ SAT hours from discovery) per Condition A of TS 3.4.5 COMMENTS:
___ UNSAT STEP 6: Is applicable TS(s)/SLC(s)/Site Directive(s), etc. satisfied with existing *CRITICAL STEP discrepancy/deficiency?
STANDARD: ___ SAT
- *Marks no
- Explains in justification that TS 3.4.5 requires both RCS loops be Operable and with no power available to the 1B1 and 1B2 RCPs, the B RCS loop is NOT operable ___ UNSAT COMMENTS:
STEP 7: Support personnel/groups contacted (if any) AND information provided:
STANDARD: Candidate may indicate requesting SPOC assistance to determine why ___ SAT neither of the required RCP breakers are racked in however since there is no indication of mechanical failures it would not be required.
___ UNSAT COMMENTS:
ADMIN-241 2S Page 7 of 9 STEP 8: Describe corrective/compensatory actions being taken (procedure change, WR, PIP, etc.), and resolution date for those actions. ___ SAT STANDARD:
- Corrective/Compensatory Action: ___ UNSAT Candidate should indicate that actions will commence to establish the required breaker alignment. This could be by issuing a Work Request, writing a PIP, or dispatching personnel to determine why the breakers are open and if the breakers could be racked in.
Resolution Date:
This blank may be left open at this time since the investigation is just beginning however in no case should a date and time that would result in exceeding the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time be entered.
COMMENTS:
STEP 9: Approval:
STANDARD: Signs and Dates either of the blanks provided ___ SAT COMMENTS:
___ UNSAT END OF TASK
ADMIN-241 2S Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Required to determine the applicable Tech Spec 4 Required to determine if this Tech Spec is applicable in Mode 3 5 Incorrect documentation could lead to exceeding allowed time to complete Tech Spec Required Actions.
6 Required to determine if the LCO is met
2S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Time/Date = 0830 on Saturday, June 8.
RCS Temperature = 298 °F.
1/0 RCP operation in progress (1A1 RCP in operation).
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress.
SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed.
Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available.
INITIATING CUE:
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance)
Encl. 13.12 (Surveillance Evaluation)
Admin-306 3B Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-306 Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (EDL)
CANDIDATE EXAMINER
Admin-306 3B Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits.
Alternate Path:
N/A Facility JPM #:
Admin 305 K/A Rating(s):
System: Gen K/A: 2.3.4 Rating: 3.2/3.7 Task Standard:
Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator _____ In-Plant ______ Classroom _ _X_ Perform __X__ Simulate _____
References:
NSD-507 (Radiation Protection)
OMP 1-18 (Implementation Standard During Abnormal And Emergency Events)
Validation Time: 20 min. Time Critical: No
=========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time _________
Examiner: ______________________________ ____________________________________/_________
NAME SIGNATURE DATE
=========================================================================
=
COMMENTS
Admin-306 3B Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS NONE
Admin-306 3B Page 4 of 8 Tools/Equipment/Procedures Needed:
Calculator Note tablet READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO A has received 1.26 Rem TEDE this year The following tasks are required to be performed:
0B TASK 1B TIME REQUIRED 2B DOSE RATE 3B 1
4B Close 3C-573 5B 11 min 6B 6.15 R/hr 7B 2
8B Open 3FDW-313 9B 6 min 10B 18.25 R/hr 1B 3
12B Open all Unit 3s ADVs 13B 4.65 R/hr 14B Note: Assume no dose is received while traveling between tasks.
INITIATING CUE Refer to the above information. NEO A has completed tasks 1 and 2 in the time required.
Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.
Admin-306 3B Page 5 of 8 START TIME: _______
Examiner Note:
- Candidate may perform these steps in a different order; however, the calculated stay time must be correct.
- Current exposure for the year is not counted toward the Emergency Dose Limits (EDL).
STEP 1: Determine dose received while performing task 1. CRITICAL STEP STANDARD: Determine dose received while performing task 1. ___ SAT 6.15 R/hr X 1hr/60 min X 11 min = 1.1275 R (1.12 to 1.13 R) ___ UNSAT COMMENTS:
STEP 2: Determine dose received while performing task 2. CRITICAL STEP
___ SAT STANDARD: Determine dose received while performing task 2.
18.25 R/hr X 1hr/60 min X 6 min = 1.825 R
___ UNSAT (1.82 to 1.83 R)
COMMENTS:
STEP 3: Determine dose remaining from EDLs. CRITICAL STEP
___ SAT STANDARD: Determine dose remaining from EDLs.
5R - 1.1275R - 1.825R = 2.0475 R
___ UNSAT (2.04 to 2.06 R)
COMMENTS:
Admin-306 3B Page 6 of 8 STEP 4: Determine time available for the NEO to complete task 3 without CRITICAL STEP exceeding EDL.
___ SAT STANDARD: Stay time is calculated to be:
Available Dose = 2.0475 R = .44 hr X 60 min = 26.42 min Dose Rate 4.65 R/hr 1hr ___ UNSAT (26 to 27 Minutes)
COMMENTS:
END OF TASK STOP TIME: ________
Admin-306 3B Page 7 of 8 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Required to calculate stay time.
2 Required to calculate stay time.
3 Required to calculate stay time.
4 Required to calculate stay time.
3B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO A has received 1.26 Rem TEDE this year The following tasks are required to be performed:
15B TASK 16B TIME REQUIRED 17B DOSE RATE 18B 1
19B Close 3C-573 20B 11 min 21B 6.15 R/hr 2B 2
23B Open 3FDW-313 24B 6 min 25B 18.25 R/hr 26B 3
27B Open all Unit 3s ADVs 28B 4.65 R/hr 29B Note: Assume no dose is received while traveling between tasks.
INITIATING CUE Refer to the above information. NEO A has completed tasks 1 and 2 in the time required.
Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.
ADMIN-412 4S Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-412 Determine Emergency Classification and complete the initial Emergency Notification form (SRO Only)
CANDIDATE EXAMINER
ADMIN-412 4S Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Determine Emergency Classification and complete the initial Emergency Notification form Alternate Path:
N/A Facility JPM #:
N/A K/A Rating(s):
System: Gen K/A: 2.4.38 Rating: 2.4/4.4 Task Standard:
Appropriate classification is determined and associated Emergency Notification Form is completed with the time critical criteria.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ ___ In-Plant ___ ___ Classroom __ X___ Perform __ X__ Simulate_ __
References:
RP/0/B/1000/001 (Emergency Classification)
RP/0/B/1000/002 (Control Room Emergency Coordinator Procedure)
Nuclear Power Plant Emergency Notification Form 4.1.A.1 Validation Time: 20 min. Time Critical: Yes
=========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ___________________________________/_________
NAME SIGNATURE DATE
=========================================================================
Comments
ADMIN-412 4S Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS NONE
ADMIN-412 4S Page 4 of 11 Tools/Equipment/Procedures Needed:
RP/0/B/1000/001 (Emergency Classification)
RP/0/B/1000/002 (Control Room Emergency Coordinator Procedure)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.
0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam.
0806 1B SG has been isolated and RCS Temperature stabilized at 520°F CETCs.
0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing.
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.
INITIATING CUE:
Perform the required actions of the Emergency Coordinator:
- 1. Determine Emergency Classification at Time = 0816
- 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event. When required, other operators will maintain the Emergency Coordinators Log and perform the duties of the Control Room Offsite Communicator.
ADMIN-412 4S Page 5 of 11 START TIME: _______
(Actual time)
STEP 1: Classify the Event CRITICAL STEP STANDARD: Refer to RP/0/B/1000/01 (Emergency Classification) Enclosure 4.1 (Fission Product Barrier Matrix) ___ SAT Classify as an ALERT due to:
___ UNSAT Time of Classification: _________________
Examiner Note: The criteria for getting 3 points for a SGTL in one S/G and the other S/G faulted is not met because the faulted S/G (1B) has been isolated.
COMMENTS:
STEP 2: Commence the Off-Site Notification Form.
STANDARD: Go to RP/0/B/1000/002 (Control Room Emergency Coordinator ___ SAT Procedure) and initiate procedure by determining symptoms for entry exist and check Step 1.1
___ UNSAT COMMENTS:
STEP 3: Step 2.1.
STANDARD: Determine step 2.1 does not apply ___ SAT COMMENTS:
___ UNSAT
ADMIN-412 4S Page 6 of 11 NOTE:
State and County agencies shall be notified within 15 minutes of E-plan declaration, Classification upgrades, and Protective Action Recommendations.
___ SAT STEP 4: Step 2.2 Declare the appropriate Emergency Classification level.
Classification __ALERT_____ (UE, ALERT, SAE, GE)
Time Declared: _________ ___ UNSAT STANDARD: Declare an ALERT due to:
1A SGTR > 160 gpm ( 4 pts.) and the SG with an open path to the environment (1B SG) is NOT being fed by the affected unit nor does it contain a SG Tube Leak
- Time ALERT Declared documented in Step 1
- (SAT is < Start Time + 15 minutes)
COMMENTS:
STEP 5: Step 2.3 & 2.4 STANDARD: Determine Steps 2.3 and 2.4 do not apply ___ SAT COMMENTS:
___ UNSAT STEP 6: Step 2.5 Appoint Control Room Offsite Communicator(s) and perform the following: N/A
___ SAT STANDARD: Any name (real or imaginary) is acceptable.
Note: Initiating Cue indicates these actions will be performed by another operator.
___ UNSAT COMMENTS:
ADMIN-412 4S Page 7 of 11 STEP 7: Step 2.6 IAAT Changing plant conditions require an emergency classification upgrade,
___ SAT THEN Notify Offsite Communicator to complete the in-progress notifications per RP/0/B/1000/15A, (Offsite Communications From The CR)
AND Re-initiate a clean copy of this procedure for the upgraded
___ UNSAT classification and stop this procedure.
STANDARD: An Upgrade is not expected.
COMMENTS:
STEP 8: Step 2.7 CRITICAL STEP Obtain the appropriate Offsite Notification form from the Emergency
___ SAT Plan cart.
STANDARD: Initial ALERT form # 4.1.A.1 is selected and candidate continues to fill-
___ UNSAT out form per the Step 2.7 substeps.
COMMENTS:
ADMIN-412 4S Page 8 of 11 STEP 9: Step 2.7 (continued) *CRITICAL STEP 2.7.1. Ensure EAL # as determined by RP/0/B/1000/001 matches Line 4.
(4.1.A.1) 2.7.2. Line 1 - Mark appropriate box "Drill" or "Actual Event" (DRILL) 2.7.3. *Line 1 - Enter Message # (#1) 2.7.4. *Line 2 - Mark Initial (INITIAL marked) ___ SAT 2.7.5. *Line 6 - (Is Occurring marked)
A. Mark "Is Occurring" if any of the following are true:
- RIAs 40, 45, or 46 are increasing or in alarm ___ UNSAT
- If containment is breached
- Containment pressure > 1 psig B. Mark "None" if none of the above is applicable.
2.7.6. *Line 7 - If Line 6 Box B or C is marked, mark Box D. Otherwise mark Box A (D marked) 2.7.7. *Line 8 - Mark "Stable" unless an upgrade or additional PARs are anticipated within an hour.
- Refer to Enclosure 4.9, (Event Prognosis Definitions) 2.7.8. *Line 10 - Military time and date of declaration (Refer to date/time in Step 2.2) (Insert time from STEP 1 and todays date, military time is not critical as long as time is specific and accurate.)
2.7.9. Line 11 - If more than one unit affected, mark "All" (Unit 1 marked) 2.7.10. Line 12 - Mark affected unit(s) (reference Line 11) AND enter power level of affected unit(s) or time/date of shutdown (Unit 1 - 0% power, Shutdown at 0800 with todays date.)
2.7.11. Line 13 - If the OSM has no remarks, write "None" (indicate NONE) 2.7.12. If Condition "A" exists ensure following PARs are included Line 5.
A. Evacuate: Move residents living downstream of the Keowee Hydro Project dams to higher ground B. Other: Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed. (Condition A does not exist. No PAR required)
STANDARD: Correctly fills out Emergency Notification Form in accordance with Key.
COMMENTS:
ADMIN-412 4S Page 9 of 11 STEP 10: Step 2.7 (Continued) CRITICAL STEP 2.7.13. Line 17 - OSM signature, CURRENT Time/Date (MUST SIGN)
STANDARD: Indicate that OSM signature will be obtained on the completed Emergency Notification Form within 15 minutes of classification time recorded in step 1.
STOP TIME #2: Time for Notification __________
(SAT is < Step 1 Time + 15 minutes)
COMMENTS:
END OF TASK
ADMIN-412 4S Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 The candidate needs to be able to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes.
8 The correct form that matches the EAL # is selected.
9 The emergency notification form is filled-out with each line entry identified as critical complete and accurate.
10 This is a time critical step. The Candidate needs to complete the notification form within 15 minutes from the time the EAL was declared. (Declaration time is the time recorded in JPM step 4)
4S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.
0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam.
0806 1B SG has been isolated and RCS Temperature stabilized at 520°F CETCs.
0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing.
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.
INITIATING CUE:
Perform the required actions of the Emergency Coordinator:
- 1. Determine Emergency Classification at Time = 0816
- 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event. When required, other operators will maintain the Emergency Coordinators Log and perform the duties of the Control Room Offsite Communicator.