| number = ML15092A759
| number = ML15092A759
| issue date = 04/02/2015
| issue date = 04/02/2015
| title = Oconee Exam 2014-301 Draft Sim IN-Plant JPMs
| title = Exam 2014-301 Draft Sim IN-Plant JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-310 CR0-310 -a Page 1 of 8 PERFORM REQUIRED ACTIONS FOR A FAILED LPI TRAIN CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Perform Required Actions For A Failed LPI Train Alternate Path: Ves Facility JPM #: KIA Ratinq(s):
{{#Wiki_filter:CR0-310 - a Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-310 PERFORM REQUIRED ACTIONS FOR A FAILED LPI TRAIN CANDIDATE EXAMINER
System: EPE 011 KIA: EA1.04 Rating: 4.4/4.4 Task Standard:
 
CR0-310 -a Page 2 of 8 1 A and 1 B LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1 LP-17 is closed after 1 A LPI pump fails. Preferred Evaluation Location:
CR0-310 - a Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Perform Required Actions For A Failed LPI Train Alternate Path:
Preferred Evaluation Method: Simulator
Ves Facility JPM #:
_x_ In-Plant __ Perform X Simulate  
KIA Ratinq(s):
System: EPE 011 KIA:     EA1.04 Rating: 4.4/4.4 Task Standard:
1A and 1B LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1LP-17 is closed after 1A LPI pump fails.
Preferred Evaluation Location:                               Preferred Evaluation Method:
Simulator _x_ In-Plant _ _                                  Perform   X     Simulate


==References:==
==References:==


EOP Enclosure 5.1, ES Actuation Validation Time: 10 minutes Time Critical:
EOP Enclosure 5.1, ES Actuation Validation Time: 10 minutes                                 Time Critical: NO
NO ====================================================================================
====================================================================================
Candidate:
Candidate:                                                                 Time Start: _ _ __
Time Start: ___ _ NAME Time Finish: __ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:
NAME                                         Time Finish: _ __
____________
Performance Rating:   SAT ___ UNSAT _ __                           Performance Time: _ _ __
_ _______________
Examiner: _ _ _ _ _ _ _ _ _ _ _ __              _ _ _ _ _ _ _ _ _ _ _ _ _ _ _! _ __
! __ _ NAME SIGNATURE DATE ====================================================================================
NAME                                 SIGNATURE                     DATE
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS: 1 . RECALL Snap 208 2. IMPORT files for CR0-310 3. WHEN directed by Lead Examiner, Go to RUN CR0-310 -a Page 3 of 8 Tools/Equipment/Procedures Needed: EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE: CR0-310 -a Page 4 of 8 I will explain the initial conditions, and state the task to be performed.
====================================================================================
All control room steps shall be performed for this JPM, including any required communications.
COMMENTS
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
 
CR0-310 - a Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS:
1 . RECALL Snap 208
: 2. IMPORT files for CR0-310
: 3. WHEN directed by Lead Examiner, Go to RUN
 
CR0-310 - a Page 4 of 8 Tools/Equipment/Procedures Needed:
EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
* A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
* ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
* ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
Line 38: Line 51:
* The LOCA CD Tab in progress.
* The LOCA CD Tab in progress.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* RCS pressure is decreasing rapidly. INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
* RCS pressure is decreasing rapidly.
ST ART TIME: __ _ I STEP 1: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier).
INITIATING CUES:
STANDARD:
The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
Checks IAAT steps to determine if any apply Determine that IAAT Step 19 applies once RCS pressure is< ::::200 psig Continue to Step 19. COMMENTS:
 
STEP 2: Step 19 IAAT RCS Pressure is < LPI pump shutoff head, THEN perform Steps 20 -21 STANDARD:
CR0-310 - a Page 5 of 8 ST ART TIME: _ __
Continue to Step 20. COMMENTS:
I STEP 1:     Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier).                                                 -  SAT STANDARD:   Checks IAAT steps to determine if any apply Determine that IAAT Step 19 applies once RCS pressure is< ::::200 psig   -   UNSAT Continue to Step 19.
STEP 3: Step 20 Perform the following:
* Open 1 LP-17 * *Start 1 A LPI Pump STANDARD:
Determine that 1 LP-17 is open by observing the Red open light is lit located on 1 UB2. Places 1A LPI Pump switch to START and observes Red light on and white light off. Continue to Step 21. COMMENTS:
I ----SAT CR0-310 -a Page 5 of 8 UNSAT SAT UN SAT *CRITICAL TASK SAT -UNSAT -
CR0-310 -a Paae 6 of 8 *CRITICAL TASK STEP 4: Step 21 Perform the following:
* Open 1 LP-18 * *Start 1 B LPI Pump SAT STANDARD:
Determine that 1 LP-18 is open by observing the red open light is lit -located on 1 UB2. Places 1 B LPI pump switch to ST ART and observes Red light on and UN SAT white light off. -Go back to Step 52. COMMENTS:
STEP 5: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 STANDARD:
Checks IAAT steps to determine if any apply Determines that IAAT Step 25 now applies -SAT Continue to Step 25. UNSAT -Evaluator Note: 1 A LP/ Pump fails while operating.
COMMENTS:
COMMENTS:
STEP 6: Step 25 CRITICAL TASK IAAT 1A LPI pump fails while operating, AND 1 B LPI pump is operating, THEN close 1 LP-17. SAT -STANDARD:
STEP 2:     Step 19 IAAT RCS Pressure is < LPI pump shutoff head,
Determine the1A LPI Pump is off and 1 B LPI pump is operating, AND Close 1LP-17. UN SAT -Cue: Another Operator will continue with this procedure.
                                                                                        -  SAT THEN perform Steps 20 - 21 STANDARD:    Continue to Step 20.
                                                                                        -  UN SAT COMMENTS:
                                                                                      *CRITICAL TASK STEP 3:      Step 20 Perform the following:
* Open 1 LP-17
                *  *Start 1A LPI Pump
                                                                                        -  SAT STANDARD:   Determine that 1LP-17 is open by observing the Red open light is lit located on 1UB2.
Places 1A LPI Pump switch to START and observes Red light on and            UNSAT white light off.
Continue to Step 21.
COMMENTS:
COMMENTS:
I END TASK STOP TIME: ____ _
I
CRITICAL STEP EXPLANATIONS:
 
STEP # Explanation 3 Student verifies 1 LP-17 is open and Starts 1 A LPI P 4 Student verifies 1 LP-18 is open and Starts 1 B LPIP 6 Student closes 1 LP-17 when 1 A LPI P fails CR0-310 -a Page 7 of 8 a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:
CR0-310 - a Paae 6 of 8
                                                                                      *CRITICAL TASK STEP 4:        Step 21 Perform the following:
* Open 1LP-18
                *  *Start 1 B LPI Pump
                                                                                        -  SAT STANDARD:      Determine that 1LP-18 is open by observing the red open light is lit located on 1 UB2.
Places 1B LPI pump switch to ST ART and observes Red light on and white light off.                                                      -  UN SAT Go back to Step 52.
COMMENTS:
STEP 5:        Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 STANDARD:      Checks IAAT steps to determine if any apply
                                                                                        -  SAT Determines that IAAT Step 25 now applies Continue to Step 25.
                                                                                        -  UNSAT Evaluator Note: 1A LP/ Pump fails while operating.
COMMENTS:
STEP 6:        Step 25                                                              CRITICAL TASK IAAT 1A LPI pump fails while operating, AND 1B LPI pump is operating, THEN close 1LP-17.
                                                                                        -  SAT STANDARD:      Determine the1A LPI Pump is off and 1 B LPI pump is operating, AND Close 1LP-17.
                                                                                        -  UN SAT Cue: Another Operator will continue with this procedure.
COMMENTS:
I                                      END TASK STOP TIME: _ _ _ __
 
CR0-310 - a Page 7 of 8 CRITICAL STEP EXPLANATIONS:
STEP #                                     Explanation 3   Student verifies 1LP-17 is open and Starts 1A LPI P 4   Student verifies 1LP-18 is open and Starts 1B LPIP 6   Student closes 1LP-17 when 1A LPI P fails
 
a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
* A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
* ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
* ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
Line 65: Line 97:
* The LOCA CD Tab in progress.
* The LOCA CD Tab in progress.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
* RCS pressure is decreasing rapidly. INITIATING CUES: The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
* RCS pressure is decreasing rapidly.
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-407 CR0-407 -b Page 1 of 12 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Establish EFDW flow through Startup valves Alternate Path: Yes Facility JPM #: CR0-015 KIA Rating(s):
INITIATING CUES:
System: APE-054 KIA: AA2.04 Rating: 4.2/4.3 Task Standard:
The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.
CR0-407 -b Page 2 of 12 EFDW flow is established to the affected header through the startup valve. Preferred Evaluation Location:
 
Simulator
CR0-407 - b Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-407 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER
_x_ In-Plant __
 
CR0-407 - b Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Establish EFDW flow through Startup valves Alternate Path:
Yes Facility JPM #:
CR0-015 KIA Rating(s):
System: APE-054 KIA:     AA2.04 Rating: 4.2/4.3 Task Standard:
EFDW flow is established to the affected header through the startup valve.
Preferred Evaluation Location:                                          Preferred Evaluation Method:
Simulator _x_ In-Plant _ _                                              Perform    X    Simulate


==References:==
==References:==


EOP Rule 3, (Loss of Main or Emergency FDW) EOP Rule 7, (SG Feed Control) EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow) Validation Time: 10 minutes Preferred Evaluation Method: Perform X Simulate Time Critical:
EOP Rule 3, (Loss of Main or Emergency FDW)
NO ====================================================================================
EOP Rule 7, (SG Feed Control)
Candidate:
EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)
Time Start: ___ _ NAME Time Finish: __ _ Performance Rating:. SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:
Validation Time: 10 minutes                                                     Time Critical: NO
____________
====================================================================================
_
Candidate:                                                                             Time Start: _ _ __
___ _ NAME SIGNATURE DATE ====================================================================================
NAME                                                   Time Finish: _ __
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 209 2. IMPORT files for CR0-407 3. WHEN directed by Lead Examiner, go to RUN CR0-407 -b Page 3 of 12 Tools/Equipment/Procedures Needed
Performance Rating:. SAT ___ UNSAT _ __                                         Performance Time _ _ __
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                    ---------------~!_ _ __
NAME                                             SIGNATURE                   DATE
====================================================================================
COMMENTS
 
CR0-407 - b Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 209
: 2. IMPORT files for CR0-407
: 3. WHEN directed by Lead Examiner, go to RUN
 
CR0-407 - b Page 4 of 12 Tools/Equipment/Procedures Needed
* EOP Rule 3, Loss of Main and Emergency Feedwater
* EOP Rule 3, Loss of Main and Emergency Feedwater
* EOP Encl 5.27, Alternate Methods for Controlling EFDW Flow READ TO OPERATOR DIRECTION TO TRAINEE CR0-407 -b Page 4 of 12 I will explain the initial conditions, and state the task to be performed.
* EOP Encl 5.27, Alternate Methods for Controlling EFDW Flow READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
All control room steps shall be performed for this JPM, including any required communications.
INITIAL CONDITIONS
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
* The reactor has just tripped from 25% power
* The reactor has just tripped from 25% power
* Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check START TIME: __ _ STEP 1: Performs a Symptom Check STANDARD:
* Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check
Performs Symptom Check and determines that there are no symptoms to report but will perform Rule 3 due to a loss of Main Feedwater EXAMINER CUE: CR SRO acknowledges performing Rule 3 due to a Loss of Main Feedwater.
 
CR0-407 - b Page 5 of 12 START TIME: _ __
STEP 1:     Performs a Symptom Check STANDARD:   Performs Symptom Check and determines that there are no symptoms to report but will perform Rule 3 due to a loss of Main Feedwater
                                                                                -    SAT EXAMINER CUE: CR SRO acknowledges performing Rule 3 due to a Loss of Main Feedwater.
                                                                                  -  UNSAT COMMENTS:
STEP 2:      Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.
STANDARD:    Observes that TB Flooding is NOT occurring by 2SA-18/A-11 (Turbine BSMT Water Emergency High Level) NOT illuminated.                  -    SAT (OP/2/A/6102/018)
Candidate will perform RNO step and GO TO step 3.
                                                                                  -    UNSAT COMMENTS:
STEP 3:      Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CSP/Emergency),
AND any of the following exist:
* RCS pressure reaches 2300 psig OR NOT limit
* Pzr level reaches 375" [340" ace]
THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).            -    SAT STANDARD:    Candidate determines Rule 4 is not required.
Continue to Step 4.                                                  -    UNSAT COMMENTS:
STEP4        Rule 3: Step 4 Start operable EFDW pumps, as required, to feed all intact SGs.
STANDARD:    Observes MD EFDWP & TD EFDWP running with switch lights on and          SAT normal discharge pressure.
Continue to Step 5.
                                                                                    -  UNSAT COMMENTS:
 
CR0-407 - b Page 6 of 12 STEP 5:    Rule 3: Step 5 Verify any EFDW Pump is operating.
STANDARD:  Checks MD EFDWP & TD EFDWP switch lights are on and Pumps have
                                                                                -    SAT normal discharge pressure.
Continue to Step 6.
                                                                                  -  UNSAT COMMENTS:
STEP 6:    Rule 3: Step 6 GO TO step 37.
                                                                                -    SAT STANDARD:  GO TO step 37.
COMMENTS:
COMMENTS:
STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.
                                                                                  -   UNSAT STEP 7:   Rule 3: Step 37 IAAT an EFDW valve CANNOT control in AUTO, OR manual operation of EFDW valve is desired to control flow/level, THEN perform Steps 38 - 42.
STANDARD:
ALTERNATE PATH
Observes that TB Flooding is NOT occurring by 2SA-18/A-11 (Turbine BSMT Water Emergency High Level) NOT illuminated. (OP/2/A/6102/018)
                                                                                -    SAT STANDARD: Determines that 1FDW-315 is NOT controlling properly (1 A SG level is
Candidate will perform RNO step and GO TO step 3. COMMENTS:
          < 30" and decreasing). Concludes that 1FDW-315 has failed closed.
STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CSP/Emergency), AND any of the following exist:
UNSAT Continue to Step 38.
* RCS pressure reaches 2300 psig OR NOT limit
COMMENTS:
* Pzr level reaches 375" [340" ace] THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).
STEP 8:   Rule 3: Step 38 Place EFDW valve in MANUAL.
STANDARD:
STANDARD:   Place 1FDW-315 in MANUAL by depressing the AIM pushbutton on the
Candidate determines Rule 4 is not required.
                                                                                  -    SAT Moore controller.
Continue to Step 4. COMMENTS:
Continue to Step 39.
STEP4 Rule 3: Step 4 Start operable EFDW pumps, as required, to feed all intact SGs. STANDARD:
                                                                                    -  UNSAT COMMENTS:
Observes MD EFDWP & TD EFDWP running with switch lights on and normal discharge pressure.
 
Continue to Step 5. COMMENTS:
CR0-407 - b Page 7 of 12 STEP 9:   Rule 3: Step 39 Control EFDW flow with EFDW valve in MANUAL.
CR0-407 -b Page 5 of 12 SAT --UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
STANDARD: Determine that 1FDW-315 will NOT control in MANAUL.                         SAT Perform RNO, GO TO Step 41.
STEP 5: Rule 3: Step 5 Verify any EFDW Pump is operating.
Continue to step 41
STANDARD:
                                                                                  -  UNSAT COMMENTS:
Checks MD EFDWP & TD EFDWP switch lights are on and Pumps have normal discharge pressure.
STEP 10:   Rule 3: Step 41 Notify CR SRO that Encl 5.27 (Alternate Methods for Controlling EFDW Flow) is being initiated.
Continue to Step 6. COMMENTS:
STANDARD: Removes Encl. 5.27 from EOP and initiates.                           -    SAT EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27.
STEP 6: Rule 3: Step 6 GO TO step 37. STANDARD:
COMMENTS:                                                                         -    UNSAT STEP 11:   Encl 5.27: Step 1 Identify the failure:
GO TO step 37. COMMENTS:
1FDW-315 has Failed CLOSED [GO TO Step         2]
STEP 7: Rule 3: Step 37 IAAT an EFDW valve CANNOT control in AUTO, OR manual operation of EFDW valve is desired to control flow/level, THEN perform Steps 38 -42. ALTERNATE PATH STANDARD:
                                                                                -    SAT STANDARD: Candidate determines the next procedural step from table in Step 1.
Determines that 1 FDW-315 is NOT controlling properly (1 A SG level is < 30" and decreasing).
Continue to Step 2.
Concludes that 1 FDW-315 has failed closed. Continue to Step 38. COMMENTS:
                                                                                    -  UNSAT COMMENTS:
STEP 8: Rule 3: Step 38 Place EFDW valve in MANUAL. STANDARD:
STEP 12:   Encl 5.27: Step 2 Verify 1A MD EFDWP is operating STANDARD:   Candidate verifies 1A MD EFDWP is operating. Verify red light on and green light off and normal discharge pressure.                       -    SAT Continue to Step 3.
Place 1 FDW-315 in MANUAL by depressing the AIM pushbutton on the Moore controller.
COMMENTS:                                                                           -  UNSAT
Continue to Step 39. COMMENTS:
 
CR0-407 -b Page 6 of 12 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT SAT -UNSAT -
CR0-407 - b Page 8 of 12 STEP 13: Encl 5.27: Steps 3                                                     *CRITICAL STEP Stop 1A MD EFDWP STANDARD: *Candidate places switch to OFF.
STEP 9: Rule 3: Step 39 Control EFDW flow with EFDW valve in MANUAL. STANDARD:
Verify red light off and white light illuminated.                       -  SAT Continue to Step 4.
Determine that 1 FDW-315 will NOT control in MANAUL. Perform RNO, GO TO Step 41. Continue to step 41 COMMENTS:
COMMENTS:                                                                         -  UNSAT STEP 14: Encl 5.27: Step 4 Verify 1B MD EFDWP is operating.
STEP 10: Rule 3: Step 41 Notify CR SRO that Encl 5.27 (Alternate Methods for Controlling EFDW Flow) is being initiated.
STANDARD: Candidate verifies 1B MD EFDWP is operating.                             -  SAT Verify red light on and green light off and normal discharge pressure.
STANDARD:
Continue to Step 5.
Removes Encl. 5.27 from EOP and initiates.
                                                                                  -  UNSAT COMMENTS:
EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27. COMMENTS:
STEP 15: Encl 5.27: Step 5                                                     *CRITICAL STEP Place 1 TD EFDW Pump in PULL TO LOCK STANDARD: *Candidate places the U1 TD EFDW Pump in PULL to LOCK.
STEP 11: Encl 5.27: Step 1 Identify the failure: 1FDW-315 has Failed CLOSED [GO TO Step 2] STANDARD:
Candidate verifies red light is out and green light is lit.             -  SAT Continue to Step 6.
Candidate determines the next procedural step from table in Step 1. Continue to Step 2. COMMENTS:
COMMENTS:                                                                           -  UNSAT STEP 16: Encl 5.27: Step 6                                                       CRITICAL STEP Place 1FDW-35 in HAND and set demand to 0%
STEP 12: Encl 5.27: Step 2 Verify 1 A MD EFDWP is operating STANDARD:
STANDARD: Candidate places 1FDW-35 in HAND and uses toggle switch to reduce demand to 0%.                                                             -  SAT Continue to Step 7.
Candidate verifies 1 A MD EFDWP is operating.
COMMENTS:                                                                           -  UNSAT
Verify red light on and green light off and normal discharge pressure.
 
Continue to Step 3. COMMENTS:
CR0-407 - b Page 9 of 12 STEP 17:     Encl 5.27: Step 7                                                     *CRITICAL STEP Close 1 FDW-33 STANDARD:   *Candidate closes SU Control Block Valve (1 FDW-33).
CR0-407 -b Page 7 of 12 SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Candidate verifies red light is out and green light is lit.             -      SAT Continue to Step 8.
STEP 13: Encl 5.27: Steps 3 Stop 1 A MD EFDWP STANDARD:  
COMMENTS:                                                                           -      UNSAT STEP 18:     Encl 5.27: Step 8 Verify 1A MD EFDWP will be used.
*Candidate places switch to OFF. Verify red light off and white light illuminated.
STANDARD:   Candidate determines that the 1A MD EFDWP will be used.
Continue to Step 4. COMMENTS:
                                                                                      -    SAT Continue to Step 9.
STEP 14: Encl 5.27: Step 4 Verify 1 B MD EFDWP is operating.
EXAMINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP.
STANDARD:
                                                                                        -    UNSAT COMMENTS:
Candidate verifies 1 B MD EFDWP is operating.
STEP 19:     Encl 5.27: Step 9                                                     *CRITICAL STEP Open 1 FDW-374 STANDARD:   *Candidate locates and opens 1FDW-374.
Verify red light on and green light off and normal discharge pressure.
Candidate observes green closed light off and red open light on.
Continue to Step 5. COMMENTS:
                                                                                    -      SAT Continue to Step 10.
STEP 15: Encl 5.27: Step 5 Place 1 TD EFDW Pump in PULL TO LOCK STANDARD:  
COMMENTS:
*Candidate places the U1 TD EFDW Pump in PULL to LOCK. Candidate verifies red light is out and green light is lit. Continue to Step 6. COMMENTS:
                                                                                      -      UNSAT STEP 20:     Encl 5.27: Step 1O Verify the following:
STEP 16: Encl 5.27: Step 6 Place 1 FDW-35 in HAND and set demand to 0% STANDARD:
              * ; FDW-36 closed
Candidate places 1 FDW-35 in HAND and uses toggle switch to reduce demand to 0%. Continue to Step 7. COMMENTS:
* 1FDW-38 open STANDARD:     Candidate locates and closes 1FDW-36 and observes green closed light on and red open light off on 1VB3 or uses OAC indication.                 -    SAT Candidate locates and opens 1FDW-38 and observes green closed light off and red open light lit on 1VB3 or uses OAC indication.
CR0-407 -b Page 8 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -CRITICAL STEP SAT -UNSAT -
                                                                                          -  UNSAT Continue to Step 11.
STEP 17: Encl 5.27: Step 7 Close 1 FDW-33 STANDARD:  
COMMENTS:
*Candidate closes SU Control Block Valve (1 FDW-33). Candidate verifies red light is out and green light is lit. Continue to Step 8. COMMENTS:
 
STEP 18: Encl 5.27: Step 8 Verify 1 A MD EFDWP will be used. STANDARD:
CR0-407 - b Page 10 of 12 STEP 21:       Encl 5.27: Step 11                                                         *CRITICAL STEP Start 1A MD EFDWP STANDARD:       *Candidate places 1A MD EFDWP switch to RUN.                                 -      SAT Candidate verifies pump start by observing white light is off and red light is lit and proper discharge pressure.
Candidate determines that the 1A MD EFDWP will be used. Continue to Step 9. EXAMINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP. COMMENTS:
Continue to Step 12.                                                         -      UNSAT COMMENTS:
STEP 19: Encl 5.27: Step 9 Open 1 FDW-37 4 STANDARD:  
NOTE:
*Candidate locates and opens 1 FDW-374. Candidate observes green closed light off and red open light on. Continue to Step 10. COMMENTS:
Flow from the TD EFDWP through a S/U control valve should be read on the FDW SU FLOW gauge.
STEP 20: Encl 5.27: Step 1 O Verify the following:  
Flow from MD EFDWP through a S/U control valve should be read on the MDEFWP DISCH FLOW gauge.
* ; FDW-36 closed
                                                                                                -    SAT STEP 22:       Encl 5.27: Step 12 Verify either of the following exists:
* 1 FDW-38 open STANDARD:
Candidate locates and closes 1 FDW-36 and observes green closed light on and red open light off on 1VB3 or uses OAC indication.
Candidate locates and opens 1 FDW-38 and observes green closed light off and red open light lit on 1 VB3 or uses OAC indication.
Continue to Step 11. COMMENTS:
CR0-407 -b Page 9 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -SAT -UNSAT -
STEP 21: Encl 5.27: Step 11 Start 1A MD EFDWP STANDARD:  
*Candidate places 1A MD EFDWP switch to RUN. Candidate verifies pump start by observing white light is off and red light is lit and proper discharge pressure.
Continue to Step 12. COMMENTS:
NOTE: Flow from the TD EFDWP through a S/U control valve should be read on the FDW SU FLOW gauge. ' Flow from MD EFDWP through a S/U control valve should be read on the MDEFWP DISCH FLOW gauge. STEP 22: Encl 5.27: Step 12 Verify either of the following exists:
* HPI Forced Cooling is maintaining core cooling
* HPI Forced Cooling is maintaining core cooling
* CBP Feed providing SG feed STANDARD:
* CBP Feed providing SG feed                                                     -    UNSAT STANDARD:       Candidate determines that neither condition is met and goes to the RNO.
Candidate determines that neither condition is met and goes to the RNO. Continue to Step 12 RNO. COMMENTS:
Continue to Step 12 RNO.
STEP 23: Encl 5.27: Step 12 RNO IF any SG is being fed, THEN perform the following:  
COMMENTS:
* *Throttle 1 FDW-35 to establish a maxim um of 100 gpm . * *Throttle 1 FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control) Notify CR SRO of SG Feed Status STANDARD:
STEP 23:         Encl 5.27: Step 12 RNO                                                     *CRITICAL STEP IF any SG is being fed, THEN perform the following:
Candidate throttles 1 FDW-35 to attain -100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1 FDW-35as necessary to establish  
                * *Throttle 1FDW-35 to establish a maxim um of 100 gpm .
-25" S/U level (per Rule 7 table 4) Rule 7 Table 4 specifies the level to establish when using EFDWP is 30" (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint (i.e. when using the S/U CVs) is 25" S/U level since RCS temperature is >500&deg;F. EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1 FDW-35 must be open and SG level increasing.
                * *Throttle 1FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control)
Notify CR SRO of SG Feed Status STANDARD:       Candidate throttles 1FDW-35 to attain - 100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1FDW-35as necessary to establish - 25" S/U level (per Rule 7 table 4)             -    SAT Rule 7 Table 4 specifies the level to establish when using EFDWP is 30" (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint (i.e.
when using the S/U CVs) is 25" S/U level since RCS temperature is             -      UNSAT
                >500&deg;F.
EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1FDW-35 must be open and SG level increasing.
EXAMINER CUE: Another operator will continue with this procedure.
EXAMINER CUE: Another operator will continue with this procedure.
COMMENTS:
COMMENTS:
END TASK CR0-407 -b Page 10 of 12 *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -
END TASK
STOP TIME: ____ _ CRITICAL STEP EXPLANATIONS STEP # Explanation 1 O This step is required to ensure the correct procedure is used. 13 This step is required to ensure the valves will operate. 15 This step is required to ensure the valves will operate. 16 This step is required to align the MD EFDWP to the S/U header. 17 This step is required to align the MD EFDWP to the S/U header. 19 This step is required to align the MD EFDWP to the S/U header. CR0-407 -b Page 11 of 12 21 This step is required to start the 1A MD EFDWP and provide a SG feed source. 23 This step is required to establish flow to the 1 A SG.
 
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS
CR0-407 - b Page 11 of 12 STOP TIME: _ _ _ __
CRITICAL STEP EXPLANATIONS STEP #                                         Explanation 1O    This step is required to ensure the correct procedure is used.
13   This step is required to ensure the valves will operate.
15   This step is required to ensure the valves will operate.
16   This step is required to align the MD EFDWP to the S/U header.
17   This step is required to align the MD EFDWP to the S/U header.
19   This step is required to align the MD EFDWP to the S/U header.
21   This step is required to start the 1A MD EFDWP and provide a SG feed source.
23   This step is required to establish flow to the 1A SG.
 
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
* The reactor has just tripped from 25% power
* The reactor has just tripped from 25% power
* Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-602 LIVE BUS TRANSFER OF MFB POWER FROM CT 1 TO CT 4 CR0-602 -c Page 1 of 14 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Live Bus Transfer Of MFB Power From CT 4 To CT 1 Alternate Path: No Facility JPM #: New KIA Rating(s):
* Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check
System: 062 KIA: A4.01 Rating: 3.3/3.1 Task Standard:
 
CR0-602 - c Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-602 LIVE BUS TRANSFER OF MFB POWER FROM CT 1 TO CT 4 CANDIDATE EXAMINER
 
CR0-602 - c Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Live Bus Transfer Of MFB Power From CT 4 To CT 1 Alternate Path:
No Facility JPM #:
New KIA Rating(s):
System: 062 KIA:     A4.01 Rating: 3.3/3.1 Task Standard:
Perform a live bus transfer from CT 4 to CT 1 by procedure.
Perform a live bus transfer from CT 4 to CT 1 by procedure.
Preferred Evaluation Location:
Preferred Evaluation Location:                                      Preferred Evaluation Method:
Simulator
Simulator _x_ In-Plant _ _                                          Perform  X    Simulate
_x_ In-Plant __


==References:==
==References:==


CR0-602 -c Page 2 of 14 Preferred Evaluation Method: Perform X Simulate OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
Validation Time: 15 minutes Time Critical:
Validation Time: 15 minutes                                       Time Critical: NO
NO ====================================================================================
====================================================================================
Candidate:
Candidate:                                                                         Time Start: _ _ __
Time Start: ___ _ NAME Time Finish: __ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:
NAME                                             Time Finish: _ __
____________
Performance Rating:     SAT ___ UNSAT _ __                                 Performance Time: _ _ __
_ _ _______________
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _! _ __
! __ _ NAME SIGNATURE DATE ====================================================================================
NAME                                       SIGNATURE                   DATE
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS:  
====================================================================================
: 1. RECALL Snap 212 2. Go to RUN 3. SELECT Chessell to Source Range CR0-602 -c Page 3 of 14 Tools/Equipment/Procedures Needed: CR0-602 -c Page 4 of 14
COMMENTS
 
CR0-602 - c Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. RECALL Snap 212
: 2. Go to RUN
: 3. SELECT Chessell to Source Range
 
CR0-602 - c Page 4 of 14 Tools/Equipment/Procedures Needed:
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)
READ TO OPERATOR DIRECTION TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR DIRECTION TO TRAINEE:
All control room steps shall be performed for this JPM, including any required communications.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Oconee Unit 1 is in MODE 5.
* Oconee Unit 1 is in MODE 5.
* KHU-2 has been started by the Keowee operator.
* KHU-2 has been started by the Keowee operator.
* It is desired to energize the MFB from CT 4
* It is desired to energize the MFB from CT 4
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4.
INITIATING CUES:
ST ART TIME: __ _ I STEP 1: Step 2.4 Energize 4160V Standby Buses: Step 2.4.1 Notify all three Units that the Standby Bus is about to be powered from CT4. STANDARD:
The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4.
Use the control room phone and notify all three ONS Units that the Standby Bus is about to be powered from CT 4. COMMENTS:
 
STEP 2: Step 2.4.2 Place CT 4 BUS 1 AUTO/MAN switch in "MAN". STANDARD:
CR0-602 - c Page 5 of 14 ST ART TIME: _ __
Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to "MAN". COMMENTS:
I STEP 1:     Step 2.4 Energize 4160V Standby Buses:
STEP 3: Step 2.4.3 Place STBY BUS 1 SYNCHRONIZING SWITCH to "ON". STANDARD:
Step 2.4.1
Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". COMMENTS:  
                                                                                        -  SAT Notify all three Units that the Standby Bus is about to be powered from CT4.
--SAT CR0-602 -c Page 5 of 14 UNSAT CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UNSAT STEP 4: Step 2.4.4 Close SK 1 CT 4 STBY BUS 1 FEEDER breaker. STANDARD:
STANDARD:   Use the control room phone and notify all three ONS Units that the
Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.
                                                                                        -  UNSAT Standby Bus is about to be powered from CT 4.
COMMENTS:
STEP 2:     Step 2.4.2                                                             CRITICAL STEP Place CT 4 BUS 1 AUTO/MAN switch in "MAN".
STANDARD:   Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to "MAN".                                                                   -  SAT COMMENTS:
                                                                                        -  UN SAT STEP 3:     Step 2.4.3                                                             CRITICAL STEP Place STBY BUS 1 SYNCHRONIZING SWITCH to "ON".
STANDARD:   Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "ON".                                                           -  SAT COMMENTS:                                                                                 UNSAT
 
CR0-602 - c p aqe 6 0 f 14 STEP 4:   Step 2.4.4                                                               CRITICAL STEP Close SK 1 CT 4 STBY BUS 1 FEEDER breaker.
STANDARD: Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and     SAT the red close light illuminates.
                                                                                    -  UNSAT COMMENTS:
STEP 5:  Step 2.4.5 Verify::::: 4160Von STANDBY BUS 1 "STANDBY BUS 1 VOLTS."
STANDARD: Verify"' 4160V on STANDBY BUS 1 "STANDBY BUS 1 VOLTS" on                  -  SAT gauge located on 2AB3.
                                                                                    -  UNSAT COMMENTS:
STEP 6:  Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to "OFF".
STANDARD:  Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on            -  SAT 2AB3, to "OFF".
                                                                                    -  UN SAT COMMENTS:
 
CR0-602 - c p aqe 7 0 f14 STEP 7:  Step 2.4.7 Place CT4 BUS 1 AUTO/MAN switch in "AUTO".
STANDARD: Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to  -  SAT "AUTO".
                                                                            -  UNSAT COMMENTS:
STEP 8:  Step 2.4.8                                                        CRITICAL STEP Place CT4 BUS 2 AUTO/MAN switch in "MAN".
STANDARD: Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to      SAT "MAN".
COMMENTS:
COMMENTS:
STEP 5: Step 2.4.5 Verify:::::
                                                                            -   UN SAT STEP 9:   Step 2.4.9                                                       CRITICAL STEP Place STBY BUS 2 SYNCHRONIZING SWITCH to "ON".
4160Von STANDBY BUS 1 "STANDBY BUS 1 VOLTS." STANDARD:
STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "ON".                                                         SAT COMMENTS:
Verify"' 4160V on STANDBY BUS 1 "STANDBY BUS 1 VOL TS" on gauge located on 2AB3. COMMENTS:
                                                                              - UN SAT
STEP 6: Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to "OFF". STANDARD:
 
Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "OFF". COMMENTS:
CR0-602 - c Paqe 8 of 14 STEP 10: Step 2.4.10                                                             CRITICAL STEP Close SK 2 CT 4 STBY BUS 2 FEEDER.
CR0-602 -c p 6 f 14 aqe 0 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -
STANDARD: Candidate rotates SK 2 CT 4 STBY BUS 2 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.                                             SAT
STEP 7: Step 2.4.7 Place CT4 BUS 1 AUTO/MAN switch in "AUTO". STANDARD:
                                                                                    -   UNSAT COMMENTS:
Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to "AUTO". COMMENTS:
STEP 11: Step 2.4.11 Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS."
STEP 8: Step 2.4.8 Place CT4 BUS 2 AUTO/MAN switch in "MAN". STANDARD:
STANDARD: Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS" using               -   SAT gauge located on 2AB3 COMMENTS:
Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "MAN". COMMENTS:
                                                                                    -  UNSAT STEP 12: Step 2.4.12 Place STBY BUS 2 SYNCHRONIZING SWITCH to "OFF".
STEP 9: Step 2.4.9 Place STBY BUS 2 SYNCHRONIZING SWITCH to "ON". STANDARD:
                                                                                    -  SAT STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "OFF".
Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". COMMENTS:  
COMMENTS:                                                                           - UN SAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in "AUTO".
--SAT CR0-602 -c p 7 f14 aqe 0 UNSAT CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UN SAT -
                                                                                    -  SAT STANDARD: Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "AUTO".
CR0-602 -c Paqe 8 o f 4 1 STEP 10: Step 2.4.10 CRITICAL STEP Close SK 2 CT 4 STBY BUS 2 FEEDER. STANDARD:
                                                                                    -  UNSAT COMMENTS:
Candidate rotates SK 2 CT 4 STBY BUS 2 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates.
 
SAT -UNSAT -COMMENTS:
CR0-602 - c p age 9 0 f 14 I CAUTION: E1 (1,2,3) E2 (1,2,3) will NOT open automatically when the S1 (1,2,3) OR S2       CRITICAL STEP (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT 4 from the time the first I "S" breaker is closed until the last "E" breaker is opened.
STEP 11: Step 2.4.11 Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS." STANDARD:
STEP 14:         Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus:                     SAT Step 2.5.1 A Unit 1 Place STANDBY 1 AUTO/MAN switch in "MAN".
Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOL TS" using -SAT gauge located on 2AB3 COMMENTS:
                                                                                              -  UN SAT STANDARD:       Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to "MAN".
UNSAT -STEP 12: Step 2.4.12 Place STBY BUS 2 SYNCHRONIZING SWITCH to "OFF". SAT STANDARD:
COMMENTS:
Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on -2AB3, to "OFF". COMMENTS:  
STEP 15:         Step 2.5.1B                                                               CRITICAL STEP Place STANDBY 2 AUTO/MAN switch in "MAN".
-UN SAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in "AUTO". SAT -STANDARD:
STANDARD:       Candidate rotates ST AND BY 2 AUTO/MAN switch, located on 1AB1, to "MAN".                                                                   -  SAT
Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "AUTO". UNSAT -COMMENTS:
                                                                                              -  UNSAT COMMENTS:
I CAUTION: E1 (1,2,3) E2 (1,2,3) will NOT open automatically when the S1 (1,2,3) OR S2 (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT 4 from the time the first I "S" breaker is closed until the last "E" breaker is opened. STEP 14: Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus: Step 2.5.1 A Unit 1 Place STANDBY 1 AUTO/MAN switch in "MAN". STANDARD:
STEP 16:         Step 2.5.1C Place MFB 1 AUTO/MAN switch in "MAN".
Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to "MAN". COMMENTS:
                                                                                              -  SAT STANDARD:         Candidate determines that the MFB 1 AUTO/MAN switch, located on 1AB1, is in "MAN".
STEP 15: Step 2.5.1B Place STANDBY 2 AUTO/MAN switch in "MAN". STANDARD:
                                                                                              -  UNSAT COMMENTS:
Candidate rotates ST AND BY 2 AUTO/MAN switch, located on 1 AB1, to "MAN". COMMENTS:
 
STEP 16: Step 2.5.1C Place MFB 1 AUTO/MAN switch in "MAN". STANDARD:
CR0-602 - c p age 10 0 f 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in "MAN".
Candidate determines that the MFB 1 AUTO/MAN switch, located on 1AB1, is in "MAN". COMMENTS:
STANDARD: Candidate determines that the MFB 2 AUTO/MAN switch, located on             -   SAT 1AB1, is in "MAN".
CR0-602 -c p 9 f 14 age 0 CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -
                                                                                      -  UN SAT COMMENTS:
CR0-602 -c age 0 p 10 f 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in "MAN". STANDARD:
STEP 18: Step 2.5.1E                                                                 CRITICAL STEP Open E1 1 (MFB1 STARTUP FDR).
Candidate determines that the MFB 2 AUTO/MAN switch, located on -SAT 1 AB1, is in "MAN". UN SAT -COMMENTS:
STANDARD: Candidate rotates E1 1 (MFB1 STARTUP FDR) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white   -   SAT open light illuminates.
STEP 18: Step 2.5.1E CRITICAL STEP Open E1 1 (MFB1 STARTUP FDR). STANDARD:
                                                                                      -  UNSAT COMMENTS:
Candidate rotates E1 1 (MFB1 STARTUP FDR) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white -SAT open light illuminates.
STEP 19: Step 2.5.1 F                                                               CRITICAL STEP Close S1 1 (STBY BUS1 TO MFB1 ).
UNSAT -COMMENTS:
STANDARD: Candidate rotates S1 1 (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light   - SAT illuminates.
STEP 19: Step 2.5.1 F CRITICAL STEP Close S1 1 (STBY BUS1 TO MFB1 ). STANDARD:
                                                                                        -  UN SAT COMMENTS:
Candidate rotates S1 1 (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.
 
UN SAT -COMMENTS:
CR0-602 - c p aqe 11 0 f 14 STEP 20: Step 2.5.1G                                                                 CRITICAL STEP Open E2 1 (MFB2 STARTUP FDR).
CR0-602 -c p 1 f 14 aqe 1 0 STEP 20: Step 2.5.1G CRITICAL STEP Open E2 1 (MFB2 STARTUP FDR). STANDARD:
STANDARD: Candidate rotates E2 1 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white   -   SAT open light illuminates.
Candidate rotates E2 1 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white -SAT open light illuminates.
                                                                                      -  UNSAT COMMENTS:
UNSAT -COMMENTS:
STEP 21: Step 2.5.1H                                                                 CRITICAL STEP Close S2 1 (STBY BUS2 TO MFB2).
STEP 21: Step 2.5.1H CRITICAL STEP Close S2 1 (STBY BUS2 TO MFB2). STANDARD:
STANDARD: Candidate rotates S2 1 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -   SAT illuminates.
Candidate rotates S2 1 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light -SAT illuminates.
                                                                                      -  UNSAT COMMENTS:
UNSAT -COMMENTS:
STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in "AUTO".
STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in "AUTO". STANDARD:
STANDARD: Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to             -   SAT "AUTO".
Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1 AB1, to -SAT "AUTO". UN SAT -COMMENTS:
                                                                                        -  UN SAT COMMENTS:
STEP 23: Step 2.5.1J Place STANDBY 2 AUTO/MAN switch in "AUTO". STANDARD:
 
Candidate rotates STANDBY 2 AUTO/MAN switch, located on 1AB1, to "AUTO". COMMENTS:
CR0-602 - c Page 12 of 14 STEP 23:   Step 2.5.1J Place STANDBY 2 AUTO/MAN switch in "AUTO".
Examiner Cue: Another operator will continue with this procedure.
STANDARD:   Candidate rotates STANDBY 2 AUTO/MAN switch, located on 1AB1, to   SAT "AUTO".
END TASK STOP TIME: ____ _ CR0-602 -c Page 12 of 14 SAT UNSAT CRITICAL STEP EXPLANATIONS:
UNSAT COMMENTS:   Examiner Cue: Another operator will continue with this procedure.
STEP # Explanation 2 Step is required to energize the STBY Bus. 3 Step is required to energize the STBY Bus. 4 Step is required to energize the STBY Bus. 8 Step is required to energize the STBY Bus. 9 Step is required to energize the STBY Bus. 10 Step is required to energize the STBY Bus. 14 Step is required to energize the MFB from the STBY Bus. 15 Step is required to energize the MFB from the STBY Bus. 18 Step is required to energize the MFB from the STBY Bus. 19 Step is required to energize the MFB from the STBY Bus. 20 Step is required to energize the MFB from the STBY Bus. 21 Step is required to energize the MFB from the STBY Bus. CR0-602 -c Page 13 of 14 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:
END TASK STOP TIME: _ _ _ __
 
CR0-602 - c Page 13 of 14 CRITICAL STEP EXPLANATIONS:
STEP #                                         Explanation 2   Step is required to energize the STBY Bus.
3   Step is required to energize the STBY Bus.
4   Step is required to energize the STBY Bus.
8   Step is required to energize the STBY Bus.
9   Step is required to energize the STBY Bus.
10   Step is required to energize the STBY Bus.
14   Step is required to energize the MFB from the STBY Bus.
15   Step is required to energize the MFB from the STBY Bus.
18   Step is required to energize the MFB from the STBY Bus.
19   Step is required to energize the MFB from the STBY Bus.
20   Step is required to energize the MFB from the STBY Bus.
21   Step is required to energize the MFB from the STBY Bus.
 
c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* Oconee Unit 1 is in MODE 5.
* Oconee Unit 1 is in MODE 5.
* KHU-2 has been started by the Keowee operator.
* KHU-2 has been started by the Keowee operator.
* It is desired to energize the MFB from CT 4
* It is desired to energize the MFB from CT 4
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
* OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.
INITIATING CUES: The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT-4 Using Live Bus Transfer) beginning at step 2.4. c REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-111 CR0-111 -d Page 1 of 10 Withdrawal of Safety Rod Group 1 to 50o/o CANDIDATE EXAMINER
INITIATING CUES:
( Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Withdrawal of Safety Rod Group 1 to 50% Alternate Path: Yes Facility JPM #: CR0-111 KIA Rating(s):
The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT-4 Using Live Bus Transfer) beginning at step 2.4.
System: 001 KIA: G2.2.2 Rating: 4.6/4.1 Task Standard:
 
CR0-111 -d Page 2 of 10 Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18. Preferred Evaluation Location:
CR0-111 - d Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-111 Withdrawal of Safety Rod Group 1 to 50o/o CANDIDATE EXAMINER
Preferred Evaluation Method: Simulator
 
_X:..:__ In-Plant __ _ Perform X Simulate  
CR0-111 - d Page 2 of 10 REGION II
(
INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Withdrawal of Safety Rod Group 1 to 50%
Alternate Path:
Yes Facility JPM #:
CR0-111 KIA Rating(s):
System:   001 KIA:       G2.2.2 Rating:   4.6/4.1 Task Standard:
Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18.
Preferred Evaluation Location:                                       Preferred Evaluation Method:
Simulator _X:..:__ In-Plant _ __                                     Perform   X   Simulate


==References:==
==References:==


OP/1/A/1105/019 (Rev 023) (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) OMP 1-18 (Rev 034) Implementation Standards During Abnormal and Emergency Events Validation Time: 10 min. Time Critical:
OP/1/A/1105/019 (Rev 023) (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
No ====================================================================================
OMP 1-18 (Rev 034) Implementation Standards During Abnormal and Emergency Events Validation Time: 10 min.                                                     Time Critical: No
Candidate:
  ====================================================================================
Time Start: ______ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:
Candidate:                                                                   Time Start: _ _ _ _ _ __
____________
NAME                                           Time Finish: _ _ _ _ __
_
Performance Rating:     SAT ___ UNSAT _ __                                   Performance Time: _ _ __
___ _ NAME SIGNATURE DATE ====================================================================================
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                --------------~!_ _ __
Comments SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 206 2. IMPORT CR0-111 Simulator files 3. Go To RUN 4. Select SR/WR on NI recorder CR0-111 -d Page 3 of 10 Tools/Equipment/Procedures Needed CR0-111 -d Page 4 of 10 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed.
NAME                                         SIGNATURE                   DATE
All control room steps shall be performed for this JPM, including any required communications.
  ====================================================================================
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature  
Comments
= 339&deg;F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Control Room SRO directs you to:
 
CR0-111 - d Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS
: 1. RECALL Snap 206
: 2. IMPORT CR0-111 Simulator files
: 3. Go To RUN
: 4. Select SR/WR on NI recorder
 
CR0-111 - d Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature = 339&deg;F RCS pressure     =530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)
Control Room SRO directs you to:
* Perform an Automatic Latch of Group 1 Control Rods
* Perform an Automatic Latch of Group 1 Control Rods
* Withdraw CRD Group 1 to 50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
* Withdraw CRD Group 1 to 50% per OP/1/A/1105/019 (Control Rod Drive System)
START TIME: __ _ I STEP 1: Step 3.1 Perform the following: (R.M.)
Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
 
CR0-111 - d Page 5of10 START TIME: _ __
I STEP 1:   Step 3.1 Perform the following: (R.M.)
* Ensure RUN is ON .
* Ensure RUN is ON .
* Ensure SINGLE SELECT SWITCH to ALL . STANDARD:
* Ensure SINGLE SELECT SWITCH to ALL .
Determine control rod speed switch is selected to RUN by observing light indication on the Diamond. Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond. COMMENTS:
STANDARD: Determine control rod speed switch is selected to RUN by observing light   -  SAT indication on the Diamond.
STEP 2: Step 3.2 WHILE CRDs are moving, monitor the following indications:
Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond.
                                                                                      -    UNSAT COMMENTS:
STEP 2:   Step 3.2 WHILE CRDs are moving, monitor the following indications:
* CRD position
* CRD position
                                                                                        -  SAT
* Appropriate ranged Nls
* Appropriate ranged Nls
* Startup Rate STANDARD:
* Startup Rate STANDARD: As CRDs are withdrawn monitor the above indications.
As CRDs are withdrawn monitor the above indications.
                                                                                        -  UNSAT COMMENTS:
COMMENTS:
 
CR0-111 -d Page 5of10 SAT -UNSAT -SAT -UNSAT -
CR0-111 - d Page 6 of 10 I NOTE: When LATCH AUTO is selected, the following automatically occurs:                   *CRITICAL STEP
I NOTE: When LATCH AUTO is selected, the following automatically occurs:
* Group/Rod inserts to latch rods (CRD TRAVEL "In" light ON)
* Group/Rod inserts to latch rods (CRD TRAVEL "In" light ON)
* Group/Rod withdraws to test for latching (CRD TRAVEL "Out" light ON)
* Group/Rod withdraws to test for latching (CRD TRAVEL "Out" light ON)
* Group/Rod inserts (CRD TRAVEL "In" light ON)
* Group/Rod inserts (CRD TRAVEL "In" light ON)
* RPI resets .
* RPI resets .
* Group In Limit light on Diamond will momentarily extinguish then illuminate . STEP 3: Step 3.3 Perform Latch and Pl alignment of Group 1, as follows: (R.M.) 3.3.1 Ensure GROUP SELECT SWITCH to 1. 3.3.2 Verify only Group 1 CONTROL ON lights are ON. (Pl panel) {9} 3.3.4 If Manual Latch and Pl Alignment is desired, perform the following: (Per initiating cue, Manual is NOT desired) 3.3.4 If Auto Latch and Pl Alignment desired, perform the following:
* Group In Limit light on Diamond will momentarily extinguish then illuminate .
A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:  
STEP 3:         Step 3.3 Perform Latch and Pl alignment of Group 1, as follows: (R.M.)
>-Verify LATCH AUTO is OFF. >-Verify Group 1 0% lights are ON. (Pl Panel) >-Verify Group 1 APl/RPI indications agree. (Pl Panel) STANDARD:  
3.3.1 Ensure GROUP SELECT SWITCH to 1.
*Rotate GROUP SELECT SWITCH to 1. Determine that only Group 1 CONTROL ON lights are "ON" on the Pl panel. *Depress the LATCH AUTO pushbutton.
3.3.2 Verify only Group 1 CONTROL ON lights are ON. (Pl panel) {9}
3.3.4 If Manual Latch and Pl Alignment is desired, perform the following:
(Per initiating cue, Manual is NOT desired)
                                                                                              -    SAT 3.3.4 If Auto Latch and Pl Alignment desired, perform the following:
A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:
                            >- Verify LATCH AUTO is OFF.
                            >- Verify Group 1 0% lights are ON. (Pl Panel)
                            >- Verify Group 1 APl/RPI indications agree. (Pl Panel)           -    UNSAT STANDARD:       *Rotate GROUP SELECT SWITCH to 1.
Determine that only Group 1 CONTROL ON lights are "ON" on the Pl panel.
                  *Depress the LATCH AUTO pushbutton.
WHEN Auto Latch is complete:
WHEN Auto Latch is complete:
* Verify LATCH AUTO is OFF .
* Verify LATCH AUTO is OFF .
* Verify Group 1 0% lights are ON. (Pl Panel)
* Verify Group 1 0% lights are ON. (Pl Panel)
* Verify Group 1 APl/RPI indications agree using the position switch on the Pl Panel. COMMENTS:
* Verify Group 1 APl/RPI indications agree using the position switch on the Pl Panel.
CR0-111 -d Page 6 of 10 *CRITICAL STEP SAT -UNSAT -
COMMENTS:
I STEP 4: Step 3.4 Select FAULT RESET STANDARD:
 
Depress FAULT RESET pushbutton on the diamond panel. COMMENTS:
CR0-111 - d Page 7 of 10 I STEP 4:   Step 3.4 Select FAULT RESET
STEP 5: Step 3.5 Select Group 1, as follows: (R.M.) Ensure GROUP SELECT SWITCH to 1. Ensure only Group 1 CONTROL ON lights are ON. (Pl panel} Ensure Group 1 at 50%. (R.M.) Place GROUP SELECT SWITCH to OFF. STANDARD:
                                                                                      -    SAT STANDARD: Depress FAULT RESET pushbutton on the diamond panel.
Ensure GROUP SELECT SWITCH to 1. Determine that only Group 1 CONTROL ON lights are ON on the Pl panel. *Begin withdrawing Group 1 Control Rods to 50% Manually Trip the Rx when two or more CROM stator temperatures are<:: 180&deg;F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.
COMMENTS:
COMMENTS:
CR0-111 -d Page 7 of 10 SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -
                                                                                      -   UNSAT STEP 5:    Step 3.5                                                              *CRITICAL STEP Select Group 1, as follows: (R.M.)
I AL TERNA TE PA TH: As rods are withdrawn, CRD temperatures will begin to increase.
                ~    Ensure GROUP SELECT SWITCH to 1.
STEP 6: Manually Trip the Rx when two or more CROM stator temperatures are ;::: 180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) STANDARD:
                ~    Ensure only Group 1 CONTROL ON lights are ON. (Pl panel}
Candidate Manually Trip the Rx when two or more CRDM stator temperatures are;::: 180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items) EXAMINER NOTE: At:::: 10% withdrawn, CRD stator temperatures will begin to increase.
                ~    Ensure Group 1 at 50%. (R.M.)                                  -    SAT
At:::: 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 1BOF, Trip the Rx. COMMENTS:
                ~    Place GROUP SELECT SWITCH to OFF.
END OF TASK TIME STOP: __ _ CR0-111 -d Page 8 of 10 CRITICAL STEP SAT UNSAT CRITICAL STEP EXPLANATIONS . EP # Explanation 3 This step is required to withdraw group 1 control rods. 5 This step is required to withdraw group 1 control rods. CR0-111 -d Page 9 of 10 6 This step is required to manually trip the reactor when CRD temperature limits are exceeded.
STANDARD:  Ensure GROUP SELECT SWITCH to 1.
d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature  
Determine that only Group 1 CONTROL ON lights are ON on the Pl panel.
= 339&deg;F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Control Room SRO directs you to:
                                                                                      -   UNSAT
            *Begin withdrawing Group 1 Control Rods to 50%
Manually Trip the Rx when two or more CROM stator temperatures are<::
180&deg;F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items)
ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.
COMMENTS:
 
CR0-111 - d Page 8 of 10 I AL TERNA TE PA TH: As rods are withdrawn, CRD temperatures will begin to increase.
CRITICAL STEP STEP 6:         Manually Trip the Rx when two or more CROM stator temperatures are ;:::
180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items)
STANDARD:       Candidate Manually Trip the Rx when two or more CRDM stator temperatures are;::: 180F IAW OMP 1-18 Attachment A (Licensed               SAT Operator Memory Items)
EXAMINER NOTE: At:::: 10% withdrawn, CRD stator temperatures will begin to increase. At:::: 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 1BOF, Trip the Rx.                       UNSAT COMMENTS:
END OF TASK TIME STOP: _ __
 
CR0-111 - d Page 9 of 10 CRITICAL STEP EXPLANATIONS
. EP #                                         Explanation 3   This step is required to withdraw group 1 control rods.
5   This step is required to withdraw group 1 control rods.
6   This step is required to manually trip the reactor when CRD temperature limits are exceeded.
 
d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature     = 339&deg;F RCS pressure   = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)
Control Room SRO directs you to:
* Perform an Automatic Latch of Group 1 Control Rods
* Perform an Automatic Latch of Group 1 Control Rods
* Withdraw CRD Group 1to50% per OP/1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
* Withdraw CRD Group 1to50% per OP/1/A/1105/019 (Control Rod Drive System)
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-225 CR0-225 -e Page 1 of 11 Align letdown with 1 HP-14 failed in 11 Bleed 11 CANDIDATE EXAMINER Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Align letdown with 1 HP-14 failed in 'Bleed" Alternate Path: No Facility JPM #: CR0-225 KIA Rating(s):
Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.
System: 002 KIA: A2.01 Rating: 4.3/4.4 Task Standard:
 
CR0-225 -e Page 2 of 11 Students align letdown with 1 HP-14 failed in the 'Bleed' position IAW AP/2 Preferred Evaluation Location:
CR0-225 - e Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-225 Align letdown with 1 HP-14 failed in 11 Bleed 11 CANDIDATE EXAMINER
Preferred Evaluation Method: Simulator  
 
-=-X.:..-_
CR0-225 - e Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
In-Plant __ _ Perform X Simulate  
Align letdown with 1HP-14 failed in 'Bleed" Alternate Path:
No Facility JPM #:
CR0-225 KIA Rating(s):
System:   002 KIA:       A2.01 Rating:   4.3/4.4 Task Standard:
Students align letdown with 1 HP-14 failed in the 'Bleed' position IAW AP/2 Preferred Evaluation Location:                                           Preferred Evaluation Method:
Simulator -=-X.:..-_ In-Plant _ __                                         Perform   X   Simulate


==References:==
==References:==


AP/1/A/1700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A/1800/001 (Rev 039) Enclosure 5.5, PZR and LOST Level Control. Validation Time: 14 min. Time Critical:
AP/1/A/1700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A/1800/001 (Rev 039) Enclosure 5.5, PZR and LOST Level Control.
No ====================================================================================
Validation Time:     14 min.                                                       Time Critical: No
Candidate:
====================================================================================
Time Start: ______ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:
Candidate:                                                                         Time Start: _ _ _ _ _ __
____________
NAME                                             Time Finish: _ _ _ _ __
_
Performance Rating:       SAT ___ UNSAT _ __                                       Performance Time: _ _ __
___ _ NAME SIGNATURE DATE ====================================================================================
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                        --------------~*!_ _ __
Comments SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 207 2. IMPORT CR0-225 Simulator files 3. WHEN directed by Lead Examiner, Go To RUN CR0-225 -e Page 3 of 11 Tools/Equipment/Procedures Needed
NAME                                           SIGNATURE                   DATE
====================================================================================
Comments
 
CR0-225 - e Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 207
: 2. IMPORT CR0-225 Simulator files
: 3. WHEN directed by Lead Examiner, Go To RUN
 
CR0-225 - e Page 4 of 11 Tools/Equipment/Procedures Needed
* EP/1/A/1800/001 Enclosure 5.5 (PZR and LOST Level Control)
* EP/1/A/1800/001 Enclosure 5.5 (PZR and LOST Level Control)
* AP/1/A/1700/002 (Excessive RCS Leakage) READ TO OPERATOR DIRECTIONS TO STUDENT CR0-225 -e Page 4 of 11 I will explain the initial conditions, and state the task to be performed.
* AP/1/A/1700/002 (Excessive RCS Leakage)
All control room steps shall be performed for this JPM, including any required communications.
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
INITIAL CONDITIONS
* Reactor Power is 100%
* Reactor Power is 100%
* AP/1/A/1700/002 is in progress due to 1 HP-14 failing in the BLEED position.
* AP/1/A/1700/002 is in progress due to 1HP-14 failing in the BLEED position.
* Another RO is making up to the LOST per Encl 5.5 of the EOP. INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.
* Another RO is making up to the LOST per Encl 5.5 of the EOP.
START TIME: __ _ I STEP 1: Step 4.155 Verify 1 A LD Filter in service. STANDARD:
INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.
Student observes 1 B Letdown (LO) Filter is in service and the 1 A LD Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO. COMMENTS:
 
STEP 2: Step 4.155 RNO 1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure. (N/ A) 2. Open 1HP-17 STANDARD:
CR0-225 - e Page 5 of 11 START TIME: _ __
Student recognizes that 1 A LD Filter is Available.  
I STEP 1:   Step 4.155 Verify 1A LD Filter in service.
*Student opens 1 H P-17. COMMENTS:
STANDARD: Student observes 1B Letdown (LO) Filter is in service and the 1A LD
STEP 3: Step 4.156 Close 1HP-6 STANDARD:
                                                                                          -    SAT Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO.
Student closes 1 HP-6 COMMENTS:
COMMENTS:
CR0-225 -e Page 5 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -
                                                                                          -    UNSAT STEP 2:   Step 4.155 RNO                                                             CRITICAL STEP
I NOTE TS 3.4.9 applies when indicated PZR Level> 260" (corrected value for 285') STEP 4: Step 4.157 Adjust 1 HP-7, as needed, to control: *BLEED flow out of failed 1 HP-14
: 1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure. (N/A)
* Pzr level STANDARD:
: 2. Open 1HP-17 STANDARD: Student recognizes that 1A LD Filter is Available.
Student adjusts 1 HP-7 as necessary to control PZR level. COMMENTS:
            *Student opens 1H P-17.
STEP 5: Step 4.158 Dispatch an operator to open 1 H P-196 STANDARD:
                                                                                          -    SAT COMMENTS:
Student dispatches an AO to open 1 HP-196 BOOTH CUE: Open 1 HP-196 with Manual Valves COMMENTS:
                                                                                            -    UNSAT STEP 3:   Step 4.156 Close 1HP-6 STANDARD: Student closes 1HP-6
CR0-225 -e Page 6 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -
                                                                                            -    SAT COMMENTS:
I STEP 6: Step 4.159 Verify CC System in Operation.
                                                                                            -    UNSAT
STANDARD:
 
Student observes:
CR0-225 - e Page 6 of 11 I                                         NOTE TS 3.4.9 applies when indicated PZR Level> 260" (corrected value for 285')
STEP 4:       Step 4.157 Adjust 1HP-7, as needed, to control:                               -    SAT
                *BLEED flow out of failed 1HP-14
* Pzr level STANDARD:     Student adjusts 1HP-7 as necessary to control PZR level.
                                                                                    -    UNSAT COMMENTS:
STEP 5:       Step 4.158                                                       CRITICAL STEP Dispatch an operator to open 1H P-196 STANDARD:     Student dispatches an AO to open 1HP-196                                 SAT BOOTH CUE: Open 1HP-196 with Manual Valves COMMENTS:
                                                                                      -    UNSAT
 
CR0-225 - e Page 7 of 11 I STEP 6:     Step 4.159 Verify CC System in Operation.
                                                                                -    SAT STANDARD:   Student observes:
* At least one CC pump in operation
* At least one CC pump in operation
* CC return flow is > 575 gpm COMMENTS:
* CC return flow is > 575 gpm COMMENTS:                                                                   -    UNSAT STEP 7:     Step 4.160 Position the standby HPI pump switch to OFF.
STEP 7: Step 4.160 Position the standby HPI pump switch to OFF. STANDARD:
                                                                                -    SAT STANDARD:   Student places the standby (1 B) HPIP switch to OFF COMMENTS:
Student places the standby (1 B) HPIP switch to OFF COMMENTS:
UNSAT STEP 8:     Step 4.161 Initiate monitoring RCP parameters.
STEP 8: Step 4.161 Initiate monitoring RCP parameters.
                                                                                -    SAT STANDARD:   Student refers to OAC TOC-RCP and control board indications to monitor RCP parameters.
STANDARD:
Booth Cue: Notify the student that 1HP-196 is open.
Student refers to OAC TOC-RCP and control board indications to monitor RCP parameters.
                                                                              -    UNSAT COMMENTS:
Booth Cue: Notify the student that 1 HP-196 is open. COMMENTS:
 
CR0-225 -e Page 7 of 11 SAT -UNSAT -SAT -UNSAT SAT -UNSAT -
CR0-225 - e Page 8 of 11 I STEP 9:   Step 4.162 Throttle 1HP-31 to establish 12-15 gpm SEAL INLET HEADER FLOW.     -    SAT STANDARD: Student throttles 1HP-31 to establish 12-15 gpm.
I STEP 9: Step 4.162 Throttle 1HP-31 to establish 12-15 gpm SEAL INLET HEADER FLOW. STANDARD:
COMMENTS:
Student throttles 1 HP-31 to establish 12-15 gpm. COMMENTS:
                                                                              -      UNSAT STEP 10: Step 4.163                                                     CRITICAL STEP When 1HP-196 is open, THEN close 1CS-26.
STEP 10: Step 4.163 When 1HP-196 is open, THEN close 1CS-26. STANDARD:
                                                                                -    SAT STANDARD: Student closes 1CS-26.
Student closes 1 CS-26. COMMENTS:
COMMENTS:
STEP 11: Step 4.164 Close the following;
                                                                              -      UNSAT STEP 11: Step 4.164 Close the following;
* 1CS-27
* 1CS-27
* 1CS-32 & 37 STANDARD:
                                                                                -    SAT
Student verifies closed 1 CS-27, 1 CS-32, and 1 CS-37. COMMENTS:
* 1CS-32 & 37 STANDARD: Student verifies closed 1CS-27, 1CS-32, and 1CS-37.
STEP 12: Step 4.165 Open 1HP-6 STANDARD:
                                                                              -    UNSAT COMMENTS:
Student opens 1 HP-6. COMMENTS:
STEP 12: Step 4.165 Open 1HP-6
CR0-225 -e Page 8 of 11 SAT -UNSAT -CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
                                                                                -    SAT STANDARD: Student opens 1HP-6.
I STEP 13: Step 4.166 Throttle 1HP-31 to establish==
COMMENTS:
32 gpm SEAL INLET HOR FLOW. STANDARD:
                                                                              -    UNSAT
Student throttles open 1 HP-31 to establish==
 
32 gpm SEAL INLET HOR FLOW. COMMENTS:
CR0-225 - e Page 9 of 11 I STEP 13:   Step 4.166 Throttle 1HP-31 to establish== 32 gpm SEAL INLET HOR FLOW.
STEP 14: Step 4.167 Adjust 1HP-7 to establish desired letdown flow. STANDARD:
                                                                                          -    SAT STANDARD:   Student throttles open 1HP-31 to establish== 32 gpm SEAL INLET HOR FLOW.
Student throttles open 1 HP-7 to establish  
COMMENTS:
== 75 gpm letdown flow. COMMENTS:
                                                                                      -      UNSAT STEP 14:   Step 4.167 Adjust 1HP-7 to establish desired letdown flow.                             -    SAT STANDARD:   Student throttles open 1HP-7 to establish == 75 gpm letdown flow.
STEP 15: Step 4.168 Position the standby HPI pump switch to AUTO STANDARD:
Student places the standby (18) HPIP switch to AUTO EXAMINER CUE: Notify the candidate that another operator will continue with this procedure.
COMMENTS:
COMMENTS:
END TASK TIME STOP: __ _ CR0-225 -e Page 9 of 11 SAT -UNSAT -SAT -UNSAT -CRITICAL TASK SAT -UNSAT -
                                                                                        -      UNSAT STEP 15:  Step 4.168                                                            CRITICAL TASK Position the standby HPI pump switch to AUTO
CRITICAL STEP EXPLANATIONS
                                                                                          -    SAT STANDARD:  Student places the standby (18) HPIP switch to AUTO EXAMINER CUE: Notify the candidate that another operator will continue with this procedure.
_ j EP # Explanation 2 1 HP-17 must be opened to align the alternate letdown flow path. 5 1 HP-196 must be open for the alternate letdown flow path. 10 1 CS-26 is closed to isolate the flow path going to the BHUTs. CR0-225 -e Page 10 of 11 15 The standby H Pl P ( 1 B) control switch is placed back in AUTO to protect RCP seals by automatically starting the standby HPIP if low seal injection flow (<22 gpm) is detected.
COMMENTS:                                                                            -      UNSAT END TASK TIME STOP: _ __
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS
 
CR0-225 - e Page 10 of 11 CRITICAL STEP EXPLANATIONS
_ j EP #                                         Explanation 2   1HP-17 must be opened to align the alternate letdown flow path.
5   1HP-196 must be open for the alternate letdown flow path.
10   1CS-26 is closed to isolate the flow path going to the BHUTs.
15   The standby H Pl P ( 1B) control switch is placed back in AUTO to protect RCP seals by automatically starting the standby HPIP if low seal injection flow (<22 gpm) is detected.
 
e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
* Reactor Power is 100%
* Reactor Power is 100%
* AP/1/A/1700/002 is in progress due to 1 HP-14 failing in the BLEED position.
* AP/1/A/1700/002 is in progress due to 1HP-14 failing in the BLEED position.
* Another RO is making up to the LOST per Encl 5.5 of the EOP. INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155. e REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a START FOURTH REACTOR COOLANT PUMP CR0-408a-f Page 1 of 11 CANDIDATE:-----------------
* Another RO is making up to the LOST per Encl 5.5 of the EOP.
INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.
 
CR0-408a- f Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a START FOURTH REACTOR COOLANT PUMP CANDIDATE:-----------------
EXAMINER:-----------------
EXAMINER:-----------------
Task: Start the fourth RCP Alternate Path: Yes Facility JPM #: CR0-038a KIA Rating(s):
 
System: 003 KIA: A4.06 Rating: 2.9*/2.9 Task Standard:
CR0-408a - f Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a -f Page 2 of 11 182 RCP is started in accordance with OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) and then secured per AP/16 due to high vibration Preferred Evaluation Location:
Start the fourth RCP Alternate Path:
Simulator  
Yes Facility JPM #:
--=-X-'--In-Plant __ _
CR0-038a KIA Rating(s):
System: 003 KIA:       A4.06 Rating: 2.9*/2.9 Task Standard:
182 RCP is started in accordance with OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) and then secured per AP/16 due to high vibration Preferred Evaluation Location:                                          Preferred Evaluation Method:
Simulator --=-X-'-- In-Plant _ __                                       Perform _X_ Simulate


==References:==
==References:==


OP/1/N1102/001 (Controlling Procedure for Unit Startup) OP/1/N1103/006 Encl. 4.4 (Starting 182 RCP) AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)
OP/1/N1102/001 (Controlling Procedure for Unit Startup)
ARG 1 SA-2 I E-2 (RC Pump Vibrations Emergency High) Validation Time: 18 minutes Preferred Evaluation Method: Perform _X_ Simulate Time Critical:
OP/1/N1103/006 Encl. 4.4 (Starting 182 RCP)
No =====================================================================================
AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)
Candidate:
ARG 1SA-2 I E-2 (RC Pump Vibrations Emergency High)
Time Start: NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: __ _ Examiner:
Validation Time: 18 minutes                                             Time Critical: No
____________
=====================================================================================
_
Candidate:                                                                       Time Start:
___ _ NAME SIGNATURE DATE =====================================================================================
NAME                                             Time Finish: _ _ _ _ __
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS  
Performance Rating: SAT ___ UNSAT _ __                                           Performance Time: _ __
: 1. Recall Snap 21 O 2. Import files for CR0-408a 3. Ensure all breaker flags are set to current plant conditions  
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                      --------------~!_ _ __
: 4. When directed by lead examiner, Go to Run. CR0-408a -f Page 3 of 11 Tools/Equipment/Procedures Needed: OP/1/A/1102/001 (Controlling Procedure for Unit Startup) OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) ARG 1 SA-2 I D-2 (RC Pump Vibration High) ARG 1 SA-2 I E-2 (RC Pump Vibration Emergency High) READ TO OPERATOR DIRECTION TO TRAINEE CR0-408a -f Page 4 of 11 I will explain the initial conditions, and state the task to be performed.
NAME                                           SIGNATURE                   DATE
All control room steps shall be performed for this JPM, including any required communications.
=====================================================================================
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature=
COMMENTS
471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1IA/1103/006 Encl. 4.4 beginning with step 2.1.
 
START TIME: __ _ I STEP 1: Step 2.1.1 Announce "Starting 182 RCP" via plant page. STANDARD:
CR0-408a - f Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS
Announces "Starting 182 RCP" using the plant page system. COMMENTS:
: 1. Recall Snap 21 O
STEP 2: Step 2.1.2 IF AT ANY TIME Oil Lift Pump low discharge pressure clears, Go To Step 2.1.6 STANDARD:
: 2. Import files for CR0-408a
Reads IAAT step and determines it does not currently apply COMMENTS:
: 3. Ensure all breaker flags are set to current plant conditions
I NOTE: AC Oil Lift Pump may take> 2 minutes to develop adequate discharge pressure.
: 4. When directed by lead examiner, Go to Run.
STEP 3: Step 2.1.3 IF available, start AC Oil Lift Pump on 182 RCP. STANDARD:
 
Determines AC Oil Lift Pump is available and: * *Rotates AC Oil Lift Pump switch to start
CR0-408a - f Page 4 of 11 Tools/Equipment/Procedures Needed:
OP/1/A/1102/001 (Controlling Procedure for Unit Startup)
OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP)
ARG 1SA-2 I D-2 (RC Pump Vibration High)
ARG 1SA-2 I E-2 (RC Pump Vibration Emergency High)
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature= 471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1IA/1103/006 Encl. 4.4 beginning with step 2.1.
 
CR0-408a - f Page 5 of 11 START TIME: _ __
I STEP 1:       Step 2.1.1 Announce "Starting 182 RCP" via plant page.
                                                                                          -  SAT STANDARD:     Announces "Starting 182 RCP" using the plant page system.
COMMENTS:                                                                             -  UNSAT STEP 2:       Step 2.1.2 IF AT ANY TIME Oil Lift Pump low discharge pressure clears, Go To Step 2.1.6
                                                                                          -  SAT STANDARD:     Reads IAAT step and determines it does not currently apply COMMENTS:                                                                             -  UNSAT I NOTE: AC Oil Lift Pump may take> 2 minutes to develop adequate discharge pressure. I *CRITICAL STEP STEP 3:       Step 2.1.3 IF available, start AC Oil Lift Pump on 182 RCP.
STANDARD:     Determines AC Oil Lift Pump is available and:
                          *   *Rotates AC Oil Lift Pump switch to start
                                                                                          -  SAT
* Observes red light on and green light off
* Observes red light on and green light off
* Monitors discharge pressure status on OAC
* Monitors discharge pressure status on OAC
* Low discharge pressure warning will clear on OAC Candidate determines that IAAT Step 2.1.2 now applies and moves ahead to Step 2.1.6 COMMENTS:
* Low discharge pressure warning will clear on OAC Candidate determines that IAAT Step 2.1.2 now applies and moves ahead to Step 2.1.6
I CR0-408a -f Page 5 of 11 SAT -UNSAT -SAT -UNSAT -*CRITICAL STEP SAT -UNSAT -
                                                                                          -  UNSAT COMMENTS:
STEP 4: Step 2.1.6 WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1 B2 RCP. STANDARD:
 
Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1 B2 RCP as follows: * *Rotate 1 B2 RCP switch to ST ART
CR0-408a - f Page 6 of 11 STEP 4:     Step 2.1.6                                                               *CRITICAL STEP WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1B2 RCP.
* Verify red lights on and green light off
STANDARD:   Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1B2 RCP as follows:
                      *   *Rotate 1B2 RCP switch to ST ART
* Verify red lights on and green light off                     -  SAT
* Verify starting current
* Verify starting current
* Verify OAC indications support pump start COMMENTS:
* Verify OAC indications support pump start
STEP 5: Step 2.1.7 After RCP is at full speed, perform the following:
                                                                                        -  UNSAT COMMENTS:
STEP 5:     Step 2.1.7 After RCP is at full speed, perform the following:
A. Ensure the following stopped
A. Ensure the following stopped
* AC Oil Lift Pump
* AC Oil Lift Pump
* DC Oil Lift Pump B. If AC Oil Lift Pump was operated, position AC Oil Lift Pump switch to "OFF" C. If DC Oil Lift Pump was operated, position AC Oil Lift Pump switch to "OFF" STANDARD:
* DC Oil Lift Pump B. If AC Oil Lift Pump was operated, position AC Oil Lift Pump switch to "OFF" C. If DC Oil Lift Pump was operated, position AC Oil Lift Pump switch to   -  SAT "OFF"
Once 1 B2 RCP is at rated speed,
                                                                                        -  UNSAT STANDARD:   Once 1B2 RCP is at rated speed,
* Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1 SA-9 I D-2 (RC Pump Vibration High) and 1 SA-2 I E-2 (RC Pump Vibration Emergency High) will alarm sec after starting 182 RCP. COMMENTS:
* Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1SA-9 I D-2 (RC Pump Vibration High) and 1SA-2 I E-2 (RC Pump Vibration Emergency High) will alarm ~30 sec after starting 182 RCP.
CR0-408a -f Page 6 of 11 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -
COMMENTS:
STEP 6: 1 SA-9 I D-2 (RC Pump Vibration High) 1 SA-9 I E-2 (RC Pump Vibration Emergency High) Step 3.1 Use one of the following means to verify RCP vibration conditions:
 
CR0-408a - f Page 7 of 11 STEP 6:   1SA-9 I D-2 (RC Pump Vibration High) 1SA-9 I E-2 (RC Pump Vibration Emergency High)
Step 3.1 Use one of the following means to verify RCP vibration conditions:
* Verify vibration readings on RCP OAC Display Group RCP .
* Verify vibration readings on RCP OAC Display Group RCP .
* IF the OAC is unavailable, verify the alarm by referring to RCP Vibration Monitoring Chart Recorder.
* IF the OAC is unavailable, verify the alarm by referring to RCP -  SAT Vibration Monitoring Chart Recorder.
STANDARD:
STANDARD: Candidate verifies vibration readings apply by referring to the OAC Display Group RCP.                                                       -  UNSAT EXAMINER NOTE: The Candidate may refer to either 1SA-9 I D-2 (High Vibration) or 1SA-9 I E-2 (Emergency High Vibration). ARG guidance is similar in either case.
Candidate verifies vibration readings apply by referring to the OAC Display Group RCP. EXAMINER NOTE: The Candidate may refer to either 1 SA-9 I D-2 (High Vibration) or 1SA-9 I E-2 (Emergency High Vibration).
ARG guidance is similar in either case. COMMENTS:
STEP 7: 1 SA-9 I D-2 (RC Pump Vibration High) Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure), swap Vibration Monitor power supplies:
STANDARD:
Candidate determines that 1 B1 RCP vibrations are not increasing and Step 3.2 does not apply. Candidate continues to Step 3.3. EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm.
(1 SA-9 I E-2) COMMENTS:
CR0-408a -f Page 7 of 11 SAT -UNSAT -SAT -UNSAT -
STEP 8: 1 SA-9 I D-2 (RC Pump Vibration High) Step 3.3 1 SA-9 I E-2 (RC Pump Vibration Emergency High) Step 3.2 IF MODE 1 or 2, initiate AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)
STANDARD:
Candidate initiates AP/1/A/1700/016 for High Vibration on 182 RCP. EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16. COMMENTS:
STEP 9: Step 4.1 IAAT any RCP meets immediate trip criteria of Encl 5.1 (RCP Immediate Trip Criteria), THEN perform Steps 4.2 -4.11 . STANDARD:
Candidate refers to AP/16 Enclosure 5.1 and determines that 182 RCP meets Immediate Trip Criteria due to High Vibrations.
COMMENTS:
COMMENTS:
STEP 10: Step 4.2 Verify MODE 1 or 2 STANDARD:
STEP 7:   1SA-9 I D-2 (RC Pump Vibration High)
Candidate verifies that Unit 1 is in MODE 3 and moves to Step 4.2 RNO. COMMENTS:
Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure), swap Vibration Monitor power supplies:                                                    SAT STANDARD: Candidate determines that 1B1 RCP vibrations are not increasing and Step 3.2 does not apply.
CR0-408a -f Page 8 of 11 SAT --UNSAT SAT -UNSAT -SAT -UNSAT -
Candidate continues to Step 3.3.                                        - UNSAT EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm. (1 SA-9 I E-2)
STEP 11: Step 4.2 RNO Stop the affected RCP. STANDARD:
Candidate stops the 182 RCP. EXAMINER CUE: Another operator will continue with this procedure.
COMMENTS:
COMMENTS:
END TASK STOP TIME: ____ _ CR0-408a -f Page 9 of 11 CRITICAL STEP SAT UN SAT CRITICAL STEP EXPLANATIONS STEP # Explanation 4 Required to start the 182 RCP 11 Required to stop 182 RCP CR0-408a -f Page 10 of 11 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK) INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature=
 
471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1/A/1103/006 Encl. 4.4 beginning with step 2.1.
CR0-408a - f Page 8 of 11 STEP 8:    1SA-9 I D-2 (RC Pump Vibration High)
CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 PUMP THE QUENCH TANK CR0-508 -g Page 1 of 9 Task: Pump the Quench Tank Alternate Path: No Facility JPM #: CR0-508 KIA Rating(s):
Step 3.3 1SA-9 I E-2 (RC Pump Vibration Emergency High)
System: 007 KIA: A1.01 Rating: 2.9/3.1 Task Standard:
Step 3.2 IF MODE 1 or 2, initiate AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 -g Page 2 of 9 Utilize OP/1/A/1104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches. Preferred Evaluation Location:
                                                                                  -  SAT STANDARD:  Candidate initiates AP/1/A/1700/016 for High Vibration on 182 RCP.
Preferred Evaluation Method: Simulator
                                                                                  -  UNSAT EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16.
_x_ In-Plant __ _ Perform X Simulate  
COMMENTS:
STEP 9:    Step 4.1 IAAT any RCP meets immediate trip criteria of Encl 5.1 (RCP Immediate Trip Criteria),
THEN perform Steps 4.2 - 4.11 .
                                                                                  -  SAT STANDARD:  Candidate refers to AP/16 Enclosure 5.1 and determines that 182 RCP meets Immediate Trip Criteria due to High Vibrations.
COMMENTS:                                                                        -  UNSAT STEP 10:  Step 4.2 Verify MODE 1 or 2 STANDARD:  Candidate verifies that Unit 1 is in MODE 3 and moves to Step 4.2 RNO. -  SAT COMMENTS:
                                                                                  -  UNSAT
 
CR0-408a - f Page 9 of 11 STEP 11:  Step 4.2 RNO CRITICAL STEP Stop the affected RCP.
STANDARD:  Candidate stops the 182 RCP.
SAT EXAMINER CUE: Another operator will continue with this procedure.
COMMENTS:                                                              UN SAT END TASK STOP TIME: _ _ _ __
 
CR0-408a - f Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP #                         Explanation 4   Required to start the 182 RCP 11   Required to stop 182 RCP
 
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK)
INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature= 471&deg;F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1/A/1103/006 Encl. 4.4 beginning with step 2.1.
 
CR0-508 - g Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 PUMP THE QUENCH TANK CANDIDATE EXAMINER
 
CR0-508 - g Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Pump the Quench Tank Alternate Path:
No Facility JPM #:
CR0-508 KIA Rating(s):
System: 007 KIA:     A1.01 Rating: 2.9/3.1 Task Standard:
Utilize OP/1/A/1104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches.
Preferred Evaluation Location:                                         Preferred Evaluation Method:
Simulator _x_ In-Plant _ __                                             Perform   X   Simulate


==References:==
==References:==


Validation Time: 10 minutes Time Critical:
Validation Time: 10 minutes                                             Time Critical: NO
NO ====================================================================================
====================================================================================
Candidate:
Candidate:                                                                             Time Start: _ _ __
Time Start: ___ _ NAME Time Finish: ___ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:
NAME                                                   Time Finish: _ _ __
____________
Performance Rating:     SAT ___ UNSAT _ __                                     Performance Time: _ _ __
_ _______________
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                   _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___,!_ _ __
__,! ___ _ NAME SIGNATURE DATE ====================================================================================
NAME                                           SIGNATURE                     DATE
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS  
====================================================================================
: 1. RECALL Snap 211 2. Place TIO sheet tags on QT Drain Pump and Component Drain Pump. CR0-508 -g Page 3 of 9 3. Update Boron Status board to show last 1 A BHUT boron sample as being > 24 hours old. 4. Provide a copy of OP/1/A/1104/017 Encl 4.1 with the following:
COMMENTS
 
CR0-508 - g Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS
: 1. RECALL Snap 211
: 2. Place TIO sheet tags on QT Drain Pump and Component Drain Pump.
: 3. Update Boron Status board to show last 1A BHUT boron sample as being > 24 hours old.
: 4. Provide a copy of OP/1/A/1104/017 Encl 4.1 with the following:
* Limits & Precautions
* Limits & Precautions
* Steps 1.1 through 1.4 signed off. 5. Go to RUN Tools/Equipment/Procedures Needed:
* Steps 1.1 through 1.4 signed off.
: 5. Go to RUN
 
CR0-508 - g Page 4 of 9 Tools/Equipment/Procedures Needed:
* OP/1/A/1104/017 Limits & Precautions
* OP/1/A/1104/017 Limits & Precautions
* OP/1/A/1104/017 Enclosure 4.1 READ TO OPERATOR DIRECTION TO TRAINEE CR0-508 -g Page 4 of 9 I will explain the initial conditions, and state the task to be performed.
* OP/1/A/1104/017 Enclosure 4.1 READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
All control room steps shall be performed for this JPM, including any required communications.
INITIAL CONDITIONS
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
* Unit 1 is Shutdown
* Unit 1 is Shutdown
* Unit 1 Quench Tank level is:::::: 86"
* Unit 1 Quench Tank level is:::::: 86"
* Quench Tank is aligned to 1 A BHUT
* Quench Tank is aligned to 1A BHUT
* Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at:::::: 75" START TIME: __ _ STEP 1: Step 2.1 Ensure open: _ 1 CS-5 (COMPONENT DRN PUMP SUCTION) _ 1 CS-6 (COMPONENT DRN PUMP SUCTION) STANDARD:
* Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at:::::: 75"
Candidate ensures 1 CS-5 and 1 CS-6 are open by taking the control switches located on 1AB1 to the open position and verifying red open light illuminated and green closed light OFF. Candidate continues to Step 2.2. COMMENTS:
 
STEP 2: Step 2.2 IF QT level will be maintained in normal operating band: 2.2.1 IF desired, start COMPONENT DRAIN PUMP. 2.2.2 IF desired, start QUENCH TANK DRAIN PUMP. STANDARD:
CR0-508 - g Page 5 of 9 START TIME: _ __
Candidate recognizes from the Initial Conditions that this step is N/A and moves on to Step 2.3 NOTE: The normal operating band for Quench Tank level is 80-100" when RCS pressure>
STEP 1:       Step 2.1                                                                   CRITICAL STEP Ensure open:
45 psig per L&P 2.4 of OP/1/A/1104/017.
_ 1CS-5 (COMPONENT DRN PUMP SUCTION)
_ 1CS-6 (COMPONENT DRN PUMP SUCTION)
                                                                                            -  SAT STANDARD:     Candidate ensures 1CS-5 and 1CS-6 are open by taking the control switches located on 1AB1 to the open position and verifying red open light illuminated and green closed light OFF.
                                                                                            -  UNSAT Candidate continues to Step 2.2.
COMMENTS:
STEP 2:       Step 2.2 IF QT level will be maintained in normal operating band:
2.2.1 IF desired, start COMPONENT DRAIN PUMP.
2.2.2 IF desired, start QUENCH TANK DRAIN PUMP.
STANDARD:     Candidate recognizes from the Initial Conditions that this step is N/A and -  SAT moves on to Step 2.3 NOTE: The normal operating band for Quench Tank level is 80-100" when RCS                 -  UNSAT pressure> 45 psig per L&P 2.4 of OP/1/A/1104/017.
COMMENTS:
STEP 3:      Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:
_2.3.1 Ensure RCS pressure < 45 psig.
                                                                                            -  SAT STANDARD:      Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig.
Candidate continues to Step 2.3.2.
                                                                                            -  UNSAT COMMENTS:
I
 
CR0-508 - g Paqe 6 of 9 CRITICAL STEP STEP 4:        Step 2.3.2 IF desired, place COMPONENT DRAIN PUMP to BYPASS STANDARD:      *Candidate places the COMPONENT DRAIN PUMP switch in the BYPASS position.
EVALUATOR NOTE: The low level cut-off for the Quench Tank Pump will trip the  _SAT pump at == 80".
EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP in the bypass position to          _UNSAT complete the task. The candidate's instructions were to use both.
COMMENTS:
CRITICAL STEP STEP 5:        Step 2.3.3 IF desired, place QUENCH TANK DRAIN PUMP to BYPASS STANDARD:      *Candidate places the QUENCH TANK DRAIN PUMP switch in the      _SAT BYPASS position.
EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The          _UNSAT candidate's instructions were to use both.
EXAMINER NOTE: Expect 1SA-6/ A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank.
COMMENTS:
COMMENTS:
STEP 3: Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:
STEP 6:       Step 2.3.4                                                    CRITICAL STEP At desired level (==75'), perform the following:
_2.3.1 Ensure RCS pressure < 45 psig. STANDARD:
Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig. Candidate continues to Step 2.3.2. COMMENTS:
I CR0-508 -g Page 5 of 9 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
I STEP 4: Step 2.3.2 IF desired, place COMPONENT DRAIN PUMP to BYPASS STANDARD:
*Candidate places the COMPONENT DRAIN PUMP switch in the BYPASS position.
EVALUATOR NOTE: The low level cut-off for the Quench Tank Pump will trip the pump at == 80". EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP in the bypass position to complete the task. The candidate's instructions were to use both. COMMENTS:
STEP 5: Step 2.3.3 IF desired, place QUENCH TANK DRAIN PUMP to BYPASS STANDARD:
*Candidate places the QUENCH TANK DRAIN PUMP switch in the BYPASS position.
EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The candidate's instructions were to use both. EXAMINER NOTE: Expect 1SA-6/ A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank. COMMENTS:
STEP 6: Step 2.3.4 At desired level (==75'), perform the following:
* Ensure stopped COMPONENT DRAIN PUMP
* Ensure stopped COMPONENT DRAIN PUMP
* Ensure stopped QUENCH TANK DRAIN PUMP STANDARD:
* Ensure stopped QUENCH TANK DRAIN PUMP
Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP. COMMENTS:
_SAT STANDARD:     Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP.
CR0-508 -g Paqe 6 of 9 CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CRITICAL STEP _SAT _UNSAT CR0-508 -g age 0 p 7 f 9 STEP 7: Step 2.4. CRITICAL STEP Perform the following:
_UNSAT COMMENTS:
_Close 1 CS-5 (COMPONENT DRN PUMP SUCTION) _Close 1 CS-6 (COMPONENT DRN PUMP SUCTION) SAT STANDARD:
I
Candidate closes 1 CS-5 and 1 CS-6 by placing each control switch in the -closed position.
 
The green closed light illuminates and the red open light extinguishes.
CR0-508 - g p age 7 0 f 9 CRITICAL STEP STEP 7:       Step 2.4.
UNSAT COMMENTS:  
Perform the following:
-STEP 8: Step 2.5. IF 1A BHUT boron sample> 24 hours old AND QT pumped to 1A BHUT, perform the following:
_Close 1CS-5 (COMPONENT DRN PUMP SUCTION)
_2.5.1 Verify closed 1 CS-46 (1 A RC BLEED XFER PUMP DISCHARGE).
_Close 1CS-6 (COMPONENT DRN PUMP SUCTION)
                                                                                            -    SAT STANDARD:     Candidate closes 1CS-5 and 1CS-6 by placing each control switch in the closed position. The green closed light illuminates and the red open light extinguishes.
                                                                                            -  UNSAT COMMENTS:
STEP 8:       Step 2.5.
IF 1A BHUT boron sample> 24 hours old AND QT pumped to 1A BHUT, perform the following:
_2.5.1 Verify closed 1CS-46 (1 A RC BLEED XFER PUMP DISCHARGE).
_2.5.2 Dispatch NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)
_2.5.2 Dispatch NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)
_2.5.3 Start 1 A BLEED TRANSFER PUMP. BOOTH CUE: When called report as NEO: "Using Time Compression, I am standing by to read 1 A Bleed Transfer Pump discharge pressure at (1 CS-PG-0084)".
_2.5.3 Start 1A BLEED TRANSFER PUMP.
SAT -STANDARD:
BOOTH CUE: When called report as NEO: "Using Time Compression, I am standing by to read 1A Bleed Transfer Pump discharge pressure at (1 CS-PG-0084)".
Candidate verifies 1CS-46 (1A RC BLEED XFER PUMP DISCHARGE) closed by observing green closed light illuminated and red open light off. -UN SAT Candidate dispatches NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)
                                                                                            -  SAT STANDARD:     Candidate verifies 1CS-46 (1A RC BLEED XFER PUMP DISCHARGE) closed by observing green closed light illuminated and red open light off.   -   UN SAT Candidate dispatches NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)
Candidate starts 1A BLEED TRANSFER PUMP and observes red light illuminated and green light off. EVALUATOR CUE: When 1A BLEED TRANSFER PUMP is started inform the candidate that another operator will continue this procedure.
Candidate starts 1A BLEED TRANSFER PUMP and observes red light illuminated and green light off.
EVALUATOR CUE: When 1A BLEED TRANSFER PUMP is started inform the candidate that another operator will continue this procedure.
COMMENTS:
COMMENTS:
END OF TASK STOP TIME: ____ _
END OF TASK STOP TIME: _ _ _ __
CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Step required to align the flow path from the QT to 1 A SHUT 4 This step is required to begin the level decrease in the Quench Tank. 5 This step is required to begin the level decrease in the Quench Tank. CR0-508 -g Page 8 of 9 6 This step stops the QT Drain Pump and the Component Drain Pump when the QT is ::::: 75 inches 7 This step isolates the flow path from the QT to 1 A SHUT CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 1 is Shutdown Unit 1 Quench Tank level is== 86" Quench Tank is aligned to 1A BHUT Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPENENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at== 75" g REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-801a CR0-80ia -h Page 1 of 18 ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE CANDIDATE EXAMINER REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE Alternate Path: Yes Facility JPM #: CR0-801 KIA Rating(s):
 
System: 075 KIA: A2.01 Rating: 3.0* /3.2 Task Standard:
CR0-508 - g Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP #                                           Explanation 1   Step required to align the flow path from the QT to 1A SHUT 4   This step is required to begin the level decrease in the Quench Tank.
CCW Intake Canal is aligned for recirc Preferred Evaluation Location:
5   This step is required to begin the level decrease in the Quench Tank.
Simulator
6   This step stops the QT Drain Pump and the Component Drain Pump when the QT is ::::: 75 inches 7   This step isolates the flow path from the QT to 1A SHUT
_x....__ In-Plant __ _
 
g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 is Shutdown Unit 1 Quench Tank level is== 86" Quench Tank is aligned to 1A BHUT .1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPENENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at== 75"
 
CR0-80ia - h Page 1 of 18 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-801a ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE CANDIDATE EXAMINER
 
CR0-801a - h Page 2 of 18 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE Alternate Path:
Yes Facility JPM #:
CR0-801 KIA Rating(s):
System: 075 KIA:     A2.01 Rating: 3.0* /3.2 Task Standard:
CCW Intake Canal is aligned for recirc Preferred Evaluation Location:                                Preferred Evaluation Method:
Simulator _x....__ In-Plant _ __                             Perform    X    Simulate


==References:==
==References:==


AP/1/A/1700/13 (CCW Dam Failure) Validation Time: 15 min. CR0-801a -h Page 2 of 18 Preferred Evaluation Method: Perform X Simulate Time Critical:
AP/1/A/1700/13 (CCW Dam Failure)
No ====================================================================================
Validation Time: 15 min.                                               Time Critical: No
Candidate:
====================================================================================
Time Start: _____ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:
Candidate:                                                             Time Start: _ _ _ _ __
____________
NAME                                   Time Finish: _ _ _ _ __
_
Performance Rating:       SAT ___ UNSAT _ __                           Performance Time: _ _ __
___ _ NAME SIGNATURE DATE ====================================================================================
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                  --------------~!_ _ __
Comments SIMULATOR OPERATOR INSTRUCTIONS: 1 . Recall snap 214 2. Import simulator files for CR0-801 a CR0-801a -h Page 3 of 18 3. Ensure all breaker flags (especially CCW pumps) are set to current plant conditions.  
NAME                                 SIGNATURE                   DATE
: 4. Go to RUN as directed by examiner 5. When asked to dispatch an operator to close the breaker for 1 CCW-12 (at step 17) Fire Timer #1 and inform student that using time compression the breaker is closed.
====================================================================================
Tools/Equipment/Procedures Needed:
Comments
* AP/1/A/1700/013 (Dam Failure) READ TO OPERATOR DIRECTIONS TO STUDENT: CR0-801a -h Page 4 of 18 I will explain the initial conditions, and state the task to be performed.
 
All control room steps shall be performed for this JPM, including any required communications.
CR0-801a - h Page 3 of 18 SIMULATOR OPERATOR INSTRUCTIONS:
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Recall snap 214
: 2. Import simulator files for CR0-801 a
: 3. Ensure all breaker flags (especially CCW pumps) are set to current plant conditions.
: 4. Go to RUN as directed by examiner
: 5. When asked to dispatch an operator to close the breaker for 1CCW-12 (at step 17)
Fire Timer #1 and inform student that using time compression the breaker is closed.
 
CR0-801a - h Page 4 of 18 Tools/Equipment/Procedures Needed:
* AP/1/A/1700/013 (Dam Failure)
READ TO OPERATOR DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Security reports that a failure of the Newry Dam has occurred.
* Security reports that a failure of the Newry Dam has occurred.
* The CCW Intake Canal is intact
* The CCW Intake Canal is intact
* Subsequent Actions of AP/1/A/1700/013 (Dam Failure) have been completed up to step 4.4. INITIATING CUE: The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1 C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.
* Subsequent Actions of AP/1/A/1700/013 (Dam Failure) have been completed up to step 4.4.
ST ART TIME: __ _ STEP 1: Step 4.4 Depress the "CCW DAM FAILURE" pushbutton.
INITIATING CUE:
STANDARD:
The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.
The "CCW DAM FAILURE" pushbutton is located by the student on 1 AB3 and depressed.
 
CR0-801a - h Page 5 of 18 ST ART TIME: _ __
STEP 1:       Step 4.4                                                                 CRITICAL STEP Depress the "CCW DAM FAILURE" pushbutton.
STANDARD:     The "CCW DAM FAILURE" pushbutton is located by the student on               -  SAT 1AB3 and depressed.
COMMENTS:
                                                                                          -  UNSAT STEP 2:      Step 4.5 Dispatch an individual to the area of the dam failure to report damage to the Control Rooms.
                                                                                          -  SAT STANDARD:    An individual is dispatched to report damage to the ControLRooms.
Booth Cue: When asked, report that an Individual has been dispatched to the Newry dam
                                                                                          -    UNSAT COMMENTS:
STEP 3:      Step 4.6 GO TO step 4.49                                                            -  SAT STANDARD:    Student goes to step 4.49 COMMENTS:                                                                                  -  UNSAT
 
CR0-801a - h Page 6 of 18 STEP 4:  Step 4.49                                                              *CRITICAL STEP
          *Stop all RCP's Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored
                                                                                    -  SAT STANDARD: *The control switches for RCPs 1A1, 1A2, 181 and 182 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.
CR SRO notified of RCP status
                                                                                    -  UNSAT COMMENTS:
STEP 5:  Step 4.50 Stop all CCW pumps.
STANDARD: 1A, 1B, 1C, and 1D CCW Pump switches are located by the student on        -  SAT 1AB3.
Student ensures all CCW pump Red 'ON' lights are extinguished and White 'OFF' lights are illuminated.
COMMENTS:
COMMENTS:
STEP 2: Step 4.5 Dispatch an individual to the area of the dam failure to report damage to the Control Rooms. STANDARD:
                                                                                    -  UNSAT STEP 6:   Step 4.51 Open 1CCW-1-6 (WATERBOX EMER DISCH VALVES).
An individual is dispatched to report damage to the ControLRooms.
STANDARD: Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control and                 -   SAT indication on 1AB3 and ensures red "OPEN" indication is illuminated and green "CLOSED" indication is extinguished.
Booth Cue: When asked, report that an Individual has been dispatched to the Newry dam COMMENTS:
STEP 3: Step 4.6 GO TO step 4.49 STANDARD:
Student goes to step 4.49 COMMENTS:
CR0-801a -h Page 5 of 18 CRITICAL STEP SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
STEP 4: Step 4.49 *Stop all RCP's Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored STANDARD:
*The control switches for RCPs 1A1, 1 A2, 181 and 182 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.
CR SRO notified of RCP status COMMENTS:
STEP 5: Step 4.50 Stop all CCW pumps. STANDARD:
1 A, 1 B, 1 C, and 1 D CCW Pump switches are located by the student on 1AB3. Student ensures all CCW pump Red 'ON' lights are extinguished and White 'OFF' lights are illuminated.
COMMENTS:
COMMENTS:
STEP 6: Step 4.51 Open 1CCW-1-6 (WATERBOX EMER DISCH VALVES). STANDARD:
                                                                                    -  UNSAT
Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control and indication on 1AB3 and ensures red "OPEN" indication is illuminated and green "CLOSED" indication is extinguished.
 
CR0-801a - h Page 7 of 18 l STEP 7:       Step 4.52 Verify all condenser outlet valves indicate closed using the OAC (GD AP13):
1 CCW-20 (Condenser 1A1 Outlet) (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) (01 D0275) 1 CCW-22 (Condenser 181 Outlet) (01 D0277) 1 CCW-23 (Condenser 182 Outlet) (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) (01 D0281)
                                                                                        - SAT 1 CCW-25 (Condenser 1C2 Outlet) (01 D0283)
STANDARD:    The student monitors the Operator Aid Computer to verify the following:
                                                                                        -  UNSAT 1 CCW-20 (Condenser 1A1 Outlet) closed (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) closed (01 D0275) 1 CCW-22 (Condenser 181 Outlet) closed (01 D0277) 1 CCW-23 (Condenser 182 Outlet) closed (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) closed (01D0281) 1 CCW-25 (Condenser 1C2 Outlet) closed (01 D0283)
COMMENTS:
COMMENTS:
CR0-801a -h Page 6 of 18 *CRITICAL STEP SAT --UNSAT SAT -UNSAT -SAT -UNSAT -
STEP 8:       Step 4.53 Dispatch an operator to place all condenser outlet valves in HAND.
l STEP 7: Step 4.52 Verify all condenser outlet valves indicate closed using the OAC (GD AP13): 1 CCW-20 (Condenser 1A1 Outlet) (01 D0273) 1 CCW-21 (Condenser 1 A2 Outlet) (01 D0275) 1 CCW-22 (Condenser 181 Outlet) (01 D0277) 1 CCW-23 (Condenser 182 Outlet) (01 D0279) 1 CCW-24 (Condenser 1 C1 Outlet) (01 D0281) 1 CCW-25 (Condenser 1 C2 Outlet) (01 D0283) STANDARD:
The student monitors the Operator Aid Computer to verify the following:
1 CCW-20 (Condenser 1A1 Outlet) closed (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) closed (01 D0275) 1 CCW-22 (Condenser 181 Outlet) closed (01 D0277) 1 CCW-23 (Condenser 182 Outlet) closed (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) closed (01D0281) 1 CCW-25 (Condenser 1 C2 Outlet) closed (01 D0283) COMMENTS:
STEP 8: Step 4.53 Dispatch an operator to place all condenser outlet valves in HAND.
* 1CCW-20
* 1CCW-20
* 1CCW-21
* 1CCW-21
* 1CCW-22
* 1CCW-22
* 1CCW-23
* 1CCW-23                                                         -  SAT
* 1CCW-24
* 1CCW-24
* 1CCW-25 STANDARD:
* 1CCW-25 STANDARD:     An operator is dispatched to place the condenser outlet valves* in HAND.
An operator is dispatched to place the condenser outlet valves* in HAND. Booth Cue: When called, acknowledge that an operator has been dispatched to place the valves in HAND. COMMENTS:
                                                                                        -  UNSAT Booth Cue: When called, acknowledge that an operator has been dispatched to place the valves in HAND.
CR0-801a -h Page 7 of 18 SAT -UNSAT -SAT -UNSAT -
I STEP 9: Step 4.54 Verify CCW-8 is open. STANDARD:
CCW-8 switch and indication is located by the student on 2AB3 verifying red "OPEN" indication illuminated and green "CLOSED" indication extinguished.
COMMENTS:
COMMENTS:
STEP 10: Step 4.55 Notify Unit 2 that emergency CCW siphon flow has been established on Unit 1. STANDARD:
 
Unit 2 Control Room is notified that siphon flow has been established on Unit 1. Examiner/Booth Cue: When candidate contacts Unit 2, acknowledge the notification that CCW siphon flow has been established on Unit 1. COMMENTS:
CR0-801a - h Page 8 of 18 I STEP 9:      Step 4.54 Verify CCW-8 is open.
STEP 11: Step 4.56 Dispatch operator(s) to perform Enclosure 5.2 (CCW Inventory Conservation).
                                                                                        -  SAT STANDARD:    CCW-8 switch and indication is located by the student on 2AB3 verifying red "OPEN" indication illuminated and green "CLOSED" indication extinguished.
STANDARD:
COMMENTS:                                                                            -  UNSAT STEP 10:     Step 4.55 Notify Unit 2 that emergency CCW siphon flow has been established on Unit 1.
Operator(s) are dispatched to perform Enclosure 5.2. Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2 COMMENTS:
                                                                                        -  SAT STANDARD:   Unit 2 Control Room is notified that siphon flow has been established on Unit 1.
CR0-801a -h Page 8 of 18 SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -
Examiner/Booth Cue: When candidate contacts Unit 2, acknowledge the notification that CCW siphon flow has been established on Unit 1.         -  UNSAT COMMENTS:
STEP 12: Step 4.57 IAAT Unit 2 CR has directed Unit 1 to supply CCW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.
STEP 11:     Step 4.56 Dispatch operator(s) to perform Enclosure 5.2 (CCW Inventory Conservation).
STANDARD:
                                                                                        -  SAT STANDARD:   Operator(s) are dispatched to perform Enclosure 5.2.
Student continues to step 4.58. Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.
Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2
                                                                                        -  UN SAT COMMENTS:
 
CR0-801a - h Page 9 of 18 STEP 12:     Step 4.57 IAAT Unit 2 CR has directed Unit 1 to supply CCW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.
                                                                                  -  SAT STANDARD:   Student continues to step 4.58.
Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.
                                                                                  -  UNSAT COMMENTS:
STEP 13:    Step 4.58 Determine which CCW Pump will be started.
SAT STANDARD:    The student determines from the turnover that the "1C" CCWP will be started COMMENTS:
                                                                                    -  UN SAT STEP 14:      Step 4.59 Place all CCW Pump switches in the trip position.
                                                                                    -  SAT STANDARD:    Student places all Unit 1 CCW Pump switches in the tripped position.
COMMENTS:
COMMENTS:
STEP 13: Step 4.58 Determine which CCW Pump will be started. STANDARD:
                                                                                    -  UN SAT
The student determines from the turnover that the "1C" CCWP will be started COMMENTS:
 
STEP 14: Step 4.59 Place all CCW Pump switches in the trip position.
CR0-801a - h Page 10 of 18 STEP 15:   Step 4.60 Verify the 1A or 1B CCW Pump is to be started.
STANDARD:
                                                                                -  SAT STANDARD: Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63.
Student places all Unit 1 CCW Pump switches in the tripped position.
COMMENTS:
COMMENTS:
CR0-801a -h Page 9 of 18 SAT --UNSAT SAT UN SAT -SAT -UN SAT -
                                                                                -   UNSAT STEP 16:   Step 4.63 Verify both of the following CCW pump discharge valves are closed.
STEP 15: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started. STANDARD:
1CCW-12 1CCW-13                                                     -  SAT STANDARD: The student notes that the discharge valve for the 1C CCW pump (1CCW-12} is not closed and proceeds to the RNO.
Student determines from initiating cue that the 1 C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:
                                                                                -  UNSAT COMMENTS:
STEP 16: Step 4.63 Verify both of the following CCW pump discharge valves are closed. 1CCW-12 1CCW-13 STANDARD:
STEP 17:   Step 4.63 RNO Locally close the discharge valve from the breaker switch for 1CCW-12 (Unit 1 Equipment room) (1CCW-13 is already closed}
The student notes that the discharge valve for the 1 C CCW pump (1CCW-12}
                                                                                -  SAT STANDARD: The student dispatches an operator to locally close 1CCW-12 from the breaker switch (1XS3-2E).
is not closed and proceeds to the RNO. COMMENTS:
STEP 17: Step 4.63 RNO Locally close the discharge valve from the breaker switch for 1CCW-12 (Unit 1 Equipment room) (1CCW-13 is already closed} STANDARD:
The student dispatches an operator to locally close 1 CCW-12 from the breaker switch (1XS3-2E).
BOOTH CUE: When an operator is dispatched, fire TIMER #1, then inform candidate that 1CCW-12 is closed (use time compression)
BOOTH CUE: When an operator is dispatched, fire TIMER #1, then inform candidate that 1CCW-12 is closed (use time compression)
                                                                                  -  UN SAT COMMENTS:
CR0-801a - h Page 11 of 18 ALTERNATE PATH STEP 18:  Step 4.64 Start the selected CCW Pump.
                                                                                -  SAT STANDARD:  *The student starts 1C CCW pump by rotating the control switch to the CLOSE position.
          "1 C" CCW Pump will NOT start. Since there is no guidance in the RNO column, the student will continue to step 4.65
_UNSAT COMMENTS:
STEP 19:  Step 4.65 Verify the started CCW Pump Discharge valve opened.
                                                                                -  SAT STANDARD:  The "1C" CCW Pump did not start and the discharge valve(1CCW-12}
did not open. Since this step cannot be performed, the student will proceed to the RNO column
                                                                                  -  UNSAT COMMENTS:
STEP 20:    Step 4.65 RNO
: 1. Stop th.e operating CCW pump
: 2. GO TO Step 4.58 to attempt to start a different CCW pump
                                                                                  -  SAT STANDARD:  The student returns to step 4.58 to start a different CCW pump EXAMINER CUE: Inform the student that the CR SRO directs returning to step 4.58 and proceed with starting the 1D CCW pump.
                                                                                  -  UN SAT COMMENTS:
CR0-801a- h Page 12 of 18 STEP 21:  Step 4.58 Determine which CCW Pump will be started.
                                                                              -  SAT STANDARD: The student determines from the turnover that the "1 D" CCWP will be started COMMENTS:
                                                                              -  UNSAT STEP 22:  Step 4.59 Place all CCW Pump switches in the trip position.
                                                                              -  SAT STANDARD: Student places all Unit 1 CCW Pump switches in the tripped position.
COMMENTS:
COMMENTS:
CR0-801a -h Page 10 of 18 SAT -UNSAT -SAT -UNSAT -SAT -UN SAT -
                                                                              -   UN SAT STEP 23: Step 4.60 Verify the 1A or 1B CCW Pump is to be started.
ALTERNATE PATH STEP 18: Step 4.64 Start the selected CCW Pump. STANDARD:
                                                                                - SAT STANDARD: Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63.
*The student starts 1 C CCW pump by rotating the control switch to the CLOSE position.
"1 C" CCW Pump will NOT start. Since there is no guidance in the RNO column, the student will continue to step 4.65 COMMENTS:
STEP 19: Step 4.65 Verify the started CCW Pump Discharge valve opened. STANDARD:
The "1C" CCW Pump did not start and the discharge valve(1CCW-12}
did not open. Since this step cannot be performed, the student will proceed to the RNO column COMMENTS:
STEP 20: Step 4.65 RNO 1. Stop th.e operating CCW pump 2. GO TO Step 4.58 to attempt to start a different CCW pump STANDARD:
The student returns to step 4.58 to start a different CCW pump EXAMINER CUE: Inform the student that the CR SRO directs returning to step 4.58 and proceed with starting the 1 D CCW pump. COMMENTS:
CR0-801a -h Page 11 of 18 SAT -_UNSAT SAT -UNSAT -SAT -UN SAT -
STEP 21: Step 4.58 Determine which CCW Pump will be started. STANDARD:
The student determines from the turnover that the "1 D" CCWP will be started COMMENTS:
STEP 22: Step 4.59 Place all CCW Pump switches in the trip position.
STANDARD:
Student places all Unit 1 CCW Pump switches in the tripped position.
COMMENTS:
COMMENTS:
STEP 23: Step 4.60 Verify the 1 A or 1 B CCW Pump is to be started. STANDARD:
                                                                                -  UN SAT
Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63. COMMENTS:
 
CR0-801a-h Page 12 of 18 SAT -UNSAT -SAT -UN SAT -SAT -UN SAT -
CR0-801a - h Page 13 of 18 STEP 24: Step 4.63 Verify both of the following CCW pump discharge valves are closed.
STEP 24: Step 4.63 Verify both of the following CCW pump discharge valves are closed. 1CCW-12 1CCW-13 STANDARD:
1CCW-12 1CCW-13                                                           -  SAT STANDARD: Both valves are determined to be closed. It is critical to ensure both valves are closed however they may have been closed at step 17 of this JPM and therefore already be closed at this step. IF CCW-12 or CCW-13 are open when reaching this step, closing them at this step is critical.  -  UNSAT COMMENTS:
Both valves are determined to be closed. It is critical to ensure both valves are closed however they may have been closed at step 17 of this JPM and therefore already be closed at this step. IF CCW-12 or CCW-13 are open when reaching this step, closing them at this step is critical.
STEP 25:  Step 4.64                                                                *CRITICAL STEP Start the selected CCW Pump.
STANDARD: *The student starts 1D CCW pump by rotating the control switch to the      -  SAT CLOSE position.
Student observes that the 1CCW-13 begins to open and the 1D CCW pump will start.
                                                                                    -  UNSAT COMMENTS:
STEP 26:  Step 4.65 Verify the started CCW Pump Discharge valve opened.
                                                                                    -  SAT STANDARD: Determine that the "1 D" CCW Pump discharge valve (1 CCW-13) indicates Open.
COMMENTS:
COMMENTS:
STEP 25: Step 4.64 Start the selected CCW Pump. STANDARD:
                                                                                    -   UNSAT
*The student starts 1 D CCW pump by rotating the control switch to the CLOSE position.
 
Student observes that the 1 CCW-13 begins to open and the 1 D CCW pump will start. COMMENTS:
CR0-801a - h Page 14 of 18 STEP 27: Step 4.66 Ensure CCWP LOAD SHED DEFEAT switch is positioned to a running CCWP.
STEP 26: Step 4.65 Verify the started CCW Pump Discharge valve opened. STANDARD:
                                                                                -    SAT STANDARD: The student ensures the CCWP LOAD SHED DEFEAT switch is in the "1 D" CCW Pump position
Determine that the "1 D" CCW Pump discharge valve (1 CCW-13) indicates Open. COMMENTS:
                                                                                -    UNSAT COMMENTS:
CR0-801a -h Page 13 of 18 SAT --UNSAT *CRITICAL STEP SAT -UNSAT -SAT -UNSAT -
STEP 28: Step 4.67 Verify CCW-9 opens.
STEP 27: Step 4.66 Ensure CCWP LOAD SHED DEFEAT switch is positioned to a running CCWP. STANDARD:
STANDARD: The student locates CCW-9 switch and indication on 2AB3 verifying red -    SAT "OPEN" indication illuminated and green "CLOSED" indication extinguished.
The student ensures the CCWP LOAD SHED DEFEAT switch is in the "1 D" CCW Pump position COMMENTS:
STEP 28: Step 4.67 Verify CCW-9 opens. STANDARD:
The student locates CCW-9 switch and indication on 2AB3 verifying red "OPEN" indication illuminated and green "CLOSED" indication extinguished.
COMMENTS:
COMMENTS:
STEP 29: Step 4.68 Verify CCW-8 is closed. STANDARD:
                                                                                -  UN SAT STEP 29: Step 4.68 Verify CCW-8 is closed.
CCW-8 switch and indication are located by the student on 2AB3 verifying green "CLOSED" indication illuminated and red "OPEN" indication extinguished.
STANDARD: CCW-8 switch and indication are located by the student on 2AB3         -  SAT verifying green "CLOSED" indication illuminated and red "OPEN" indication extinguished.
COMMENTS:
COMMENTS:
CR0-801a -h Page 14 of 18 SAT -UNSAT -SAT -UN SAT -SAT -UNSAT -
                                                                                  -  UNSAT
STEP 30: Step 4.69 Verify an operator has been dispatched to open 1 DP-FSC (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).
 
STANDARD:
CR0-801a - h Page 15 of 18 STEP 30:     Step 4.69 Verify an operator has been dispatched to open 1DP-FSC (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).
An operator has not yet been dispatched so the student proceeds to the RNO. COMMENTS:
                                                                                        -  SAT STANDARD:   An operator has not yet been dispatched so the student proceeds to the RNO.
STEP 31: Step 4.69 RNO Dispatch an operator to open 1 DP-F5C (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).
STANDARD:
Operator dispatched.
Booth Cue: When contacted, inform the student that an operator has been dispatched to open the breaker for CCW-8 COMMENTS:
STEP 32: Step 4.70 Ensure the discharge valves on all stopped CCW Pumps are closed. CCW-10 (1A CCW PUMP DISCHARGE VLV) CCW-11 (18 CCW PUMP DISCHARGE VLV) CCW-12 (1C CCW PUMP DISCHARGE VLV) STANDARD:
CCW pump discharge valve indications are located by the student on 1AB3. Valves associated with tripped CCW pumps (white lights lit) will have the green "CLOSED" indication illuminated.
COMMENTS:
COMMENTS:
CR0-801a -h Page 15 of 18 SAT -_UNSAT SAT -UN SAT -SAT -UNSAT -
_UNSAT STEP 31:    Step 4.69 RNO Dispatch an operator to open 1DP-F5C (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).
STEP 33: Step 4.71 Notify Unit 2 and 3 to ensure all Unit 2 and 3 CCW pump discharge valves are closed. STANDARD:
                                                                                        -  SAT STANDARD:    Operator dispatched.
Unit 2 and 3 are notified to ensure their CCW Pump Discharge valves are closed. EXAMINER CUE: Another operator will continue with this procedure.
Booth Cue: When contacted, inform the student that an operator has been dispatched to open the breaker for CCW-8
                                                                                        -   UN SAT COMMENTS:
STEP 32:     Step 4.70 Ensure the discharge valves on all stopped CCW Pumps are closed.
CCW-10 (1A CCW PUMP DISCHARGE VLV)
CCW-11 (18 CCW PUMP DISCHARGE VLV)                                        -  SAT CCW-12 (1C CCW PUMP DISCHARGE VLV)
STANDARD:     CCW pump discharge valve indications are located by the student on 1AB3.
                                                                                        -  UNSAT Valves associated with tripped CCW pumps (white lights lit) will have the green "CLOSED" indication illuminated.
COMMENTS:
COMMENTS:
END TASK TIME STOP: __ _ CR0-801a -h Page 16 of 18 SAT UNSAT CRITICAL STEP EXPLANATIONS STEP # Explanation CR0-801a -h Page 17 of 18 1 This step is critical because depressing this pushbutton trips all operating CCW Pumps and sets up system logic for CCW recirculation flow. 4 This step is critical because RCPs must be stopped to reduce primary heat load. 25 This step is critical because the pump provides the necessary recirculation flow.
 
h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK) INITIAL CONDITIONS:
CR0-801a - h Page 16 of 18 STEP 33:    Step 4.71 Notify Unit 2 and 3 to ensure all Unit 2 and 3 CCW pump discharge valves are closed.
STANDARD:  Unit 2 and 3 are notified to ensure their CCW Pump Discharge valves are closed.
SAT EXAMINER CUE: Another operator will continue with this procedure.
UNSAT COMMENTS:
END TASK TIME STOP: _ __
 
CR0-801a - h Page 17 of 18 CRITICAL STEP EXPLANATIONS STEP #                                         Explanation 1   This step is critical because depressing this pushbutton trips all operating CCW Pumps and sets up system logic for CCW recirculation flow.
4   This step is critical because RCPs must be stopped to reduce primary heat load.
25   This step is critical because the pump provides the necessary recirculation flow.
 
h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK)
INITIAL CONDITIONS:
Security reports that a failure of the Newry Darn has occurred.
Security reports that a failure of the Newry Darn has occurred.
The CCW Intake Canal is intact Subsequent Actions of AP/1/A/1700/013 (Darn Failure) have been completed up to step 4.4. INITIATING CUE: The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1 C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.
The CCW Intake Canal is intact Subsequent Actions of AP/1/A/1700/013 (Darn Failure) have been completed up to step 4.4.
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-710 Place the Reactor Building Hydrogen Analyzer In Service CANDIDATE EXAMINER A0-710 -i Page 1 of 12 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Place the 1 A Reactor Building Hydrogen Analyzer In Service Alternate Path: No Facility JPM #: A0-010 KIA Rating(s):
INITIATING CUE:
System: 028 KIA: A4.03 Rating: 3.1/3.3 Task Standard:
The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.
A0-710 -i Page 2 of 12 Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes. Preferred Evaluation Location:
 
Preferred Evaluation Method: Simulator In-Plant _x_ Perform Simulate _x_  
A0-710 - i Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-710 Place the Reactor Building Hydrogen Analyzer In Service CANDIDATE EXAMINER
 
A0-710 - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Place the 1A Reactor Building Hydrogen Analyzer In Service Alternate Path:
No Facility JPM #:
A0-010 KIA Rating(s):
System: 028 KIA:     A4.03 Rating: 3.1/3.3 Task Standard:
Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes.
Preferred Evaluation Location:                                         Preferred Evaluation Method:
Simulator       In-Plant _x_                                 Perform         Simulate _x_


==References:==
==References:==


EP/1/A/1800/00, (Rev 39) EOPEnclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Validation Time: 12 minutes Time Critical:Yes  
EP/1/A/1800/00, (Rev 39) EOPEnclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Validation Time: 12 minutes                                                               Time Critical:Yes
=====================================================================================
Candidate:                                                                              Time Start: _ _ __
NAME                                                    Time Finish: _ _ __
Performance Rating:    SAT ___ UNSAT _ __                                      Performance Time _ _ __
Examiner: _ _ _ _ _ _ _ _ _ _ _ __
NAME                                          SIGNATURE                      DATE
=====================================================================================
=====================================================================================
Candidate:
COMMENTS
Time Start: ___ _ NAME Time Finish: ___ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:
 
____________
A0-710 - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None
_ NAME SIGNATURE DATE =====================================================================================
 
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS None A0-710 -i Page 3 of 12 Tools/Equipment/Procedures Needed A0-710 -i Page 4 of 12 Enclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Enclosure of EP/1/A/1800/001 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)
A0-710 - i Page 4 of 12 Tools/Equipment/Procedures Needed .2, "Placing RB Hydrogen Analyzers in Service" Enclosure of EP/1/A/1800/001 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
All control room steps shall be performed for this JPM, including any required communications.
INITIAL CONDITIONS A LOCA has occurred on Unit 1.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS A LOCA has occurred on Unit 1. Engineered Safeguards Channels 1 and 2 have actuated.
Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.
Enclosure 5.1 (ES Actuation) of the EOP is being completed.
The 1A and 1B RB Hydrogen Analyzer Train is aligned in the standby mode.
The 1 A and 1 B RB Hydrogen Analyzer Train is aligned in the standby mode. INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".
INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".
START TIME: __ _ NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West. STEP 1: Step 1 At 1 A H2 ANALYZER (RP), perform the following:
 
START TIME: _ __
NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West.
STEP 1:       Step 1 At 1A H2 ANALYZER (RP), perform the following:
* Ensure POWER ON light is on .
* Ensure POWER ON light is on .
* Position H2 DUAL RANGE SW toH2 0 -10% Range . -SAT
* Position H2 DUAL RANGE SW toH2 0 -10% Range .
                                                                                          - SAT
* Position FUNCTION SELECTORswitch to SAMPLE.
* Position FUNCTION SELECTORswitch to SAMPLE.
* Depress the OFF button for the following: _ 1 PR-83 (BYP TO POST AC 1 SV220) -UN SAT _ 1 PR-86 (BYP TO POST AC 1 SV221) STANDARD:
* Depress the OFF button for the following:
Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "A"). Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale. Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.
_ 1PR-83 (BYP TO POST AC 1SV220)                                   - UN SAT
Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves: Train A
_ 1 PR-86 (BYP TO POST AC 1SV221)
STANDARD:     Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "A").
Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale.
Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.
Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves:
Train A
* PR-83 (Bypass to Post Accident Sample Panel)
* PR-83 (Bypass to Post Accident Sample Panel)
* PR-86 (Bypass from Post Accident Sample Panel) Cue: Indication is as you see it COMMENTS:
* PR-86 (Bypass from Post Accident Sample Panel)
NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West. STEP 2: Step 2 At 1 B H2 ANALYZER (RP), perform the following:
Cue: Indication is as you see it COMMENTS:
 
NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West.
STEP 2:       Step 2 At 1B H2 ANALYZER (RP), perform the following:
* Ensure POWER ON light is on .
* Ensure POWER ON light is on .
* Position H2 DUAL RANGE SW toH2 0 -10% Range . SAT -* Position FUNCTION SELECTORswitch to SAMPLE.
* Position H2 DUAL RANGE SW toH2 0 -10% Range .
                                                                                        - SAT
* Position FUNCTION SELECTORswitch to SAMPLE.
* Depress the OFF button for the following:
* Depress the OFF button for the following:
_ 1 PR-89 (BYP TO POST AC 1 SV220) -UN SAT _ 1 PR-92 (BYP TO POST AC 1 SV221) STANDARD:
_ 1 PR-89 (BYP TO POST AC 1SV220)                                   - UN SAT
Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "B"). Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale. Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.
_   1PR-92 (BYP TO POST AC 1SV221)
Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves: Train A
STANDARD:     Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "B").
Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale.
Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.
Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves:
Train A
* PR-89 (Bypass to Post Accident Sample Panel)
* PR-89 (Bypass to Post Accident Sample Panel)
* PR-92 (Bypass from Post Accident Sample Panel) Cue: Indication is as you see it COMMENTS:
* PR-92 (Bypass from Post Accident Sample Panel)
STEP 3: Step 3 Notify Control Room to perform thefollowing:
Cue: Indication is as you see it COMMENTS:
* Open 1 PR-81 and 1 PR-84
 
* Open 1 PR-87 and 1 PR-90 STANDARD:
STEP 3:       Step 3 Notify Control Room to perform thefollowing:                       CRITICAL STEP
Unit 1 Control Room personnel are notified to open 1 PR-81, 1 PR-84, 1 PR-87, and 1 PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.
* Open 1 PR-81 and 1PR-84
Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON. COMMENTS:
* Open 1 PR-87 and 1 PR-90 STANDARD:     Unit 1Control Room personnel are notified to open 1PR-81, 1PR-84, 1PR-87, and 1PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.
CRITICAL STEP SAT UNSAT NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes. STEP 4: Step 4 At 1 A H2 ANALYZER (RP), perform the following:
Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON.         SAT COMMENTS:
UNSAT
 
CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.
It should return down scale to the correct reading in"' 3 minutes.
STEP 4:           Step 4 At 1A H2 ANALYZER (RP), perform the following:
* Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).
* Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).
* Position OFF I ST AN DBY I ANALYZE switch to ANALYZE.
* Position OFF I ST AN DBY I ANALYZE switch to ANALYZE.
* Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel. STANDARD:
_SAT
SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:
* Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.
STANDARD:         SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:
_UNSAT
* PR-71 (Top of Containment Sample) for Train 'A' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-71 position and the red light is illuminated
* PR-71 (Top of Containment Sample) for Train 'A' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-71 position and the red light is illuminated
* OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode. Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
* OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode.
Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
* REMOTE SELECTOR Pushbutton is depressed.
* REMOTE SELECTOR Pushbutton is depressed.
Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:
Cue: Control is from the remote panel.
CRITICAL STEP _SAT _UNSAT CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in"' 3 minutes. STEP 5: Step 5 At 1 B H2 ANALYZER (RP), perform the following:
Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0%
hydrogen concentration COMMENTS:
 
CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.
It should return down scale to the correct reading in"' 3 minutes.
STEP 5:           Step 5 At 1B H2 ANALYZER (RP), perform the following:
* Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).
* Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).
* Position OFF I STANDBY I ANALYZE switch to ANALYZE . Depress REMOTE SELECTOR pushbutton to ensure control is -SAT
* Position OFF I STANDBY I ANALYZE switch to ANALYZE .
* from the Remote Panel. STANDARD:
                                                                                    -  SAT
SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve: UNSAT
* Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.
* PR-76 (Top of Containment Sample) for Train 'B' -Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-76 position and the red light is illuminated.
STANDARD:         SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:
                                                                                    -  UNSAT
* PR-76 (Top of Containment Sample) for Train 'B' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-76 position and the red light is illuminated.
* OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode .
* OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode .
* Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.
* REMOTE SELECTOR Pushbutton is depressed . Cue: Control is from the remote panel. Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:
* REMOTE SELECTOR Pushbutton is depressed .
STEP 6: Step 6 IAATeither RB Hydrogen Analyzer Train indicates<
Cue: Control is from the remote panel.
2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train. _ 1A RB Hydrogen Analyzer Train SAT -STANDARD:
Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0%
ALARM RESET Pushbutton is depressed for both trains. Cue: If the candidate asks, indicate that the Hydrogen reading is ""' O percent on -UNSAT both trains. Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.
hydrogen concentration COMMENTS:
 
STEP 6:       Step 6 IAATeither RB Hydrogen Analyzer Train indicates< 2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train.
_ 1A RB Hydrogen Analyzer Train
                                                                                        -  SAT STANDARD:     ALARM RESET Pushbutton is depressed for both trains.
Cue: If the candidate asks, indicate that the Hydrogen reading is ""' O percent on     - UNSAT both trains.
Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.
COMMENTS:
COMMENTS:
STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1 B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1 A Hydrogen Analyzer Train is in service. SAT STANDARD:
STEP 7:       Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1A Hydrogen Analyzer Train is in service.
Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service. Cue: Control room acknowledges Hydrogen Analyzers is in service. -UN SAT COMMENTS:
SAT STANDARD:     Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service.
STEP 6: Step 8 EXIT this enclosure.
Cue: Control room acknowledges Hydrogen Analyzers is in service.                       - UN SAT COMMENTS:
STANDARD:
STEP 6:       Step 8 EXIT this enclosure.
Procedure is exited. SAT -COMMENTS:
STANDARD:     Procedure is exited.
UN SAT -END TASK STOP TIME: ____ _
                                                                                        -  SAT COMMENTS:
CRITICAL STEP EXPLANATIONS STEP # Explanation 3 Opens the block valves to the 1 A and 1 B H2 analyzer.
                                                                                        - UN SAT END TASK STOP TIME: _ _ _ __
4 Starts the Analyzer pump and the sampling process for the 1 A H2 Analyzer 5 Starts the Analyzer pump and the sampling process for the 1 B H2 Analyzer CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS A LOCA has occurred on Unit 1. Engineered Safeguards Channels 1 and 2 have actuated.
 
Enclosure 5.1 (ES Actuation) of the EOP is being completed.
CRITICAL STEP EXPLANATIONS STEP #                                   Explanation 3   Opens the block valves to the 1A and 1B H2 analyzer.
The 1 A and 1 B RB Hydrogen Analyzer Train is aligned in the standby mode. INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".
4   Starts the Analyzer pump and the sampling process for the 1A H2 Analyzer 5   Starts the Analyzer pump and the sampling process for the 1B H2 Analyzer
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-805 OATC Actions for Control Room Evacuation CANDIDATE EXAMINER CR0-805 -j Page 1 of 11 Task: REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-805 -j Page 2 of 11 Remove Control Power Fuses and Open Breakers as directed by AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)
 
Alternate Path: No Facility JPM #: A0-805 KIA Rating(s):
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
System: BW I A06 KIA: AA1.10 Rating: 3.7*/3.9 Task Standard:
INITIAL CONDITIONS A LOCA has occurred on Unit 1.
Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location:
Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.
Preferred Evaluation Method: Simulator In-Plant _x_ Perform Simulate _x_  
The 1A and 1B RB Hydrogen Analyzer Train is aligned in the standby mode.
INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".
 
CR0-805 - j Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-805 OATC Actions for Control Room Evacuation CANDIDATE EXAMINER
 
CR0-805 - j Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Remove Control Power Fuses and Open Breakers as directed by AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)
Alternate Path:
No Facility JPM #:
A0-805 KIA Rating(s):
System: BWI A06 KIA:     AA1.10 Rating: 3.7*/3.9 Task Standard:
Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location:                                       Preferred Evaluation Method:
Simulator       In-Plant _x_                                       Perform       Simulate _x_


==References:==
==References:==


AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)
AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)
Validation Time: 25 minutes Time Critical:
Validation Time: 25 minutes                                                           Time Critical: No
No =====================================================================================
=====================================================================================
Candidate:
Candidate:                                                                           Time Start: _ _ __
Time Start: ___ _ NAME Time Finish: ___ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time ___ _ Examiner:
NAME                                                 Time Finish: _ _ __
____________
Performance Rating:     SAT ___ UNSAT _ __                                   Performance Time _ _ __
_ _ _______________
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.!_ _ __
.! ___ _ NAME SIGNATURE DATE =====================================================================================
NAME                                       SIGNATURE                     DATE
COMMENTS SIMULATOR OPERATOR INSTRUCTIONS None CR0-805 -j Page 3 of 11 Tools/Equipment/Procedures Needed CR0-805 -j Page 4 of 11 AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)
=====================================================================================
Breaker compartment pictures READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed.
COMMENTS
All control room steps shall be performed for this JPM, including any required communications.
 
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS
CR0-805 - j Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS None
 
CR0-805 - j Page 4 of 11 Tools/Equipment/Procedures Needed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)
Breaker compartment pictures READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS
* A plant fire is in progress that requires evacuation of Unit 3 Control Room
* A plant fire is in progress that requires evacuation of Unit 3 Control Room
* AP/3/A/1700/050(Challenging Plant Fire) is in progress
* AP/3/A/1700/050(Challenging Plant Fire) is in progress
* You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5. (OATC Actions for Control Room Evacuation)
* You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) .5. (OATC Actions for Control Room Evacuation)
START TIME: __ _ CR0-805 -j Page 5 of 11 EXAMINER NOTE: Do NOT allow candidate to open any of the electrical panels during the performance of this JPM. STEP 1: Step 10 CRITICAL STEP Remove all control power fuses from 38 HPI Pump at 3TE-9 (T-3/L45).
 
STANDARD:
CR0-805 - j Page 5 of 11 START TIME: _ __
Candidate locates the 4160V breaker cabinet for the 38 HPI Pump and indicates that the upper compartment door would be opened -SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT -blocks and indicates they would be pulled out and left in the compartment COMMENTS:
EXAMINER NOTE: Do NOT allow candidate to open any of the electrical panels during the performance of this JPM.
STEP 2: Step 11 CRITICAL STEP Remove all control power fuses from 3C HPI Pump at 3TD-9 (T-3/L44).
STEP 1:     Step 10 CRITICAL STEP Remove all control power fuses from 38 HPI Pump at 3TE-9 (T-3/L45).
STANDARD:
STANDARD: Candidate locates the 4160V breaker cabinet for the 38 HPI Pump and indicates that the upper compartment door would be opened                                                           -   SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse   -  UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:
Candidate locates the 4160V breaker cabinet for the 3C HPI Pump and indicates that the upper compartment door would be opened -SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT -blocks and indicates they would be pulled out and left in the compartment COMMENTS:
STEP 2:     Step 11 CRITICAL STEP Remove all control power fuses from 3C HPI Pump at 3TD-9 (T-3/L44).
STEP 3: Step 12 Remove all control power fuses from 3B RBS Pump at 3TD-11 (T-3/L44).
STANDARD: Candidate locates the 4160V breaker cabinet for the 3C HPI Pump and indicates that the upper compartment door would be opened                                                             -   SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse   -  UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:
STANDARD:
 
Candidate locates the 4160V breaker cabinet for the 3B RBS Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
CR0-805 - j Page 6 of 11 STEP 3:     Step 12 CRITICAL STEP Remove all control power fuses from 3B RBS Pump at 3TD-11 (T-3/L44).
STEP 4: Step 13 Remove all control power fuses from 3A HPI Pump at 3TC-8 (T-3/L43).
STANDARD: Candidate locates the 4160V breaker cabinet for the 3B RBS Pump and indicates that the upper compartment door would be opened                                                           -    SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse       UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:
STANDARD:
STEP 4:     Step 13 CRITICAL STEP Remove all control power fuses from 3A HPI Pump at 3TC-8 (T-3/L43).
Candidate locates the 4160V breaker cabinet for the 3A HPI Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
STANDARD: Candidate locates the 4160V breaker cabinet for the 3A HPI Pump and indicates that the upper compartment door would be opened                                                           -    SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse   -  UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:
CR0-805 -j Page 6 of 11 CRITICAL STEP SAT -UNSAT -CRITICAL STEP SAT -UNSAT -
 
STEP 5: Step 10 Remove all control power fuses from 3A RBS Pump at 3TC-1 O (T-3/L43).
CR0-805 - j Page 7 of 11 STEP 5:       Step 10 CRITICAL STEP Remove all control power fuses from 3A RBS Pump at 3TC-1 O (T-3/L43).
STANDARD:
STANDARD: Candidate locates the 4160V breaker cabinet for the 3A RBS Pump and indicates that the upper compartment door would be opened                                                                 -    SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse           UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:
Candidate locates the 4160V breaker cabinet for the 3A RBS Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
STEP 6:       Step 15                                                               CRITICAL STEP Open the following breakers (U3 Equip Rm):
STEP 6: Step 15 Open the following breakers (U3 Equip Rm):
* 3XS5-F38 (3HP-940 8kr) (LDST to R8ES Train 8)
* 3XS5-F38 (3HP-940 8kr) (LDST to R8ES Train 8)
* 3XS2-F3D (3LP-22 Bkr) (38 LPI BWST Suction)
* 3XS2-F3D (3LP-22 Bkr) (38 LPI BWST Suction)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)                 -  SAT
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction) STANDARD:
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction)
Candidate locates the following breakers and positions the handles to the OPEN position:
                                                                                      -  UNSAT STANDARD:     Candidate locates the following breakers and positions the handles to the OPEN position:
* 3XS5-F38 (3HP-940 8kr) (LDST to R8ES Train 8)
* 3XS5-F38 (3HP-940 8kr) (LDST to R8ES Train 8)
* 3XS2-F3D (3LP-22 8kr) (38 LPI 8WST Suction)
* 3XS2-F3D (3LP-22 8kr) (38 LPI 8WST Suction)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)
* 3XS4-F38 (3HP-939 8kr) (LDST to R8ES Train A)
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction) Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM. COMMENTS:
* 3XS1-F5D (3LP-21 8kr) (3A LPI 8WST Suction)
CR0-805 -j Page 7 of 11 CRITICAL STEP SAT --UNSAT CRITICAL STEP SAT -UNSAT -
Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM.
STEP 7: Step 16 Remove all control power fuses from 3A2 RC PUMP beaker at 3TB-8 (U#3 6900v Switchgear House) STANDARD:
COMMENTS:
Candidate locates the 6900V breaker cabinet for the 3A2 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
 
STEP 8: Step 17 Remove all control power fuses from 382 RC PUMP beaker at 3TB-9 (U#3 6900v Switchgear House) STANDARD:
CR0-805 - j Page 8 of 11 STEP 7:     Step 16                                                         CRITICAL STEP Remove all control power fuses from 3A2 RC PUMP beaker at 3TB-8 (U#3 6900v Switchgear House)
Candidate locates the 6900V breaker cabinet for the 382 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
                                                                              -    SAT STANDARD:   Candidate locates the 6900V breaker cabinet for the 3A2 RC Pump and indicates that the upper compartment door would be opened
CR0-805 -j Page 8 of 11 CRITICAL STEP SAT --UN SAT CRITICAL STEP SAT -UNSAT -
                                                                              -  UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
STEP 9: Step 18 Remove all control power fuses from 3A 1 RC PUMP beaker at 3T A-3 (U#3 6900v Switchgear House) STANDARD:
STEP 8:     Step 17                                                         CRITICAL STEP Remove all control power fuses from 382 RC PUMP beaker at 3TB-9 (U#3 6900v Switchgear House)
Candidate locates the 6900V breaker cabinet for the 3A 1 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
                                                                              -  SAT STANDARD:   Candidate locates the 6900V breaker cabinet for the 382 RC Pump and indicates that the upper compartment door would be opened
STEP 10: Step 19 Remove all control power fuses from 381 RC PUMP beaker at 3T A-4 (U#3 6900v Switchgear House) STANDARD:
                                                                              -  UNSAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
Candidate locates the 6900V breaker cabinet for the 381 RC Pump and indicates that the upper compartment door would be opened Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
 
Examinet Cue: Another operator will continue with this procedure END TASK CR0-805 -j Page 9 of 11 CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UN SAT -
CR0-805 - j Page 9 of 11 STEP 9:     Step 18                                                           CRITICAL STEP Remove all control power fuses from 3A 1 RC PUMP beaker at 3T A-3 (U#3 6900v Switchgear House)
STEP# CRITICAL STEP EXPLANATIONS Explanation CR0-805 -j Page 10 of 11 All steps are critical since they secure components that could challenge operation of the SSF from the main control room prior to evacuation by placed them in a failsafe position to prevent the component from spuriously operating due to fire damage.
                                                                              -    SAT STANDARD:   Candidate locates the 6900V breaker cabinet for the 3A 1 RC Pump and indicates that the upper compartment door would be opened
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS
                                                                                -  UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
STEP 10:   Step 19                                                           CRITICAL STEP Remove all control power fuses from 381 RC PUMP beaker at 3TA-4 (U#3 6900v Switchgear House)
                                                                                -  SAT STANDARD:   Candidate locates the 6900V breaker cabinet for the 381 RC Pump and indicates that the upper compartment door would be opened
                                                                                -  UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:
Examinet Cue: Another operator will continue with this procedure END TASK
 
CR0-805 - j Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP#                                       Explanation All steps are critical since they secure components that could challenge operation of the SSF from the main control room prior to evacuation by placed them in a failsafe position to prevent the component from spuriously operating due to fire damage.
 
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
* A plant fire is in progress that requires evacuation of Unit 3 Control Room
* A plant fire is in progress that requires evacuation of Unit 3 Control Room
* AP/3/A/1700/050(Challenging Plant Fire) is in progress
* AP/3/A/1700/050(Challenging Plant Fire) is in progress
* You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)
* You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) .5.(0ATC Actions for Control Room Evacuation)
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-427 A0-427 -k Page 1 of 10 Reset an Emergency Feedwater Pump Turbine CANDIDATE EXAMINER Task: Reset the TDEFWP Alternate Path: NO Facility JPM #: A0-027 KIA Rating(s):
 
System: 061 KIA: A2.04 Rating: 3.4/3.8 Task Standard:
A0-427 - k Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-427 Reset an Emergency Feedwater Pump Turbine CANDIDATE EXAMINER
REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location:
 
Simulator
A0-427 - k Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
__ In-Plant _"'""'X'--
Reset the TDEFWP Alternate Path:
NO Facility JPM #:
A0-027 KIA Rating(s):
System:   061 KIA:       A2.04 Rating:   3.4/3.8 Task Standard:
Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location:                                Preferred Evaluation Method:
Simulator _ _ In-Plant _"'""'X'--                             Perform        Simulate _x_


==References:==
==References:==


Rule 3 (Loss of Main or Emergency FDW) EOP Enclosure 5.26 (Manual Start of TDEFDWP) Validation Time: 8 min. A0-427 -k Page 2 of 10 Preferred Evaluation Method: Perform Simulate _x_ Time Critical:
Rule 3 (Loss of Main or Emergency FDW)
No ====================================================================================
EOP Enclosure 5.26 (Manual Start of TDEFDWP)
Candidate:
Validation Time: 8 min.                                               Time Critical: No
Time Start: ______ _ NAME Time Finish: _____ _ Performance Rating: SAT ___ UNSAT __ _ Performance Time: ___ _ Examiner:
====================================================================================
____________
Candidate:                                                           Time Start: _ _ _ _ _ __
_
NAME                                   Time Finish: _ _ _ _ __
___ _ NAME SIGNATURE DATE ====================================================================================
Performance Rating:     SAT ___ UNSAT _ __                           Performance Time: _ _ __
Comments SIMULATOR OPERATOR INSTRUCTIONS NONE A0-427 -k Page 3 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP) READ TO OPERATOR DIRECTIONS TO CANDIDATE A0-427 -k Page 4 of 10 I will explain the initial conditions, and state the task to be performed.
Examiner: _ _ _ _ _ _ _ _ _ _ _ __                --------------~!_ _ __
All control room steps shall be performed for this JPM, including any required communications.
NAME                                 SIGNATURE                   DATE
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.
====================================================================================
Unit 2 TD EFDW Pump is tripped. Rule 3 is in progress.
Comments
 
A0-427 - k Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE
 
A0-427 - k Page 4 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP)
READ TO OPERATOR DIRECTIONS TO CANDIDATE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.
A loss of all 4160V power has occurred.
Unit 2 TD EFDW Pump is tripped.
Rule 3 is in progress.
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.
START TIME: __ _ STEP 1: Step 1 (Procedure is pre-staged at the TDEFWP. Provide the candidate a copy once the pre-staged copy is located) Verify TDEFDWP trip device tripped. STANDARD:
 
Candidate determines from the Initial Conditions that Unit 2 TD EFDW pump is tripped. Cue: If the candidate asks for local indications for Unit 2 TD EFDW pump being tripped, inform him/her that "the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position".
A0-427 - k Page 5 of 10 START TIME: _ __
STEP 1:         Step 1 (Procedure is pre-staged at the TDEFWP. Provide the candidate a copy once the pre-staged copy is located)                                         -  SAT Verify TDEFDWP trip device tripped.
STANDARD:       Candidate determines from the Initial Conditions that Unit 2 TD EFDW         -  UNSAT pump is tripped.
Cue: If the candidate asks for local indications for Unit 2 TD EFDW pump being tripped, inform him/her that "the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position".
COMMENTS:
COMMENTS:
STEP 2: Step 2 Notify CRO to place TDEFDWP switch in PULL TO LOCK. STANDARD:
STEP 2:         Step 2 Notify CRO to place TDEFDWP switch in PULL TO LOCK.
Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TD EFDW pump in PULL TO LOCK. Cue: Indicate to candidate that Unit 2 TD EFDW pump is in PULL TO LOCK. COMMENTS:
                                                                                              -  SAT STANDARD:       Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TD EFDW pump in PULL TO LOCK.
STEP 3: Step 3 Push reset lever toward turbine shaft until engaged: STANDARD:
Cue: Indicate to candidate that Unit 2 TD EFDW pump is in PULL TO LOCK.                       -  UNSAT COMMENTS:
Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged. Cue: Indicate to candidate that the reset lever is engaged. COMMENTS:
STEP 3:         Step 3                                                                     CRITICAL STEP Push reset lever toward turbine shaft until engaged:
STEP 4: Step 4 Rotate spindle fully clockwise.
STANDARD:       Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged.                                                                     -  SAT Cue: Indicate to candidate that the reset lever is engaged.
STANDARD:
COMMENTS:                                                                                   -  UN SAT STEP 4:         Step 4                                                                     CRITICAL STEP Rotate spindle fully clockwise.
Candidate rotates 2MS-94 spindle fully clockwise until it reaches a hard stop. Cue: Indicate to candidate that the spindle is in its full clockwise position.
                                                                                                -  SAT STANDARD:       Candidate rotates 2MS-94 spindle fully clockwise until it reaches a hard stop.
COMMENTS:
Cue: Indicate to candidate that the spindle is in its full clockwise position.               -  UN SAT COMMENTS:
A0-427 -k Page 5 of 10 SAT --UNSAT SAT -UNSAT -CRITICAL STEP SAT -UN SAT -CRITICAL STEP SAT -UN SAT -
 
STEP 5: Step 5 Rotate spindle fully counter-clockwise.
A0-427 - k Page 6 of 10 STEP 5:       Step 5                                                                 CRITICAL STEP Rotate spindle fully counter-clockwise.
STANDARD:
                                                                                        -    SAT STANDARD:     Candidate observes spring plate in its full up position.
Candidate observes spring plate in its full up position.
Cue: Indicate to candidate that the spindle is in its full counter-clockwise position.
Cue: Indicate to candidate that the spindle is in its full counter-clockwise position.
                                                                                        -  UNSAT COMMENTS:
STEP 6:        Step 6 Rotate spindle % turn clockwise.
                                                                                        -  SAT STANDARD:      Candidate rotates spindle % turn clockwise.
Cue: Indicate to candidate that the spindle is 14 turn from full counterclockwise position.                                                                          -  UNSAT COMMENTS:
STEP 7:        Step 7 Notify CRO to place TDEFDWP switch in RUN:                                -  SAT STANDARD:      Candidate notifies Unit 2 CRO by phone/radio to place Unit 2 TD EFDW pump switch in RUN:
                                                                                        -  UN SAT Cue: Indicate to candidate that Unit 2 TD EFDW pump switch is in the RUN position, the TDEFWP can be seen and heard to be starting.
COMMENTS:
COMMENTS:
STEP 6: Step 6 Rotate spindle % turn clockwise.
STEP 8:       Step 8
STANDARD:
                                                                                        -  SAT Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD:     Candidate locates 2MS-93 and determines the valve is Open.
Candidate rotates spindle % turn clockwise.
                                                                                          -  UNSAT Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible.
Cue: Indicate to candidate that the spindle is 14 turn from full counterclockwise position.
COMMENTS:
COMMENTS:
STEP 7: Step 7 Notify CRO to place TDEFDWP switch in RUN: STANDARD:
 
Candidate notifies Unit 2 CRO by phone/radio to place Unit 2 TD EFDW pump switch in RUN: Cue: Indicate to candidate that Unit 2 TD EFDW pump switch is in the RUN position, the TDEFWP can be seen and heard to be starting.
A0-427 - k Page 7 of 10 STEP 9:         Step 8 RNO GO TO Step 11                                                            - SAT STANDARD:      Candidate goes to step 11.
                                                                                          - UNSAT COMMENTS:
STEP 10:        Step 11 Verify TDEFDWP running                                                  - SAT STANDARD:     Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.
                                                                                          - UNSAT Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.
COMMENTS:
COMMENTS:
STEP 8: Step 8 Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD:
STEP 10:       Step 12 EXIT this enclosure                                                     - SAT STANDARD:     Candidate exits the enclosure Cue: Indicate to candidate that this task is complete.                                 - UN SAT COMMENTS:
Candidate locates 2MS-93 and determines the valve is Open. Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible. COMMENTS:
END TASK TIME STOP: _ __
A0-427 -k Page 6 of 10 CRITICAL STEP SAT -UNSAT --SAT UNSAT -SAT -UN SAT -SAT -UNSAT -
 
STEP 9: Step 8 RNO GO TO Step 11 STANDARD:
A0-427 - k Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP#                                      Explanation This step is required to reset 2MS-94 This step is required to reset 2MS-94 This step is required to reset 2MS-94
Candidate goes to step 11. COMMENTS:
 
STEP 10: Step 11 Verify TDEFDWP running STANDARD:
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.
INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.
Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.
A loss of all 4160V power has occurred.
COMMENTS:
Unit 2 TD EFDW Pump is tripped.
STEP 10: Step 12 EXIT this enclosure STANDARD:
Rule 3 is in progress.
Candidate exits the enclosure Cue: Indicate to candidate that this task is complete.
COMMENTS:
END TASK TIME STOP: __ _ ------A0-427 -k Page 7 of 10 SAT UNSAT SAT UNSAT SAT UN SAT STEP# 3 4 5 CRITICAL STEP EXPLANATIONS Explanation This step is required to reset 2MS-94 This step is required to reset 2MS-94 This step is required to reset 2MS-94 A0-427 -k Page 9 of 10 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power. A loss of all 4160V power has occurred.
Unit 2 TD EFDW Pump is tripped. Rule 3 is in progress.
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.}}
INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.}}

Latest revision as of 14:01, 5 February 2020

Exam 2014-301 Draft Sim IN-Plant JPMs
ML15092A759
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/02/2015
From:
Division of Reactor Safety II
To:
References
Download: ML15092A759 (125)


Text

CR0-310 - a Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-310 PERFORM REQUIRED ACTIONS FOR A FAILED LPI TRAIN CANDIDATE EXAMINER

CR0-310 - a Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Perform Required Actions For A Failed LPI Train Alternate Path:

Ves Facility JPM #:

KIA Ratinq(s):

System: EPE 011 KIA: EA1.04 Rating: 4.4/4.4 Task Standard:

1A and 1B LPI pumps are started when RCS pressure decreases below LPI pump discharge pressure and 1LP-17 is closed after 1A LPI pump fails.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ _ Perform X Simulate

References:

EOP Enclosure 5.1, ES Actuation Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _! _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-310 - a Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS:

1 . RECALL Snap 208

2. IMPORT files for CR0-310
3. WHEN directed by Lead Examiner, Go to RUN

CR0-310 - a Page 4 of 8 Tools/Equipment/Procedures Needed:

EOP Enclosure 5.1, ES Actuation READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
  • ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
  • Enclosure 5.1 (ES Actuation) has been completed up to Step 52 with outstanding IAATs.
  • The LOCA CD Tab in progress.
  • Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
  • RCS pressure is decreasing rapidly.

INITIATING CUES:

The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.

CR0-310 - a Page 5 of 8 ST ART TIME: _ __

I STEP 1: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 (since this was the exit point earlier). - SAT STANDARD: Checks IAAT steps to determine if any apply Determine that IAAT Step 19 applies once RCS pressure is< ::::200 psig - UNSAT Continue to Step 19.

COMMENTS:

STEP 2: Step 19 IAAT RCS Pressure is < LPI pump shutoff head,

- SAT THEN perform Steps 20 - 21 STANDARD: Continue to Step 20.

- UN SAT COMMENTS:

  • CRITICAL TASK STEP 3: Step 20 Perform the following:
  • *Start 1A LPI Pump

- SAT STANDARD: Determine that 1LP-17 is open by observing the Red open light is lit located on 1UB2.

Places 1A LPI Pump switch to START and observes Red light on and UNSAT white light off.

Continue to Step 21.

COMMENTS:

I

CR0-310 - a Paae 6 of 8

  • CRITICAL TASK STEP 4: Step 21 Perform the following:
  • *Start 1 B LPI Pump

- SAT STANDARD: Determine that 1LP-18 is open by observing the red open light is lit located on 1 UB2.

Places 1B LPI pump switch to ST ART and observes Red light on and white light off. - UN SAT Go back to Step 52.

COMMENTS:

STEP 5: Step 52 REFER TO Enclosure 5.1 IAAT Steps prior to Step 52 STANDARD: Checks IAAT steps to determine if any apply

- SAT Determines that IAAT Step 25 now applies Continue to Step 25.

- UNSAT Evaluator Note: 1A LP/ Pump fails while operating.

COMMENTS:

STEP 6: Step 25 CRITICAL TASK IAAT 1A LPI pump fails while operating, AND 1B LPI pump is operating, THEN close 1LP-17.

- SAT STANDARD: Determine the1A LPI Pump is off and 1 B LPI pump is operating, AND Close 1LP-17.

- UN SAT Cue: Another Operator will continue with this procedure.

COMMENTS:

I END TASK STOP TIME: _ _ _ __

CR0-310 - a Page 7 of 8 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Student verifies 1LP-17 is open and Starts 1A LPI P 4 Student verifies 1LP-18 is open and Starts 1B LPIP 6 Student closes 1LP-17 when 1A LPI P fails

a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A LOCA has been in progress that initially stabilized RCS Pressure at 1000 psig.
  • ES Channels 1-8 have actuated on high RB pressure, the LPI pumps were secured as directed by Enclosure 5.1 (ES Actuation) to prevent pump damage.
  • Enclosure 5.1 (ES Actuation) has been completed up to Step 52.
  • The LOCA CD Tab in progress.
  • Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by the OATC.
  • RCS pressure is decreasing rapidly.

INITIATING CUES:

The Control Room SRO instructs you, the Balance of Plant Operator, to continue in Enclosure 5.1 (ES Actuation) and respond to plant conditions.

CR0-407 - b Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-407 Establish EFDW Flow Through Startup Valves CANDIDATE EXAMINER

CR0-407 - b Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Establish EFDW flow through Startup valves Alternate Path:

Yes Facility JPM #:

CR0-015 KIA Rating(s):

System: APE-054 KIA: AA2.04 Rating: 4.2/4.3 Task Standard:

EFDW flow is established to the affected header through the startup valve.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ _ Perform X Simulate

References:

EOP Rule 3, (Loss of Main or Emergency FDW)

EOP Rule 7, (SG Feed Control)

EOP Enclosure 5.27, (Alternate Methods for Controlling EFDW Flow)

Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ __

Performance Rating:. SAT ___ UNSAT _ __ Performance Time _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ ---------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-407 - b Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 209

2. IMPORT files for CR0-407
3. WHEN directed by Lead Examiner, go to RUN

CR0-407 - b Page 4 of 12 Tools/Equipment/Procedures Needed

  • EOP Encl 5.27, Alternate Methods for Controlling EFDW Flow READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • The reactor has just tripped from 25% power
  • Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check

CR0-407 - b Page 5 of 12 START TIME: _ __

STEP 1: Performs a Symptom Check STANDARD: Performs Symptom Check and determines that there are no symptoms to report but will perform Rule 3 due to a loss of Main Feedwater

- SAT EXAMINER CUE: CR SRO acknowledges performing Rule 3 due to a Loss of Main Feedwater.

- UNSAT COMMENTS:

STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

STANDARD: Observes that TB Flooding is NOT occurring by 2SA-18/A-11 (Turbine BSMT Water Emergency High Level) NOT illuminated. - SAT (OP/2/A/6102/018)

Candidate will perform RNO step and GO TO step 3.

- UNSAT COMMENTS:

STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CSP/Emergency),

AND any of the following exist:

  • RCS pressure reaches 2300 psig OR NOT limit
  • Pzr level reaches 375" [340" ace]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling). - SAT STANDARD: Candidate determines Rule 4 is not required.

Continue to Step 4. - UNSAT COMMENTS:

STEP4 Rule 3: Step 4 Start operable EFDW pumps, as required, to feed all intact SGs.

STANDARD: Observes MD EFDWP & TD EFDWP running with switch lights on and SAT normal discharge pressure.

Continue to Step 5.

- UNSAT COMMENTS:

CR0-407 - b Page 6 of 12 STEP 5: Rule 3: Step 5 Verify any EFDW Pump is operating.

STANDARD: Checks MD EFDWP & TD EFDWP switch lights are on and Pumps have

- SAT normal discharge pressure.

Continue to Step 6.

- UNSAT COMMENTS:

STEP 6: Rule 3: Step 6 GO TO step 37.

- SAT STANDARD: GO TO step 37.

COMMENTS:

- UNSAT STEP 7: Rule 3: Step 37 IAAT an EFDW valve CANNOT control in AUTO, OR manual operation of EFDW valve is desired to control flow/level, THEN perform Steps 38 - 42.

ALTERNATE PATH

- SAT STANDARD: Determines that 1FDW-315 is NOT controlling properly (1 A SG level is

< 30" and decreasing). Concludes that 1FDW-315 has failed closed.

UNSAT Continue to Step 38.

COMMENTS:

STEP 8: Rule 3: Step 38 Place EFDW valve in MANUAL.

STANDARD: Place 1FDW-315 in MANUAL by depressing the AIM pushbutton on the

- SAT Moore controller.

Continue to Step 39.

- UNSAT COMMENTS:

CR0-407 - b Page 7 of 12 STEP 9: Rule 3: Step 39 Control EFDW flow with EFDW valve in MANUAL.

STANDARD: Determine that 1FDW-315 will NOT control in MANAUL. SAT Perform RNO, GO TO Step 41.

Continue to step 41

- UNSAT COMMENTS:

STEP 10: Rule 3: Step 41 Notify CR SRO that Encl 5.27 (Alternate Methods for Controlling EFDW Flow) is being initiated.

STANDARD: Removes Encl. 5.27 from EOP and initiates. - SAT EXAMINER CUE: CR SRO acknowledges entry into Enclosure 5.27.

COMMENTS: - UNSAT STEP 11: Encl 5.27: Step 1 Identify the failure:

1FDW-315 has Failed CLOSED [GO TO Step 2]

- SAT STANDARD: Candidate determines the next procedural step from table in Step 1.

Continue to Step 2.

- UNSAT COMMENTS:

STEP 12: Encl 5.27: Step 2 Verify 1A MD EFDWP is operating STANDARD: Candidate verifies 1A MD EFDWP is operating. Verify red light on and green light off and normal discharge pressure. - SAT Continue to Step 3.

COMMENTS: - UNSAT

CR0-407 - b Page 8 of 12 STEP 13: Encl 5.27: Steps 3 *CRITICAL STEP Stop 1A MD EFDWP STANDARD: *Candidate places switch to OFF.

Verify red light off and white light illuminated. - SAT Continue to Step 4.

COMMENTS: - UNSAT STEP 14: Encl 5.27: Step 4 Verify 1B MD EFDWP is operating.

STANDARD: Candidate verifies 1B MD EFDWP is operating. - SAT Verify red light on and green light off and normal discharge pressure.

Continue to Step 5.

- UNSAT COMMENTS:

STEP 15: Encl 5.27: Step 5 *CRITICAL STEP Place 1 TD EFDW Pump in PULL TO LOCK STANDARD: *Candidate places the U1 TD EFDW Pump in PULL to LOCK.

Candidate verifies red light is out and green light is lit. - SAT Continue to Step 6.

COMMENTS: - UNSAT STEP 16: Encl 5.27: Step 6 CRITICAL STEP Place 1FDW-35 in HAND and set demand to 0%

STANDARD: Candidate places 1FDW-35 in HAND and uses toggle switch to reduce demand to 0%. - SAT Continue to Step 7.

COMMENTS: - UNSAT

CR0-407 - b Page 9 of 12 STEP 17: Encl 5.27: Step 7 *CRITICAL STEP Close 1 FDW-33 STANDARD: *Candidate closes SU Control Block Valve (1 FDW-33).

Candidate verifies red light is out and green light is lit. - SAT Continue to Step 8.

COMMENTS: - UNSAT STEP 18: Encl 5.27: Step 8 Verify 1A MD EFDWP will be used.

STANDARD: Candidate determines that the 1A MD EFDWP will be used.

- SAT Continue to Step 9.

EXAMINER CUE: If candidate asks if 1A MD EFDWP will be used, inform him that the CR SRO directs using the 1A MD EFDWP.

- UNSAT COMMENTS:

STEP 19: Encl 5.27: Step 9 *CRITICAL STEP Open 1 FDW-374 STANDARD: *Candidate locates and opens 1FDW-374.

Candidate observes green closed light off and red open light on.

- SAT Continue to Step 10.

COMMENTS:

- UNSAT STEP 20: Encl 5.27: Step 1O Verify the following:

  • ; FDW-36 closed
  • 1FDW-38 open STANDARD: Candidate locates and closes 1FDW-36 and observes green closed light on and red open light off on 1VB3 or uses OAC indication. - SAT Candidate locates and opens 1FDW-38 and observes green closed light off and red open light lit on 1VB3 or uses OAC indication.

- UNSAT Continue to Step 11.

COMMENTS:

CR0-407 - b Page 10 of 12 STEP 21: Encl 5.27: Step 11 *CRITICAL STEP Start 1A MD EFDWP STANDARD: *Candidate places 1A MD EFDWP switch to RUN. - SAT Candidate verifies pump start by observing white light is off and red light is lit and proper discharge pressure.

Continue to Step 12. - UNSAT COMMENTS:

NOTE:

Flow from the TD EFDWP through a S/U control valve should be read on the FDW SU FLOW gauge.

Flow from MD EFDWP through a S/U control valve should be read on the MDEFWP DISCH FLOW gauge.

- SAT STEP 22: Encl 5.27: Step 12 Verify either of the following exists:

  • HPI Forced Cooling is maintaining core cooling
  • CBP Feed providing SG feed - UNSAT STANDARD: Candidate determines that neither condition is met and goes to the RNO.

Continue to Step 12 RNO.

COMMENTS:

STEP 23: Encl 5.27: Step 12 RNO *CRITICAL STEP IF any SG is being fed, THEN perform the following:

  • *Throttle 1FDW-35 to establish a maxim um of 100 gpm .
  • *Throttle 1FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control)

Notify CR SRO of SG Feed Status STANDARD: Candidate throttles 1FDW-35 to attain - 100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1FDW-35as necessary to establish - 25" S/U level (per Rule 7 table 4) - SAT Rule 7 Table 4 specifies the level to establish when using EFDWP is 30" (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint (i.e.

when using the S/U CVs) is 25" S/U level since RCS temperature is - UNSAT

>500°F.

EXAMINER NOTE: The candidate does not need to establish this level to complete the JPM. 1FDW-35 must be open and SG level increasing.

EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS:

END TASK

CR0-407 - b Page 11 of 12 STOP TIME: _ _ _ __

CRITICAL STEP EXPLANATIONS STEP # Explanation 1O This step is required to ensure the correct procedure is used.

13 This step is required to ensure the valves will operate.

15 This step is required to ensure the valves will operate.

16 This step is required to align the MD EFDWP to the S/U header.

17 This step is required to align the MD EFDWP to the S/U header.

19 This step is required to align the MD EFDWP to the S/U header.

21 This step is required to start the 1A MD EFDWP and provide a SG feed source.

23 This step is required to establish flow to the 1A SG.

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • The reactor has just tripped from 25% power
  • Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check

CR0-602 - c Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-602 LIVE BUS TRANSFER OF MFB POWER FROM CT 1 TO CT 4 CANDIDATE EXAMINER

CR0-602 - c Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Live Bus Transfer Of MFB Power From CT 4 To CT 1 Alternate Path:

No Facility JPM #:

New KIA Rating(s):

System: 062 KIA: A4.01 Rating: 3.3/3.1 Task Standard:

Perform a live bus transfer from CT 4 to CT 1 by procedure.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ _ Perform X Simulate

References:

OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)

Validation Time: 15 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _! _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-602 - c Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 212
2. Go to RUN
3. SELECT Chessell to Source Range

CR0-602 - c Page 4 of 14 Tools/Equipment/Procedures Needed:

  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Oconee Unit 1 is in MODE 5.
  • KHU-2 has been started by the Keowee operator.
  • It is desired to energize the MFB from CT 4
  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.

INITIATING CUES:

The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) beginning at step 2.4.

CR0-602 - c Page 5 of 14 ST ART TIME: _ __

I STEP 1: Step 2.4 Energize 4160V Standby Buses:

Step 2.4.1

- SAT Notify all three Units that the Standby Bus is about to be powered from CT4.

STANDARD: Use the control room phone and notify all three ONS Units that the

- UNSAT Standby Bus is about to be powered from CT 4.

COMMENTS:

STEP 2: Step 2.4.2 CRITICAL STEP Place CT 4 BUS 1 AUTO/MAN switch in "MAN".

STANDARD: Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to "MAN". - SAT COMMENTS:

- UN SAT STEP 3: Step 2.4.3 CRITICAL STEP Place STBY BUS 1 SYNCHRONIZING SWITCH to "ON".

STANDARD: Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". - SAT COMMENTS: UNSAT

CR0-602 - c p aqe 6 0 f 14 STEP 4: Step 2.4.4 CRITICAL STEP Close SK 1 CT 4 STBY BUS 1 FEEDER breaker.

STANDARD: Candidate rotates SK 1 CT 4 STBY BUS 1 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and SAT the red close light illuminates.

- UNSAT COMMENTS:

STEP 5: Step 2.4.5 Verify::::: 4160Von STANDBY BUS 1 "STANDBY BUS 1 VOLTS."

STANDARD: Verify"' 4160V on STANDBY BUS 1 "STANDBY BUS 1 VOLTS" on - SAT gauge located on 2AB3.

- UNSAT COMMENTS:

STEP 6: Step 2.4.6 Place STBY BUS 1 SYNCHRONIZING SWITCH to "OFF".

STANDARD: Candidate rotates STBY BUS 1 SYNCHRONIZING SWITCH, located on - SAT 2AB3, to "OFF".

- UN SAT COMMENTS:

CR0-602 - c p aqe 7 0 f14 STEP 7: Step 2.4.7 Place CT4 BUS 1 AUTO/MAN switch in "AUTO".

STANDARD: Candidate rotates CT 4 BUS 1 AUTO/MAN switch, located on 2AB3, to - SAT "AUTO".

- UNSAT COMMENTS:

STEP 8: Step 2.4.8 CRITICAL STEP Place CT4 BUS 2 AUTO/MAN switch in "MAN".

STANDARD: Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to SAT "MAN".

COMMENTS:

- UN SAT STEP 9: Step 2.4.9 CRITICAL STEP Place STBY BUS 2 SYNCHRONIZING SWITCH to "ON".

STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "ON". SAT COMMENTS:

- UN SAT

CR0-602 - c Paqe 8 of 14 STEP 10: Step 2.4.10 CRITICAL STEP Close SK 2 CT 4 STBY BUS 2 FEEDER.

STANDARD: Candidate rotates SK 2 CT 4 STBY BUS 2 FEEDER breaker switch, located on 2AB3, to close and verifies white open light extinguishes and the red close light illuminates. SAT

- UNSAT COMMENTS:

STEP 11: Step 2.4.11 Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS."

STANDARD: Verify ==4160V on STANDBY BUS 2 "STANDBY BUS 2 VOLTS" using - SAT gauge located on 2AB3 COMMENTS:

- UNSAT STEP 12: Step 2.4.12 Place STBY BUS 2 SYNCHRONIZING SWITCH to "OFF".

- SAT STANDARD: Candidate rotates STBY BUS 2 SYNCHRONIZING SWITCH, located on 2AB3, to "OFF".

COMMENTS: - UN SAT STEP 13: Step 2.4.13 Place CT 4 BUS 2 AUTO/MAN switch in "AUTO".

- SAT STANDARD: Candidate rotates CT 4 BUS 2 AUTO/MAN switch, located on 2AB3, to "AUTO".

- UNSAT COMMENTS:

CR0-602 - c p age 9 0 f 14 I CAUTION: E1 (1,2,3) E2 (1,2,3) will NOT open automatically when the S1 (1,2,3) OR S2 CRITICAL STEP (1,2,3) breakers are closed. Minimize time during which both of these sets of breakers are closed. CT 1, 2, OR 3 Transformer will be paralleled with CT 4 from the time the first I "S" breaker is closed until the last "E" breaker is opened.

STEP 14: Step 2.5 For the desired Oconee Units, perform a Live Bus transfer from the Startup Transformer (CT1 ,CT2, OR CT3) to the Standby Bus: SAT Step 2.5.1 A Unit 1 Place STANDBY 1 AUTO/MAN switch in "MAN".

- UN SAT STANDARD: Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to "MAN".

COMMENTS:

STEP 15: Step 2.5.1B CRITICAL STEP Place STANDBY 2 AUTO/MAN switch in "MAN".

STANDARD: Candidate rotates ST AND BY 2 AUTO/MAN switch, located on 1AB1, to "MAN". - SAT

- UNSAT COMMENTS:

STEP 16: Step 2.5.1C Place MFB 1 AUTO/MAN switch in "MAN".

- SAT STANDARD: Candidate determines that the MFB 1 AUTO/MAN switch, located on 1AB1, is in "MAN".

- UNSAT COMMENTS:

CR0-602 - c p age 10 0 f 14 STEP 17: Step 2.5.1D Place MFB 2 AUTO/MAN switch in "MAN".

STANDARD: Candidate determines that the MFB 2 AUTO/MAN switch, located on - SAT 1AB1, is in "MAN".

- UN SAT COMMENTS:

STEP 18: Step 2.5.1E CRITICAL STEP Open E1 1 (MFB1 STARTUP FDR).

STANDARD: Candidate rotates E1 1 (MFB1 STARTUP FDR) switch located on 1AB1 to trip and verifies that the red close lights extinguishes and the white - SAT open light illuminates.

- UNSAT COMMENTS:

STEP 19: Step 2.5.1 F CRITICAL STEP Close S1 1 (STBY BUS1 TO MFB1 ).

STANDARD: Candidate rotates S1 1 (STBY BUS1 TO MFB1) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light - SAT illuminates.

- UN SAT COMMENTS:

CR0-602 - c p aqe 11 0 f 14 STEP 20: Step 2.5.1G CRITICAL STEP Open E2 1 (MFB2 STARTUP FDR).

STANDARD: Candidate rotates E2 1 (MFB2 STARTUP FDR) switch located on 1AB1 to open and verifies that the red close lights extinguishes and the white - SAT open light illuminates.

- UNSAT COMMENTS:

STEP 21: Step 2.5.1H CRITICAL STEP Close S2 1 (STBY BUS2 TO MFB2).

STANDARD: Candidate rotates S2 1 (STBY BUS2 TO MFB2) switch located on 1AB1 to close and verifies white open light extinguishes and the red close light - SAT illuminates.

- UNSAT COMMENTS:

STEP 22: Step 2.5.11 Place STANDBY 1 AUTO/MAN switch in "AUTO".

STANDARD: Candidate rotates STANDBY 1 AUTO/MAN switch, located on 1AB1, to - SAT "AUTO".

- UN SAT COMMENTS:

CR0-602 - c Page 12 of 14 STEP 23: Step 2.5.1J Place STANDBY 2 AUTO/MAN switch in "AUTO".

STANDARD: Candidate rotates STANDBY 2 AUTO/MAN switch, located on 1AB1, to SAT "AUTO".

UNSAT COMMENTS: Examiner Cue: Another operator will continue with this procedure.

END TASK STOP TIME: _ _ _ __

CR0-602 - c Page 13 of 14 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 2 Step is required to energize the STBY Bus.

3 Step is required to energize the STBY Bus.

4 Step is required to energize the STBY Bus.

8 Step is required to energize the STBY Bus.

9 Step is required to energize the STBY Bus.

10 Step is required to energize the STBY Bus.

14 Step is required to energize the MFB from the STBY Bus.

15 Step is required to energize the MFB from the STBY Bus.

18 Step is required to energize the MFB from the STBY Bus.

19 Step is required to energize the MFB from the STBY Bus.

20 Step is required to energize the MFB from the STBY Bus.

21 Step is required to energize the MFB from the STBY Bus.

c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Oconee Unit 1 is in MODE 5.
  • KHU-2 has been started by the Keowee operator.
  • It is desired to energize the MFB from CT 4
  • OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT 4 Using Live Bus Transfer) is in progress.

INITIATING CUES:

The Control Room SRO directs you to continue with OP/O/A/1106/019 (Keowee Hydro At Oconee), Enclosure 4.11 (Energizing MFB Power From CT-4 Using Live Bus Transfer) beginning at step 2.4.

CR0-111 - d Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-111 Withdrawal of Safety Rod Group 1 to 50o/o CANDIDATE EXAMINER

CR0-111 - d Page 2 of 10 REGION II

(

INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Withdrawal of Safety Rod Group 1 to 50%

Alternate Path:

Yes Facility JPM #:

CR0-111 KIA Rating(s):

System: 001 KIA: G2.2.2 Rating: 4.6/4.1 Task Standard:

Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _X:..:__ In-Plant _ __ Perform X Simulate

References:

OP/1/A/1105/019 (Rev 023) (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

OMP 1-18 (Rev 034) Implementation Standards During Abnormal and Emergency Events Validation Time: 10 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

CR0-111 - d Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 206
2. IMPORT CR0-111 Simulator files
3. Go To RUN
4. Select SR/WR on NI recorder

CR0-111 - d Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature = 339°F RCS pressure =530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)

Control Room SRO directs you to:

  • Withdraw CRD Group 1 to 50% per OP/1/A/1105/019 (Control Rod Drive System)

Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.

CR0-111 - d Page 5of10 START TIME: _ __

I STEP 1: Step 3.1 Perform the following: (R.M.)

  • Ensure RUN is ON .
  • Ensure SINGLE SELECT SWITCH to ALL .

STANDARD: Determine control rod speed switch is selected to RUN by observing light - SAT indication on the Diamond.

Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond.

- UNSAT COMMENTS:

STEP 2: Step 3.2 WHILE CRDs are moving, monitor the following indications:

- SAT

  • Appropriate ranged Nls
  • Startup Rate STANDARD: As CRDs are withdrawn monitor the above indications.

- UNSAT COMMENTS:

CR0-111 - d Page 6 of 10 I NOTE: When LATCH AUTO is selected, the following automatically occurs: *CRITICAL STEP

  • Group/Rod inserts to latch rods (CRD TRAVEL "In" light ON)
  • Group/Rod withdraws to test for latching (CRD TRAVEL "Out" light ON)
  • Group/Rod inserts (CRD TRAVEL "In" light ON)
  • Group In Limit light on Diamond will momentarily extinguish then illuminate .

STEP 3: Step 3.3 Perform Latch and Pl alignment of Group 1, as follows: (R.M.)

3.3.1 Ensure GROUP SELECT SWITCH to 1.

3.3.2 Verify only Group 1 CONTROL ON lights are ON. (Pl panel) {9}

3.3.4 If Manual Latch and Pl Alignment is desired, perform the following:

(Per initiating cue, Manual is NOT desired)

- SAT 3.3.4 If Auto Latch and Pl Alignment desired, perform the following:

A. Select LATCH AUTO B. WHEN Auto Latch is complete, perform the following:

>- Verify LATCH AUTO is OFF.

>- Verify Group 1 0% lights are ON. (Pl Panel)

>- Verify Group 1 APl/RPI indications agree. (Pl Panel) - UNSAT STANDARD: *Rotate GROUP SELECT SWITCH to 1.

Determine that only Group 1 CONTROL ON lights are "ON" on the Pl panel.

  • Depress the LATCH AUTO pushbutton.

WHEN Auto Latch is complete:

  • Verify LATCH AUTO is OFF .
  • Verify Group 1 0% lights are ON. (Pl Panel)
  • Verify Group 1 APl/RPI indications agree using the position switch on the Pl Panel.

COMMENTS:

CR0-111 - d Page 7 of 10 I STEP 4: Step 3.4 Select FAULT RESET

- SAT STANDARD: Depress FAULT RESET pushbutton on the diamond panel.

COMMENTS:

- UNSAT STEP 5: Step 3.5 *CRITICAL STEP Select Group 1, as follows: (R.M.)

~ Ensure GROUP SELECT SWITCH to 1.

~ Ensure only Group 1 CONTROL ON lights are ON. (Pl panel}

~ Ensure Group 1 at 50%. (R.M.) - SAT

~ Place GROUP SELECT SWITCH to OFF.

STANDARD: Ensure GROUP SELECT SWITCH to 1.

Determine that only Group 1 CONTROL ON lights are ON on the Pl panel.

- UNSAT

Manually Trip the Rx when two or more CROM stator temperatures are<::

180°F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items)

ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.

COMMENTS:

CR0-111 - d Page 8 of 10 I AL TERNA TE PA TH: As rods are withdrawn, CRD temperatures will begin to increase.

CRITICAL STEP STEP 6: Manually Trip the Rx when two or more CROM stator temperatures are ;:::

180F IAW OMP 1-18 Attachment A (Licensed Operator Memory Items)

STANDARD: Candidate Manually Trip the Rx when two or more CRDM stator temperatures are;::: 180F IAW OMP 1-18 Attachment A (Licensed SAT Operator Memory Items)

EXAMINER NOTE: At:::: 10% withdrawn, CRD stator temperatures will begin to increase. At:::: 18% withdrawn, CRD stator temperatures will reach the OAC alarm set point. Once any two CRD stator temperatures reach 1BOF, Trip the Rx. UNSAT COMMENTS:

END OF TASK TIME STOP: _ __

CR0-111 - d Page 9 of 10 CRITICAL STEP EXPLANATIONS

. EP # Explanation 3 This step is required to withdraw group 1 control rods.

5 This step is required to withdraw group 1 control rods.

6 This step is required to manually trip the reactor when CRD temperature limits are exceeded.

d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 startup is in progress RCS temperature = 339°F RCS pressure = 530 psig INITIATING CUE In accordance with step 2.12.4 of OP/1/A/1102/001 (Controlling Procedure For Unit Startup)

Control Room SRO directs you to:

  • Withdraw CRD Group 1to50% per OP/1/A/1105/019 (Control Rod Drive System)

Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 3.1.

CR0-225 - e Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-225 Align letdown with 1 HP-14 failed in 11 Bleed 11 CANDIDATE EXAMINER

CR0-225 - e Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align letdown with 1HP-14 failed in 'Bleed" Alternate Path:

No Facility JPM #:

CR0-225 KIA Rating(s):

System: 002 KIA: A2.01 Rating: 4.3/4.4 Task Standard:

Students align letdown with 1 HP-14 failed in the 'Bleed' position IAW AP/2 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator -=-X.:..-_ In-Plant _ __ Perform X Simulate

References:

AP/1/A/1700/002, Excessive RCS Leakage, (Rev 14) and EP/1/A/1800/001 (Rev 039) Enclosure 5.5, PZR and LOST Level Control.

Validation Time: 14 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~*!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

CR0-225 - e Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS 1 . RECALL Snap 207

2. IMPORT CR0-225 Simulator files
3. WHEN directed by Lead Examiner, Go To RUN

CR0-225 - e Page 4 of 11 Tools/Equipment/Procedures Needed

  • EP/1/A/1800/001 Enclosure 5.5 (PZR and LOST Level Control)
  • AP/1/A/1700/002 (Excessive RCS Leakage)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • Reactor Power is 100%
  • AP/1/A/1700/002 is in progress due to 1HP-14 failing in the BLEED position.
  • Another RO is making up to the LOST per Encl 5.5 of the EOP.

INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.

CR0-225 - e Page 5 of 11 START TIME: _ __

I STEP 1: Step 4.155 Verify 1A LD Filter in service.

STANDARD: Student observes 1B Letdown (LO) Filter is in service and the 1A LD

- SAT Filter is NOT in service using either the OAC or Control Board indications and goes to the RNO.

COMMENTS:

- UNSAT STEP 2: Step 4.155 RNO CRITICAL STEP

1. If 1A LD Filter is OOS for maintenance, THEN restore 1A LD Filter per in progress procedure. (N/A)
2. Open 1HP-17 STANDARD: Student recognizes that 1A LD Filter is Available.
  • Student opens 1H P-17.

- SAT COMMENTS:

- UNSAT STEP 3: Step 4.156 Close 1HP-6 STANDARD: Student closes 1HP-6

- SAT COMMENTS:

- UNSAT

CR0-225 - e Page 6 of 11 I NOTE TS 3.4.9 applies when indicated PZR Level> 260" (corrected value for 285')

STEP 4: Step 4.157 Adjust 1HP-7, as needed, to control: - SAT

  • BLEED flow out of failed 1HP-14
  • Pzr level STANDARD: Student adjusts 1HP-7 as necessary to control PZR level.

- UNSAT COMMENTS:

STEP 5: Step 4.158 CRITICAL STEP Dispatch an operator to open 1H P-196 STANDARD: Student dispatches an AO to open 1HP-196 SAT BOOTH CUE: Open 1HP-196 with Manual Valves COMMENTS:

- UNSAT

CR0-225 - e Page 7 of 11 I STEP 6: Step 4.159 Verify CC System in Operation.

- SAT STANDARD: Student observes:

  • At least one CC pump in operation
  • CC return flow is > 575 gpm COMMENTS: - UNSAT STEP 7: Step 4.160 Position the standby HPI pump switch to OFF.

- SAT STANDARD: Student places the standby (1 B) HPIP switch to OFF COMMENTS:

UNSAT STEP 8: Step 4.161 Initiate monitoring RCP parameters.

- SAT STANDARD: Student refers to OAC TOC-RCP and control board indications to monitor RCP parameters.

Booth Cue: Notify the student that 1HP-196 is open.

- UNSAT COMMENTS:

CR0-225 - e Page 8 of 11 I STEP 9: Step 4.162 Throttle 1HP-31 to establish 12-15 gpm SEAL INLET HEADER FLOW. - SAT STANDARD: Student throttles 1HP-31 to establish 12-15 gpm.

COMMENTS:

- UNSAT STEP 10: Step 4.163 CRITICAL STEP When 1HP-196 is open, THEN close 1CS-26.

- SAT STANDARD: Student closes 1CS-26.

COMMENTS:

- UNSAT STEP 11: Step 4.164 Close the following;

- SAT

- UNSAT COMMENTS:

STEP 12: Step 4.165 Open 1HP-6

- SAT STANDARD: Student opens 1HP-6.

COMMENTS:

- UNSAT

CR0-225 - e Page 9 of 11 I STEP 13: Step 4.166 Throttle 1HP-31 to establish== 32 gpm SEAL INLET HOR FLOW.

- SAT STANDARD: Student throttles open 1HP-31 to establish== 32 gpm SEAL INLET HOR FLOW.

COMMENTS:

- UNSAT STEP 14: Step 4.167 Adjust 1HP-7 to establish desired letdown flow. - SAT STANDARD: Student throttles open 1HP-7 to establish == 75 gpm letdown flow.

COMMENTS:

- UNSAT STEP 15: Step 4.168 CRITICAL TASK Position the standby HPI pump switch to AUTO

- SAT STANDARD: Student places the standby (18) HPIP switch to AUTO EXAMINER CUE: Notify the candidate that another operator will continue with this procedure.

COMMENTS: - UNSAT END TASK TIME STOP: _ __

CR0-225 - e Page 10 of 11 CRITICAL STEP EXPLANATIONS

_ j EP # Explanation 2 1HP-17 must be opened to align the alternate letdown flow path.

5 1HP-196 must be open for the alternate letdown flow path.

10 1CS-26 is closed to isolate the flow path going to the BHUTs.

15 The standby H Pl P ( 1B) control switch is placed back in AUTO to protect RCP seals by automatically starting the standby HPIP if low seal injection flow (<22 gpm) is detected.

e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • Reactor Power is 100%
  • AP/1/A/1700/002 is in progress due to 1HP-14 failing in the BLEED position.
  • Another RO is making up to the LOST per Encl 5.5 of the EOP.

INITIATING CUE The CRSRO directs you to continue with AP/1/A/1700/002 (Excessive RCS Leakage) beginning at step 4.155.

CR0-408a- f Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-408a START FOURTH REACTOR COOLANT PUMP CANDIDATE:-----------------

EXAMINER:-----------------

CR0-408a - f Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Start the fourth RCP Alternate Path:

Yes Facility JPM #:

CR0-038a KIA Rating(s):

System: 003 KIA: A4.06 Rating: 2.9*/2.9 Task Standard:

182 RCP is started in accordance with OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP) and then secured per AP/16 due to high vibration Preferred Evaluation Location: Preferred Evaluation Method:

Simulator --=-X-'-- In-Plant _ __ Perform _X_ Simulate

References:

OP/1/N1102/001 (Controlling Procedure for Unit Startup)

OP/1/N1103/006 Encl. 4.4 (Starting 182 RCP)

AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)

ARG 1SA-2 I E-2 (RC Pump Vibrations Emergency High)

Validation Time: 18 minutes Time Critical: No

=========================================================================

Candidate: Time Start:

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CR0-408a - f Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 21 O
2. Import files for CR0-408a
3. Ensure all breaker flags are set to current plant conditions
4. When directed by lead examiner, Go to Run.

CR0-408a - f Page 4 of 11 Tools/Equipment/Procedures Needed:

OP/1/A/1102/001 (Controlling Procedure for Unit Startup)

OP/1/A/1103/006 Encl. 4.4 (Starting 182 RCP)

ARG 1SA-2 I D-2 (RC Pump Vibration High)

ARG 1SA-2 I E-2 (RC Pump Vibration Emergency High)

READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature= 471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1IA/1103/006 Encl. 4.4 beginning with step 2.1.

CR0-408a - f Page 5 of 11 START TIME: _ __

I STEP 1: Step 2.1.1 Announce "Starting 182 RCP" via plant page.

- SAT STANDARD: Announces "Starting 182 RCP" using the plant page system.

COMMENTS: - UNSAT STEP 2: Step 2.1.2 IF AT ANY TIME Oil Lift Pump low discharge pressure clears, Go To Step 2.1.6

- SAT STANDARD: Reads IAAT step and determines it does not currently apply COMMENTS: - UNSAT I NOTE: AC Oil Lift Pump may take> 2 minutes to develop adequate discharge pressure. I *CRITICAL STEP STEP 3: Step 2.1.3 IF available, start AC Oil Lift Pump on 182 RCP.

STANDARD: Determines AC Oil Lift Pump is available and:

  • *Rotates AC Oil Lift Pump switch to start

- SAT

  • Observes red light on and green light off
  • Monitors discharge pressure status on OAC
  • Low discharge pressure warning will clear on OAC Candidate determines that IAAT Step 2.1.2 now applies and moves ahead to Step 2.1.6

- UNSAT COMMENTS:

CR0-408a - f Page 6 of 11 STEP 4: Step 2.1.6 *CRITICAL STEP WHEN Oil Lift Pump low discharge pressure clears AND> 60 seconds has elapsed since starting oil lift pumps, start 1B2 RCP.

STANDARD: Once the AC Oil Lift Pump low discharge pressure has cleared, start the 1B2 RCP as follows:

  • Verify red lights on and green light off - SAT
  • Verify starting current
  • Verify OAC indications support pump start

- UNSAT COMMENTS:

STEP 5: Step 2.1.7 After RCP is at full speed, perform the following:

A. Ensure the following stopped

  • AC Oil Lift Pump
  • DC Oil Lift Pump B. If AC Oil Lift Pump was operated, position AC Oil Lift Pump switch to "OFF" C. If DC Oil Lift Pump was operated, position AC Oil Lift Pump switch to - SAT "OFF"

- UNSAT STANDARD: Once 1B2 RCP is at rated speed,

  • Rotates AC Oil Lift Pump switch to OFF EXAMINER NOTE: Stat-Alarms 1SA-9 I D-2 (RC Pump Vibration High) and 1SA-2 I E-2 (RC Pump Vibration Emergency High) will alarm ~30 sec after starting 182 RCP.

COMMENTS:

CR0-408a - f Page 7 of 11 STEP 6: 1SA-9 I D-2 (RC Pump Vibration High) 1SA-9 I E-2 (RC Pump Vibration Emergency High)

Step 3.1 Use one of the following means to verify RCP vibration conditions:

  • Verify vibration readings on RCP OAC Display Group RCP .
  • IF the OAC is unavailable, verify the alarm by referring to RCP - SAT Vibration Monitoring Chart Recorder.

STANDARD: Candidate verifies vibration readings apply by referring to the OAC Display Group RCP. - UNSAT EXAMINER NOTE: The Candidate may refer to either 1SA-9 I D-2 (High Vibration) or 1SA-9 I E-2 (Emergency High Vibration). ARG guidance is similar in either case.

COMMENTS:

STEP 7: 1SA-9 I D-2 (RC Pump Vibration High)

Step 3.2 IF indications of both RCPs in a loop are trending up together without any changes to RCS conditions (Temp/Pressure), swap Vibration Monitor power supplies: SAT STANDARD: Candidate determines that 1B1 RCP vibrations are not increasing and Step 3.2 does not apply.

Candidate continues to Step 3.3. - UNSAT EXAMINER NOTE: This step does not exist if the Candidate refers to the Emergency High Vibration stat-alarm. (1 SA-9 I E-2)

COMMENTS:

CR0-408a - f Page 8 of 11 STEP 8: 1SA-9 I D-2 (RC Pump Vibration High)

Step 3.3 1SA-9 I E-2 (RC Pump Vibration Emergency High)

Step 3.2 IF MODE 1 or 2, initiate AP/1/A/1700/016 (Abnormal Reactor Coolant Pump Operation)

- SAT STANDARD: Candidate initiates AP/1/A/1700/016 for High Vibration on 182 RCP.

- UNSAT EXAMINER CUE: If the candidate tells the CRSRO that the ARG directs initiating AP/16 inform the candidate that the CRSRO directs the Candidate to initiate AP/16.

COMMENTS:

STEP 9: Step 4.1 IAAT any RCP meets immediate trip criteria of Encl 5.1 (RCP Immediate Trip Criteria),

THEN perform Steps 4.2 - 4.11 .

- SAT STANDARD: Candidate refers to AP/16 Enclosure 5.1 and determines that 182 RCP meets Immediate Trip Criteria due to High Vibrations.

COMMENTS: - UNSAT STEP 10: Step 4.2 Verify MODE 1 or 2 STANDARD: Candidate verifies that Unit 1 is in MODE 3 and moves to Step 4.2 RNO. - SAT COMMENTS:

- UNSAT

CR0-408a - f Page 9 of 11 STEP 11: Step 4.2 RNO CRITICAL STEP Stop the affected RCP.

STANDARD: Candidate stops the 182 RCP.

SAT EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS: UN SAT END TASK STOP TIME: _ _ _ __

CR0-408a - f Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 4 Required to start the 182 RCP 11 Required to stop 182 RCP

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK)

INITIAL CONDITIONS OP/1/A/1102/001 (Controlling Procedure for Unit Startup) is in progress and completed up to steps which directs starting the fourth RCP RCS Pressure = 1660 psig slowly increasing RCS Temperature= 471°F slowly increasing INITIATING CUES The CRSRO directs you to start the 182 RCP per OP/1/A/1103/006 Encl. 4.4 beginning with step 2.1.

CR0-508 - g Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-508 PUMP THE QUENCH TANK CANDIDATE EXAMINER

CR0-508 - g Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Pump the Quench Tank Alternate Path:

No Facility JPM #:

CR0-508 KIA Rating(s):

System: 007 KIA: A1.01 Rating: 2.9/3.1 Task Standard:

Utilize OP/1/A/1104/017 Enclosure 4.1 to lower Quench Tank level to 75 inches.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x_ In-Plant _ __ Perform X Simulate

References:

Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___,!_ _ __

NAME SIGNATURE DATE

========================================================================

COMMENTS

CR0-508 - g Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 211
2. Place TIO sheet tags on QT Drain Pump and Component Drain Pump.
3. Update Boron Status board to show last 1A BHUT boron sample as being > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old.
4. Provide a copy of OP/1/A/1104/017 Encl 4.1 with the following:
  • Limits & Precautions
  • Steps 1.1 through 1.4 signed off.
5. Go to RUN

CR0-508 - g Page 4 of 9 Tools/Equipment/Procedures Needed:

  • OP/1/A/1104/017 Limits & Precautions
  • OP/1/A/1104/017 Enclosure 4.1 READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • Unit 1 is Shutdown
  • Unit 1 Quench Tank level is:::::: 86"
  • Quench Tank is aligned to 1A BHUT
  • Enclosure 4.1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at:::::: 75"

CR0-508 - g Page 5 of 9 START TIME: _ __

STEP 1: Step 2.1 CRITICAL STEP Ensure open:

_ 1CS-5 (COMPONENT DRN PUMP SUCTION)

_ 1CS-6 (COMPONENT DRN PUMP SUCTION)

- SAT STANDARD: Candidate ensures 1CS-5 and 1CS-6 are open by taking the control switches located on 1AB1 to the open position and verifying red open light illuminated and green closed light OFF.

- UNSAT Candidate continues to Step 2.2.

COMMENTS:

STEP 2: Step 2.2 IF QT level will be maintained in normal operating band:

2.2.1 IF desired, start COMPONENT DRAIN PUMP.

2.2.2 IF desired, start QUENCH TANK DRAIN PUMP.

STANDARD: Candidate recognizes from the Initial Conditions that this step is N/A and - SAT moves on to Step 2.3 NOTE: The normal operating band for Quench Tank level is80-100" when RCS - UNSAT pressure> 45 psig per L&P 2.4 of OP/1/A/1104/017.

COMMENTS:

STEP 3: Step 2.3 IF QT level is to be reduced below low level setpoint of 80 inches, perform the following:

_2.3.1 Ensure RCS pressure < 45 psig.

- SAT STANDARD: Candidate reads RCS pressure from the Low Range Cooldown Pressure indication and ensures that RCS pressure is <45 psig.

Candidate continues to Step 2.3.2.

- UNSAT COMMENTS:

I

CR0-508 - g Paqe 6 of 9 CRITICAL STEP STEP 4: Step 2.3.2 IF desired, place COMPONENT DRAIN PUMP to BYPASS STANDARD: *Candidate places the COMPONENT DRAIN PUMP switch in the BYPASS position.

EVALUATOR NOTE: The low level cut-off for the Quench Tank Pump will trip the _SAT pump at == 80".

EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP in the bypass position to _UNSAT complete the task. The candidate's instructions were to use both.

COMMENTS:

CRITICAL STEP STEP 5: Step 2.3.3 IF desired, place QUENCH TANK DRAIN PUMP to BYPASS STANDARD: *Candidate places the QUENCH TANK DRAIN PUMP switch in the _SAT BYPASS position.

EVALUATOR NOTE: The candidate must start either the COMPONENT DRAIN PUMP or the QUENCH TANK DRAIN PUMP to complete the task. The _UNSAT candidate's instructions were to use both.

EXAMINER NOTE: Expect 1SA-6/ A-7 (Quench Tank Level High/Low) to alarm at 80 inches in the Quench Tank.

COMMENTS:

STEP 6: Step 2.3.4 CRITICAL STEP At desired level (==75'), perform the following:

  • Ensure stopped COMPONENT DRAIN PUMP
  • Ensure stopped QUENCH TANK DRAIN PUMP

_SAT STANDARD: Candidate stops the COMPONENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP by rotating the switch to STOP.

_UNSAT COMMENTS:

I

CR0-508 - g p age 7 0 f 9 CRITICAL STEP STEP 7: Step 2.4.

Perform the following:

_Close 1CS-5 (COMPONENT DRN PUMP SUCTION)

_Close 1CS-6 (COMPONENT DRN PUMP SUCTION)

- SAT STANDARD: Candidate closes 1CS-5 and 1CS-6 by placing each control switch in the closed position. The green closed light illuminates and the red open light extinguishes.

- UNSAT COMMENTS:

STEP 8: Step 2.5.

IF 1A BHUT boron sample> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old AND QT pumped to 1A BHUT, perform the following:

_2.5.1 Verify closed 1CS-46 (1 A RC BLEED XFER PUMP DISCHARGE).

_2.5.2 Dispatch NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)

_2.5.3 Start 1A BLEED TRANSFER PUMP.

BOOTH CUE: When called report as NEO: "Using Time Compression, I am standing by to read 1A Bleed Transfer Pump discharge pressure at (1 CS-PG-0084)".

- SAT STANDARD: Candidate verifies 1CS-46 (1A RC BLEED XFER PUMP DISCHARGE) closed by observing green closed light illuminated and red open light off. - UN SAT Candidate dispatches NEO to observe 1A Bleed Transfer Pump discharge pressure.(1 CS-PG-0084)

Candidate starts 1A BLEED TRANSFER PUMP and observes red light illuminated and green light off.

EVALUATOR CUE: When 1A BLEED TRANSFER PUMP is started inform the candidate that another operator will continue this procedure.

COMMENTS:

END OF TASK STOP TIME: _ _ _ __

CR0-508 - g Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Step required to align the flow path from the QT to 1A SHUT 4 This step is required to begin the level decrease in the Quench Tank.

5 This step is required to begin the level decrease in the Quench Tank.

6 This step stops the QT Drain Pump and the Component Drain Pump when the QT is ::::: 75 inches 7 This step isolates the flow path from the QT to 1A SHUT

g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 is Shutdown Unit 1 Quench Tank level is== 86" Quench Tank is aligned to 1A BHUT .1 of OP/1/A/1104/017 is complete up to Step 2.1 INITIATING CUES The Control Room SRO directs you to use the COMPENENT DRAIN PUMP and the QUENCH TANK DRAIN PUMP to pump the Quench Tank to 1A BHUT beginning at Step 2.1 of OP/1/A/1104/017 Enclosure 4.1 Secure pumping the Quench Tank at== 75"

CR0-80ia - h Page 1 of 18 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-801a ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE CANDIDATE EXAMINER

CR0-801a - h Page 2 of 18 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

ALIGN INTAKE CANAL FOR RECIRC ON DAM FAILURE Alternate Path:

Yes Facility JPM #:

CR0-801 KIA Rating(s):

System: 075 KIA: A2.01 Rating: 3.0* /3.2 Task Standard:

CCW Intake Canal is aligned for recirc Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _x....__ In-Plant _ __ Perform X Simulate

References:

AP/1/A/1700/13 (CCW Dam Failure)

Validation Time: 15 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

CR0-801a - h Page 3 of 18 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall snap 214
2. Import simulator files for CR0-801 a
3. Ensure all breaker flags (especially CCW pumps) are set to current plant conditions.
4. Go to RUN as directed by examiner
5. When asked to dispatch an operator to close the breaker for 1CCW-12 (at step 17)

Fire Timer #1 and inform student that using time compression the breaker is closed.

CR0-801a - h Page 4 of 18 Tools/Equipment/Procedures Needed:

  • AP/1/A/1700/013 (Dam Failure)

READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Security reports that a failure of the Newry Dam has occurred.
  • The CCW Intake Canal is intact
  • Subsequent Actions of AP/1/A/1700/013 (Dam Failure) have been completed up to step 4.4.

INITIATING CUE:

The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.

CR0-801a - h Page 5 of 18 ST ART TIME: _ __

STEP 1: Step 4.4 CRITICAL STEP Depress the "CCW DAM FAILURE" pushbutton.

STANDARD: The "CCW DAM FAILURE" pushbutton is located by the student on - SAT 1AB3 and depressed.

COMMENTS:

- UNSAT STEP 2: Step 4.5 Dispatch an individual to the area of the dam failure to report damage to the Control Rooms.

- SAT STANDARD: An individual is dispatched to report damage to the ControLRooms.

Booth Cue: When asked, report that an Individual has been dispatched to the Newry dam

- UNSAT COMMENTS:

STEP 3: Step 4.6 GO TO step 4.49 - SAT STANDARD: Student goes to step 4.49 COMMENTS: - UNSAT

CR0-801a - h Page 6 of 18 STEP 4: Step 4.49 *CRITICAL STEP

  • Stop all RCP's Notify the CR SRO that for EOP purposes, RCPs should be considered unavailable for restart until LPSW is restored

- SAT STANDARD: *The control switches for RCPs 1A1, 1A2, 181 and 182 are located by the student on 1AB1 and rotated counter-clockwise to the TRIP position.

CR SRO notified of RCP status

- UNSAT COMMENTS:

STEP 5: Step 4.50 Stop all CCW pumps.

STANDARD: 1A, 1B, 1C, and 1D CCW Pump switches are located by the student on - SAT 1AB3.

Student ensures all CCW pump Red 'ON' lights are extinguished and White 'OFF' lights are illuminated.

COMMENTS:

- UNSAT STEP 6: Step 4.51 Open 1CCW-1-6 (WATERBOX EMER DISCH VALVES).

STANDARD: Student locates 1CCW-1-6 (WATERBOX EMER DISCH) control and - SAT indication on 1AB3 and ensures red "OPEN" indication is illuminated and green "CLOSED" indication is extinguished.

COMMENTS:

- UNSAT

CR0-801a - h Page 7 of 18 l STEP 7: Step 4.52 Verify all condenser outlet valves indicate closed using the OAC (GD AP13):

1 CCW-20 (Condenser 1A1 Outlet) (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) (01 D0275) 1 CCW-22 (Condenser 181 Outlet) (01 D0277) 1 CCW-23 (Condenser 182 Outlet) (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) (01 D0281)

- SAT 1 CCW-25 (Condenser 1C2 Outlet) (01 D0283)

STANDARD: The student monitors the Operator Aid Computer to verify the following:

- UNSAT 1 CCW-20 (Condenser 1A1 Outlet) closed (01 D0273) 1 CCW-21 (Condenser 1A2 Outlet) closed (01 D0275) 1 CCW-22 (Condenser 181 Outlet) closed (01 D0277) 1 CCW-23 (Condenser 182 Outlet) closed (01 D0279) 1 CCW-24 (Condenser 1C1 Outlet) closed (01D0281) 1 CCW-25 (Condenser 1C2 Outlet) closed (01 D0283)

COMMENTS:

STEP 8: Step 4.53 Dispatch an operator to place all condenser outlet valves in HAND.

  • 1CCW-25 STANDARD: An operator is dispatched to place the condenser outlet valves* in HAND.

- UNSAT Booth Cue: When called, acknowledge that an operator has been dispatched to place the valves in HAND.

COMMENTS:

CR0-801a - h Page 8 of 18 I STEP 9: Step 4.54 Verify CCW-8 is open.

- SAT STANDARD: CCW-8 switch and indication is located by the student on 2AB3 verifying red "OPEN" indication illuminated and green "CLOSED" indication extinguished.

COMMENTS: - UNSAT STEP 10: Step 4.55 Notify Unit 2 that emergency CCW siphon flow has been established on Unit 1.

- SAT STANDARD: Unit 2 Control Room is notified that siphon flow has been established on Unit 1.

Examiner/Booth Cue: When candidate contacts Unit 2, acknowledge the notification that CCW siphon flow has been established on Unit 1. - UNSAT COMMENTS:

STEP 11: Step 4.56 Dispatch operator(s) to perform Enclosure 5.2 (CCW Inventory Conservation).

- SAT STANDARD: Operator(s) are dispatched to perform Enclosure 5.2.

Booth Cue: When contacted by the candidate, acknowledge that operators will perform Enclosure 5.2

- UN SAT COMMENTS:

CR0-801a - h Page 9 of 18 STEP 12: Step 4.57 IAAT Unit 2 CR has directed Unit 1 to supply CCW recirculation, THEN perform Steps 4.58-4.73 to start one CCW Pump and establish recirculation.

- SAT STANDARD: Student continues to step 4.58.

Cue: Unit 2 Control Room has directed Unit 1 to supply CCW recirculation.

- UNSAT COMMENTS:

STEP 13: Step 4.58 Determine which CCW Pump will be started.

SAT STANDARD: The student determines from the turnover that the "1C" CCWP will be started COMMENTS:

- UN SAT STEP 14: Step 4.59 Place all CCW Pump switches in the trip position.

- SAT STANDARD: Student places all Unit 1 CCW Pump switches in the tripped position.

COMMENTS:

- UN SAT

CR0-801a - h Page 10 of 18 STEP 15: Step 4.60 Verify the 1A or 1B CCW Pump is to be started.

- SAT STANDARD: Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63.

COMMENTS:

- UNSAT STEP 16: Step 4.63 Verify both of the following CCW pump discharge valves are closed.

1CCW-12 1CCW-13 - SAT STANDARD: The student notes that the discharge valve for the 1C CCW pump (1CCW-12} is not closed and proceeds to the RNO.

- UNSAT COMMENTS:

STEP 17: Step 4.63 RNO Locally close the discharge valve from the breaker switch for 1CCW-12 (Unit 1 Equipment room) (1CCW-13 is already closed}

- SAT STANDARD: The student dispatches an operator to locally close 1CCW-12 from the breaker switch (1XS3-2E).

BOOTH CUE: When an operator is dispatched, fire TIMER #1, then inform candidate that 1CCW-12 is closed (use time compression)

- UN SAT COMMENTS:

CR0-801a - h Page 11 of 18 ALTERNATE PATH STEP 18: Step 4.64 Start the selected CCW Pump.

- SAT STANDARD: *The student starts 1C CCW pump by rotating the control switch to the CLOSE position.

"1 C" CCW Pump will NOT start. Since there is no guidance in the RNO column, the student will continue to step 4.65

_UNSAT COMMENTS:

STEP 19: Step 4.65 Verify the started CCW Pump Discharge valve opened.

- SAT STANDARD: The "1C" CCW Pump did not start and the discharge valve(1CCW-12}

did not open. Since this step cannot be performed, the student will proceed to the RNO column

- UNSAT COMMENTS:

STEP 20: Step 4.65 RNO

1. Stop th.e operating CCW pump
2. GO TO Step 4.58 to attempt to start a different CCW pump

- SAT STANDARD: The student returns to step 4.58 to start a different CCW pump EXAMINER CUE: Inform the student that the CR SRO directs returning to step 4.58 and proceed with starting the 1D CCW pump.

- UN SAT COMMENTS:

CR0-801a- h Page 12 of 18 STEP 21: Step 4.58 Determine which CCW Pump will be started.

- SAT STANDARD: The student determines from the turnover that the "1 D" CCWP will be started COMMENTS:

- UNSAT STEP 22: Step 4.59 Place all CCW Pump switches in the trip position.

- SAT STANDARD: Student places all Unit 1 CCW Pump switches in the tripped position.

COMMENTS:

- UN SAT STEP 23: Step 4.60 Verify the 1A or 1B CCW Pump is to be started.

- SAT STANDARD: Student determines from initiating cue that the 1C CCW pump will be started and goes to the RNO column and therefore goes to step 4.63.

COMMENTS:

- UN SAT

CR0-801a - h Page 13 of 18 STEP 24: Step 4.63 Verify both of the following CCW pump discharge valves are closed.

1CCW-12 1CCW-13 - SAT STANDARD: Both valves are determined to be closed. It is critical to ensure both valves are closed however they may have been closed at step 17 of this JPM and therefore already be closed at this step. IF CCW-12 or CCW-13 are open when reaching this step, closing them at this step is critical. - UNSAT COMMENTS:

STEP 25: Step 4.64 *CRITICAL STEP Start the selected CCW Pump.

STANDARD: *The student starts 1D CCW pump by rotating the control switch to the - SAT CLOSE position.

Student observes that the 1CCW-13 begins to open and the 1D CCW pump will start.

- UNSAT COMMENTS:

STEP 26: Step 4.65 Verify the started CCW Pump Discharge valve opened.

- SAT STANDARD: Determine that the "1 D" CCW Pump discharge valve (1 CCW-13) indicates Open.

COMMENTS:

- UNSAT

CR0-801a - h Page 14 of 18 STEP 27: Step 4.66 Ensure CCWP LOAD SHED DEFEAT switch is positioned to a running CCWP.

- SAT STANDARD: The student ensures the CCWP LOAD SHED DEFEAT switch is in the "1 D" CCW Pump position

- UNSAT COMMENTS:

STEP 28: Step 4.67 Verify CCW-9 opens.

STANDARD: The student locates CCW-9 switch and indication on 2AB3 verifying red - SAT "OPEN" indication illuminated and green "CLOSED" indication extinguished.

COMMENTS:

- UN SAT STEP 29: Step 4.68 Verify CCW-8 is closed.

STANDARD: CCW-8 switch and indication are located by the student on 2AB3 - SAT verifying green "CLOSED" indication illuminated and red "OPEN" indication extinguished.

COMMENTS:

- UNSAT

CR0-801a - h Page 15 of 18 STEP 30: Step 4.69 Verify an operator has been dispatched to open 1DP-FSC (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).

- SAT STANDARD: An operator has not yet been dispatched so the student proceeds to the RNO.

COMMENTS:

_UNSAT STEP 31: Step 4.69 RNO Dispatch an operator to open 1DP-F5C (CCW-8 BKR (EMERG CCW DISCH TO TAILRACE)).

- SAT STANDARD: Operator dispatched.

Booth Cue: When contacted, inform the student that an operator has been dispatched to open the breaker for CCW-8

- UN SAT COMMENTS:

STEP 32: Step 4.70 Ensure the discharge valves on all stopped CCW Pumps are closed.

CCW-10 (1A CCW PUMP DISCHARGE VLV)

CCW-11 (18 CCW PUMP DISCHARGE VLV) - SAT CCW-12 (1C CCW PUMP DISCHARGE VLV)

STANDARD: CCW pump discharge valve indications are located by the student on 1AB3.

- UNSAT Valves associated with tripped CCW pumps (white lights lit) will have the green "CLOSED" indication illuminated.

COMMENTS:

CR0-801a - h Page 16 of 18 STEP 33: Step 4.71 Notify Unit 2 and 3 to ensure all Unit 2 and 3 CCW pump discharge valves are closed.

STANDARD: Unit 2 and 3 are notified to ensure their CCW Pump Discharge valves are closed.

SAT EXAMINER CUE: Another operator will continue with this procedure.

UNSAT COMMENTS:

END TASK TIME STOP: _ __

CR0-801a - h Page 17 of 18 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is critical because depressing this pushbutton trips all operating CCW Pumps and sets up system logic for CCW recirculation flow.

4 This step is critical because RCPs must be stopped to reduce primary heat load.

25 This step is critical because the pump provides the necessary recirculation flow.

h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OFT ASK)

INITIAL CONDITIONS:

Security reports that a failure of the Newry Darn has occurred.

The CCW Intake Canal is intact Subsequent Actions of AP/1/A/1700/013 (Darn Failure) have been completed up to step 4.4.

INITIATING CUE:

The Control Room SRO directs you to align the CCW Intake Canal for recirc, using the 1C CCW pump, beginning at step 4.4 of AP/1/A/1700/013.

A0-710 - i Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-710 Place the Reactor Building Hydrogen Analyzer In Service CANDIDATE EXAMINER

A0-710 - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Place the 1A Reactor Building Hydrogen Analyzer In Service Alternate Path:

No Facility JPM #:

A0-010 KIA Rating(s):

System: 028 KIA: A4.03 Rating: 3.1/3.3 Task Standard:

Reactor Building Hydrogen Analyzers are placed in service by procedure within 90 minutes.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant _x_ Perform Simulate _x_

References:

EP/1/A/1800/00, (Rev 39) EOPEnclosure 5.2, "Placing RB Hydrogen Analyzers in Service" Validation Time: 12 minutes Time Critical:Yes

=========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

=========================================================================

COMMENTS

A0-710 - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None

A0-710 - i Page 4 of 12 Tools/Equipment/Procedures Needed .2, "Placing RB Hydrogen Analyzers in Service" Enclosure of EP/1/A/1800/001 NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)

READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS A LOCA has occurred on Unit 1.

Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.

The 1A and 1B RB Hydrogen Analyzer Train is aligned in the standby mode.

INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".

START TIME: _ __

NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West.

STEP 1: Step 1 At 1A H2 ANALYZER (RP), perform the following:

  • Ensure POWER ON light is on .
  • Position H2 DUAL RANGE SW toH2 0 -10% Range .

- SAT

  • Position FUNCTION SELECTORswitch to SAMPLE.
  • Depress the OFF button for the following:

_ 1PR-83 (BYP TO POST AC 1SV220) - UN SAT

_ 1 PR-86 (BYP TO POST AC 1SV221)

STANDARD: Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "A").

Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale.

Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.

Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves:

Train A

  • PR-83 (Bypass to Post Accident Sample Panel)
  • PR-86 (Bypass from Post Accident Sample Panel)

Cue: Indication is as you see it COMMENTS:

NOTE Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col 073 West.

STEP 2: Step 2 At 1B H2 ANALYZER (RP), perform the following:

  • Ensure POWER ON light is on .
  • Position H2 DUAL RANGE SW toH2 0 -10% Range .

- SAT

  • Position FUNCTION SELECTORswitch to SAMPLE.
  • Depress the OFF button for the following:

_ 1 PR-89 (BYP TO POST AC 1SV220) - UN SAT

_ 1PR-92 (BYP TO POST AC 1SV221)

STANDARD: Red "Power On" light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train "B").

Cue: Indication is as you see it H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the "0-10%" scale.

Cue: Indication is as you see it FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the "SAMPLE" position.

Cue: Indication is as you see it At the remote panel, the "OFF" button is pushed for the following valves:

Train A

  • PR-89 (Bypass to Post Accident Sample Panel)
  • PR-92 (Bypass from Post Accident Sample Panel)

Cue: Indication is as you see it COMMENTS:

STEP 3: Step 3 Notify Control Room to perform thefollowing: CRITICAL STEP

  • Open 1 PR-87 and 1 PR-90 STANDARD: Unit 1Control Room personnel are notified to open 1PR-81, 1PR-84, 1PR-87, and 1PR-90 to align the Reactor Building Hydrogen Analyzer to the Reactor Building.

Cue: After notification has been made, indicate to student that the red OPEN indication lights for all four valves located at the Remote Panel, are ON. SAT COMMENTS:

UNSAT

CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.

It should return down scale to the correct reading in"' 3 minutes.

STEP 4: Step 4 At 1A H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).
  • Position OFF I ST AN DBY I ANALYZE switch to ANALYZE.

_SAT

  • Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.

STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:

_UNSAT

  • PR-71 (Top of Containment Sample) for Train 'A' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-71 position and the red light is illuminated
  • OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode.

Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed.

Cue: Control is from the remote panel.

Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0%

hydrogen concentration COMMENTS:

CRITICAL STEP NOTE When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room.

It should return down scale to the correct reading in"' 3 minutes.

STEP 5: Step 5 At 1B H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).
  • Position OFF I STANDBY I ANALYZE switch to ANALYZE .

- SAT

  • Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.

STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:

- UNSAT

  • PR-76 (Top of Containment Sample) for Train 'B' Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-76 position and the red light is illuminated.
  • OFF/STANDBY/ANALYZE switch is positioned to the "ANALYZE" Mode .

Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed .

Cue: Control is from the remote panel.

Cue: Inform candidate that using time compressionapproximately three minutes have elapsed and point to the Hydrogen Concentration Meter indicating 0%

hydrogen concentration COMMENTS:

STEP 6: Step 6 IAATeither RB Hydrogen Analyzer Train indicates< 2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train.

_ 1A RB Hydrogen Analyzer Train

- SAT STANDARD: ALARM RESET Pushbutton is depressed for both trains.

Cue: If the candidate asks, indicate that the Hydrogen reading is ""' O percent on - UNSAT both trains.

Cue: Indicate to student that both yellow alarm lights are out after the ALARM RESET Pushbutton is depressed.

COMMENTS:

STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both 1A and 1B RB Hydrogen Analyzer Train, THEN notify Unit 1 Control Room that 1A Hydrogen Analyzer Train is in service.

SAT STANDARD: Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service.

Cue: Control room acknowledges Hydrogen Analyzers is in service. - UN SAT COMMENTS:

STEP 6: Step 8 EXIT this enclosure.

STANDARD: Procedure is exited.

- SAT COMMENTS:

- UN SAT END TASK STOP TIME: _ _ _ __

CRITICAL STEP EXPLANATIONS STEP # Explanation 3 Opens the block valves to the 1A and 1B H2 analyzer.

4 Starts the Analyzer pump and the sampling process for the 1A H2 Analyzer 5 Starts the Analyzer pump and the sampling process for the 1B H2 Analyzer

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS A LOCA has occurred on Unit 1.

Engineered Safeguards Channels 1 and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.

The 1A and 1B RB Hydrogen Analyzer Train is aligned in the standby mode.

INITIATING CUES The Control Room SRO directs you to place both trains of the RB Hydrogen Analyzers in service on Unit 1 per EOP Enclosure 5.2 "Placing RB Hydrogen Analyzers in Service".

CR0-805 - j Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-805 OATC Actions for Control Room Evacuation CANDIDATE EXAMINER

CR0-805 - j Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Remove Control Power Fuses and Open Breakers as directed by AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Alternate Path:

No Facility JPM #:

A0-805 KIA Rating(s):

System: BWI A06 KIA: AA1.10 Rating: 3.7*/3.9 Task Standard:

Control Power fuses for HPI pumps, RB Spray Pumps, and Reactor Coolant Pumps are pulled. Breakers for 3HP-939, 3HP-940, 3LP-21, and 3LP-22 are opened Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant _x_ Perform Simulate _x_

References:

AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Validation Time: 25 minutes Time Critical: No

=========================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.!_ _ __

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CR0-805 - j Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS None

CR0-805 - j Page 4 of 11 Tools/Equipment/Procedures Needed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation)

Breaker compartment pictures READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

  • A plant fire is in progress that requires evacuation of Unit 3 Control Room
  • AP/3/A/1700/050(Challenging Plant Fire) is in progress
  • You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) .5. (OATC Actions for Control Room Evacuation)

CR0-805 - j Page 5 of 11 START TIME: _ __

EXAMINER NOTE: Do NOT allow candidate to open any of the electrical panels during the performance of this JPM.

STEP 1: Step 10 CRITICAL STEP Remove all control power fuses from 38 HPI Pump at 3TE-9 (T-3/L45).

STANDARD: Candidate locates the 4160V breaker cabinet for the 38 HPI Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse - UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 2: Step 11 CRITICAL STEP Remove all control power fuses from 3C HPI Pump at 3TD-9 (T-3/L44).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3C HPI Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse - UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 - j Page 6 of 11 STEP 3: Step 12 CRITICAL STEP Remove all control power fuses from 3B RBS Pump at 3TD-11 (T-3/L44).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3B RBS Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 4: Step 13 CRITICAL STEP Remove all control power fuses from 3A HPI Pump at 3TC-8 (T-3/L43).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3A HPI Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse - UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 - j Page 7 of 11 STEP 5: Step 10 CRITICAL STEP Remove all control power fuses from 3A RBS Pump at 3TC-1 O (T-3/L43).

STANDARD: Candidate locates the 4160V breaker cabinet for the 3A RBS Pump and indicates that the upper compartment door would be opened - SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse UNSAT blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 6: Step 15 CRITICAL STEP Open the following breakers (U3 Equip Rm):

- UNSAT STANDARD: Candidate locates the following breakers and positions the handles to the OPEN position:

Examiner Cue: The breaker handles that have the silver ring require the ring be removed before the breaker can be re-positioned Examiner Note: The breaker for 3HP-939 is located just inside an RCA however it is visible from outside the RCA area therefore entry is into the RCA is not required for this JPM.

COMMENTS:

CR0-805 - j Page 8 of 11 STEP 7: Step 16 CRITICAL STEP Remove all control power fuses from 3A2 RC PUMP beaker at 3TB-8 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3A2 RC Pump and indicates that the upper compartment door would be opened

- UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 8: Step 17 CRITICAL STEP Remove all control power fuses from 382 RC PUMP beaker at 3TB-9 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 382 RC Pump and indicates that the upper compartment door would be opened

- UNSAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

CR0-805 - j Page 9 of 11 STEP 9: Step 18 CRITICAL STEP Remove all control power fuses from 3A 1 RC PUMP beaker at 3T A-3 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 3A 1 RC Pump and indicates that the upper compartment door would be opened

- UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

STEP 10: Step 19 CRITICAL STEP Remove all control power fuses from 381 RC PUMP beaker at 3TA-4 (U#3 6900v Switchgear House)

- SAT STANDARD: Candidate locates the 6900V breaker cabinet for the 381 RC Pump and indicates that the upper compartment door would be opened

- UN SAT Examiner Cue: Provide picture of the inside of the upper breaker compartment to the candidate Candidate identifies the location of the two Control Power Fuse blocks and indicates they would be pulled out and left in the compartment COMMENTS:

Examinet Cue: Another operator will continue with this procedure END TASK

CR0-805 - j Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP# Explanation All steps are critical since they secure components that could challenge operation of the SSF from the main control room prior to evacuation by placed them in a failsafe position to prevent the component from spuriously operating due to fire damage.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • A plant fire is in progress that requires evacuation of Unit 3 Control Room
  • AP/3/A/1700/050(Challenging Plant Fire) is in progress
  • You have completed AP/3/A/1700/050(Challenging Plant Fire) Enclosure 5.5.(0ATC Actions for Control Room Evacuation) through step 9 INITIATING CUES The Control Room SRO directs you to complete AP/3/A/1700/050(Challenging Plant Fire) .5.(0ATC Actions for Control Room Evacuation)

A0-427 - k Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE A0-427 Reset an Emergency Feedwater Pump Turbine CANDIDATE EXAMINER

A0-427 - k Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Reset the TDEFWP Alternate Path:

NO Facility JPM #:

A0-027 KIA Rating(s):

System: 061 KIA: A2.04 Rating: 3.4/3.8 Task Standard:

Emergency Feedwater Pump Turbine is reset Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _ _ In-Plant _"'""'X'-- Perform Simulate _x_

References:

Rule 3 (Loss of Main or Emergency FDW)

EOP Enclosure 5.26 (Manual Start of TDEFDWP)

Validation Time: 8 min. Time Critical: No

========================================================================

Candidate: Time Start: _ _ _ _ _ __

NAME Time Finish: _ _ _ _ __

Performance Rating: SAT ___ UNSAT _ __ Performance Time: _ _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __ --------------~!_ _ __

NAME SIGNATURE DATE

========================================================================

Comments

A0-427 - k Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE

A0-427 - k Page 4 of 10 Tools/Equipment/Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP)

READ TO OPERATOR DIRECTIONS TO CANDIDATE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.

A loss of all 4160V power has occurred.

Unit 2 TD EFDW Pump is tripped.

Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.

A0-427 - k Page 5 of 10 START TIME: _ __

STEP 1: Step 1 (Procedure is pre-staged at the TDEFWP. Provide the candidate a copy once the pre-staged copy is located) - SAT Verify TDEFDWP trip device tripped.

STANDARD: Candidate determines from the Initial Conditions that Unit 2 TD EFDW - UNSAT pump is tripped.

Cue: If the candidate asks for local indications for Unit 2 TD EFDW pump being tripped, inform him/her that "the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position".

COMMENTS:

STEP 2: Step 2 Notify CRO to place TDEFDWP switch in PULL TO LOCK.

- SAT STANDARD: Candidate notifies Unit 2 control room using radio/phone to place Unit 2 TD EFDW pump in PULL TO LOCK.

Cue: Indicate to candidate that Unit 2 TD EFDW pump is in PULL TO LOCK. - UNSAT COMMENTS:

STEP 3: Step 3 CRITICAL STEP Push reset lever toward turbine shaft until engaged:

STANDARD: Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged. - SAT Cue: Indicate to candidate that the reset lever is engaged.

COMMENTS: - UN SAT STEP 4: Step 4 CRITICAL STEP Rotate spindle fully clockwise.

- SAT STANDARD: Candidate rotates 2MS-94 spindle fully clockwise until it reaches a hard stop.

Cue: Indicate to candidate that the spindle is in its full clockwise position. - UN SAT COMMENTS:

A0-427 - k Page 6 of 10 STEP 5: Step 5 CRITICAL STEP Rotate spindle fully counter-clockwise.

- SAT STANDARD: Candidate observes spring plate in its full up position.

Cue: Indicate to candidate that the spindle is in its full counter-clockwise position.

- UNSAT COMMENTS:

STEP 6: Step 6 Rotate spindle % turn clockwise.

- SAT STANDARD: Candidate rotates spindle % turn clockwise.

Cue: Indicate to candidate that the spindle is 14 turn from full counterclockwise position. - UNSAT COMMENTS:

STEP 7: Step 7 Notify CRO to place TDEFDWP switch in RUN: - SAT STANDARD: Candidate notifies Unit 2 CRO by phone/radio to place Unit 2 TD EFDW pump switch in RUN:

- UN SAT Cue: Indicate to candidate that Unit 2 TD EFDW pump switch is in the RUN position, the TDEFWP can be seen and heard to be starting.

COMMENTS:

STEP 8: Step 8

- SAT Verify 2MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD: Candidate locates 2MS-93 and determines the valve is Open.

- UNSAT Cue: Indicate to candidate using 2MS-93 position indicator that the valve is Open and steam flow is audible.

COMMENTS:

A0-427 - k Page 7 of 10 STEP 9: Step 8 RNO GO TO Step 11 - SAT STANDARD: Candidate goes to step 11.

- UNSAT COMMENTS:

STEP 10: Step 11 Verify TDEFDWP running - SAT STANDARD: Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.

- UNSAT Cue: Indicate to candidate that Unit 2 TD EFDW pump is operating.

COMMENTS:

STEP 10: Step 12 EXIT this enclosure - SAT STANDARD: Candidate exits the enclosure Cue: Indicate to candidate that this task is complete. - UN SAT COMMENTS:

END TASK TIME STOP: _ __

A0-427 - k Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP# Explanation 3 This step is required to reset 2MS-94 4 This step is required to reset 2MS-94 5 This step is required to reset 2MS-94

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 2 Reactor has tripped from 100% power.

A loss of all 4160V power has occurred.

Unit 2 TD EFDW Pump is tripped.

Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to reset the Unit 2 TDEFWP.