{{#Wiki_filter:Exelon Generation LG-16-074 July 20, 2016 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Limerick Generating Station, Unit 2 Renewed Facility Operating License No NPF-85 NRC Docket Nos. 50-353 T.S. 6.9.1.12
{{#Wiki_filter:Exelon Generation T.S. 6.9.1.12 LG-16-074 July 20, 2016 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Limerick Generating Station, Unit 2 Renewed Facility Operating License No NPF-85 NRC Docket Nos. 50-353


==Subject:==
==Subject:==
Issuance of a Revision to the Core Operating Limits Report (COLA) for Unit 2 Reload 13, Cycle 14 Enclosed is a copy of the revised Core Operating Limits Report (COLA) for Limerick Generating Station (LGS) Unit 2 Reload 13 Cycle 14 which incorporates the revised cycle specific parameters resulting from the new configuration implemented for LGS, Unit 2. This revision of the COLA became effective on July 11, 2016. The COLA is being submitted to the NRC in accordance with LGS, Unit 2 Technical Specification 6.9.1.12.
Issuance of a Revision to the Core Operating Limits Report (COLA) for Unit 2 Reload 13, Cycle 14 Enclosed is a copy of the revised Core Operating Limits Report (COLA) for Limerick Generating Station (LGS) Unit 2 Reload 13 Cycle 14 which incorporates the revised cycle specific parameters resulting from the new configuration implemented for LGS, Unit 2. This revision of the COLA became effective on July 11, 2016.
The COLA is being submitted to the NRC in accordance with LGS, Unit 2 Technical Specification 6.9.1.12.
If you have any questions or require additional information, please contact Giuseppe Rubinaccio at 610-718-3560.
If you have any questions or require additional information, please contact Giuseppe Rubinaccio at 610-718-3560.
Respectfully, Site Vice President-Limerick Generating Station Exelon Generation Company, LLC  
Respectfully,
~~fn~~u~
Site Vice President-Limerick Generating Station Exelon Generation Company, LLC


==Attachment:==
==Attachment:==
Core Operating Limits Report for Limerick Generating Station Unit 2 Reload 13, Cycle 14 cc:  D. Dorman, Administrator, Region I, USNRC                                (w/attachments)
S. Rutenkroger, USNRC Sr. Resident Inspector, LGS                        (w/attachments)
A. Ennis, USN RC Project Manager for LGS                                (w/attachments)
A. A. Janati, PADEP-BRP                                                (w/attachments)


Core Operating Limits Report for Limerick Generating Station Unit 2 Reload 13, Cycle 14 cc: D. Dorman, Administrator, Region I, USNRC S. Rutenkroger, USNRC Sr. Resident Inspector, LGS A. Ennis, USN RC Project Manager for LGS A. A. Janati, PADEP-BRP (w/attachments) (w/attachments) (w/attachments) (w/attachments)
bee: A. Libra      LGS Site Vice President  (w/o attachment)
D. Lewis      LGS Plant Manager        (w/o attachment)
M. Herr      LGS Director Operations  (w/o attachment)
G. Rubinaccio Mgr Reactor Engineering  (w/o attachment)
A. Dickinson  Mgr Regulatory Assurance (w/o attachment)
D. Helker    Mgr Corp Licensing      (w/o attachment)
M. Holmes    Corp Fuels Engineer      (w/o attachment)
S. Martin    PADEP BRP                (w/attachment)


bee: A. Libra D. Lewis M. Herr G. Rubinaccio A. Dickinson D. Helker M. Holmes S. Martin LGS Site Vice President LGS Plant Manager LGS Director Operations Mgr Reactor Engineering Mgr Regulatory Assurance Mgr Corp Licensing Corp Fuels Engineer PADEP BRP (w/o attachment) (w/o attachment) (w/o attachment) (w/o attachment) (w/o attachment) (w/o attachment) (w/o attachment) (w/attachment) 
Bulan Nuclear- Nuclear Fuels                                    COLR.Umedck2,Rev.10 I Core Operating Limits Report CORBOPERATING LIMITS BBPORT FOR LIMBRICK GENERATING STATION lJNIT2 RELOAD l3, CYCLE 14 PmparedBy:          /?d ~        M. Halma Dace:
Pmpamr t=-rtutk W. Tril<.ur                    3-15-16 Reviewed By:
P. Trikur Reviewed By:      A_        ~    A. Stefanczyk Date: 3/ 1)/ 16 c:~~                                -    Date: 3)#fb Reviewed By:
T.Bemeint
                          &gine<<ing~ ADalyais Api...iBy:      ~ -if                4NA/
J. Tll8ar Dale: 03l2:Jl20:16 Manapr-BWR Design (GNP)
S1ldm Om"6"d Rmewed By:
                  ' -I'- _j} J)                           Date: 03/29/2016 L.Kmbeil Slldan Qualified Rmewet


Bulan Nuclear-Nuclear Fuels Core Operating Limits Report CORBOPERATING LIMITS BBPORT FOR LIMBRICK GENERATING STATION lJNIT2 RELOAD l3, CYCLE 14 COLR.Umedck2,Rev.10 I PmparedBy:
Exelon Nuclear - Nuclear Fuels                               COLR Limerick 2, Rev. 10 I Core Operating Limits Report Table of Contents Page Revision History                                                     3 List of Tables                                                       4 1.0   Terms and Definitions                                         5 2.0   General Information                                           7 3.0   MAPLHGR Limits                                                 8 4.0   MCPRLimits                                                     9 5.0   LHGR Limits                                                 12 6.0   Control Rod Block Setpoints                                   15 7.0   Turbine Bypass Valve Parameters                               16 8.0   Stability Protection Setpoints                               17 9.0   Modes of Operation                                           18 10.0 Methodology                                                   19 11.0 References                                                     19 Page 2of19
/?d Dace: # M.Halma Pmpamr Reviewed By: t=-rtutk W. Tril<.ur 3-15-16 P. Trikur Reviewed By: A_ Date: 3/ 1)/ 16 A. Stefanczyk
 
-Reviewed By: Date: 3)#fb T.Bemein t ADalyais Api...iBy: -if 4NA/ Dale: 03l2:Jl20:16 J. Tll8ar Manapr-BWR Design (GNP) S1ldm Om"6"d '-I _j} J) Rmewed By: '-Date: 03/29/2016 L.Kmbeil Slldan Qualified Rmewet Exelon Nuclear -Nuclear Fuels Core Operating Limits Report Revision History List of Tables 1.0 Terms and Definitions 2.0 General Information 3.0 MAPLHGR Limits 4.0 MCPRLimits 5.0 LHGR Limits 6.0 Control Rod Block Setpoints Table of Contents 7.0 Turbine Bypass Valve Parameters 8.0 Stability Protection Setpoints 9.0 Modes of Operation 10.0 Methodology 11.0 References Page 2of19 COLR Limerick 2, Rev. 10 I Page 3 4 5 7 8 9 12 15 16 17 18 19 19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report Revision Revision 10 Revision 9 COLR Limerick 2, Rev. I 0 I Revision History Description
Exelon Nuclear - Nuclear Fuels                                   COLR Limerick 2, Rev. I0 I Core Operating Limits Report Revision History Revision                            Description Revision 10
* Incorporates revised OLMCPR limits in accordance with "Limerick Unit 2 Cycle 14 Reload Licensing Reports -Supplemental Reload Licensing Report (SRLR), OOON9396-SRLR Revision I."
* Incorporates revised OLMCPR limits in accordance with "Limerick Unit 2 Cycle 14 Reload Licensing Reports - Supplemental Reload Licensing Report (SRLR),
OOON9396-SRLR Revision I."
* Revises Section 9.1 text to more explicitly retlect allowed/dis-allowed conditions.
* Revises Section 9.1 text to more explicitly retlect allowed/dis-allowed conditions.
* Updates References 2, 3, and 8.
* Updates References 2, 3, and 8.
* Adds Revision History Page New issue for Cycle 14 Page 3of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report COLR Limerick 2, Rev. to I List of Tables Page TABLE 3-1 MAPLHGR versus Average Planar Exposure-All Fuel Types 8 TABLE 3-2 MAPLHGR Single Loop Operation (SLO) Multiplier
* Adds Revision History Page Revision 9                          New issue for Cycle 14 Page 3of19
-All Fuel Types 8 TABLE 4-1 Operating Limit Minimum Critical Power Ratio (OLMCPR)-All Fuel Types 10 TABLE 4-2 Power Dependent MCPR Limits and Multipliers MCPR(P) and Kp -All Fuel Types 11 TABLE 4-3 Flow Dependent MCPR Limits MCPR(F)-All Fuel Types II TABLE 5-1 Linear Heat Generation Rate Limits -U0 2 Rods 12 TABLE 5-2 Linear Heat Generation Rate Limits -Gad Rods 12 TABLE 5-3 LHGR Single Loop Operation (SLO) Multiplier-All Fuel Types 13 TABLE 5-4 Power Dependent LHGR Multiplier LHGRF AC(P)-All Fuel Types 13 TABLE 5-5 Flow Dependent LHGR Multiplier LHGRF AC(F) -All Fuel Types 14 TABLE 6-1 Rod Block Monitor Setpoints 15 TABLE 6-2 Reactor Coolant System Recirculation Flow Upscale Trip 15 TABLE 7-1 Turbine Bypass System Response Time 16 TABLE 7-2 Minimum Required Bypass Valves To Maintain System Operability 16 TABLE 8-1 OPRM PBDA Trip Setpoints 17 TABLE 8-2 SLO OPRM PBDA Trip Setpoints 17 TABLE 9-1 Modes of Operation 18 Page 4of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 1.0 Terms and Definitions COLR Limerick 2, Rev. 10 I ARTS APRM, RBM, and Technical Specification Improvement Program BASE A case analyzed with Turbine Bypass System in service and Recirculation Pump Trip in service and Feedwater Temperature Reduction allowed (FFWTR includes FWHOOS or final feedwater temperature reduction) and PLUOOS allowed at any point during the cycle in Dual Loop mode. DLO Dual Loop Operation DTSP Rod Block Monitor Downscale Trip Setpoint EOOS Equipment Out of Service EOR End of Rated, the cycle exposure at which reactor power is equal to rated thermal power with recirculation system flow equal to I 00%, all control rods fully withdrawn, all feedwater heating in service and equilibrium Xenon. FFWTR Final Feedwater Temperature Reduction FWHOOS HTSP JCF JTSP Kp LHGR LHGRFAC(F)
 
LHGRFAC(P)
Exelon Nuclear - Nuclear Fuels                                           COLR Limerick 2, Rev. to I Core Operating Limits Report List of Tables Page TABLE 3-1     MAPLHGR versus Average Planar Exposure - All Fuel Types                       8 TABLE 3-2     MAPLHGR Single Loop Operation (SLO) Multiplier - All Fuel Types               8 TABLE 4-1   Operating Limit Minimum Critical Power Ratio (OLMCPR) - All Fuel Types       10 TABLE 4-2     Power Dependent MCPR Limits and Multipliers MCPR(P) and Kp - All Fuel Types 11 TABLE 4-3   Flow Dependent MCPR Limits MCPR(F) - All Fuel Types                           II TABLE 5-1     Linear Heat Generation Rate Limits - U02 Rods                               12 TABLE 5-2   Linear Heat Generation Rate Limits - Gad Rods                                 12 TABLE 5-3   LHGR Single Loop Operation (SLO) Multiplier-All Fuel Types                   13 TABLE 5-4   Power Dependent LHGR Multiplier LHGRF AC(P)-All Fuel Types                   13 TABLE 5-5   Flow Dependent LHGR Multiplier LHGRFAC(F) - All Fuel Types                   14 TABLE 6-1   Rod Block Monitor Setpoints                                                   15 TABLE 6-2   Reactor Coolant System Recirculation Flow Upscale Trip                       15 TABLE 7-1   Turbine Bypass System Response Time                                           16 TABLE 7-2   Minimum Required Bypass Valves To Maintain System Operability                 16 TABLE 8-1   OPRM PBDA Trip Setpoints                                                     17 TABLE 8-2 SLO OPRM PBDA Trip Setpoints                                                   17 TABLE 9-1   Modes of Operation                                                           18 Page 4of19
LTSP MAPFAC(F)
 
MAPFAC(P)
Exelon Nuclear - Nuclear Fuels                                                 COLR Limerick 2, Rev. 10 I Core Operating Limits Report 1.0   Terms and Definitions ARTS                   APRM, RBM, and Technical Specification Improvement Program BASE                   A case analyzed with Turbine Bypass System in service and Recirculation Pump Trip in service and Feedwater Temperature Reduction allowed (FFWTR includes FWHOOS or final feedwater temperature reduction) and PLUOOS allowed at any point during the cycle in Dual Loop mode.
MAPLHGR MCPR MCPR(F) MCPR(P) Feedwater Heaters Out of Service Rod Block Monitor High Trip Setpoint Increased Core Flow Rod Block Monitor Intermediate Trip Setpoint Off-rated power dependent OLMCPR multiplier Linear Heat Generation Rate ARTS LHGR thermal limit flow dependent multipliers ARTS LHGR thennaJ limit power dependent multipliers Rod Block Monitor Low Trip Setpoint Off-rated flow dependent MAPLHGR multiplier Off-rated power dependent MAPLHGR multiplier Maximum Average Planar Linear Heat Generation Rate Minimum Critical Power Ratio Off-rated flow dependent OLMCPR multiplier Off-rated power dependent OLMCPR multiplier Page 5of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report MELLLA Maximum Extended Load Line Limit Analysis MSIVOOS Main Steam Isolation Valve Out of Service OLMCPR Operating Limit Minimum Critical Power Ratio OPRM Oscillation Power Range Monitor oos Out of Service PBDA Period Based Detection Algorithm PLUOOS Power Load Unbalance Out of Service PROOS Pressure Regulator Out of Service RBM Rod Block Monitor RPTOOS Recirculation Pump Trip Out of Service RWE Rod Withdrawal Error SLO Single Loop Operation TB SOOS Turbine Bypass System Out of Service TCV Turbine Control Valve TIPOOS Traversing In core Probe Out of Service TSV Turbine Stop Valve Page 6of19 COLR Limerick 2, Rev. 10 I Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 2.0 General Information COLR Limerick 2, Rev. I 0 I This report provides the following cycle-specific parameter limits for Limerick Generating Station Unit 2 Cycle 14:
DLO                   Dual Loop Operation DTSP                   Rod Block Monitor Downscale Trip Setpoint EOOS                   Equipment Out of Service EOR                   End of Rated, the cycle exposure at which reactor power is equal to rated thermal power with recirculation system flow equal to I00%, all control rods fully withdrawn, all feedwater heating in service and equilibrium Xenon.
FFWTR                 Final Feedwater Temperature Reduction FWHOOS                 Feedwater Heaters Out of Service HTSP                  Rod Block Monitor High Trip Setpoint JCF                    Increased Core Flow JTSP                  Rod Block Monitor Intermediate Trip Setpoint Kp                    Off-rated power dependent OLMCPR multiplier LHGR                  Linear Heat Generation Rate LHGRFAC(F)            ARTS LHGR thermal limit flow dependent multipliers LHGRFAC(P)            ARTS LHGR thennaJ limit power dependent multipliers LTSP                  Rod Block Monitor Low Trip Setpoint MAPFAC(F)            Off-rated flow dependent MAPLHGR multiplier MAPFAC(P)            Off-rated power dependent MAPLHGR multiplier MAPLHGR              Maximum Average Planar Linear Heat Generation Rate MCPR                  Minimum Critical Power Ratio MCPR(F)              Off-rated flow dependent OLMCPR multiplier MCPR(P)              Off-rated power dependent OLMCPR multiplier Page 5of19
 
Exelon Nuclear - Nuclear Fuels                                     COLR Limerick 2, Rev. 10 I Core Operating Limits Report MELLLA                 Maximum Extended Load Line Limit Analysis MSIVOOS               Main Steam Isolation Valve Out of Service OLMCPR                 Operating Limit Minimum Critical Power Ratio OPRM                   Oscillation Power Range Monitor oos                   Out of Service PBDA                   Period Based Detection Algorithm PLUOOS                 Power Load Unbalance Out of Service PROOS                 Pressure Regulator Out of Service RBM                   Rod Block Monitor RPTOOS                 Recirculation Pump Trip Out of Service RWE                   Rod Withdrawal Error SLO                   Single Loop Operation TB SOOS               Turbine Bypass System Out of Service TCV                   Turbine Control Valve TIPOOS               Traversing In core Probe Out of Service TSV                   Turbine Stop Valve Page 6of19
 
Exelon Nuclear - Nuclear Fuels                                                      COLR Limerick 2, Rev. I0  I Core Operating Limits Report 2.0     General Information This report provides the following cycle-specific parameter limits for Limerick Generating Station Unit 2 Cycle 14:
* Maximum Average Planar Linear Heat Generation Rate (MAPLHGR)
* Maximum Average Planar Linear Heat Generation Rate (MAPLHGR)
* Minimum Critical Power Ratio (MCPR)
* Minimum Critical Power Ratio (MCPR)
* Single Loop Operation (SLO) OLMCPR adjustment
* Single Loop Operation (SLO) OLMCPR adjustment
* Off-rated OLMCPR adjustments (MCPR{P) or MCPR(F))
* Off-rated OLMCPR adjustments (MCPR{P) or MCPR(F))
* Off-rated OLMCPR multipliers
* Off-rated OLMCPR multipliers {Kp)
{Kp)
* Off-rated LHGR multipliers (LHGRFAC{P) or LHGRF AC(F))
* Off-rated LHGR multipliers (LHGRF AC{P) or LHGRF AC(F))
* Rod Block Monitor (RBM) setpoints
* Rod Block Monitor (RBM) setpoints
* MAPLHGR single loop operation multiplier
* MAPLHGR single loop operation multiplier
Line 55: Line 81:
* Turbine Bypass Valve parameters
* Turbine Bypass Valve parameters
* Reactor Coolant System Recirculation Flow Upscale Trips
* Reactor Coolant System Recirculation Flow Upscale Trips
* Oscillation Power Range Monitor Period Based Detection Algorithm (OPRM PBDA) Trip Setpoints This report is prepared in accordance with Technical Specification 6.9.1.9 of Reference I. Preparation of this report was performed in accordance with Exelon Nuclear, Nuclear Fuels T &RM NF-AB-120-3600.
* Oscillation Power Range Monitor Period Based Detection Algorithm (OPRM PBDA) Trip Setpoints This report is prepared in accordance with Technical Specification 6.9.1.9 of Reference I. Preparation of this report was performed in accordance with Exelon Nuclear, Nuclear Fuels T&RM NF-AB-120-3600.
The data presented in this report is valid for all licensed operating domains on the operating map, including:
The data presented in this report is valid for all licensed operating domains on the operating map, including:
* Maximum Extended Load Line Limit down to 82.9% ofrated core flow during full power operation
* Maximum Extended Load Line Limit down to 82.9% ofrated core flow during full power operation
* Increased Core Flow (ICF) up to 110% ofrated core flow
* Increased Core Flow (ICF) up to 110% ofrated core flow
* Final Feedwater Temperature Reduction (FFWTR) up to I 05&deg;F during cycle extension operation
* Final Feedwater Temperature Reduction (FFWTR) up to I05&deg;F during cycle extension operation
* Feedwater Heater Out of Service (FWHOOS) up to 60&deg;F feedwater temperature reduction at any time during the cycle prior to cycle extension.
* Feedwater Heater Out of Service (FWHOOS) up to 60&deg;F feedwater temperature reduction at any time during the cycle prior to cycle extension.
Further information on the cycle specific analyses for Limerick 2 Cycle 14 and the associated operating domains discussed above is available in Reference
Further information on the cycle specific analyses for Limerick 2 Cycle 14 and the associated operating domains discussed above is available in Reference 2.
: 2. Page 7of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 3.0 MAPLHGR Limits 3.1 Technical Specification Section 3.2.1 3 .2 Description COLR Limerick 2, Rev. 10 The limiting MAPLHGR value for the most limiting lattice (excluding natural uranium) of each fuel type as a function of average planar exposure is given in Table 3-1. For single loop operation, a multiplier is used, which is shown in Table 3-2. The power and flow dependent multipliers for MAPLHGR have been removed and replaced with LHGRFAC(P) and LHGRFAC(F);
Page 7of19
therefore, MAPFAC{P) and MAPFAC(F) are equal to 1.0 for all power and flow conditions (Reference 2). LHGRFAC(P) and LHGRFAC(F) are addressed in Section 5.0. TABLE3-1 MAPLHGR versus Average Planar Exposure-All Fuel Types (Reference
 
: 2) Average Planar Exposure MAPLHGR Limit (GWD/ST) (kW/ft) 0.0 13.78 17.52 13.78 60.78 7.50 63.50 6.69 TABLE3-2 MAPLHGR Single Loop Operation (SLO) Multiplier-All Fuel Types (Ref ere nee 2) SLO Multiplier 0.80 Page 8of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 4.0 MCPR Limits 4.1 Technical Specification Section 3.2.3 4.2 Description COLR Limerick 2, Rev. 10 I Table 4-1 is derived from Reference 2 and is valid for all fuel types and all operating domains. Table 4-1 includes treatment of these MCPR limits for all conditions listed in Section 9.0, Modes of Operation.
Exelon Nuclear - Nuclear Fuels                                               COLR Limerick 2, Rev. 10 Core Operating Limits Report 3.0     MAPLHGR Limits 3.1   Technical Specification Section 3.2.1 3 .2   Description The limiting MAPLHGR value for the most limiting lattice (excluding natural uranium) of each fuel type as a function of average planar exposure is given in Table 3-1. For single loop operation, a multiplier is used, which is shown in Table 3-2. The power and flow dependent multipliers for MAPLHGR have been removed and replaced with LHGRFAC(P) and LHGRFAC(F); therefore, MAPFAC{P) and MAPFAC(F) are equal to 1.0 for all power and flow conditions (Reference 2).
ARTS provides for power and flow dependent thermal limit adjustments and multipliers, which allow for a more reliable administration of the MCPR thermal limit. The flow dependent adjustment MCPR(F) is sufficiently generic to apply to all fuel types and operating domains. The power dependent adjustment MCPR(P) is independent of recirculation pump trip operability.
LHGRFAC(P) and LHGRFAC(F) are addressed in Section 5.0.
MCPR(P) and MCPR(F) are independent of Scram Time Option. In addition, there are ten sets of power dependent MCPR multipliers (Kp) for use with BASE, TBSOOS, RPTOOS, PROOS, DLO and SLO conditions, and PROOS+TBSOOS, PROOS+RPTOOS, DLO only. The PLUOOS condition is included in the BASE MCPR(P) and MCPR(F) limits and Kp multipliers and is bounded by the TBSOOS limits and multipliers; therefore, no additional adjustments are required for PLUOOS in those operating conditions.
TABLE3-1 MAPLHGR versus Average Planar Exposure-All Fuel Types (Reference 2)
The PLUOOS condition has not been analyzed concurrent with the RPTOOS operating condition.
Average Planar Exposure                 MAPLHGR Limit (GWD/ST)                               (kW/ft) 0.0                                 13.78 17.52                               13.78 60.78                               7.50 63.50                               6.69 TABLE3-2 MAPLHGR Single Loop Operation (SLO) Multiplier- All Fuel Types (Refere nee 2)
Operation in the PLUOOS condition concurrent with the RPTOOS condition requires core thermal power < 55% of rated (Reference 3). Section 7.0 contains the conditions for Turbine Bypass Valve Operability.
SLO Multiplier                 0.80 Page 8of19
MCPR(P) and MCPR(F) adjustments are provided in Tables 4-2 and 4-3. The OLMCPR is determined for a given power and flow condition by evaluating the power dependent MCPR and the flow dependent MCPR and selecting the greater of the two. Page 9of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report COLR Limerick 2, Rev. 10 I TABLE4-1 Operating Limit Minimum Critical Power Ratio (OLM CPR) -All Fuel Types (References 2 and 8) SCRAM Cycle Exposure Time < EOR-2542 EOOS Combination Option<1> MWd/ST MWd/ST BASE B I .36<2> 1.36 A 1.43 1.44 BASE SL0<3> B 1.58 1.58 A 1.58 1.58 TB SOOS B 1.38 1.39 A 1.47 1.48 TBSOOS SL0<3> B 1.58 1.58 A 1.58 1.58 RPTOOS B 1.38 1.39 A 1.55 1.56 RPTOOS SL0<3> B 1.58 1.58 A 1.58 1.59 PROOS B 1.36(2) 1.36 A 1.43 1.47 PROOS SL0<3> B 1.58 1.58 A 1.58 1.58 PROOS+TBSOOS B 1.38 1.39 PROOS+RPTOOS B 1.38 1.39 1 When Tau does not equal 0 or I, determine OLMCPR via linear interpolation.
 
For PROOS+TBSOOS and PROOS+RPTOOS, only Option B is allowed. 2 Value is adjusted to obtain an OPRM amplitude setpoint of 1.12. 3 For single-loop operation, the MCPR operating limit is 0.03 greater than the analyzed two loop value. However, a m i n i mum value of 1.58 is required to obtain an OLMCPR limit set by the Single Loop Operation Recirculation Pump Seizure Event. Page 10of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report COLR Limerick 2, Rev. 10 I TABLE4-2 Power Dependent MCPR Limits and Multipliers MCPR(P) and Kp-All Fuel Types (References 2 and 8) Core Core Thermal Power (% of rated) EOOS Flow 0 25 <30 65 85 100 Combination
Exelon Nuclear - Nuclear Fuels                                                     COLR Limerick 2, Rev. 10  I Core Operating Limits Report 4.0     MCPR Limits 4.1   Technical Specification Section 3.2.3 4.2     Description Table 4-1 is derived from Reference 2 and is valid for all fuel types and all operating domains. Table 4-1 includes treatment of these MCPR limits for all conditions listed in Section 9.0, Modes of Operation.
(%of MCPR(P) Operating Limit MCPR Multiplier, Kp rated) Base Base SLO TB SOOS TBSOOSSLO RPTOOS RPTOOSSLO PROOS PROOS SLO PROOS+ TB SOOS PROOS+RPTOOS S 60 2.50 2.50 2.40 1.340 1.131 >60 2.75 2.75 2.55 S 60 2.53 2.53 2.43 1.340 1.131 >60 2.78 2.78 2.58 S 60 3.25 3.25 2.75 1.340 1.131 >60 3.75 3.75 3.25 S60 3.28 3.28 2.78 1.340 1.131 >60 3.78 3.78 3.28 S60 2.50 2.50 2.40 1.340 1.131 > 60 2.75 2.75 2.55 S60 2.53 2.53 2.43 1.340 1.131 > 60 2.78 2.78 2.58 S60 2.50 2.50 2.40 1.367 1.236 > 60 2.75 2.75 2.55 :s 60 2.53 2.53 2.43 1.367 1.236 >60 2.78 2.78 2.58 :s 60 3.25 3.25 2.75 1.367 1.236 >60 3.75 3.75 3.25 :s 60 2.50 2.50 2.40 1.367 1.236 >60 2.75 2.75 2.55 TABLE4-3 Flow Dependent MCPR Limits MCPR(F) -All Fuel Types (Reference
ARTS provides for power and flow dependent thermal limit adjustments and multipliers, which allow for a more reliable administration of the MCPR thermal limit. The flow dependent adjustment MCPR(F) is sufficiently generic to apply to all fuel types and operating domains. The power dependent adjustment MCPR(P) is independent of recirculation pump trip operability. MCPR(P) and MCPR(F) are independent of Scram Time Option. In addition, there are ten sets of power dependent MCPR multipliers (Kp) for use with BASE, TBSOOS, RPTOOS, PROOS, DLO and SLO conditions, and PROOS+TBSOOS, PROOS+RPTOOS, DLO only. The PLUOOS condition is included in the BASE MCPR(P) and MCPR(F) limits and Kp multipliers and is bounded by the TBSOOS limits and multipliers; therefore, no additional adjustments are required for PLUOOS in those operating conditions. The PLUOOS condition has not been analyzed concurrent with the RPTOOS operating condition. Operation in the PLUOOS condition concurrent with the RPTOOS condition requires core thermal power < 55% of rated (Reference 3). Section 7.0 contains the conditions for Turbine Bypass Valve Operability. MCPR(P) and MCPR(F) adjustments are provided in Tables 4-2 and 4-3. The OLMCPR is determined for a given power and flow condition by evaluating the power dependent MCPR and the flow dependent MCPR and selecting the greater of the two.
: 2) Flow MCPR(F) (%rated) Limit 0.0 1.70 30.0 1.53 79.0 1.25 110.0 1.25 Page 11 of 19 1.067 1.000 1.067 1.000 1.067 1.000 1.067 1.000 1.067 1.000 1.067 1.000 1.160 1.000 1.160 1.000 1.160 1.000 1.160 1.000 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report COLR Limerick 2, Rev. 10 I 5.0 LHGR Limits 5.1 Technical Specification Section 3.2.4 5.2 Description The LHGR limit is the product of the exposure dependent LHGR limit (from Table 5-1 for U0 2 fuel rods and Table 5-2 for Gadolinia fuel rods) and the minimum of: the power dependent LHGR Factor, LHGRFAC(P), and the flow dependent LHGR Factor, LHGRFAC(F).
Page 9of19
For single loop operation, a multiplier is used, which is shown in Table 5-3 and applied in Table 5-5. No further Single Loop Operating multipliers need to be applied to the values in Tables 5-4 and 5-5. ARTS provides for power and flow dependent thermal limit multipliers, which allow for a more reliable administration of the LHGR thermal limits. There are two sets of flow dependent LHGR multipliers for dual-loop and single-loop operation.
 
In addition, there are ten sets of power dependent LHGR multipliers for use with the BASE, TBSOOS, RPTOOS, PROOS, DLO and SLO conditions, and PROOS+TBSOOS and PROOS+RPTOOS, DLO only. The PLUOOS condition is included in the BASE LHGRF AC(P) and LHGRF AC(F) multipliers and is bounded by the TBSOOS multipliers; therefore, no additional adjustments are required for PLUOOS in those operating conditions.
Exelon Nuclear - Nuclear Fuels                                                       COLR Limerick 2, Rev. 10 I Core Operating Limits Report TABLE4-1 Operating Limit Minimum Critical Power Ratio (OLM CPR) - All Fuel Types (References 2 and 8)
The PLUOOS condition has not been analyzed concurrent with the RPTOOS operating condition.
SCRAM                     Cycle Exposure Time         < EOR-2542 ~EOR-2542 EOOS Combination       Option< 1>       MWd/ST           MWd/ST B               I .36< 2 >       1.36 BASE A                 1.43           1.44 B                 1.58           1.58 BASE SL0< 3 >
Operation in the PLUOOS condition concurrent with the RPTOOS condition requires core thermal power< 55% of rated (Reference 3). Section 7.0 contains the conditions for Turbine Bypass Valve Operability.
A                 1.58             1.58 B                 1.38           1.39 TB SOOS A                 1.47             1.48 B                 1.58           1.58 TBSOOS SL0< 3 >
The ARTS LHGR multipliers are shown in Tables 5-4 and 5-5. Linear interpolation should be used for points not listed in Reference
A                 1.58             1.58 B                 1.38             1.39 RPTOOS A                 1.55             1.56 B                 1.58             1.58 RPTOOS SL0<3 >
: 7. Thermal limit monitoring must be performed with the more limiting LHGR limit resulting from the power and flow biased calculation.
A                 1.58             1.59 B               1.36(2)           1.36 PROOS A                 1.43             1.47 B                 1.58             1.58 PROOS SL0< 3 >
The LHGRF AC(P) curves are independent ofrecirculation pump trip operability.
A                 1.58             1.58 PROOS+TBSOOS               B                 1.38             1.39 PROOS+RPTOOS               B                 1.38             1.39 1
TABLES-1 Linear Heat Generation Rate Limits -U0 2 Rods (References 5 and 7) Fuel Type LHGR I GNF2 See Table B-1 of Reference 7 TABLES-2 Linear Heat Generation Rate Limits -Gad Rods (References 5 and 7) Fuel Type LHGR GNF2 See Table B-2 of Reference 7 Page 12of19 Exelon Nuclear-Nuclear Fuels Core Operating Limits Report COLR Limerick 2, Rev. 10 I TABLES-3 LHGR Single Loop Operation (SLO) Multiplier-All Fuel Types (Reference
When Tau does not equal 0 or I, determine OLMCPR via linear interpolation. For PROOS+TBSOOS and PROOS+RPTOOS, only Option B is allowed.
: 2) SLO Multiplier 1 0.80 TABLES-4 Power Dependent LHGR Multiplier LHGRFAC(P)-All Fuel Types (References 2 and 8) Core Core Thermal Power (% of rated) EOOS Combination Flow (%of 0 25 <30 65 85 rated) LHGRFAC(P)
2 Value is adjusted to obtain an OPRM amplitude setpoint of 1.12.
Multiplier BASE ::;60 0.485 0.485 0.490 0.750 0.817 0.922 >60 0.434 0.434 0.473 BASE SLO ::;60 0.485 0.485 0.490 0.750 0.817 0.922 > 60 0.434 0.434 0.473 TB SOOS ::;60 0.463 0.463 0.490 0.750 0.817 0.922 > 60 0.352 0.352 0.386 TBSOOS SLO ::;;60 0.463 0.463 0.490 0.750 0.817 0.922 >60 0.352 0.352 0.386 RPTOOS ::;60 0.485 0.485 0.490 0.750 0.817 0.922 >60 0.434 0.434 0.473 RPTOOS SLO :::;; 60 0.485 0.485 0.490 0.750 0.817 0.922 >60 0.434 0.434 0.473 PROOS ::; 60 0.485 0.485 0.490 0.750 0.817 0.922 >60 0.434 0.434 0.473 PROOSSLO ::; 60 0.485 0.485 0.490 0.750 0.817 0.922 >60 0.434 0.434 0.473 PROOS+ IBSOOS ::;;60 0.463 0.463 0.490 0.750 0.817 0.922 > 60 0.352 0.352 0.386 PROOS+RPTOOS
3 For single-loop operation, the MCPR operating limit is 0.03 greater than the analyzed two loop value.
::; 60 0.485 0.485 0.490 0.750 0.817 0.922 >60 0.434 0.434 0.473 1 Applied through Table 5-5 Page 13of19 100 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report COLR Limerick 2, Rev. to I TABLES-5 Flow Dependent LHGR Multiplier LHGRFAC(F)-All Fuel Types (Reference
However, a minimum value of 1.58 is required to obtain an OLMCPR limit set by the Single Loop Operation Recirculation Pump Seizure Event.
: 2) Core Flow (% of rated) EOOS Combination 0 30 44.1 70 80 LHGRFAC(F)
Page 10of19
Multiplier Dual Loop 0.506 0.706 0.973 1.000 Single Loop 0.506 0.706 0.800 Page 14of19 110 1.000 0.800 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 6.0 Control Rod Block Setpoints 6.1 Technical Specification Sections 3.1.4.3 and 3.3.6 6.2 Description COLR Limerick 2, Rev. 10 I The ARTS Rod Block Monitor provides for power-dependent RBM trips. Technical Specification 3.3.6 states control rod block instrumentation channels shall be OPERABLE with their trip setpoints consistent with the values shown in the Trip Setpoint column of Technical Specification Table 3.3.6-2. The trip setpoints/allowable values and applicable RBM signal filter time constant data are shown in Table 6-1. The Reactor Coolant System Recirculation Flow Upscale Trip is shown in Table 6-2. These setpoints are set high enough to allow full utilization of the enhanced ICF domain up to I JO% of rated core flow. Power Level LTSP ITSP HTSP DTSP TABLE 6-1 Rod Block Monitor Setpoints 1 (References 2 and 4) Analytical Allowable Limit Value 123.0% 121.5% 118.0% 116.5% 113.2% 111.7% No Limitation 2.0% TABLE6-2 Nominal Trip Setpoint 121.5% 116.5% 111.0% 5.0% Reactor Coolant System Recirculation Flow Upscale Trip (Reference
 
: 4) Analytical Limit NIA Allowable Value 115.6% Nominal Trip Setpoint 113.4% 1 These setpo i nts (with Rod Block Monitor filter time constant between 0.1 seconds and 0.55 seconds) are based on a cycle-spec i fic rated RWE MCPR limit of 1.32, which is less than the minimum cycle OLM CPR. Page 15of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 7.0 Turbine Bypass Valve Parameters 7.1 Technical Specification Section 3.7.8 and 4.7.8.c 7.2 Description COLR Limerick 2, Rev. 10 I The operability requirements for the steam bypass system are found in Tables 7-1 and 7-2. If these requirements cannot be met, the MCPR, MCPR(P) and LHGRF AC(P) limits for inoperable Steam Bypass System, known as Turbine Bypass System Out Of Service (TBSOOS), must be used. Additional information on the operability of the turbine bypass system can be found in Reference
Exelon Nuclear - Nuclear Fuels                                           COLR Limerick 2, Rev. 10 I Core Operating Limits Report TABLE4-2 Power Dependent MCPR Limits and Multipliers MCPR(P) and Kp- All Fuel Types (References 2 and 8)
: 6. TABLE7-1 Turbine Bypass System Response Time (Reference
Core                           Core Thermal Power (% of rated)
: 3) Maximum delay time before start of bypass valve opening following initial turbine inlet valve movemene Maximum time after initial turbine inlet valve movement' for bypass valve position to reach 80% of full flow (includes the above delay time) O.llsec 0.31 sec 1 First movement of any TSV or any TCV or generation of the turbine bypass valve flow signal (whichever occurs first) TABLE7-2 Minimum Required Bypass Valves To Maintain System Operability (References 1 and 3) Reactor Power No. of Valves in Service P2:25% 7 Page 16of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 8.0 Stability Protection Setpoints 8.1 Technical Specification Section 2.2.1 8.2 Description COLR Limerick 2, Rev. 10 I The Limerick 2 Cycle 14 OPRM PBDA Trip Setpoints for the OPRM System are found in Table 8-1. l11ese values are based on the cycle specific analysis documented in Reference
EOOS           Flow         0     25       <30           ~30        65       85           100 Combination       (%of rated)
: 2. The setpoints provided in Table 8-1 are bounding for all modes of operation shown in Table 9-1. The setpoints provided in Table 8-2 are acceptable for use in Single Loop Operation.
MCPR(P)                     Operating Limit MCPR Multiplier, Kp S 60      2.50    2.50        2.40 Base                                                     1.340      1.131      1.067        1.000
The standard two loop operation OPRM Setpoints specified in Table 8-1 must be implemented prior to restarting the idle pump when exiting the SLO condition.
                    > 60     2.75   2.75       2.55 S 60     2.53   2.53       2.43 Base SLO                                                    1.340     1.131     1.067        1.000
TABLE 8-1 OPRM PBDA Trip Setpoints (Reference
                    > 60      2.78   2.78        2.58 S 60     3.25   3.25       2.75 TB SOOS                                                    1.340     1.131     1.067        1.000
: 2) PBDA Trip Amplitude
                    > 60     3.75   3.75       3.25 S60       3.28   3.28       2.78 TBSOOSSLO                                                    1.340     1.131     1.067        1.000
::; 1.12 Corresponding Maximum Confirmation Count Trip Setting ::; 14 TABLE8-2 SLO OPRM PBDA Trip Setpoints (Reference
                    >60       3.78   3.78       3.28 S60       2.50   2.50       2.40 RPTOOS                                                      1.340     1.131     1.067        1.000
: 2) PBDA Trip Amplitude
                    > 60     2.75   2.75       2.55 S60       2.53   2.53       2.43 RPTOOSSLO                                                    1.340     1.131     1.067        1.000
::; 1.15 Corresponding Maximum Confirmation Count Trip Setting ::; 16 Page 17of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 9.0 Modes of Operation 9.1 Description COLR Limerick 2, Rev. 10 I The allowable modes of operation are found in Table 9-1. The BASE application condition includes I MSIVOOS and 1 TCV trSVOOS provided the restrictions identified in the applicable station procedures are met. Note that 1 TCV trSVOOS is not allowed to be coincident with one or more TBVOOS. All EOOS options also support the allowance of 1 TIPOOS. TABLE 9-1 Modes of Operation (References 2 and 8) EOOS Options BASE, Option A or B BASE SLO, Option A or B TBSOOS, Option A or B TBSOOS SLO, Option A or B RPTOOS, Option A or B RPTOOS SLO, Option A or B TBSOOS and RPTOOS, Option A or B TBSOOS and RPTOOS SLO, Option A or B PROOS. Ootion A or B PROOS SLO, Option A or B PROOS+TBSOOS, Option A PROOS+TBSOOS, Option B PROOS+TBSOOS SLO, Option A or B PROOS+RPTOOS, Option A PROOS+RPTOOS, Option B PROOS+RPTOOS SLO, Option A or B Operatin2 Re2ion 1 Yes 2 Yes 2 Yes-Yes-YesJ Yes 3 No No Yes-Yes-No Yes 2 No No YesJ No 1 Operating Region refers to operation on the Power to Flow map " i th or without FFWTRIFWHOOS.
                    > 60      2.78   2.78      2.58 S60       2.50   2.50       2.40 PROOS                                                      1.367     1.236     1.160        1.000
2 The PLUOOS condition is supported in this mode of operat i on with no power reduction required.
                    > 60     2.75   2.75       2.55 PROOS SLO
3 The PLUOOS condition requires core thermal power level< 55% of rated (Reference 3). Page 18of19 Exelon Nuclear -Nuclear Fuels Core Operating Limits Report 10.0 Methodology COLR Limerick 2, Rev. I 0 I The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following document:
:s 60     2.53   2.53       2.43 1.367     1.236     1.160        1.000
I. "General Electric Standard Application for Reactor Fuel", Global Nuclear Fuel Document, NEDE-240 I l-P-A-21, May 2015 and the U.S. Supplement NEDE-24011-P-A-2 I-US, May 2015. 2. "Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications", GENE Document, NED0-32465-A, August 1996. 11.0 References I. " Technical Specifications and Bases for Limerick Generating Station Unit 2", Docket No. 50-353, License No. NPF-85, Exelon Document.
                    >60       2.78   2.78       2.58 PROOS+TB SOOS
: 2. "Supplemental Reload Licensing Report for Limerick 2 Reload 13 Cycle 14", Global Nuclear Fuel Document No. OOON9396-SRLR, Rev. I, September 2015. 3. "Final Resolved OPL-3 Parameters for Limerick 2 Cycle 14", Exelon TOOi ESl400022 Rev. I, August 31,2015. 4. "GE NUMAC PRNM Setpoint Study'', Exelon Design Analysis LE-0107, Rev. 2, February 23, 2012. 5. "Fuel Bundle Information Report for Limerick 2 Reload 13 Cycle 14", Global Nuclear Fuel Document No. OOON9397-FBIR, Rev. 0, February 2015. 6. "Tech Eva) Stop Valve Load Limit Documentation'
:s 60     3.25   3.25       2.75 1.367     1.236     1.160        1.000
', Exelon Document IR 917231 Assignment 7, November 11, 2009. 7. "GNF2 Advantage Generic Compliance with NEDE-24011-PA (GESTAR II)'', Global Nuclear Fuel Document No. NEDC-33270P, Rev. 5, May 2013. 8. "Limerick Generating Station (LGS) Units 1 and 2 TRACG Cycle-Independent PROOS Analysis Report", GE Hitachi Nuclear Energy Document No. 002N4397, Rev. I, January 15, 2016. Page 19of19}}
                    >60       3.75   3.75       3.25 PROOS+RPTOOS
:s 60     2.50   2.50       2.40 1.367     1.236     1.160        1.000
                    >60       2.75   2.75       2.55 TABLE4-3 Flow Dependent MCPR Limits MCPR(F) - All Fuel Types (Reference 2)
Flow         MCPR(F)
(%rated)         Limit 0.0           1.70 30.0           1.53 79.0           1.25 110.0           1.25 Page 11 of 19
 
Exelon Nuclear - Nuclear Fuels                                                    COLR Limerick 2, Rev. 10 I Core Operating Limits Report 5.0    LHGR Limits 5.1   Technical Specification Section 3.2.4 5.2    Description The LHGR limit is the product of the exposure dependent LHGR limit (from Table 5-1 for U0 2 fuel rods and Table 5-2 for Gadolinia fuel rods) and the minimum of: the power dependent LHGR Factor, LHGRFAC(P), and the flow dependent LHGR Factor, LHGRFAC(F). For single loop operation, a multiplier is used, which is shown in Table 5-3 and applied in Table 5-5. No further Single Loop Operating multipliers need to be applied to the values in Tables 5-4 and 5-5.
ARTS provides for power and flow dependent thermal limit multipliers, which allow for a more reliable administration of the LHGR thermal limits. There are two sets of flow dependent LHGR multipliers for dual-loop and single-loop operation. In addition, there are ten sets of power dependent LHGR multipliers for use with the BASE, TBSOOS, RPTOOS, PROOS, DLO and SLO conditions, and PROOS+TBSOOS and PROOS+RPTOOS, DLO only. The PLUOOS condition is included in the BASE LHGRF AC(P) and LHGRFAC(F) multipliers and is bounded by the TBSOOS multipliers; therefore, no additional adjustments are required for PLUOOS in those operating conditions. The PLUOOS condition has not been analyzed concurrent with the RPTOOS operating condition. Operation in the PLUOOS condition concurrent with the RPTOOS condition requires core thermal power< 55% of rated (Reference 3). Section 7.0 contains the conditions for Turbine Bypass Valve Operability. The ARTS LHGR multipliers are shown in Tables 5-4 and 5-5. Linear interpolation should be used for points not listed in Reference 7.
Thermal limit monitoring must be performed with the more limiting LHGR limit resulting from the power and flow biased calculation. The LHGRFAC(P) curves are independent ofrecirculation pump trip operability.
TABLES-1 Linear Heat Generation Rate Limits - U02 Rods (References 5 and 7)
Fuel Type                            LHGR              I GNF2                    See Table B-1 of Reference 7 ~
TABLES-2 Linear Heat Generation Rate Limits - Gad Rods (References 5 and 7)
Fuel Type                            LHGR GNF2                    See Table B-2 of Reference 7 Page 12of19
 
Exelon Nuclear- Nuclear Fuels                                                COLR Limerick 2, Rev. 10 I Core Operating Limits Report TABLES-3 LHGR Single Loop Operation (SLO) Multiplier-All Fuel Types (Reference 2)
SLO Multiplier 1                0.80 TABLES-4 Power Dependent LHGR Multiplier LHGRFAC(P)-All Fuel Types (References 2 and 8)
Core                  Core Thermal Power (% of rated)
Flow EOOS Combination                  0      25      <30      ~30    65      85      100
(%of rated)                    LHGRFAC(P) Multiplier
::;60  0.485    0.485    0.490 BASE                                                0.750 0.817  0.922  1.000
                              >60      0.434    0.434    0.473
::;60    0.485    0.485    0.490 BASE SLO                                              0.750 0.817   0.922   1.000
                              > 60     0.434   0.434   0.473
::;60   0.463    0.463    0.490 TB SOOS                                              0.750 0.817   0.922   1.000
                              > 60     0.352    0.352    0.386
::;;60   0.463   0.463   0.490 TBSOOS SLO                                              0.750 0.817   0.922   1.000
                              >60     0.352   0.352   0.386
::;60   0.485    0.485    0.490 RPTOOS                                                0.750 0.817   0.922   1.000
                              >60     0.434    0.434    0.473
:::;; 60 0.485   0.485   0.490 RPTOOS SLO                                              0.750 0.817   0.922   1.000
                              >60     0.434   0.434   0.473
::; 60   0.485   0.485   0.490 PROOS                                                0.750 0.817   0.922   1.000
                              >60     0.434   0.434   0.473
::; 60   0.485   0.485   0.490 PROOSSLO                                              0.750 0.817   0.922   1.000
                              >60     0.434   0.434   0.473
::;;60   0.463    0.463    0.490 PROOS+IBSOOS                                              0.750 0.817   0.922   1.000
                              > 60     0.352    0.352    0.386
::; 60   0.485    0.485    0.490 PROOS+RPTOOS                                              0.750 0.817   0.922   1.000
                              >60     0.434    0.434    0.473 1
Applied through Table 5-5 Page 13of19
 
Exelon Nuclear - Nuclear Fuels                                     COLR Limerick 2, Rev. to I Core Operating Limits Report TABLES-5 Flow Dependent LHGR Multiplier LHGRFAC(F)-All Fuel Types (Reference 2)
Core Flow (% of rated)
EOOS Combination           0     30         44.1     70       80         110 LHGRFAC(F) Multiplier Dual Loop           0.506 0.706               0.973     1.000      1.000 Single Loop           0.506 0.706       0.800                         0.800 Page 14of19
 
Exelon Nuclear - Nuclear Fuels                                                       COLR Limerick 2, Rev. 10 I Core Operating Limits Report 6.0     Control Rod Block Setpoints 6.1     Technical Specification Sections 3.1.4.3 and 3.3.6 6.2     Description The ARTS Rod Block Monitor provides for power-dependent RBM trips. Technical Specification 3.3.6 states control rod block instrumentation channels shall be OPERABLE with their trip setpoints consistent with the values shown in the Trip Setpoint column of Technical Specification Table 3.3.6-
: 2. The trip setpoints/allowable values and applicable RBM signal filter time constant data are shown in Table 6-1. The Reactor Coolant System Recirculation Flow Upscale Trip is shown in Table 6-2.
These setpoints are set high enough to allow full utilization of the enhanced ICF domain up to I JO%
of rated core flow.
TABLE 6-1 Rod Block Monitor Setpoints 1 (References 2 and 4)
Power Level          Analytical       Allowable         Nominal Trip Limit             Value             Setpoint LTSP              123.0%             121.5%              121.5%
ITSP            118.0%             116.5%             116.5%
HTSP              113.2%             111.7%             111.0%
DTSP          No Limitation           2.0%               5.0%
TABLE6-2 Reactor Coolant System Recirculation Flow Upscale Trip (Reference 4)
Analytical Limit                               NIA Allowable Value                             115.6%
Nominal Trip Setpoint                           113.4%
1 These setpoints (with Rod Block Monitor filter time constant between 0.1 seconds and 0.55 seconds) are based on a cycle-specific rated RWE MCPR limit of 1.32, which is less than the minimum cycle OLM CPR.
Page 15of19
 
Exelon Nuclear - Nuclear Fuels                                                     COLR Limerick 2, Rev. 10  I Core Operating Limits Report 7.0     Turbine Bypass Valve Parameters 7.1     Technical Specification Section 3.7.8 and 4.7.8.c 7.2     Description The operability requirements for the steam bypass system are found in Tables 7-1 and 7-2. If these requirements cannot be met, the MCPR, MCPR(P) and LHGRF AC(P) limits for inoperable Steam Bypass System, known as Turbine Bypass System Out Of Service (TBSOOS), must be used.
Additional information on the operability of the turbine bypass system can be found in Reference 6.
TABLE7-1 Turbine Bypass System Response Time (Reference 3)
Maximum delay time before start of bypass valve opening O.llsec following initial turbine inlet valve movemene Maximum time after initial turbine inlet valve movement' for bypass valve position to reach 80% of full flow (includes the                   0.31 sec above delay time) 1 First movement of any TSV or any TCV or generation of the turbine bypass valve flow signal (whichever occurs first)
TABLE7-2 Minimum Required Bypass Valves To Maintain System Operability (References 1 and 3)
Reactor Power                     No. of Valves in Service P2:25%                                   7 Page 16of19
 
Exelon Nuclear - Nuclear Fuels                                                 COLR Limerick 2, Rev. 10  I Core Operating Limits Report 8.0   Stability Protection Setpoints 8.1   Technical Specification Section 2.2. 1 8.2   Description The Limerick 2 Cycle 14 OPRM PBDA Trip Setpoints for the OPRM System are found in Table 8-
: 1. l11ese values are based on the cycle specific analysis documented in Reference 2. The setpoints provided in Table 8-1 are bounding for all modes of operation shown in Table 9-1. The setpoints provided in Table 8-2 are acceptable for use in Single Loop Operation. The standard two loop operation OPRM Setpoints specified in Table 8-1 must be implemented prior to restarting the idle pump when exiting the SLO condition.
TABLE 8-1 OPRM PBDA Trip Setpoints (Reference 2)
Corresponding Maximum PBDA Trip Amplitude Confirmation Count Trip Setting
::; 1.12                                   ::; 14 TABLE8-2 SLO OPRM PBDA Trip Setpoints (Reference 2)
Corresponding Maximum PBDA Trip Amplitude Confirmation Count Trip Setting
::; 1.15                                   ::; 16 Page 17of19
 
Exelon Nuclear - Nuclear Fuels                                                       COLR Limerick 2, Rev. 10 I Core Operating Limits Report 9.0     Modes of Operation 9.1     Description The allowable modes of operation are found in Table 9-1. The BASE application condition includes I MSIVOOS and 1 TCVtrSVOOS provided the restrictions identified in the applicable station procedures are met. Note that 1 TCV trSVOOS is not allowed to be coincident with one or more TBVOOS. All EOOS options also support the allowance of 1 TIPOOS.
TABLE 9-1 Modes of Operation (References 2 and 8) 1 EOOS Options                               Operatin2 Re2ion BASE, Option A or B                                                 Yes2 BASE SLO, Option A or B                                             Yes2 TBSOOS, Option A or B                                               Yes-TBSOOS SLO, Option A or B                                           Yes-RPTOOS, Option A or B                                               YesJ RPTOOS SLO, Option A or B                                           Yes3 TBSOOS and RPTOOS, Option A or B                                     No TBSOOS and RPTOOS SLO, Option A or B                                 No PROOS. Ootion A or B                                                 Yes-PROOS SLO, Option A or B                                             Yes-PROOS+TBSOOS, Option A                                               No PROOS+TBSOOS, Option B                                               Yes2 PROOS+TBSOOS SLO, Option A or B                                       No PROOS+RPTOOS, Option A                                               No PROOS+RPTOOS, Option B                                               YesJ PROOS+RPTOOS SLO, Option A or B                                       No 1
Operating Region refers to operation on the Power to Flow map " ith or without FFWTRIFWHOOS.
2 The PLUOOS condition is supported in this mode of operation with no power reduction required.
3 The PLUOOS condition requires core thermal power level< 55% of rated (Reference 3).
Page 18of19
 
Exelon Nuclear - Nuclear Fuels                                                 COLR Limerick 2, Rev. I0  I Core Operating Limits Report 10.0   Methodology The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following document:
I . "General Electric Standard Application for Reactor Fuel", Global Nuclear Fuel Document, NEDE-240 I l-P-A-21, May 2015 and the U.S. Supplement NEDE-24011-P-A-2 I-US, May 2015.
: 2. "Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications", GENE Document, NED0-32465-A, August 1996.
11.0   References I. "Technical Specifications and Bases for Limerick Generating Station Unit 2", Docket No. 50-353, License No. NPF-85, Exelon Document.
: 2. "Supplemental Reload Licensing Report for Limerick 2 Reload 13 Cycle 14", Global Nuclear Fuel Document No. OOON9396-SRLR, Rev. I, September 2015.
: 3. "Final Resolved OPL-3 Parameters for Limerick 2 Cycle 14", Exelon TOOi ESl400022 Rev. I, August 31,2015.
: 4. "GE NUMAC PRNM Setpoint Study'', Exelon Design Analysis LE-0107, Rev. 2, February 23, 2012.
: 5. "Fuel Bundle Information Report for Limerick 2 Reload 13 Cycle 14", Global Nuclear Fuel Document No. OOON9397-FBIR, Rev. 0, February 2015.
: 6. "Tech Eva) Stop Valve Load Limit Documentation'', Exelon Document IR 917231 Assignment 7, November 11, 2009.
: 7. "GNF2 Advantage Generic Compliance with NEDE-24011-PA (GESTAR II)'', Global Nuclear Fuel Document No. NEDC-33270P, Rev. 5, May 2013.
: 8. "Limerick Generating Station (LGS) Units 1 and 2 TRACG Cycle-Independent PROOS Analysis Report", GE Hitachi Nuclear Energy Document No. 002N4397, Rev. I, January 15, 2016.
Page 19of19}}

Latest revision as of 01:39, 5 February 2020

Issuance of a Revision to the Core Operating Limits Report (Cola) for Reload 13, Cycle 14
ML16202A284
Person / Time
Site: Limerick Constellation icon.png
Issue date: 07/20/2016
From: Libra R
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LG-16-074 COLR Limerick 2, Rev. 10
Download: ML16202A284 (24)


Text

Exelon Generation T.S. 6.9.1.12 LG-16-074 July 20, 2016 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Limerick Generating Station, Unit 2 Renewed Facility Operating License No NPF-85 NRC Docket Nos. 50-353

Subject:

Issuance of a Revision to the Core Operating Limits Report (COLA) for Unit 2 Reload 13, Cycle 14 Enclosed is a copy of the revised Core Operating Limits Report (COLA) for Limerick Generating Station (LGS) Unit 2 Reload 13 Cycle 14 which incorporates the revised cycle specific parameters resulting from the new configuration implemented for LGS, Unit 2. This revision of the COLA became effective on July 11, 2016.

The COLA is being submitted to the NRC in accordance with LGS, Unit 2 Technical Specification 6.9.1.12.

If you have any questions or require additional information, please contact Giuseppe Rubinaccio at 610-718-3560.

Respectfully,

~~fn~~u~

Site Vice President-Limerick Generating Station Exelon Generation Company, LLC

Attachment:

Core Operating Limits Report for Limerick Generating Station Unit 2 Reload 13, Cycle 14 cc: D. Dorman, Administrator, Region I, USNRC (w/attachments)

S. Rutenkroger, USNRC Sr. Resident Inspector, LGS (w/attachments)

A. Ennis, USN RC Project Manager for LGS (w/attachments)

A. A. Janati, PADEP-BRP (w/attachments)

bee: A. Libra LGS Site Vice President (w/o attachment)

D. Lewis LGS Plant Manager (w/o attachment)

M. Herr LGS Director Operations (w/o attachment)

G. Rubinaccio Mgr Reactor Engineering (w/o attachment)

A. Dickinson Mgr Regulatory Assurance (w/o attachment)

D. Helker Mgr Corp Licensing (w/o attachment)

M. Holmes Corp Fuels Engineer (w/o attachment)

S. Martin PADEP BRP (w/attachment)

Bulan Nuclear- Nuclear Fuels COLR.Umedck2,Rev.10 I Core Operating Limits Report CORBOPERATING LIMITS BBPORT FOR LIMBRICK GENERATING STATION lJNIT2 RELOAD l3, CYCLE 14 PmparedBy: /?d ~ M. Halma Dace:

Pmpamr t=-rtutk W. Tril<.ur 3-15-16 Reviewed By:

P. Trikur Reviewed By: A_ ~ A. Stefanczyk Date: 3/ 1)/ 16 c:~~ - Date: 3)#fb Reviewed By:

T.Bemeint

&gine<<ing~ ADalyais Api...iBy: ~ -if 4NA/

J. Tll8ar Dale: 03l2:Jl20:16 Manapr-BWR Design (GNP)

S1ldm Om"6"d Rmewed By:

' -I'- _j} J) Date: 03/29/2016 L.Kmbeil Slldan Qualified Rmewet

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report Table of Contents Page Revision History 3 List of Tables 4 1.0 Terms and Definitions 5 2.0 General Information 7 3.0 MAPLHGR Limits 8 4.0 MCPRLimits 9 5.0 LHGR Limits 12 6.0 Control Rod Block Setpoints 15 7.0 Turbine Bypass Valve Parameters 16 8.0 Stability Protection Setpoints 17 9.0 Modes of Operation 18 10.0 Methodology 19 11.0 References 19 Page 2of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. I0 I Core Operating Limits Report Revision History Revision Description Revision 10

  • Incorporates revised OLMCPR limits in accordance with "Limerick Unit 2 Cycle 14 Reload Licensing Reports - Supplemental Reload Licensing Report (SRLR),

OOON9396-SRLR Revision I."

  • Revises Section 9.1 text to more explicitly retlect allowed/dis-allowed conditions.
  • Updates References 2, 3, and 8.
  • Adds Revision History Page Revision 9 New issue for Cycle 14 Page 3of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. to I Core Operating Limits Report List of Tables Page TABLE 3-1 MAPLHGR versus Average Planar Exposure - All Fuel Types 8 TABLE 3-2 MAPLHGR Single Loop Operation (SLO) Multiplier - All Fuel Types 8 TABLE 4-1 Operating Limit Minimum Critical Power Ratio (OLMCPR) - All Fuel Types 10 TABLE 4-2 Power Dependent MCPR Limits and Multipliers MCPR(P) and Kp - All Fuel Types 11 TABLE 4-3 Flow Dependent MCPR Limits MCPR(F) - All Fuel Types II TABLE 5-1 Linear Heat Generation Rate Limits - U02 Rods 12 TABLE 5-2 Linear Heat Generation Rate Limits - Gad Rods 12 TABLE 5-3 LHGR Single Loop Operation (SLO) Multiplier-All Fuel Types 13 TABLE 5-4 Power Dependent LHGR Multiplier LHGRF AC(P)-All Fuel Types 13 TABLE 5-5 Flow Dependent LHGR Multiplier LHGRFAC(F) - All Fuel Types 14 TABLE 6-1 Rod Block Monitor Setpoints 15 TABLE 6-2 Reactor Coolant System Recirculation Flow Upscale Trip 15 TABLE 7-1 Turbine Bypass System Response Time 16 TABLE 7-2 Minimum Required Bypass Valves To Maintain System Operability 16 TABLE 8-1 OPRM PBDA Trip Setpoints 17 TABLE 8-2 SLO OPRM PBDA Trip Setpoints 17 TABLE 9-1 Modes of Operation 18 Page 4of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report 1.0 Terms and Definitions ARTS APRM, RBM, and Technical Specification Improvement Program BASE A case analyzed with Turbine Bypass System in service and Recirculation Pump Trip in service and Feedwater Temperature Reduction allowed (FFWTR includes FWHOOS or final feedwater temperature reduction) and PLUOOS allowed at any point during the cycle in Dual Loop mode.

DLO Dual Loop Operation DTSP Rod Block Monitor Downscale Trip Setpoint EOOS Equipment Out of Service EOR End of Rated, the cycle exposure at which reactor power is equal to rated thermal power with recirculation system flow equal to I00%, all control rods fully withdrawn, all feedwater heating in service and equilibrium Xenon.

FFWTR Final Feedwater Temperature Reduction FWHOOS Feedwater Heaters Out of Service HTSP Rod Block Monitor High Trip Setpoint JCF Increased Core Flow JTSP Rod Block Monitor Intermediate Trip Setpoint Kp Off-rated power dependent OLMCPR multiplier LHGR Linear Heat Generation Rate LHGRFAC(F) ARTS LHGR thermal limit flow dependent multipliers LHGRFAC(P) ARTS LHGR thennaJ limit power dependent multipliers LTSP Rod Block Monitor Low Trip Setpoint MAPFAC(F) Off-rated flow dependent MAPLHGR multiplier MAPFAC(P) Off-rated power dependent MAPLHGR multiplier MAPLHGR Maximum Average Planar Linear Heat Generation Rate MCPR Minimum Critical Power Ratio MCPR(F) Off-rated flow dependent OLMCPR multiplier MCPR(P) Off-rated power dependent OLMCPR multiplier Page 5of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report MELLLA Maximum Extended Load Line Limit Analysis MSIVOOS Main Steam Isolation Valve Out of Service OLMCPR Operating Limit Minimum Critical Power Ratio OPRM Oscillation Power Range Monitor oos Out of Service PBDA Period Based Detection Algorithm PLUOOS Power Load Unbalance Out of Service PROOS Pressure Regulator Out of Service RBM Rod Block Monitor RPTOOS Recirculation Pump Trip Out of Service RWE Rod Withdrawal Error SLO Single Loop Operation TB SOOS Turbine Bypass System Out of Service TCV Turbine Control Valve TIPOOS Traversing In core Probe Out of Service TSV Turbine Stop Valve Page 6of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. I0 I Core Operating Limits Report 2.0 General Information This report provides the following cycle-specific parameter limits for Limerick Generating Station Unit 2 Cycle 14:

  • Maximum Average Planar Linear Heat Generation Rate (MAPLHGR)
  • Minimum Critical Power Ratio (MCPR)
  • Single Loop Operation (SLO) OLMCPR adjustment
  • Off-rated OLMCPR multipliers {Kp)
  • Off-rated LHGR multipliers (LHGRFAC{P) or LHGRF AC(F))
  • Rod Block Monitor (RBM) setpoints
  • MAPLHGR single loop operation multiplier
  • LHGR single loop operation multiplier
  • Linear Heat Generation Rate (LHGR)
  • Oscillation Power Range Monitor Period Based Detection Algorithm (OPRM PBDA) Trip Setpoints This report is prepared in accordance with Technical Specification 6.9.1.9 of Reference I. Preparation of this report was performed in accordance with Exelon Nuclear, Nuclear Fuels T&RM NF-AB-120-3600.

The data presented in this report is valid for all licensed operating domains on the operating map, including:

  • Maximum Extended Load Line Limit down to 82.9% ofrated core flow during full power operation
  • Increased Core Flow (ICF) up to 110% ofrated core flow
  • Final Feedwater Temperature Reduction (FFWTR) up to I05°F during cycle extension operation

Further information on the cycle specific analyses for Limerick 2 Cycle 14 and the associated operating domains discussed above is available in Reference 2.

Page 7of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 Core Operating Limits Report 3.0 MAPLHGR Limits 3.1 Technical Specification Section 3.2.1 3 .2 Description The limiting MAPLHGR value for the most limiting lattice (excluding natural uranium) of each fuel type as a function of average planar exposure is given in Table 3-1. For single loop operation, a multiplier is used, which is shown in Table 3-2. The power and flow dependent multipliers for MAPLHGR have been removed and replaced with LHGRFAC(P) and LHGRFAC(F); therefore, MAPFAC{P) and MAPFAC(F) are equal to 1.0 for all power and flow conditions (Reference 2).

LHGRFAC(P) and LHGRFAC(F) are addressed in Section 5.0.

TABLE3-1 MAPLHGR versus Average Planar Exposure-All Fuel Types (Reference 2)

Average Planar Exposure MAPLHGR Limit (GWD/ST) (kW/ft) 0.0 13.78 17.52 13.78 60.78 7.50 63.50 6.69 TABLE3-2 MAPLHGR Single Loop Operation (SLO) Multiplier- All Fuel Types (Refere nee 2)

SLO Multiplier 0.80 Page 8of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report 4.0 MCPR Limits 4.1 Technical Specification Section 3.2.3 4.2 Description Table 4-1 is derived from Reference 2 and is valid for all fuel types and all operating domains. Table 4-1 includes treatment of these MCPR limits for all conditions listed in Section 9.0, Modes of Operation.

ARTS provides for power and flow dependent thermal limit adjustments and multipliers, which allow for a more reliable administration of the MCPR thermal limit. The flow dependent adjustment MCPR(F) is sufficiently generic to apply to all fuel types and operating domains. The power dependent adjustment MCPR(P) is independent of recirculation pump trip operability. MCPR(P) and MCPR(F) are independent of Scram Time Option. In addition, there are ten sets of power dependent MCPR multipliers (Kp) for use with BASE, TBSOOS, RPTOOS, PROOS, DLO and SLO conditions, and PROOS+TBSOOS, PROOS+RPTOOS, DLO only. The PLUOOS condition is included in the BASE MCPR(P) and MCPR(F) limits and Kp multipliers and is bounded by the TBSOOS limits and multipliers; therefore, no additional adjustments are required for PLUOOS in those operating conditions. The PLUOOS condition has not been analyzed concurrent with the RPTOOS operating condition. Operation in the PLUOOS condition concurrent with the RPTOOS condition requires core thermal power < 55% of rated (Reference 3). Section 7.0 contains the conditions for Turbine Bypass Valve Operability. MCPR(P) and MCPR(F) adjustments are provided in Tables 4-2 and 4-3. The OLMCPR is determined for a given power and flow condition by evaluating the power dependent MCPR and the flow dependent MCPR and selecting the greater of the two.

Page 9of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report TABLE4-1 Operating Limit Minimum Critical Power Ratio (OLM CPR) - All Fuel Types (References 2 and 8)

SCRAM Cycle Exposure Time < EOR-2542 ~EOR-2542 EOOS Combination Option< 1> MWd/ST MWd/ST B I .36< 2 > 1.36 BASE A 1.43 1.44 B 1.58 1.58 BASE SL0< 3 >

A 1.58 1.58 B 1.38 1.39 TB SOOS A 1.47 1.48 B 1.58 1.58 TBSOOS SL0< 3 >

A 1.58 1.58 B 1.38 1.39 RPTOOS A 1.55 1.56 B 1.58 1.58 RPTOOS SL0<3 >

A 1.58 1.59 B 1.36(2) 1.36 PROOS A 1.43 1.47 B 1.58 1.58 PROOS SL0< 3 >

A 1.58 1.58 PROOS+TBSOOS B 1.38 1.39 PROOS+RPTOOS B 1.38 1.39 1

When Tau does not equal 0 or I, determine OLMCPR via linear interpolation. For PROOS+TBSOOS and PROOS+RPTOOS, only Option B is allowed.

2 Value is adjusted to obtain an OPRM amplitude setpoint of 1.12.

3 For single-loop operation, the MCPR operating limit is 0.03 greater than the analyzed two loop value.

However, a minimum value of 1.58 is required to obtain an OLMCPR limit set by the Single Loop Operation Recirculation Pump Seizure Event.

Page 10of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report TABLE4-2 Power Dependent MCPR Limits and Multipliers MCPR(P) and Kp- All Fuel Types (References 2 and 8)

Core Core Thermal Power (% of rated)

EOOS Flow 0 25 <30 ~30 65 85 100 Combination (%of rated)

MCPR(P) Operating Limit MCPR Multiplier, Kp S 60 2.50 2.50 2.40 Base 1.340 1.131 1.067 1.000

> 60 2.75 2.75 2.55 S 60 2.53 2.53 2.43 Base SLO 1.340 1.131 1.067 1.000

> 60 2.78 2.78 2.58 S 60 3.25 3.25 2.75 TB SOOS 1.340 1.131 1.067 1.000

> 60 3.75 3.75 3.25 S60 3.28 3.28 2.78 TBSOOSSLO 1.340 1.131 1.067 1.000

>60 3.78 3.78 3.28 S60 2.50 2.50 2.40 RPTOOS 1.340 1.131 1.067 1.000

> 60 2.75 2.75 2.55 S60 2.53 2.53 2.43 RPTOOSSLO 1.340 1.131 1.067 1.000

> 60 2.78 2.78 2.58 S60 2.50 2.50 2.40 PROOS 1.367 1.236 1.160 1.000

> 60 2.75 2.75 2.55 PROOS SLO

s 60 2.53 2.53 2.43 1.367 1.236 1.160 1.000

>60 2.78 2.78 2.58 PROOS+TB SOOS

s 60 3.25 3.25 2.75 1.367 1.236 1.160 1.000

>60 3.75 3.75 3.25 PROOS+RPTOOS

s 60 2.50 2.50 2.40 1.367 1.236 1.160 1.000

>60 2.75 2.75 2.55 TABLE4-3 Flow Dependent MCPR Limits MCPR(F) - All Fuel Types (Reference 2)

Flow MCPR(F)

(%rated) Limit 0.0 1.70 30.0 1.53 79.0 1.25 110.0 1.25 Page 11 of 19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report 5.0 LHGR Limits 5.1 Technical Specification Section 3.2.4 5.2 Description The LHGR limit is the product of the exposure dependent LHGR limit (from Table 5-1 for U0 2 fuel rods and Table 5-2 for Gadolinia fuel rods) and the minimum of: the power dependent LHGR Factor, LHGRFAC(P), and the flow dependent LHGR Factor, LHGRFAC(F). For single loop operation, a multiplier is used, which is shown in Table 5-3 and applied in Table 5-5. No further Single Loop Operating multipliers need to be applied to the values in Tables 5-4 and 5-5.

ARTS provides for power and flow dependent thermal limit multipliers, which allow for a more reliable administration of the LHGR thermal limits. There are two sets of flow dependent LHGR multipliers for dual-loop and single-loop operation. In addition, there are ten sets of power dependent LHGR multipliers for use with the BASE, TBSOOS, RPTOOS, PROOS, DLO and SLO conditions, and PROOS+TBSOOS and PROOS+RPTOOS, DLO only. The PLUOOS condition is included in the BASE LHGRF AC(P) and LHGRFAC(F) multipliers and is bounded by the TBSOOS multipliers; therefore, no additional adjustments are required for PLUOOS in those operating conditions. The PLUOOS condition has not been analyzed concurrent with the RPTOOS operating condition. Operation in the PLUOOS condition concurrent with the RPTOOS condition requires core thermal power< 55% of rated (Reference 3). Section 7.0 contains the conditions for Turbine Bypass Valve Operability. The ARTS LHGR multipliers are shown in Tables 5-4 and 5-5. Linear interpolation should be used for points not listed in Reference 7.

Thermal limit monitoring must be performed with the more limiting LHGR limit resulting from the power and flow biased calculation. The LHGRFAC(P) curves are independent ofrecirculation pump trip operability.

TABLES-1 Linear Heat Generation Rate Limits - U02 Rods (References 5 and 7)

Fuel Type LHGR I GNF2 See Table B-1 of Reference 7 ~

TABLES-2 Linear Heat Generation Rate Limits - Gad Rods (References 5 and 7)

Fuel Type LHGR GNF2 See Table B-2 of Reference 7 Page 12of19

Exelon Nuclear- Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report TABLES-3 LHGR Single Loop Operation (SLO) Multiplier-All Fuel Types (Reference 2)

SLO Multiplier 1 0.80 TABLES-4 Power Dependent LHGR Multiplier LHGRFAC(P)-All Fuel Types (References 2 and 8)

Core Core Thermal Power (% of rated)

Flow EOOS Combination 0 25 <30 ~30 65 85 100

(%of rated) LHGRFAC(P) Multiplier

60 0.485 0.485 0.490 BASE 0.750 0.817 0.922 1.000

>60 0.434 0.434 0.473

60 0.485 0.485 0.490 BASE SLO 0.750 0.817 0.922 1.000

> 60 0.434 0.434 0.473

60 0.463 0.463 0.490 TB SOOS 0.750 0.817 0.922 1.000

> 60 0.352 0.352 0.386

60 0.463 0.463 0.490 TBSOOS SLO 0.750 0.817 0.922 1.000

>60 0.352 0.352 0.386

60 0.485 0.485 0.490 RPTOOS 0.750 0.817 0.922 1.000

>60 0.434 0.434 0.473

60 0.485 0.485 0.490 RPTOOS SLO 0.750 0.817 0.922 1.000

>60 0.434 0.434 0.473

60 0.485 0.485 0.490 PROOS 0.750 0.817 0.922 1.000

>60 0.434 0.434 0.473

60 0.485 0.485 0.490 PROOSSLO 0.750 0.817 0.922 1.000

>60 0.434 0.434 0.473

60 0.463 0.463 0.490 PROOS+IBSOOS 0.750 0.817 0.922 1.000

> 60 0.352 0.352 0.386

60 0.485 0.485 0.490 PROOS+RPTOOS 0.750 0.817 0.922 1.000

>60 0.434 0.434 0.473 1

Applied through Table 5-5 Page 13of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. to I Core Operating Limits Report TABLES-5 Flow Dependent LHGR Multiplier LHGRFAC(F)-All Fuel Types (Reference 2)

Core Flow (% of rated)

EOOS Combination 0 30 44.1 70 80 110 LHGRFAC(F) Multiplier Dual Loop 0.506 0.706 0.973 1.000 1.000 Single Loop 0.506 0.706 0.800 0.800 Page 14of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report 6.0 Control Rod Block Setpoints 6.1 Technical Specification Sections 3.1.4.3 and 3.3.6 6.2 Description The ARTS Rod Block Monitor provides for power-dependent RBM trips. Technical Specification 3.3.6 states control rod block instrumentation channels shall be OPERABLE with their trip setpoints consistent with the values shown in the Trip Setpoint column of Technical Specification Table 3.3.6-

2. The trip setpoints/allowable values and applicable RBM signal filter time constant data are shown in Table 6-1. The Reactor Coolant System Recirculation Flow Upscale Trip is shown in Table 6-2.

These setpoints are set high enough to allow full utilization of the enhanced ICF domain up to I JO%

of rated core flow.

TABLE 6-1 Rod Block Monitor Setpoints 1 (References 2 and 4)

Power Level Analytical Allowable Nominal Trip Limit Value Setpoint LTSP 123.0% 121.5% 121.5%

ITSP 118.0% 116.5% 116.5%

HTSP 113.2% 111.7% 111.0%

DTSP No Limitation 2.0% 5.0%

TABLE6-2 Reactor Coolant System Recirculation Flow Upscale Trip (Reference 4)

Analytical Limit NIA Allowable Value 115.6%

Nominal Trip Setpoint 113.4%

1 These setpoints (with Rod Block Monitor filter time constant between 0.1 seconds and 0.55 seconds) are based on a cycle-specific rated RWE MCPR limit of 1.32, which is less than the minimum cycle OLM CPR.

Page 15of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report 7.0 Turbine Bypass Valve Parameters 7.1 Technical Specification Section 3.7.8 and 4.7.8.c 7.2 Description The operability requirements for the steam bypass system are found in Tables 7-1 and 7-2. If these requirements cannot be met, the MCPR, MCPR(P) and LHGRF AC(P) limits for inoperable Steam Bypass System, known as Turbine Bypass System Out Of Service (TBSOOS), must be used.

Additional information on the operability of the turbine bypass system can be found in Reference 6.

TABLE7-1 Turbine Bypass System Response Time (Reference 3)

Maximum delay time before start of bypass valve opening O.llsec following initial turbine inlet valve movemene Maximum time after initial turbine inlet valve movement' for bypass valve position to reach 80% of full flow (includes the 0.31 sec above delay time) 1 First movement of any TSV or any TCV or generation of the turbine bypass valve flow signal (whichever occurs first)

TABLE7-2 Minimum Required Bypass Valves To Maintain System Operability (References 1 and 3)

Reactor Power No. of Valves in Service P2:25% 7 Page 16of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report 8.0 Stability Protection Setpoints 8.1 Technical Specification Section 2.2. 1 8.2 Description The Limerick 2 Cycle 14 OPRM PBDA Trip Setpoints for the OPRM System are found in Table 8-

1. l11ese values are based on the cycle specific analysis documented in Reference 2. The setpoints provided in Table 8-1 are bounding for all modes of operation shown in Table 9-1. The setpoints provided in Table 8-2 are acceptable for use in Single Loop Operation. The standard two loop operation OPRM Setpoints specified in Table 8-1 must be implemented prior to restarting the idle pump when exiting the SLO condition.

TABLE 8-1 OPRM PBDA Trip Setpoints (Reference 2)

Corresponding Maximum PBDA Trip Amplitude Confirmation Count Trip Setting

1.12
:; 14 TABLE8-2 SLO OPRM PBDA Trip Setpoints (Reference 2)

Corresponding Maximum PBDA Trip Amplitude Confirmation Count Trip Setting

1.15
:; 16 Page 17of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. 10 I Core Operating Limits Report 9.0 Modes of Operation 9.1 Description The allowable modes of operation are found in Table 9-1. The BASE application condition includes I MSIVOOS and 1 TCVtrSVOOS provided the restrictions identified in the applicable station procedures are met. Note that 1 TCV trSVOOS is not allowed to be coincident with one or more TBVOOS. All EOOS options also support the allowance of 1 TIPOOS.

TABLE 9-1 Modes of Operation (References 2 and 8) 1 EOOS Options Operatin2 Re2ion BASE, Option A or B Yes2 BASE SLO, Option A or B Yes2 TBSOOS, Option A or B Yes-TBSOOS SLO, Option A or B Yes-RPTOOS, Option A or B YesJ RPTOOS SLO, Option A or B Yes3 TBSOOS and RPTOOS, Option A or B No TBSOOS and RPTOOS SLO, Option A or B No PROOS. Ootion A or B Yes-PROOS SLO, Option A or B Yes-PROOS+TBSOOS, Option A No PROOS+TBSOOS, Option B Yes2 PROOS+TBSOOS SLO, Option A or B No PROOS+RPTOOS, Option A No PROOS+RPTOOS, Option B YesJ PROOS+RPTOOS SLO, Option A or B No 1

Operating Region refers to operation on the Power to Flow map " ith or without FFWTRIFWHOOS.

2 The PLUOOS condition is supported in this mode of operation with no power reduction required.

3 The PLUOOS condition requires core thermal power level< 55% of rated (Reference 3).

Page 18of19

Exelon Nuclear - Nuclear Fuels COLR Limerick 2, Rev. I0 I Core Operating Limits Report 10.0 Methodology The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following document:

I . "General Electric Standard Application for Reactor Fuel", Global Nuclear Fuel Document, NEDE-240 I l-P-A-21, May 2015 and the U.S. Supplement NEDE-24011-P-A-2 I-US, May 2015.

2. "Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications", GENE Document, NED0-32465-A, August 1996.

11.0 References I. "Technical Specifications and Bases for Limerick Generating Station Unit 2", Docket No. 50-353, License No. NPF-85, Exelon Document.

2. "Supplemental Reload Licensing Report for Limerick 2 Reload 13 Cycle 14", Global Nuclear Fuel Document No. OOON9396-SRLR, Rev. I, September 2015.
3. "Final Resolved OPL-3 Parameters for Limerick 2 Cycle 14", Exelon TOOi ESl400022 Rev. I, August 31,2015.
4. "GE NUMAC PRNM Setpoint Study, Exelon Design Analysis LE-0107, Rev. 2, February 23, 2012.
5. "Fuel Bundle Information Report for Limerick 2 Reload 13 Cycle 14", Global Nuclear Fuel Document No. OOON9397-FBIR, Rev. 0, February 2015.
6. "Tech Eva) Stop Valve Load Limit Documentation, Exelon Document IR 917231 Assignment 7, November 11, 2009.
7. "GNF2 Advantage Generic Compliance with NEDE-24011-PA (GESTAR II), Global Nuclear Fuel Document No. NEDC-33270P, Rev. 5, May 2013.
8. "Limerick Generating Station (LGS) Units 1 and 2 TRACG Cycle-Independent PROOS Analysis Report", GE Hitachi Nuclear Energy Document No. 002N4397, Rev. I, January 15, 2016.

Page 19of19