L-2016-168, NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations - Updated Response: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 .. August12,2016 L-2016-168 NRC Regulatory Issue Summary 2016-09 . Preparation and Scheduling of Operator Licensing Examinations-Updated Response The purpose of this letter is to provide the information requested by NRC Regulatory Issue Summary (RIS) 2016-09, "Preparation and Scheduling of Operator Licensing Examinations," issued June 16, 2016. The Operator Licensing Examination Data, NRC Form 536, is enclosed.
{{#Wiki_filter:August12,2016 L-2016-168 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Re:       Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Regulatory Issue Summary 2016-09                                         .
Preparation and Scheduling of Operator Licensing Examinations-Updated Response The purpose of this letter is to provide the information requested by NRC Regulatory Issue Summary (RIS) 2016-09, "Preparation and Scheduling of Operator Licensing Examinations,"
issued June 16, 2016. The Operator Licensing Examination Data, NRC Form 536, is enclosed.
Should there be any questions, please contact Mr. Joseph Gionfriddo, Initial Operator Training Supervisor, at (305)'246-6515.
Should there be any questions, please contact Mr. Joseph Gionfriddo, Initial Operator Training Supervisor, at (305)'246-6515.
Sincerely, Z.s
Sincerely, Z.s       ~~~e-r_s    _ __
__ _ Vice President Turkey Point Nuclear Plant Enclosure cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.()131 EXPIRES: 10/31/2017 (05-2016) ,pM1:0u4.
Vice President Turkey Point Nuclear Plant Enclosure cc:       Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035
Estimated burden per response to comply with this voluntary information collection request 1 hour. This F" -.
 
information coUection is used to plan budgets and resources for operator examinations.
NRC FORM536                         U.S. NUCLEAR REGULATORY COMMISSION     APPROVED BY OMB: NO. 3150.()131                                       EXPIRES: 10/31/2017 (05-2016)                                                                 Estimated burden per response to comply with this voluntary information collection request 1 hour. This
Send *l . OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch {T-5 t F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to .I: EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means '?,.*,..,f, ... ,. used to impose an information collection does not display a cumently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
                ,pM1:0u4.
FACILITY NRC REGION Turkey Point Nuclear Plant 9760 SW 344th Street II Homestead, FL 33035 -A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS  
F"         -. ~<>;                                        information coUection is used to plan budgets and resources for operator examinations. Send
: 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 10 10 7 OPERATORS
            *l               . -~      OPERATOR LICENSING                 comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch {T-5
' NUMBER OF SENIOR REACTOR 0 14 10 7 OPERATORS
            ~                    t
-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE NIA 1/712019 11612020 111112021 ALTERNATE DATE NIA 112112019 112712020 112512021  
            ~                    .I:                                      F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 24 0 20 0 CANDIDATES NRG FORM 536 (05-2016)}}
            ;%~_-.             ~l        EXAMINATION DATA                 lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means
              '?,.*,..,f,... ,.                                           used to impose an information collection does not display a cumently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                             NRC REGION Turkey Point Nuclear Plant 9760 SW 344th Street                                                                                                 II Homestead, FL 33035 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018               CY2019                                   CY2020                                       CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                           0                     1                                         1                                           1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                           0                   0                                           0                                           0 EXAMINATIONS
: 8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018             CY2019                             CY2020                                     CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS                              0                   10                                         10                                           7 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                          0                   14                                         10                                         7 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                              0                   0                                           0                                         0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                          0                   0                                           0                                         0 PROPOSED DATES PRIMARY DATE                         NIA               1/712019                                 11612020                                 111112021 ALTERNATE DATE                           NIA               112112019                               112712020                                 112512021
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY
                                                  - - SEPTEMBER                           MARCH CY
                                                                                                                          -2018              SEPTEMBER ESTIMATED NUMBER OF                         24                   0                                   20                                                     0 CANDIDATES NRG FORM 536 (05-2016)}}

Latest revision as of 00:41, 5 February 2020

NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations - Updated Response
ML16243A043
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/12/2016
From: Summers T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2016-168
Download: ML16243A043 (2)


Text

August12,2016 L-2016-168 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Regulatory Issue Summary 2016-09 .

Preparation and Scheduling of Operator Licensing Examinations-Updated Response The purpose of this letter is to provide the information requested by NRC Regulatory Issue Summary (RIS) 2016-09, "Preparation and Scheduling of Operator Licensing Examinations,"

issued June 16, 2016. The Operator Licensing Examination Data, NRC Form 536, is enclosed.

Should there be any questions, please contact Mr. Joseph Gionfriddo, Initial Operator Training Supervisor, at (305)'246-6515.

Sincerely, Z.s ~~~e-r_s _ __

Vice President Turkey Point Nuclear Plant Enclosure cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.()131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

,pM1:0u4.

F" -. ~<>; information coUection is used to plan budgets and resources for operator examinations. Send

  • l . -~ OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch {T-5

~ t

~ .I: F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

%~_-. ~l EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means

'?,.*,..,f,... ,. used to impose an information collection does not display a cumently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Turkey Point Nuclear Plant 9760 SW 344th Street II Homestead, FL 33035 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 10 10 7 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 14 10 7 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 1/712019 11612020 111112021 ALTERNATE DATE NIA 112112019 112712020 112512021
c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY

- - SEPTEMBER MARCH CY

-2018 SEPTEMBER ESTIMATED NUMBER OF 24 0 20 0 CANDIDATES NRG FORM 536 (05-2016)