ML16341E007: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
| document type = License-Operator, Part 55 Examination Related Material | | document type = License-Operator, Part 55 Examination Related Material | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: DC ( . C> (> 'i:::. Date of Examination: ,f,,J t<- ** * / ;i. i./11.,, Operating Test Number: | |||
Initials | |||
: 1. General Criteria a b* c# | |||
: a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.Q., 10 CFR 55.45, operational importance, safety function distribution). -v 5i( '?r~ | |||
: b. There is no day-to-day repetition between this and other operating tests to be administered durinq this examination. -..; 1:5<7( ~ | |||
: c. T he operatina test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) ......; li j ~ *.(h | |||
: d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. | |||
......; 11Jf'r.?_~~ | |||
: e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the desianated license level. | |||
...-./ 1J6 I~ | |||
: 2. Walk-Through Criteria ...,.. -- -- | |||
: a. Each JPM includes the following, as applicable: | |||
.. initial conditions initiating cues | |||
.. references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific | |||
. designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: | |||
- detailed expected actions with exact criteria and nomenclature | |||
- system response and other examiner cues | |||
- statements describing important observations to be made by the applicant | |||
- criteria for successful completion of the task | |||
-I I~( ~ | |||
identification of critical steps and thei r associated performance standards | |||
- restrictions on the sequence of steps, if applicable | |||
: b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. -v 1( ~ | |||
: 3. Simulator Criteria -- - -- | |||
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a coov is attached. -v ~ ;e-:~ | |||
Printed Name I Signature Date a. | |||
b. | |||
Author Facility Reviewer(*) | |||
*?;;:J-r (b~~~5 ;/~d~~ ri>-Ltc, s-s-/ti.:. | |||
C. NRC Chief Examiner (#) ?~~A\.. ~~\S&cg'1l ?'. \\)Q~ ts> L.2Ltb J_~ | |||
f-3) | |||
: d. NRC Supervisor | |||
{~ ).jllllt 9-o':> .,\ ..:s ()('\~\,,ii I ;}I ' f>( .)'{,j .lOJ b I | |||
NOTE: | |||
* The facility signature is not applicable for NRC-developed tests. | |||
# Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.}} |
Latest revision as of 22:40, 4 February 2020
ML16341E007 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 12/02/2016 |
From: | NRC/RGN-III |
To: | Indiana Michigan Power Co, American Electric Power |
Shared Package | |
ML15274A375 | List: |
References | |
Download: ML16341E007 (1) | |
Text
ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: DC ( . C> (> 'i:::. Date of Examination: ,f,,J t<- ** * / ;i. i./11.,, Operating Test Number:
Initials
- 1. General Criteria a b* c#
- a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.Q., 10 CFR 55.45, operational importance, safety function distribution). -v 5i( '?r~
- b. There is no day-to-day repetition between this and other operating tests to be administered durinq this examination. -..; 1:5<7( ~
- c. T he operatina test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) ......; li j ~ *.(h
- d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
......; 11Jf'r.?_~~
- e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the desianated license level.
...-./ 1J6 I~
- 2. Walk-Through Criteria ...,.. -- --
- a. Each JPM includes the following, as applicable:
.. initial conditions initiating cues
.. references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific
. designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:
- detailed expected actions with exact criteria and nomenclature
- system response and other examiner cues
- statements describing important observations to be made by the applicant
- criteria for successful completion of the task
-I I~( ~
identification of critical steps and thei r associated performance standards
- restrictions on the sequence of steps, if applicable
- b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. -v 1( ~
- 3. Simulator Criteria -- - --
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a coov is attached. -v ~ ;e-:~
Printed Name I Signature Date a.
b.
Author Facility Reviewer(*)
- ?;;:J-r (b~~~5 ;/~d~~ ri>-Ltc, s-s-/ti.:.
C. NRC Chief Examiner (#) ?~~A\.. ~~\S&cg'1l ?'. \\)Q~ ts> L.2Ltb J_~
f-3)
- d. NRC Supervisor
{~ ).jllllt 9-o':> .,\ ..:s ()('\~\,,ii I ;}I ' f>( .)'{,j .lOJ b I
NOTE:
- The facility signature is not applicable for NRC-developed tests.
- Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.