| {{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: | | {{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: DC ( . C> (> 'i:::. Date of Examination: ,f,,J t<- ** * / ;i. i./11.,, Operating Test Number: |
| DC (. C> (> 'i:::. Date of Examination: ,f,,J t<-** */ ;i. i./11.,, Operating Test Number: 1. Gene r al C r iteria Initials a b* c# a. The operating test conforms with the previously approved outline; changes are consistent with 5i( | | Initials |
| sampling requirements (e.Q., 10 CFR 55.45, operational importance, safety function distribution). -v b. There is no day-to-day repetition between this and other operating tests to be administered | | : 1. General Criteria a b* c# |
| -..; 1:5<7( durinq this examination. | | : a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.Q., 10 CFR 55.45, operational importance, safety function distribution). -v 5i( '?r~ |
| : c. T he operatina test shall not duplicate items from the applicants | | : b. There is no day-to-day repetition between this and other operating tests to be administered durinq this examination. -..; 1:5<7( ~ |
| ' audit test(s). (see Section D.1.a.) ......; l ij * .(h d. Overlap with the written examination and between different parts of the operating test is within ......; 11Jf' acceptable limits. e. It appears that the operating test will differentiate between competent and l ess-t han-competent | | : c. T he operatina test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) ......; li j ~ *.(h |
| ...-./ 1J6 app lic ants at the desianated license level. 2. Walk-Through Criteria ... , .. ----a. Each JPM includes the following , as applicable: . initial conditions . initiating cues . references and tools, including associated procedures . reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee . operationally important specific performance criteria that include: -detailed expected actions with exact criteria and nomenclature | | : d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. |
| -system response and other examiner cues -statements describing important observations to be made by the applicant | | ......; 11Jf'r.?_~~ |
| -criteria for successful completion of the task -identification of critical steps and thei r associated performance standards -I -restrictions on the sequence of steps, if applicable | | : e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the desianated license level. |
| : b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified -v 1( on those forms and Form ES-201-2. | | ...-./ 1J6 I~ |
| : 3. Simulator Criteria -----The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES--v 301-4 and a coov is attached. | | : 2. Walk-Through Criteria ...,.. -- -- |
| Printed Name I Signature Date a. Author *?;;:J-r r i>-Ltc, b. Facility Reviewer(*) | | : a. Each JPM includes the following, as applicable: |
| s-s-/ti.:. | | .. initial conditions initiating cues |
| C. NRC Chief Examiner (#) \S&cg'1l ?'. | | .. references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific |
| ts> L.2Ltb d. NRC Supervisor f-3) 9-o':> .,\ ..:s I ;}I' f>(.)'{,j .lOJ b ).jllllt I NOTE: | | . designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: |
| * The facili ty signature is not applicable for NRC-developed tests. # Independen t NRC reviewer in itial items in Column " c"; chief examiner concurrence required.}} | | - detailed expected actions with exact criteria and nomenclature |
| | - system response and other examiner cues |
| | - statements describing important observations to be made by the applicant |
| | - criteria for successful completion of the task |
| | -I I~( ~ |
| | identification of critical steps and thei r associated performance standards |
| | - restrictions on the sequence of steps, if applicable |
| | : b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. -v 1( ~ |
| | : 3. Simulator Criteria -- - -- |
| | The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a coov is attached. -v ~ ;e-:~ |
| | Printed Name I Signature Date a. |
| | b. |
| | Author Facility Reviewer(*) |
| | *?;;:J-r (b~~~5 ;/~d~~ ri>-Ltc, s-s-/ti.:. |
| | C. NRC Chief Examiner (#) ?~~A\.. ~~\S&cg'1l ?'. \\)Q~ ts> L.2Ltb J_~ |
| | f-3) |
| | : d. NRC Supervisor |
| | {~ ).jllllt 9-o':> .,\ ..:s ()('\~\,,ii I ;}I ' f>( .)'{,j .lOJ b I |
| | NOTE: |
| | * The facility signature is not applicable for NRC-developed tests. |
| | # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.}} |
Similar Documents at Cook |
---|
Category:License-Operator
MONTHYEARML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A2652020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO and SRO Admin JPMs ML21006A4102020-08-25025 August 2020 2020 DC Cook Ile Operating Test Review Worksheet ES-301-7 ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML21006A4412020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 RO ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML20356A1492020-08-25025 August 2020 2020 DC Cook Ile Operating Test Scenario Outlines ES-D-1 ML20356A0992020-08-25025 August 2020 2020 DC Cook Ile Proposed Ro_Sro Written Examination ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 ML21006A4202020-08-25025 August 2020 2020 DC Cook Ile Written Exam Review Worksheet ES-401-9 ML20356A0952020-08-25025 August 2020 2020 DC Cook Ile Proposed RO and SRO Admin JPMs ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML20364A2132020-08-13013 August 2020 2018 Donald C. Cook Nuclear Power Plant Exam Administered Scenarios ML20210M4202020-07-29029 July 2020 Operator Licensing Examination Approval ML19353A0252019-12-18018 December 2019 Confirmation of Initial License Examination AEP-NRC-2019-26, Response to RIS 2019-022019-05-30030 May 2019 Response to RIS 2019-02 ML19106A0162019-04-15015 April 2019 GFE Results, March 2019 ML19045A3722019-02-12012 February 2019 March 2019 GFE Cover Letter Riii 2023-12-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4202020-08-25025 August 2020 2020 DC Cook Ile Written Exam Review Worksheet ES-401-9 ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML20356A2652020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO and SRO Admin JPMs ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML20356A1492020-08-25025 August 2020 2020 DC Cook Ile Operating Test Scenario Outlines ES-D-1 ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 ML20356A0992020-08-25025 August 2020 2020 DC Cook Ile Proposed Ro_Sro Written Examination ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML21006A4412020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 RO ML20356A0952020-08-25025 August 2020 2020 DC Cook Ile Proposed RO and SRO Admin JPMs ML21006A4102020-08-25025 August 2020 2020 DC Cook Ile Operating Test Review Worksheet ES-301-7 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML20364A2132020-08-13013 August 2020 2018 Donald C. Cook Nuclear Power Plant Exam Administered Scenarios ML20210M4202020-07-29029 July 2020 Operator Licensing Examination Approval ML19353A0252019-12-18018 December 2019 Confirmation of Initial License Examination AEP-NRC-2019-26, Response to RIS 2019-022019-05-30030 May 2019 Response to RIS 2019-02 ML20365A0662018-08-13013 August 2018 2018 Donald C. Cook Nuclear Power Plant Exam Form ES-201-1 ML20363A0982018-08-13013 August 2018 2018 Donald C. Cook Nuclear Power Plant Exam Form ES-401-6 ML20363A1042018-08-13013 August 2018 2018 Donald C. Cook Nuclear Power Plant Exam Proposed JPMs 2023-12-05
[Table view] |
Text
ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: DC ( . C> (> 'i:::. Date of Examination: ,f,,J t<- ** * / ;i. i./11.,, Operating Test Number:
Initials
- 1. General Criteria a b* c#
- a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.Q., 10 CFR 55.45, operational importance, safety function distribution). -v 5i( '?r~
- b. There is no day-to-day repetition between this and other operating tests to be administered durinq this examination. -..; 1:5<7( ~
- c. T he operatina test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) ......; li j ~ *.(h
- d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
......; 11Jf'r.?_~~
- e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the desianated license level.
...-./ 1J6 I~
- 2. Walk-Through Criteria ...,.. -- --
- a. Each JPM includes the following, as applicable:
.. initial conditions initiating cues
.. references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific
. designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:
- detailed expected actions with exact criteria and nomenclature
- system response and other examiner cues
- statements describing important observations to be made by the applicant
- criteria for successful completion of the task
-I I~( ~
identification of critical steps and thei r associated performance standards
- restrictions on the sequence of steps, if applicable
- b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. -v 1( ~
- 3. Simulator Criteria -- - --
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a coov is attached. -v ~ ;e-:~
Printed Name I Signature Date a.
b.
Author Facility Reviewer(*)
- ?;;:J-r (b~~~5 ;/~d~~ ri>-Ltc, s-s-/ti.:.
C. NRC Chief Examiner (#) ?~~A\.. ~~\S&cg'1l ?'. \\)Q~ ts> L.2Ltb J_~
f-3)
- d. NRC Supervisor
{~ ).jllllt 9-o':> .,\ ..:s ()('\~\,,ii I ;}I ' f>( .)'{,j .lOJ b I
NOTE:
- The facility signature is not applicable for NRC-developed tests.
- Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.