ML17277B387: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/25/1984
| issue date = 04/25/1984
| title = Updated Application for Amend to License NPF-21,clarifying 840309 Application Re Change to Section 6 of Tech Specs Re Util Organization & Util Organization Responsibilities, Per NRC Request
| title = Updated Application for Amend to License NPF-21,clarifying 840309 Application Re Change to Section 6 of Tech Specs Re Util Organization & Util Organization Responsibilities, Per NRC Request
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = SCHWENCER A
| addressee name = Schwencer A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000397
| docket = 05000397
Line 13: Line 13:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 6
| page count = 6
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:REGULATORY ORMATION DISTRIBUTION SYS (RIOS)W ACCESSION NBR:8405010435 DOC~DATE: 84/04/25 NOTARIZED:
{{#Wiki_filter:REGULATORY               ORMATION DISTRIBUTION SYS           (RIOS)
NO DOCKET FACIL:50 397 HPPSS Nuclear ProJect<Unit 2r Nashington Public Powe 05000397 AUTH~NAME AUTHOR AFFILIATION SORENSENiG,C, Washington, Public Power Supply System RECIP,NAME RE'CIPIKNT AFFILIATION SCHNENCERiA,'icensing, Branch 2  
W ACCESSION NBR:8405010435                   DOC   ~ DATE: 84/04/25 NOTARIZED: NO             DOCKET FACIL:50 397 HPPSS Nuclear               ProJect< Unit 2r Nashington Public         Powe 05000397 AUTH ~ NAME         AUTHOR           AFFILIATION SORENSENiG,C,       Washington, Public Power Supply System RECIP,NAME           RE'CIPIKNT AFFILIATION SCHNENCERiA,     'icensing,                     Branch 2


==SUBJECT:==
==SUBJECT:==
Updated application for-amend to License NPF 21rclarifying 840309 application"re change to Section 6 of Tech'pecs re util organitation L util organi2ation responsibilityiesi per NRC request<DI'STRIBUTION.CODE: B001S COPIES RECEIVED!LTR ENCL SIZE>>, TITLE" Licensing Submittal:
Updated     application for- amend to License NPF 21rclarifying 840309 application"re change to Section 6 of Tech'pecs re util organitation L util organi2ation responsibilityiesi per NRC request<
PSAR/FSAR Amdts 8, Related Correspondence' NOTES~RECIP IENT Il)CODE/NAME.
DI'STRIBUTION .CODE: B001S               COPIES RECEIVED!LTR           ENCL     SIZE>>,
NRR/DL/ADL NRR LB2 LA INTERNALB ELO/HDS2 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11'RR/OE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB NRR/DHFS/HFEB40 NRA/DHFS/PSRB NRR/OSl/AEB 26 NRA/DSI/CPB 10.NRR/DSI/I CSB 16 NRR/OS I/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL;ACRS 41 DMB/DSS (AMDTS)LPOR 03 NSIC 05 COPIES LTTR KNCLt 1 0 1 0 0 3'3 1 1 2'1 1 1 1 1 1 1 1 1 1 1 1 3-3 6 6 1 1 1 1 RECIPIENT ID CaDE/NAME NRR LB2 BC AULUCK i R e 01 IE.FILE IE/DEPER/IRB 35 NRR/DK/AKAB NRR/OE/EHEB NRR/DK/GB 28 NRR/OK/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB
TITLE" Licensing     Submittal: PSAR/FSAR Amdts 8,                 Related Correspondence' NOTES ~
-32 NRR/DL/SSPB NRR/DSI/ASB NRR/OS I/CSB 09 NRR/OSI/METB 12 AB 22'KG F E 04/MIB BNL(AMDTS ONLY)FEMA"REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1 0 1 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 1 0 1 1, 1 1 1 1 1 0 1 1 1 1 1 1 f7 TOTAL NUMBER OP COPIES REQUIRED: LTTR BB ENCL i>>S H~)l h)r<<ai ,)iy's))$" lI ga l r l r'I>>'rr 0 II>>Hg'rr r)),'l ll>>>>lr.SIF rl)>>>>r r'r/, rr>>r rig p>>V+>>+fYP r Jr h f I'i q l,H'h)rli i F)>>hi)s)!)
RECIP IENT                 COPIES              RECIPIENT          COPIES Il) CODE/NAME.               LTTR KNCLt        ID CaDE/NAME        LTTR ENCL NRR/DL/ADL                       1        0    NRR LB2 BC              1    0 NRR LB2 LA                       1        0    AULUCKi R e      01      1    1 INTERNALB ELO/HDS2                                   0    IE. FILE                1 IE/DEPER/EPB 36                 3      '3    IE/DEPER/IRB 35          1    1 IE/DQASIP/QAB21                           1    NRR/DK/AKAB              1    0 NRR/DE/CEB                       1              NRR/OE/EHEB              1    1 13 11'RR/OE/EQB 2  '
F)>>)f l'r l r)r>>Zr)i>>>", h'S.)r,>>ry 8 f f))r>r iil.,l,'l i)C i)Fili if')ry f f>>,I'IFy I" ill')r>>)')Ii'rll'f 4 i, h f l>>IF~f Fr)Il f'f H)g rr)>>r i r"P I)f r g)i,p 4'l)h l f'l)llrI>>>>'>>r'I>>N SS P~e mrs we~~%e~m+)s'!r i)'l H r,y~,l)>q q,i i, r)gl,lri l ,r r , J"j 1 I I,''f),.>>,II I:"gli)i, I j I,>>I)l'I:," l<,'5'>>r'),'),l r s'r F x)rr'>>r<<)f Iw~II I 5)I)i', Il)l I s>>T Ij I i>>l jl'Ilk')),)lr:>>I>>IT'rl Ihk rk l,g II tl I hrr I r I)re Ji IH li rl II IH F'>>,'II~l rl<S'H>>(IH I)H i<H>>l:I<<',,y'1)X r>>lli, rr N$11)iri i'Xg, Il,'Ilg M pg i'I Cir Hrrr)1 I<f a, li th r rl I)X'')Hr>>3 K hs ,>>)"'r Iir>>r(),,I t, r~S I'l HC j ,)$>>I 0 Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 April 25, 1984 G02-84-269 Docket No.50-397 Director of Nuclear Reactor Regulation Attention:
NRR/DK/GB      28      2    2 NRR/DE/MEB     18                       1    NRR/OK/MTEB 17          1    1 NRR/DE/SAB                               1    NRR/DE/SGEB 25          1    1 NRR/DHFS/HFEB40                 1        1    NRR/DHFS/LQB -32        1    1 NRA/DHFS/PSRB                   1        1    NRR/DL/SSPB            1    0 NRR/OSl/AEB 26                           1    NRR/DSI/ASB                  1 NRA/DSI/CPB 10.                 1              NRR/OS I/CSB    09          1, NRR/DSI/I CSB 16                 1        1    NRR/OSI/METB 12        1    1 NRR/OS I/PSB   19               1                          AB  22'KG 1
Nr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
NRR/DSI/RSB 23                           1          F  E      04          1 RGN5                             3      -3                /MIB        1    0 EXTERNAL; ACRS             41               6        6    BNL(AMDTS ONLY)          1 DMB/DSS (AMDTS)                 1       1     FEMA"REP DIV 39         1    1 LPOR            03                        1    NRC PDR         02     1   1 NSIC            05                        1     NTIS                    1 f7 TOTAL NUMBER OP COPIES               REQUIRED: LTTR       BB   ENCL


==Dear Nr.Schwencer:==
i >>S      H
                                          ~
                                            )
l  h
                                                                        )r<<ai
                                                                                                                                                    ))  $ " lI                    ga
                                                                                                                                                                                      >>r          r    'r l                                            /, rr>>r
                                                                                            ,  )iy's                                    r l r'I>>'rr    0      II>>    Hg'rr r rig p>>        V
                                                                                                                                          )),  'l ll>>>>        lr      .SIF  rl) r  Jr  h  f I'i q l,H'h    )  rli i F)>>hi)s)!)                                iil.,l,'      l i    )C i  )      Fili  if')ry f f>>,I'IFy                          I"    ill')r F)>>) f l .) r,>> ry                                                          >>)')      Ii'rll'  f 4 i, f l  h                >>IF  ~
            +>>    +fYP 'r l r                )r>>Zr) i  >>>",    h'S                          8 f f))r>      r f Fr)      Il f 'f  H)g  rr      )>>r  ir    "P I) f r g)i,p 4'l)h l f                          'l)  llrI
                                                                                                                                                                        >>>>'>>      r'I>>N
  ~ e mrs SS P we~~%e~m              +                                                              l                ,  J  "j    1  I I,''f            ),.>>,II          I:"gli)i,                      I              j        I,  >>I)  l'I:,"      l<,'5
              )  s'! r i ) 'l H  r,y~,l)>q q,i            i,  r)  gl,lri                                ,r r                                                '>>r'),'),l        r              s'r      F      x) rr '>>r<<)              f Iw ~  II  I 5 )I )
i',    Il)l    I jl      'Ilk')          ),)                                              IT'rl Ihk                                  II s>>T Ij I                                                                                                          rk    l,g i>>                l                                                                                                                                                                tl      I hrr    I I)re r
lr: >>I rl  II  IH Ji            F'>>,              'II~    l      rl    <  S'H>>  (IH                                                                                                        r    rl I
                                                                            )H i <  H>>    l:I <<',,y'1                                                                      pg i'I IH                                                                                                                                      Cir
                                                                            )X r >>  lli, rr    N
                                                                                                  $ 11)iri                                                                  Hrrr )              I    )X''          )Hr>>                r Iir>>
i'Xg,                                                                                                  1 Il,'Ilg                                                                                            I<f M                    a,    li                3  K      hs ,>>)  "'
li                                                                                                                                      th r()
r ~  S    I 'l    HC j
                                                                                                  ,,I t,                                                                                                                          ,)$  >>  I 0
 
Washington Public Power Supply System P.O. Box 968  3000 George Washington Way Richland, Washington 99352 (509) 372-5000 April 25,    1984 G02-84-269 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Nr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Dear Nr. Schwencer:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, AHENDHENT RE(VEST CLARIFICATION


==Reference:==
==Reference:==
Letter, G02-84-126,    G. C. Sorensen (SS) to A. Schwencer  (NRC), "Operating License NPF-21, Request for  Amendment", dated Harch 9, 1984 As  requested in a phone conversation with Nessrs. R. Auluck and F.
Allenspach of your staff and P. Powell and H. Aeschliman (SS), the attached information is provided in clarification of the change to Section'    of the WNP-2 technical specification requested by the referenced letter.
Should you have any further questions,        please contact Hr. P. L. Powell, Hanager, WNP-2 Licensing.
Very  truly yours, G. C. Sorensen,  Hanager Regulatory Programs PLP/tmh Attachment cc:    R  Auluck  - NRC WS  Chin    - BPA D  Hoffman -  NRC N  Lewis    - EFSEC AD  Toth    - NRC  Site 1'40501043 0>0"00397 pDR pDOCK            pDR p
Fl l
gf
        ;I
          ,fo II
The following  chandi es  represent only  title changes.-  No deletion of support to  WNP-2  or  change  of personnel is represented in these changes:
Power  Generation Director          to        Assistant Managing Director for Operations Technology Director                to        Engineering Director Health Physicist                    to        Health Physics/Chemistry Support Supervisor Training  Manager                  to        Technical Training Coordinator
: 2. The  following changes represent minor administrative changes. No deletion of support to WNP-2 or change of personnel is represented in these changes:
Support Services Director              - reports to the Assistant Managing Director for Operations Spare Parts Material Supervisor        - fullfils, a matrix reporting function to the Plant Maintenance Manager as the Procurement Manager. Day-to-day reporting to the Maintenance Manager is required, long term policy reporting is to the Manager, Corporate Contracts and Materials Management.
: 3. The  following positions have been added to the plant organization.          No deletion of support to WNP-2 is represented by these: changes.
A Planning and Scheduling Supervisor        has been added  reporting directly to the. Plant Manager.
Two  Plant Engineering Supervisors have been added to the Plant Technical Manager's  staff in response to increased activities and responsibilities.
The  Shift Technical. Advisers (STA's) are reflected as part of the Reactor Engineering Supervisor's staff.
: 4. The member  of  P;-O.C. described as the Plant gA/gC Manager is the Plant gA Manager.
.5. The change  to Se'ction.6.8.2 reflects implementing procedures        f'r the Kealth Physics/Chemistry .Support Program as. being coordinated by the "Director of Support Services" instead of the "Manager, Radiological Programs". This change is made because the "Manager, Radiological Programs" reports to the "Director of Support Services" who has the final responsibility for this area. No deletion of suport to WNP-2 or change'of personnel is represented in this change.


NUCLEAR PLANT NO.2 OPERATING LICENSE NPF-21, AHENDHENT RE(VEST CLARIFICATION Letter, G02-84-126, G.C.Sorensen (SS)to A.Schwencer (NRC),"Operating License NPF-21, Request for Amendment", dated Harch 9, 1984 As requested in a phone conversation with Nessrs.R.Auluck and F.Allenspach of your staff and P.Powell and H.Aeschliman (SS), the attached information is provided in clarification of the change to Section'of the WNP-2 technical specification requested by the referenced letter.Should you have any further questions, please contact Hr.P.L.Powell, Hanager, WNP-2 Licensing.
0 r 4}}
Very truly yours, G.C.Sorensen, Hanager Regulatory Programs PLP/tmh Attachment cc: R Auluck WS Chin D Hoffman N Lewis AD Toth-NRC-BPA-NRC-EFSEC-NRC Site 1'40501043 "00397 pDR pDOCK 0>0 pDR p Fl l gf;I ,fo II' The following chandi es represent only title changes.-No deletion of support to WNP-2 or change of personnel is represented in these changes: Power Generation Director to Assistant Managing Director for Operations Technology Director Health Physicist Training Manager to to to Engineering Director Health Physics/Chemistry Support Supervisor Technical Training Coordinator 2.The following changes represent minor administrative changes.No deletion of support to WNP-2 or change of personnel is represented in these changes: Support Services Director-reports to the Assistant Managing Director for Operations Spare Parts Material Supervisor
-fullfils, a matrix reporting function to the Plant Maintenance Manager as the Procurement Manager.Day-to-day reporting to the Maintenance Manager is required, long term policy reporting is to the Manager, Corporate Contracts and Materials Management.
3.The following positions have been added to the plant organization.
No deletion of support to WNP-2 is represented by these: changes.A Planning and Scheduling Supervisor has been added reporting directly to the.Plant Manager.Two Plant Engineering Supervisors have been added to the Plant Technical Manager's staff in response to increased activities and responsibilities.
The Shift Technical.
Advisers (STA's)are reflected as part of the Reactor Engineering Supervisor's staff.4.The member of P;-O.C.described as the Plant gA/gC Manager is the Plant gA Manager..5.The change to Se'ction.6.8.2 reflects implementing procedures f'r the Kealth Physics/Chemistry.Support Program as.being coordinated by the"Director of Support Services" instead of the"Manager, Radiological Programs".
This change is made because the"Manager, Radiological Programs" reports to the"Director of Support Services" who has the final responsibility for this area.No deletion of suport to WNP-2 or change'of personnel is represented in this change.
0 4 r}}

Latest revision as of 07:36, 4 February 2020

Updated Application for Amend to License NPF-21,clarifying 840309 Application Re Change to Section 6 of Tech Specs Re Util Organization & Util Organization Responsibilities, Per NRC Request
ML17277B387
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/25/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-84-269, NUDOCS 8405010435
Download: ML17277B387 (6)


Text

REGULATORY ORMATION DISTRIBUTION SYS (RIOS)

W ACCESSION NBR:8405010435 DOC ~ DATE: 84/04/25 NOTARIZED: NO DOCKET FACIL:50 397 HPPSS Nuclear ProJect< Unit 2r Nashington Public Powe 05000397 AUTH ~ NAME AUTHOR AFFILIATION SORENSENiG,C, Washington, Public Power Supply System RECIP,NAME RE'CIPIKNT AFFILIATION SCHNENCERiA, 'icensing, Branch 2

SUBJECT:

Updated application for- amend to License NPF 21rclarifying 840309 application"re change to Section 6 of Tech'pecs re util organitation L util organi2ation responsibilityiesi per NRC request<

DI'STRIBUTION .CODE: B001S COPIES RECEIVED!LTR ENCL SIZE>>,

TITLE" Licensing Submittal: PSAR/FSAR Amdts 8, Related Correspondence' NOTES ~

RECIP IENT COPIES RECIPIENT COPIES Il) CODE/NAME. LTTR KNCLt ID CaDE/NAME LTTR ENCL NRR/DL/ADL 1 0 NRR LB2 BC 1 0 NRR LB2 LA 1 0 AULUCKi R e 01 1 1 INTERNALB ELO/HDS2 0 IE. FILE 1 IE/DEPER/EPB 36 3 '3 IE/DEPER/IRB 35 1 1 IE/DQASIP/QAB21 1 NRR/DK/AKAB 1 0 NRR/DE/CEB 1 NRR/OE/EHEB 1 1 13 11'RR/OE/EQB 2 '

NRR/DK/GB 28 2 2 NRR/DE/MEB 18 1 NRR/OK/MTEB 17 1 1 NRR/DE/SAB 1 NRR/DE/SGEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB -32 1 1 NRA/DHFS/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/OSl/AEB 26 1 NRR/DSI/ASB 1 NRA/DSI/CPB 10. 1 NRR/OS I/CSB 09 1, NRR/DSI/I CSB 16 1 1 NRR/OSI/METB 12 1 1 NRR/OS I/PSB 19 1 AB 22'KG 1

NRR/DSI/RSB 23 1 F E 04 1 RGN5 3 -3 /MIB 1 0 EXTERNAL; ACRS 41 6 6 BNL(AMDTS ONLY) 1 DMB/DSS (AMDTS) 1 1 FEMA"REP DIV 39 1 1 LPOR 03 1 NRC PDR 02 1 1 NSIC 05 1 NTIS 1 f7 TOTAL NUMBER OP COPIES REQUIRED: LTTR BB ENCL

i >>S H

~

)

l h

)r<<ai

)) $ " lI ga

>>r r 'r l /, rr>>r

, )iy's r l r'I>>'rr 0 II>> Hg'rr r rig p>> V

)), 'l ll>>>> lr .SIF rl) r Jr h f I'i q l,H'h ) rli i F)>>hi)s)!) iil.,l,' l i )C i ) Fili if')ry f f>>,I'IFy I" ill')r F)>>) f l .) r,>> ry >>)') Ii'rll' f 4 i, f l h >>IF ~

+>> +fYP 'r l r )r>>Zr) i >>>", h'S 8 f f))r> r f Fr) Il f 'f H)g rr )>>r ir "P I) f r g)i,p 4'l)h l f 'l) llrI

>>>>'>> r'I>>N

~ e mrs SS P we~~%e~m + l , J "j 1 I I,f ),.>>,II I:"gli)i, I j I, >>I) l'I:," l<,'5

) s'! r i ) 'l H r,y~,l)>q q,i i, r) gl,lri ,r r '>>r'),'),l r s'r F x) rr '>>r<<) f Iw ~ II I 5 )I )

i', Il)l I jl 'Ilk') ),) IT'rl Ihk II s>>T Ij I rk l,g i>> l tl I hrr I I)re r

lr: >>I rl II IH Ji F'>>, 'II~ l rl < S'H>> (IH r rl I

)H i < H>> l:I <<',,y'1 pg i'I IH Cir

)X r >> lli, rr N

$ 11)iri Hrrr ) I )X )Hr>> r Iir>>

i'Xg, 1 Il,'Ilg I<f M a, li 3 K hs ,>>) "'

li th r()

r ~ S I 'l HC j

,,I t, ,)$ >> I 0

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 April 25, 1984 G02-84-269 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Nr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Nr. Schwencer:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, AHENDHENT RE(VEST CLARIFICATION

Reference:

Letter, G02-84-126, G. C. Sorensen (SS) to A. Schwencer (NRC), "Operating License NPF-21, Request for Amendment", dated Harch 9, 1984 As requested in a phone conversation with Nessrs. R. Auluck and F.

Allenspach of your staff and P. Powell and H. Aeschliman (SS), the attached information is provided in clarification of the change to Section' of the WNP-2 technical specification requested by the referenced letter.

Should you have any further questions, please contact Hr. P. L. Powell, Hanager, WNP-2 Licensing.

Very truly yours, G. C. Sorensen, Hanager Regulatory Programs PLP/tmh Attachment cc: R Auluck - NRC WS Chin - BPA D Hoffman - NRC N Lewis - EFSEC AD Toth - NRC Site 1'40501043 0>0"00397 pDR pDOCK pDR p

Fl l

gf

I

,fo II

The following chandi es represent only title changes.- No deletion of support to WNP-2 or change of personnel is represented in these changes:

Power Generation Director to Assistant Managing Director for Operations Technology Director to Engineering Director Health Physicist to Health Physics/Chemistry Support Supervisor Training Manager to Technical Training Coordinator

2. The following changes represent minor administrative changes. No deletion of support to WNP-2 or change of personnel is represented in these changes:

Support Services Director - reports to the Assistant Managing Director for Operations Spare Parts Material Supervisor - fullfils, a matrix reporting function to the Plant Maintenance Manager as the Procurement Manager. Day-to-day reporting to the Maintenance Manager is required, long term policy reporting is to the Manager, Corporate Contracts and Materials Management.

3. The following positions have been added to the plant organization. No deletion of support to WNP-2 is represented by these: changes.

A Planning and Scheduling Supervisor has been added reporting directly to the. Plant Manager.

Two Plant Engineering Supervisors have been added to the Plant Technical Manager's staff in response to increased activities and responsibilities.

The Shift Technical. Advisers (STA's) are reflected as part of the Reactor Engineering Supervisor's staff.

4. The member of P;-O.C. described as the Plant gA/gC Manager is the Plant gA Manager.

.5. The change to Se'ction.6.8.2 reflects implementing procedures f'r the Kealth Physics/Chemistry .Support Program as. being coordinated by the "Director of Support Services" instead of the "Manager, Radiological Programs". This change is made because the "Manager, Radiological Programs" reports to the "Director of Support Services" who has the final responsibility for this area. No deletion of suport to WNP-2 or change'of personnel is represented in this change.

0 r 4