ML17277B595: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 105: Line 105:
   )
   )
I
I
          ,'


Attachment  2 E ui ment Presentl  Bein Evaluated EPN                Descri tion                  Modification RCIC-MO-V/63      Motor Operator                Block Valve Travel Partially Closed Until Replacement Parts Available RWCU-MO-V/1        Motor Operator                Block Valve Travel Partially Closed Until Replacement Parts Available
Attachment  2 E ui ment Presentl  Bein Evaluated EPN                Descri tion                  Modification RCIC-MO-V/63      Motor Operator                Block Valve Travel Partially Closed Until Replacement Parts Available RWCU-MO-V/1        Motor Operator                Block Valve Travel Partially Closed Until Replacement Parts Available

Latest revision as of 07:34, 4 February 2020

Application to Amend License NPF-21,extending Required Date for 30 Days to Replace Electrical Equipment.Amend Due to Design Changes,Delays in Procurement,Test Complications & Installation Problems.Fee Paid
ML17277B595
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/17/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-85-021, GO2-85-21, TAC-56827, NUDOCS 8501240208
Download: ML17277B595 (14)


Text

0 REGULATOR INFORMATION DISTRIBUTION i'EM (RIDS)

ACCESSION NSR:0501200200 DOC,DATE: 05/01/17 NOTARIZED: YES DOCKETi 0 FACIL:50 397 NPPSS Nuclear Projects Unit- 2g Washington Public. Powe'5000397 AUTH>>NAME AUTHOR AFFILIATION SORENSENEG>>CD Washington Public Power Supply System RECIP,NAME RECIPIENT AFFILIATION SCHHENCERiA'0 Licensing Branch 2

SUBJECT:

Application to amend License, NPF 2iiextending required'ate>

for30 days to replace e.lectrical equipment, Amend due to design changesidelays in procurementEtest complications. L installation problems.Fee paid, DISTRIBUTION CODE: A048D COPIES RECEI VED>> LiTR ENCLA "'IZE; TITLE: OR/Licensing Submittal: Equipment Qualification NOTES! 05000397 OL>> 12'/20/83 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME" LTTR ENCL ID CODE/NAME LTTR.

AULUCKgR'1 ENCL'=

NRR'B2 BC 1 0 1 ACRS 12'NTERNAL; 15 8 8 ADM/LFflB, 1 ~

0.

ELD/HDS2'2 l. 1 GC. 13< 1 1

'2.

NRR, KARSCHiR 1 NRR/DE/EQB 07 2 NRR/DL DIR 10 1 1 N /ORAB 06" 1 1 NRR/DSI/AE8 1 1 G 04 1 1.

RGNS 1 1 EXTERNAL>> LPDR 03 1 NRC PDR 02 NSIC 05 1 1

~ Wll'>>0. 9

+/po $ +o TOTAL NUMBER" OF COPIES REQUIRED'TTR 20 ENCL 22

II i

e iaaf

~ ( II f '

4 II

't

'L f '

5

~

F, tf II I

III ll lh V

4 ,

~

' g6+P V

I p I

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 17, 1985 G02-85-021 Docket No. 50-397 I

Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Branch No. 2 'icensing Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h)

NOT I F I CAT ION

Reference:

Letter, G02-83-842,.G. C. Sorensen (SS) to A.

Schwencer (NRC), "Environmental Qualification Report for Safety Related Equipment, September 1983", dated September 16, 1983 The subject license condition requires the Supply System to environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 prior to March 31, 1985. In order to satisfy this condition, the equipment identified in Attachment 1 must be replaced. This will require plant shut-down while systems are removed from service for component replacement.

The Supply System has determined that due to recent design changes, delays in procurement, test complications, and installation problems, we must request an extension for thirty .(30) days from the required date for the items identified in Attachment 1. Accordingly, in accordance with the Code of Federal Regulations,'arts 50.90 and 2. 101, the Supply System requests that the subject license condition be amended to read as follows:

850i240208 850il7 PDR ADOCK 050003'P7 P PDR

~ol+q )~.e4

@ ~@V~

N

~ \

C

A. Schwencer Page Two REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h) NOTIFICATION "Prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 with exception of the equipment listed below, which shall be qualified on or before April 30, 1985."

MS-LITS-26A PSR-V-X77A/1 MS-L ITS-26B PSR-V-X77A/3 MS-L ITS-26C RRA-RMS-FN/1 MS-L ITS-26D RRA-RMS-FN/2 REA- E/P- lA RRA-RMS-FN/3 REA-E/P-1B L PCS-PIS-1 The Supply System has reviewed this change per 10 CFR 50.59 and determined that no unreviewed safety questions will result from this extension.

The Supply System has reviewed this change per 10 CFR 50.92 and determined that it does not:

1) involve a significant increase in the probability or consequences of an accident previously evaluated because (a) overall equipment qualification requirements applicable to WNP-2 are themselves more stringent than similar require-ments applicable to plants licensed to operate prior to February 22, 1983 and (b) given the overall requirements governing the operation of WNP-2, the requested amendment does not constitute a significant change to the licensing basis of the plant; or
2) create the possibility of a new or different kind of accident from any accident previously evaluated because no changes are being made to any equipment and/or systems, and therefore no new or different kinds of accidents would be made possible; or
3) involve a significant reduction in a margin of safety because no original design parameters are being reduced.

This amendment is being requested in the spirit of the extension for environ-mental qualification under which the industry operates. Namely, deferral is technically justified and allows .utilities the opportunity to install qualified equipment on a reasonable schedule with minimal impact to resources. Such would also coincide with our presently scheduled outage of mid to late an'xtension April, 1985. WNP-2, through agreements with Bonneville Power Administration (BPA), must schedule our planned outages to coincide with the peak river flow and hydro. generation in the Pacific Northwest. This extension would accommodate BPA's request and be in the public interest.

P g~

pC <

i'$

i

A. Schwencer Page Three REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h) NOTIFICATION The Supply System would also like to take this opportunity to advise you of another matter concerning environmental qualification related to high energy line break analysis (i.e. RWCU and. RCIC lines, Refer to Licensee Event Report 85-001). We are presently undertaking an independent assessment of the appropriateness of the stroke times of the valves identified in Attach-ment 2. These valves are presently identified on Table B of the Justification for Interim Operation (JIO) as being qualified. We expect this study to be completed in 6 to 8 weeks. Until this study is completed, we have insufficient basis upon which to conclude that an application for a license amendment is necessary. If the results indicate that a change is necessary in order to satisfy qualification design criteria, an emergency license condition amend-ment will be requested prior to March 31, 1985. If a change is necessitated, we plan to block the valves to reduce the stroke times during the next sched-uled outage, and procure the replacement parts on an expedited basis.

The Supply System has evaluated this request in accordance with the criteria in 10 CFR 170.21, and has included a warrant for one hundred fifty dollars

($ 150.00) as initial payment for this application for amendment under Facility Category A (Power Reactors).

In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.

This letter also, provides notification per 10 CFR 50.49(h).

Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing. As you are aware, prompt attention to this amendment is necessary; continued operation of WNP-2 requires approval of this amendment no later than March 31, 1985.

G. C. Sorensen, Manager Regulatory Programs PLP/tmh Attachments cc: R Auluck - NRC WS Chin - BPA N Lewis - EFSEC JB Martin - NRC RV AD Toth - NRC Site

)

S r.:o.

gN'

Attachment 1 Equipment Proposed for Replacement by A ril 30, 1985 for Environmental uglification Replacement EPN Descri tion E ui ment MS-L ITS-26A Level Transmitter Rosemount 1153

-26B Static. 0 Ring D05PA

-26C

-26D PSR-V-X77A/1 Solenoid Valve Upgrade Kit

-X77A/3 RRA-RMS-FN/1 Remote Manual Switch Electroswitch

-FN/2

-FN/3 REA-E/P-1A El ectro/Pneumati c ITT Conoflow

-1B Converters LPCS-PIS-1 Pressure Switch Static 0 Ring

N il FF

)

I

Attachment 2 E ui ment Presentl Bein Evaluated EPN Descri tion Modification RCIC-MO-V/63 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available RWCU-MO-V/1 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available

~ ~

I

~'s l"

t

h

~ 4 h t ~

I

'HNP-2 OL NPF-23, Request fop .

Amendment to Licensing Gondstion (28) 8 Environmental gualification STATE OF WASHINGTON )

10CFR50.49(h) Notification

)

County of Benton )

I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

OATE / cJAQ , 1985 or sen, anager Regulatory Programs On this day personally appeared before me G. C. SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this day of , 1985.

otry u c xnan orte State of Washing o Residing at h t tp t htt' h p

I'

F, ~ ~

S

~

J I

I

,~yeas ~

e

-3 d