ML18005A743: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | ||
| page count = 6 | | page count = 6 | ||
| project = | |||
| stage = Draft Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:AC CEXZRATH)ST33BUTf ON DEMON'RrkTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8901040249 DOC.DATE: 88/12/29 NOTARIZED: | {{#Wiki_filter:AC CEXZRATH) ST33BUTf ON DEMON 'RrkTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION MCDUFFIE,M.A. | ACCESSION NBR:8901040249 DOC.DATE: 88/12/29 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION MCDUFFIE,M.A. Carolina Power & Light Co. | ||
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | ||
==SUBJECT:== | ==SUBJECT:== | ||
Application for amend to License NPF-63,revising senior reactor operator requirements for manager | Application for amend to License NPF-63,revising senior reactor operator requirements for manager operations. | ||
DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR J ENCL I SIZE | DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: 'General Distribution J ENCL I SIZE: | ||
NOTES:Application for permit renewal filed. 05000400 ~ | |||
RECIPIENT ID CODE/NAME, COPIES RECIPIENT COPIES j | |||
'IHE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT.20079)TO ZZZHZNATE YOUR NAME FRCH DISTIGBUTION LISTS POR DOCE&NIS YOU DGNiT NEEDf sS TOTAL NUMBER OF COPIES REQUIRED: LTTR Z6'NCL 2Q l l CHILL Carolina Power 8 Ught Company P.O.Box 1551~Raleigh, N.C.27502 M.A.McDUFFIE Senior Vlcc Prestdent Nuclear Generation | LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 2 2 BUCKL'EY,B 1 1 D | ||
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER-OPERATIONS Gentlemen: | \ | ||
Carolina Power&Light Company hereby submits a supplement to the January 4, 1988 license amendment request for the Shearon Harris Nuclear Power Plant (SHNPP)regarding Technical Specification 6.2.2.e.This submittal is a result of conversations held between members of the Staff and CP&L personnel. | INTERNAL ACRS 6 6 ARM/DAF/LFMB 1 0 D NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/S CBI 1 1 NRR/DOEA/TSB 11 1 1 NRR/ PMAS/I LRB1 2 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS1 1 0 RE~'X~ 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 gg(p oL.~ | ||
Currently, Technical Specification 6.2.2.e requires that the Manager-Operations hold a Senior Reactor Operator (SRO)license.The proposed change would allow the Manager-Operations to: (1)hold an SRO license;(2)have at one time held an SRO license;or (3)meet the qualifications for plant managers specified in Section 4.2.1 of the September 1979 draft of ANS 3.1.Based on discussions with the Staff, CP&L has removed Option 3 from the request.Enclosure 1 provides a revised Technical Specification page reflecting this change.The Company's January 4, 1988 request was prenoticed on March 9, 1988 (46 FR 7587).Removal of Option 3 from the original request does not affect the conclusions reached in the 10 CFR 50.92 analysis provided in the January 4, 1988 submittal or the March 9, 1988 prenotice. | )JJ'P~ 0+pp HFS i I h | ||
As such, the 10 CFR 50.92 analysis remains valid and an additional prenotice of this request should not be necessary. | NVZE TO ALL "RIDS>> RECIPIENTS ~ | ||
PIZASE HELP US TO REDUCE HASTE.'ONTACT 'IHE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 20079) TO ZZZHZNATE YOUR NAME FRCH DISTIGBUTION LISTS POR DOCE&NIS YOU DGNiT NEEDf sS TOTAL NUMBER OF COPIES REQUIRED: LTTR Z6'NCL 2Q | |||
/Page 2 Please refer any questions regarding this submittal to Mr.Mark A.Turkal at (919)362-2985. | |||
l l | |||
CHILL Carolina Power 8 Ught Company P. O. Box 1551 ~ Raleigh, N.C. 27502 OECQ s $ 88 M. A. McDUFFIE Senior Vlcc Prestdent Nuclear Generation SERIAL: NLS-88-290 10CFR50.90 h | |||
United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER - OPERATIONS Gentlemen: | |||
Carolina Power & Light Company hereby submits a supplement to the January 4, 1988 license amendment request for the Shearon Harris Nuclear Power Plant (SHNPP) regarding Technical Specification 6.2.2.e. This submittal is a result of conversations held between members of the Staff and CP&L personnel. | |||
Currently, Technical Specification 6.2.2.e requires that the Manager-Operations hold a Senior Reactor Operator (SRO) license. The proposed change would allow the Manager - Operations to: (1) hold an SRO license; (2) have at one time held an SRO license; or (3) meet the qualifications for plant managers specified in Section 4.2.1 of the September 1979 draft of ANS 3.1. Based on discussions with the Staff, CP&L has removed Option 3 from the request. Enclosure 1 provides a revised Technical Specification page reflecting this change. | |||
The Company's January 4, 1988 request was prenoticed on March 9, 1988 (46 FR 7587). Removal of Option 3 from the original request does not affect the conclusions reached in the 10 CFR 50.92 analysis provided in the January 4, 1988 submittal or the March 9, 1988 prenotice. As such, the 10 CFR 50.92 analysis remains valid and an additional prenotice of this request should not be necessary. | |||
wag P4 | |||
/on/- | |||
' g~ ~E< ~g 44'(age ( l 890i040249 881229 PDR ADOCK 05000400 gl/6 /I/FP v P . PDC | |||
0 0 t 4 | |||
E | |||
.> 1 "I | |||
Document Control Desk NLS-88-290 / Page 2 Please refer any questions regarding this submittal to Mr. Mark A. | |||
Turkal at (919) 362-2985. | |||
truly, 7'~ | |||
Yours very Qg M. A. McDuffie MAM/MAT | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Technical Specification Page CC: Mr. R. A. Becker Mr. W. H. Bradford Mr. Dayne H. Brown Mr. M. L. Ernst M. A. McDuffie, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are-officers, employees, contractors, and agents of Carolina Power & | |||
Light Company. | |||
a Notary (Seal | |||
~gyqill IIly yp My commission expires: 97 H gOKAR> | |||
~ 044 | |||
-, PuSuc ~ | |||
C.p | |||
C.p%~,gC''y'H'P'wL)sv'* | % ~ | ||
,gC | |||
''y'H' I e | |||
P 'wL )sv '* | |||
'I I | |||
Jl p1}} |
Latest revision as of 20:22, 3 February 2020
ML18005A743 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 12/29/1988 |
From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
Shared Package | |
ML18005A744 | List: |
References | |
NLS-88-290, NUDOCS 8901040249 | |
Download: ML18005A743 (6) | |
Text
AC CEXZRATH) ST33BUTf ON DEMON 'RrkTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8901040249 DOC.DATE: 88/12/29 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION MCDUFFIE,M.A. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to License NPF-63,revising senior reactor operator requirements for manager operations.
DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: 'General Distribution J ENCL I SIZE:
NOTES:Application for permit renewal filed. 05000400 ~
RECIPIENT ID CODE/NAME, COPIES RECIPIENT COPIES j
LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 2 2 BUCKL'EY,B 1 1 D
\
INTERNAL ACRS 6 6 ARM/DAF/LFMB 1 0 D NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/S CBI 1 1 NRR/DOEA/TSB 11 1 1 NRR/ PMAS/I LRB1 2 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS1 1 0 RE~'X~ 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 gg(p oL.~
)JJ'P~ 0+pp HFS i I h
NVZE TO ALL "RIDS>> RECIPIENTS ~
PIZASE HELP US TO REDUCE HASTE.'ONTACT 'IHE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 20079) TO ZZZHZNATE YOUR NAME FRCH DISTIGBUTION LISTS POR DOCE&NIS YOU DGNiT NEEDf sS TOTAL NUMBER OF COPIES REQUIRED: LTTR Z6'NCL 2Q
l l
CHILL Carolina Power 8 Ught Company P. O. Box 1551 ~ Raleigh, N.C. 27502 OECQ s $ 88 M. A. McDUFFIE Senior Vlcc Prestdent Nuclear Generation SERIAL: NLS-88-290 10CFR50.90 h
United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER - OPERATIONS Gentlemen:
Carolina Power & Light Company hereby submits a supplement to the January 4, 1988 license amendment request for the Shearon Harris Nuclear Power Plant (SHNPP) regarding Technical Specification 6.2.2.e. This submittal is a result of conversations held between members of the Staff and CP&L personnel.
Currently, Technical Specification 6.2.2.e requires that the Manager-Operations hold a Senior Reactor Operator (SRO) license. The proposed change would allow the Manager - Operations to: (1) hold an SRO license; (2) have at one time held an SRO license; or (3) meet the qualifications for plant managers specified in Section 4.2.1 of the September 1979 draft of ANS 3.1. Based on discussions with the Staff, CP&L has removed Option 3 from the request. Enclosure 1 provides a revised Technical Specification page reflecting this change.
The Company's January 4, 1988 request was prenoticed on March 9, 1988 (46 FR 7587). Removal of Option 3 from the original request does not affect the conclusions reached in the 10 CFR 50.92 analysis provided in the January 4, 1988 submittal or the March 9, 1988 prenotice. As such, the 10 CFR 50.92 analysis remains valid and an additional prenotice of this request should not be necessary.
wag P4
/on/-
' g~ ~E< ~g 44'(age ( l 890i040249 881229 PDR ADOCK 05000400 gl/6 /I/FP v P . PDC
0 0 t 4
E
.> 1 "I
Document Control Desk NLS-88-290 / Page 2 Please refer any questions regarding this submittal to Mr. Mark A.
Turkal at (919) 362-2985.
truly, 7'~
Yours very Qg M. A. McDuffie MAM/MAT
Enclosures:
- 1. Technical Specification Page CC: Mr. R. A. Becker Mr. W. H. Bradford Mr. Dayne H. Brown Mr. M. L. Ernst M. A. McDuffie, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are-officers, employees, contractors, and agents of Carolina Power &
Light Company.
a Notary (Seal
~gyqill IIly yp My commission expires: 97 H gOKAR>
~ 044
-, PuSuc ~
C.p
% ~
,gC
y'H' I e
P 'wL )sv '*
'I I
Jl p1