| issue date = 04/10/1998
| issue date = 04/10/1998
| title = Informs That Util Completed Committed Action to Perform Documented Evaluation Adequacy of Existing Plant Procedures Re Loss of Load Scenario When EDG Is Paralleled to Grid. Plant Procedures Have Been Revised to Include Addl Guidance
| title = Informs That Util Completed Committed Action to Perform Documented Evaluation Adequacy of Existing Plant Procedures Re Loss of Load Scenario When EDG Is Paralleled to Grid. Plant Procedures Have Been Revised to Include Addl Guidance
| author name = HASKELL N L
| author name = Haskell N
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1 A CMS Energy Company April 10, 1998 U S Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
{{#Wiki_filter:*
* Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT Tel: 616 764 2216 Fax: 616 764 2490 Nathan L. Haskell Director, Licensing
A CMS Energy Company Palisades Nuclear Plant          Tel: 616 764 2216 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 Nathan L. Haskell Director, Licensing April 10, 1998 U S Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT
*TECHNICAL SPECIFICATIONS CHANGE REQUEST -ELECTRICAL POWER SYSTEMS -COMPLETION OF COMMITTED ACTION On November 21, -1997, Palisades submitted a response to a Request for Additional Information associated with our Electrical Power Systems Technical Specifications request (TAC M94378). In that letter, Palisades committed to the following action: By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if determined necessary by the evaluation.
      *TECHNICAL SPECIFICATIONS CHANGE REQUEST - ELECTRICAL POWER SYSTEMS -
That committed action has been completed.
COMPLETION OF COMMITTED ACTION On November 21, -1997, Palisades submitted a response to a Request for Additional Information associated with our Electrical Power Systems Technical Specifications chang~ request (TAC M94378). In that letter, Palisades committed to the following action:
The evaluation has been completed and documented under Palisades Action Item Record A-CMT-97-112.
By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if determined necessary by the evaluation.
That evaluation concluded that several operating and test procedures could be enhanced with more explicit guidance for the subject situation.
That committed action has been completed. The evaluation has been completed and documented under Palisades Action Item Record A-CMT-97-112. That evaluation concluded that several operating and test procedures could be enhanced with more explicit guidance for the subject situation. Those procedures have been revised to include that additional guidance.
Those procedures have been revised to include that additional guidance. ( (
1(                                                     (
,~~+,~~~~~~~~~~~--:-;--,----'~~----\
9804220137 980410
9804220137 980410
* I PDR ADOCK 05000255 '1
* I PDR ADOCK 05000255                           '1
* P PDR 1.... ___ ...,.
* P                       PDR 1.... ___ ...,.
* *  
 
                    *
* 2


==SUMMARY==
==SUMMARY==
OF COMMITMENTS This letter closes the following commitment made in our November 21, 1997 letter: By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if-determined necessary by the evaluation.
OF COMMITMENTS This letter closes the following commitment made in our November 21, 1997 letter:
irector, Licensing CC Administrator, Region III, USNRC Project Manager; NRR, ,LJSNRC NRC Resident Inspector  
By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if-determined necessary by the evaluation.
-Palisades
irector, Licensing CC Administrator, Region III, USNRC Project Manager; NRR, ,LJSNRC NRC Resident Inspector - Palisades
*
 
* CONSUMERS ENERGY COMPANY TECHNICAL SPECIFICATIONS CHANGE REQUEST ELECTRICAL POWER SYSTEM COMPLETION OF COMMITTED ACTION To the best of my knowledge, the content of this letter, reporting completion of a November 21, 1997 committed action associated with our Technical Specifications change request for the Electrical Power System, is truthful and complete.
CONSUMERS ENERGY COMPANY TECHNICAL SPECIFICATIONS CHANGE REQUEST ELECTRICAL POWER SYSTEM COMPLETION OF COMMITTED ACTION To the best of my knowledge, the content of this letter, reporting completion of a November 21, 1997 committed action associated with our Technical Specifications change request for the Electrical Power System, is truthful and complete.
Director, Licensing Alora M. Davis, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)
Director, Licensing 1998.
My commission expires August 26, 1999 1998.}}
Alora M. Davis, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)
My commission expires August 26, 1999}}

Latest revision as of 11:00, 3 February 2020

Informs That Util Completed Committed Action to Perform Documented Evaluation Adequacy of Existing Plant Procedures Re Loss of Load Scenario When EDG Is Paralleled to Grid. Plant Procedures Have Been Revised to Include Addl Guidance
ML18068A326
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/10/1998
From: Haskell N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M94378, NUDOCS 9804220137
Download: ML18068A326 (3)


Text

A CMS Energy Company Palisades Nuclear Plant Tel: 616 764 2216 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 Nathan L. Haskell Director, Licensing April 10, 1998 U S Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT

  • TECHNICAL SPECIFICATIONS CHANGE REQUEST - ELECTRICAL POWER SYSTEMS -

COMPLETION OF COMMITTED ACTION On November 21, -1997, Palisades submitted a response to a Request for Additional Information associated with our Electrical Power Systems Technical Specifications chang~ request (TAC M94378). In that letter, Palisades committed to the following action:

By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if determined necessary by the evaluation.

That committed action has been completed. The evaluation has been completed and documented under Palisades Action Item Record A-CMT-97-112. That evaluation concluded that several operating and test procedures could be enhanced with more explicit guidance for the subject situation. Those procedures have been revised to include that additional guidance.

1( (

,~~+,~~~~~~~~~~~--:-;--,----'~~----\

9804220137 980410

  • I PDR ADOCK 05000255 '1
  • P PDR 1.... ___ ...,.
  • 2

SUMMARY

OF COMMITMENTS This letter closes the following commitment made in our November 21, 1997 letter:

By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if-determined necessary by the evaluation.

irector, Licensing CC Administrator, Region III, USNRC Project Manager; NRR, ,LJSNRC NRC Resident Inspector - Palisades

CONSUMERS ENERGY COMPANY TECHNICAL SPECIFICATIONS CHANGE REQUEST ELECTRICAL POWER SYSTEM COMPLETION OF COMMITTED ACTION To the best of my knowledge, the content of this letter, reporting completion of a November 21, 1997 committed action associated with our Technical Specifications change request for the Electrical Power System, is truthful and complete.

Director, Licensing 1998.

Alora M. Davis, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)

My commission expires August 26, 1999