A CMS Energy Company Palisades Nuclear Plant Tel: 616 764 2216 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 Nathan L. Haskell Director, Licensing April 10, 1998 U S Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT

  • TECHNICAL SPECIFICATIONS CHANGE REQUEST - ELECTRICAL POWER SYSTEMS -

COMPLETION OF COMMITTED ACTION On November 21, -1997, Palisades submitted a response to a Request for Additional Information associated with our Electrical Power Systems Technical Specifications chang~ request (TAC M94378). In that letter, Palisades committed to the following action:

By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if determined necessary by the evaluation.

That committed action has been completed. The evaluation has been completed and documented under Palisades Action Item Record A-CMT-97-112. That evaluation concluded that several operating and test procedures could be enhanced with more explicit guidance for the subject situation. Those procedures have been revised to include that additional guidance.

1( (

,~~+,~~~~~~~~~~~--:-;--,----'~~----\

9804220137 980410

  • I PDR ADOCK 05000255 '1
  • P PDR 1.... ___ ...,.
  • 2

SUMMARY

OF COMMITMENTS This letter closes the following commitment made in our November 21, 1997 letter:

By April 30, 1998, Consumers Energy will perform a documented evaluation of the adequacy of existing plant procedures concerning a loss of load scenario when the Palisades emergency diesel generator is paralleled to the grid. Plant procedures will be revised if-determined necessary by the evaluation.

irector, Licensing CC Administrator, Region III, USNRC Project Manager; NRR, ,LJSNRC NRC Resident Inspector - Palisades

CONSUMERS ENERGY COMPANY TECHNICAL SPECIFICATIONS CHANGE REQUEST ELECTRICAL POWER SYSTEM COMPLETION OF COMMITTED ACTION To the best of my knowledge, the content of this letter, reporting completion of a November 21, 1997 committed action associated with our Technical Specifications change request for the Electrical Power System, is truthful and complete.

Director, Licensing 1998.

Alora M. Davis, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)