ML18078A312: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18078A312
| number = ML18078A312
| issue date = 02/28/2018
| issue date = 02/28/2018
| title = Pilgrim, and Independent Spent Fuel Storage Installation - Radioactive Effluent Release Report
| title = Independent Spent Fuel Storage Installation - Radioactive Effluent Release Report
| author name = Miner P J
| author name = Miner P
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:* ~Entergx February 28, 2018 Attn: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360
{{#Wiki_filter:*~Entergx                                                                                   Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 February 28, 2018 Attn: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Independent Spent Fuel Storage Installation Radioactive Effluent Release Report for 2017 Pilgrim Nuclear Power Station Docket Nos. 50-293 and 72-1044 7 t -I b I <f Renewed License No. DPR-35 LETTER NUMBER: 2.18.014  
Independent Spent Fuel Storage Installation Radioactive Effluent Release Report for 2017 Pilgrim Nuclear Power Station Docket Nos. 50-293 and 72-1044                 7t -   IbI <f Renewed License No. DPR-35 LETTER NUMBER: 2.18.014


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pilgrim Nuclear Power Station (PNPS) utilizes the Holtec International HI-STORM 100 Cask System tor the Independent Spent Fuel Storage Installation (ISFSI). Amendment No. 7 to Certificate of Compliance No. 1014 for the HI-STORM 100 Spent Fuel Storage Casks Section 5.4 requires the submittal of an Annual Radioactive Effluent Release Report pursuant to Title 1 O Code of Federal Regulations 72.44(d)(3).
 
The purpose of this letter is to document radioactive effluent releases for calendar year 2017 from the PNPS ISFSI spent fuel storage casks. The HI-STORM 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific*
Pilgrim Nuclear Power Station (PNPS) utilizes the Holtec International HI-STORM 100 Cask System tor the Independent Spent Fuel Storage Installation (ISFSI). Amendment No. 7 to Certificate of Compliance No. 1014 for the HI-STORM 100 Spent Fuel Storage Casks Section 5.4 requires the submittal of an Annual Radioactive Effluent Release Report pursuant to Title 1O Code of Federal Regulations 72.44(d)(3). The purpose of this letter is to document radioactive effluent releases for calendar year 2017 from the PNPS ISFSI spent fuel storage casks.
operating procedures for the control of radioactive effluents are not required.
The HI-STORM 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific* operating procedures for the control of radioactive effluents are not required. The HI-STORM 100 Cask System is also designed and fabricated with a totally ;seal-welded pressure vessel such that leakage from the cor:tfinement boundary is not considered to be a credible occurrence. Therefore, there were no radionuclides released to the environment in liquid or gaseous effluents from the ISFSI at PNPS during the reporting period of January 1, 2017 to December 31, 2017. Since there were no radioactive effluent releases, there were also no offsite effluent dose consequences.
The HI-STORM 100 Cask System is also designed and fabricated with a totally ;seal-welded pressure vessel such that leakage from the cor:tfinement boundary is not considered to be a credible occurrence.
If yo.u have any questions regarding this information, please contact me at (5.08) 830~7127.' :*
Therefore, there were no radionuclides released to the environment in liquid or gaseous effluents from the ISFSI at PNPS during the reporting period of January 1, 2017 to December 31, 2017. Since there were no radioactive effluent releases, there were also no offsite effluent dose consequences.
J\. .                         .* i   * : :.,       * ::'.
If yo.u have any questions regarding this information, please contact me at (5.08) 830~7127.'  
There are; no:regulatory commitments contained in ;this letter; . *           '! ' :.. _*',.
:* J\. . .* i * : :., * ::'. There are; no:regulatory commitments contained in ;this letter; . * '! ' : .. _*',. .:* .. i::* ,:( Peter J. i er* Manager, Regulatory Assurance:, ...1*.:,.  
                                                                                .:* ..i::* ,:(
' PJM/mw __J Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: Mr. David C. Lew Acting Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRG Senior Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.18.014 Page 2 of 2}}
Peter J. i er*
Manager, Regulatory Assurance:,                         ...1*.:,.
PJM/mw
__J
 
Entergy Nuclear Operations, Inc.       Letter No. 2.18.014 Pilgrim Nuclear Power Station                   Page 2 of 2 cc:
Mr. David C. Lew Acting Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRG Senior Resident Inspector Pilgrim Nuclear Power Station}}

Latest revision as of 09:43, 3 February 2020

Independent Spent Fuel Storage Installation - Radioactive Effluent Release Report
ML18078A312
Person / Time
Site: Pilgrim, Holtec
Issue date: 02/28/2018
From: Miner P
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML18078A312 (2)


Text

  • ~Entergx Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 February 28, 2018 Attn: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Independent Spent Fuel Storage Installation Radioactive Effluent Release Report for 2017 Pilgrim Nuclear Power Station Docket Nos. 50-293 and 72-1044 7t - IbI <f Renewed License No. DPR-35 LETTER NUMBER: 2.18.014

Dear Sir or Madam:

Pilgrim Nuclear Power Station (PNPS) utilizes the Holtec International HI-STORM 100 Cask System tor the Independent Spent Fuel Storage Installation (ISFSI). Amendment No. 7 to Certificate of Compliance No. 1014 for the HI-STORM 100 Spent Fuel Storage Casks Section 5.4 requires the submittal of an Annual Radioactive Effluent Release Report pursuant to Title 1O Code of Federal Regulations 72.44(d)(3). The purpose of this letter is to document radioactive effluent releases for calendar year 2017 from the PNPS ISFSI spent fuel storage casks.

The HI-STORM 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific* operating procedures for the control of radioactive effluents are not required. The HI-STORM 100 Cask System is also designed and fabricated with a totally ;seal-welded pressure vessel such that leakage from the cor:tfinement boundary is not considered to be a credible occurrence. Therefore, there were no radionuclides released to the environment in liquid or gaseous effluents from the ISFSI at PNPS during the reporting period of January 1, 2017 to December 31, 2017. Since there were no radioactive effluent releases, there were also no offsite effluent dose consequences.

If yo.u have any questions regarding this information, please contact me at (5.08) 830~7127.' :*

J\. . .* i * : :., * ::'.

There are; no:regulatory commitments contained in ;this letter; . * '! ' :.. _*',.

.:* ..i::* ,:(

Peter J. i er*

Manager, Regulatory Assurance:, ...1*.:,.

PJM/mw

__J

Entergy Nuclear Operations, Inc. Letter No. 2.18.014 Pilgrim Nuclear Power Station Page 2 of 2 cc:

Mr. David C. Lew Acting Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRG Senior Resident Inspector Pilgrim Nuclear Power Station