{{#Wiki_filter:DEFINITIONS  
{{#Wiki_filter:DEFINITIONS CONTAINMENT INTEGRITY 1.7    CONTAINMENT INTEGRITY shall exist when:
--------------------------------------------------------------------------------
1.7.1 All penetrations required to be closed during accident conditions are either:
CONTAINMENT INTEGRITY
: a. Capable of being closed by an OPERABLE containment automatic isolation valve system, or
: b. Closed by manual valves, blind flanges, or deactivated        I_
automatic valves secured in their closed positions, except as provided in Table 3.6-1 of Specification 3.6.3.1.
1.7.2 All equipment hatches are closed  -~nd sealed, -
1.7.3 Each air lock is OPERABLE pursuant to Specification 3.6.1.3, 1.7.4 The containment leakage rates are within the limits of Specification 3.6.1.2, and 1.7.5 The sealing mechanism associated with each penetration (e.g.,
welds, bellows or 0-rings) is OPERABLE.
CONTROLLED LEAKAGE 1.8 CONTROLLED LEAKAGE shall be that seal water flow from the reactor coolant pufll' seals.
CORE ALTERATION 1.9 CORE ALTERATION shall be the rmvement or manipulation of any component within the reactor pressure vessel with the vessel head removed and fuel in the vessel. Suspension of CORE ALTERATION shall not preclude completion of rmvement of a component to a safe conservative position.
DOSE EQJIVALENT 1-131 LlO DOSE EQJIVALENT I-131 shall be that concentration of I-131 (microcuries -
per gram) which alone _would produce the same thyroid dose as-the quantity and isotopic mixture of I-131, I-132, I-133~ I-134, and I-135 actually present. The SALEM - UNIT l                          1-2 8502200306 850208 PDR ADOCK 05000272 P                  PDR


===1.7 CONTAINMENT===
DEFINITIONS PHYSICS TESTS 1.20 PHYSICS TESTS shall be those tests perfor~d to rTEasure the fundamental nuclear characteristics of the reactor core and related instrumentation and 1) described in Chapter 14 of the Updated FSAR, 2) authorized under the provisions of 10CFRS0.59, or 3) otherwise by the Commission.
PRESSURE BOUNDARY LEAKAGE L21 PRESSURE BOUNDARY LEAKAGE shall be leakage (except _steam generator tube leakage} through a non-isolable fault in a Reactor Coolant System component body, pipe wa 11 or vessel wall.
PROCESS CONTROL PROGRAM (PCP) 1.22____The PROCESS CONTROL PROGRAM shall be that program which contains the current formula, sampling, analyses, test, and determinations to be made to ensure that the processing and packaging of solid radioactive wastes, based on de100nstrated processing of actual or simulated wet solid wastes, will be accomplished in such a way as to assure compliance with 10 CFR Part 20, 10 CFR Part 71 and Federal and State regulations and other requirements gJverni ng the-disposal of the radioactive waste.                                            **
PURGE - PURGING 1.23 PURGE or PURGING shall be the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration, or other operating condition, in such a manner that replacerTEnt air or gas is required to purify the confinerTEnt.
QUADRANT POWER TILT RATIO 1.24 QUADRANT POWER TILT RATIO shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater. With one excore detector inoperable, the remaining three detectors shall be used for computing the average.
RATED THERMAL POWER
. L25 RATED THERMAL POWER shall be a total reactor. core heat transfer rate to    * -
the reactor coo 1 ant of 3338 MWt.
SALEM - UNIT 1                          1-5


INTEGRITY shall exist when: 1.7.1 All penetrations required to be closed during accident conditions are either: a. Capable of being closed by an OPERABLE containment automatic isolation valve system, or b. Closed by manual valves, blind flanges, or deactivated I_ automatic valves secured in their closed positions, except as provided in Table 3.6-1 of Specification 3.6.3.1. 1.7.2 All equipment hatches are closed sealed, -1.7.3 Each air lock is OPERABLE pursuant to Specification 3.6.1.3, 1.7.4 The containment leakage rates are within the limits of Specification 3.6.1.2, and 1.7.5 The sealing mechanism associated with each penetration (e.g., welds, bellows or 0-rings) is OPERABLE.
TABLE 4.3-1 (Continued)
CONTROLLED LEAKAGE 1.8 CONTROLLED LEAKAGE shall be that seal water flow from the reactor coolant pufll' seals. CORE ALTERATION 1.9 CORE ALTERATION shall be the rmvement or manipulation of any component within the reactor pressure vessel with the vessel head removed and fuel in the vessel. Suspension of CORE ALTERATION shall not preclude completion of rmvement of a component to a safe conservative position.
NOTATION
DOSE EQJIVALENT 1-131 LlO DOSE EQJIVALENT I-131 shall be that concentration of I-131 (microcuries
*    - With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.
-per gram) which alone _would produce the same thyroid dose as-the quantity and isotopic mixture of I-131, I-132, I-134, and I-135 actually present. The SALEM -UNIT l 8502200306 850208 PDR ADOCK 05000272 P PDR 1-2 DEFINITIONS PHYSICS TESTS 1.20 PHYSICS TESTS shall be those tests to rTEasure the fundamental nuclear characteristics of the reactor core and related instrumentation and 1) described in Chapter 14 of the Updated FSAR, 2) authorized under the provisions of lOCFRS0.59, or 3) otherwise by the Commission.
(1)  -  If not performed in previous 7 days.
PRESSURE BOUNDARY LEAKAGE L21 PRESSURE BOUNDARY LEAKAGE shall be leakage (except _steam generator tube leakage} through a non-isolable fault in a Reactor Coolant System component body, pipe wa 11 or vessel wall. PROCESS CONTROL PROGRAM (PCP) 1.22 ____ The PROCESS CONTROL PROGRAM shall be that program which contains the current formula, sampling, analyses, test, and determinations to be made to ensure that the processing and packaging of solid radioactive wastes, based on de100nstrated processing of actual or simulated wet solid wastes, will be accomplished in such a way as to assure compliance with 10 CFR Part 20, 10 CFR Part 71 and Federal and State regulations and other requirements gJverni ng disposal of the radioactive waste. *
(2)  -   Heat balance only, above 15% of RATED THERMAL POWER.
* PURGE -PURGING 1.23 PURGE or PURGING shall be the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration, or other operating condition, in such a manner that replacerTEnt air or gas is required to purify the confinerTEnt.
(3-   Compare incore to excore axial offset above 15% of RATED THERMAL POWER_.
QUADRANT POWER TILT RATIO 1.24 QUADRANT POWER TILT RATIO shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater. With one excore detector inoperable, the remaining three detectors shall be used for computing the average. RATED THERMAL POWER . L25 RATED THERMAL POWER shall be a total reactor. core heat transfer rate to * -the reactor coo 1 ant of 3338 MWt. SALEM -UNIT 1 1-5 TABLE 4.3-1 (Continued)
Recalibrate if absolute difference l_ 3 percent.
NOTATION * -With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.  
(4)  - Manual SSPS functional input check every 18 months.
(1) -If not performed in previous 7 days. (2) -Heat balance only, above 15% of RATED THERMAL POWER. (3) -Compare incore to excore axial offset above 15% of RATED THERMAL POWER_. Recalibrate if absolute difference l_ 3 percent. (4) -Manual SSPS functional input check every 18 months. (_5) -Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS. ( 6) -Neutron detectors may be excluded from CHANNEL CALIBRATION.
(_5) -  Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.
(7) -Below P-6 {Block of Source Range Reactor Trip) setpQint.
( 6) -  Neutron detectors may be excluded from CHANNEL CALIBRATION.
(8) -Deleted (9) If not performed in the previous 24 hours, conduct a functional test of the Manual Reactor Trip Switches (using voltmeters). (10) -If not performed in the previous 24 hours, conduct a functional test of: 1 Reactor Trip Breaker UV Trip (via SSPS) 1 Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)
(7)  -  Below P-6 {Block of Source Range Reactor Trip) setpQint.
(11) -Perform a functional test of: 1 Reactor Trip Breaker UV Trip (via SSPS) and conduct response time testing of UV/Breakers (event recorders) 1 Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)
(8)  - Deleted (9)     If not performed in the previous 24 hours, conduct a functional test of the Manual Reactor Trip Switches (using voltmeters).
-(12) -Perform periodic maintenance on Reactor Trip Breakers and Reactor rr:iP Bypass Breakers semiannually as follows: a. response time testing, (3 times) (visicorder) trend data b. trip bar lift force measurements c *. UV output force measurement
                                            ~
: d. dropout voltage check e. servicing/lubrication/adjustments (See Table Notation ###) f. repeat testing steps (a-d) following any necessary actions at step (e) SALEM -UNIT 1 3/4 3-13 
(10) -   If not performed in the previous 24 hours, conduct a functional test of:
' : l'.1 ' I' TABLE 3.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION INSTRUMENT
1 Reactor Trip Breaker UV Trip (via SSPS) 1  Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING AUTOMATIC TERMINATION OF RELEASE a. liquid Radwaste Effluent Line (1-Rl8) . b. Steam Generator Blowdown Line (1-Rl9 A, 89 C, and D) 2o GROSS RADIOACTIVITY MONITORS NOT PROVIDING AUTOMATIC
(11) - Perform a functional test of:
'-0 TERMINATION OF RELEASE a.
1  Reactor Trip Breaker UV Trip (via SSPS) and conduct response time testing of UV/Breakers (event recorders) 1 Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)
Fan Coolers -Service Water Line (l-Rl3 A, B, C, D, E) Discharge .
-(12) ~ -Perform periodic maintenance on Reactor Trip Breakers and Reactor rr:iP Bypass Breakers semiannually as follows:
* 3. FLOW RATE MEASUREMENT DEVICES a. Liquid Radwaste Effluent Line b. Steam* Generator Blowdown Line 4. TANK LEVEL INDICATING DEVICES a. Temporary Outside Storage Tanks as Required 'lj ; I l i ; .l . : , I MINIMUM CHANNELS OPERABLE l 4 5 1 4 1 I*' ACTION 26 27 28 29 29 30 .. I e w I O'I N 'I ,, . . TABLE 403-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQJIREMENTS CHANNEL SOURCE CHANNEL INSTRUMENT C.HECK CHECK CALIBRATION
: a. response time testing, (3 times) (visicorder) trend data
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM AND AUTOMATIC TERMINATION OF RELEASE a. Liquid Radwaste Effluent Line (1-Rl8) D P# R(3) bo Steam Generator Blowdown line D M R(3) (1-Rl9 A, C, and D) 2o GROSS RADIOACTIVITY MONITORS PROVIDING ALARM BUT NOT PROVIDING AUTOMATIC TERMINATION OF RELEASE a. Containll'P-nt Fan Coolers -Service Water Line D M R(3) (1-R13 A, B, C, D, E) Discharge
: b. trip bar lift force measurements c *. UV output force measurement
: 3. FLOW RATE MEASUREMENT DEVICES a. Liquid Radwaste Effluent Line D(4) NoA. R b. Steam Generator Blowdown Line D(4) N.Ao R I 4. TANK LEVEL INDICATING DEVICES**
: d. dropout voltage check
: a. Temporary Outside Storage Tanks as Required D* N.Ao R '"' CHANNEL FUNCTIONAL TEST Q(l) e Q(l) 0(2) N.A. N.A. 0 TABLE 4.3-12 (Continued)
: e. servicing/lubrication/adjustments (See Table 3.3~1 Notation ###)
TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist: 1. Instrument indicates measured levels at or above the alarm/trip setpoint.  
: f. repeat testing steps (a-d) following any necessary actions at step (e)
: 2. Circuit failure. (Loss of Power) 3. Instrument indicates a downscale failure. (Indication on instrument drawer in Control Equipment Room only) {2) The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exist: 1. Instrument indicates measured levels at or above the alarm/trip setpoi nt. 2. Circuit failure. (Loss Df Power) 3. Instrument indicates a downscale failure. (Indication on instrument drawer in Control Equipment Room only) 4. Instrument controls not* set in operate rnde. (On instruments equipped with mode switches only) (3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable suppliers.
SALEM - UNIT 1                           3/4 3-13
The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or more NBS standards.  
 
(4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be Made at least once per 24 hours on days on which continuous, periodic, or batch releases are made.
                      ' : l'.1 '
* During liquid additions to the tank. ** If tank level indication is not provided, vertification will be done by visual inspection.
I' TABLE 3.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION MINIMUM CHANNELS INSTRUMENT                                                                        OPERABLE  ACTION
# The Rl8 channel is an in-line channel which requires periodic decontamination.
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING AUTOMATIC TERMINATION OF RELEASE
Any count rate indication above 10,000 cpl"'I constitutes a CHANNEL CHECK for compliance purposes.
: a. liquid Radwaste Effluent Line (1-Rl8)                                       l        26
SALEM = UNIT 1 3/4 3-63 II The following process streams are routed to the pl ant vent where they are effectively nonitored by the instruments.described: (a) Condenser Air Rennval System (b) *.Auxiliary Building Ventilation-System (c) Fuel Handljng Building Ventilation System (d) Radwaste*Area Ventilation System (e) Containment Purges I ' 
          . b. Steam Generator Blowdown Line                                              4        27 (1-Rl9 A, 89 C, and D)
'. *, TABLE 4.3-13 (Continued}
~    2o    GROSS RADIOACTIVITY MONITORS NOT PROVIDING AUTOMATIC
TABLE NOTATION * (1) The CHANNEL FUNCTIONAL TEST shall also derronstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist: le Instrument indicates measured levels at or above the alarm/trip setpoi nt. 2. Circuit failure. (Loss of Power) 3. Instrument indicates a downscale failure. (2) The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the 'following conditions exist: 1. Instrument indicates measured levels at or above the alarm/trip setpoi nt. 2. Circuit failure. (Loss of Power ) 3. Instrument indicates a downscale failure. (Indication on instrument in Control Equipment Room only for 1Rl6} 4. Instrument co*ntrols not set in.operate nnde. (Applicable to l-Rl6 only) (3} The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration obtained from reputable suppliers.
'-0          TERMINATION OF RELEASE
The activity of the calibration sources were reconfirmed using a analyzer which was calibrated using one or rrore NBS standards.
: a. Contain~nt          Fan Coolers - Service Water Line                      5        28 (l-Rl3 A, B, C, D, E) Discharge                    .
(4} The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal: 1. One volume percent oxygen, balance nitrogen, and 2. Four volume percent oxygen, balance nitrogen.
* 3. FLOW RATE MEASUREMENT DEVICES I
* At all times . ** During waste gas holdup system operationc SALEM -UN IT 1 3/4 3-69 I*
: a. Liquid Radwaste Effluent Line                                              1        29    e
: b. Steam* Generator Blowdown Line                                              4        29
: 4. TANK LEVEL INDICATING DEVICES                                  : , I
: a. Temporary Outside Storage Tanks as Required                                  1       30 I*'
      'lj  ;
                        ~. I  ~ li
                            ; .l  .
 
                            'I    ,,
                              . .~
TABLE 403-12                                             '"'
RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQJIREMENTS CHANNEL CHANNEL    SOURCE      CHANNEL        FUNCTIONAL INSTRUMENT                                                  C.HECK    CHECK      CALIBRATION        TEST
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM AND AUTOMATIC TERMINATION OF RELEASE
: a. Liquid Radwaste Effluent Line (1-Rl8)                  D      P#          R(3)             Q(l)  e bo Steam Generator Blowdown line                          D      M            R(3)              Q(l)
(1-Rl9 A, B~ C, and D) 2o GROSS RADIOACTIVITY MONITORS PROVIDING ALARM BUT NOT PROVIDING AUTOMATIC TERMINATION OF
~        RELEASE w
I O'I N        a. Containll'P-nt Fan Coolers - Service Water Line        D      M            R(3)             0(2)
(1-R13 A, B, C, D, E) Discharge
: 3. FLOW RATE MEASUREMENT DEVICES
: a. Liquid Radwaste Effluent Line                        D(4)     NoA.        R                N.A.
: b. Steam Generator Blowdown Line                         D(4)    N.Ao        R                N.A.
I
: 4. TANK LEVEL INDICATING DEVICES**
: a. Temporary Outside Storage Tanks as Required            D*      N.Ao        R                0
 
TABLE 4.3-12 (Continued)
TABLE NOTATION (1)  The CHANNEL FUNCTIONAL TEST shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:
: 1. Instrument indicates measured levels at or above the alarm/trip setpoint.
: 2. Circuit failure.   (Loss of Power)
: 3. Instrument indicates a downscale failure.   (Indication on instrument drawer in Control Equipment Room only)
{2)  The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exist:
: 1. Instrument indicates measured levels at or above the alarm/trip setpoi nt.
: 2. Circuit failure.     (Loss Df Power)
: 3. Instrument indicates a downscale failure.   (Indication on instrument drawer in Control Equipment Room only)
: 4. Instrument controls not* set in operate rnde.  (On instruments equipped with ope~ate mode switches only)
(3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable suppliers. The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or more NBS standards.
(4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be Made at least once per 24 hours on days on which continuous, periodic, or batch releases are made.
* During liquid additions to the tank.
** If tank level indication is not provided, vertification will be done by visual inspection.
  # The Rl8 channel is an in-line channel which requires periodic decontamination. Any count rate indication above 10,000 cpl"'I constitutes a CHANNEL CHECK for compliance purposes.
SALEM  = UNIT 1                          3/4 3-63
 
II The following process streams are routed to the pl ant vent where they are effectively nonitored by the instruments.described:
(a) Condenser Air Rennval System (b) *.Auxiliary Building Ventilation- System (c) Fuel Handljng Building Ventilation System (d) Radwaste*Area Ventilation System (e) Containment Purges I '
 
TABLE 4.3-13 (Continued}
TABLE NOTATION (1)   The CHANNEL FUNCTIONAL TEST shall also derronstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:
le  Instrument indicates measured levels at or above the alarm/trip setpoi nt.
: 2. Circuit failure.       (Loss of Power)
: 3. Instrument indicates a downscale failure.
(2)   The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the 'following conditions exist:
: 1. Instrument indicates measured levels at or above the alarm/trip         I*
setpoi nt.
: 2. Circuit failure.     (Loss of Power )
: 3. Instrument indicates a downscale failure. (Indication on instrument drawe~  in Control Equipment Room only for 1Rl6}
: 4. Instrument co*ntrols not set in.operate nnde. (Applicable to l-Rl6 only)
(3The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sourc~s obtained from reputable suppliers. The activity of the calibration sources were reconfirmed using a multi~channel analyzer which was calibrated using one or rrore NBS standards.
(4}  The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:
: 1. One volume percent oxygen, balance nitrogen, and
: 2. Four volume percent oxygen, balance nitrogen.
* At all times
      . ** During waste gas holdup system operationc SALEM - UN IT 1                           3/4 3-69
* TABLE 4.11-1 (Continued)
* TABLE 4.11-1 (Continued)
TABLE NOTATION
TABLE NOTATION
* b. A batch release is the discharge of liquid wastes of a discrete voluJTle.
: b. A batch release is the discharge of liquid wastes of a discrete voluJTle.
Prior to sampling for analyses, each batch shall be isolated, and then thoroughly mixed to assure representative sampling.  
Prior to sampling for analyses, each batch shall be isolated, and then thoroughly mixed to assure representative sampling.
: c. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides:
: c. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs~l34, Cs-137, Ce-141, and Ce-144*. This list does not rrean I.
Mn-54, Fe-59, Co-58, Co-60, I Zn-65, Mo-99, Cs-137, Ce-141, and Ce-144*. This list does not rrean . that only these nuclides are to be detected and reported.
that only these nuclides are to be detected and reported. Other peaks that are measurable and identifiable, together with the above nuclides, shall also be identified and reported.                 **
Other peaks that are measurable and identifiable, together with the above nuclides, shall also be identified and reported.  
: d. A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and in which the method of *Sampling employed results in a specimen that is representative of the liquids released.
** d. A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and in which the method of *Sampling employed results in a specimen that is representative of the liquids released.  
: e. A continuous release is the discharge of liquid wastes of a nondiscrete volume, e.g., from a volume of a system that has an input flow durtng the_
: e. A continuous release is the discharge of liquid wastes of a nondiscrete volume, e.g., from a volume of a system that has an input flow durtng the_ continuous rel ease.
continuous rel ease.
* The LLD for shall be 2xl0-6 uCi /ml. . SALEM -UNIT 1 3/4 11-4
* The LLD for Ce~144 shall be 2xl0-6 uCi /ml.
. SALEM - UNIT 1                         3/4 11-4
* TABLE 4.11-2 (Continued)
* TABLE 4.11-2 (Continued)
TABLE NOTATION a. The LLD is defined in Table 4.11.1
TABLE NOTATION
* b. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides:
: a. The LLD is defined in Table 4.11.1
Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, Xe-138 for gaseous emissions  
: b. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, Xe-138 for gaseous emissions *and Mn-54, Fe-59, Co-58,     I Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144* for particulate emissions. This list does not rrean that only these nuclides are to be detected and reported. Other peaks that are measurable and i dent ifi ab 1e, together with the above nuclides, shall also be identified and reported.
*and Mn-54, Fe-59, Co-58, I Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144* for particulate emissions.
: c. Sampling and analysis shall also be performed following shutdown, startup or a THERMAL PQWER change(exceeding 15 percent of RATED THERMAL POWER within one hou~ unless:                                           *
This list does not rrean that only these nuclides are to be detected and reported.
: 1. Analysis shows that the DOSE EQJIVALENT 1-131 concentrations in the primary coolant has not increased rmre than a factor of three.
Other peaks that are measurable and i dent ifi ab 1 e, together with the above nuclides, shall also be identified and reported.  
: 2. The noble gas activity rmnitor shows that effluent activity has not exceeded the monitor warni ng"setpo int.
: c. Sampling and analysis shall also be performed following shutdown, startup or a THERMAL PQWER change(exceeding 15 percent of RATED THERMAL POWER within one unless:
11
* 1. Analysis shows that the DOSE EQJIVALENT 1-131 concentrations in the primary coolant has not increased rmre than a factor of three. 2. The noble gas activity rmnitor shows that effluent activity has not exceeded the monitor 11 warni ng"setpo int. d. Tritium grab samples shall be taken least once per 24 hours when the refueling canal is flooded. e. Tritium grab samples shall be taken at least once per 7 days from the ventilation exhaust from the spent fuel pool area whenever spent fuel is in the spent fuel pool. f. The ratio* of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with Specifications 3.11.2.1, 3.11.2.2 and  
: d. Tritium grab samples shall be taken   ~t least once per 24 hours when the refueling canal is flooded.
*The LLD for Ce-144 shall be 2xlo-6 uCi/ml. SALEM -UNIT 1 3/4 11-io
: e. Tritium grab samples shall be taken at least once per 7 days from the ventilation exhaust from the spent fuel pool area whenever spent fuel is in the spent fuel pool.
* TABLE 4.11-2 (Continued)
: f. The ratio* of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with Specifications 3.11.2.1, 3.11.2.2 and 3.11~2.3.
TABLE NOTATION g. Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours after changing (or after reroval from sampler.).
*The LLD for Ce-144 shall be 2xlo-6 uCi/ml.
Sampling shall also be performed at least once per 24 hours f& at least 7 days following each shutdown, startup or THERMAL POWER change exceeding 15 percent of RATED THERMAL POWER in one and analyses shall e completed I within 48 hours of changing.
SALEM - UNIT 1                         3/4 11-io
When samples' collected for 24 hours are _ analyzed, the corresponding LLDs may be increased by a factor of 10. This requirement does not apply if (1) analysis shows that the DOSE EQJIVALENT 1=13.1 concentration in the primary coolant has not increased rore than a factor of 3; and (2) the noble gas rrcnitor shows that effluent activity has not exceeded the ronitor 11 warning 11 setpointo
 
* SALEM = UNIT l 3/4 11-11 RADIOACTIVE EFFLUENTS EXPLOSIVE GAS Ml XTURE LIMITING CONDITION FOR OPERATION 3.11.2.5 The concentration of oxygen in the waste gas holdup systefll shall be limited to less than or equal to 2% by volune whenever the hydrogen concentration exceeds 4% by vo 1 ume. APPLICABILITY:
TABLE 4.11-2 (Continued)
At all tir.ies. ACTION: a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volune but less than or equal 4% by volume, reduce the oxygen concentration to the above limits within 48 hours. b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volune and the hydrogen concentration greater than 2% by volume, ifllmediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to 1 ess than or equal to 2% by volume without delay. c. The provision of Specifications 3.0.3 and 3.0.4 are not applicablP..
TABLE NOTATION
SURVEILLANCE REQJIREMENTS 4.11.2.5 The concentrations of oxygen in the waste gas holdup system shall be determined to be within the above lifllits by continuously monitoring the waste gases in the waste gas holdup system with the oxygen monitor required OPERABLE by Table 3.3-13. SALEM UNIT 1 3/4 11-15 . i SOLID RADIOACTIVE WASTE LIMITING CONDITION FOR OPERATION 3.11.3. The solid radwaste system shall be used in accordance with a PROCESS CONTROL PROGRAM to process wet radioactive waste to meet shipping and burial ground requirements.
: g. Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours after changing (or after reroval from sampler.).
APPLICABILITY:
Sampling shall also be performed at least once per 24 hours f& at least 7 days following each shutdown, startup or THERMAL POWER change exceeding 15 percent of RATED THERMAL POWER in one hou~ and analyses shall e completed within 48 hours of changing. When samples' collected for 24 hours are I _
At all times. ACTION: a. With the provisions of the PROCESS CONTROL PROGRAM not satisfied, suspend shipments of defectively processed or defectively packaged solid radioactive wastes from the site. b. The provisions of Specifications 3.0.3 and 3.0.4, and 6.9.1.9.b are not applicable.
analyzed, the corresponding LLDs may be increased by a factor of 10. This requirement does not apply if (1) analysis shows that the DOSE EQJIVALENT 1=13.1 concentration in the primary coolant has not increased rore than a factor of 3; and (2) the noble gas rrcnitor shows that effluent activity has not exceeded the ronitor 11 warning 11 setpointo
SURVEILLANCE RECUIREMENTS
* SALEM = UNIT l                           3/4 11-11
--------------------------------------------------------------------------------
 
4.11.3. The PROCESS CONTROL PROGRAM shall be used to verify the SOLIDIFICATION of at least one representative test specimen from at least every tenth batch of each type of wet radioactive waste filter sludges, spend resins, evaporator bottoms, boric acid solutions, and sodium sulfate solutions).  
RADIOACTIVE EFFLUENTS EXPLOSIVE GAS Ml XTURE LIMITING CONDITION FOR OPERATION 3.11.2.5 The concentration of oxygen in the waste gas holdup systefll shall be limited to less than or equal to 2% by volune whenever the hydrogen concentration exceeds 4% by vo 1ume.
: a. If any test specimen fails to verify SOLIDIFICATION, the SOLIDIFICATION of the batch under test shall be suspended until such tirre as additional test specimens can be obtained, alternative SOLIDIFICATION parameters can be deterr.ii ned in accordance with the PROCESS CONTROL PROGRAM, and a subsequent test verifies SOLIDIFICATION.
APPLICABILITY:   At all tir.ies.
SOLIDIFICATION of the batch may then be resumed using the alternative SOLIDIFCATION parameters determined by the PROCESS CONTROL PROGRAM. b. If the initial test specimen from a batch of waste fails to verify SOLIDIFICATION, the PROCESS CONTROL PROGRAM shall provide for the collection and testing of representative test specimens from each *consecutive batch of the same type of wet waste until at least three consecutive initial test specimens deironstrate SOLIDIFICATION.
ACTION:
The PROCESS CONTROL PROGRAM shall be modified as requirec1, as provided in Specification 6.13, to assure SOLIDIFICATION of subsequent batches of waste. SALEM -UNIT 1 3/4 11-17 RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.2 LAND USE CENSUS LIMITING CONDITION FOR OPERATION  
: a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volune but less than or equal 4% by volume, reduce the oxygen concentration to the above limits within 48 hours.
-------3.12.2. A land use census shall be conducted and shall identify within a distance of 8 km (5 miles) the location in each of the 16 meteorological sectors of the nearest milk the nearest residence and the nearest garden* of greater than 50 m2 (500 ft ) producing broad leaf vegetation. (For elevated releases as defined in Regulatory Guide 1.111, Revision 1, July 1977, the land use census shall also identify within a distance of 5 km (3 miles) the locations in each of the 16 meteorological  
: b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volune and the hydrogen concentration greater than 2% by volume, ifllmediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to 1ess than or equal to 2% by volume without delay.
*sectors of all milk animals and all gardens of greater than 50 m2 producing broad leaf vegetation.  
: c. The provision of Specifications 3.0.3 and 3.0.4 are not applicablP..
-APPLICABILITY:
SURVEILLANCE REQJIREMENTS
At all times. ACTION: a. With a land use census identifying a location(s) that yields a calculated dose or dose commitment greater than the values currently being calculated in Specification 4.11.2.3, in lieu of a Licensee Event Report, identify the new location(s) in the next Semiannual Radioactive*
-~---=---~-------------------------------------------------------------~--------
Effluent Release Report, pursuant to Specification 6.9.1.11.  
4.11.2.5 The concentrations of oxygen in the waste gas holdup system shall be determined to be within the above lifllits by continuously monitoring the waste gases in the waste gas holdup system with the oxygen monitor required OPERABLE by Table 3.3-13.
: b. With a land use census identifying a location(s) that yields a calculated dose or dose commitment (via) the sane exposure pathway) 20 percent greater than at a locaticrn from which samples are currently being obtained in accordance with Specification 3.12.1, add the new location(s) to the radiological environmental rronitoring program within 30 days. The sampling location(s), excluding the control station location, having the lowest calculated dose or dose commitment(s) (via the saJTe exposure pathway) may be deleted from this monitoring program after (October 31) of the year in which this land use census was conducted.
SALEM  ~ UNIT 1                          3/4 11-15
In lieu of a Licensee Event Report and pursuant to Specification 6.9.1.11, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report and also include in the report a revised figure(s) and table for the ODCM reflecting the new location(s).
 
* c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.  
SOLID RADIOACTIVE WASTE LIMITING CONDITION FOR OPERATION 3.11.3. The solid radwaste system shall be used in accordance with a PROCESS CONTROL PROGRAM to process wet radioactive waste to meet shipping and burial ground requirements.
*Broad leaf vegetation sampling of at least three. different kinds of vegetation may be performed at the SITE BOUNDARY in each of two different direction sectors with the highest predicted D/Q in lieu of the garden census. Specifications for broadleaf vegetation sampling in Table 3.12-1.4c shall be followedp including analysis of control samples. SALEM -UNIT 1 3/4 12-11 RADIOACTIVE EFFLUENTS BASES 3/4.11.2.5 EXPLOSIVE GAS MIXTURE This specification is provided*
APPLICABILITY:    At all times.
to ensure that the concentration of potentially explosive gas mixtures contained in the waste gas holdup system is maintained  
ACTION:
*below the flammability limits of hydrogen and oxygen. Maintaining the concentration of hydrogen and oxygen below their flammab.ility limits provides assurance that the releases of radioactive materials will be controlled in conformance with the of General Design Criterion 60 of Appendix A to 10 CFR Part 50. 3/4.11.2.6 GAS STORAGE TANKS The tanks included in this specification are those tanks for which the quantity of radioactivity contained is not limited directly or indirectly by another Technical Specification to a quantity that is less than the quantity which provides assurance that in the event of a uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem in an event of 2 hours. Restricting the-quantity of radioactivity contained in each gas storage tank provides assurance that in the event of an uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem. This is consistent with Branch Technical Position ETSB 11-5 in NUREG-0800, July 1981. 3/4.11.3 SOLID RADIOACTIVE WASTE This specification implements the requirements of 10 CFR Part 50.36a and General Design Criterion 60 of Appendix A to 10 CFR Part 50. The process parameters included in establishing the PROCESS CONTROL PROGRAM may include, but are not limited to waste type, waste pH, waste/liquid/solidification agent/catalyst ratios, waste oil content, waste principal chemical constituents, mixing and curing times. SALEM -UNIT 1 B 3/4
: a. With the provisions of the PROCESS CONTROL PROGRAM not satisfied, suspend shipments of defectively processed or defectively packaged solid radioactive wastes from the site.
*.e DESIGN FEATURES DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained for a maximum internal pressure of 47 psig and an air temperature of 271°Fo 5.3 REACTOR CORE FUEL ASSEMBLIES 5.3.1 The reactor core shall contain 193 fuel assemblies*
: b. The provisions of Specifications 3.0.3 and 3.0.4, and 6.9.1.9.b are not applicable.
with each fuel assembly containing 264 fuel rods clarl with Zircaloy-4  
SURVEILLANCE RECUIREMENTS 4.11.3. The PROCESS CONTROL PROGRAM shall be used to verify the SOLIDIFICATION of at least one representative test specimen from at least every tenth batch of each type of wet radioactive waste (e.g.~ filter sludges, spend resins, evaporator bottoms, boric acid solutions, and sodium sulfate solutions).
*. Each fuel rod shall have a nominal active fuel length of 143.7 inches and* contain a maximum total weight of 1766 grams uranium. The initial core loading shall have a maxil!'lUm enrichment of 3.35 weight percent U-235. Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichnEnt l -of 4.05 weight percent U-235. CONTROL ROD ASSEMBLIES 5c3.2 The reactor core shall contain 53 full length and no part length control rod assemblies.
: a. If any test specimen fails to verify SOLIDIFICATION, the SOLIDIFICATION of the batch under test shall be suspended until such tirre as additional test specimens can be obtained, alternative SOLIDIFICATION parameters can be deterr.ii ned in accordance with the PROCESS CONTROL PROGRAM, and a subsequent test verifies SOLIDIFICATION. SOLIDIFICATION of the batch may then be resumed using the alternative SOLIDIFCATION parameters determined by the PROCESS CONTROL PROGRAM.
The full length control rod assemblies shall contain a nominal 142 inches of absorber material.
: b. If the initial test specimen from a batch of waste fails to verify SOLIDIFICATION, the PROCESS CONTROL PROGRAM shall provide for the collection and testing of representative test specimens from each
The nominal values of absorber material shall be 80 percent 15 percent indium and cadmium. All control rods shall be clad with stainless steel tubing. 5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The reactor coolant system is designed and shall be maintained:
        *consecutive batch of the same type of wet waste until at least three consecutive initial test specimens deironstrate SOLIDIFICATION. The PROCESS CONTROL PROGRAM shall be modified as requirec1, as provided in Specification 6.13, to assure SOLIDIFICATION of subsequent batches of waste.
SALEM -UNIT 1 ADMINISTRATIVE CONTROLS Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plant, 11 Revision 1, June 1974, with data summarized on a quarterly basis following the format of Appendix B thereof. The Radioactive Effluent Release Report to be submitted within 60 days after January 1 of each year shall include an annual summary of hourly meteorological data collected over the previous year. This annual summary may be either in the form of an hour-by-hour listing of magnetic tape of wind speed, winrl direction, atrrospheric stability, and precipitation (if measured), or in the form of joint frequency distributions of wind speed, wind direction, and attrospheric stability.***
SALEM - UNIT 1                             3/4 11-17
This same* report shall include an assessment of the radiation doses due to the radioactive liquid and gaseous effluents released from the unit or station during the previous calendar year. This same report shall also include an assessment of the radiation doses from radioacti\fe liquid and gaseous effluents to MEMBERS OF THE PUBLIC due to their activities inside the SITE BOUNDARY (Figure 5.1-3) during the report period. All assumptions used in making these assessments (i.e., specific activity, exposure time and location) shall be included in these reports. The meteorological conditions concurrent with the time of release of radioactive materials in gaseous effluents (as determined by sampling frequency and measurement) shall be used for the gaseous pathway doses. The assessment of radiation doses shall be performed in accordance with the OFFSITE DOSE CALCULATION MANUAL. The Radioactive Effluent Release Report to be submitted 60 days after January 1 of each year shall include an asses.sment of radiation doses to the likely most exposed MEMBER OF THE PUBLIC from reactor releases and other nearby uranium fuel cycle sources (including doses from primary effluent pathways and direct radiation) for the previous calendar year to show conformance with 40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operation.
 
Acceptable methods for calculating the dose contribution from liquid and. gaseous effluents are given in Regulatory Guide 1.109, Rev. 1, October 1977. The Radioactive Effluent Release Reports shall include the following information for each class of solid waste (as defined by 10 CRF Part 61) shipped offsite during the report period: a. Container volume, b. Total curie quantity (specify whether determined by fll:!asurement or estimate),
RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.2 LAND USE CENSUS LIMITING CONDITION FOR OPERATION 3.12.2. A land use census shall be conducted and shall identify within a distance of 8 km (5 miles) the location in each of the 16 meteorological sectors of the nearest milk animal~ the nearest residence and the nearest garden* of greater than 50 m2 (500 ft ) producing broad leaf vegetation. (For elevated releases as defined in Regulatory Guide 1.111, Revision 1, July 1977, the land use census shall also identify within a distance of 5 km (3 miles) the locations in each of the 16 meteorological *sectors of all milk animals and all gardens of greater than 50 m2 producing broad leaf vegetation.               -
* c. Principal radionuclides (specify whether determined by measurement or estimate), d. Source of waste and processing employed (e.g., dewatered spent resin, compacted dry waste, evaporator bottoms), ***In lieu of submission with the first half year Radioactive Effluent Release Report, the licensee has the option of retaining this summary of required *meteorological data on site in a file that shall be to the NRC upon request. SALEM = UNIT 1 6-20 DEFINITIONS CONTAINMENT INTEGRITY
APPLICABILITY:   At all times.
ACTION:
: a. With a land use census identifying a location(s) that yields a calculated dose or dose commitment greater than the values currently being calculated in Specification 4.11.2.3, in lieu of a Licensee Event Report, identify the new location(s) in the next Semiannual Radioactive*
Effluent Release Report, pursuant to Specification 6.9.1.11.
: b. With a land use census identifying a location(s) that yields a calculated dose or dose commitment (via) the sane exposure pathway) 20 percent greater than at a locaticrn from which samples are currently being obtained in accordance with Specification 3.12.1, add the new location(s) to the radiological environmental rronitoring program within 30 days. The sampling location(s), excluding the control station location, having the lowest calculated dose or dose commitment(s) (via the saJTe exposure pathway) may be deleted from this monitoring program after (October 31) of the year in which this land use census was conducted. In lieu of a Licensee Event Report and pursuant to Specification 6.9.1.11, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report and also include in the report a revised figure(s) and table for the ODCM reflecting the new location(s).           *
: c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
*Broad leaf vegetation sampling of at least three. different kinds of vegetation may be performed at the SITE BOUNDARY in each of two different direction sectors with the highest predicted D/Q in lieu of the garden census. Specifications for broadleaf vegetation sampling in Table 3.12-1.4c shall be followedp including analysis of control samples.
SALEM - UNIT 1                         3/4 12-11
 
RADIOACTIVE EFFLUENTS BASES 3/4.11.2.5 EXPLOSIVE GAS MIXTURE This specification is provided* to ensure that the concentration of potentially explosive gas mixtures contained in the waste gas holdup system is maintained
*below the flammability limits of hydrogen and oxygen. Maintaining the concentration of hydrogen and oxygen below their flammab.ility limits provides assurance that the releases of radioactive materials will be controlled in conformance with the require~nts of General Design Criterion 60 of Appendix A to 10 CFR Part 50.
3/4.11.2.6 GAS STORAGE TANKS The tanks included in this specification are those tanks for which the quantity of radioactivity contained is not limited directly or indirectly by another Technical Specification to a quantity that is less than the quantity which provides assurance that in the event of a uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem in an event of 2 hours.
Restricting the-quantity of radioactivity contained in each gas storage tank provides assurance that in the event of an uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem. This is consistent with Branch Technical Position ETSB 11-5 in NUREG-0800, July 1981.
3/4.11.3     SOLID RADIOACTIVE WASTE This specification implements the requirements of 10 CFR Part 50.36a and General Design Criterion 60 of Appendix A to 10 CFR Part 50. The process parameters included in establishing the PROCESS CONTROL PROGRAM may include, but are not limited to waste type, waste pH, waste/liquid/solidification agent/catalyst ratios, waste oil content, waste principal chemical constituents, mixing and curing times.
SALEM - UNIT 1                       B 3/4 11~6
 
                  *.e DESIGN FEATURES
~-~~---------------------------------------------------~------------------------
DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained for a maximum internal pressure of 47 psig and an air temperature of 271°Fo 5.3  REACTOR CORE FUEL ASSEMBLIES 5.3.1 The reactor core shall contain 193 fuel assemblies* with each fuel assembly containing 264 fuel rods clarl with Zircaloy-4 *. Each fuel rod shall have a nominal active fuel length of 143.7 inches and* contain a maximum total weight of 1766 grams uranium. The initial core loading shall have a maxil!'lUm enrichment of 3.35 weight percent U-235. Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichnEnt  l -
of 4.05 weight percent U-235.
CONTROL ROD ASSEMBLIES 5c3.2 The reactor core shall contain 53 full length and no part length control rod assemblies. The full length control rod assemblies shall contain a nominal 142 inches of absorber material. The nominal values of absorber material shall be 80 percent ~ilver, 15 percent indium and ~percent cadmium. All control rods shall be clad with stainless steel tubing.
5.4   REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.The reactor coolant system is designed and shall be maintained:
SALEM - UNIT 1
 
ADMINISTRATIVE CONTROLS Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plant, 11 Revision 1, June 1974, with data summarized on a quarterly basis following the format of Appendix B thereof.
The Radioactive Effluent Release Report to be submitted within 60 days after January 1 of each year shall include an annual summary of hourly meteorological data collected over the previous year. This annual summary may be either in the form of an hour-by-hour listing of magnetic tape of wind speed, winrl direction, atrrospheric stability, and precipitation (if measured), or in the form of joint frequency distributions of wind speed, wind direction, and attrospheric stability.*** This same* report shall include an assessment of the radiation doses due to the radioactive liquid and gaseous effluents released from the unit or station during the previous calendar year. This same report shall also include an assessment of the radiation doses from radioacti\fe liquid and gaseous effluents to MEMBERS OF THE PUBLIC due to their activities inside the SITE BOUNDARY (Figure 5.1-3) during the report period. All assumptions used in making these assessments (i.e., specific activity, exposure time and location) shall be included in these reports. The meteorological conditions concurrent with the time of release of radioactive materials in gaseous effluents (as determined by sampling frequency and measurement) shall be used for determinin~
the gaseous pathway doses. The assessment of radiation doses shall be performed in accordance with the OFFSITE DOSE CALCULATION MANUAL.
The Radioactive Effluent Release Report to be submitted 60 days after January 1 of each year shall .al~o include an asses.sment of radiation doses to the likely most exposed MEMBER OF THE PUBLIC from reactor releases and other nearby uranium fuel cycle sources (including doses from primary effluent pathways and direct radiation) for the previous calendar year to show conformance with 40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operation.
Acceptable methods for calculating the dose contribution from liquid and. gaseous effluents are given in Regulatory Guide 1.109, Rev. 1, October 1977.
The Radioactive Effluent Release Reports shall include the following information for each class of solid waste (as defined by 10 CRF Part 61) shipped offsite during the report period:
: a. Container volume,
: b. Total curie quantity (specify whether determined by fll:!asurement or estimate), *
: c. Principal radionuclides (specify whether determined by measurement or estimate),
: d. Source of waste and processing employed (e.g., dewatered spent resin, compacted dry waste, evaporator bottoms),
***In lieu of submission with the first half year Radioactive Effluent Release Report, the licensee has the option of retaining this summary of required
  *meteorological data on site in a file that shall be provide~ to the NRC upon request.
SALEM = UNIT 1                         6-20


===1.7 CONTAINMENT===
DEFINITIONS
-------------------------------------------------------------------~------------
CONTAINMENT INTEGRITY 1.7   CONTAINMENT INTEGRITY shall exist when:
1.7.1 All penetrations required to be closed during accident conditions are either:
: a. Capable of being closed by an OPERABLE containment autornatic isolation valve system, or
: b. Closed by manual valves, blind flanges, or deactivated automatic valves secured in their clo-sed positionsg except as provided in Table 3.6-1 of Specification 3.6.3.1.
1.7.2 All equipment hatches are closed and sealed, 1.7.3 Each air lock is OPERABLE pursuant to Specification 3.6.1.3, 1.7.4 The containment leakage rates are within the limits of Specification 3.6.1.2, and 1.7.5 The sealing Mechanism associated with each penetration (e.g.,
welds, bellows or 0-rings) is OPERABLE.
CONTROLLED LEAKAGE 1.8 CONTROLLED LEAKAGE shall be that seal water flow from the reactor coolant purnp seals.
CORE ALTERATION 1.9 CORE ALTERATION shall be the rmvement or manipulation of any component within the reactor pressure vessel with the vessel head reimved and fuel in the vessel. Suspension of CORE ALTERATION shall not preclude coMpletion of nnveirent of a component to a safe conservative position.
DOSE EQJIVALENT I-131 1.10 DOSE EQJIVALENT I-131 shall be that concentration of I-131 (microcuries per gram) which alone would produce* the same thyroid dose as the* quantity and*
isotopic mixture of I-131, I-132g 1~1339 I-134, and I-135 actually *present. The SALEM - UNIT 2


INTEGRITY shall exist when: 1.7.1 All penetrations required to be closed during accident conditions are either: a. Capable of being closed by an OPERABLE containment autornatic isolation valve system, or b. Closed by manual valves, blind flanges, or deactivated automatic valves secured in their clo-sed positionsg except as provided in Table 3.6-1 of Specification 3.6.3.1. 1.7.2 All equipment hatches are closed and sealed, 1.7.3 Each air lock is OPERABLE pursuant to Specification 3.6.1.3, 1.7.4 The containment leakage rates are within the limits of Specification 3.6.1.2, and 1.7.5 The sealing Mechanism associated with each penetration (e.g., welds, bellows or 0-rings) is OPERABLE.
                            *.e TABLE 4.3-1 (Continued)
CONTROLLED LEAKAGE 1.8 CONTROLLED LEAKAGE shall be that seal water flow from the reactor coolant purnp seals. CORE ALTERATION 1.9 CORE ALTERATION shall be the rmvement or manipulation of any component within the reactor pressure vessel with the vessel head reimved and fuel in the vessel. Suspension of CORE ALTERATION shall not preclude coMpletion of nnveirent of a component to a safe conservative position.
NOTATION
DOSE EQJIVALENT I-131 1.10 DOSE EQJIVALENT I-131 shall be that concentration of I-131 (microcuries per gram) which alone would produce* the same thyroid dose as the* quantity and* isotopic mixture of I-131, I-132g I-134, and I-135 actually *present.
*     - With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.
The SALEM -UNIT 2 
(1)   -     If not performed in previous 7 days.
*.e TABLE 4.3-1 (Continued)
(2)   - Heat balance only, above lSi_of RATED THERMAL POWER.
NOTATION * -With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.  
(3) - Compare incore to excore axial offset above         15~ of RATED THERMAL ~OWER.
(1) -If not performed in previous 7 days. (2) -Heat balance only, above lSi_of RATED THERMAL POWER. (3) -Compare incore to excore axial offset above of RATED THERMAL Recalibrate if absolute 3 percent. (4) -Manual SSPS functional input check every 18 months. (5) -Each train or logic channel shall be tested at least 62 days on a STAGGERED TEST BASIS. (6) -Neutron detectors may be excluded from CHANNEL CALIBRATION.  
Recalibrate if absolute   difference~  3 percent.
(7) = Below P-6 (Block of SourceRang.e Reactor Trip) setpoint.  
(4)   - Manual SSPS functional input check every 18 months.
(8) Deleted (9) If not performed in the previous 24 hours, conduct a functional test of the Manual Reactor Trip Switches (using voltmeters).  
(5)   - Each train or logic channel shall be tested at least ev~ry 62 days on a STAGGERED TEST BASIS.
(10) -If not performed in the previous 24 hours, conduct a functional test of:
(6)   -     Neutron detectors may be excluded from CHANNEL CALIBRATION.
(7)   =   Below P-6 (Block of SourceRang.e Reactor Trip) setpoint.
(8)       Deleted (9)         If not performed in the previous 24 hours, conduct a functional test of the Manual Reactor Trip Switches (using voltmeters).
(10) -     If not performed in the previous 24 hours, conduct a functional test of:
* Reactor Trip Breaker UV Trip (via SSPS)
* Reactor Trip Breaker UV Trip (via SSPS)
* Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)  
* Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)
(11) -Perform a functional test of:
(11) - Perform a functional test of:
* Reactor Trip Breaker UV Trip (via SSPS) and conduct response time testing (event recorders)
* Reactor Trip Breaker UV Trip (via SSPS) and conduct response time testing of~UV/Breakers (event recorders)
* Reactor Shunt Trip (via manual pushbutton controls)  
* Reactor Tr~~:~~reaker Shunt Trip (via manual pushbutton controls)
* (12) = Perform periodic maintenance on Reactor Trip Breakers and Reactor Trip Bypass Breakers semiannually as follows: a. response time testing, (3 times) (visicorder) trend data b. trip bar lift force measurements  
* (12)   =   Perform periodic maintenance on Reactor Trip Breakers and Reactor Trip Bypass Breakers semiannually as follows:
: c. UV output force measurement  
: a. response time testing, (3 times) (visicorder) trend data
: d. dropout voltage check e. servicing/lubrication/adjustments (See Table 3.3=1  
: b. trip bar lift force measurements
###) f. repeat testing steps (a-d) following any necessary actions at step ( e) SALEM = UNIT 2 3/4 3-13 N w I. VI .g:.. ' I *:* TABLE 3.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION INSTRUMENT  
: c. UV output force measurement
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING AUTOMATIC TERMINATION OF RELEASE a. Liquid Radwaste Effluent Line (2-Rl8) b. Steam Generator Slowdown Line (2-Rl9 A, B. c9 and D) 2. GROSS RADIOACTIVITY MONITORS NOT PROVIDING ,AUTOMATIC TERMINATION OF RELEASE a. Containment Fan Coolers -Service Water Line (2-Rl3 A, B. C) Discharge  
: d. dropout voltage check
: b. Chemical Waste Basin Line (R37) 3. FLOW RATE MEASUREMENT DEVICES a. Liquid Radwaste Effluent Line b. Steam Generator Slowdown Line 4. TANK LEVEL INDICATING DEVICES a. Temporary Outside Storage Tanks as Required . 1:. I, ; I ! I , I, I ]' I,** MINIMUM CHANNELS OPERABLE 1 4 3 1 l 1 ACTION 26 27 28 28 29 29 30 
: e. servicing/lubrication/adjustments (See Table 3.3=1 No~ation ###)
: I : I !1, TABLE 4.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE ""' 2. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM 'f BUT NOT PROVIDING .AUTOMATIC TERMINATION OF U1 RELEASE . -...) a. Containrrent Fan Coolers -Service Water Line {2-Rl3 A, B, C} Discharge  
: f. repeat testing steps (a-d) following any necessary actions at step (e)
: b. Chemical Waste Basin Line {R37) 3. FLOW RATE MEASUREMENT DEVICES a. Liquid Radwaste Effluent Line I ' b. Steam Generator Blowdown Line 4. TANK LEVEL INDICATING DEVICES**  
SALEM   =   UNIT 2                         3/4 3-13
: a. Temporary Outside Storage Tanks as Required \ ,, i 'I ' ' I I D D D{4) 0(4) D* M M N.A. N.A. N.A. R(3) R(3) R R R Q(2) 0(2) N.A. N.A Q 
 
*.e TABLE 4.3-12 (Continued)
                          '   I TABLE 3.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION N
TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also derronstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:
MINIMUM CHANNELS INSTRUMENT                                                                       OPERABLE  ACTION
* 1. Instrument indicates measured levels at or above the alarm/trip setpoi nt. 2. Circuit failure. (Loss o*f Power) (Automatic Isolation only) 3o Instrument indicates a downscale failure. (2) The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the following conditions exist: *
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING AUTOMATIC TERMINATION OF RELEASE
* 1. Instrument indicates measured levels at or above the alarm/trip set poi lit o 2. Circuit failure. (Loss of Power) (Indication only) 3. Instrument indicates a downscale failure. 4. Instrument controls not set in operate r.nde. (3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or rrore NBS standards.  
: a. Liquid Radwaste Effluent Line (2-Rl8)                                     1        26
(4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be made at least once per 24 hours on days on which continuous, periodic, or batch releases are made.
: b. Steam Generator Slowdown Line                                             4        27 (2-Rl9 A, B. c9 and D)
* During liquid additions to the tank. ** If tank level indication is not provided, vertification will be do*ne by visual inspection.  
: 2. GROSS RADIOACTIVITY MONITORS NOT PROVIDING ,AUTOMATIC
# The Rl8 channel is an off-line channel which requires periodic decontamination.
~          TERMINATION OF RELEASE w
Any count rate indication above lO:iOOO cpm constitutes a CHANNEL CHECK for *compliance.purposes.
I.
SALEM UNIT 2 3/4 3-58 TABLE 4.3-13 (Continued)
VI          a. Containment Fan Coolers - Service Water Line                               3        28
TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also dennnstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist: 1. Instrument indicates measured levels at or above the alarm/trip setpoi nt G 2. Circuit failure. (Loss of Power) (Automatic Isolation only) 3. Instrument indicates a downscale failure. (2) The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the following conditions exist: 1. Instrument indicates measured levels at or above the alarm/trip set point. 2. Circuit failure. (Loss of Power) (Indication only) 3. Instrurrent indicates a downscale failure. 4. Instrument controls not set in operate 1TOde. (3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable suppliers.
.g:..
The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or rrore NBS standards.  
(2-Rl3 A, B. C) Discharge
(4) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal: 1. One volume percent oxygen, balance nitrogen, and 2. Four volume percent balance nitrogen.
: b. Chemical Waste Basin Line (R37)                                           1        28
* At all times ** During waste gas holdup system operation.
: 3. FLOW RATE MEASUREMENT DEVICES
SALEM -UNIT 2
: a. Liquid Radwaste Effluent Line                                             l        29
*.e TABLE 4.11-1 (Continued)
: b. Steam Generator Slowdown Line                                                     29
TABLE NOTATION b. A batch *release is the discharge of liquid wastes of a discrete wluJTJe. Prior to sampling for analyses 9 each batch shall be isolated, and then thoroughly mixed to assure representative sampling.  
: 4. TANK LEVEL INDICATING DEVICES
: c. The principal emitters for which* the LLD specification applies exclusively are the following*radionuclides:
: a. Temporary Outside Storage Tanks as Required                               1        30
Mn-54i Fe-59, Co-58, Co-60, Zn=65, Mo-99, Cs-134, Cs-137, Ce-141, and Ce-144*. This list does not mean I
          . 1:.
I,             ; I ! I
            , I,           I     ]'
I,**
 
:     I
: I
                                    !1, TABLE 4.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE RE~IREMENTS
~
""'   2. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM
'f       BUT NOT PROVIDING .AUTOMATIC TERMINATION OF U1
-...)
RELEASE            .
: a. Containrrent Fan Coolers - Service Water Line       D        M            R(3)        Q(2)
{2-Rl3 A, B, C} Discharge
: b. Chemical Waste Basin Line {R37)                       D        M            R(3)        0(2)
: 3. FLOW RATE MEASUREMENT DEVICES
: a. Liquid Radwaste Effluent Line                       D{4)    N.A.          R            N.A.
I '
: b. Steam Generator Blowdown Line                       0(4)    N.A.          R            N.A
: 4. TANK LEVEL INDICATING DEVICES**
: a. Temporary Outside Storage Tanks as Required         D*      N.A.          R            Q
                                \   ,,   i
                                    'I I I
 
                        *.e TABLE 4.3-12 (Continued)
TABLE NOTATION (1)   The CHANNEL FUNCTIONAL TEST shall also derronstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:                               *
: 1. Instrument indicates measured levels at or above the alarm/trip setpoi nt.
: 2. Circuit failure.   (Loss o*f Power) (Automatic Isolation only) 3o   Instrument indicates a downscale failure.
(2)   The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the following conditions exist:
  *
* 1. Instrument indicates measured levels at or above the alarm/trip set poi lit o
: 2. Circuit failure.   (Loss of Power) (Indication only)
: 3. Instrument indicates a downscale failure.
: 4. Instrument controls not set in operate r.nde.
(3)   The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable supplie~s. The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or rrore NBS standards.
(4)   CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be made at least once per 24 hours on days on which continuous, periodic, or batch releases are made.
* During liquid additions to the tank.
** If tank level indication is not provided, vertification will     be do*ne by visual inspection.
  # The Rl8 channel is an off-line channel which requires periodic decontamination. Any count rate indication above lO:iOOO cpm constitutes a CHANNEL CHECK for *compliance.purposes.
SALEM UNIT 2                         3/4 3-58
 
TABLE 4.3-13 (Continued)
TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also dennnstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:
: 1. Instrument indicates measured levels at or above the alarm/trip setpoi nt G
: 2. Circuit failure.     (Loss of Power) (Automatic Isolation only)
: 3. Instrument indicates a downscale failure.
(2) The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the following conditions exist:
: 1. Instrument indicates measured levels at or above the alarm/trip set point.
: 2. Circuit failure.     (Loss of Power) (Indication only)
: 3. Instrurrent indicates a downscale failure.
: 4. Instrument controls not set in operate 1TOde.
(3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable suppliers. The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or rrore NBS standards.
(4) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:
: 1. One volume percent oxygen, balance nitrogen, and
: 2. Four volume percent oxygen~ balance nitrogen.
* At all times
** During waste gas holdup system operation.
SALEM - UNIT 2
 
                  *.e TABLE 4.11-1 (Continued)
TABLE NOTATION
: b. A batch *release is the discharge of liquid wastes of a discrete wluJTJe.
Prior to sampling for analyses 9 each batch shall be isolated, and then thoroughly mixed to assure representative sampling.
: c. The principal ga~rna emitters for which* the LLD specification applies exclusively are the following*radionuclides: Mn-54i Fe-59, Co-58, Co-60, Zn=65, Mo-99, Cs-134, Cs-137, Ce-141, and Ce-144*. This list does not mean     I
* that only these nucl ides are to be detected and reported.
* that only these nucl ides are to be detected and reported.
* Other peaks that are measurable and identifiablei together with the above nuclides, shall also be identified and reported.  
* Other peaks that are measurable and identifiablei together with the above nuclides, shall also be identified and reported.
: d. A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of.liquid waste discharged and in which the method of sampling employed results in a specimen that is representative of the liquids released.  
: d. A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of.liquid waste discharged and in which the method of sampling employed results in a specimen that is representative of the liquids released.
: e. A continuous release is the discharge of liquid wastes of a nondiscrete volume, e.g., from a volume of a system that has an input flow during the continuous release. *The LLD for Ce=l44 shall be 2xl0-6 uCi/ml. SALEM -UN IT 2 3/4 11=4 . I 
: e. A continuous release is the discharge of liquid wastes of a nondiscrete volume, e.g., from a volume of a system that has an input flow during the continuous release.
.... *.e TABLE 4.11-2 (Continued)
*The LLD for Ce=l44 shall be 2xl0-6 uCi/ml.                                       .I~
TABLE NOTATION a. The LLD is defined in Table 4.11.1. b. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, Xe-138 for gaseous emissions and Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144* for particulate emissions.
SALEM - UN IT 2                       3/4 11=4
This list does not mean that only these nuclides are to be detected and reported.
 
Other peaks that are measurable and identifiable, together with the above nucl ides, shall al so be identified and reported.  
....                       *.e TABLE 4.11-2 (Continued)
: c. Sampling and analysis shall also be performed following shutdown, startup or a THERMAL PQ..WER change(exceeding 15 percent of RATED THERMAL POWER within one hour) unless: 1. Analysis shows that the DOSE EQJIVALENT I-131 concentrations in the primary coolant has not increased JT1)re than a factor of three. 2. The noble gas activity rmnitor shows that effluent activity has not exceeded the rronitor 11 warni ng 11 setpo int. Tritium grab samples shall be taken at least once per 24 hours when the refueling canal is flooded. e. Tritium grab samples shall be taken at least once per 7 days from the ventilation exhaust from the spent fuel pool area whenever spent fuel is in the spent fuel poo 1. f. The ratio of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with Specifications 3.11.2.1, 3.11.2.2 and 3.11.2.3.  
TABLE NOTATION
*The LLD for Ce-144 shall be 2xlo-6 uCi/ml. SALEM = UNIT 2 3/4 11-10
: a. The LLD is defined in Table 4.11.1.
*.e TABLE 4.11-2 (Continued)
: b. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, Xe-138 for gaseous emissions and Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144* for particulate emissions. This list does not mean that only these nuclides are to be detected and reported. Other peaks that are measurable and identifiable, together with the above nucl ides, shall al so be identified and reported.
TABLE NOTATION g. Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours after changing (or after rerro val from sampler).
: c. Sampling and analysis shall also be performed following shutdown, startup or a THERMAL PQ..WER change(exceeding 15 percent of RATED THERMAL POWER within one hour) unless:
Sampling shall also be performed at least once per 24 hours for at least 7 days following each shutdown, startup or POWER change texceedi ng 15 percent of RATED THERMAL POWER in one hourJ and analyses shall be completed 1-* within 48 hours of changing.
: 1. Analysis shows that the DOSE EQJIVALENT I-131 concentrations in the primary coolant has not increased JT1)re than a factor of three.
When samples collected for 24 hours are analyzed, the corresponding LLDs may be increased*
: 2. The noble gas activity rmnitor shows that effluent activity has not exceeded the rronitor 11warni ng 11 setpo int.
by a factor of 10. This requirement does not apply if {l) analysis shows that the DOSE EQJIVALENT concentration in the primary coolant has not increased rnre than a I factor of 3; and (2) the noble gas nnnitor shows that effluent activity has -not exceeded the rronitor 11 warni ng 11 setpoi nt. SALEM -UN IT 2 3/4 11=11
d~  Tritium grab samples shall be taken at least once per 24 hours when the refueling canal is flooded.
*.e RADIOACTIVE EFFLUENTS EXPLOSIVE GAS MIXTURE LIMITING CONDITION FOR OPERATION . --
: e. Tritium grab samples shall be taken at least once per 7 days from the ventilation exhaust from the spent fuel pool area whenever spent fuel is in the spent fuel poo 1.
3all.2.5 The concentration of oxygen in the waste gas holdup systelTl shall be li111ited to less than or equal to 2% by voluire whenever the hydrogen concentration exceeds 4% by volume. APPLICABILITY:
: f. The ratio of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with Specifications 3.11.2.1, 3.11.2.2 and 3.11.2.3.
At all times. ACTION: a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volume but less than or equal 4% by volume, reduce the oxygen concentration to the above limits within 48 hours. b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volume and the hydrogen concentration greater than 2% by volume, immediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to less than or equal to 2% by volume without delay. , c. The provision of Specifications 3.0.3 and 3.0.4 are not applicable.
    *The LLD for Ce-144 shall be 2xlo-6 uCi/ml.
_SURVEILLANCE RE QJIREMENTS 4.11.2.5 The concentrations of oxygen in the waste gas holdup system shall be deter111ined to be within the above limits by continuously rmnitoring the waste gases in the waste gas holdup system with the oxygen rronitor required OPERABLE by Table 3.3-13. SALEM = UN IT 2 3/4 11-15 
SALEM = UNIT 2                           3/4 11-10
*1 RADIOACTIVE EFFLUENTS BASES 3/4.11.2.5 EXPLOSIVE GAS MIXTURE This specification is provided to ensure that the concentration of potentially explosive gas mixtures contained in the waste gas holdup system is maintained below the flammability limits of hydrogen and oxygen. Maintaining the concentration of hydrogen and oxygen below their flammability limits provides assurance that the releases of radioactive materials will be controlled in conformance with the requirements of General Design Criterion 60 of Appendix A* to 10 CFR Part 500 3/4.11.2.6 GAS STORAGE TANKS The tanks included in this specification are those tanks for which the quantity of radioactivity contained is not limited directly or indirectly by another Technical Specification to a quantity that is less than the quantity which .1. -provides assurance that in.the event of a uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem in an event of 2 hours. Restricting the quantity of radioactivity contained in each gas storage tank provides assurance that in the event of an uncontrolled release of the tank's . contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem. This is conistent with Branch Technical Position ETSB 11-5 in NUREG-0800, July 1981. 3/4.11.3 SOLID RADIOACTIVE WASTE This specification implements the requirements of 10 CFR Part 50.36a and General Design Criterion 60 of Appendix A to 10 CFR Part 50. The process parameters.
 
included in establishing the PROCESS CONTROL PROGRAM may include, but are not limited to waste type, waste pH, waste/liquid/solidification agent/catalyst ratios, waste oil content, waste principal chemical constituents, mixing and curing times. SALEM -UN IT 2 B 3/4 11-6 RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.2 LAND USE CENSUS LIMITING CONDITION FOR OPERATION
                  *.e TABLE 4.11-2 (Continued)
----------------------------------------------------------------------------------
TABLE NOTATION
3.12.2. A land use census shall be conducted and shall identify within a distance of 8 km (5 miles) the location in each of the 16 meteorological sectors of the nearest milk the nearest residence and the nearest garden* of greater than 50 m2 {500 ft ) producing broad leaf vegetation. (For elevated releases as defined in Regulatory Guide 1.111, Revision 1, July 1977, the land use census shall also identify within a distance of 5 km (3 miles) the locations . in each of the 16 meteorological sectors of all milk animals and all gardens of greater than 50 m2 producing broad leaf vegetation.  
: g. Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours after changing (or after rerro val from sampler).
-APPLICABILITY:
Sampling shall also be performed at least once per 24 hours for at least 7 days following each shutdown, startup or ~~ERMAL POWER change texceedi ng 15 percent of RATED THERMAL POWER in one hourJ and analyses shall be completed 1-
At all times. ACTION: a. With a land use census identifying a location(s) that yields a calculated dose or dose commitment greater than the values currently being calculated in Specification 4.11.2.3, in lieu of a Licensee Event Report, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report, pursuant to Specification 6.9.1.11.  
* within 48 hours of changing. When samples collected for 24 hours are analyzed, the corresponding LLDs may be increased* by a factor of 10. This requirement does not apply if {l) analysis shows that the DOSE EQJIVALENT I~l31 concentration in the primary coolant has not increased rnre than a factor of 3; and (2) the noble gas nnnitor shows that effluent activity has -
: b. With a land use census identifying a location(s) that yields a calculated dose or dose commitment (via) the same exposure pathway) 20 percent greater than at a location from which samples are currently being obtained in accordance with Specification 3.12.1, add the new location(s) to the radiological environmental rmnitoring program within 30 days. The sampling location(s), excluding the control station location, having the lowest calculated dose or dose cornmitITEnt(s) (via the same exposure pathway) may be deleted from this monitoring program after October 31 of the year in which this land use census was conducted.
not exceeded the rronitor 11warni ng 11 setpoi nt.
In lieu of a Licensee Event Report and pursuant to Specification 6.9.1.11, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report and also include in the report a revised figure(s) and table for the ODCM reflecting the new location(s).  
SALEM - UN IT 2                           3/4 11=11
: c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.  
 
*Broad leaf vegetation sampling of at* least three different kinds of vegetation may be performed at the SITE BOUNDARY in each of t'fKl different direction sectors with the highest predicted D/Q in lieu of the garden census. Specifications for broadleaf vegetation sampling in Table shall be followed, including analysis of control samples. SALEM -UN IT 2 3/4 12-11
                      *.e RADIOACTIVE EFFLUENTS EXPLOSIVE GAS MIXTURE LIMITING CONDITION FOR OPERATION             .               -   -
.... ' *e DESIGN FEATURES --------------------------------------------------------------------------------
----------~-------------------------------------~-----------~--------------------
DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained for a maximum internal pressure of 47 psig and an air temperature of 271°F. 5.3 REACTOR CORE FUEL ASSEMBLIES S.3.1 The reactor core shall contain 193 fuel assemblies with each fuel assembly containing 264 fuel rods clad with Zircaloy-4.
3all.2.5    The concentration of oxygen in the waste gas holdup systelTl shall be li111ited to less than or equal to 2% by voluire whenever the hydrogen concentration exceeds 4% by volume.
Each fuel rod shall have a nominal active fuel length of 143.7 inches and-contain a 111axirnum total weight of 1766 grams uranium. The initial core loading shall have a maximum enrichment of 3.35 weight percent U-235. Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichment I_ -of 4.05 weight percent U-235. CONTROL ROD ASSEMBLIES 5.3.2 The reactor core shall contain 53 full length and no part length control rod assemblies.
APPLICABILITY:      At all times.
The full length control rod assemblies shall contain a nominal 142 inches of absorber material.
ACTION:
The nominal values of absorber material shall be 80 percent silver, 15 percent indium and 5 percent cadmium. All control rods shall be clad with stainless steel tubing. 5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The reactor coolant system is designed and shall be maintained:
: a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volume but less than or equal 4% by volume, reduce the oxygen concentration to the above limits within 48 hours.
VOLUME a. In accordance with the code requirements specified in Section 4.1 of the FSAR, with alowance for normal degradation pursuant to the applicable Surveillance Requirements, b. For a pressure of 2485 psig, and c. For a temperature of except for the pressurizer which is 680°F. 5.4.2 The total water and steam volume of the reactor coolant system is 12,811.!.100 cubic feet at a nominal Tavg of 581.0°F. SALEM -UNIT 2 5-4
: b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volume and the hydrogen concentration greater than 2% by volume, immediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to less than or equal to 2% by volume without delay.                                                ,
'**e ADMINISTRATIVE CONTROLS Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents fro.m Light-Water-Cooled Nuclear Power Plant, 11 Revision 1, June 1974, with data summarized on a quarterly basis following the format of Appendix B thereof. The Radioactive Effluent Rel ease Report to be submitted within 60 days after January 1 of each year shall include an annual summary of hourly meteorological data collected over the previous year. This annual summary may be either in the form of an hour-by-hour listing of magnetic tape of wind speed, wind direction, atrrospheric stability, and precipitation (if measured), or in the form of joint frequency distributions of wind speed, wind direction, and atrrospheric stability.***
: c. The provision of Specifications 3.0.3 and 3.0.4 are not applicable.
This same report shall include an assessment of the radiation doses due to the radioactive 1 iquid and gaseous effluents rel eased from the unit or station during the previous calendar year. This same report shall also include an assessment of the radiation doses from radioactive liquid and gaseous effluents to MEMBERS OF THE PUBLIC due to their activities inside the SITE BOUNDARY (Figure 5.1-3) during the report period. All assumptions used in making these assessments (i.e.*, specific activity, exposure time and location) shall be included in these reports. The meteorological conditions concurrent with the time of release of radioactive materials in gaseous effluents (as determined by sampling frequency and measurement) sha 11 be used for deter mining the gaseous pathway doses. The assessment of radiation doses shall be performed in accordance with the OFFSITE DOSE CALCULATION MANUAL. The Radioactive Effluent Release Report to be submitted 60 days after January 1 of each year shall also include an asses-sment of radiation doses to the likely 111)St exposed MEMBER OF THE PUBLIC from reactor releases *and other nearby uranium fuel cycle sources (including doses from primary. effluent pathways and direct radiation) for the previous calendar year to show conformance with 40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operation.
_SURVEILLANCE RE QJIREMENTS
Acceptable methods for calculating the dose contribution from 1 iquid and gaseous effluents are given in Regulatory Guide 1.109, Rev. 1, October 1977. The Radioactive Effluent Release Reports shall include the following information for each class of solid waste (as defined by 10 CRF Part 61) shipped offsite during the report period: a. Container volume, b. Total curie quantity (specify whether determined by lll!asurement or estimate),*
-------------------------~--------------------~---------------------------------
c *. Principal radionuclides (specify whether determined by measurerTent*
4.11.2.5 The concentrations of oxygen in the waste gas holdup system shall be deter111ined to be within the above limits by continuously rmnitoring the waste gases in the waste gas holdup system with the oxygen rronitor required OPERABLE by Table 3.3-13.
or j estimate), *
SALEM    = UN IT 2                        3/4 11-15
* d. Source of waste and processing employed (e.g., dewatered spent resin, cor.ipacted dry waste, evaporator bottoms), ***In lieu of submission with the first half year Radioactive Effluent Release Report, the licensee has the option of retaining this summary of required meteorological data on site in a. file that shall be provided to the NRC upon request. SALEM UNIT 2 6-20 I
 
* I I I}}
*1 RADIOACTIVE EFFLUENTS BASES
  ~------------------------------------------------------------------------------
3/4.11.2.5 EXPLOSIVE GAS MIXTURE This specification is provided to ensure that the concentration of potentially explosive gas mixtures contained in the waste gas holdup system is maintained below the flammability limits of hydrogen and oxygen. Maintaining the concentration of hydrogen and oxygen below their flammability limits provides assurance that the releases of radioactive materials will be controlled in conformance with the requirements of General Design Criterion 60 of Appendix A*
to 10 CFR Part 500 3/4.11.2.6 GAS STORAGE TANKS The tanks included in this specification are those tanks for which the quantity of radioactivity contained is not limited directly or indirectly by another Technical Specification to a quantity that is less than the quantity which      .1. -
provides assurance that in.the event of a uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem in an event of 2 hours.
Restricting the quantity of radioactivity contained in each gas storage tank provides assurance that in the event of an uncontrolled release of the tank's
. contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem. This is conistent with Branch Technical Position ETSB 11-5 in NUREG-0800, July 1981.
3/4.11.3    SOLID RADIOACTIVE WASTE This specification implements the requirements of 10 CFR Part 50.36a and General Design Criterion 60 of Appendix A to 10 CFR Part 50. The process parameters.
included in establishing the PROCESS CONTROL PROGRAM may include, but are not limited to waste type, waste pH, waste/liquid/solidification agent/catalyst ratios, waste oil content, waste principal chemical constituents, mixing and curing times.
SALEM - UN IT 2                      B  3/4 11-6
 
RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.2 LAND USE CENSUS LIMITING CONDITION FOR OPERATION 3.12.2. A land use census shall be conducted and shall identify within a distance of 8 km (5 miles) the location in each of the 16 meteorological sectors of the nearest milk animal~ the nearest residence and the nearest garden* of greater than 50 m2 {500 ft ) producing broad leaf vegetation. (For elevated releases as defined in Regulatory Guide 1.111, Revision 1, July 1977, the land use census shall also identify within a distance of 5 km (3 miles) the locations
. in each of the 16 meteorological sectors of all milk animals and all gardens of greater than 50 m2 producing broad leaf vegetation.               -
APPLICABILITY:   At all times.
ACTION:
: a. With a land use census identifying a location(s) that yields a calculated dose or dose commitment greater than the values currently being calculated in Specification 4.11.2.3, in lieu of a Licensee Event Report, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report, pursuant to Specification 6.9.1.11.
: b. With a land use census identifying a location(s) that yields a calculated dose or dose commitment (via) the same exposure pathway) 20 percent greater than at a location from which samples are currently being obtained in accordance with Specification 3.12.1, add the new location(s) to the radiological environmental rmnitoring program within 30 days. The sampling location(s), excluding the control station location, having the lowest calculated dose or dose cornmitITEnt(s) (via the same exposure pathway) may be deleted from this monitoring program after October 31 of the year in which this land use census was conducted. In lieu of a Licensee Event Report and pursuant to Specification 6.9.1.11, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report and also include in the report a revised figure(s) and table for the ODCM reflecting the new location(s).
: c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
*Broad leaf vegetation sampling of at* least three different kinds of vegetation may be performed at the SITE BOUNDARY in each of t'fKl different direction sectors with the highest predicted D/Q in lieu of the garden census.
Specifications for broadleaf vegetation sampling in Table 3.12~1.4c shall be followed, including analysis of control samples.
SALEM - UN IT 2                         3/4 12-11
 
                    ' *e DESIGN FEATURES DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained for a maximum internal pressure of 47 psig and an air temperature of 271°F.
5.3 REACTOR CORE FUEL ASSEMBLIES S.3.1 The reactor core shall contain 193 fuel assemblies with each fuel assembly containing 264 fuel rods clad with Zircaloy-4. Each fuel rod shall have a nominal active fuel length of 143.7 inches and-contain a 111axirnum total weight of 1766 grams uranium. The initial core loading shall have a maximum enrichment of 3.35 weight percent U-235. Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichment  I_ -
of 4.05 weight percent U-235.
CONTROL ROD ASSEMBLIES 5.3.2 The reactor core shall contain 53 full length and no part length control rod assemblies. The full length control rod assemblies shall contain a nominal 142 inches of absorber material. The nominal values of absorber material shall be 80 percent silver, 15 percent indium and 5 percent cadmium. All control rods shall be clad with stainless steel tubing.
5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The reactor coolant system is designed and shall be maintained:
: a. In accordance with the code requirements specified in Section 4.1 of the FSAR, with alowance for normal degradation pursuant to the applicable Surveillance Requirements,
: b. For a pressure of 2485 psig, and
: c. For a temperature of 650°F~  except for the pressurizer which is 680°F.
VOLUME 5.4.2 The total water and steam volume of the reactor coolant system is 12,811.!.100 cubic feet at a nominal Tavg of 581.0°F.
SALEM - UNIT 2                         5-4
 
                    '**e
* ADMINISTRATIVE CONTROLS
------------------------------~-------------------------------------------------
Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents fro.m Light-Water-Cooled Nuclear Power Plant, 11 Revision 1, June 1974, with data summarized on a quarterly basis following the format of Appendix B thereof.
The Radioactive Effluent Rel ease Report to be submitted within 60 days after January 1 of each year shall include an annual summary of hourly meteorological data collected over the previous year. This annual summary may be either in the form of an hour-by-hour listing of magnetic tape of wind speed, wind direction, atrrospheric stability, and precipitation (if measured), or in the form of joint frequency distributions of wind speed, wind direction, and atrrospheric stability.*** This same report shall include an assessment of the radiation doses due to the radioactive 1 iquid and gaseous effluents rel eased from the unit or station during the previous calendar year. This same report shall also include an assessment of the radiation doses from radioactive liquid and gaseous effluents to MEMBERS OF THE PUBLIC due to their activities inside the SITE BOUNDARY (Figure 5.1-3) during the report period. All assumptions used in making these assessments (i.e.*, specific activity, exposure time and location) shall be included in these reports. The meteorological conditions concurrent with the time of release of radioactive materials in gaseous effluents (as determined by sampling frequency and measurement) sha 11 be used for deter mining the gaseous pathway doses. The assessment of radiation doses shall be performed in accordance with the OFFSITE DOSE CALCULATION MANUAL.
The Radioactive Effluent Release Report to be submitted 60 days after January 1 of each year shall also include an asses-sment of radiation doses to the likely 111)St exposed MEMBER OF THE PUBLIC from reactor releases *and other nearby uranium fuel cycle sources (including doses from primary. effluent pathways and direct radiation) for the previous calendar year to show conformance with 40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operation.
Acceptable methods for calculating the dose contribution from 1 iquid and gaseous effluents are given in Regulatory Guide 1.109, Rev. 1, October 1977.
The Radioactive Effluent Release Reports shall include the following information for each class of solid waste (as defined by 10 CRF Part 61) shipped offsite during the report period:
: a. Container volume,
: b. Total curie quantity (specify whether determined by lll!asurement or estimate),*
c*. Principal radionuclides (specify whether determined by measurerTent* or j estimate),          *                                                    *
: d. Source of waste and processing employed (e.g., dewatered spent resin, cor.ipacted dry waste, evaporator bottoms),
***In lieu of submission with the first half year Radioactive Effluent Release Report, the licensee has the option of retaining this summary of required meteorological data on site in a. file that shall be provided to the NRC upon request.
SALEM  ~  UNIT 2                         6-20}}

Latest revision as of 07:15, 3 February 2020

Proposed Radiological ETS Correcting Amends 55 & 28 to Licenses DPR-70 & DPR-75,respectively
ML18092A491
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/08/1985
From:
Public Service Enterprise Group
To:
Shared Package
ML18092A490 List:
References
NUDOCS 8502200306
Download: ML18092A491 (31)


Text

DEFINITIONS CONTAINMENT INTEGRITY 1.7 CONTAINMENT INTEGRITY shall exist when:

1.7.1 All penetrations required to be closed during accident conditions are either:

a. Capable of being closed by an OPERABLE containment automatic isolation valve system, or
b. Closed by manual valves, blind flanges, or deactivated I_

automatic valves secured in their closed positions, except as provided in Table 3.6-1 of Specification 3.6.3.1.

1.7.2 All equipment hatches are closed -~nd sealed, -

1.7.3 Each air lock is OPERABLE pursuant to Specification 3.6.1.3, 1.7.4 The containment leakage rates are within the limits of Specification 3.6.1.2, and 1.7.5 The sealing mechanism associated with each penetration (e.g.,

welds, bellows or 0-rings) is OPERABLE.

CONTROLLED LEAKAGE 1.8 CONTROLLED LEAKAGE shall be that seal water flow from the reactor coolant pufll' seals.

CORE ALTERATION 1.9 CORE ALTERATION shall be the rmvement or manipulation of any component within the reactor pressure vessel with the vessel head removed and fuel in the vessel. Suspension of CORE ALTERATION shall not preclude completion of rmvement of a component to a safe conservative position.

DOSE EQJIVALENT 1-131 LlO DOSE EQJIVALENT I-131 shall be that concentration of I-131 (microcuries -

per gram) which alone _would produce the same thyroid dose as-the quantity and isotopic mixture of I-131, I-132, I-133~ I-134, and I-135 actually present. The SALEM - UNIT l 1-2 8502200306 850208 PDR ADOCK 05000272 P PDR

DEFINITIONS PHYSICS TESTS 1.20 PHYSICS TESTS shall be those tests perfor~d to rTEasure the fundamental nuclear characteristics of the reactor core and related instrumentation and 1) described in Chapter 14 of the Updated FSAR, 2) authorized under the provisions of 10CFRS0.59, or 3) otherwise by the Commission.

PRESSURE BOUNDARY LEAKAGE L21 PRESSURE BOUNDARY LEAKAGE shall be leakage (except _steam generator tube leakage} through a non-isolable fault in a Reactor Coolant System component body, pipe wa 11 or vessel wall.

PROCESS CONTROL PROGRAM (PCP) 1.22____The PROCESS CONTROL PROGRAM shall be that program which contains the current formula, sampling, analyses, test, and determinations to be made to ensure that the processing and packaging of solid radioactive wastes, based on de100nstrated processing of actual or simulated wet solid wastes, will be accomplished in such a way as to assure compliance with 10 CFR Part 20, 10 CFR Part 71 and Federal and State regulations and other requirements gJverni ng the-disposal of the radioactive waste. **

PURGE - PURGING 1.23 PURGE or PURGING shall be the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration, or other operating condition, in such a manner that replacerTEnt air or gas is required to purify the confinerTEnt.

QUADRANT POWER TILT RATIO 1.24 QUADRANT POWER TILT RATIO shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater. With one excore detector inoperable, the remaining three detectors shall be used for computing the average.

RATED THERMAL POWER

. L25 RATED THERMAL POWER shall be a total reactor. core heat transfer rate to * -

the reactor coo 1 ant of 3338 MWt.

SALEM - UNIT 1 1-5

TABLE 4.3-1 (Continued)

NOTATION

(1) - If not performed in previous 7 days.

(2) - Heat balance only, above 15% of RATED THERMAL POWER.

(3) - Compare incore to excore axial offset above 15% of RATED THERMAL POWER_.

Recalibrate if absolute difference l_ 3 percent.

(4) - Manual SSPS functional input check every 18 months.

(_5) - Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.

( 6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.

(7) - Below P-6 {Block of Source Range Reactor Trip) setpQint.

(8) - Deleted (9) If not performed in the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, conduct a functional test of the Manual Reactor Trip Switches (using voltmeters).

~

(10) - If not performed in the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, conduct a functional test of:

1 Reactor Trip Breaker UV Trip (via SSPS) 1 Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)

(11) - Perform a functional test of:

1 Reactor Trip Breaker UV Trip (via SSPS) and conduct response time testing of UV/Breakers (event recorders) 1 Reactor Trip Breaker Shunt Trip (via manual pushbutton controls)

-(12) ~ -Perform periodic maintenance on Reactor Trip Breakers and Reactor rr:iP Bypass Breakers semiannually as follows:

a. response time testing, (3 times) (visicorder) trend data
b. trip bar lift force measurements c *. UV output force measurement
d. dropout voltage check
e. servicing/lubrication/adjustments (See Table 3.3~1 Notation ###)
f. repeat testing steps (a-d) following any necessary actions at step (e)

SALEM - UNIT 1 3/4 3-13

' : l'.1 '

I' TABLE 3.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION MINIMUM CHANNELS INSTRUMENT OPERABLE ACTION

1. GROSS RADIOACTIVITY MONITORS PROVIDING AUTOMATIC TERMINATION OF RELEASE
a. liquid Radwaste Effluent Line (1-Rl8) l 26

. b. Steam Generator Blowdown Line 4 27 (1-Rl9 A, 89 C, and D)

~ 2o GROSS RADIOACTIVITY MONITORS NOT PROVIDING AUTOMATIC

'-0 TERMINATION OF RELEASE

a. Contain~nt Fan Coolers - Service Water Line 5 28 (l-Rl3 A, B, C, D, E) Discharge .
  • 3. FLOW RATE MEASUREMENT DEVICES I
a. Liquid Radwaste Effluent Line 1 29 e
b. Steam* Generator Blowdown Line 4 29
4. TANK LEVEL INDICATING DEVICES  : , I
a. Temporary Outside Storage Tanks as Required 1 30 I*'

'lj  ;

~. I ~ li

.l .

'I ,,

. .~

TABLE 403-12 '"'

RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQJIREMENTS CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL INSTRUMENT C.HECK CHECK CALIBRATION TEST

1. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM AND AUTOMATIC TERMINATION OF RELEASE
a. Liquid Radwaste Effluent Line (1-Rl8) D P# R(3) Q(l) e bo Steam Generator Blowdown line D M R(3) Q(l)

(1-Rl9 A, B~ C, and D) 2o GROSS RADIOACTIVITY MONITORS PROVIDING ALARM BUT NOT PROVIDING AUTOMATIC TERMINATION OF

~ RELEASE w

I O'I N a. Containll'P-nt Fan Coolers - Service Water Line D M R(3) 0(2)

(1-R13 A, B, C, D, E) Discharge

3. FLOW RATE MEASUREMENT DEVICES
a. Liquid Radwaste Effluent Line D(4) NoA. R N.A.
b. Steam Generator Blowdown Line D(4) N.Ao R N.A.

I

4. TANK LEVEL INDICATING DEVICES**
a. Temporary Outside Storage Tanks as Required D* N.Ao R 0

TABLE 4.3-12 (Continued)

TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:

1. Instrument indicates measured levels at or above the alarm/trip setpoint.
2. Circuit failure. (Loss of Power)
3. Instrument indicates a downscale failure. (Indication on instrument drawer in Control Equipment Room only)

{2) The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exist:

1. Instrument indicates measured levels at or above the alarm/trip setpoi nt.
2. Circuit failure. (Loss Df Power)
3. Instrument indicates a downscale failure. (Indication on instrument drawer in Control Equipment Room only)
4. Instrument controls not* set in operate rnde. (On instruments equipped with ope~ate mode switches only)

(3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable suppliers. The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or more NBS standards.

(4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be Made at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on days on which continuous, periodic, or batch releases are made.

  • During liquid additions to the tank.
    • If tank level indication is not provided, vertification will be done by visual inspection.
  1. The Rl8 channel is an in-line channel which requires periodic decontamination. Any count rate indication above 10,000 cpl"'I constitutes a CHANNEL CHECK for compliance purposes.

SALEM = UNIT 1 3/4 3-63

II The following process streams are routed to the pl ant vent where they are effectively nonitored by the instruments.described:

(a) Condenser Air Rennval System (b) *.Auxiliary Building Ventilation- System (c) Fuel Handljng Building Ventilation System (d) Radwaste*Area Ventilation System (e) Containment Purges I '

TABLE 4.3-13 (Continued}

TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also derronstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:

le Instrument indicates measured levels at or above the alarm/trip setpoi nt.

2. Circuit failure. (Loss of Power)
3. Instrument indicates a downscale failure.

(2) The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the 'following conditions exist:

1. Instrument indicates measured levels at or above the alarm/trip I*

setpoi nt.

2. Circuit failure. (Loss of Power )
3. Instrument indicates a downscale failure. (Indication on instrument drawe~ in Control Equipment Room only for 1Rl6}
4. Instrument co*ntrols not set in.operate nnde. (Applicable to l-Rl6 only)

(3} The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sourc~s obtained from reputable suppliers. The activity of the calibration sources were reconfirmed using a multi~channel analyzer which was calibrated using one or rrore NBS standards.

(4} The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:

1. One volume percent oxygen, balance nitrogen, and
2. Four volume percent oxygen, balance nitrogen.
  • At all times

. ** During waste gas holdup system operationc SALEM - UN IT 1 3/4 3-69

  • TABLE 4.11-1 (Continued)

TABLE NOTATION

b. A batch release is the discharge of liquid wastes of a discrete voluJTle.

Prior to sampling for analyses, each batch shall be isolated, and then thoroughly mixed to assure representative sampling.

c. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs~l34, Cs-137, Ce-141, and Ce-144*. This list does not rrean I.

that only these nuclides are to be detected and reported. Other peaks that are measurable and identifiable, together with the above nuclides, shall also be identified and reported. **

d. A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and in which the method of *Sampling employed results in a specimen that is representative of the liquids released.
e. A continuous release is the discharge of liquid wastes of a nondiscrete volume, e.g., from a volume of a system that has an input flow durtng the_

continuous rel ease.

. SALEM - UNIT 1 3/4 11-4

  • TABLE 4.11-2 (Continued)

TABLE NOTATION

a. The LLD is defined in Table 4.11.1
b. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, Xe-138 for gaseous emissions *and Mn-54, Fe-59, Co-58, I Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144* for particulate emissions. This list does not rrean that only these nuclides are to be detected and reported. Other peaks that are measurable and i dent ifi ab 1e, together with the above nuclides, shall also be identified and reported.
c. Sampling and analysis shall also be performed following shutdown, startup or a THERMAL PQWER change(exceeding 15 percent of RATED THERMAL POWER within one hou~ unless: *
1. Analysis shows that the DOSE EQJIVALENT 1-131 concentrations in the primary coolant has not increased rmre than a factor of three.
2. The noble gas activity rmnitor shows that effluent activity has not exceeded the monitor warni ng"setpo int.

11

d. Tritium grab samples shall be taken ~t least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the refueling canal is flooded.
e. Tritium grab samples shall be taken at least once per 7 days from the ventilation exhaust from the spent fuel pool area whenever spent fuel is in the spent fuel pool.
f. The ratio* of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with Specifications 3.11.2.1, 3.11.2.2 and 3.11~2.3.

SALEM - UNIT 1 3/4 11-io

TABLE 4.11-2 (Continued)

TABLE NOTATION

g. Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after changing (or after reroval from sampler.).

Sampling shall also be performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> f& at least 7 days following each shutdown, startup or THERMAL POWER change exceeding 15 percent of RATED THERMAL POWER in one hou~ and analyses shall e completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of changing. When samples' collected for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are I _

analyzed, the corresponding LLDs may be increased by a factor of 10. This requirement does not apply if (1) analysis shows that the DOSE EQJIVALENT 1=13.1 concentration in the primary coolant has not increased rore than a factor of 3; and (2) the noble gas rrcnitor shows that effluent activity has not exceeded the ronitor 11 warning 11 setpointo

  • SALEM = UNIT l 3/4 11-11

RADIOACTIVE EFFLUENTS EXPLOSIVE GAS Ml XTURE LIMITING CONDITION FOR OPERATION 3.11.2.5 The concentration of oxygen in the waste gas holdup systefll shall be limited to less than or equal to 2% by volune whenever the hydrogen concentration exceeds 4% by vo 1ume.

APPLICABILITY: At all tir.ies.

ACTION:

a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volune but less than or equal 4% by volume, reduce the oxygen concentration to the above limits within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volune and the hydrogen concentration greater than 2% by volume, ifllmediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to 1ess than or equal to 2% by volume without delay.
c. The provision of Specifications 3.0.3 and 3.0.4 are not applicablP..

SURVEILLANCE REQJIREMENTS

-~---=---~-------------------------------------------------------------~--------

4.11.2.5 The concentrations of oxygen in the waste gas holdup system shall be determined to be within the above lifllits by continuously monitoring the waste gases in the waste gas holdup system with the oxygen monitor required OPERABLE by Table 3.3-13.

SALEM ~ UNIT 1 3/4 11-15

SOLID RADIOACTIVE WASTE LIMITING CONDITION FOR OPERATION 3.11.3. The solid radwaste system shall be used in accordance with a PROCESS CONTROL PROGRAM to process wet radioactive waste to meet shipping and burial ground requirements.

APPLICABILITY: At all times.

ACTION:

a. With the provisions of the PROCESS CONTROL PROGRAM not satisfied, suspend shipments of defectively processed or defectively packaged solid radioactive wastes from the site.
b. The provisions of Specifications 3.0.3 and 3.0.4, and 6.9.1.9.b are not applicable.

SURVEILLANCE RECUIREMENTS 4.11.3. The PROCESS CONTROL PROGRAM shall be used to verify the SOLIDIFICATION of at least one representative test specimen from at least every tenth batch of each type of wet radioactive waste (e.g.~ filter sludges, spend resins, evaporator bottoms, boric acid solutions, and sodium sulfate solutions).

a. If any test specimen fails to verify SOLIDIFICATION, the SOLIDIFICATION of the batch under test shall be suspended until such tirre as additional test specimens can be obtained, alternative SOLIDIFICATION parameters can be deterr.ii ned in accordance with the PROCESS CONTROL PROGRAM, and a subsequent test verifies SOLIDIFICATION. SOLIDIFICATION of the batch may then be resumed using the alternative SOLIDIFCATION parameters determined by the PROCESS CONTROL PROGRAM.
b. If the initial test specimen from a batch of waste fails to verify SOLIDIFICATION, the PROCESS CONTROL PROGRAM shall provide for the collection and testing of representative test specimens from each
  • consecutive batch of the same type of wet waste until at least three consecutive initial test specimens deironstrate SOLIDIFICATION. The PROCESS CONTROL PROGRAM shall be modified as requirec1, as provided in Specification 6.13, to assure SOLIDIFICATION of subsequent batches of waste.

SALEM - UNIT 1 3/4 11-17

RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.2 LAND USE CENSUS LIMITING CONDITION FOR OPERATION 3.12.2. A land use census shall be conducted and shall identify within a distance of 8 km (5 miles) the location in each of the 16 meteorological sectors of the nearest milk animal~ the nearest residence and the nearest garden* of greater than 50 m2 (500 ft ) producing broad leaf vegetation. (For elevated releases as defined in Regulatory Guide 1.111, Revision 1, July 1977, the land use census shall also identify within a distance of 5 km (3 miles) the locations in each of the 16 meteorological *sectors of all milk animals and all gardens of greater than 50 m2 producing broad leaf vegetation. -

APPLICABILITY: At all times.

ACTION:

a. With a land use census identifying a location(s) that yields a calculated dose or dose commitment greater than the values currently being calculated in Specification 4.11.2.3, in lieu of a Licensee Event Report, identify the new location(s) in the next Semiannual Radioactive*

Effluent Release Report, pursuant to Specification 6.9.1.11.

b. With a land use census identifying a location(s) that yields a calculated dose or dose commitment (via) the sane exposure pathway) 20 percent greater than at a locaticrn from which samples are currently being obtained in accordance with Specification 3.12.1, add the new location(s) to the radiological environmental rronitoring program within 30 days. The sampling location(s), excluding the control station location, having the lowest calculated dose or dose commitment(s) (via the saJTe exposure pathway) may be deleted from this monitoring program after (October 31) of the year in which this land use census was conducted. In lieu of a Licensee Event Report and pursuant to Specification 6.9.1.11, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report and also include in the report a revised figure(s) and table for the ODCM reflecting the new location(s). *
c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
  • Broad leaf vegetation sampling of at least three. different kinds of vegetation may be performed at the SITE BOUNDARY in each of two different direction sectors with the highest predicted D/Q in lieu of the garden census. Specifications for broadleaf vegetation sampling in Table 3.12-1.4c shall be followedp including analysis of control samples.

SALEM - UNIT 1 3/4 12-11

RADIOACTIVE EFFLUENTS BASES 3/4.11.2.5 EXPLOSIVE GAS MIXTURE This specification is provided* to ensure that the concentration of potentially explosive gas mixtures contained in the waste gas holdup system is maintained

3/4.11.2.6 GAS STORAGE TANKS The tanks included in this specification are those tanks for which the quantity of radioactivity contained is not limited directly or indirectly by another Technical Specification to a quantity that is less than the quantity which provides assurance that in the event of a uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem in an event of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Restricting the-quantity of radioactivity contained in each gas storage tank provides assurance that in the event of an uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem. This is consistent with Branch Technical Position ETSB 11-5 in NUREG-0800, July 1981.

3/4.11.3 SOLID RADIOACTIVE WASTE This specification implements the requirements of 10 CFR Part 50.36a and General Design Criterion 60 of Appendix A to 10 CFR Part 50. The process parameters included in establishing the PROCESS CONTROL PROGRAM may include, but are not limited to waste type, waste pH, waste/liquid/solidification agent/catalyst ratios, waste oil content, waste principal chemical constituents, mixing and curing times.

SALEM - UNIT 1 B 3/4 11~6

  • .e DESIGN FEATURES

~-~~---------------------------------------------------~------------------------

DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained for a maximum internal pressure of 47 psig and an air temperature of 271°Fo 5.3 REACTOR CORE FUEL ASSEMBLIES 5.3.1 The reactor core shall contain 193 fuel assemblies* with each fuel assembly containing 264 fuel rods clarl with Zircaloy-4 *. Each fuel rod shall have a nominal active fuel length of 143.7 inches and* contain a maximum total weight of 1766 grams uranium. The initial core loading shall have a maxil!'lUm enrichment of 3.35 weight percent U-235. Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichnEnt l -

of 4.05 weight percent U-235.

CONTROL ROD ASSEMBLIES 5c3.2 The reactor core shall contain 53 full length and no part length control rod assemblies. The full length control rod assemblies shall contain a nominal 142 inches of absorber material. The nominal values of absorber material shall be 80 percent ~ilver, 15 percent indium and ~percent cadmium. All control rods shall be clad with stainless steel tubing.

5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The reactor coolant system is designed and shall be maintained:

SALEM - UNIT 1

ADMINISTRATIVE CONTROLS Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plant, 11 Revision 1, June 1974, with data summarized on a quarterly basis following the format of Appendix B thereof.

The Radioactive Effluent Release Report to be submitted within 60 days after January 1 of each year shall include an annual summary of hourly meteorological data collected over the previous year. This annual summary may be either in the form of an hour-by-hour listing of magnetic tape of wind speed, winrl direction, atrrospheric stability, and precipitation (if measured), or in the form of joint frequency distributions of wind speed, wind direction, and attrospheric stability.*** This same* report shall include an assessment of the radiation doses due to the radioactive liquid and gaseous effluents released from the unit or station during the previous calendar year. This same report shall also include an assessment of the radiation doses from radioacti\fe liquid and gaseous effluents to MEMBERS OF THE PUBLIC due to their activities inside the SITE BOUNDARY (Figure 5.1-3) during the report period. All assumptions used in making these assessments (i.e., specific activity, exposure time and location) shall be included in these reports. The meteorological conditions concurrent with the time of release of radioactive materials in gaseous effluents (as determined by sampling frequency and measurement) shall be used for determinin~

the gaseous pathway doses. The assessment of radiation doses shall be performed in accordance with the OFFSITE DOSE CALCULATION MANUAL.

The Radioactive Effluent Release Report to be submitted 60 days after January 1 of each year shall .al~o include an asses.sment of radiation doses to the likely most exposed MEMBER OF THE PUBLIC from reactor releases and other nearby uranium fuel cycle sources (including doses from primary effluent pathways and direct radiation) for the previous calendar year to show conformance with 40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operation.

Acceptable methods for calculating the dose contribution from liquid and. gaseous effluents are given in Regulatory Guide 1.109, Rev. 1, October 1977.

The Radioactive Effluent Release Reports shall include the following information for each class of solid waste (as defined by 10 CRF Part 61) shipped offsite during the report period:

a. Container volume,
b. Total curie quantity (specify whether determined by fll:!asurement or estimate), *
c. Principal radionuclides (specify whether determined by measurement or estimate),
d. Source of waste and processing employed (e.g., dewatered spent resin, compacted dry waste, evaporator bottoms),
      • In lieu of submission with the first half year Radioactive Effluent Release Report, the licensee has the option of retaining this summary of required
  • meteorological data on site in a file that shall be provide~ to the NRC upon request.

SALEM = UNIT 1 6-20

DEFINITIONS


~------------

CONTAINMENT INTEGRITY 1.7 CONTAINMENT INTEGRITY shall exist when:

1.7.1 All penetrations required to be closed during accident conditions are either:

a. Capable of being closed by an OPERABLE containment autornatic isolation valve system, or
b. Closed by manual valves, blind flanges, or deactivated automatic valves secured in their clo-sed positionsg except as provided in Table 3.6-1 of Specification 3.6.3.1.

1.7.2 All equipment hatches are closed and sealed, 1.7.3 Each air lock is OPERABLE pursuant to Specification 3.6.1.3, 1.7.4 The containment leakage rates are within the limits of Specification 3.6.1.2, and 1.7.5 The sealing Mechanism associated with each penetration (e.g.,

welds, bellows or 0-rings) is OPERABLE.

CONTROLLED LEAKAGE 1.8 CONTROLLED LEAKAGE shall be that seal water flow from the reactor coolant purnp seals.

CORE ALTERATION 1.9 CORE ALTERATION shall be the rmvement or manipulation of any component within the reactor pressure vessel with the vessel head reimved and fuel in the vessel. Suspension of CORE ALTERATION shall not preclude coMpletion of nnveirent of a component to a safe conservative position.

DOSE EQJIVALENT I-131 1.10 DOSE EQJIVALENT I-131 shall be that concentration of I-131 (microcuries per gram) which alone would produce* the same thyroid dose as the* quantity and*

isotopic mixture of I-131, I-132g 1~1339 I-134, and I-135 actually *present. The SALEM - UNIT 2

  • .e TABLE 4.3-1 (Continued)

NOTATION

(1) - If not performed in previous 7 days.

(2) - Heat balance only, above lSi_of RATED THERMAL POWER.

(3) - Compare incore to excore axial offset above 15~ of RATED THERMAL ~OWER.

Recalibrate if absolute difference~ 3 percent.

(4) - Manual SSPS functional input check every 18 months.

(5) - Each train or logic channel shall be tested at least ev~ry 62 days on a STAGGERED TEST BASIS.

(6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.

(7) = Below P-6 (Block of SourceRang.e Reactor Trip) setpoint.

(8) Deleted (9) If not performed in the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, conduct a functional test of the Manual Reactor Trip Switches (using voltmeters).

(10) - If not performed in the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, conduct a functional test of:

(11) - Perform a functional test of:

  • Reactor Trip Breaker UV Trip (via SSPS) and conduct response time testing of~UV/Breakers (event recorders)
  • Reactor Tr~~:~~reaker Shunt Trip (via manual pushbutton controls)
a. response time testing, (3 times) (visicorder) trend data
b. trip bar lift force measurements
c. UV output force measurement
d. dropout voltage check
e. servicing/lubrication/adjustments (See Table 3.3=1 No~ation ###)
f. repeat testing steps (a-d) following any necessary actions at step (e)

SALEM = UNIT 2 3/4 3-13

' I TABLE 3.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION N

MINIMUM CHANNELS INSTRUMENT OPERABLE ACTION

1. GROSS RADIOACTIVITY MONITORS PROVIDING AUTOMATIC TERMINATION OF RELEASE
a. Liquid Radwaste Effluent Line (2-Rl8) 1 26
b. Steam Generator Slowdown Line 4 27 (2-Rl9 A, B. c9 and D)
2. GROSS RADIOACTIVITY MONITORS NOT PROVIDING ,AUTOMATIC

~ TERMINATION OF RELEASE w

I.

VI a. Containment Fan Coolers - Service Water Line 3 28

.g:..

(2-Rl3 A, B. C) Discharge

b. Chemical Waste Basin Line (R37) 1 28
3. FLOW RATE MEASUREMENT DEVICES
a. Liquid Radwaste Effluent Line l 29
b. Steam Generator Slowdown Line 29
4. TANK LEVEL INDICATING DEVICES
a. Temporary Outside Storage Tanks as Required 1 30

. 1:.

I,  ; I  ! I

, I, I ]'

I,**

I
I

!1, TABLE 4.3-12 RADIOACTIVE LIQJID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE RE~IREMENTS

~

""' 2. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM

'f BUT NOT PROVIDING .AUTOMATIC TERMINATION OF U1

-...)

RELEASE .

a. Containrrent Fan Coolers - Service Water Line D M R(3) Q(2)

{2-Rl3 A, B, C} Discharge

b. Chemical Waste Basin Line {R37) D M R(3) 0(2)
3. FLOW RATE MEASUREMENT DEVICES
a. Liquid Radwaste Effluent Line D{4) N.A. R N.A.

I '

b. Steam Generator Blowdown Line 0(4) N.A. R N.A
4. TANK LEVEL INDICATING DEVICES**
a. Temporary Outside Storage Tanks as Required D* N.A. R Q

\ ,, i

'I I I

  • .e TABLE 4.3-12 (Continued)

TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also derronstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist: *

1. Instrument indicates measured levels at or above the alarm/trip setpoi nt.
2. Circuit failure. (Loss o*f Power) (Automatic Isolation only) 3o Instrument indicates a downscale failure.

(2) The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the following conditions exist:

  • 1. Instrument indicates measured levels at or above the alarm/trip set poi lit o
2. Circuit failure. (Loss of Power) (Indication only)
3. Instrument indicates a downscale failure.
4. Instrument controls not set in operate r.nde.

(3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable supplie~s. The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or rrore NBS standards.

(4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be made at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on days on which continuous, periodic, or batch releases are made.

  • During liquid additions to the tank.
    • If tank level indication is not provided, vertification will be do*ne by visual inspection.
  1. The Rl8 channel is an off-line channel which requires periodic decontamination. Any count rate indication above lO:iOOO cpm constitutes a CHANNEL CHECK for *compliance.purposes.

SALEM ~ UNIT 2 3/4 3-58

TABLE 4.3-13 (Continued)

TABLE NOTATION (1) The CHANNEL FUNCTIONAL TEST shall also dennnstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:

1. Instrument indicates measured levels at or above the alarm/trip setpoi nt G
2. Circuit failure. (Loss of Power) (Automatic Isolation only)
3. Instrument indicates a downscale failure.

(2) The CHANNEL FUNCTIONAL TEST shall also derronstrate that control room alarm annunciation occurs if any of the following conditions exist:

1. Instrument indicates measured levels at or above the alarm/trip set point.
2. Circuit failure. (Loss of Power) (Indication only)
3. Instrurrent indicates a downscale failure.
4. Instrument controls not set in operate 1TOde.

(3) The initial CHANNEL CALIBRATION was performed using appropriate liquid or gaseous calibration sources obtained from reputable suppliers. The activity of the calibration sources were reconfirmed using a rrulti-channel analyzer which was calibrated using one or rrore NBS standards.

(4) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:

1. One volume percent oxygen, balance nitrogen, and
2. Four volume percent oxygen~ balance nitrogen.
  • At all times
    • During waste gas holdup system operation.

SALEM - UNIT 2

  • .e TABLE 4.11-1 (Continued)

TABLE NOTATION

b. A batch *release is the discharge of liquid wastes of a discrete wluJTJe.

Prior to sampling for analyses 9 each batch shall be isolated, and then thoroughly mixed to assure representative sampling.

c. The principal ga~rna emitters for which* the LLD specification applies exclusively are the following*radionuclides: Mn-54i Fe-59, Co-58, Co-60, Zn=65, Mo-99, Cs-134, Cs-137, Ce-141, and Ce-144*. This list does not mean I
  • that only these nucl ides are to be detected and reported.
  • Other peaks that are measurable and identifiablei together with the above nuclides, shall also be identified and reported.
d. A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of.liquid waste discharged and in which the method of sampling employed results in a specimen that is representative of the liquids released.
e. A continuous release is the discharge of liquid wastes of a nondiscrete volume, e.g., from a volume of a system that has an input flow during the continuous release.
  • The LLD for Ce=l44 shall be 2xl0-6 uCi/ml. .I~

SALEM - UN IT 2 3/4 11=4

.... *.e TABLE 4.11-2 (Continued)

TABLE NOTATION

a. The LLD is defined in Table 4.11.1.
b. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, Xe-138 for gaseous emissions and Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144* for particulate emissions. This list does not mean that only these nuclides are to be detected and reported. Other peaks that are measurable and identifiable, together with the above nucl ides, shall al so be identified and reported.
c. Sampling and analysis shall also be performed following shutdown, startup or a THERMAL PQ..WER change(exceeding 15 percent of RATED THERMAL POWER within one hour) unless:
1. Analysis shows that the DOSE EQJIVALENT I-131 concentrations in the primary coolant has not increased JT1)re than a factor of three.
2. The noble gas activity rmnitor shows that effluent activity has not exceeded the rronitor 11warni ng 11 setpo int.

d~ Tritium grab samples shall be taken at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the refueling canal is flooded.

e. Tritium grab samples shall be taken at least once per 7 days from the ventilation exhaust from the spent fuel pool area whenever spent fuel is in the spent fuel poo 1.
f. The ratio of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with Specifications 3.11.2.1, 3.11.2.2 and 3.11.2.3.

SALEM = UNIT 2 3/4 11-10

  • .e TABLE 4.11-2 (Continued)

TABLE NOTATION

g. Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after changing (or after rerro val from sampler).

Sampling shall also be performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for at least 7 days following each shutdown, startup or ~~ERMAL POWER change texceedi ng 15 percent of RATED THERMAL POWER in one hourJ and analyses shall be completed 1-

  • within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of changing. When samples collected for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are analyzed, the corresponding LLDs may be increased* by a factor of 10. This requirement does not apply if {l) analysis shows that the DOSE EQJIVALENT I~l31 concentration in the primary coolant has not increased rnre than a factor of 3; and (2) the noble gas nnnitor shows that effluent activity has I -

not exceeded the rronitor 11warni ng 11 setpoi nt.

SALEM - UN IT 2 3/4 11=11

  • .e RADIOACTIVE EFFLUENTS EXPLOSIVE GAS MIXTURE LIMITING CONDITION FOR OPERATION . - -

~-------------------------------------~-----------~--------------------

3all.2.5 The concentration of oxygen in the waste gas holdup systelTl shall be li111ited to less than or equal to 2% by voluire whenever the hydrogen concentration exceeds 4% by volume.

APPLICABILITY: At all times.

ACTION:

a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volume but less than or equal 4% by volume, reduce the oxygen concentration to the above limits within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volume and the hydrogen concentration greater than 2% by volume, immediately suspend all additions of waste gases to the system and reduce the concentration of oxygen to less than or equal to 2% by volume without delay. ,
c. The provision of Specifications 3.0.3 and 3.0.4 are not applicable.

_SURVEILLANCE RE QJIREMENTS


~--------------------~---------------------------------

4.11.2.5 The concentrations of oxygen in the waste gas holdup system shall be deter111ined to be within the above limits by continuously rmnitoring the waste gases in the waste gas holdup system with the oxygen rronitor required OPERABLE by Table 3.3-13.

SALEM = UN IT 2 3/4 11-15

  • 1 RADIOACTIVE EFFLUENTS BASES

~------------------------------------------------------------------------------

3/4.11.2.5 EXPLOSIVE GAS MIXTURE This specification is provided to ensure that the concentration of potentially explosive gas mixtures contained in the waste gas holdup system is maintained below the flammability limits of hydrogen and oxygen. Maintaining the concentration of hydrogen and oxygen below their flammability limits provides assurance that the releases of radioactive materials will be controlled in conformance with the requirements of General Design Criterion 60 of Appendix A*

to 10 CFR Part 500 3/4.11.2.6 GAS STORAGE TANKS The tanks included in this specification are those tanks for which the quantity of radioactivity contained is not limited directly or indirectly by another Technical Specification to a quantity that is less than the quantity which .1. -

provides assurance that in.the event of a uncontrolled release of the tank's contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem in an event of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Restricting the quantity of radioactivity contained in each gas storage tank provides assurance that in the event of an uncontrolled release of the tank's

. contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem. This is conistent with Branch Technical Position ETSB 11-5 in NUREG-0800, July 1981.

3/4.11.3 SOLID RADIOACTIVE WASTE This specification implements the requirements of 10 CFR Part 50.36a and General Design Criterion 60 of Appendix A to 10 CFR Part 50. The process parameters.

included in establishing the PROCESS CONTROL PROGRAM may include, but are not limited to waste type, waste pH, waste/liquid/solidification agent/catalyst ratios, waste oil content, waste principal chemical constituents, mixing and curing times.

SALEM - UN IT 2 B 3/4 11-6

RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.2 LAND USE CENSUS LIMITING CONDITION FOR OPERATION 3.12.2. A land use census shall be conducted and shall identify within a distance of 8 km (5 miles) the location in each of the 16 meteorological sectors of the nearest milk animal~ the nearest residence and the nearest garden* of greater than 50 m2 {500 ft ) producing broad leaf vegetation. (For elevated releases as defined in Regulatory Guide 1.111, Revision 1, July 1977, the land use census shall also identify within a distance of 5 km (3 miles) the locations

. in each of the 16 meteorological sectors of all milk animals and all gardens of greater than 50 m2 producing broad leaf vegetation. -

APPLICABILITY: At all times.

ACTION:

a. With a land use census identifying a location(s) that yields a calculated dose or dose commitment greater than the values currently being calculated in Specification 4.11.2.3, in lieu of a Licensee Event Report, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report, pursuant to Specification 6.9.1.11.
b. With a land use census identifying a location(s) that yields a calculated dose or dose commitment (via) the same exposure pathway) 20 percent greater than at a location from which samples are currently being obtained in accordance with Specification 3.12.1, add the new location(s) to the radiological environmental rmnitoring program within 30 days. The sampling location(s), excluding the control station location, having the lowest calculated dose or dose cornmitITEnt(s) (via the same exposure pathway) may be deleted from this monitoring program after October 31 of the year in which this land use census was conducted. In lieu of a Licensee Event Report and pursuant to Specification 6.9.1.11, identify the new location(s) in the next Semiannual Radioactive Effluent Release Report and also include in the report a revised figure(s) and table for the ODCM reflecting the new location(s).
c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
  • Broad leaf vegetation sampling of at* least three different kinds of vegetation may be performed at the SITE BOUNDARY in each of t'fKl different direction sectors with the highest predicted D/Q in lieu of the garden census.

Specifications for broadleaf vegetation sampling in Table 3.12~1.4c shall be followed, including analysis of control samples.

SALEM - UN IT 2 3/4 12-11

' *e DESIGN FEATURES DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment building is designed and shall be maintained for a maximum internal pressure of 47 psig and an air temperature of 271°F.

5.3 REACTOR CORE FUEL ASSEMBLIES S.3.1 The reactor core shall contain 193 fuel assemblies with each fuel assembly containing 264 fuel rods clad with Zircaloy-4. Each fuel rod shall have a nominal active fuel length of 143.7 inches and-contain a 111axirnum total weight of 1766 grams uranium. The initial core loading shall have a maximum enrichment of 3.35 weight percent U-235. Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichment I_ -

of 4.05 weight percent U-235.

CONTROL ROD ASSEMBLIES 5.3.2 The reactor core shall contain 53 full length and no part length control rod assemblies. The full length control rod assemblies shall contain a nominal 142 inches of absorber material. The nominal values of absorber material shall be 80 percent silver, 15 percent indium and 5 percent cadmium. All control rods shall be clad with stainless steel tubing.

5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The reactor coolant system is designed and shall be maintained:

a. In accordance with the code requirements specified in Section 4.1 of the FSAR, with alowance for normal degradation pursuant to the applicable Surveillance Requirements,
b. For a pressure of 2485 psig, and
c. For a temperature of 650°F~ except for the pressurizer which is 680°F.

VOLUME 5.4.2 The total water and steam volume of the reactor coolant system is 12,811.!.100 cubic feet at a nominal Tavg of 581.0°F.

SALEM - UNIT 2 5-4

'**e

  • ADMINISTRATIVE CONTROLS

~-------------------------------------------------

Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents fro.m Light-Water-Cooled Nuclear Power Plant, 11 Revision 1, June 1974, with data summarized on a quarterly basis following the format of Appendix B thereof.

The Radioactive Effluent Rel ease Report to be submitted within 60 days after January 1 of each year shall include an annual summary of hourly meteorological data collected over the previous year. This annual summary may be either in the form of an hour-by-hour listing of magnetic tape of wind speed, wind direction, atrrospheric stability, and precipitation (if measured), or in the form of joint frequency distributions of wind speed, wind direction, and atrrospheric stability.*** This same report shall include an assessment of the radiation doses due to the radioactive 1 iquid and gaseous effluents rel eased from the unit or station during the previous calendar year. This same report shall also include an assessment of the radiation doses from radioactive liquid and gaseous effluents to MEMBERS OF THE PUBLIC due to their activities inside the SITE BOUNDARY (Figure 5.1-3) during the report period. All assumptions used in making these assessments (i.e.*, specific activity, exposure time and location) shall be included in these reports. The meteorological conditions concurrent with the time of release of radioactive materials in gaseous effluents (as determined by sampling frequency and measurement) sha 11 be used for deter mining the gaseous pathway doses. The assessment of radiation doses shall be performed in accordance with the OFFSITE DOSE CALCULATION MANUAL.

The Radioactive Effluent Release Report to be submitted 60 days after January 1 of each year shall also include an asses-sment of radiation doses to the likely 111)St exposed MEMBER OF THE PUBLIC from reactor releases *and other nearby uranium fuel cycle sources (including doses from primary. effluent pathways and direct radiation) for the previous calendar year to show conformance with 40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operation.

Acceptable methods for calculating the dose contribution from 1 iquid and gaseous effluents are given in Regulatory Guide 1.109, Rev. 1, October 1977.

The Radioactive Effluent Release Reports shall include the following information for each class of solid waste (as defined by 10 CRF Part 61) shipped offsite during the report period:

a. Container volume,
b. Total curie quantity (specify whether determined by lll!asurement or estimate),*

c*. Principal radionuclides (specify whether determined by measurerTent* or j estimate), * *

d. Source of waste and processing employed (e.g., dewatered spent resin, cor.ipacted dry waste, evaporator bottoms),
      • In lieu of submission with the first half year Radioactive Effluent Release Report, the licensee has the option of retaining this summary of required meteorological data on site in a. file that shall be provided to the NRC upon request.

SALEM ~ UNIT 2 6-20