ML18219B549: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[see also::IR 05000316/1978002]]


=Text=
=Text=
{{#Wiki_filter:nape-+/NQ REGULATORY
{{#Wiki_filter:nape-+/NQ REGULATORY INFORMATION DISTRIBUTION SYSTEM
INFORMATION
      ~ DISTRIBUTION   FOR INCOMING MATERIAL
DISTRIBUTION
                                                                      < RIDS) 50-3i6 REC:   KEPPLER J G                 ORG: SHALLER D V                       DOCDATE: 02/28/78 NRC                                IN,8c MI  PWR                        DATE RCVD: 03/03/78 DOCTYPE:   LETTER     NOTARIZED: NO                                           COPIES RECEIVED SUB JECT:                                                                     LTR i   ENCL i LICENSEE EVENT REPT     <RO 50-3l6/78-02)     ON 02/02/78 CONCERNING REVIEW OF PREOPERATIONAL TEST REVEALED THREE TEMPORARY CHANGE SHEETS
SYSTEM<RIDS)~DISTRIBUTION
<TP-2r 3 AND 4 FOR 2-PO-050-575A) WERE WRITTEN ON           Oi/06/78'UT       NOT APPROVED BY PNSRC AND THE PLANT MANAGER UNTI 02/07/78' PLANT NAME: COOK UNIT 2                                         REVIEWER    INITIAL: X JM DISTRIBUTOR    INITIAL:
FOR INCOMING MATERIAL 50-3i6 REC: KEPPLER J G NRC ORG: SHALLER D V IN,8c MI PWR DOCDATE: 02/28/78 DATE RCVD: 03/03/78 DOCTYPE: LETTER NOTARIZED:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NOTES:
NO COPIES RECEIVED SUB JECT: LTR i ENCL i LICENSEE EVENT REPT<RO 50-3l6/78-02)
: i. SEND 3 COPIES OF ALL MATERIAL TO IS(E INCIDENT REPORTS (DISTRIBUTION CODE A002)
ON 02/02/78 CONCERNING
FOR ACTION:       BR CHIEF     KNIEL4+W/4 ENCL INTERNAL:                         ENCL                  NRC PDR++W/ENCL I   0 E~~W/2 ENC                       MIPC4+W/3 ENCL SCHROEDER/I PPOL I TO+4 W/ENCL         HOUSTON++W/ENCL NOVAK/CHECK++W/ENCL                     GRIMES< +W/ENCL KN I GHT++W/ENCL                       BUTLER++W/ENCL HANAUER+~W/ENCL                         TEDESCOw<W/ENCL E ISENHUT+>W/ENCL                       BAER++W/ENCL SHA04+W/ENCL                           VOLLMER/BUNCH<4W/ENCL MKMK+KO++W/ENCL             ROSA>4W/ENCL K SEYFR   IT/IE44W/ENCL EXTERNAL'REG).
REVIEW OF PREOPERATIONAL
LPDR S ST. JOSEPH'     I ++W/ENCL TIC44W/ENCL NS IC++W/ENCL ACRS CAT B4+W/16 ENCL DISTRIBUTION:     LTR 45       ENCL 45                           CONTROL NBR:    780660023 SIZE: iP+iP THE END
TEST REVEALED THREE TEMPORARY CHANGE SHEETS<TP-2r 3 AND 4 FOR 2-PO-050-575A)
 
WERE WRITTEN ON Oi/06/78'UT
II I, t K k>
NOT APPROVED BY PNSRC AND THE PLANT MANAGER UNTI 02/07/78'PLANT NAME: COOK-UNIT 2 DISTRIBUTION
0 n II I
OF THIS MATERIAL NOTES: i.SEND 3 COPIES OF ALL MATERIAL TO IS(E REVIEWER INITIAL: X JM DISTRIBUTOR
r,<
INITIAL: IS AS FOLLOWS INCIDENT REPORTS (DISTRIBUTION
 
CODE A002)FOR ACTION: BR CHIEF KNIEL4+W/4
KILULYIINIlI(EAl.f. ISW, y5<< INDIAIN & NlCHIGA0 PD IVER. CONPA IIIY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 C5 February 28, 1978 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement                         ~@R3    )g78c. 1~
ENCL INTERNAL: ENCL I 0 E~~W/2 ENC SCHROEDER/I
United States Nuclear Regulatory Comiission Region   III                                                   i~i~    ~
PPOL I TO+4 W/ENCL NOVAK/CHECK++W/ENCL
I 799 Roosevelt     Road Glen   Ellyn, IL     60137
KN I GHT++W/ENCL
                                                                <;so Operating License DPR-74 Docket No. 50-316
HANAUER+~W/ENCL
 
E ISENHUT+>W/ENCL
==Dear Mr. Keppler:==
SHA04+W/ENCL
 
NRC PDR++W/ENCL
Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory'Guide 1.16, Revision 4, Section 2.b, tne following report is submitted:
MIPC4+W/3 ENCL HOUSTON++W/ENCL
RO 50-316/78-02 Sincerely, D.Y. Shaller Plant Manager
GRIMES<+W/ENCL BUTLER++W/ENCL
/bab CC-   J;E. Dolan R.l<. Jurgensen G.E. Lien R. Kilburn R.J. Yollen BPI K.R. Baker RO:III R.C. Callen MPSC P.hl. Steketee, Esq.
TEDESCOw<W/ENCL
R. Malsh, Esq.
BAER++W/ENCL
G. Charnoff, Esq.
VOLLMER/BUNCH<4W/ENCL
G. Olson J.M. Hennigan PNSRC J.F. Stietzel Dir.,   IE (30 copies)
EXTERNAL'REG).
Dir.,   MIPC (3   copies) 780660023
MKMK+KO++W/ENCL
 
K SEYFR IT/IE44W/ENCL
s,f"
LPDR S ST.JOSEPH'I++W/ENCL TIC44W/ENCL
~
NS IC++W/ENCL
 
ACRS CAT B4+W/16 ENCL ROSA>4W/ENCL
Form No. 4494 CONTROL BLOCK LICENSEE                 EVENT REPORT
DISTRIBUTION:
                                                                                                                      ~
LTR 45 ENCL 45 SIZE: iP+iP THE END CONTROL NBR: 780660023
[PLEASE PRlhlT.,ALL REdUIRED INFORMATIDhl)
II I, t K k>0 n II I r,<  
LICENSEE                                                                                           LICENSE                EVENT NAME                                           LICENSE NUMBER                                      TYPE                  TYPE.
KILULYI INIlI(E Al.f.ISW, y5<<INDIA IN&NlCHIGA 0 PD IVER.CONPA III Y DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 February 28, 1978 Mr.J.G.Keppler, Regional Director Office of Inspection
[oOg       Yi   I     0     C C       2               0   0   0       0     0   0   0   0     0         4     1   1
and Enforcement
                                                                                                                                    'I   1     ~03'32
United States Nuclear Regulatory
                    ~
Comiission
7 89                                    14                                                                    26                       30 . 31 REPORT 022878 REPORT.
Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Dear Mr.Keppler: C5~@R3)g78c.1~i~i~~I<;so Operating License DPR-74 Docket No.50-316 Pursuant to the requirements
7    8 conn CATEGORY 57        58 TYPE L
of Appendix A Technical Specifications
59 SOURCE'os
and the United States Nuclear Regulatory
                                                      ~L 60     61 0    50            0316 DOCKET NUMBER 68    69 020278 EVENT DATE 74    75 REPORT DATE 80 EVENT DESCRIPTION
Commission
[oO~]       A REVIEll OF A PREOPERATIONAL TEST REVEALED THREE TEMPORARY CHANGE SHEETS                                                               (TP-2, 3, 7     89                                                                                                                                                             80
Regulatory'Guide
[003]'ND           4   for     2-PO-050-575A                   l'IERE. >lRITTEN Ol'l JANUARY 6             1978       BUT NOT APPROVED BY 80
1.16, Revision 4, Section 2.b, tne following report is submitted:
  ~() 4       PNSRC AND THE PLANT NNAGER                               UNTIL FEBRUARY           7, 1978.       THIS EXCEEDED THE 14-DAY 7 8 9                                                                                                                                                               80
RO 50-316/78-02
'os 7
Sincerely, D.Y.Shaller Plant Manager/bab CC-J;E.Dolan R.l<.Jurgensen G.E.Lien R.Kilburn R.J.Yollen BPI K.R.Baker RO:III R.C.Callen MPSC P.hl.Steketee, Esq.R.Malsh, Esq.G.Charnoff, Esq.G.Olson J.M.Hennigan PNSRC J.F.Stietzel Dir., IE (30 copies)Dir., MIPC (3 copies)780660023  
LIflIT IN         TECHNICAL SPECIFICATION                         6.8.3.C.
~'s,f"  
8 9                                                                                                                                                            80 (RO-050-0316/78-02                )
Form No.4494*LICENSEE EVENT REPORT~CONTROL BLOCK LICENSEE NAME[oOg Yi I 0 C C 2 7 89 14 LICENSE NUMBER 0 0-0 0 0 0 0-0 0[PLEASE PRlhlT.,ALL
[oat 7    8"9                                                                          PRME                                                                              80 SYSTEM        CAUSE                                                COMPONBIT            COMPOIIENT CODE        CODE                COMPONENT CODE                    SUPPUER            MANUFACTURER            VIOLATION
REdUIRED INFORMATIDhl)
[oc7I  ~zz                A              z          z  z  z    z z              z            Z  9    9    9            ~Y 7 8 9 10                    11        12                                17  . 43          44                47,          48 CAUSE DESCRIPTION
LICENSE EVENT TYPE TYPE.4 1 1'I 1~03 26 30.31'32 REPORT.REPORT CATEGORY TYPE SOURCE'os conn~L~L 0 7 8 57 58 59 60 61 DOCKET NUMBER EVENT DATE REPORT DATE 50 0316 020278 022878 68 69 74 75 80 7 8 9[oat (RO-050-0316/78-02
  ~08        THE RESPONSIBLE TEST ENGINEER FAILED TO SUBMIT THE TEHPORARY SH                                                          TS T 7 8 9                                                                                                                                                                80 Qo9        SECTION HEAD FOR PNSRC                            REVIEll.
)7 8"9 PRME SYSTEM CAUSE COMPONBIT COMPOIIENT
7 8 9                                                                                                                                                                80 I
CODE CODE COMPONENT CODE SUPPUER MANUFACTURER
t1iO]
VIOLATION[oc7I~zz A z z z z z z z 7 8 9 10 11 12 17.43 44 47, 48 CAUSE DESCRIPTION
7 89                                                                                                                                                                 80 FACILITY                                                                   METHOD OF STATUS             To PowER                       OTHER STATUS            DISCOVERY                        DISCOVERY DESCRIPTION 0             ~00         O                       N/A                     C                      Proc d      r 7     8       9               10                   12 13                             44    45      46                                                            BO FORM OF ACTIVITY         COATENT RELEASEO       OF RELEASE                   AMOUNT OF ACTIVITY                                               LOCATION'F      RELEASE Q~g             Z               Z                           N/A                                                   N/A
~08 THE RESPONSIBLE
, 7     8       9           ,   10       11                                           44      45                                                                  80 PERSONNEL EXPOSURES 7     8 9               11     .12     13                                                                                                                         80 PERSONNEL INJURIES 7     89                 11   12                                                                                                                                   80 OFFSITE CONSEQUENCES Q~g                                   N/A 7    89                                                                                                                                                              80 LOSS OR DAMAGE TO FACILITY TYPE'ESCRIPTION, Z                          N/A 7    89          10                                                                                                                                                80 PUBLICITY N/A 7    89                                                                                                                                                              80 ADDITIONAL FACTORS
TEST ENGINEER FAILED TO SUBMIT THE TEHPORARY SH TS T Z 9 9 9~Y 7 8 9 Qo9 SECTION HEAD FOR PNSRC REVIEll.7 8 9 t1iO]EVENT DESCRIPTION
  ~18         THE RESPONSIBLE TEST ENGIl'lEER HAS REVIEIJED THE TECHl'lICAL SPECIFICATION REOUIREHENTS 7   89                                                                                                                                                             80 CONCERNING TEt'IPORARY CHANGE SHEETS.
[oO~]A REVIEll OF A PREOPERATIONAL
Q~g 7,.8   9                                                                                                                                                           80 NAME:
TEST REVEALED THREE TEMPORARY CHANGE SHEETS (TP-2, 3, 7 89[003]'ND 4 for 2-PO-050-575A
J. L. Rischling                                       PHONE(
l'IERE.>lRITTEN Ol'l JANUARY 6 1978 BUT NOT APPROVED BY~()4 PNSRC AND THE PLANT NNAGER UNTIL FEBRUARY 7, 1978.THIS EXCEEDED THE 14-DAY 7 8 9'os LIflIT IN TECHNICAL SPECIFICATION
GPO Sb'I e dST
6.8.3.C.80 80 80 80 80 80 80 I OTHER STATUS 7 89 LOSS OR DAMAGE TO FACILITY TYPE'ESCRIPTION, Z N/A 7 89 10 PUBLICITY N/A 7 89 7 89 FACILITY STATUS To PowER 0~00 O N/A 7 8 9 10 12 13 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY Q~g Z Z N/A , 7 8 9 , 10 11 PERSONNEL EXPOSURES 7 8 9 11.12 13 PERSONNEL INJURIES 7 89 11 12 OFFSITE CONSEQUENCES
 
Q~g N/A METHOD OF DISCOVERY C 44 45 46 44 45 DISCOVERY DESCRIPTION
0
Proc d r LOCATION'F
      , er L
RELEASE N/A 80 BO 80 80 80 80 80 80 ADDITIONAL
1
FACTORS~18 THE RESPONSIBLE
    /}}
TEST ENGIl'lEER
HAS REVIEIJED THE TECHl'lICAL
SPECIFICATION
REOUIREHENTS
7 89 CONCERNING
TEt'IPORARY
CHANGE SHEETS.Q~g 80 7,.8 9 NAME: J.L.Rischling 80 PHONE(GPO Sb'I e dST  
0 , er L 1/
}}

Latest revision as of 20:22, 2 February 2020

D.C. Cook - Submit Licensee Event Report RO 50-316/78-02 for Unit 2
ML18219B549
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/28/1978
From: Shaller D
American Electrtic Power System, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: James Keppler
NRC/RGN-III
References
LER 1978-002-00
Download: ML18219B549 (6)


Text

nape-+/NQ REGULATORY INFORMATION DISTRIBUTION SYSTEM

~ DISTRIBUTION FOR INCOMING MATERIAL

< RIDS) 50-3i6 REC: KEPPLER J G ORG: SHALLER D V DOCDATE: 02/28/78 NRC IN,8c MI PWR DATE RCVD: 03/03/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED SUB JECT: LTR i ENCL i LICENSEE EVENT REPT <RO 50-3l6/78-02) ON 02/02/78 CONCERNING REVIEW OF PREOPERATIONAL TEST REVEALED THREE TEMPORARY CHANGE SHEETS

<TP-2r 3 AND 4 FOR 2-PO-050-575A) WERE WRITTEN ON Oi/06/78'UT NOT APPROVED BY PNSRC AND THE PLANT MANAGER UNTI 02/07/78' PLANT NAME: COOK UNIT 2 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NOTES:

i. SEND 3 COPIES OF ALL MATERIAL TO IS(E INCIDENT REPORTS (DISTRIBUTION CODE A002)

FOR ACTION: BR CHIEF KNIEL4+W/4 ENCL INTERNAL: ENCL NRC PDR++W/ENCL I 0 E~~W/2 ENC MIPC4+W/3 ENCL SCHROEDER/I PPOL I TO+4 W/ENCL HOUSTON++W/ENCL NOVAK/CHECK++W/ENCL GRIMES< +W/ENCL KN I GHT++W/ENCL BUTLER++W/ENCL HANAUER+~W/ENCL TEDESCOw<W/ENCL E ISENHUT+>W/ENCL BAER++W/ENCL SHA04+W/ENCL VOLLMER/BUNCH<4W/ENCL MKMK+KO++W/ENCL ROSA>4W/ENCL K SEYFR IT/IE44W/ENCL EXTERNAL'REG).

LPDR S ST. JOSEPH' I ++W/ENCL TIC44W/ENCL NS IC++W/ENCL ACRS CAT B4+W/16 ENCL DISTRIBUTION: LTR 45 ENCL 45 CONTROL NBR: 780660023 SIZE: iP+iP THE END

II I, t K k>

0 n II I

r,<

KILULYIINIlI(EAl.f. ISW, y5<< INDIAIN & NlCHIGA0 PD IVER. CONPA IIIY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 C5 February 28, 1978 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement ~@R3 )g78c. 1~

United States Nuclear Regulatory Comiission Region III i~i~ ~

I 799 Roosevelt Road Glen Ellyn, IL 60137

<;so Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory'Guide 1.16, Revision 4, Section 2.b, tne following report is submitted:

RO 50-316/78-02 Sincerely, D.Y. Shaller Plant Manager

/bab CC- J;E. Dolan R.l<. Jurgensen G.E. Lien R. Kilburn R.J. Yollen BPI K.R. Baker RO:III R.C. Callen MPSC P.hl. Steketee, Esq.

R. Malsh, Esq.

G. Charnoff, Esq.

G. Olson J.M. Hennigan PNSRC J.F. Stietzel Dir., IE (30 copies)

Dir., MIPC (3 copies) 780660023

s,f"

~

Form No. 4494 CONTROL BLOCK LICENSEE EVENT REPORT

~

[PLEASE PRlhlT.,ALL REdUIRED INFORMATIDhl)

LICENSEE LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE.

[oOg Yi I 0 C C 2 0 0 0 0 0 0 0 0 0 4 1 1

'I 1 ~03'32

~

7 89 14 26 30 . 31 REPORT 022878 REPORT.

7 8 conn CATEGORY 57 58 TYPE L

59 SOURCE'os

~L 60 61 0 50 0316 DOCKET NUMBER 68 69 020278 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION

[oO~] A REVIEll OF A PREOPERATIONAL TEST REVEALED THREE TEMPORARY CHANGE SHEETS (TP-2, 3, 7 89 80

[003]'ND 4 for 2-PO-050-575A l'IERE. >lRITTEN Ol'l JANUARY 6 1978 BUT NOT APPROVED BY 80

~() 4 PNSRC AND THE PLANT NNAGER UNTIL FEBRUARY 7, 1978. THIS EXCEEDED THE 14-DAY 7 8 9 80

'os 7

LIflIT IN TECHNICAL SPECIFICATION 6.8.3.C.

8 9 80 (RO-050-0316/78-02 )

[oat 7 8"9 PRME 80 SYSTEM CAUSE COMPONBIT COMPOIIENT CODE CODE COMPONENT CODE SUPPUER MANUFACTURER VIOLATION

[oc7I ~zz A z z z z z z z Z 9 9 9 ~Y 7 8 9 10 11 12 17 . 43 44 47, 48 CAUSE DESCRIPTION

~08 THE RESPONSIBLE TEST ENGINEER FAILED TO SUBMIT THE TEHPORARY SH TS T 7 8 9 80 Qo9 SECTION HEAD FOR PNSRC REVIEll.

7 8 9 80 I

t1iO]

7 89 80 FACILITY METHOD OF STATUS To PowER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION 0 ~00 O N/A C Proc d r 7 8 9 10 12 13 44 45 46 BO FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY LOCATION'F RELEASE Q~g Z Z N/A N/A

, 7 8 9 , 10 11 44 45 80 PERSONNEL EXPOSURES 7 8 9 11 .12 13 80 PERSONNEL INJURIES 7 89 11 12 80 OFFSITE CONSEQUENCES Q~g N/A 7 89 80 LOSS OR DAMAGE TO FACILITY TYPE'ESCRIPTION, Z N/A 7 89 10 80 PUBLICITY N/A 7 89 80 ADDITIONAL FACTORS

~18 THE RESPONSIBLE TEST ENGIl'lEER HAS REVIEIJED THE TECHl'lICAL SPECIFICATION REOUIREHENTS 7 89 80 CONCERNING TEt'IPORARY CHANGE SHEETS.

Q~g 7,.8 9 80 NAME:

J. L. Rischling PHONE(

GPO Sb'I e dST

0

, er L

1

/