| {{#Wiki_filter:* l=PL .. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001 RE: Turkey Point Nuclear Plant, Unit 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating Licenses DPR-31 and DPR-41 October 24, 2018 L-2018-198 10 CFR 50.90 Requested Approval for License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals | | {{#Wiki_filter:*l=PL. |
| | October 24, 2018 L-2018-198 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001 RE: Turkey Point Nuclear Plant, Unit 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating Licenses DPR-31 and DPR-41 Requested Approval for License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals |
|
| |
|
| ==Reference:== | | ==Reference:== |
| : 1. FPL letter L-2018-170, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals, October 17, 2018 (ADAMS Accession No. ML 18290A862) | | : 1. FPL letter L-2018-170, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals, October 17, 2018 (ADAMS Accession No. ML18290A862) |
| : 2. NRC letter to Westinghouse Owners Group, "Final Safety Evaluation for Pressurized Water Reactor Owners Group (PWROG) Topical Report WCAP-16175-P, Revision 0, (CE NPSD-1199, Revision 1) "Model for Failure of RCP Seals Given Loss of Seal Cooling in CE NSSS Plants" (TAC No. MB5803)" dated February 12, 2007 (ADAMS Accession No. ML070240429) | | : 2. NRC letter to Westinghouse Owners Group, "Final Safety Evaluation for Pressurized Water Reactor Owners Group (PWROG) Topical Report WCAP-16175-P, Revision 0, (CE NPSD-1199, Revision 1) "Model for Failure of RCP Seals Given Loss of Seal Cooling in CE NSSS Plants" (TAC No. MB5803)" dated February 12, 2007 (ADAMS Accession No. ML070240429) |
| In Reference 1, Florida Power & Light Company (FPL) submitted license amendment request (LAR) 265, "Revise NFPA 805 License Condition for Reactor Coolant Pump Seals", for Turkey Point Nuclear Plant Units 3 and 4 (Turkey Point). The proposed amendments remove reliance on the Flowserve Reactor Coolant Pump (RCP) Seal Topical Report as a condition of Turkey Point's transition to NFPA 805, and document the application of WCAP-16175-P | | In Reference 1, Florida Power & Light Company (FPL) submitted license amendment request (LAR) 265, "Revise NFPA 805 License Condition for Reactor Coolant Pump Seals", for Turkey Point Nuclear Plant Units 3 and 4 (Turkey Point). The proposed amendments remove reliance on the Flowserve Reactor Coolant Pump (RCP) Seal Topical Report as a condition of Turkey Point's transition to NFPA 805, and document the application of WCAP-16175-P-A (Reference 2) for modeling RCP seal leakage in the Turkey Point Probabilistic Risk Assessment (PRA). |
| -A (Reference | | In a discussion with the NRC, the staff requested that FPL specify a requested approval date and implementation period for LAR 265 . This letter serves as FPL's request for LAR 265 approval by April 1, 2019 with implementation to be completed within 30 days thereafter. The requested approval supports the planned Unit 4 refuel outage schedule. |
| : 2) for modeling RCP seal leakage in the Turkey Point Probabilistic Risk Assessment (PRA). In a discussion with the NRC, the staff requested that FPL specify a requested approval date and implementation period for LAR 265. This letter serves as FPL's request for LAR 265 approval by April 1, 2019 with implementation to be completed within 30 days thereafter.
| | This letter contains no new or revised regulatory commitments. This supplemental information does not alter the conclusion in Reference 1 that the proposed changes do not involve a significant hazards consideration pursuant to 10 CFR 50.92 , and there are no significant environmental impacts associated with the proposed changes. |
| The requested approval supports the planned Unit 4 refuel outage schedule. | | Should you have any questions regarding this matter, please feel free to contact me at (305) 246-4112. |
| This letter contains no new or revised regulatory commitments. This supplemental information does not alter the conclusion in Reference 1 that the proposed changes do not involve a significant hazards consideration pursuant to 10 CFR 50.92 , and there are no significant environmental impacts associated with the proposed changes. Should you have any questions regarding this matter, please feel free to contact me at (305) 246-4112. | | Manager, Turkey Point Licensing Florida Power & Light Company |
| ----Manager, Turkey Point Licensing Florida Power & Light Company Turkey Point Nuclear Plant L-2018-198 Docket Nos. 50-250 and 50-251 Page 2 of 2 cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health}}
| | |
| | Turkey Point Nuclear Plant L-2018-198 Docket Nos. 50-250 and 50-251 Page 2 of 2 cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health}} |
Letter Sequence Request |
---|
EPID:L-2018-LLA-0280, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals (Approved, Closed) |
|
MONTHYEARL-2018-170, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals2018-10-17017 October 2018 License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals Project stage: Request L-2018-198, Requested Approval for License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals2018-10-24024 October 2018 Requested Approval for License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals Project stage: Request ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals Project stage: Acceptance Review L-2018-219, Supplement to License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals2018-12-0303 December 2018 Supplement to License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals Project stage: Supplement ML18347B3442018-12-13013 December 2018 Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals Project stage: Acceptance Review ML18297A2252018-12-18018 December 2018 License Amendment Application; Opportunity to Comment, Request a Hearing and Petition for Leave to Intervene; Order Imposing Procedures for Florida Power & Lighting Company; Turkey Point Nuclear Generating Units Nos. 3 & 4 (Docket Nos.50-25 Project stage: Other ML18297A2012018-12-18018 December 2018 Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing & Order Imposing Procedures Project stage: Other ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 Project stage: RAI ML19064A2092019-03-0404 March 2019 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Florida Regarding Turkey Point License Amendments - Revise NFPA 805 License Condition for Reactor Project stage: Other ML19064A9032019-03-27027 March 2019 Issuance of Amendments Regarding Transition License Conditions for Reactor Coolant Pump Seals Project stage: Approval 2018-12-18
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] |
Text
October 24, 2018 L-2018-198 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001 RE: Turkey Point Nuclear Plant, Unit 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating Licenses DPR-31 and DPR-41 Requested Approval for License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals
Reference:
- 1. FPL letter L-2018-170, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals, October 17, 2018 (ADAMS Accession No. ML18290A862)
- 2. NRC letter to Westinghouse Owners Group, "Final Safety Evaluation for Pressurized Water Reactor Owners Group (PWROG) Topical Report WCAP-16175-P, Revision 0, (CE NPSD-1199, Revision 1) "Model for Failure of RCP Seals Given Loss of Seal Cooling in CE NSSS Plants" (TAC No. MB5803)" dated February 12, 2007 (ADAMS Accession No. ML070240429)
In Reference 1, Florida Power & Light Company (FPL) submitted license amendment request (LAR) 265, "Revise NFPA 805 License Condition for Reactor Coolant Pump Seals", for Turkey Point Nuclear Plant Units 3 and 4 (Turkey Point). The proposed amendments remove reliance on the Flowserve Reactor Coolant Pump (RCP) Seal Topical Report as a condition of Turkey Point's transition to NFPA 805, and document the application of WCAP-16175-P-A (Reference 2) for modeling RCP seal leakage in the Turkey Point Probabilistic Risk Assessment (PRA).
In a discussion with the NRC, the staff requested that FPL specify a requested approval date and implementation period for LAR 265 . This letter serves as FPL's request for LAR 265 approval by April 1, 2019 with implementation to be completed within 30 days thereafter. The requested approval supports the planned Unit 4 refuel outage schedule.
This letter contains no new or revised regulatory commitments. This supplemental information does not alter the conclusion in Reference 1 that the proposed changes do not involve a significant hazards consideration pursuant to 10 CFR 50.92 , and there are no significant environmental impacts associated with the proposed changes.
Should you have any questions regarding this matter, please feel free to contact me at (305) 246-4112.
Manager, Turkey Point Licensing Florida Power & Light Company
Turkey Point Nuclear Plant L-2018-198 Docket Nos. 50-250 and 50-251 Page 2 of 2 cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health