OPERATING DATA REPORT DOCKET NO. 50-336
OPERATING DATA REPORT DOCKET NO. 50-336 DATE 1/1/79 LOMPLETED BY S. H Hnwlatt TELEPHO.NE 203/ A A7 1791
  .
DATE 1/1/79 LOMPLETED BY S. H Hnwlatt TELEPHO.NE 203/ A A7 1791
                                                                                                                 . Ext 364 OPERATING STATUS Notes                                <-
                                                                                                                 . Ext 364 OPERATING STATUS Notes                                <-
: 1. Unit Name:      Millstone ?
: 1. Unit Name:      Millstone ?
Line 35: Line 31:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:              -
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:              -
None
None
                                                                                                                            .
: 9. Power level To Which Restricted,If Any (Net MWe): Nene                                                            *
: 9. Power level To Which Restricted,If Any (Net MWe): Nene                                                            *
.          10. Reasons For Restrictions,1f Any:                        Nnno 4
.          10. Reasons For Restrictions,1f Any:                        Nnno 4
        .                                                                                                        .
                                                                                                                          ..
This Month            Yr to-Date          Cumulative ,
This Month            Yr to-Date          Cumulative ,
8760                .pgagg                    i
8760                .pgagg                    i
Line 45: Line 38:
: 12. Number Of Ilours Reactor Was Critical              744                    6065_5              19527.7
: 12. Number Of Ilours Reactor Was Critical              744                    6065_5              19527.7
: 13. Reactor Reserve Shutdown Hours                        0                    120,0                2000.7            ~
: 13. Reactor Reserve Shutdown Hours                        0                    120,0                2000.7            ~
                                                                                                                                    .
: 14. Hours Generator On-Line                            7aA                    5757.6            'l8431.7
: 14. Hours Generator On-Line                            7aA                    5757.6            'l8431.7
: 15. Unit Reserve Shutdown Hours                          n                    133.5                226
: 15. Unit Reserve Shutdown Hours                          n                    133.5                226
Line 55: Line 47:
: 21. Unit Capacity Factor (Using MDC Net) -              44 4                    A1 a            A2.6
: 21. Unit Capacity Factor (Using MDC Net) -              44 4                    A1 a            A2.6
: 22. Unit Capacity Factor (Using DER Net)                97 5                    61_9            61_1
: 22. Unit Capacity Factor (Using DER Net)                97 5                    61_9            61_1
                                                                                                                        *
: 23. Unit Forced Outage Rate                                0                    26.3        _i',3'
: 23. Unit Forced Outage Rate                                0                    26.3        _i',3'
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):                            . s..    ,
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):                            . s..    ,
Refueling March 24, 1979                10 Weeks                                                                            .
Refueling March 24, 1979                10 Weeks                                                                            .
                                                                                >                                                        ,
                                                       -  c                                                                                      _
                                                       -  c                                                                                      _
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                                                        /
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                                                        /
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast            Achieved
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIAL CRITICALITY                                      N/A                  N/A INITIAL ELECTRICITY                                      N/A                .N/A COMMERCIAL OPERATION                                    N/A                  N/A 79011602 31                                                                                                      (9/77)
      .
INITIAL CRITICALITY                                      N/A                  N/A INITIAL ELECTRICITY                                      N/A                .N/A COMMERCIAL OPERATION                                    N/A                  N/A 79011602 31                                                                                                      (9/77)


    .
AVER AGE D AILY UNIT POWER LEVEL DOCKET NO.      50-336 unir Millstone 2 DATE    l/4/79 t.UNIPLETED BY    G.H. Howlett TELEPHONE 203/447-1791 Ext. 364 510NDI      December 1978
  .      .
                                                              .
AVER AGE D AILY UNIT POWER LEVEL DOCKET NO.      50-336 unir Millstone 2 DATE    l/4/79 t.UNIPLETED BY    G.H. Howlett TELEPHONE 203/447-1791 Ext. 364
                  .
510NDI      December 1978
       ,    DAY        AVERAGE DAILY POWER LEVEL                          DAY        AVER AGE DAILY POWER LEVEL
       ,    DAY        AVERAGE DAILY POWER LEVEL                          DAY        AVER AGE DAILY POWER LEVEL
   ,                                  (N!We Net)                                                  (MWe. Net) 3 810                                          37                810 2                805                                          is                808 3                810                                          39                809 4                810                                          20                809 810
   ,                                  (N!We Net)                                                  (MWe. Net) 3 810                                          37                810 2                805                                          is                808 3                810                                          39                809 4                810                                          20                809 810 s                                                              21                81 0 6                8S                                          22                810 7      -
'
s                                                              21                81 0
          ,
6                8S                                          22                810
                                '
7      -
23 8                811                                          24                810 9
23 8                811                                          24                810 9
0ll 25              810 10                809                                          26              789 in                810                                          27              807 12 809                                                          808 28 13                809                                          29              808 14                809                                          30              811 15 810                                          3,              811 16      _
0ll 25              810 10                809                                          26              789 in                810                                          27              807 12 809                                                          808 28 13                809                                          29              808 14                809                                          30              811 15 810                                          3,              811 16      _
Line 86: Line 63:
(9/77)
(9/77)


                  .                                                                    .                                                  .
l                                          .
l                                          .
                                                                                                                                    -      -
DOCKET NO.
DOCKET NO.
50-336
50-336
                                       .      UNIT SHUTDOWNS AND POWER REDUCTIONS                    UNIT NA3f E Millstone 2
                                       .      UNIT SHUTDOWNS AND POWER REDUCTIONS                    UNIT NA3f E Millstone 2 DATE I/5//9 COMPLETED BY .G.H.      Howlett REPORT MONTH December 1978                      TELEPif0NE 203/447-1791 oxt. 364 4
            *
w
* DATE I/5//9
        '
COMPLETED BY .G.H.      Howlett REPORT MONTH December 1978                      TELEPif0NE 203/447-1791 oxt. 364
            *
        .
4 w
                                               %e                          e a
                                               %e                          e a
                     -    jp      "h    j ,_E 5        Licensee  E,,    je.                    Cause & Correct- e 3g            ,s s 5          Event    g?    g"g                        Action to No.        Daic    h            n mO                            Prevent Recurrence H
                     -    jp      "h    j ,_E 5        Licensee  E,,    je.                    Cause & Correct- e 3g            ,s s 5          Event    g?    g"g                        Action to No.        Daic    h            n mO                            Prevent Recurrence H
f:        5    jgg            Report
f:        5    jgg            Report
* g d
* g d
                                                                                                                                        .
t Summary: The unit operated at or,near 10'0% ' rated. thermal . power throughout .the. rep. ort'ing period.
                                                                                                  -
                                                                      .
t
                                                                                                                                          .
                                                      .
          -                                                          -
                                                                                                                      .
                                                                                                                                .
                            .
                .
                                                                            .
                                              .
                                                    .
                                            .                          .
                                            .
* Summary: The unit operated at or,near 10'0% ' rated. thermal . power throughout .the. rep. ort'ing period.
                                                  '
                                                                                                                                      .
e 0
e 0
                                                                          %                                                **.
* e (9/77)                    .
* e (9/77)                    .
                                                                                .                                                .
S S
S S
9
9


Docket No. 50-336            .      '.
Docket No. 50-336            .      '.
Page 1 of j                                                                            Date        1/9/79 Unit Name  Millstone d
Page 1 of j                                                                            Date        1/9/79 Unit Name  Millstone d Completed By G.H. Howlett Telephone    tus/44/-i/9  txt. 3o4 C0h .CCTIVE MAINTENANCE  
                            .
Completed By G.H. Howlett Telephone    tus/44/-i/9  txt. 3o4 C0h .CCTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT
FOR SAFETY RELATED EQUIPMENT Report Month November 1978 DATE                SYSTEM                          COMPONENT                              MAINTENANCE ACTION    -
                                    '
Report Month November 1978 DATE                SYSTEM                          COMPONENT                              MAINTENANCE ACTION    -
                                                                                                                          .
11/11/78    Chemical & Volume          Heat [racingckt.P-21                Installed new heat tracing.
11/11/78    Chemical & Volume          Heat [racingckt.P-21                Installed new heat tracing.
Qontrol 11/15/78    Service Water              Vital A.C. switchgear room          Machined corroded cooler heads.
Qontrol 11/15/78    Service Water              Vital A.C. switchgear room          Machined corroded cooler heads.
coolers X-181,182, & 183
coolers X-181,182, & 183 11/21/78    Chemical & Volume          Charging pump P-18A                Replaced pump.
              .
11/21/78    Chemical & Volume          Charging pump P-18A                Replaced pump.
Control 11/22/78    Chemical & Volume          Charging pump P-18C                Replaced pump discharge valves.
Control 11/22/78    Chemical & Volume          Charging pump P-18C                Replaced pump discharge valves.
Control 11/30/78    Reactor Building          RBCCW pump P-11B                    Replaced mechanical seal.
Control 11/30/78    Reactor Building          RBCCW pump P-11B                    Replaced mechanical seal.
Closed Cooling Water
Closed Cooling Water 4
                                                                                                    .
                    #                                                                        .
4
                                                                  .


.. . .
Docket No. 50-336 Date:        1/10/79 Completed By: G.H. Howlett III
Docket No. 50-336 Date:        1/10/79 Completed By: G.H. Howlett III
   .                                                            Telephone:
   .                                                            Telephone:
                                                                      ,
203/447-1971 X364 REFUELING INFORMATION REQUEST
203/447-1971 X364 REFUELING INFORMATION REQUEST
: 1. Name of facility:    Millstone 2
: 1. Name of facility:    Millstone 2

Latest revision as of 00:34, 2 February 2020

Monthly Operating Rept for Dec 1978
ML19256A856
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/03/1979
From: Howlett G
NORTHEAST UTILITIES
To:
Shared Package
ML19256A855 List:
References
NUDOCS 7901160237
Download: ML19256A856 (5)


Text

.- .

~

OPERATING DATA REPORT DOCKET NO. 50-336 DATE 1/1/79 LOMPLETED BY S. H Hnwlatt TELEPHO.NE 203/ A A7 1791

. Ext 364 OPERATING STATUS Notes <-

1. Unit Name: Millstone ?
2. Reporting Period: _Doremhor 147R
3. Licensed Thermal Power (MWt): 2560
4. Nameplate Rating (Gross MWe): 909 ,
5. Design Electrical Rating (Net MWe): 830
6. Maximum Dependable Cr'scity (Gross MWe):

842

7. Maumum Dependable Ca3.acity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: -

None

9. Power level To Which Restricted,If Any (Net MWe): Nene *

. 10. Reasons For Restrictions,1f Any: Nnno 4

This Month Yr to-Date Cumulative ,

8760 .pgagg i

11. Hours In Reporting Period 744
12. Number Of Ilours Reactor Was Critical 744 6065_5 19527.7
13. Reactor Reserve Shutdown Hours 0 120,0 2000.7 ~
14. Hours Generator On-Line 7aA 5757.6 'l8431.7
15. Unit Reserve Shutdown Hours n 133.5 226
16. Gross Thermal Energy Generated (MWH) 1.900.976 14.375_l59 41_RR9.911 1
17. Gross Electrical Energy Generated (MWH) 624.600 __. 4.697.890 14.028.801
18. Net Electrical Energy Generrted (MWH) 601,807 4.500,379 13.41'6.~691
19. Unit Service Factor 100 65.7 69.7  ;
20. Unit Availability Factor 100 67.3 70.5 '
21. Unit Capacity Factor (Using MDC Net) - 44 4 A1 a A2.6
22. Unit Capacity Factor (Using DER Net) 97 5 61_9 61_1
23. Unit Forced Outage Rate 0 26.3 _i',3'
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each): . s.. ,

Refueling March 24, 1979 10 Weeks .

- c _

25. If Shut Down At End Of Report Period. Estimated Date of Startup: /
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A .N/A COMMERCIAL OPERATION N/A N/A 79011602 31 (9/77)

AVER AGE D AILY UNIT POWER LEVEL DOCKET NO. 50-336 unir Millstone 2 DATE l/4/79 t.UNIPLETED BY G.H. Howlett TELEPHONE 203/447-1791 Ext. 364 510NDI December 1978

, DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL

, (N!We Net) (MWe. Net) 3 810 37 810 2 805 is 808 3 810 39 809 4 810 20 809 810 s 21 81 0 6 8S 22 810 7 -

23 8 811 24 810 9

0ll 25 810 10 809 26 789 in 810 27 807 12 809 808 28 13 809 29 808 14 809 30 811 15 810 3, 811 16 _

803 IN' TRUCTIONS On this format. list the average daily i; nit power leselin 51%e. Net for each day in the reponing month. Compute to -

the nearest whole megawait.

(9/77)

l .

DOCKET NO.

50-336

. UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NA3f E Millstone 2 DATE I/5//9 COMPLETED BY .G.H. Howlett REPORT MONTH December 1978 TELEPif0NE 203/447-1791 oxt. 364 4

w

%e e a

- jp "h j ,_E 5 Licensee E,, je. Cause & Correct- e 3g ,s s 5 Event g? g"g Action to No. Daic h n mO Prevent Recurrence H

f: 5 jgg Report

  • g d

t Summary: The unit operated at or,near 10'0% ' rated. thermal . power throughout .the. rep. ort'ing period.

e 0

  • e (9/77) .

S S

9

Docket No. 50-336 . '.

Page 1 of j Date 1/9/79 Unit Name Millstone d Completed By G.H. Howlett Telephone tus/44/-i/9 txt. 3o4 C0h .CCTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month November 1978 DATE SYSTEM COMPONENT MAINTENANCE ACTION -

11/11/78 Chemical & Volume Heat [racingckt.P-21 Installed new heat tracing.

Qontrol 11/15/78 Service Water Vital A.C. switchgear room Machined corroded cooler heads.

coolers X-181,182, & 183 11/21/78 Chemical & Volume Charging pump P-18A Replaced pump.

Control 11/22/78 Chemical & Volume Charging pump P-18C Replaced pump discharge valves.

Control 11/30/78 Reactor Building RBCCW pump P-11B Replaced mechanical seal.

Closed Cooling Water 4

Docket No. 50-336 Date: 1/10/79 Completed By: G.H. Howlett III

. Telephone:

203/447-1971 X364 REFUELING INFORMATION REQUEST

1. Name of facility: Millstone 2
2. Scheduled date for next refueling shutdown: March 24, 1979
3. Schedule date for restart following refueling: May 19, 1979
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Because the Spring,1979 refueling will be only the second at Millstone Unit No. 2., Technical Specification Changes are anticipated, especially in the area of reactor engineering specifications. Inspections of the CEA guide tubes and the steam generators are scheduled for the second refueling outage; the results of these inspections may ultimately involve a license amendannt. Review of the reload design is scheduled for January,1979.

5. Scheduled date's) for submitting proposed licensing action and supporting information:

" Licensing submittals are scheduled as outlined in the November 1,1978 letter from W. G. Counsil to R. Reid."

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes :n fuel design, new operating procedures:

Serious consideration has been given to uprate the thermal output for cycle 3 from 2560 MWT to 2700 MWT. Further schedular & tails will be forwarded as they developed.

7. The number of fuel assemblies (a) in the core and (b) in the sp at fuel storage pool:

(a) In Core: 21 7 ih; 72

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensad storage capacity that has been requested or is planned, in number of fuel assemblies:

667

9. The projected date of tne last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1983, Spent Fuel Pool, full core off load capability is reached.