p o ,3 ; l that DG 1-1 was making unusual noises.
p o ,3 ; l that DG 1-1 was making unusual noises.
I o 141 l from the turbocharger. It was suspected the turbocharger reliabiliev was inadeouate I
I o 141 l from the turbocharger. It was suspected the turbocharger reliabiliev was inadeouate I
        -
the unit in Action Statement I g y land DC 1-1 was declared inoperable at 1245 hours placing There was 1 lo Js l l A of TS 3.8.1.1, which requires two independent DC in Modes 1, 2. "3 and 4 jol7) } no danger to the health and safety of the public or to unit                                                                          eersonnel. DC 1-2 was                        !
the unit in Action Statement I g y land DC 1-1 was declared inoperable at 1245 hours placing There was 1 lo Js l l A of TS 3.8.1.1, which requires two independent DC in Modes 1, 2. "3 and 4 jol7) } no danger to the health and safety of the public or to unit                                                                          eersonnel. DC 1-2 was                        !
(Np-33-78-21)                        I I o la 1 l Operable if a loss of all normal power supplies had occurred.                                                                                                                80
(Np-33-78-21)                        I I o la 1 l Operable if a loss of all normal power supplies had occurred.                                                                                                                80
                   '                                                                                                                            COMP.          VALVE
                   '                                                                                                                            COMP.          VALVE
                                               $YSTEM            CAUSE          CAust                                                        SU8 CODE        SUSCODE CODE              CODE        SU8 CODE                  COMPCNENT CODE lol91 7          8 lE]Bl@ Q @ l l@ l Bl Ll Ol W} El Rl@ l Z l@ l Z l @
                                               $YSTEM            CAUSE          CAust                                                        SU8 CODE        SUSCODE CODE              CODE        SU8 CODE                  COMPCNENT CODE lol91 7          8 lE]Bl@ Q @ l l@ l Bl Ll Ol W} El Rl@ l Z l@ l Z l @
9          10          11            12            r3                                18            19 REPORT 20 REVISt JN SEcutNTIAL                          OCCURRENCE
9          10          11            12            r3                                18            19 REPORT 20 REVISt JN SEcutNTIAL                          OCCURRENCE CCCE                  TYPE                          No.
                                        ,_
CCCE                  TYPE                          No.
R EPORT No.
R EPORT No.
(g ggo        EVENT YE A R l0l3l                    lL l          l-l          l0l
(g ggo        EVENT YE A R l0l3l                    lL l          l-l          l0l
Line 51: Line 48:
                                           % POWER                      oTH ER STATUS 5TA                                                                                                                                                                        l I1 l 5 l l E j@ l 0l 7 l 4 l@l NA                                                          l      l B l@l46Surveillance Test ST 5081.01                                                80 44        45 y        8 9                    to              12      11 ACTIVITY CONTENT                                                                                                            LOCATION OF RELEASE RELEASEC OF RELEASE                            AMOUNT OF ACTIVITY l
                                           % POWER                      oTH ER STATUS 5TA                                                                                                                                                                        l I1 l 5 l l E j@ l 0l 7 l 4 l@l NA                                                          l      l B l@l46Surveillance Test ST 5081.01                                                80 44        45 y        8 9                    to              12      11 ACTIVITY CONTENT                                                                                                            LOCATION OF RELEASE RELEASEC OF RELEASE                            AMOUNT OF ACTIVITY l
NA                                    l            l NA
NA                                    l            l NA
!
!
[1 l68 l9 W @ l Zl@l
[1 l68 l9 W @ l Zl@l
       ;                              to          11 44              45 80 1
       ;                              to          11 44              45 80 1
PER$oNNEL ExPCSURES NUM8ER                TYPE        DESCRIPTION 39 l                                                                                                                                                                                              l l1l7j l0l0                                  2            NA                                                                                                                          80
PER$oNNEL ExPCSURES NUM8ER                TYPE        DESCRIPTION 39 l                                                                                                                                                                                              l l1l7j l0l0                                  2            NA                                                                                                                          80 l                          PERSONNE L INJURIES NUVBE R              CEsCRiPTION                                                                                                                                    I 8 9 10l0lol@l .
_
l                          PERSONNE L INJURIES NUVBE R              CEsCRiPTION                                                                                                                                    I 8 9 10l0lol@l .
11      12 NA                                                                                                                                      80 LCss OF CR DauA0E To FACILITY l , m i y'lgi g'"' ~
11      12 NA                                                                                                                                      80 LCss OF CR DauA0E To FACILITY l , m i y'lgi g'"' ~
                       '              "                                                                                                  s o o2 060 oU                                          i
                       '              "                                                                                                  s o o2 060 oU                                          i
       ;          & 9                10                                                                                                                                  NRC USE ONLY
       ;          & 9                10                                                                                                                                  NRC USE ONLY
* PUC(tCITY i :Ugn        DESCRiPTICN I    I I I I I I l 1 1 I I I ldu*:.    ,
* PUC(tCITY i :Ugn        DESCRiPTICN I    I I I I I I l 1 1 I I I ldu*:.    ,
j;inj lNj                    l NA                                                                                                                  G3 69                                    a;
j;inj lNj                    l NA                                                                                                                  G3 69                                    a; hh Uninn                                                                mer 3:    MO WWM. Sxt. 2%E
        ,
hh Uninn                                                                mer 3:    MO WWM. Sxt. 2%E
         'T.
         'T.
         -        M-C"7              y A. e ce P,isp AngR
         -        M-C"7              y A. e ce P,isp AngR
                                          .


                        ._      .      .          _        _ . ..                  ..        .    - ..                    - - _ . .
      ,    . .      --
                                                            ,
                                                     =                                          : y;.              ,
                                                     =                                          : y;.              ,
                *                                    ''
I
I
           -t            4 TOLEDO EDISON COMPANY DAVIS oESSE UNIT ONE NUCLEAR POWER STa.AON O                            SUPPLEMENTAL INFORMATION FOR LER NP-33-78-21
           -t            4 TOLEDO EDISON COMPANY DAVIS oESSE UNIT ONE NUCLEAR POWER STa.AON O                            SUPPLEMENTAL INFORMATION FOR LER NP-33-78-21
Line 79: Line 65:
(                                                                                                                    .
(                                                                                                                    .
,                DATE OF EVENT:    February 8, 1978 t
,                DATE OF EVENT:    February 8, 1978 t
FACILITY: , Davis-Besse Unit'1
FACILITY: , Davis-Besse Unit'1 IDENTIFICATION OF OCCURRENCE: Replacement                  of Diesel Generator (DG) 1-1 turbo-charger due to anticipated failure.                                        .
                                                                                                                                        '
IDENTIFICATION OF OCCURRENCE: Replacement                  of Diesel Generator (DG) 1-1 turbo-
    ,
charger due to anticipated failure.                                        .
:              Conditions Prior to occurrence: The unit was in Mode 1, with Power (MWT) = 2060, and Load O!WF.) = 73C.
:              Conditions Prior to occurrence: The unit was in Mode 1, with Power (MWT) = 2060, and Load O!WF.) = 73C.
         .        Description of Occurrence: On February 8, 1978, while performing Surveillance Test ST 5081.01, " Diesel Generator Monthly Test", Operations personnel noticed that Diesel Generator (DG) 1-1 was making unusual noises which appeared to be originating from an air start motor. On further investigation by Maintenance personnel, it was determined that the noise was coming from the turbocharger.
         .        Description of Occurrence: On February 8, 1978, while performing Surveillance Test ST 5081.01, " Diesel Generator Monthly Test", Operations personnel noticed that Diesel Generator (DG) 1-1 was making unusual noises which appeared to be originating from an air start motor. On further investigation by Maintenance personnel, it was determined that the noise was coming from the turbocharger.
'
The turbocharger puts more air into the diesel cylinders allowing better effi-ciency and higher horsepower. On a loss of the turbocharger, the diesel would not be able to reach full load pouar requirements.                    It was suspected the turbo-charger reliability was inadequate and the Shif t Foreman declared Dies:1 Genera-
The turbocharger puts more air into the diesel cylinders allowing better effi-ciency and higher horsepower. On a loss of the turbocharger, the diesel would not be able to reach full load pouar requirements.                    It was suspected the turbo-charger reliability was inadequate and the Shif t Foreman declared Dies:1 Genera-
         /''N      tor 1-1 inoperable at 1245 hours.                This placed the unit in Action Statement "A"
         /''N      tor 1-1 inoperable at 1245 hours.                This placed the unit in Action Statement "A"
Line 97: Line 78:
                                                                             ~
                                                                             ~
l the exact nature of the problec is not known at this time. The turbocharger is being sent back to the factory where an investigation and analysis will be made.
l the exact nature of the problec is not known at this time. The turbocharger is being sent back to the factory where an investigation and analysis will be made.
_
,
Analysis of Occurrerce: There was no danger to the health and safety of the public                                    ;
Analysis of Occurrerce: There was no danger to the health and safety of the public                                    ;
or unit personnel. Diesel Generator 1-2 was operable if a loss of normal power supplies had occurred.
or unit personnel. Diesel Generator 1-2 was operable if a loss of normal power supplies had occurred.
Line 104: Line 83:
Diesel Generator 1-1 turbocharger was replaced under Maintenance Work Order 78-324 under the supervision of a vendor representative. Surveillance Test ST 5081.01, " Diesel Generator Monthly Test" was completed satisfactorily'and Diesel Generator 1-1 was declared operable at 1420 hours on February 10, 1978, removing the unit from Action Statement A of Technical Specification 3.8.1.1.
Diesel Generator 1-1 turbocharger was replaced under Maintenance Work Order 78-324 under the supervision of a vendor representative. Surveillance Test ST 5081.01, " Diesel Generator Monthly Test" was completed satisfactorily'and Diesel Generator 1-1 was declared operable at 1420 hours on February 10, 1978, removing the unit from Action Statement A of Technical Specification 3.8.1.1.
         '-        Failure Data:    There have been no previous reportable turbocharger failures.
         '-        Failure Data:    There have been no previous reportable turbocharger failures.
                                                  -
.
1 LER #7S-01S
1 LER #7S-01S
                 -          ., .          -, --.        --            --    - - - .    --              - . . - _ - . _ - -}}
                 -          ., .          -, --.        --            --    - - - .    --              - . . - _ - . _ - -}}

Revision as of 21:17, 31 January 2020

LER 78-018/03L-0:on 780208,diesel Generator 1-1 Making Unusual Noises During Monthly Test.Unusual Noise Traced to Turbocharger.Exact Cause Undetermined.Turbocharger Replaced & Diesel Generator Monthly Test Completed
ML19329B858
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/07/1978
From: Hartigan J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19329B809 List:
References
LER-78-018-03L, LER-78-18-3L, NUDOCS 8002060865
Download: ML19329B858 (2)


Text

(7 UL . -

(), . LICENSEE EVENT REPORT ..

l ] (PLEASE PRINT OR TY LLL REQUtGEO INFORMATl!N)

CONTROL BLOCK: l l l }

t e@

o 0 HUCEN388 D BlS 1 @ 160 l 0 l - l 0 l 0 l N l p l F l -2$l 0 26l 3 uCENSE l@l 4TYPEl 140 l 167lCAT l

1 l Sd l@

1 l@l 7 CODE 14 uCENSE NUMSLR CON'T lolil [y l L ]@] 0 l 5 ] 0 l - l 0 l 3 l 4 l 686 ]@l 69 01210 EVENT DATE l 8 l 7181@l01374 75 REPORTI01717 DATE 80!8 l@

I 8 '

60 6l DOCKET NUMBER EVENT DESCRIPTION AND PROS ABLE CONSEQUENCES h l o l a j l On 2/8/78, while performing the " Diesel Cenerator (DC) Monthlv Test" it was noticed I

Investigation determined the noise was comine !

p o ,3 ; l that DG 1-1 was making unusual noises.

I o 141 l from the turbocharger. It was suspected the turbocharger reliabiliev was inadeouate I

the unit in Action Statement I g y land DC 1-1 was declared inoperable at 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br /> placing There was 1 lo Js l l A of TS 3.8.1.1, which requires two independent DC in Modes 1, 2. "3 and 4 jol7) } no danger to the health and safety of the public or to unit eersonnel. DC 1-2 was  !

(Np-33-78-21) I I o la 1 l Operable if a loss of all normal power supplies had occurred. 80

' COMP. VALVE

$YSTEM CAUSE CAust SU8 CODE SUSCODE CODE CODE SU8 CODE COMPCNENT CODE lol91 7 8 lE]Bl@ Q @ l l@ l Bl Ll Ol W} El Rl@ l Z l@ l Z l @

9 10 11 12 r3 18 19 REPORT 20 REVISt JN SEcutNTIAL OCCURRENCE CCCE TYPE No.

R EPORT No.

(g ggo EVENT YE A R l0l3l lL l l-l l0l

@NUM8ER l28 7l 8l R epoRT l_j l0ll]8l l/l 31 J2 26 27 28 29 23

- 22 23 24

$ 8 i FOR 4 8. 5 !* LIE MANUF CTUPER oNP NT ME HOUR $

N AC CN lsezl@ l of Of al o'do LrJ@ LyJ@ l4aAl@ lu 81 c i a l a l8 v LcJ@L.zJ@ 22 2 l zl@

25 si ai 42 47 CAUSE DESCRIPTtON AND CORRECTIVE ACTIONS l,,ollThe apparent cause of this occurrence is believed to be a Comeonent failure or a desied DC l g,,3g l fabrication error, but the exact nature of the problem is not known at this time.

-1 turbocharger was replaced under work order 78-324 under the suoervision of the i 1

,,,,,1 Diesel Generator Monthly Test was satisfactorily completed and j 7,,,j l vendor representative.

1420 hours0.0164 days <br />0.394 hours <br />0.00235 weeks <br />5.4031e-4 months <br /> on Feb uary 10, 1978. I g,,,,gDC 1-1 was declared operable at 80 7 8 9

' i RY OtsCQVERY DESCRIPTION

% POWER oTH ER STATUS 5TA l I1 l 5 l l E j@ l 0l 7 l 4 l@l NA l l B l@l46Surveillance Test ST 5081.01 80 44 45 y 8 9 to 12 11 ACTIVITY CONTENT LOCATION OF RELEASE RELEASEC OF RELEASE AMOUNT OF ACTIVITY l

NA l l NA

[1 l68 l9 W @ l Zl@l

to 11 44 45 80 1

PER$oNNEL ExPCSURES NUM8ER TYPE DESCRIPTION 39 l l l1l7j l0l0 2 NA 80 l PERSONNE L INJURIES NUVBE R CEsCRiPTION I 8 9 10l0lol@l .

11 12 NA 80 LCss OF CR DauA0E To FACILITY l , m i y'lgi g'"' ~

' " s o o2 060 oU i

& 9 10 NRC USE ONLY
  • PUC(tCITY i :Ugn DESCRiPTICN I I I I I I I l 1 1 I I I ldu*:. ,

j;inj lNj l NA G3 69 a; hh Uninn mer 3: MO WWM. Sxt. 2%E

'T.

- M-C"7 y A. e ce P,isp AngR

=  : y;. ,

I

-t 4 TOLEDO EDISON COMPANY DAVIS oESSE UNIT ONE NUCLEAR POWER STa.AON O SUPPLEMENTAL INFORMATION FOR LER NP-33-78-21

^

( .

, DATE OF EVENT: February 8, 1978 t

FACILITY: , Davis-Besse Unit'1 IDENTIFICATION OF OCCURRENCE: Replacement of Diesel Generator (DG) 1-1 turbo-charger due to anticipated failure. .

Conditions Prior to occurrence: The unit was in Mode 1, with Power (MWT) = 2060, and Load O!WF.) = 73C.

. Description of Occurrence: On February 8, 1978, while performing Surveillance Test ST 5081.01, " Diesel Generator Monthly Test", Operations personnel noticed that Diesel Generator (DG) 1-1 was making unusual noises which appeared to be originating from an air start motor. On further investigation by Maintenance personnel, it was determined that the noise was coming from the turbocharger.

The turbocharger puts more air into the diesel cylinders allowing better effi-ciency and higher horsepower. On a loss of the turbocharger, the diesel would not be able to reach full load pouar requirements. It was suspected the turbo-charger reliability was inadequate and the Shif t Foreman declared Dies:1 Genera-

/N tor 1-1 inoperable at 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br />. This placed the unit in Action Statement "A"

( of Technical Specification 3.8.1.1, which requires-two ind'ependent Diesel Genern-Operations personnel test started Diesel Generator '

~

tors in Modes 1, 2, 3 and 4.

l-2 and performed Surveillance Test ST 5080.01, "offsite AC Sources" as required by the Action Staterent throughout the occurrence.

Designation of Ap3arent Cause of Occurrence: The apparent cause of this occur-rence is believed to be a component failure or a. design / fabrication error, but

~

l the exact nature of the problec is not known at this time. The turbocharger is being sent back to the factory where an investigation and analysis will be made.

Analysis of Occurrerce: There was no danger to the health and safety of the public  ;

or unit personnel. Diesel Generator 1-2 was operable if a loss of normal power supplies had occurred.

Corrective Action: The vendor, Power Systems, was contacted and it was decided to replace the turbocharger. A service representative was sent to the site.

Diesel Generator 1-1 turbocharger was replaced under Maintenance Work Order 78-324 under the supervision of a vendor representative. Surveillance Test ST 5081.01, " Diesel Generator Monthly Test" was completed satisfactorily'and Diesel Generator 1-1 was declared operable at 1420 hours0.0164 days <br />0.394 hours <br />0.00235 weeks <br />5.4031e-4 months <br /> on February 10, 1978, removing the unit from Action Statement A of Technical Specification 3.8.1.1.

'- Failure Data: There have been no previous reportable turbocharger failures.

1 LER #7S-01S