ML19340B540: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 21: Line 21:
                 ,                          I                                b lo l 18 9l l 0 lLICENSEE 7                    H l DCODE  l B l S14l 1 15l@l 0 l 0 l 0LICENSE        l 0 l 0NuveEH l 0 l 0 l 0 l 0 l2d0 l 260 l@l          4 l 1 l 1 l1 l 61 LICENSE TY PE JO 1 CAT l@l l
                 ,                          I                                b lo l 18 9l l 0 lLICENSEE 7                    H l DCODE  l B l S14l 1 15l@l 0 l 0 l 0LICENSE        l 0 l 0NuveEH l 0 l 0 l 0 l 0 l2d0 l 260 l@l          4 l 1 l 1 l1 l 61 LICENSE TY PE JO 1 CAT l@l l
68 l@
68 l@
COTT
COTT lo111 7      8        S$n"C60 l L l@l        61 0 l 5DOCKl 0ETl NUMBE
                      "
lo111 7      8        S$n"C60 l L l@l        61 0 l 5DOCKl 0ETl NUMBE
                                                                       - l 0R l 3 l 468l 6 69@l 1EVENT  l 0 lDATE 0 l 8 l 874 l 0 l@l REPORT 75_
                                                                       - l 0R l 3 l 468l 6 69@l 1EVENT  l 0 lDATE 0 l 8 l 874 l 0 l@l REPORT 75_
1l ll 0l    5l 8l 800l@
1l ll 0l    5l 8l 800l@
Line 52: Line 50:
801117o_                              M                                                                        ~
801117o_                              M                                                                        ~


                                                                                                --
TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEYENTAL INFORMATION FOR LER NP-33-80-97 DATE OF EVENT:    October 8, 1980 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: LTSP9B9, level indication for Steam and Feedwater Rup-                ,
                                                                                          ._.
  -
TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEYENTAL INFORMATION FOR LER NP-33-80-97
                                                                                              -
DATE OF EVENT:    October 8, 1980 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: LTSP9B9, level indication for Steam and Feedwater Rup-                ,
ture Control System (SFRCS)/ steam generator level instrument cabinet channel 3 read-ing high Conditions Prior to Occurrence: The unit was in Mode 3 with Power (MWT) = 0 and Load (Gross MWE) = 0.
ture Control System (SFRCS)/ steam generator level instrument cabinet channel 3 read-ing high Conditions Prior to Occurrence: The unit was in Mode 3 with Power (MWT) = 0 and Load (Gross MWE) = 0.
Description of Occurrence: On October 6, 1980 at 1915 hours during the performance of ST 5099.01, Miscellaneous Instrument Shift Checks, operations personnel noted that the Number 1 Steam Generator Level Instrument to SFRCS/ Steam Generator Level Instrument Cabinet Channel 3 was reading high out 'f tolerance at 250 inches.      The remaining three SFRCS/ Steam Generator Level Indications for Number 1 Steam Generator indicated 235 inches, 234 inches and 240 inches. On October 8, 1980 at 1535 hours, Instrument and Control personnel determined that the signal from level transmitter LTSP9B9 was errone-ous when compared to the remaining three channels and was higher than the signal re-presenting the actual steam generator level. This would have made the steam generator level low level bistable for SFRCS trip at a much lower than desired value if the level indication was correspondingly-high throughout its range of indication. A cali-bration check of the above mentioned transmitter has shown that for an applied differ-ential pressure that ar,,roximately 15 inches of error did exist.
Description of Occurrence: On October 6, 1980 at 1915 hours during the performance of ST 5099.01, Miscellaneous Instrument Shift Checks, operations personnel noted that the Number 1 Steam Generator Level Instrument to SFRCS/ Steam Generator Level Instrument Cabinet Channel 3 was reading high out 'f tolerance at 250 inches.      The remaining three SFRCS/ Steam Generator Level Indications for Number 1 Steam Generator indicated 235 inches, 234 inches and 240 inches. On October 8, 1980 at 1535 hours, Instrument and Control personnel determined that the signal from level transmitter LTSP9B9 was errone-ous when compared to the remaining three channels and was higher than the signal re-presenting the actual steam generator level. This would have made the steam generator level low level bistable for SFRCS trip at a much lower than desired value if the level indication was correspondingly-high throughout its range of indication. A cali-bration check of the above mentioned transmitter has shown that for an applied differ-ential pressure that ar,,roximately 15 inches of error did exist.
On October 8, 1980 at 1535 hours after determination that the signal from the steam generator level transmitter was shown to maintain a 15 inch error over the entire scale, the SFRCS steam generctor level instrument cabinet channel 3 output was placed in the tripped condition. The station had entered the action statement of Technical Specification 3.3.2.2 which required the inoperable channel to be placed in the tripped condition within one hour af ter the determination. The requirements were met.
On October 8, 1980 at 1535 hours after determination that the signal from the steam generator level transmitter was shown to maintain a 15 inch error over the entire scale, the SFRCS steam generctor level instrument cabinet channel 3 output was placed in the tripped condition. The station had entered the action statement of Technical Specification 3.3.2.2 which required the inoperable channel to be placed in the tripped condition within one hour af ter the determination. The requirements were met.
* l Designation of Apparent Cause of Occurrence: There was a zero shift in the transmitter.
l Designation of Apparent Cause of Occurrence: There was a zero shift in the transmitter.
This meant that the entire scalc shifted an equivalent of 15 inches in level. The exact-cause of the zero shift is unknown. -The transmitter is being monitored by observing the four channels and comparing the indicated levels as recorded in ST 5099.01, Miscel-
This meant that the entire scalc shifted an equivalent of 15 inches in level. The exact-cause of the zero shift is unknown. -The transmitter is being monitored by observing the four channels and comparing the indicated levels as recorded in ST 5099.01, Miscel-
,laneous Instrument Shift Check.
,laneous Instrument Shift Check.
                                      .
l l;-
l l;-
Analysis of Occurrence: There was no danger to the health and safety of the public or            !
Analysis of Occurrence: There was no danger to the health and safety of the public or            !
to station personnel. Three other channels were operable at the time of the occurrence.          !.-
to station personnel. Three other channels were operable at the time of the occurrence.          !.-
h-I, LER# 80-075 i
h-I, LER# 80-075 i
                                                                                                  !


V                                                                                      ,
V                                                                                      ,
                                                                                        '
        .
      .
TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80                              PAGE 2 Corrective Action: The transmitter was' checked under Maintenance Work Order IC-697-80 and found to.be out of tolerance. The transmitter was recalibrated under ST 5031.06, Stesa re s.ator Level to SFRCS Refueling Calibration within specification and placed back in service. The channel was declared operable on October 8 at 2240 hours. The transmitter is being monitored by ST 5099.01 to detect any further shift.
TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80                              PAGE 2 Corrective Action: The transmitter was' checked under Maintenance Work Order IC-697-80 and found to.be out of tolerance. The transmitter was recalibrated under ST 5031.06, Stesa re s.ator Level to SFRCS Refueling Calibration within specification and placed back in service. The channel was declared operable on October 8 at 2240 hours. The transmitter is being monitored by ST 5099.01 to detect any further shift.
Failure Data: One previous failure of this type is reported in Licensee Event Report NP-33-80-46 (80-037).
Failure Data: One previous failure of this type is reported in Licensee Event Report NP-33-80-46 (80-037).
                                                                                            '
                                                                                          '
   'LER# 80-075 i
   'LER# 80-075 i
1 i
1 i
t i.
t i.
t 4
t 4
i
                                                                                          !
i i
i i
                                                                                          !
i e
                                                      ,
l i
e l
I 1
i I
i c
1 i
c
_}}
_}}

Latest revision as of 11:10, 31 January 2020

LER 80-075/03L-0:on 801008,steam Generator Level Instrument to Steam & Feedwater Rupture Control Sys Cabinet Channel 3 Maintained 15-inch Error Over Entire Scale.Caused by Zero Shift in Transmitter.Transmitter Being Monitored
ML19340B540
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/05/1980
From: Trautman D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19340B536 List:
References
LER-80-075-03L, LER-80-75-3L, NUDOCS 8011110258
Download: ML19340B540 (3)


Text

. u ,,, .

~s LICENSEE EVENT REPORT CONTROL BLOCW l l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

, I b lo l 18 9l l 0 lLICENSEE 7 H l DCODE l B l S14l 1 15l@l 0 l 0 l 0LICENSE l 0 l 0NuveEH l 0 l 0 l 0 l 0 l2d0 l 260 l@l 4 l 1 l 1 l1 l 61 LICENSE TY PE JO 1 CAT l@l l

68 l@

COTT lo111 7 8 S$n"C60 l L l@l 61 0 l 5DOCKl 0ETl NUMBE

- l 0R l 3 l 468l 6 69@l 1EVENT l 0 lDATE 0 l 8 l 874 l 0 l@l REPORT 75_

1l ll 0l 5l 8l 800l@

D ATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h Io 12 ] l (NP-33-80-97) On 10/8/80 it was determined by Inctrument and Control personnel that l

[o la l l the Number 1 Steam Generator Level Instrument to Steam and Feedwater Rupture Control l j o 14 l l System (SFRCS) Cabinet Channel 3 maintained a 15 inch error ove r its entire scale. l loIsl l This would have prevented the low level bistable from actuating at the required level.l 1 o is l l The level instrument cabinet channel 3 output was placed in the tripped condition. l Q W lThe station entered the action statement of T.S. 3.3.2.2. There was no danger to the l 6 o la 1 l public or station personnel. The other three channels were operable at the time. I 7 8 9 80 C OE CODE SL8C E COMPONENT CODE SL8C DE SU Q

7 8 [C l H l@ lX l@ lX l@ lI lN lS lT [R lU l@ l T l@ l Z l @

9 10 11 12 13 E

18 19 20 SE OuE NTI AL OCCURRENCE RCPORT REVISION LER RO EVENT YE AR REPORT NO. COOE TYPE NO.

O'7 "'"SES ui l 8l 0l l-l l 0l 7l 5l l/l l0l3l l Ll l-l lOl

_ 21 22 23 24 26 27 28 29 30 31 32 AK N A T ON ONP NT TH WOURS 22 SS 17 D FOR4 UB. SU PLIE MANUFAC URER lE l@]@ l Zl@

33 J4 35 lZ 36 l@ l0l0l0l0l 31 40

[@

43 lYl@ y@ l R l 3 l 6 l 947 l@

42 43 44

\

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h lijollThe cause was a zero shift in the transmitter. This caused the entire scale to shift I i 11I lan equivalent 15 inches in level. The cause of this shift is unknown. The transnitted I i 7 I I was checked under WO IC-697-80 and recalibrated under ST 5031.06. The channel was 1 1 [3l l declared operable on October 8,1980 at 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br />. The transmitter is being moni- 1 U_LJ l tored by ST 5099.01 to detect any further shift. l 7 3 9 gn STA 5  % POWE R oTHER STATUS ISCO Rr OtSCoVERY DESCRtPTION QQ) W@ l0 l 0 l 0 l@l NA l lB l@lSurveillanceTest ST 5099.01 l ACTIVITY CONTENT RELEASED OF RELE ASE AMOUNT of ACTIVITY LOCATION OF RELEASE QW 7 8*9 @ lZ l@l NA 10 11 44 l l NA 45 l

PERSONNEL EXPOSLRES 80 NLMBER TYPE DESCRIPTION ,

j li' l 7* l*l 0 l 0 l 0 l@W@l NA l

,ERSONa',J'as

'o NUYRER DESCRIPTION 7

i a 8 9 l0l0l0l@l 11 12 NA l

LOSS OF on DAYAGE TO F ACILITY 80 TYPE CESCRIPTiON L_U izl@l sa l

80 I

d k L.J ISSUE H 9 SlDENASC R.PTIO*.

la l lllllllllllll$

68 69 60 %

7.3 80-180 nan na m an N,yggypygg,ggg pggyg. WO NMM, M. m{

801117o_ M ~

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEYENTAL INFORMATION FOR LER NP-33-80-97 DATE OF EVENT: October 8, 1980 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: LTSP9B9, level indication for Steam and Feedwater Rup- ,

ture Control System (SFRCS)/ steam generator level instrument cabinet channel 3 read-ing high Conditions Prior to Occurrence: The unit was in Mode 3 with Power (MWT) = 0 and Load (Gross MWE) = 0.

Description of Occurrence: On October 6, 1980 at 1915 hours0.0222 days <br />0.532 hours <br />0.00317 weeks <br />7.286575e-4 months <br /> during the performance of ST 5099.01, Miscellaneous Instrument Shift Checks, operations personnel noted that the Number 1 Steam Generator Level Instrument to SFRCS/ Steam Generator Level Instrument Cabinet Channel 3 was reading high out 'f tolerance at 250 inches. The remaining three SFRCS/ Steam Generator Level Indications for Number 1 Steam Generator indicated 235 inches, 234 inches and 240 inches. On October 8, 1980 at 1535 hours0.0178 days <br />0.426 hours <br />0.00254 weeks <br />5.840675e-4 months <br />, Instrument and Control personnel determined that the signal from level transmitter LTSP9B9 was errone-ous when compared to the remaining three channels and was higher than the signal re-presenting the actual steam generator level. This would have made the steam generator level low level bistable for SFRCS trip at a much lower than desired value if the level indication was correspondingly-high throughout its range of indication. A cali-bration check of the above mentioned transmitter has shown that for an applied differ-ential pressure that ar,,roximately 15 inches of error did exist.

On October 8, 1980 at 1535 hours0.0178 days <br />0.426 hours <br />0.00254 weeks <br />5.840675e-4 months <br /> after determination that the signal from the steam generator level transmitter was shown to maintain a 15 inch error over the entire scale, the SFRCS steam generctor level instrument cabinet channel 3 output was placed in the tripped condition. The station had entered the action statement of Technical Specification 3.3.2.2 which required the inoperable channel to be placed in the tripped condition within one hour af ter the determination. The requirements were met.

l Designation of Apparent Cause of Occurrence: There was a zero shift in the transmitter.

This meant that the entire scalc shifted an equivalent of 15 inches in level. The exact-cause of the zero shift is unknown. -The transmitter is being monitored by observing the four channels and comparing the indicated levels as recorded in ST 5099.01, Miscel-

,laneous Instrument Shift Check.

l l;-

Analysis of Occurrence: There was no danger to the health and safety of the public or  !

to station personnel. Three other channels were operable at the time of the occurrence.  !.-

h-I, LER# 80-075 i

V ,

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80 PAGE 2 Corrective Action: The transmitter was' checked under Maintenance Work Order IC-697-80 and found to.be out of tolerance. The transmitter was recalibrated under ST 5031.06, Stesa re s.ator Level to SFRCS Refueling Calibration within specification and placed back in service. The channel was declared operable on October 8 at 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br />. The transmitter is being monitored by ST 5099.01 to detect any further shift.

Failure Data: One previous failure of this type is reported in Licensee Event Report NP-33-80-46 (80-037).