| | title = Er 05000528-09-301, 05000529-09-301, 05000530-09-301, on November 6, 2009, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report | | | title = Er 05000528-09-301, 05000529-09-301, 05000530-09-301, on November 6, 2009, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report |
| | author name = Garchow S M | | | author name = Garchow S |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = Edington R K | | | addressee name = Edington R |
| | addressee affiliation = Arizona Public Service Co | | | addressee affiliation = Arizona Public Service Co |
| | docket = 05000528, 05000529, 05000530 | | | docket = 05000528, 05000529, 05000530 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 15, 2009 |
| [[Issue date::December 15, 2009]]
| |
|
| |
|
| Randall K. Edington, Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
| | ==SUBJECT:== |
| | | PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - |
| SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - | |
| NRC EXAMINATION REPORT 05000528/2009301; 05000529/2009301; 05000530/2009301 | | NRC EXAMINATION REPORT 05000528/2009301; 05000529/2009301; 05000530/2009301 |
|
| |
|
Line 29: |
Line 27: |
| On November 13, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The enclosed report documents the examination findings and licensing decisions. The preliminary examination findings were discussed on November 12, 2009, with Mr. Bob Bement, Vice-President Nuclear Operations, and other members of your staff. A telephonic exit meeting was conducted on December 2, 2009, with Mr. Warren Potter, Simulator Department Leader, who was provided the NRC licensing decisions. | | On November 13, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The enclosed report documents the examination findings and licensing decisions. The preliminary examination findings were discussed on November 12, 2009, with Mr. Bob Bement, Vice-President Nuclear Operations, and other members of your staff. A telephonic exit meeting was conducted on December 2, 2009, with Mr. Warren Potter, Simulator Department Leader, who was provided the NRC licensing decisions. |
|
| |
|
| The examination included the evaluation of fifteen applicants for reactor operator licenses, five applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses. The license examiners determined that all but one of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. The one individual failed the written examination and has been issued a license denial letter. There were two post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution. | | The examination included the evaluation of fifteen applicants for reactor operator licenses, five applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses. The license examiners determined that all but one of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. |
|
| |
|
| No findings of significance were identified during this examination. Arizona Public Service Company - 2 -
| | The one individual failed the written examination and has been issued a license denial letter. |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,/RA/
| | There were two post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution. |
| Stephen M. Garchow, Acting Chief Operations Branch Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74
| |
|
| |
|
| ===Enclosure:===
| | No findings of significance were identified during this examination. |
| 1. NRC Examination Report 05000528/2009301; 05000529/2009301; 05000530/2009301 2. NRC Post Examination Comment Resolution
| |
|
| |
|
| cc w/enclosure: Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040
| | Arizona Public Service Company -2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Arizona Public Service Company - 3 -Mr. Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034
| | Sincerely, |
| | /RA/ |
| | Stephen M. Garchow, Acting Chief Operations Branch Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74 |
|
| |
|
| Mr. Dwight C. Mims Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100
| | ===Enclosure:=== |
| | 1. NRC Examination Report 05000528/2009301; 05000529/2009301; 05000530/2009301 2. NRC Post Examination Comment Resolution |
|
| |
|
| Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224
| | REGION IV== |
| | Dockets: 50-528, 50-529, 50-530 Licenses: NPF-41, NPF-51, NPF-74 Report: 05000528/2009301; 05000529/2009301; 05000530/2009301 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Location: 5951 S. Wintersburg Road Tonopah, Arizona Dates: November 6, 2009 Inspectors: Stephen Garchow, Chief Examiner Kelly Clayton, Senior Operations Engineer Jim Drake, Senior Reactor Inspector Chuck Zoia, Operations Engineer Peter Presby, Operations Engineer Gabriel Apger, Senior Operations Engineer Approved By: Stephen Garchow, Acting Chief Operations Branch Division of Reactor Safety-1- Enclosure 1 |
|
| |
|
| Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. D21 San Clemente, CA 92672
| | =SUMMARY OF FINDINGS= |
| | | ER05000528/2009301; 05000529/2009301; 05000530/2009301; November 6, 2009; |
| Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251
| |
| | |
| Arizona Public Service Company - 4 -Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78701-3326
| |
| | |
| Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003
| |
| | |
| Mr. John C. Taylor Director, Nuclear Generation El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004
| |
| | |
| Chief, Technological Hazards Branch FEMA Region IX 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 Arizona Public Service Company - 5 -Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov)
| |
| DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Ryan.Treadway@nrc.gov) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) PV Administrative Assistant (Regina.McFadden@nrc.gov) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)
| |
| Public Affairs Officer (Victor.Dricks@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource ROPreports DRS STA (Dale.Powers@nrc.gov) OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
| |
| | |
| R:\ ADAMS ML ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: SMG x Publicly Available x Non-Sensitive Non-publicly Available Sensitive SGarchow KClayton JDrake RLantz SGarchow /RA/ /RA/ /RA/ /RA/ /RA/ 12/15/09 12/15/09 12/15/09 12/15/09 12/15/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION REGION IV
| |
| | |
| Dockets: 50-528, 50-529, 50-530 Licenses: NPF-41, NPF-51, NPF-74 Report: 05000528/2009301; 05000529/2009301; 05000530/2009301 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Location: 5951 S. Wintersburg Road Tonopah, Arizona Dates: November 6, 2009 Inspectors: Stephen Garchow, Chief Examiner Kelly Clayton, Senior Operations Engineer Jim Drake, Senior Reactor Inspector Chuck Zoia, Operations Engineer Peter Presby, Operations Engineer Gabriel Apger, Senior Operations Engineer Approved By: Stephen Garchow, Acting Chief Operations Branch Division of Reactor Safety Enclosure 1
| |
|
| |
|
| =SUMMARY OF FINDINGS=
| | Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report. |
| ER05000528/2009301; 05000529/2009301; 05000530/2009301; November 6, 2009; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report.
| |
|
| |
|
| NRC examiners evaluated the competency of fifteen applicants for reactor operator licenses, five applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. | | NRC examiners evaluated the competency of fifteen applicants for reactor operator licenses, five applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. |
Line 75: |
Line 58: |
| The examiners determined that all but one of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. One individual failed the written portion of the examination and a license denial letter has been issued. | | The examiners determined that all but one of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. One individual failed the written portion of the examination and a license denial letter has been issued. |
|
| |
|
| ===A. NRC-Identified and Self-Revealing Findings=== | | ===NRC-Identified and Self-Revealing Findings=== |
|
| |
|
| No findings of significance were identified. | | No findings of significance were identified. |
|
| |
|
| ===B. Licensee-Identified Violations=== | | ===Licensee-Identified Violations=== |
|
| |
|
| None. | | None. |
|
| |
| 1
| |
|
| |
|
| =REPORT DETAILS= | | =REPORT DETAILS= |
Line 94: |
Line 75: |
|
| |
|
| ====a. Scope==== | | ====a. Scope==== |
| NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited five of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes. | | NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited five of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
Line 132: |
Line 113: |
|
| |
|
| ====a. Scope==== | | ====a. Scope==== |
| The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | | The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
Line 144: |
Line 125: |
| ====b. Findings==== | | ====b. Findings==== |
| No findings of significance were identified. | | No findings of significance were identified. |
| | | {{a|4OA6}} |
| {{a|4OA6}} | |
| ==4OA6 Meetings, Including Exit== | | ==4OA6 Meetings, Including Exit== |
|
| |
|
Line 152: |
Line 132: |
| The licensee did not identify any information or materials used during the examination as proprietary. | | The licensee did not identify any information or materials used during the examination as proprietary. |
|
| |
|
| ATTACHMENT: | | ATTACHMENT: |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
Line 160: |
Line 140: |
| ===Licensee Personnel=== | | ===Licensee Personnel=== |
| Warren Potter, Simulator Department Leader | | Warren Potter, Simulator Department Leader |
| Larry Burton, Exam Developer Alan Malley, Exam Developer Louis Cortopassi, Plant Manager Joe Waid, Training Director Ron Barnes, Regulatory Affairs Director | | Larry Burton, Exam Developer |
| | | Alan Malley, Exam Developer |
| | Louis Cortopassi, Plant Manager |
| | Joe Waid, Training Director |
| | Ron Barnes, Regulatory Affairs Director |
| ===NRC Personnel=== | | ===NRC Personnel=== |
| Joseph Bayshore, Resident Inspector | | Joseph Bayshore, Resident Inspector |
|
| |
|
| ==ADAMS DOCUMENTS REFERENCED== | | ==ADAMS DOCUMENTS REFERENCED== |
| Accession No.
| | |
| : ML 093450278
| |
| : Accession No.
| |
| : ML 093370156
| |
| : NRC Resolution to the Palo Verde Post Examination Comments
| |
| : A complete text of the licensee's post examination analysis and comments can be found in ADAMS under Accession Number ML093370156.
| |
| : RO QUESTION # 50
| |
| : COMMENT:
| |
| : This question required the applicant to evaluate the indications associated with the 'A' PK Battery Charger and correctly assess its' status.
| |
| : The original answer was the battery charger was in a normal alignment.
| |
| : Following the exam, the applicants were interviewed and it was discovered that from the indications provided there were two correct answers; the battery charger could be in its' normal alignment or the battery charger's output breaker could be tripped.
| |
| : Based on this, the facility licensee believes distractors A and B should both be considered correct.
| |
| : NRC RESOLUTION:
| |
| : In this question the applicants were provided a picture of the 'A' Battery Charger PK indications as observed on Panel B01.
| |
| : From the picture, the applicant was expected to evaluate the indications and determine the battery charger was in a normal alignment.
| |
| : Following the examination it was determined the indications would be the same for a normal alignment as for a tripped battery output breaker alignment with the exception of the battery charger charging rate would drop by 10 amperes with the battery output breaker open.
| |
| : The meter showing the battery charger amperes has a scale of 0 to 500 amperes and there is very little meter movement associated with a 10 ampere change.
| |
| : The difference in the indications is barely discernible and could be interpreted in two ways depending on other plant variables associated with this battery charger.
| |
| : Depending on how the applicant interpreted the battery charging amperes, the applicant could correctly conclude distractor 'A' or 'B' as being correct.
| |
| : Therefore, the NRC agrees with the facility licensee that distractors 'A' and 'B' should both be considered correct.
| |
| : SRO QUESTION # 15
| |
| : COMMENT:
| |
| : In this question, the applicant is given a set of conditions associated with the CEDM Air Cooling Fan System.
| |
| : Basically, the question states one of two running fans trip on overload and asks the applicant what the system response would be and what procedure would then be in use.
| |
| : The facility licensee argues two answers should be correct; the first is there would be no auto start of the standby fans and the second answer states the standby fans would auto start following a 120 second time delay.
| |
| : This would depend on whether the running fan differential pressure would fall below the automatic start setpoint.
| |
| : The associated alarm response procedure states the standby fan will start following the time delay and also states the standby fan will auto start only if the differential pressure falls below the automatic start setpoint.
| |
| : NRC RESOLUTION:
| |
| : The two answers argued as both being correct are diametrically opposed answers; one states the standby fans will automatically start and the other distractor states the standby fans will not auto start.
| |
| : Both cannot be correct.
| |
| : To resolve this conflict, the NRC requested the conditions as stated in the stem in the question be tested on the simulator and the results would be used to determine the correct answer.
| |
| : This was not successful as it could not be simulated in the same fashion as presented in the stem of the question.
| |
| : The NRC then requested a check be made on the station's operating experience and system testing to see if a similar event had been experienced in the plant in order to make a determination as to whether the fan differential pressure would fall below the automatic start setpoint.
| |
| : This effort was also unsuccessful.
| |
| : Because the two distractors are diametrically opposed, both cannot be considered as correct and because the correct answer could not be determined, the question was deleted from the exam.
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000528/20223012022-06-21021 June 2022 NRC Examination Report 05000528/2022301, 05000529/2022301, and 05000530/2022301 IR 05000528/20193012020-01-28028 January 2020 NRC Initial Examination Report 05000528/2019301, 05000529/2019301, and 05000530/2019301 IR 05000528/20183022018-10-31031 October 2018 NRC Retake Examination Report 05000528/2018302; 05000529/2018/2018302; 05000530/2018302 IR 05000528/20183012018-06-0404 June 2018 NRC Examination Report 05000528/2018301; 05000529/2018301; 05000530/2018301 IR 05000528/20163012016-12-0505 December 2016 NRC Examination Report 05000528/2016301; 05000529/2016301; 05000530/2016301 ML15182A1192015-06-19019 June 2015 Response to Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20153012015-06-10010 June 2015 Er 05000528/2015301; 05000529/2015301; 05000530/2015301; 04/13/2015 - 05/13/2015; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20133012013-12-17017 December 2013 Er 05000528/2013301; 05000529/2013301; 05000530/2013301; October 1 - November 20, 2013; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20123012012-05-31031 May 2012 Er 05000528-12-301, 05000529-12-301 & 05000530-12-301, March 16 - May 23, 2012, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Initial Operator Licensing Examination Report IR 05000528/20103012010-12-22022 December 2010 Er 05000528-10-301; 05000529-10-301; 05000530-10-301; November 5-17, 2010; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20093012009-12-15015 December 2009 Er 05000528-09-301, 05000529-09-301, 05000530-09-301, on November 6, 2009, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report IR 05000528/20073012007-09-21021 September 2007 Er 05000528-07-301, 05000529-07-301, 05000530-07-301; 07/20 - 08/21/2007, Palo Verde Nuclear Generating Station Units 1, 2 and 3, Operator Licensing Initial Examination Report ML0527602712005-09-21021 September 2005 Response to RIS 2005-19, Preparation and Scheduling of Operator Licensing Examinations. ML0432300042004-11-16016 November 2004 Use of Plant Equipment for Limited Senior Operator Examinations (Examination Report 50-528/-529/-530/2004-301) ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000528/20033012003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations ML0324806192003-09-0303 September 2003 Er 05000528-03-301, 05000529-03-301, 05000530-03-301; on 7/21-24/2003; for Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examinations 2022-06-21
[Table view] |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 15, 2009
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC EXAMINATION REPORT 05000528/2009301; 05000529/2009301; 05000530/2009301
Dear Mr. Edington:
On November 13, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The enclosed report documents the examination findings and licensing decisions. The preliminary examination findings were discussed on November 12, 2009, with Mr. Bob Bement, Vice-President Nuclear Operations, and other members of your staff. A telephonic exit meeting was conducted on December 2, 2009, with Mr. Warren Potter, Simulator Department Leader, who was provided the NRC licensing decisions.
The examination included the evaluation of fifteen applicants for reactor operator licenses, five applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses. The license examiners determined that all but one of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
The one individual failed the written examination and has been issued a license denial letter.
There were two post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution.
No findings of significance were identified during this examination.
Arizona Public Service Company -2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Stephen M. Garchow, Acting Chief Operations Branch Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74
Enclosure:
1. NRC Examination Report 05000528/2009301; 05000529/2009301; 05000530/2009301 2. NRC Post Examination Comment Resolution
REGION IV==
Dockets: 50-528, 50-529, 50-530 Licenses: NPF-41, NPF-51, NPF-74 Report: 05000528/2009301; 05000529/2009301; 05000530/2009301 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Location: 5951 S. Wintersburg Road Tonopah, Arizona Dates: November 6, 2009 Inspectors: Stephen Garchow, Chief Examiner Kelly Clayton, Senior Operations Engineer Jim Drake, Senior Reactor Inspector Chuck Zoia, Operations Engineer Peter Presby, Operations Engineer Gabriel Apger, Senior Operations Engineer Approved By: Stephen Garchow, Acting Chief Operations Branch Division of Reactor Safety-1- Enclosure 1
SUMMARY OF FINDINGS
ER05000528/2009301; 05000529/2009301; 05000530/2009301; November 6, 2009;
Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of fifteen applicants for reactor operator licenses, five applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses at Palo Verde Nuclear Generating Station, Units 1, 2, and 3.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on November 6, 2009. NRC examiners administered the operating tests on November 9 - 13, 2009.
The examiners determined that all but one of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. One individual failed the written portion of the examination and a license denial letter has been issued.
NRC-Identified and Self-Revealing Findings
No findings of significance were identified.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited five of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings of significance were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined that the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On November 6, 2009, the licensee proctored the administration of the written examinations to all 23 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post examination comments to the NRC on November 17, 2009.
The NRC examination team administered the various portions of the operating tests to all 23 applicants on November 9 - 13, 2009.
b. Findings
No findings of significance were identified.
All but one of the applicants passed the written examination and all parts of the operating test. The final written examinations and post-examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.
The examination team noted the following generic weaknesses:
- Knowledge of administrative dose limits and radiological postings
- Knowledge of licensed operator proficiency requirements
- Knowledge of the indications associated with determining if a running Emergency Diesel Generator was ready to load following an automatic start
- Ability to diagnose system status following an abnormal event such as a loss of an electrical bus
- Ability to determine charging flow when in an usual alignment such as charging via the High Pressure Safety Injection header
- The applicants, as a group, failed more of the individual administrative job-performance-measures (JPMs) than what is typically seen on an examination.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings of significance were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings of significance were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to Messrs. Bob Bement, Lou Cortopassi, Joe Waid, and other members of the licensee staff on November 12, 2009. A telephonic exit was conducted on December 2, 2009, between Messrs. Stephen Garchow, Chief Examiner, and Warren Potter, Simulator Department Leader.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
Warren Potter, Simulator Department Leader
Larry Burton, Exam Developer
Alan Malley, Exam Developer
Louis Cortopassi, Plant Manager
Joe Waid, Training Director
Ron Barnes, Regulatory Affairs Director
NRC Personnel
Joseph Bayshore, Resident Inspector
ADAMS DOCUMENTS REFERENCED