ML080850792: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080850792
| number = ML080850792
| issue date = 03/25/2008
| issue date = 03/25/2008
| title = 06/09/2008 Notice of Meeting with Exelon Generation Company, LLC Regarding the Nrc'S Assessment of the Safety Performance of the Peach Bottom Atomic Power Station for Calendar Year 2007
| title = Notice of Meeting with Exelon Generation Company, LLC Regarding the Nrc'S Assessment of the Safety Performance of the Peach Bottom Atomic Power Station for Calendar Year 2007
| author name = Krohn P G
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:MN No. 08-015  
{{#Wiki_filter:MN No. 08-015 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 25, 2008 Licensee:            Exelon Generation Company, LLC Facility:            Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos.:          50-277; 50-278 Date/ Time:          June 9, 2008 at 6:30 p.m.
Location:            Peach Bottom Inn 6085 Delta Road Delta, PA 17314


U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING
==Purpose:==
The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2007. In addition, the status of Confirmatory Action Letter (CAL) commitments, including those related to safety conscious work environment issues, will be discussed.
The NRCs assessment is documented in a letter dated March 3, 2008.
Attendees*:
NRC:        M. Dapas, Deputy Regional Administrator M. Gamberoni, Director, Division of Reactor Safety P. Krohn, Chief, Division of Reactor Projects Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom M. Brown, Resident Inspector, Peach Bottom Licensee:    R. DeGregorio, Senior Vice President, Mid-Atlantic Operations J. Grimes, Site Vice President, Peach Bottom M. Massaro, Plant Manager G. Stathes, Director of Operations J. Armstrong, Manager, Regulatory Assurance Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Meeting


March 25, 2008
==Contact:==
Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: pgk1@nrc.gov


Licensee:  Exelon Generation Company, LLC
2 The NRCs assessment letter can be found in ADAMS with Accession Number: ML080630190.
 
This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML080850792. ADAMS is accessible from the NRC Web Site at:
Facility:  Peach Bottom Atomic Power Station, Units 2 and 3
 
Docket Nos.:  50-277; 50-278
 
Date/ Time: June 9, 2008 at 6:30 p.m.   
 
Location:  Peach Bottom Inn 6085 Delta Road Delta, PA 17314
 
Purpose:  The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRC's assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2007. In addition, the status of Confirmatory Action Letter (CAL) commitments, including those related to safety conscious work environment issues, will be discussed.
The NRC's assessment is documented in a letter dated March 3, 2008.
 
Attendees*: 
 
NRC:  M. Dapas, Deputy Regional Administrator M. Gamberoni, Director, Division of Reactor Safety P. Krohn, Chief, Division of Reactor Projects Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom M. Brown, Resident Inspector, Peach Bottom
 
Licensee: R. DeGregorio, Senior Vice President, Mid-Atlantic Operations J. Grimes, Site Vice President, Peach Bottom M. Massaro, Plant Manager G. Stathes, Director of Operations J. Armstrong, Manager, Regulatory Assurance
 
Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail:  pgk1@nrc.gov
 
2  The NRC's assessment letter can be found in ADAMS with Accession Number: ML080630190. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML080850792. ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.html.
http://www.nrc.gov/reading-rm/adams.html.
Previous 2007 regulatory actions regarding Peach Bottom can be located in ADAMS with Ascension Numbers ML072920283 (CAL); ML073090061 (Augmented Inspection Team);
Previous 2007 regulatory actions regarding Peach Bottom can be located in ADAMS with Ascension Numbers ML072920283 (CAL); ML073090061 (Augmented Inspection Team);
ML073320344 (Reactor Oversight Process Deviation Memorandum); ML073550590 (Augmented Inspection Team Follow-up); and ML080440012 (Final Significance Determination).  
ML073320344 (Reactor Oversight Process Deviation Memorandum); ML073550590 (Augmented Inspection Team Follow-up); and ML080440012 (Final Significance Determination).
 
Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRCs web site at:
Additional information relative to the NRC's Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRC's web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html .
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html . The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting.
Attendance by NRC personnel at this meeting should be made known by April 14, 2008, via telephone to the NRC meeting contact.
Attendance by NRC personnel at this meeting should be made known by April 14, 2008, via telephone to the NRC meeting contact.
Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.
Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.
 
Approved By: ______/RA/________
Approved By: ______/RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:
________ Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl: C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation J. Grimes, Site Vice President, Peach Bottom M. Pacilio, Chief Operating Officer, Exelon R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight M. Massaro, Plant Manager, Peach Bottom G. Stathes, Director of Operations J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs P. Cowan, Director, Licensing and Regulatory Affairs Manager Licensing, PBAPS Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD) 3  S. Pattison, Asst. Secretary, MD Department of the Environment A. Lauland, Director, Director, Homeland Security Advisor  T. Snyder, MD Department of the Environment  Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. O'Connor, Harford County Council Administrator R. Ayers, Deputy Manager, Harford County Div of Emergency Operations E. Crist, Harford County Emergency Operations  R. Brooks, Cecil County Dept. of Emergency Services  Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Department of Environment, Radiological Health Program  J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists
C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation J. Grimes, Site Vice President, Peach Bottom M. Pacilio, Chief Operating Officer, Exelon R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight M. Massaro, Plant Manager, Peach Bottom G. Stathes, Director of Operations J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs P. Cowan, Director, Licensing and Regulatory Affairs Manager Licensing, PBAPS Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)
 
4   
 
Agenda  NRC's Annual Assessment Meeting Peach Bottom Atomic Power Station June 9, 2008
 
Introduction 
.......................................................................................................NRC (3 minutes)
Review of Reactor Oversight Process................................................................NRC (5 minutes)
 
National Summary of Plant Performance............................................................NRC (7 minutes)
 
Discussion of Peach Bottom Performance........................................................NRC (30 minutes) (including status of CAL commitments and SCWE issues)
 
Exelon's Response and Remarks..................................................................Exelon (30 minutes) (including status of CAL commitments and SCWE issues)
 
Closing Remarks
..............................................................................................NRC (10 minutes)
 
Short Break................................................................................................................(5 minutes)
NRC to address public questions ..................................NRC/Members of the Public (as needed)
 
ML080850792               


DOCUMENT NAME:  G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP-7 EOC\2007 AAM Meeting Notices\PB 2007 AAM Meeting Notice Rev0.doc 
3 S. Pattison, Asst. Secretary, MD Department of the Environment A. Lauland, Director, Director, Homeland Security Advisor T. Snyder, MD Department of the Environment Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. OConnor, Harford County Council Administrator R. Ayers, Deputy Manager, Harford County Div of Emergency Operations E. Crist, Harford County Emergency Operations R. Brooks, Cecil County Dept. of Emergency Services Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Department of Environment, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists


SUNSI Review Complete:      PGK            (Reviewer's Initials)   After declaring this document "An Official Agency Record" it will be released to the Public.
4 Agenda NRCs Annual Assessment Meeting Peach Bottom Atomic Power Station June 9, 2008 Introduction .......................................................................................................NRC (3 minutes)
Review of Reactor Oversight Process ................................................................NRC (5 minutes)
National Summary of Plant Performance............................................................NRC (7 minutes)
Discussion of Peach Bottom Performance........................................................NRC (30 minutes)
(including status of CAL commitments and SCWE issues)
Exelons Response and Remarks..................................................................Exelon (30 minutes)
(including status of CAL commitments and SCWE issues)
Closing Remarks ..............................................................................................NRC (10 minutes)
Short Break ................................................................................................................ (5 minutes)
NRC to address public questions ..................................NRC/Members of the Public (as needed)


To receive a copy of this document, indicate in the box:
ML080850792 DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP-7 EOC\2007 AAM Meeting Notices\PB 2007 AAM Meeting Notice Rev0.doc SUNSI Review Complete:                PGK              (Reviewers Initials)
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure  
After declaring this document An Official Agency Record it will be released to the Public.
    " N" = No copy OFFICE RI/DRP   RI/DRP     NAME FBower/FB PKrohn/PGK DATE 03/25 /08 03/25/08}}
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE         RI/DRP                           RI/DRP NAME             FBower/FB                         PKrohn/PGK DATE             03/25 /08                         03/25/08}}

Latest revision as of 08:39, 7 December 2019

Notice of Meeting with Exelon Generation Company, LLC Regarding the Nrc'S Assessment of the Safety Performance of the Peach Bottom Atomic Power Station for Calendar Year 2007
ML080850792
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/25/2008
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN, PG
References
MN 08-015
Download: ML080850792 (5)


Text

MN No.08-015 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 25, 2008 Licensee: Exelon Generation Company, LLC Facility: Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos.: 50-277; 50-278 Date/ Time: June 9, 2008 at 6:30 p.m.

Location: Peach Bottom Inn 6085 Delta Road Delta, PA 17314

Purpose:

The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2007. In addition, the status of Confirmatory Action Letter (CAL) commitments, including those related to safety conscious work environment issues, will be discussed.

The NRCs assessment is documented in a letter dated March 3, 2008.

Attendees*:

NRC: M. Dapas, Deputy Regional Administrator M. Gamberoni, Director, Division of Reactor Safety P. Krohn, Chief, Division of Reactor Projects Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom M. Brown, Resident Inspector, Peach Bottom Licensee: R. DeGregorio, Senior Vice President, Mid-Atlantic Operations J. Grimes, Site Vice President, Peach Bottom M. Massaro, Plant Manager G. Stathes, Director of Operations J. Armstrong, Manager, Regulatory Assurance Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Meeting

Contact:

Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: pgk1@nrc.gov

2 The NRCs assessment letter can be found in ADAMS with Accession Number: ML080630190.

This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML080850792. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

Previous 2007 regulatory actions regarding Peach Bottom can be located in ADAMS with Ascension Numbers ML072920283 (CAL); ML073090061 (Augmented Inspection Team);

ML073320344 (Reactor Oversight Process Deviation Memorandum); ML073550590 (Augmented Inspection Team Follow-up); and ML080440012 (Final Significance Determination).

Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html .

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by April 14, 2008, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved By: ______/RA/________

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation J. Grimes, Site Vice President, Peach Bottom M. Pacilio, Chief Operating Officer, Exelon R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight M. Massaro, Plant Manager, Peach Bottom G. Stathes, Director of Operations J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs P. Cowan, Director, Licensing and Regulatory Affairs Manager Licensing, PBAPS Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)

3 S. Pattison, Asst. Secretary, MD Department of the Environment A. Lauland, Director, Director, Homeland Security Advisor T. Snyder, MD Department of the Environment Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. OConnor, Harford County Council Administrator R. Ayers, Deputy Manager, Harford County Div of Emergency Operations E. Crist, Harford County Emergency Operations R. Brooks, Cecil County Dept. of Emergency Services Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Department of Environment, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists

4 Agenda NRCs Annual Assessment Meeting Peach Bottom Atomic Power Station June 9, 2008 Introduction .......................................................................................................NRC (3 minutes)

Review of Reactor Oversight Process ................................................................NRC (5 minutes)

National Summary of Plant Performance............................................................NRC (7 minutes)

Discussion of Peach Bottom Performance........................................................NRC (30 minutes)

(including status of CAL commitments and SCWE issues)

Exelons Response and Remarks..................................................................Exelon (30 minutes)

(including status of CAL commitments and SCWE issues)

Closing Remarks ..............................................................................................NRC (10 minutes)

Short Break ................................................................................................................ (5 minutes)

NRC to address public questions ..................................NRC/Members of the Public (as needed)

ML080850792 DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP-7 EOC\2007 AAM Meeting Notices\PB 2007 AAM Meeting Notice Rev0.doc SUNSI Review Complete: PGK (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME FBower/FB PKrohn/PGK DATE 03/25 /08 03/25/08