ML13098B073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13098B073
| number = ML13098B073
| issue date = 04/08/2013
| issue date = 04/08/2013
| title = 2013/04/08 NRR E-mail Capture - Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles (TAC No. MF1015)
| title = NRR E-mail Capture - Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles
| author name = Billoch-Colon A T
| author name = Billoch-Colon A
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name = Hightower R
| addressee name = Hightower R
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Billoch, AraceliSent:Monday, April 08, 2013 8:51 AMTo:Hightower, RichardSubject:Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles (TAC No. MF1015)Dear Mr. Hightower, By letter dated March 13, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13080A258), Carolina Power and Light Company, submitted a relief request based on the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a for the Inservice Testing Program Plan for the Fifth-Ten Year Interval for H.B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP).
{{#Wiki_filter:NRR-PMDAPEm Resource From:                         Billoch, Araceli Sent:                         Monday, April 08, 2013 8:51 AM To:                           Hightower, Richard
 
==Subject:==
Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles (TAC No. MF1015)
 
==Dear Mr. Hightower,==
 
By letter dated March 13, 2013 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML13080A258), Carolina Power and Light Company, submitted a relief request based on the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a for the Inservice Testing Program Plan for the Fifth-Ten Year Interval for H.B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP).
The proposed relief requested the use of alternative volumetric examinations of the reactor vessel hot leg and cold leg nozzle-to-pipe dissimilar metal welds to support inspections scheduled during the HBRSEP fall 2013 refueling outage.
The proposed relief requested the use of alternative volumetric examinations of the reactor vessel hot leg and cold leg nozzle-to-pipe dissimilar metal welds to support inspections scheduled during the HBRSEP fall 2013 refueling outage.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-3302.
Araceli T. Billoch Colón Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Tel. 301-415-3302 1


If you have any questions, please contact me at (301) 415-3302.
Hearing Identifier:     NRR_PMDA Email Number:           658 Mail Envelope Properties     (Araceli.Billoch@nrc.gov20130408085000)
Araceli T. Billoch Colón                    Project Manager            Division of Operating Reactor Licensing            Office of Nuclear Reactor Regulation            U.S. Nuclear Regulatory Commission Tel. 301-415-3302 Hearing Identifier: NRR_PMDA Email Number: 658   Mail Envelope Properties   (Araceli.Billoch@nrc.gov20130408085000)  


==Subject:==
==Subject:==
Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles (TAC No. MF1015) Sent Date:   4/8/2013 8:50:36 AM Received Date: 4/8/2013 8:50:00 AM From:   Billoch, Araceli Created By:   Araceli.Billoch@nrc.gov Recipients:     "Hightower, Richard" <richard.hightower@pgnmail.com> Tracking Status: None  
Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles (TAC No. MF1015)
 
Sent Date:             4/8/2013 8:50:36 AM Received Date:         4/8/2013 8:50:00 AM From:                   Billoch, Araceli Created By:             Araceli.Billoch@nrc.gov Recipients:
Post Office:     Files     Size     Date & Time MESSAGE   2322     4/8/2013 8:50:00 AM image001.gif   1332
"Hightower, Richard" <richard.hightower@pgnmail.com>
Tracking Status: None Post Office:
Files                           Size                     Date & Time MESSAGE                         2322                   4/8/2013 8:50:00 AM image001.gif                     1332 Options Priority:                        Standard Return Notification:            No Reply Requested:                Yes Sensitivity:                    Normal Expiration Date:
Recipients Received:


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    Yes  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Page 1 of 1 file://c:\EMailCapture\NRR_PMDA\658\attch1.gif   4/8/2013}}
Page 1of 14/8/2013file://c:\EMailCapture\NRR_PMDA\658\attch1.gif  
}}

Latest revision as of 14:38, 5 December 2019

NRR E-mail Capture - Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles
ML13098B073
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/08/2013
From: Billoch-Colon A
Division of Operating Reactor Licensing
To: Hightower R
Progress Energy
References
TAC MF1015
Download: ML13098B073 (3)


Text

NRR-PMDAPEm Resource From: Billoch, Araceli Sent: Monday, April 08, 2013 8:51 AM To: Hightower, Richard

Subject:

Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles (TAC No. MF1015)

Dear Mr. Hightower,

By letter dated March 13, 2013 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML13080A258), Carolina Power and Light Company, submitted a relief request based on the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a for the Inservice Testing Program Plan for the Fifth-Ten Year Interval for H.B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP).

The proposed relief requested the use of alternative volumetric examinations of the reactor vessel hot leg and cold leg nozzle-to-pipe dissimilar metal welds to support inspections scheduled during the HBRSEP fall 2013 refueling outage.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-3302.

Araceli T. Billoch Colón Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Tel. 301-415-3302 1

Hearing Identifier: NRR_PMDA Email Number: 658 Mail Envelope Properties (Araceli.Billoch@nrc.gov20130408085000)

Subject:

Acceptance Review for Robinson Unit 2 RR-08 Alternative Volumetric Examination of Reactor Vessel Hot and Cold Leg Nozzles (TAC No. MF1015)

Sent Date: 4/8/2013 8:50:36 AM Received Date: 4/8/2013 8:50:00 AM From: Billoch, Araceli Created By: Araceli.Billoch@nrc.gov Recipients:

"Hightower, Richard" <richard.hightower@pgnmail.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2322 4/8/2013 8:50:00 AM image001.gif 1332 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 1 file://c:\EMailCapture\NRR_PMDA\658\attch1.gif 4/8/2013