| issue date = 06/07/2011
| issue date = 06/07/2011
| title = Inspection Plan - Oconee
| title = Inspection Plan - Oconee
| author name = Martin K O, Rapp C W, Rogers W
| author name = Martin K, Rapp C, Rogers W
| author affiliation = NRC/NRR, NRC/RGN-II
| author affiliation = NRC/NRR, NRC/RGN-II
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:INSPECTION PLANInspection of: OconeeInspection Dates: 6/7 -6/011Report Number: 2010-006Type of Inspection:
{{#Wiki_filter:INSPECTION PLAN Inspection of: Oconee Inspection Dates: 6/7 - 6/011 Report Number: 2010-006 Type of Inspection: Confirm external flood ICMs Planned Inspection Hours: 120 Inspector(s): Curt Rapp (Lead)
Confirm external flood ICMsPlanned Inspection Hours: 120Inspector(s):
Walt Rogers, RI1 SRA Kamishan Martin Inspection Objectives: Verify ICMs have been implemented and will provide reasonable assurance they will be effective in mitigating the effects of Jocassee dam failure.
Curt Rapp (Lead)Walt Rogers, RI1 SRAKamishan MartinInspection Objectives:
Past Plant Performance in This Inspection Area: NA Risk-informed Inspection: (NEED ANY INSIGHTS FROM NRR OR WALT)
Verify ICMs have been implemented and will provide reasonable assurance they will beeffective in mitigating the effects of Jocassee dam failure.Past Plant Performance in This Inspection Area: NARisk-informed Inspection:  
Projects Branch Chief/Senior Resident Perspective: NA Allegation Awareness:
(NEED ANY INSIGHTS FROM NRR OR WALT)Projects Branch Chief/Senior Resident Perspective:
Outstanding Items to Be Reviewed: External flood ICMs Lodging During Inspection: Curt Rapp - Hilton Garden Inn Anderson, SC In Charge of Exit Interview: Curt Rapp Date Projects Informed: NA Date Plan Provided to Projects: NA Date Licensee Informed:                       Licensee
NAAllegation Awareness:
 
Outstanding Items to Be Reviewed:
==Contact:==
External flood ICMsLodging During Inspection:
Bob Meixelle Branch Chiefs Instructions:
Curt Rapp -Hilton Garden Inn Anderson, SCIn Charge of Exit Interview:
Approving Branch Chief:                                     Date:
Curt RappDate Projects Informed:
D3-7,
NADate Plan Provided to Projects:
 
NADate Licensee Informed:
Oconee ICM Inspection Matrix ICM                        Assigned   Inspectable                   Inspection Tasks                   IPs     Estimated Hours' Inspector       Area                                                               In-Office   On-Site Prep    Inspection Bi-weekly dam walkdown                     Curt       Procedures       Interview operators to assess their             7111121, 3         5 2" or > rainfall                           Curt       Responsibilities understanding of responsibilities and event     93801, Daily dam observation                     Curt       Corrective       response                                       42001, Actions         Review procedures for acceptance criteria       71152 and required actions Verify corrective actions Annual FERC Report                         Kamishan   Corrective       Review reports for any adverse trends or       71152   4        4 5 yr independent                           Kamishan   Actions         observations.
Licensee Contact:
Verify corrective actions
Bob MeixelleBranch Chiefs Instructions:
________________________                                nstr" menadow   lontofing Monthly observation wells and               Walt       Procedures       Review procedures for acceptance criteria       7111121, 4         6 seepage collection monitoring                         Corrective       and actions if exceeded.                       93801, Inspection of monitoring wells             Walt       Actions         Review monitoring logs and process for         71152   1         2 and seepage collection after "felt"                   Responsibilities indication of adverse trend.
Approving Branch Chief: Date:D3-7, Oconee ICM Inspection MatrixICM Assigned Inspectable Inspection Tasks IPs Estimated Hours'Inspector Area In-Office On-SitePrep Inspection Bi-weekly dam walkdown Curt Procedures Interview operators to assess their 7111121, 3 52" or > rainfall Curt Responsibilities understanding of responsibilities and event 93801,Daily dam observation Curt Corrective response 42001,Actions Review procedures for acceptance criteria 71152and required actionsVerify corrective actionsAnnual FERC Report Kamishan Corrective Review reports for any adverse trends or 71152 4 45 yr independent Kamishan Actions observations.
seismic event                                                           Verify corrective actions for either condition.
Verify corrective actions________________________
nstr" menadow lontofing Monthly observation wells and Walt Procedures Review procedures for acceptance criteria  
: 7111121, 4 6seepage collection monitoring Corrective and actions if exceeded.
93801,Inspection of monitoring wells Walt Actions Review monitoring logs and process for 71152 1 2and seepage collection after "felt" Responsibilities indication of adverse trend.seismic event Verify corrective actions for either condition.
Review procedures for actions and criteria.
Review procedures for actions and criteria.
Interview staff to verify understanding ofactions consistent with procedures.
Interview staff to verify understanding of actions consistent with procedures.
Annual surface monument survey Walt Corrective Review reports for any movement.
Annual surface monument survey             Walt       Corrective       Review reports for any movement.               71152   2         3 Actions          Verify corrective actions On-site control room staff                 Kamishan   Responsibilities Review procedures to assess required           7111121, 2         3 Hydro central ops center                   Curt       Procedures       actions.                                       93801, Interview staff to assess their understanding   42001 of responsibilities and verify consistent with procedures.
71152 2 3Actions Verify corrective actionsOn-site control room staff Kamishan Responsibilities Review procedures to assess required  
Forebay camera feed to control             Kamishan   Procedures       Interview staff to assess their use of these   7111121, 2         7 room                                                  Responsibilities cameras for event response.                     93801, Staff gauge camera                                                     Review procedures to verify cameras             42001 Fixed staff gauge camera fed to             Kamishan                   included in response actions control room and Hydro central Forebay and tail race                       Curt       Procedures       Check calibration of instruments and verify     7111121, instrumentation monitored by                           Calibration     alarm setpoints consistent with assumed         93801, control room and Hydro central                         Corrective       response.                                       42001.
: 7111121, 2 3Hydro central ops center Curt Procedures actions.
Seismographs around reservoir               Walt       Actions         Review response procedures.                     71152 Verify corrective actions for any deficiencies.
93801,Interview staff to assess their understanding 42001of responsibilities and verify consistent withprocedures.
 
Forebay camera feed to control Kamishan Procedures Interview staff to assess their use of these 7111121, 2 7room Responsibilities cameras for event response.
Dam and ONS flooding response       Walt     Procedures       Review procedures for actions and criteria. 42001,   3 4 procedures                                  Calibration       Interview staff to verify understanding of 71152, Corrective       'actions consistent with procedures.         93801 Actions          Verify corrective actions for any Responsibilities deficiencies.
93801,Staff gauge camera Review procedures to verify cameras 42001Fixed staff gauge camera fed to Kamishan included in response actionscontrol room and Hydro centralForebay and tail race Curt Procedures Check calibration of instruments and verify 7111121,instrumentation monitored by Calibration alarm setpoints consistent with assumed 93801,control room and Hydro central Corrective response.
Training         Review lesson plans and simulator training.
42001.Seismographs around reservoir Walt Actions Review response procedures.
Emergency Action Plan               Kamishan Emergency       Review emergency plan.                       7111140   3 8 Call tree notification to ONS       Kamishan Plan             Review procedures for actions and criteria. 3, Call tree notification to off-site Kamishan Procedures       Interview staff to verify understanding of   7111140 organizations                                Training         actions consistent with procedures.         6, 82001, ONS EP implementation               Kamishan Responsibilities Review lesson plans and emergency drills.
71152Verify corrective actions for anydeficiencies.
OSAG and ERO direction             Kamishan Recovery actions to restore         Curt electrical after flood water recede
Dam and ONS flooding response Walt Procedures Review procedures for actions and criteria.
(-10 hours)
42001, 3 4procedures Calibration Interview staff to verify understanding of 71152,Corrective  
Keowee FD respond to site           Curt EM 5.3 for flood:> 803.5'           Curt     Procedures       Review procedures for actions and criteria. TI-171   3 4
'actions consistent with procedures.
- Staging of B.5.!5-pump                   Responsibilities Verify actions can be accomplished within
93801Actions Verify corrective actions for anyResponsibilities deficiencies.
- Shutdown of ONS units w/i 1               Corrective       the required time.
Training Review lesson plans and simulator training.
hour                                         Actions         Review corrective actions for any Containments (fail > 59 hrs after   Curt                     deficiencies.
Emergency Action Plan Kamishan Emergency Review emergency plan. 7111140 3 8Call tree notification to ONS Kamishan Plan Review procedures for actions and criteria.
dam break)                                                   Verify actions consistent with B5b plan.
3,Call tree notification to off-site Kamishan Procedures Interview staff to verify understanding of 7111140organizations Training actions consistent with procedures.
B.5.b Strategies                   Curt
6, 82001,ONS EP implementation Kamishan Responsibilities Review lesson plans and emergency drills.OSAG and ERO direction KamishanRecovery actions to restore Curtelectrical after flood water recede(-10 hours)Keowee FD respond to site CurtEM 5.3 for flood:> 803.5' Curt Procedures Review procedures for actions and criteria.
: 1) Is there a procedure or policy that describes what actions would be taken, and when?
TI-171 3 4-Staging of B.5.!5-pump Responsibilities Verify actions can be accomplished within-Shutdown of ONS units w/i 1 Corrective the required time.hour Actions Review corrective actions for anyContainments (fail > 59 hrs after Curt deficiencies.
: 2) If a storm of exceptional magnitude were predicted to move into the watershed of Jocassee and Keowee reservoirs, what actions would be taken by Duke? Here also, is there a procedure or policy that describes what actions would be taken, and when?
dam break) Verify actions consistent with B5b plan.B.5.b Strategies Curt  
 
: 1) Is there a procedure or policy that describes what actions would be taken, and when?2) If a storm of exceptional magnitude were predicted to move into the watershed of Jocassee andKeowee reservoirs, what actions would be taken by Duke? Here also, is there a procedure or policythat describes what actions would be taken, and when?
Verify ICM Mitigqation Capability Dam Safety Inspections Bi-weekly dam walkdown; 2" or > rainfall; Daily dam observation
Verify ICM Mitigqation Capability Dam Safety Inspections Bi-weekly dam walkdown; 2" or > rainfall; Daily dam observation
* Review procedures for acceptance criteria and required actions (IP 7111121 02.02 c.)* Review procedures controlling reservoir water level for actions if one or more turbines or gates areinoperable prior to a rainfall event.Annual FERC Report; 5 yr independent inspection
* Review procedures for acceptance criteria and required actions (IP 7111121 02.02 c.)
* Review reports for any adverse trends or observations Monthly observation wells and seepage collection monitoring; Inspection of monitoring wells and seepagecollection after "felt" seismic event* Review procedures for acceptance criteria and required actions* Review monitoring logs and process for indication of adverse trendAnnual surface monument survey* Review reports for any movementInstrumentation/Monitoring On-site control room staff; Hydro central ops center* Review procedures to assess required actionsForebay camera feed to control room; Staff gauge camera; Fixed staff gauge camera fed to control room andHydro central* Review procedures to verify cameras included in response actions* Review comp measures for inoperable cameras and feedForebay and tail race instrumentation monitored by control room and Hydro central; Seismographs aroundreservoir
* Review procedures controlling reservoir water level for actions if one or more turbines or gates are inoperable prior to a rainfall event.
Annual FERC Report; 5 yr independent inspection
* Review reports for any adverse trends or observations Monthly observation wells and seepage collection monitoring; Inspection of monitoring wells and seepage collection after "felt" seismic event
* Review procedures for acceptance criteria and required actions
* Review monitoring logs and process for indication of adverse trend Annual surface monument survey
* Review reports for any movement Instrumentation/Monitoring On-site control room staff; Hydro central ops center
* Review procedures to assess required actions Forebay camera feed to control room; Staff gauge camera; Fixed staff gauge camera fed to control room and Hydro central
* Review procedures to verify cameras included in response actions
* Review comp measures for inoperable cameras and feed Forebay and tail race instrumentation monitored by control room and Hydro central; Seismographs around reservoir
* Verify alarm setpoints consistent with assumed response.
* Verify alarm setpoints consistent with assumed response.
" Review response procedures
" Review response procedures
* Review comp measures for inoperable instrumentation and indications Emergency Procedures/Plan Dam and ONS flooding response procedures
* Review comp measures for inoperable instrumentation and indications Emergency Procedures/Plan Dam and ONS flooding response procedures
* Review procedures for actions and criteria* Review lesson plans and simulator trainingEmergency Plan" Review emergency plan and implementing procedures for actions and criteria.
* Review procedures for actions and criteria
* Review training lesson plans and emergency drills." Review recovery actions to restore electrical after flood water recede (-10 hours)* Verify procedures to have Keowee fire department respondEM 5.3 for flood > 803.5'; Containments (fail > 59 hrs after dam break); B.5.b Strategies
* Review lesson plans and simulator training Emergency Plan
" Review procedures for actions and criteria* Verify actions can be accomplished within the required time* Verify actions consistent with B5b plano Staging of B.5.b pumpo Shutdown of ONS units w/i 1 hour* Review of the calculations for the B.5.B pumps' capability to provide sufficient water for heat removal Verify ICM Implementation Dam Safety Inspections Bi-weekly dam walkdown; 2" or > rainfall; Daily dam observation
"   Review emergency plan and implementing procedures for actions and criteria.
* Interview operators to assess their understanding of responsibilities and event response* Verify corrective actions (IP 71152)* Review training records or drill critiques
* Review training lesson plans and emergency drills.
* Actions taken if anomalous piping discharges on the abutments were to be discovered Annual FERC Report; 5 yr independent dam inspection 0 Verify corrective actions for any deficiencies Monthly observation wells and seepage collection monitoring; Inspection of monitoring wells and seepagecollection after "felt" seismic event* Verify corrective actions for adverse trendsAnnual surface monument survey* Verify corrective actions for any movementInstrumentation/Monitoring On-site control room staff; Hydro central ops center* Interview staff to assess their understanding of responsibilities and verify consistent with procedures
"   Review recovery actions to restore electrical after flood water recede (-10 hours)
* Review any training records or drill results* Verify corrective actions for any deficiencies
* Verify procedures to have Keowee fire department respond EM  5.3 for flood > 803.5'; Containments (fail > 59 hrs after dam break); B.5.b Strategies
* Procedures for equipment condition monitoring of ammeters and voltmeters installed on spillway gates* Address whether these gages will allow for remote monitoring of spillway operation
"   Review procedures for actions and criteria
* Methods to remotely confirm operation of the spillway gates" Third means of operating the spillway gates implemented in April 2010Forebay camera feed to control room; Staff gauge camera; Fixed.staff gauge camera fed to control room andhydro central* Interview staff to assess their use of these cameras for event response.
* Verify actions can be accomplished within the required time
* Verify operability of cameras and dedicated feed to hydro central.* Verify corrective actions for any deficiencies.
* Verify actions consistent with B5b plan o Staging of B.5.b pump o Shutdown of ONS units w/i 1 hour
* Review corrective action system for reliability or availability trends.* Verify comp measures implemented for inoperable cameras or indications.
* Review of the calculations for the B.5.B pumps' capability to provide sufficient water for heat removal
Forebay and tail race instrumentation monitored by control room and Hydro central; Seismographs aroundreservoir
 
Verify ICM Implementation Dam Safety Inspections Bi-weekly dam walkdown; 2" or > rainfall; Daily dam observation
* Interview operators to assess their understanding of responsibilities and event response
* Verify corrective actions (IP 71152)
* Review training records or drill critiques
* Actions taken if anomalous piping discharges on the abutments were to be discovered Annual FERC Report; 5 yr independent dam inspection 0   Verify corrective actions for any deficiencies Monthly observation wells and seepage collection monitoring; Inspection of monitoring wells and seepage collection after "felt" seismic event
* Verify corrective actions for adverse trends Annual surface monument survey
* Verify corrective actions for any movement Instrumentation/Monitoring On-site control room staff; Hydro central ops center
* Interview staff to assess their understanding of responsibilities and verify consistent with procedures
* Review any training records or drill results
* Verify corrective actions for any deficiencies
* Procedures for equipment condition monitoring of ammeters and voltmeters installed on spillway gates
* Address whether these gages will allow for remote monitoring of spillway operation
* Methods to remotely confirm operation of the spillway gates
" Third means of operating the spillway gates implemented in April 2010 Forebay camera feed to control room; Staff gauge camera; Fixed.staff gauge camera fed to control room and hydro central
* Interview staff to assess their use of these cameras for event response.
* Verify operability of cameras and dedicated feed to hydro central.
* Verify corrective actions for any deficiencies.
* Review corrective action system for reliability or availability trends.
* Verify comp measures implemented for inoperable cameras or indications.
Forebay and tail race instrumentation monitored by control room and Hydro central; Seismographs around reservoir
* Check calibration of instruments.
* Check calibration of instruments.
* Verify corrective actions for any deficiencies.
* Verify corrective actions for any deficiencies.
* Verify operability of indications in control room and hydro central.* Review corrective action system for reliability or availability trends.* Verify comp measures implemented for inoperable instrumentation.
* Verify operability of indications in control room and hydro central.
* Review corrective action system for reliability or availability trends.
* Verify comp measures implemented for inoperable instrumentation.
Emergency ProcedureslE-Plan Dam and ONS flooding response procedures
Emergency ProcedureslE-Plan Dam and ONS flooding response procedures
" Interview staff to verify understanding of actions is consistent with procedures.
"   Interview staff to verify understanding of actions is consistent with procedures.
* Verify corrective actions for any deficiencies.
* Verify corrective actions for any deficiencies.
* Verify procedures are up-to-date and readily accessible.
* Verify procedures are up-to-date and readily accessible.
* Conduct simulator drill to verify procedure adequacy and operator response.
* Conduct simulator drill to verify procedure adequacy and operator response.
Emergency Plan" Interview staff to verify understanding of actions consistent with procedures.
Emergency Plan
* Review corrective actions for deficiencies or weaknesses identified during emergency drills EM 5.3 for flood > 803.5'; Containment failure > 59 hrs after dam break; B.5.b Strategies
"   Interview staff to verify understanding of actions consistent with procedures.
* Review corrective actions for deficiencies or weaknesses identified during emergency drills
 
EM 5.3 for flood > 803.5'; Containment failure > 59 hrs after dam break; B.5.b Strategies
* Review corrective actions for any deficiencies.
* Review corrective actions for any deficiencies.
Documents for ICM inspection Procedures
Documents for ICM inspection Procedures
* BI-weekly dam walkdown* Dam inspection for 2" or > rainfall" Observation well monitoring
* BI-weekly dam walkdown
" Response of Jocassee control room, Keowee control room, Hydro Central Ops personnel, and ONS control room for high level, overtopping, dam failure* Response for forebay and tailrace alarms* Calibration of forebay and tail race instruments
* Dam inspection for 2" or > rainfall
" Response for "felt" seismic event* Interface agreements with off-site organizations (fire department, police, etc.)" Staging of B5b pump, shutdown of ONS units* B5b response plan* E-plan related to dam failure/flooding
" Observation well monitoring
* Contingency plans for containment failureDocuments 0 Annual FERC reports (pervious 2 yrs)* 5 yr independent inspections (most recent and previous and any associated PIPs* Monthly observation well records for past year and any associated PIPs* Annual monument survey results for past three years and any associated PIPs0 PIPs associated with Jocassee forebay and trailrace instruments or alarms* E-drill results for dam break/flooding and any associated PIPs* Training lesson plans for responding to dam failure/flooding}}
" Response of Jocassee control room, Keowee control room, Hydro Central Ops personnel, and ONS control room for high level, overtopping, dam failure
* Response for forebay and tailrace alarms
* Calibration of forebay and tail race instruments
" Response for "felt" seismic event
* Interface agreements with off-site organizations (fire department, police, etc.)
" Staging of B5b pump, shutdown of ONS units
* B5b response plan
* E-plan related to dam failure/flooding
* Contingency plans for containment failure Documents 0 Annual FERC reports (pervious 2 yrs)
* 5 yr independent inspections (most recent and previous and any associated PIPs
* Monthly observation well records for past year and any associated PIPs
* Annual monument survey results for past three years and any associated PIPs 0 PIPs associated with Jocassee forebay and trailrace instruments or alarms
* E-drill results for dam break/flooding and any associated PIPs
* Training lesson plans for responding to dam failure/flooding}}

Latest revision as of 08:41, 5 December 2019

Inspection Plan - Oconee
ML14058A043
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/07/2011
From: Martin K, Curtis Rapp, Rogers W
Office of Nuclear Reactor Regulation, NRC/RGN-II
To:
Shared Package
ML14055A421 List: ... further results
References
FOIA/PA-2012-0325, IR-10-006
Download: ML14058A043 (8)


Text

INSPECTION PLAN Inspection of: Oconee Inspection Dates: 6/7 - 6/011 Report Number: 2010-006 Type of Inspection: Confirm external flood ICMs Planned Inspection Hours: 120 Inspector(s): Curt Rapp (Lead)

Walt Rogers, RI1 SRA Kamishan Martin Inspection Objectives: Verify ICMs have been implemented and will provide reasonable assurance they will be effective in mitigating the effects of Jocassee dam failure.

Past Plant Performance in This Inspection Area: NA Risk-informed Inspection: (NEED ANY INSIGHTS FROM NRR OR WALT)

Projects Branch Chief/Senior Resident Perspective: NA Allegation Awareness:

Outstanding Items to Be Reviewed: External flood ICMs Lodging During Inspection: Curt Rapp - Hilton Garden Inn Anderson, SC In Charge of Exit Interview: Curt Rapp Date Projects Informed: NA Date Plan Provided to Projects: NA Date Licensee Informed: Licensee

Contact:

Bob Meixelle Branch Chiefs Instructions:

Approving Branch Chief: Date:

D3-7,

Oconee ICM Inspection Matrix ICM Assigned Inspectable Inspection Tasks IPs Estimated Hours' Inspector Area In-Office On-Site Prep Inspection Bi-weekly dam walkdown Curt Procedures Interview operators to assess their 7111121, 3 5 2" or > rainfall Curt Responsibilities understanding of responsibilities and event 93801, Daily dam observation Curt Corrective response 42001, Actions Review procedures for acceptance criteria 71152 and required actions Verify corrective actions Annual FERC Report Kamishan Corrective Review reports for any adverse trends or 71152 4 4 5 yr independent Kamishan Actions observations.

Verify corrective actions

________________________ nstr" menadow lontofing Monthly observation wells and Walt Procedures Review procedures for acceptance criteria 7111121, 4 6 seepage collection monitoring Corrective and actions if exceeded. 93801, Inspection of monitoring wells Walt Actions Review monitoring logs and process for 71152 1 2 and seepage collection after "felt" Responsibilities indication of adverse trend.

seismic event Verify corrective actions for either condition.

Review procedures for actions and criteria.

Interview staff to verify understanding of actions consistent with procedures.

Annual surface monument survey Walt Corrective Review reports for any movement. 71152 2 3 Actions Verify corrective actions On-site control room staff Kamishan Responsibilities Review procedures to assess required 7111121, 2 3 Hydro central ops center Curt Procedures actions. 93801, Interview staff to assess their understanding 42001 of responsibilities and verify consistent with procedures.

Forebay camera feed to control Kamishan Procedures Interview staff to assess their use of these 7111121, 2 7 room Responsibilities cameras for event response. 93801, Staff gauge camera Review procedures to verify cameras 42001 Fixed staff gauge camera fed to Kamishan included in response actions control room and Hydro central Forebay and tail race Curt Procedures Check calibration of instruments and verify 7111121, instrumentation monitored by Calibration alarm setpoints consistent with assumed 93801, control room and Hydro central Corrective response. 42001.

Seismographs around reservoir Walt Actions Review response procedures. 71152 Verify corrective actions for any deficiencies.

Dam and ONS flooding response Walt Procedures Review procedures for actions and criteria. 42001, 3 4 procedures Calibration Interview staff to verify understanding of 71152, Corrective 'actions consistent with procedures. 93801 Actions Verify corrective actions for any Responsibilities deficiencies.

Training Review lesson plans and simulator training.

Emergency Action Plan Kamishan Emergency Review emergency plan. 7111140 3 8 Call tree notification to ONS Kamishan Plan Review procedures for actions and criteria. 3, Call tree notification to off-site Kamishan Procedures Interview staff to verify understanding of 7111140 organizations Training actions consistent with procedures. 6, 82001, ONS EP implementation Kamishan Responsibilities Review lesson plans and emergency drills.

OSAG and ERO direction Kamishan Recovery actions to restore Curt electrical after flood water recede

(-10 hours)

Keowee FD respond to site Curt EM 5.3 for flood:> 803.5' Curt Procedures Review procedures for actions and criteria. TI-171 3 4

- Staging of B.5.!5-pump Responsibilities Verify actions can be accomplished within

- Shutdown of ONS units w/i 1 Corrective the required time.

hour Actions Review corrective actions for any Containments (fail > 59 hrs after Curt deficiencies.

dam break) Verify actions consistent with B5b plan.

B.5.b Strategies Curt

1) Is there a procedure or policy that describes what actions would be taken, and when?
2) If a storm of exceptional magnitude were predicted to move into the watershed of Jocassee and Keowee reservoirs, what actions would be taken by Duke? Here also, is there a procedure or policy that describes what actions would be taken, and when?

Verify ICM Mitigqation Capability Dam Safety Inspections Bi-weekly dam walkdown; 2" or > rainfall; Daily dam observation

  • Review procedures for acceptance criteria and required actions (IP 7111121 02.02 c.)
  • Review procedures controlling reservoir water level for actions if one or more turbines or gates are inoperable prior to a rainfall event.

Annual FERC Report; 5 yr independent inspection

  • Review reports for any adverse trends or observations Monthly observation wells and seepage collection monitoring; Inspection of monitoring wells and seepage collection after "felt" seismic event
  • Review procedures for acceptance criteria and required actions
  • Review monitoring logs and process for indication of adverse trend Annual surface monument survey
  • Review reports for any movement Instrumentation/Monitoring On-site control room staff; Hydro central ops center
  • Review procedures to assess required actions Forebay camera feed to control room; Staff gauge camera; Fixed staff gauge camera fed to control room and Hydro central
  • Review procedures to verify cameras included in response actions
  • Review comp measures for inoperable cameras and feed Forebay and tail race instrumentation monitored by control room and Hydro central; Seismographs around reservoir
  • Verify alarm setpoints consistent with assumed response.

" Review response procedures

  • Review comp measures for inoperable instrumentation and indications Emergency Procedures/Plan Dam and ONS flooding response procedures
  • Review procedures for actions and criteria

" Review emergency plan and implementing procedures for actions and criteria.

  • Review training lesson plans and emergency drills.

" Review recovery actions to restore electrical after flood water recede (-10 hours)

  • Verify procedures to have Keowee fire department respond EM 5.3 for flood > 803.5'; Containments (fail > 59 hrs after dam break); B.5.b Strategies

" Review procedures for actions and criteria

  • Verify actions can be accomplished within the required time
  • Verify actions consistent with B5b plan o Staging of B.5.b pump o Shutdown of ONS units w/i 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
  • Review of the calculations for the B.5.B pumps' capability to provide sufficient water for heat removal

Verify ICM Implementation Dam Safety Inspections Bi-weekly dam walkdown; 2" or > rainfall; Daily dam observation

  • Interview operators to assess their understanding of responsibilities and event response
  • Review training records or drill critiques
  • Actions taken if anomalous piping discharges on the abutments were to be discovered Annual FERC Report; 5 yr independent dam inspection 0 Verify corrective actions for any deficiencies Monthly observation wells and seepage collection monitoring; Inspection of monitoring wells and seepage collection after "felt" seismic event
  • Verify corrective actions for adverse trends Annual surface monument survey
  • Verify corrective actions for any movement Instrumentation/Monitoring On-site control room staff; Hydro central ops center
  • Interview staff to assess their understanding of responsibilities and verify consistent with procedures
  • Review any training records or drill results
  • Verify corrective actions for any deficiencies
  • Procedures for equipment condition monitoring of ammeters and voltmeters installed on spillway gates
  • Address whether these gages will allow for remote monitoring of spillway operation
  • Methods to remotely confirm operation of the spillway gates

" Third means of operating the spillway gates implemented in April 2010 Forebay camera feed to control room; Staff gauge camera; Fixed.staff gauge camera fed to control room and hydro central

  • Interview staff to assess their use of these cameras for event response.
  • Verify operability of cameras and dedicated feed to hydro central.
  • Verify corrective actions for any deficiencies.
  • Review corrective action system for reliability or availability trends.
  • Verify comp measures implemented for inoperable cameras or indications.

Forebay and tail race instrumentation monitored by control room and Hydro central; Seismographs around reservoir

  • Check calibration of instruments.
  • Verify corrective actions for any deficiencies.
  • Verify operability of indications in control room and hydro central.
  • Review corrective action system for reliability or availability trends.
  • Verify comp measures implemented for inoperable instrumentation.

Emergency ProcedureslE-Plan Dam and ONS flooding response procedures

" Interview staff to verify understanding of actions is consistent with procedures.

  • Verify corrective actions for any deficiencies.
  • Verify procedures are up-to-date and readily accessible.
  • Conduct simulator drill to verify procedure adequacy and operator response.

Emergency Plan

" Interview staff to verify understanding of actions consistent with procedures.

  • Review corrective actions for deficiencies or weaknesses identified during emergency drills

EM 5.3 for flood > 803.5'; Containment failure > 59 hrs after dam break; B.5.b Strategies

  • Review corrective actions for any deficiencies.

Documents for ICM inspection Procedures

  • BI-weekly dam walkdown
  • Dam inspection for 2" or > rainfall

" Observation well monitoring

" Response of Jocassee control room, Keowee control room, Hydro Central Ops personnel, and ONS control room for high level, overtopping, dam failure

  • Response for forebay and tailrace alarms
  • Calibration of forebay and tail race instruments

" Response for "felt" seismic event

  • Interface agreements with off-site organizations (fire department, police, etc.)

" Staging of B5b pump, shutdown of ONS units

  • B5b response plan
  • E-plan related to dam failure/flooding
  • Contingency plans for containment failure Documents 0 Annual FERC reports (pervious 2 yrs)
  • 5 yr independent inspections (most recent and previous and any associated PIPs
  • Monthly observation well records for past year and any associated PIPs
  • Annual monument survey results for past three years and any associated PIPs 0 PIPs associated with Jocassee forebay and trailrace instruments or alarms
  • E-drill results for dam break/flooding and any associated PIPs
  • Training lesson plans for responding to dam failure/flooding