ML14170B220: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML14170B220
| number = ML14170B220
| issue date = 06/18/2014
| issue date = 06/18/2014
| title = Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466)
| title = NRR E-mail Capture - Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466)
| author name = Rankin J
| author name = Rankin J
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project =
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Rankin, Jennivine Sent: Wednesday, June 18, 2014 8:37 PM To: medwards@oppd.com; BHansher@oppd.com
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Rankin, Jennivine Sent:                       Wednesday, June 18, 2014 8:37 PM To:                         medwards@oppd.com; BHansher@oppd.com


==Subject:==
==Subject:==
Acceptance Review - Fort Calhoun LAR - Revi se Surveillance Frequency for the Pressurizer Safety Valves (MF3466)Mr. Hansher and Mr. Edwards, By letter dated February 10, 2014, as supplemented June 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML14041A408 and ML14163A417, respectively), Omaha Public Power District (OPPD) submitted a license amendment request for Fort Calhoun Station, Unit 1 (FCS). The proposed amendment would revise the surveillance fre quency for the pressurizer safety valves from a refueling frequency to be consistent with the Inservice Testing Program. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466)
 
Mr. Hansher and Mr. Edwards, By letter dated February 10, 2014, as supplemented June 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML14041A408 and ML14163A417, respectively), Omaha Public Power District (OPPD) submitted a license amendment request for Fort Calhoun Station, Unit 1 (FCS).
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
The proposed amendment would revise the surveillance frequency for the pressurizer safety valves from a refueling frequency to be consistent with the Inservice Testing Program. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1530.
If you have any questions, please contact me at (301) 415-1530.
: Thanks, Jennie Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station Fort Calhoun Station  
: Thanks, Jennie Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station Fort Calhoun Station Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station Fort Calhoun Station Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1
 
Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station  
 
Fort Calhoun Station Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


Hearing Identifier: NRR_PMDA Email Number: 1389   Mail Envelope Properties   (E85CAE0ED2FC5449B808712D77E97576B5E9DF238C)
Hearing Identifier:     NRR_PMDA Email Number:           1389 Mail Envelope Properties     (E85CAE0ED2FC5449B808712D77E97576B5E9DF238C)


==Subject:==
==Subject:==
Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466) Sent Date:   6/18/2014 8:37:27 PM Received Date: 6/18/2014 8:37:00 PM From:   Rankin, Jennivine Created By:   Jennivine.Rankin@nrc.gov Recipients:     "medwards@oppd.com" <medwards@oppd.com> Tracking Status: None "BHansher@oppd.com" <BHansher@oppd.com> Tracking Status: None  
Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466)
 
Sent Date:             6/18/2014 8:37:27 PM Received Date:         6/18/2014 8:37:00 PM From:                   Rankin, Jennivine Created By:             Jennivine.Rankin@nrc.gov Recipients:
Post Office:   HQCLSTR02.nrc.gov Files     Size     Date & Time MESSAGE   2895     6/18/2014 8:37:00 PM
"medwards@oppd.com" <medwards@oppd.com>
 
Tracking Status: None "BHansher@oppd.com" <BHansher@oppd.com>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                           Size                   Date & Time MESSAGE                         2895                   6/18/2014 8:37:00 PM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Latest revision as of 05:33, 5 December 2019

NRR E-mail Capture - Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466)
ML14170B220
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/18/2014
From: Jennivine Rankin
Plant Licensing Branch IV
To: Edwards M, Hansher B
Entergy Nuclear Operations
References
MF3466
Download: ML14170B220 (2)


Text

NRR-PMDAPEm Resource From: Rankin, Jennivine Sent: Wednesday, June 18, 2014 8:37 PM To: medwards@oppd.com; BHansher@oppd.com

Subject:

Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466)

Mr. Hansher and Mr. Edwards, By letter dated February 10, 2014, as supplemented June 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML14041A408 and ML14163A417, respectively), Omaha Public Power District (OPPD) submitted a license amendment request for Fort Calhoun Station, Unit 1 (FCS).

The proposed amendment would revise the surveillance frequency for the pressurizer safety valves from a refueling frequency to be consistent with the Inservice Testing Program. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1530.

Thanks, Jennie Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station Fort Calhoun Station Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station Fort Calhoun Station Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 1389 Mail Envelope Properties (E85CAE0ED2FC5449B808712D77E97576B5E9DF238C)

Subject:

Acceptance Review - Fort Calhoun LAR - Revise Surveillance Frequency for the Pressurizer Safety Valves (MF3466)

Sent Date: 6/18/2014 8:37:27 PM Received Date: 6/18/2014 8:37:00 PM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients:

"medwards@oppd.com" <medwards@oppd.com>

Tracking Status: None "BHansher@oppd.com" <BHansher@oppd.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 2895 6/18/2014 8:37:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: