ML15093A311: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15093A311 | | number = ML15093A311 | ||
| issue date = 03/16/2015 | | issue date = 03/16/2015 | ||
| title = Request for Additional Information: Clinton Flooding Hazard Reevaluation Report | | title = NRR E-mail Capture - Request for Additional Information: Clinton Flooding Hazard Reevaluation Report | ||
| author name = Hall V | | author name = Hall V | ||
| author affiliation = NRC/NRR/JLD | | author affiliation = NRC/NRR/JLD | ||
| addressee name = Distel D | | addressee name = Distel D | ||
| addressee affiliation = Exelon Corp | | addressee affiliation = Exelon Corp | ||
| docket = 05000461 | | docket = 05000461 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Hall, Victor Sent: Monday, March 16, 2015 4:28 PM To: david.distel@exeloncorp.com Cc: Whaley, Sheena; Purnell, Blake | ||
==Subject:== | ==Subject:== | ||
Request for Additional Information: Clinton Flooding Hazard Reevaluation Report (TAC No. | Request for Additional Information: Clinton Flooding Hazard Reevaluation Report (TAC No. | ||
MF3654)Attachments: | MF3654) | ||
Clinton RAI Rev1.docx Mr. Distel, By letter dated March 12, 2014, Exelon Generation Company LLC (the licensee) submitted its flood hazard reevaluation report (FHRR) for Clinton Power Station, Unit No. 1 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14079A419). By e mail dated June 18, 2014, the U.S. | Attachments: Clinton RAI Rev1.docx Mr. Distel, By letter dated March 12, 2014, Exelon Generation Company LLC (the licensee) submitted its flood hazard reevaluation report (FHRR) for Clinton Power Station, Unit No. 1 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14079A419). By e mail dated June 18, 2014, the U.S. | ||
Nuclear Regulatory Commission (NRC) staff provided a Request for Additional Information (RAI) regarding the above referenced FHRR (ADAMS Accession No. | Nuclear Regulatory Commission (NRC) staff provided a Request for Additional Information (RAI) regarding the above referenced FHRR (ADAMS Accession No. ML14169A545). The licensee responded to this RAI by letter dated November 3, 2014 (RS-14-312). | ||
The staff determined that the attached RAI is necessary to complete its assessment of the licensees FHRR. | |||
Please contact me if you would like clarification on the attached RAI. If no clarification is necessary, the NRC requests that Exelon provide a response, or a schedule to provide a response, within 30 days of this e-mail. | |||
The NRC staff has determined that no security-related or proprietary information is contained herein. | |||
Thank you, | |||
-Vic Victor Hall Senior Project Manager Japan Lessons Learned Division Office of Nuclear Reactor Regulation 301-415-2915 1 | |||
Hearing Identifier: NRR_PMDA Email Number: 1968 Mail Envelope Properties (Victor.Hall@nrc.gov20150316162700) | |||
==Subject:== | |||
Request for Additional Information: Clinton Flooding Hazard Reevaluation Report (TAC No. MF3654) | |||
Sent Date: 3/16/2015 4:27:52 PM Received Date: 3/16/2015 4:27:00 PM From: Hall, Victor Created By: Victor.Hall@nrc.gov Recipients: | |||
"Whaley, Sheena" <Sheena.Whaley@nrc.gov> | |||
Tracking Status: None "Purnell, Blake" <Blake.Purnell@nrc.gov> | |||
Tracking Status: None "david.distel@exeloncorp.com" <david.distel@exeloncorp.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 1177 3/16/2015 4:27:00 PM Clinton RAI Rev1.docx 27920 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received: | |||
Request for Additional Information Fukushima Lessons Learned Flood Hazard Reevaluation Report Clinton Power Station, Unit No. 1 (TAC No. MF3654) | Request for Additional Information Fukushima Lessons Learned Flood Hazard Reevaluation Report Clinton Power Station, Unit No. 1 (TAC No. MF3654) | ||
By letter dated March 12, 2014, Exelon Generation Company LLC(the licensee) submitted its flood hazard reevaluation report (FHRR) for Clinton Power Station, Unit No. 1 (Agencywide Documents Access and Management System (ADAMS) Accession No.ML14079A419). By e-mail dated June 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff provided a request for additional information (RAI) regarding the above referenced FHRR (ADAMS Accession No. ML14169A545). The licensee responded to this RAI by letter dated November 3, 2014 (RS-14-312).The staff determined that additional information, as requested below,is necessary to complete its assessment of the | By letter dated March 12, 2014, Exelon Generation Company LLC(the licensee) submitted its flood hazard reevaluation report (FHRR) for Clinton Power Station, Unit No. 1 (Agencywide Documents Access and Management System (ADAMS) Accession No.ML14079A419). By e-mail dated June 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff provided a request for additional information (RAI) regarding the above referenced FHRR (ADAMS Accession No. ML14169A545). The licensee responded to this RAI by letter dated November 3, 2014 (RS-14-312).The staff determined that additional information, as requested below,is necessary to complete its assessment of the licensees FHRR. | ||
RAI: Local Intense Precipitation (LIP) Event Duration and Distribution The FHRR presents a LIP flood reevaluation for a 1-hour, front-loaded probable maximum precipitation (PMP) event using Hydrometeorological Report Nos. 51 and 52. Provide justification that the LIP analysis presented in the FHRR is bounding in terms of warning time, flood depth, and flood duration. This justification can include sensitivity analysis of LIP event duration to consider localized (one square mile) PMP events up to 72 hours in duration (e.g., 1-, 6-, 12-, 24-, 48-, 72-hour PMPs) and various rainfall distributions (e.g., center-loaded and others in addition to a front-loaded distribution). The evaluations could identify potentially bounding scenarios with respect to flood height, event duration, and associated effects. Provide electronic versions of any associated modeling input and output files for the sensitivity runs.}} | RAI: Local Intense Precipitation (LIP) Event Duration and Distribution The FHRR presents a LIP flood reevaluation for a 1-hour, front-loaded probable maximum precipitation (PMP) event using Hydrometeorological Report Nos. 51 and 52. Provide justification that the LIP analysis presented in the FHRR is bounding in terms of warning time, flood depth, and flood duration. This justification can include sensitivity analysis of LIP event duration to consider localized (one square mile) PMP events up to 72 hours in duration (e.g., 1-, | ||
6-, 12-, 24-, 48-, 72-hour PMPs) and various rainfall distributions (e.g., center-loaded and others in addition to a front-loaded distribution). The evaluations could identify potentially bounding scenarios with respect to flood height, event duration, and associated effects. Provide electronic versions of any associated modeling input and output files for the sensitivity runs.}} |
Latest revision as of 00:35, 5 December 2019
ML15093A311 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 03/16/2015 |
From: | Victor Hall Japan Lessons-Learned Division |
To: | Distel D Exelon Corp |
References | |
TAC MF3654 | |
Download: ML15093A311 (3) | |
Text
NRR-PMDAPEm Resource From: Hall, Victor Sent: Monday, March 16, 2015 4:28 PM To: david.distel@exeloncorp.com Cc: Whaley, Sheena; Purnell, Blake
Subject:
Request for Additional Information: Clinton Flooding Hazard Reevaluation Report (TAC No.
MF3654)
Attachments: Clinton RAI Rev1.docx Mr. Distel, By letter dated March 12, 2014, Exelon Generation Company LLC (the licensee) submitted its flood hazard reevaluation report (FHRR) for Clinton Power Station, Unit No. 1 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14079A419). By e mail dated June 18, 2014, the U.S.
Nuclear Regulatory Commission (NRC) staff provided a Request for Additional Information (RAI) regarding the above referenced FHRR (ADAMS Accession No. ML14169A545). The licensee responded to this RAI by letter dated November 3, 2014 (RS-14-312).
The staff determined that the attached RAI is necessary to complete its assessment of the licensees FHRR.
Please contact me if you would like clarification on the attached RAI. If no clarification is necessary, the NRC requests that Exelon provide a response, or a schedule to provide a response, within 30 days of this e-mail.
The NRC staff has determined that no security-related or proprietary information is contained herein.
Thank you,
-Vic Victor Hall Senior Project Manager Japan Lessons Learned Division Office of Nuclear Reactor Regulation 301-415-2915 1
Hearing Identifier: NRR_PMDA Email Number: 1968 Mail Envelope Properties (Victor.Hall@nrc.gov20150316162700)
Subject:
Request for Additional Information: Clinton Flooding Hazard Reevaluation Report (TAC No. MF3654)
Sent Date: 3/16/2015 4:27:52 PM Received Date: 3/16/2015 4:27:00 PM From: Hall, Victor Created By: Victor.Hall@nrc.gov Recipients:
"Whaley, Sheena" <Sheena.Whaley@nrc.gov>
Tracking Status: None "Purnell, Blake" <Blake.Purnell@nrc.gov>
Tracking Status: None "david.distel@exeloncorp.com" <david.distel@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1177 3/16/2015 4:27:00 PM Clinton RAI Rev1.docx 27920 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Request for Additional Information Fukushima Lessons Learned Flood Hazard Reevaluation Report Clinton Power Station, Unit No. 1 (TAC No. MF3654)
By letter dated March 12, 2014, Exelon Generation Company LLC(the licensee) submitted its flood hazard reevaluation report (FHRR) for Clinton Power Station, Unit No. 1 (Agencywide Documents Access and Management System (ADAMS) Accession No.ML14079A419). By e-mail dated June 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff provided a request for additional information (RAI) regarding the above referenced FHRR (ADAMS Accession No. ML14169A545). The licensee responded to this RAI by letter dated November 3, 2014 (RS-14-312).The staff determined that additional information, as requested below,is necessary to complete its assessment of the licensees FHRR.
RAI: Local Intense Precipitation (LIP) Event Duration and Distribution The FHRR presents a LIP flood reevaluation for a 1-hour, front-loaded probable maximum precipitation (PMP) event using Hydrometeorological Report Nos. 51 and 52. Provide justification that the LIP analysis presented in the FHRR is bounding in terms of warning time, flood depth, and flood duration. This justification can include sensitivity analysis of LIP event duration to consider localized (one square mile) PMP events up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in duration (e.g., 1-,
6-, 12-, 24-, 48-, 72-hour PMPs) and various rainfall distributions (e.g., center-loaded and others in addition to a front-loaded distribution). The evaluations could identify potentially bounding scenarios with respect to flood height, event duration, and associated effects. Provide electronic versions of any associated modeling input and output files for the sensitivity runs.