NRR E-mail Capture - NRC Acceptance Review - Clinton - Third Inservice Inspection Interval Relief Request I3R-18
ML21203A306
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/21/2021
From: Joel Wiebe
NRC/NRR/DORL/LPL3
To: Nicely K
Exelon Generation Co
References
Download: ML21203A306 (2)


Text

From: Wiebe, Joel Sent: Wednesday, July 21, 2021 1:37 PM To: Nicely, Ken M.:(GenCo-Nuc) (ken.nicely@exeloncorp.com)

Subject:

NRC Acceptance Review - Clinton - Third Inservice Inspection Interval Relief Request I3R-18 Hi Ken, By letter dated June 28, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21179B389), Exelon Generation Company, LLC (Exelon) submitted a proposed alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," on the basis that the required ultrasonic examination is impractical for the reactor pressure vessel shell to flange weld. Specifically, in accordance with 10 CFR 50.55a(g)(5)(iv),

Exelon is requesting an alternative to allow relief from performing the examination on essentially 100 percent of the examination area. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months from the date of this acceptance, which is July 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606.

Joel

Hearing Identifier: NRR_DRMA Email Number: 1286 Mail Envelope Properties (MN2PR09MB497175059B476FCD7730A21E8BE39)

Subject:

NRC Acceptance Review - Clinton - Third Inservice Inspection Interval Relief Request I3R-18 Sent Date: 7/21/2021 1:37:00 PM Received Date: 7/21/2021 1:36:00 PM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients:

"Nicely, Ken M.:(GenCo-Nuc) (ken.nicely@exeloncorp.com)" <ken.nicely@exeloncorp.com>

Tracking Status: None Post Office: MN2PR09MB4971.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2665 7/21/2021 1:36:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: