ML15104A337: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15104A337
| number = ML15104A337
| issue date = 04/14/2015
| issue date = 04/14/2015
| title = 2015/04/14 NRR E-mail Capture - Acceptance Review (TAC No. MF5854)
| title = NRR E-mail Capture - Acceptance Review
| author name = Lyon F
| author name = Lyon F
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name = Hansher B R
| addressee name = Hansher B
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Lyon, Fred Sent: Tuesday, April 14, 2015 10:30 AM To: bhansher@oppd.com Cc: medwards@oppd.com
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Lyon, Fred Sent:                       Tuesday, April 14, 2015 10:30 AM To:                         bhansher@oppd.com Cc:                         medwards@oppd.com


==Subject:==
==Subject:==
Acceptance Review (TAC No. MF5854)By letter dated November 25, 2014, OPPD submitted a license amendment request to revise the Cyber Security Plan Milestone 8 full implementation date at FCS.  
Acceptance Review (TAC No. MF5854)
By letter dated November 25, 2014, OPPD submitted a license amendment request to revise the Cyber Security Plan Milestone 8 full implementation date at FCS.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
1


The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Hearing Identifier:   NRR_PMDA Email Number:         1995 Mail Envelope Properties  (Fred.Lyon@nrc.gov20150414102900)
The NRC staff has reviewed your application and concluded t hat it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Hearing Identifier: NRR_PMDA Email Number: 1995   Mail Envelope Properties  (Fred.Lyon@nrc.gov20150414102900)


==Subject:==
==Subject:==
Acceptance Review (TAC No. MF5854) Sent Date:   4/14/2015 10:29:33 AM Received Date: 4/14/2015 10:29:00 AM From:   Lyon, Fred Created By:   Fred.Lyon@nrc.gov Recipients:     "medwards@oppd.com" <medwards@oppd.com> Tracking Status: None "bhansher@oppd.com" <bhansher@oppd.com>
Acceptance Review (TAC No. MF5854)
Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   1237     4/14/2015 10:29:00 AM
Sent Date:           4/14/2015 10:29:33 AM Received Date:       4/14/2015 10:29:00 AM From:                 Lyon, Fred Created By:           Fred.Lyon@nrc.gov Recipients:
 
"medwards@oppd.com" <medwards@oppd.com>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "bhansher@oppd.com" <bhansher@oppd.com>
Tracking Status: None Post Office:
Files                         Size                 Date & Time MESSAGE                       1237                 4/14/2015 10:29:00 AM Options Priority:                     Standard Return Notification:         No Reply Requested:             No Sensitivity:                 Normal Expiration Date:
Recipients Received:}}

Latest revision as of 00:26, 5 December 2019

NRR E-mail Capture - Acceptance Review
ML15104A337
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/14/2015
From: Lyon F
Plant Licensing Branch IV
To: Hansher B
Omaha Public Power District
References
TAC MF5854
Download: ML15104A337 (2)


Text

NRR-PMDAPEm Resource From: Lyon, Fred Sent: Tuesday, April 14, 2015 10:30 AM To: bhansher@oppd.com Cc: medwards@oppd.com

Subject:

Acceptance Review (TAC No. MF5854)

By letter dated November 25, 2014, OPPD submitted a license amendment request to revise the Cyber Security Plan Milestone 8 full implementation date at FCS.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

1

Hearing Identifier: NRR_PMDA Email Number: 1995 Mail Envelope Properties (Fred.Lyon@nrc.gov20150414102900)

Subject:

Acceptance Review (TAC No. MF5854)

Sent Date: 4/14/2015 10:29:33 AM Received Date: 4/14/2015 10:29:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

"medwards@oppd.com" <medwards@oppd.com>

Tracking Status: None "bhansher@oppd.com" <bhansher@oppd.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1237 4/14/2015 10:29:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: