| number = ML16182A505
| number = ML16182A505
| issue date = 06/28/2016
| issue date = 06/28/2016
| title = R.E. Ginna, and Independent Spent Fuel Storage Installation (ISFSI) - Registration for Use of General License ISFSI Casks
| title = Independent Spent Fuel Storage Installation (ISFSI) - Registration for Use of General License ISFSI Casks
| author name = Pacher J
| author name = Pacher J
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Exelon Generation June 28, 2016 ATIN: Document Control Desk U.S. Nuclear Regulatory Commission  
{{#Wiki_filter:Joe Pacher Site Vice President R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
: Director, Division of Spent Fuel Management  
Exelon Generation                                       Ontario. NY 14519 315.791.5200 Office www.exeloncorp.com joseph.pacher@exeloncorp.com June 28, 2016 ATIN: Document Control Desk U.S. Nuclear Regulatory Commission Director, Division of Spent Fuel Management
. Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Joe Pacher Site Vice President R.E. Ginna Nuclear Power Plant 1503 Lake Rd. Ontario.
. Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Independent Spent Fuel Storage Installation (ISFSI)
NY 14519 315.791.5200 Office www.exeloncorp.com joseph.pacher@exeloncorp.com Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244  
ISFSI Docket No. 72-67          z I -1      oJ'-1--


==Subject:==
==Subject:==
Registration for Use of General License ISFSI Casks In accordance with 10 CFR 72.212, "Conditions of general license issued under §72.210,"
paragraph (b)(2), Exelon Generation Company, LLC (EGC) is registering, with the NRC, the use of four approved spent fuel storage casks under the general license to store spent fuel at the R.E. Ginna Nuclear Power Plant. The four casks were placed into service with stored spent fuel on June 2, June 10, June 17, and June 24, 2016. This registration is required to be submitted within 30 days. Accordingly, this submittal is due by July 5, 2016.
The information required by 10 CFR 72.212(b )(2) is provided in the Enclosure to this letter.
There are no regulatory commitments contained in this submittal. Should you have any other questions regarding this submittal, please contact Thomas Harding at 315-791-5219.
Enclosure JP/cs cc:            NRC Regional Administrator, Region I


Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket No. 72-67 I z -1 oJ'-1--Registration for Use of General License ISFSI Casks In accordance with 10 CFR 72.212, "Conditions of general license issued under §72.210,"
Enclosure Cask Registration Information 10 CFR 72.212(b)(2) Required Information Licensee Name:                              Exelon Generation Licensee Address:                           R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519 Reactor License Number:                     Renewed DPR-18 Reactor Docket Number:                     50-244 ISFSI Docket Number:                       72-67 Contact Person and
paragraph (b)(2), Exelon Generation  
 
: Company, LLC (EGC) is registering, with the NRC, the use of four approved spent fuel storage casks under the general license to store spent fuel at the R.E. Ginna Nuclear Power Plant. The four casks were placed into service with stored spent fuel on June 2, June 10, June 17, and June 24, 2016. This registration is required to be submitted within 30 days. Accordingly, this submittal is due by July 5, 2016. The information required by 1 O CFR 72.212(b
==Title:==
)(2) is provided in the Enclosure to this letter. There are no regulatory commitments contained in this submittal.
Tom Harding, Regulatory Assurance Manager Cask Model            Cask Certificate Cask ID Number                                                           In-Service Date Number                  Number REG32PT-S125-A 16-007         32PT-S125         1004, Amendment 1O          June 2, 2016 REG32PT-S 125-A16-008         32PT-S125         1004, Amendment 1O          June 24, 2016 REG32PT-S 125-A16-009         32PT-S125         1004, Amendment 1O          June 10, 2016 REG32PT-S125-A 16-01 O         32PT-S125         1004, Amendment 1O          June 17, 2016 None of the casks listed above are the highest heat load cask loaded to date; therefore, thermal performance assessments are not provided.}}
Should you have any other questions regarding this submittal, please contact Thomas Harding at 315-791-5219.
Enclosure JP/cs cc: NRC Regional Administrator, Region I Enclosure Cask Registration Information 10 CFR 72.212(b)(2)
Required Information Licensee Name: Licensee Address:
Reactor License Number: Reactor Docket Number: ISFSI Docket Number: Contact Person and Title: Cask ID Number Cask Model Number REG32PT-S125-A 16-007 32PT-S125 REG32PT-S 125-A 16-008 32PT-S125 REG32PT-S 125-A 16-009 32PT-S125 REG32PT-S125-A 16-01 O 32PT-S125 Exelon Generation R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519 Renewed DPR-18 50-244 72-67 Tom Harding, Regulatory Assurance Manager Cask Certificate In-Service Date Number 1004, Amendment 1 O June 2, 2016 1004, Amendment 1 O June 24, 2016 1004, Amendment 1 O June 10, 2016 1004, Amendment 1 O June 17, 2016 None of the casks listed above are the highest heat load cask loaded to date; therefore, thermal performance assessments are not provided.}}

Latest revision as of 15:27, 4 December 2019

Independent Spent Fuel Storage Installation (ISFSI) - Registration for Use of General License ISFSI Casks
ML16182A505
Person / Time
Site: Ginna, 07201004  Constellation icon.png
Issue date: 06/28/2016
From: Joseph Pacher
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML16182A505 (2)


Text

Joe Pacher Site Vice President R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Exelon Generation Ontario. NY 14519 315.791.5200 Office www.exeloncorp.com joseph.pacher@exeloncorp.com June 28, 2016 ATIN: Document Control Desk U.S. Nuclear Regulatory Commission Director, Division of Spent Fuel Management

. Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Independent Spent Fuel Storage Installation (ISFSI)

ISFSI Docket No. 72-67 z I -1 oJ'-1--

Subject:

Registration for Use of General License ISFSI Casks In accordance with 10 CFR 72.212, "Conditions of general license issued under §72.210,"

paragraph (b)(2), Exelon Generation Company, LLC (EGC) is registering, with the NRC, the use of four approved spent fuel storage casks under the general license to store spent fuel at the R.E. Ginna Nuclear Power Plant. The four casks were placed into service with stored spent fuel on June 2, June 10, June 17, and June 24, 2016. This registration is required to be submitted within 30 days. Accordingly, this submittal is due by July 5, 2016.

The information required by 10 CFR 72.212(b )(2) is provided in the Enclosure to this letter.

There are no regulatory commitments contained in this submittal. Should you have any other questions regarding this submittal, please contact Thomas Harding at 315-791-5219.

Enclosure JP/cs cc: NRC Regional Administrator, Region I

Enclosure Cask Registration Information 10 CFR 72.212(b)(2) Required Information Licensee Name: Exelon Generation Licensee Address: R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519 Reactor License Number: Renewed DPR-18 Reactor Docket Number: 50-244 ISFSI Docket Number: 72-67 Contact Person and

Title:

Tom Harding, Regulatory Assurance Manager Cask Model Cask Certificate Cask ID Number In-Service Date Number Number REG32PT-S125-A 16-007 32PT-S125 1004, Amendment 1O June 2, 2016 REG32PT-S 125-A16-008 32PT-S125 1004, Amendment 1O June 24, 2016 REG32PT-S 125-A16-009 32PT-S125 1004, Amendment 1O June 10, 2016 REG32PT-S125-A 16-01 O 32PT-S125 1004, Amendment 1O June 17, 2016 None of the casks listed above are the highest heat load cask loaded to date; therefore, thermal performance assessments are not provided.