ML16299A067: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16299A067
| number = ML16299A067
| issue date = 10/25/2016
| issue date = 10/25/2016
| title = 2016/10/25 NRR E-mail Capture - Accepted for Review - TVA Topical Report Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397
| title = NRR E-mail Capture - Accepted for Review - TVA Topical Report Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397
| author name = Hon A L
| author name = Hon A
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Shea J W, Thompson R R
| addressee name = Shea J, Thompson R
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000259, 05000260, 05000296, 05000327, 05000328, 05000390, 05000391
| docket = 05000259, 05000260, 05000296, 05000327, 05000328, 05000390, 05000391
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Hon, AndrewSent:Tuesday, October 25, 2016 8:25 AMTo:Shea, Joseph W; Thompson, Russell RCc:Dion, Jeanne
{{#Wiki_filter:NRR-PMDAPEm Resource From:                               Hon, Andrew Sent:                               Tuesday, October 25, 2016 8:25 AM To:                                 Shea, Joseph W; Thompson, Russell R Cc:                                 Dion, Jeanne


==Subject:==
==Subject:==
Accepted for Review - TVA Topical Report "Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis" CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 By letter dated September 20, 2016 (ADAMS NO. ML16264A454), TVA submitted the subject fleet topical report for Browns Ferry Units 1,2 and 3, Sequoyah Units 1 and 2 and Watts Bar Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
Accepted for Review - TVA Topical Report Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 By letter dated September 20, 2016 (ADAMS NO. ML16264A454), TVA submitted the subject fleet topical report for Browns Ferry Units 1,2 and 3, Sequoyah Units 1 and 2 and Watts Bar Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
If you have any questions, please contact me.
Andy Hon, PE Project Manager (Sequoyah Nuclear Plant)
Andy Hon, PE Project Manager (Sequoyah Nuclear Plant)
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov Hearing Identifier: NRR_PMDA Email Number: 3121   Mail Envelope Properties   (Andrew.Hon@nrc.gov20161025082400)  
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov 1
 
Hearing Identifier:     NRR_PMDA Email Number:           3121 Mail Envelope Properties     (Andrew.Hon@nrc.gov20161025082400)


==Subject:==
==Subject:==
Accepted for Review - TVA Topical Report "Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis" CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 Sent Date:   10/25/2016 8:24:30 AM Received Date: 10/25/2016 8:24:00 AM From:   Hon, Andrew Created By:   Andrew.Hon@nrc.gov Recipients:     "Dion, Jeanne" <Jeanne.Dion@nrc.gov> Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov> Tracking Status: None "Thompson, Russell R" <rrthompson@tva.gov> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   1830     10/25/2016 8:24:00 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:      
Accepted for Review - TVA Topical Report Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 Sent Date:               10/25/2016 8:24:30 AM Received Date:           10/25/2016 8:24:00 AM From:                   Hon, Andrew Created By:             Andrew.Hon@nrc.gov Recipients:
}}
"Dion, Jeanne" <Jeanne.Dion@nrc.gov>
Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov>
Tracking Status: None "Thompson, Russell R" <rrthompson@tva.gov>
Tracking Status: None Post Office:
Files                           Size                     Date & Time MESSAGE                         1830                     10/25/2016 8:24:00 AM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 13:32, 4 December 2019

NRR E-mail Capture - Accepted for Review - TVA Topical Report Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397
ML16299A067
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/25/2016
From: Andrew Hon
Plant Licensing Branch II
To: James Shea, Thompson R
Tennessee Valley Authority
References
MF8391, MF8392, MF8393, MF8394, MF8395, MF8396, MF8397
Download: ML16299A067 (2)


Text

NRR-PMDAPEm Resource From: Hon, Andrew Sent: Tuesday, October 25, 2016 8:25 AM To: Shea, Joseph W; Thompson, Russell R Cc: Dion, Jeanne

Subject:

Accepted for Review - TVA Topical Report Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 By letter dated September 20, 2016 (ADAMS NO. ML16264A454), TVA submitted the subject fleet topical report for Browns Ferry Units 1,2 and 3, Sequoyah Units 1 and 2 and Watts Bar Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Andy Hon, PE Project Manager (Sequoyah Nuclear Plant)

Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 3121 Mail Envelope Properties (Andrew.Hon@nrc.gov20161025082400)

Subject:

Accepted for Review - TVA Topical Report Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 Sent Date: 10/25/2016 8:24:30 AM Received Date: 10/25/2016 8:24:00 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients:

"Dion, Jeanne" <Jeanne.Dion@nrc.gov>

Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov>

Tracking Status: None "Thompson, Russell R" <rrthompson@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1830 10/25/2016 8:24:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: