ML19098A190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML19098A190
| number = ML19098A190
| issue date = 04/08/2019
| issue date = 04/08/2019
| title = for Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g
| title = NRR E-mail Capture - for Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g
| author name = Lamb J G
| author name = Lamb J
| author affiliation = NRC/NRR/DORL/LSPB
| author affiliation = NRC/NRR/DORL/LSPB
| addressee name = Turberville D
| addressee name = Turberville D
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations}}
{{#Wiki_filter:NRR-DMPSPEm Resource From:                            Lamb, John Sent:                            Monday, April 8, 2019 7:58 AM To:                              David.Turberville@adph.state.al.us
 
==Subject:==
For Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g Attachments:                    LTR 09-2018 - SNC LAR TS 5 2 2 g.pdf Importance:                      High Mr. Turberville:
My name is John Lamb. I am the U.S. Nuclear Regulatory Commission (NRC) Project Manager for Vogtle Electric Generating Plant, Units 1 and 2.
The NRC staff plans to issue amendments to Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley); Edwin I.
Hatch Nuclear Power Plant, Units 1 and 2 (Hatch); and Vogtle 1 and 2 in the middle of April 2019.
By application dated August 9, 2018 (see attached), as supplemented by letter dated January 31, 2019 (ML19031C836), Southern Nuclear Operating Company, Inc. (SNC, the licensee), requested changes to the Technical Specifications (TSs) for Farley, Hatch, and Vogtle 1 and 2.
The proposed amendments would revise TS 5.2.2.g of each plants TS with equivalent wording, comparable to TS 5.2.2.e in the standard technical specifications (STS). The proposed amendments are based, in part, on Technical Specification Task Force (TSTF) traveler TSTF-258, Changes to Section 5.0, Administrative Controls, Revision 4 (ML040620102). The proposed amendments would eliminate a dedicated shift technical advisor (STA) position at Farley and Hatch by allowing the STA functions to be combined with one or more of the required senior licensed operator positions. The Vogtle units TS change would align the facilities with equivalent wording. The proposed amendments would incorporate wording related to the modes of operation during which the individual meeting the requirements in TS 5.2.2.g is required and provides guidance that the same individual may provide advisory technical support for both units.
Additionally, the proposed amendments would approve the revision to the minimum on-shift staffing tables in the Hatch and Farley annexes associated with the SNC standard emergency plan (SEP) and an accompanying editorial change in the SEP. This proposed change would reduce the total number of required on-shift personnel, which was considered a reduction in the effectiveness of the Hatch and Farley emergency plans (EPs) requiring NRC approval pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.54(q)(4).
If the State of Alabama has comments, please provide the comments by March 29, 2019.
Thanks.
John 1
 
Hearing Identifier:  NRR_DMPS Email Number:        915 Mail Envelope Properties    (BL0PR0901MB37318BC5D6DA36AE9DEE561EFA2C0)
 
==Subject:==
For Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g Sent Date:            4/8/2019 7:58:08 AM Received Date:        4/8/2019 7:58:00 AM From:                Lamb, John Created By:          John.Lamb@nrc.gov Recipients:
"David.Turberville@adph.state.al.us" <David.Turberville@adph.state.al.us>
Tracking Status: None Post Office:          BL0PR0901MB3731.namprd09.prod.outlook.com Files                          Size                      Date & Time MESSAGE                        2224                      4/8/2019 7:58:00 AM LTR 09-2018 - SNC LAR TS 5 2 2 g.pdf                      9899307 Options Priority:                      High Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:}}

Latest revision as of 22:33, 1 December 2019

NRR E-mail Capture - for Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g
ML19098A190
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 04/08/2019
From: John Lamb
Special Projects and Process Branch
To: Turberville D
State of AL, Dept of Environmental Management
References
Download: ML19098A190 (30)


Text

NRR-DMPSPEm Resource From: Lamb, John Sent: Monday, April 8, 2019 7:58 AM To: David.Turberville@adph.state.al.us

Subject:

For Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g Attachments: LTR 09-2018 - SNC LAR TS 5 2 2 g.pdf Importance: High Mr. Turberville:

My name is John Lamb. I am the U.S. Nuclear Regulatory Commission (NRC) Project Manager for Vogtle Electric Generating Plant, Units 1 and 2.

The NRC staff plans to issue amendments to Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley); Edwin I.

Hatch Nuclear Power Plant, Units 1 and 2 (Hatch); and Vogtle 1 and 2 in the middle of April 2019.

By application dated August 9, 2018 (see attached), as supplemented by letter dated January 31, 2019 (ML19031C836), Southern Nuclear Operating Company, Inc. (SNC, the licensee), requested changes to the Technical Specifications (TSs) for Farley, Hatch, and Vogtle 1 and 2.

The proposed amendments would revise TS 5.2.2.g of each plants TS with equivalent wording, comparable to TS 5.2.2.e in the standard technical specifications (STS). The proposed amendments are based, in part, on Technical Specification Task Force (TSTF) traveler TSTF-258, Changes to Section 5.0, Administrative Controls, Revision 4 (ML040620102). The proposed amendments would eliminate a dedicated shift technical advisor (STA) position at Farley and Hatch by allowing the STA functions to be combined with one or more of the required senior licensed operator positions. The Vogtle units TS change would align the facilities with equivalent wording. The proposed amendments would incorporate wording related to the modes of operation during which the individual meeting the requirements in TS 5.2.2.g is required and provides guidance that the same individual may provide advisory technical support for both units.

Additionally, the proposed amendments would approve the revision to the minimum on-shift staffing tables in the Hatch and Farley annexes associated with the SNC standard emergency plan (SEP) and an accompanying editorial change in the SEP. This proposed change would reduce the total number of required on-shift personnel, which was considered a reduction in the effectiveness of the Hatch and Farley emergency plans (EPs) requiring NRC approval pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.54(q)(4).

If the State of Alabama has comments, please provide the comments by March 29, 2019.

Thanks.

John 1

Hearing Identifier: NRR_DMPS Email Number: 915 Mail Envelope Properties (BL0PR0901MB37318BC5D6DA36AE9DEE561EFA2C0)

Subject:

For Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g Sent Date: 4/8/2019 7:58:08 AM Received Date: 4/8/2019 7:58:00 AM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:

"David.Turberville@adph.state.al.us" <David.Turberville@adph.state.al.us>

Tracking Status: None Post Office: BL0PR0901MB3731.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2224 4/8/2019 7:58:00 AM LTR 09-2018 - SNC LAR TS 5 2 2 g.pdf 9899307 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: