ML19150A751: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19150A751
| number = ML19150A751
| issue date = 05/30/2019
| issue date = 05/30/2019
| title = 2019/05/30 Vogtle COL Docs - FW: Clarification: LAR 19-004 Drawing Inconsistencies
| title = COL Docs - FW: Clarification: LAR 19-004 Drawing Inconsistencies
| author name =  
| author name =  
| author affiliation = NRC
| author affiliation = NRC
Line 12: Line 12:
| document type = E-Mail
| document type = E-Mail
| page count = 4
| page count = 4
| project =
| stage = Other
}}
}}



Latest revision as of 21:12, 1 December 2019

COL Docs - FW: Clarification: LAR 19-004 Drawing Inconsistencies
ML19150A751
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/30/2019
From:
NRC
To:
NRC/NRO/DLSE/LB4
References
Download: ML19150A751 (4)


Text

Vogtle PEmails From: Habib, Donald Sent: Thursday, May 30, 2019 1:48 PM To: Vogtle PEmails

Subject:

FW: Clarification: LAR 19-004 Drawing Inconsistencies Attachments: LAR 19-004 Differences in Drawing Symbols_ (002).docx From: Habib, Donald Sent: Thursday, May 30, 2019 11:10 AM To: Quarles, Adam Graham <AGQUARLE@southernco.com>

Cc: Hearn, Peter <Peter.Hearn@nrc.gov>; Budzynski, John <John.Budzynski@nrc.gov>; Stubbs, Angelo

<Angelo.Stubbs@nrc.gov>

Subject:

Clarification: LAR 19-004 Drawing Inconsistencies Adam -

For LAR 19-004, the staff identified differences in the Tier 1 and Tier 2 drawings. Please contact the Project Manager for this LAR, Peter Hearn, about whether SNC would like to discuss this clarification question in a future public meeting.

Thanks Don Habib U.S. Nuclear Regulatory Commission Office of New Reactors Project Manager NRO/DLSE, Licensing Branch 2 O-8D13 301-415-1035 1

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 450 Mail Envelope Properties (SN4PR0901MB21759BFA037FB93444829A2597180)

Subject:

FW: Clarification: LAR 19-004 Drawing Inconsistencies Sent Date: 5/30/2019 1:47:32 PM Received Date: 5/30/2019 1:47:37 PM From: Habib, Donald Created By: Donald.Habib@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office: SN4PR0901MB2175.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 772 5/30/2019 1:47:37 PM LAR 19-004 Differences in Drawing Symbols_ (002).docx 168929 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Below are 2 examples where the valves do not match up symbolically between Tier 2 Figure 10 and Tier 1 Figure 2. For the symbol differences of the same component, please provide an explanation.

1. The valves in figure 10 below do not match the valve in figure 2 and valve shown in the Tier 2 Chapter 1 legend drawings.

Tier 2, Figure 10.3.2-2 Main Steam System Diagram Tier 1, Figure 2.2.4-1 (Sheet 3) Proposed revision:

2. The relief valves below do not match the Tier 2, Figure 10.3.2-1 (Sheet 2 of 2)

Figure 2.2.4-1 (Sheet 2 of 3) Steam Generator System