|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML18166A340 | | | number = ML18166A340 |
| | issue date = 07/17/2018 | | | issue date = 07/17/2018 |
| | title = 06/05/18 DG-1327 Enclosure 3 - Public Meeting NEI Presentation | | | title = DG-1327 Enclosure 3 - Public Meeting NEI Presentation |
| | author name = Eichenberg T | | | author name = Eichenberg T |
| | author affiliation = Nuclear Energy Institute (NEI) | | | author affiliation = Nuclear Energy Institute (NEI) |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:DG-1327 Public Comment Disposition T. W. Eichenberg EPRI Fuel Reliability Program, Reg-TAC Chair Sr. Specialist Reactor Safety Analysis, TVA July 17, 2018 |
| | |
| | Issue Overview |
| | * Dose |
| | * Comment Resolution |
| | * Forward Fit |
| | * Work Scope |
| | © 2018 NEI. All rights reserved. |
| | |
| | Dose Assessment |
| | * Changes to Non-LOCA Dose Assessment - Not Appropriate to DG-1327 Fission Product Release Fraction in DG-1327 should only be applicable to CRE/CRDA Revise other regulatory guidance as appropriate, such as RG 1.183 or 1.195 |
| | * Changes to AST Governed by 10CFR50.67(b) |
| | New CRE/CRDA calculation creates 10CFR50.67 potential AST issues |
| | © 2018 NEI. All rights reserved. |
| | |
| | Comment Resolution |
| | * Section C.1.2 Comment C Comment D Prompt vs. 5% power threshold issue. |
| | What does at power limits becomes questionable mean? |
| | * Section C.1.3 Comment C Dismissing the transition temperature phenomenon (PWR vs BWR) |
| | © 2018 NEI. All rights reserved. |
| | |
| | Comment Resolution |
| | * Section C.2.1.1 Comment A Test are Inherently Conservative; not representative of actual operation. Recent changes to curve fits of Figures 2 & 4 in DG-1327 adds conservatism at lower Hydrogen levels. Revised technical basis for DG-1327 is missing. |
| | Comment B Is Non-LOCA Realistic/Best Estimate Allowed or Not? |
| | * Section C.2.2.3 Comment A-F Additional Workshop to flesh out Work Scope |
| | © 2018 NEI. All rights reserved. |
| | |
| | Comment Resolution |
| | * Section C.2.3.4 Comment C How can we reference a Draft Reg. Guide 1.224 |
| | * Section C.2.3.5 Comment B Hydride reorientation, imposing beyond existing analyses |
| | * Section 3.1 Comment C, E Additional Workshop to flesh out Work Scope |
| | © 2018 NEI. All rights reserved. |
| | |
| | Comment Resolution |
| | * Section 3.2 Comment F, H-K Mechanical Properties vs. In-Pile |
| | * Section 3.3 Comment A-B Fuel cladding failure is conservatively presumed. |
| | © 2018 NEI. All rights reserved. |
| | |
| | Dose Assessment |
| | * Page 53 comment table Comment F, H-K No Response Provided |
| | © 2018 NEI. All rights reserved. |
| | |
| | Forward Fit / Implementation |
| | * When Should Forward Fit Be Applied? |
| | Possible Areas - When 50.59 indicates an LAR in needed, and touches: |
| | * NUREG-800, SRP-4.2 (Fuel System Design) (Sans PAD5 related stuff) |
| | * NUREG-800, SRP-15.4.8, (Spectrum of Rod Ejection Accidents (PWR)) |
| | * NUREG-800, SRP-15.4.8.A, (Radiological Consequences of Rod Ejection Accident (PWR)) |
| | * NUREG-800, SRP-15.4.9, (Spectrum of Rod Drop Accidents (BWR)) |
| | * NUREG-800, SRP-15.4.9.A, (Radiological Consequence of Rod Drop Accident (BWR)) |
| | * Reg. Guide 1.183; 1.195 |
| | * Example LAR Fuel Transition with a Specific Change of Methodology (i.e., 3D methods) |
| | * Availability of Approved Methods Not every vendor in the same position right now |
| | © 2018 NEI. All rights reserved. |
| | |
| | Work Scope |
| | * Additional Public Workshop to Discuss Scope Everyone on the same page |
| | © 2018 NEI. All rights reserved. |
| | |
| | Questions?? / Discussion}} |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24303A2212024-10-29029 October 2024 NEI SDP Realism Presentation for October 30, 2024 Public Meeting ML24291A0062024-10-17017 October 2024 NEI Slide Presentation: ACRS Regulatory Policies and Practices - Draft White Paper on Nth-of-a-Kind (Noak) Micro-Reactor Licensing and Deployment Considerations - Sc - October 17, 2024 ML24267A0032024-09-25025 September 2024 NEI Slides for ROP Public Meeting Sept 2024 ML24263A2592024-09-17017 September 2024 06 Jim Slider NEI September 2024 NRC Ai Public Workshop 09-17-2024 ML24249A2012024-09-0909 September 2024 NEI Presentation - Sept 9 Public Meeting - Flooding DGs - Final ML24249A1152024-09-0505 September 2024 Power Uprate September 5, 2024 Public Meeting Slides ML24243A1612024-08-30030 August 2024 Slide Presentations for High Burnup (Hbu) Workshop V ML24228A2102024-08-20020 August 2024 2024 NEI Early Warning System (EWS) Presentation - NEI Slides ML24229A0012024-08-19019 August 2024 NEI - Spent Fuel Management: Safety and Efficiency Improvements Through Technology and Performance Margins - NRC PIRTs Public Meeting Rev. 8.15.2024 Final ML24218A1832024-07-30030 July 2024 NEI 7-30-24 Trial Use RG 1.247 Path Forward Final ML24172A1952024-06-27027 June 2024 NEI Slides for 06-27-2024 Public Meeting Structures as IROFS at Fuel Cycle Facilities ML24178A0372024-06-26026 June 2024 NRC Power Uprate Review Preparation June 26, 2024 Public Meeting Slides ML24164A1972024-06-17017 June 2024 Public Meeting Slides - NRC Staff Comments and Observations on NEI 10-01, Rev 2 Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Site Permit ML24129A1382024-05-0808 May 2024 NEI Slides on Centralized Inspections for May 9, 2024 Public Workshop ML24103A1532024-04-12012 April 2024 NEI Supplemental Information on NRC Comments of NEI 20-07 Rev E (Non-Proprietary) - Slides ML24088A2252024-03-26026 March 2024 NEI Slides for Centralized Inspections March 2024 ROP Public Meeting ML24075A2092024-03-14014 March 2024 NEI Advanced Reactor Di&C Task Force Slides - Accident Monitoring Instrumentation ML24075A2102024-03-14014 March 2024 NEI Alan Campbell Slides - Non-Safety-Related with Special Treatment – Digital Considerations ML24086A5342024-03-14014 March 2024 RIC 2024 TH23 Slides - the Industry’S Innovation Imperative ML24067A0062024-03-0808 March 2024 1 - NRC - Workshop3 - Non-LOCA Release Fractions Feedback - Final ML24067A0072024-03-0808 March 2024 2 - NRC - Workshop3 - Non-LOCA - FFRD - Final ML24067A0092024-03-0808 March 2024 3 - NRC - Worshop3 - CR Dose Presentation - Final ML24067A0102024-03-0808 March 2024 4 - NRC - Workshop3 - EQ Presentation - Final ML24067A0122024-03-0808 March 2024 6 - NRC - Workshop3 - Best Estimate Dose ML24067A0132024-03-0808 March 2024 7 - NRC - Workshop3 - Closing Remarks ML24067A2882024-03-0808 March 2024 1 (Revised)-NRC_Workshop3_Non-LOCA Release Fraction Feedback-Final ML24043A1162024-02-13013 February 2024 3- EQ Presentation Workshop 2 ML24043A1192024-02-13013 February 2024 1- Impacts on RG 1.183 for Workshop2 ML24043A1202024-02-13013 February 2024 2- CR Dose Presentation Workshop 2 ML24016A2372024-01-17017 January 2024 NEI Environmental Reviews Slides Public Meeting 1-17-24 ML24008A0442024-01-0909 January 2024 NEI - Slides for NRC Workshop 1 on Revision to RG 1.183 R1 - Final - ML24008A044 ML23342A0262023-12-14014 December 2023 December 14, 2023, Presentation on NEI 23-01 Operator Cold Licensing Training Plan for Advanced Nuclear Reactors ML23347A1782023-12-13013 December 2023 12-14 NEI EPRI Presentation NRC Public Meeting 16-03 R1 ML23303A1922023-10-30030 October 2023 NEI Slides for SLR Public Meeting - Oct 31 2023 ML23324A2392023-10-24024 October 2023 S1P6 - Hilary Lane - NRC AMT Workshop - Oct. 2023 ML23258A1992023-09-20020 September 2023 NEI 99-02 Draft Rev. 8 Update for Sept 2023 ROP Public Meeting ML23242A0782023-08-30030 August 2023 Hbu Workshop IV Industry Presentation: Drive to Deploy ATF with Increased Enrichment and Higher Burnup ML23230A0142023-08-22022 August 2023 Industry Slide Presentation for 8-22-23 Meeting on ARCAP-TICAP and DG-1404 Guidance Documents ML23191A0632023-07-0707 July 2023 NEI Cybersecurity Presentation for July 2023 ROP Public Meeting ML23191A0662023-07-0707 July 2023 NEI 99-02 Draft Rev. 8 Update for July 2023 ROP Public Meeting ML23160A1512023-06-15015 June 2023 25 - Industry - Industry Perspectives on ASME III and XI Pre-Service Inspection ML23160A1422023-06-15015 June 2023 20 - Industry - Industry Perspective on Performance Monitoring ML23116A1892023-05-31031 May 2023 Industry Observations of NRC Licensing Program (NEI Slides May 2023) ML23136A5912023-05-18018 May 2023 NEI Safety Culture Presentation for May 2023 ROP Public Meeting ML23125A3192023-05-0909 May 2023 NEI Presentation for May 9, 2023, Public Meeting on NEI 22-05, Revision a ML23115A0302023-04-27027 April 2023 NEI Perspective on Performance Monitoring in Use of Probabilistic Fracture Mechanics for Optimizing Inspections of Non-RPV Pressure Vessels, April 27, 2023 ML23088A0822023-03-30030 March 2023 NEI Presentation - March 30, 2023 PRA Configuration Control Public Meeting ML23082A0572023-03-28028 March 2023 Proposal to Establish Alternate Requirements for Components Commensurate with Safety and Risk ML23079A2642023-03-23023 March 2023 General Visual Examination of Containment Surfaces Covered by Insulation - March 23, 2023 Public Meeting Slides from NEI ML23210A0042023-03-15015 March 2023 Destination: Termination, NRC Regulatory Information Conference 2024-09-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24303A2212024-10-29029 October 2024 NEI SDP Realism Presentation for October 30, 2024 Public Meeting ML24291A0062024-10-17017 October 2024 NEI Slide Presentation: ACRS Regulatory Policies and Practices - Draft White Paper on Nth-of-a-Kind (Noak) Micro-Reactor Licensing and Deployment Considerations - Sc - October 17, 2024 ML24267A0032024-09-25025 September 2024 NEI Slides for ROP Public Meeting Sept 2024 ML24263A2592024-09-17017 September 2024 06 Jim Slider NEI September 2024 NRC Ai Public Workshop 09-17-2024 ML24249A2012024-09-0909 September 2024 NEI Presentation - Sept 9 Public Meeting - Flooding DGs - Final ML24249A1152024-09-0505 September 2024 Power Uprate September 5, 2024 Public Meeting Slides ML24243A1612024-08-30030 August 2024 Slide Presentations for High Burnup (Hbu) Workshop V ML24228A2102024-08-20020 August 2024 2024 NEI Early Warning System (EWS) Presentation - NEI Slides ML24229A0012024-08-19019 August 2024 NEI - Spent Fuel Management: Safety and Efficiency Improvements Through Technology and Performance Margins - NRC PIRTs Public Meeting Rev. 8.15.2024 Final ML24218A1832024-07-30030 July 2024 NEI 7-30-24 Trial Use RG 1.247 Path Forward Final ML24197A0652024-07-17017 July 2024 SDP Realism Public Meeting NEI Presentation ML24172A1952024-06-27027 June 2024 NEI Slides for 06-27-2024 Public Meeting Structures as IROFS at Fuel Cycle Facilities ML24178A0372024-06-26026 June 2024 NRC Power Uprate Review Preparation June 26, 2024 Public Meeting Slides ML24164A1972024-06-17017 June 2024 Public Meeting Slides - NRC Staff Comments and Observations on NEI 10-01, Rev 2 Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Site Permit ML24130A1972024-05-0909 May 2024 NEI Presentation Slides on Rapid and Large-Scale Nuclear Reactor Deployments for Remote Industrial Applications - May 14 2024 Public Meeting ML24129A1382024-05-0808 May 2024 NEI Slides on Centralized Inspections for May 9, 2024 Public Workshop ML24114A1142024-04-18018 April 2024 NEI Supplemental Information on NRC Comments on NEI 20-07, Draft Revision E - April 18 Meeting (Non-Proprietary) ML24103A1532024-04-12012 April 2024 NEI Supplemental Information on NRC Comments of NEI 20-07 Rev E (Non-Proprietary) - Slides ML24092A3132024-04-0303 April 2024 Public Mtg_2024-04-03 Pre-submittal Meeting with the Nuclear Energy Institute (NEI) to Discuss an Update to NEI 03-12, Security Plan Template (Revision 8)_NEI Slides ML24088A2252024-03-26026 March 2024 NEI Slides for Centralized Inspections March 2024 ROP Public Meeting ML24075A2092024-03-14014 March 2024 NEI Advanced Reactor Di&C Task Force Slides - Accident Monitoring Instrumentation ML24075A2102024-03-14014 March 2024 NEI Alan Campbell Slides - Non-Safety-Related with Special Treatment – Digital Considerations ML24082A1792024-03-14014 March 2024 RIC-2024 TH18 True Slides ML24086A5342024-03-14014 March 2024 RIC 2024 TH23 Slides - the Industry’S Innovation Imperative ML24067A2592024-03-13013 March 2024 RIC-2024 W14 Slides - NEI-BHoltzman an Industry Perspective on Advanced Reactor Construction Oversight ML24067A0062024-03-0808 March 2024 1 - NRC - Workshop3 - Non-LOCA Release Fractions Feedback - Final ML24067A0072024-03-0808 March 2024 2 - NRC - Workshop3 - Non-LOCA - FFRD - Final ML24067A0092024-03-0808 March 2024 3 - NRC - Worshop3 - CR Dose Presentation - Final ML24067A0102024-03-0808 March 2024 4 - NRC - Workshop3 - EQ Presentation - Final ML24067A0122024-03-0808 March 2024 6 - NRC - Workshop3 - Best Estimate Dose ML24067A0132024-03-0808 March 2024 7 - NRC - Workshop3 - Closing Remarks ML24067A2882024-03-0808 March 2024 1 (Revised)-NRC_Workshop3_Non-LOCA Release Fraction Feedback-Final ML24043A1162024-02-13013 February 2024 3- EQ Presentation Workshop 2 ML24043A1192024-02-13013 February 2024 1- Impacts on RG 1.183 for Workshop2 ML24043A1202024-02-13013 February 2024 2- CR Dose Presentation Workshop 2 ML24016A2372024-01-17017 January 2024 NEI Environmental Reviews Slides Public Meeting 1-17-24 ML24010A0202024-01-11011 January 2024 Public Meeting on SLR Efficiencies - NEI Presentation ML24008A0442024-01-0909 January 2024 NEI - Slides for NRC Workshop 1 on Revision to RG 1.183 R1 - Final - ML24008A044 ML23342A0262023-12-14014 December 2023 December 14, 2023, Presentation on NEI 23-01 Operator Cold Licensing Training Plan for Advanced Nuclear Reactors ML23347A1782023-12-13013 December 2023 12-14 NEI EPRI Presentation NRC Public Meeting 16-03 R1 ML23303A1922023-10-30030 October 2023 NEI Slides for SLR Public Meeting - Oct 31 2023 ML23324A2392023-10-24024 October 2023 S1P6 - Hilary Lane - NRC AMT Workshop - Oct. 2023 ML23261C3792023-09-27027 September 2023 NEI 22-04 Pre-Submittal Meeting with NRC - September 27, 2023 ML23258A1992023-09-20020 September 2023 NEI 99-02 Draft Rev. 8 Update for Sept 2023 ROP Public Meeting ML23242A0782023-08-30030 August 2023 Hbu Workshop IV Industry Presentation: Drive to Deploy ATF with Increased Enrichment and Higher Burnup ML23242A1662023-08-30030 August 2023 the Future of Nuclear Power: 2023 Baseline Survey (Slides) ML23230A0142023-08-22022 August 2023 Industry Slide Presentation for 8-22-23 Meeting on ARCAP-TICAP and DG-1404 Guidance Documents ML23228A0042023-08-18018 August 2023 NEI Slides for Public Meeting to Discuss Possible Efficiencies on the Subsequent License Renewal Review - August 18, 2023 ML23191A0162023-07-11011 July 2023 NEI Comments on Risk-Informed Process for Evaluation (RIPE) DORL TSG - 7/11/23 Public Meeting Slides from NEI ML23191A0632023-07-0707 July 2023 NEI Cybersecurity Presentation for July 2023 ROP Public Meeting 2024-09-09
[Table view] |
Text
DG-1327 Public Comment Disposition T. W. Eichenberg EPRI Fuel Reliability Program, Reg-TAC Chair Sr. Specialist Reactor Safety Analysis, TVA July 17, 2018
Issue Overview
© 2018 NEI. All rights reserved.
Dose Assessment
- Changes to Non-LOCA Dose Assessment - Not Appropriate to DG-1327 Fission Product Release Fraction in DG-1327 should only be applicable to CRE/CRDA Revise other regulatory guidance as appropriate, such as RG 1.183 or 1.195
New CRE/CRDA calculation creates 10CFR50.67 potential AST issues
© 2018 NEI. All rights reserved.
Comment Resolution
- Section C.1.2 Comment C Comment D Prompt vs. 5% power threshold issue.
What does at power limits becomes questionable mean?
- Section C.1.3 Comment C Dismissing the transition temperature phenomenon (PWR vs BWR)
© 2018 NEI. All rights reserved.
Comment Resolution
- Section C.2.1.1 Comment A Test are Inherently Conservative; not representative of actual operation. Recent changes to curve fits of Figures 2 & 4 in DG-1327 adds conservatism at lower Hydrogen levels. Revised technical basis for DG-1327 is missing.
Comment B Is Non-LOCA Realistic/Best Estimate Allowed or Not?
- Section C.2.2.3 Comment A-F Additional Workshop to flesh out Work Scope
© 2018 NEI. All rights reserved.
Comment Resolution
- Section C.2.3.5 Comment B Hydride reorientation, imposing beyond existing analyses
- Section 3.1 Comment C, E Additional Workshop to flesh out Work Scope
© 2018 NEI. All rights reserved.
Comment Resolution
- Section 3.2 Comment F, H-K Mechanical Properties vs. In-Pile
- Section 3.3 Comment A-B Fuel cladding failure is conservatively presumed.
© 2018 NEI. All rights reserved.
Dose Assessment
- Page 53 comment table Comment F, H-K No Response Provided
© 2018 NEI. All rights reserved.
Forward Fit / Implementation
- When Should Forward Fit Be Applied?
Possible Areas - When 50.59 indicates an LAR in needed, and touches:
- NUREG-800, SRP-4.2 (Fuel System Design) (Sans PAD5 related stuff)
- NUREG-800, SRP-15.4.8, (Spectrum of Rod Ejection Accidents (PWR))
- NUREG-800, SRP-15.4.8.A, (Radiological Consequences of Rod Ejection Accident (PWR))
- NUREG-800, SRP-15.4.9, (Spectrum of Rod Drop Accidents (BWR))
- NUREG-800, SRP-15.4.9.A, (Radiological Consequence of Rod Drop Accident (BWR))
- Example LAR Fuel Transition with a Specific Change of Methodology (i.e., 3D methods)
- Availability of Approved Methods Not every vendor in the same position right now
© 2018 NEI. All rights reserved.
Work Scope
- Additional Public Workshop to Discuss Scope Everyone on the same page
© 2018 NEI. All rights reserved.
Questions?? / Discussion