{{#Wiki_filter:INITIAL SUBMITTAL OF THE WALKTHROUGH JPMS FOR THE DAVIS-BESSE EXAMINATION THE WEEK OF OCTOBER 2, 2000 ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility:
{{#Wiki_filter:INITIAL SUBMITTAL OF THE WALKTHROUGH JPMS FOR THE DAVIS-BESSE EXAMINATION THE WEEK OF OCTOBER 2, 2000
Davis Besse Nuclear Power Station Date of Examination:
 
10/2/2000 Exam Level (circle one): RO / SRO(I)/I Operating Test No.: B.1 Control Room Systems System / JPM Title Type Safety Code* Function a. Establish Long Term Boron Dilution using LPI Train 2. N, S, A, L 2-ESF b. Perform Operator Actions for a High Steam Generator M, S, L 7 Level due to a SGTR. C. d. e. f. g. B.2 Facility Walk-Through
ES-301       Control Room Systems and Facility Walk-Through Test Outline         Form ES-301-2 Facility:   Davis Besse Nuclear Power Station     Date of Examination: 10/2/2000 Exam Level (circle one): RO / SRO(I)/I       *-J        Operating Test No.:
: a. Serious Control Fire, Assistant Shift Supervisor Actions M, L 6 (EDG and High Voltage Switchgear Room) b. Locally Operate the AFW Turbine. M, A Secondary (PSA related) 4 c. Borate the RCS from Outside the Control Room D,R 1* Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA DAVIS-BESSE NUJCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 1A Rev. 00 Page 1 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION:
B.1 Control Room Systems System / JPM Title                         Type           Safety Code*         Function
Local Operation of the AFW Pump Turbine 1 (Use when Train 2 is protected.)
: a. Establish Long Term Boron Dilution using LPI Train 2.         N, S, A, L       2-ESF
: b. Perform Operator Actions for a High Steam Generator             M, S, L           7 Level due to a SGTR.
C.
d.
e.
f.
g.
B.2 Facility Walk-Through
: a. Serious Control Fire, Assistant Shift Supervisor Actions         M, L             6 (EDG and High Voltage Switchgear Room)
: b. Locally Operate the AFW Turbine.                                 M, A       Secondary (PSA related)                                                                     4
: c. Borate the RCS from Outside the Control Room                     D,R             1
* Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA
 
DAVIS-BESSE NUJCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:     1A                           Rev. 00                     Page 1 of 13 TASK NO.:     061-019-04-0100,     061-020-04-0100 TASK DESCRIPTION:       Local Operation of the AFW Pump Turbine 1 (Use when Train 2 is protected.)
K/A  
K/A  


==REFERENCE:==
==REFERENCE:==
 
061-K5.01 3.6/3.9,     061-K6.01 2.5/2.8 061:A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING:         Simulate Performance In-plant Alternate Path TIME FOR COMPLETION:         20 minutes APPLICABILITY:       [X] RO       [X] SRO TASK STANDARDS:
061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061:A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION:
20 minutes APPLICABILITY:
[X] RO[X] SRO TASK STANDARDS:
AFW Train 1 manual speed control at the AFPT governor.
AFW Train 1 manual speed control at the AFPT governor.
REQUIRED MATERIALS:
REQUIRED MATERIALS:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL  
DB-OP-06233,     Auxiliary Feedwater System,       Revision 05 GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:
DB-OP-06233,     Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:
A loss of DIP from 100% power has occurred.
A loss of DIP from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.(Hand examinee the procedure.)
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
JPM No. 1A Page 2 of 13 INITIAL CONDITIONS:
A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing     open is a result     of the loss of DIP and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
(Hand examinee   the procedure.)
 
JPM No. 1A                                                     Page 2 of 13 INITIAL CONDITIONS:
A loss of DIP from 100% power has occurred.
A loss of DIP from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
Page 3 of 13 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS.
START TIME: 1. PERFORMANCE STEP: Locate the correct procedure.
INITIATING CUES:
STANDARD:
You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
Identifies Section 5.1 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
 
CUE: (if asked) ALL prerequisites have been performed.
JPM No. 1A                                                            Page 3 of 13 PERFORMANCE INFORMATION NOTE:   Critical     steps denoted with a "C". Failure to meet any one of these standards for this       item constitutes failure. Sequence is NOT critical     unless denoted in the "Comments".
SAT UNSAT 2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.
START TIME:
STANDARD:
: 1. PERFORMANCE STEP:       Locate the correct procedure.
Applies a downward force to the governor valve linkage labeled L1. CUE: Governor valve moves inward slightly and is NOT STUCK. SAT UNSAT 3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.STANDARD:
STANDARD:       Identifies Section 5.1 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
Contacts the Control Room to attempt speed control of AFPT 1. CUE: Control Room operator informs you he has no speed control of AFPT 1. (if necessary)
CUE:   (if   asked) ALL prerequisites have been performed.
Shift Supervisor directs you to continue with the procedure.
SAT UNSAT
SAT UNSAT 4. PERFORMANCE STEP: In AFPT 1 Room, establish communications with the Reactor Operator.
: 2. PERFORMANCE STEP:       Attempt to unstick governor valve/linkage.
STANDARD:
STANDARD:       Applies a downward force to the governor valve linkage labeled L1.
Establish communications with Reactor Operator via Gai-Tronics or radio. CUE: You have established communications with a Reactor Operator.
CUE:   Governor valve moves inward slightly       and is NOT STUCK.
The Reactor Operator directs you to reduce AFPT 1 speed. SAT UNSAT JPM No. 1A Page 4 of 13 5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the face of the governor.
SAT UNSAT
STANDARD:
: 3. PERFORMANCE STEP:       Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.
Locates electrical connector and unscrews it. COMMENT: This step must be performed prior to Step 6. CUE: The electrical connector is DISCONNECTED.
STANDARD:       Contacts the Control Room to attempt     speed control of AFPT 1.
SAT UNSAT 6. PERFORMANCE STEP: Turn the manual speed setting control knob as ........ C .........
CUE:   Control Room operator informs you he has no speed control of AFPT 1.
appropriate to control AFPT speed/flow as directed by the Reactor Operator.
(if   necessary) Shift Supervisor directs you to continue with the procedure.
STANDARD:
SAT UNSAT
Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
: 4. PERFORMANCE STEP:       In AFPT 1 Room, establish communications with the Reactor Operator.
COMMENT: AFPT 1 speed will not change regardless of the examinee's actions.
STANDARD:       Establish communications with Reactor Operator via Gai-Tronics or radio.
CUE: AFPT 1 speed remains constant. (if asked) AFPT speed is 3600 rpm. SAT UNSAT 7. PERFORMANCE STEP: Identify AFPT 1 speed control, using the governor ........ C .........
CUE:   You have established communications with a Reactor Operator.         The Reactor Operator directs you to reduce AFPT 1 speed.
valve, has failed and route to Section 5.3. STANDARD:
SAT UNSAT
Locate the correct procedure section. Identifies Section 5.3 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
 
CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 1 speed. SAT UNSAT 8. PERFORMANCE STEP: Establish communication with Control Room. STANDARD:
JPM No.     1A                                                             Page 4 of 13
Utilize the Gai-Tronics or radio to communicate with the Control Room. CUE: (If asked) You have established communications with the Control Room. SAT UNSAT JPM No. 1A Page 5 of 13 9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38C. ... ....C........
: 5. PERFORMANCE STEP:               Unscrew and remove the electrical connector on the face of the governor.
STANDARD:
STANDARD:             Locates electrical connector and unscrews it.
The trip throttle valve seal disconnected.
COMMENT:               This step must be performed prior to Step 6.
CUE: The trip throttle valve seal is DISCONNECTED.
CUE:       The electrical       connector is DISCONNECTED.
SAT UNSAT 10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38C. ........ C ........
SAT UNSAT
STANDARD:
: 6. PERFORMANCE STEP:               Turn the manual speed setting control knob as
Valve handwheel rotated clockwise to CLOSE. CUE Valve handwheel is rotated FULLY clockwise (to CLOSE). SAT UNSAT 11. PERFORMANCE STEP: Obtain red governor tool and other required tools. ... ... C........
    ........       C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.
STANDARD:
STANDARD:             Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
Obtain necessary tools at entrance to AFP room. COMMENT: Tools may have already been obtained.
COMMENT:             AFPT 1 speed will not change regardless of the examinee's actions.
This step can be performed out of sequence.
CUE:       AFPT 1 speed remains constant.
CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.
(if     asked) AFPT speed is   3600 rpm.
SAT UNSAT 12. PERFORMANCE STEP: Disconnect the linkage between the governor and the ........ C ........ governor valve, where the spring meets linkage.
SAT UNSAT
STANDARD:
: 7. PERFORMANCE STEP:               Identify AFPT 1 speed control, using the governor
Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.
    ........       C ......... valve, has failed and route to Section 5.3.
CUE: The linkage is DISCONNECTED.
STANDARD:             Locate the correct procedure section. Identifies Section 5.3 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
SAT UNSAT 13. PERFORMANCE STEP: Block the governor valve, ICS 38B, "full open". .... .C.........
CUE:       (If     asked) Shift Supervisor directs you to gain control of AFPT 1 speed.
STANDARD:
SAT UNSAT
Pull up on L1, put the Red AFPT governor blocking tool in CUE: place above the governor rod in red area on linkage.
: 8. PERFORMANCE               STEP: Establish communication with Control Room.
Ll has been pulled up. The block is in place above the governor rod in the Red area.SAT UNSAT JPM No. 1A Page 6 of 13 14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38C. ......C........
STANDARD:             Utilize the Gai-Tronics or radio to communicate with the Control Room.
STANDARD:
CUE:         (If     asked) You have established communications with the Control Room.
Trip throttle valve, ICS 38C, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm. CUE: The trip throttle valve, ICS 38C, handwheel is rotated slowly counterclockwise.
SAT UNSAT
AFPT 1 speed has INCREASED TO 2800 rpm. SAT UNSAT 15. PERFORMANCE STEP: Control the AFPT 1 speed to maintain the required AFW flow. STANDARD:
 
Ask Control Room for feedback.
JPM No.       1A                                                                               Page 5 of 13
CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 1A DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: lB Rev. 00 Page 7 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION:
: 9. PERFORMANCE STEP:                     Unseal the trip       throttle   valve,   ICS 38C.
Local Operation of the AFW Pump Turbine 2 (Use when Train 1 is protected.)
    ...       .... C........
STANDARD:                 The trip     throttle     valve seal disconnected.
CUE:         The trip         throttle       valve seal is     DISCONNECTED.
SAT UNSAT
: 10. PERFORMANCE STEP:                     Close the trip     throttle   valve,   ICS 38C.
    ........         C ........
STANDARD:                 Valve handwheel rotated clockwise to CLOSE.
CUE         Valve handwheel is                   rotated FULLY clockwise     (to CLOSE).
SAT UNSAT
: 11. PERFORMANCE STEP:                     Obtain red governor tool and other required tools.
    ...       ... C........
STANDARD:                 Obtain necessary tools at entrance to AFP room.
COMMENT:                   Tools may have already been obtained.               This step can be performed out of sequence.
CUE:           The Red governor tool and other required tools to disconnect linkage have been obtained.
SAT UNSAT
: 12. PERFORMANCE STEP:                     Disconnect the linkage between the governor and the
    ........         C ........           governor valve, where the spring meets linkage.
STANDARD:                 Linkage disconnected where the spring meets the linkage at the second joint         from the governor controller with the tools from the emergency hatch cabinet.
CUE:         The linkage is               DISCONNECTED.
SAT UNSAT
: 13. PERFORMANCE STEP:                     Block the governor valve,         ICS 38B,   "full   open".
        ....       .C.........
STANDARD:                 Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE:                      Ll has been pulled up.
The block is         in place above the governor rod in       the Red area.
SAT UNSAT
 
JPM No. 1A                                                                     Page 6 of 13
: 14. PERFORMANCE STEP:         Slowly open the trip       throttle     valve,   ICS 38C.
    .   ..... C........
STANDARD:       Trip throttle       valve, ICS 38C, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.
CUE:             The trip   throttle     valve, ICS 38C,     handwheel is   rotated slowly counterclockwise.
AFPT 1 speed has INCREASED TO 2800 rpm.
SAT UNSAT
: 15. PERFORMANCE STEP:         Control the AFPT 1 speed to maintain the required AFW flow.
STANDARD:       Ask Control Room for feedback.
CUE:             The Control Room Operator directs you to maintain speed at the current value until       he can evaluate SG level trend.
SAT UNSAT TERMINATING   CUES:       This JPM is       complete.
END TIME
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:     lB                         Rev. 00                     Page 7 of 13 TASK NO.:     061-019-04-0100,   061-020-04-0100 TASK DESCRIPTION:       Local Operation of the AFW Pump Turbine 2 (Use when Train 1 is protected.)
K/A  
K/A  


==REFERENCE:==
==REFERENCE:==
 
061-K5.01 3.6/3.9,     061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING:         Simulate   Performance In-plant Alternate Path TIME FOR COMPLETION:       20 minutes APPLICABILITY:     [X] RO     [XI SRO TASK STANDARDS:
061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION:
20 minutes APPLICABILITY:
[X] RO[XI SRO TASK STANDARDS:
AFW Train 2 manual speed control at the AFPT governor.
AFW Train 2 manual speed control at the AFPT governor.
REQUIRED MATERIALS:
REQUIRED MATERIALS:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL  
DB-OP-06233,     Auxiliary Feedwater System,     Revision 05 GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:
DB-OP-06233,     Auxiliary Feedwater System,     Revision 05 INITIAL CONDITIONS:
A loss of D2P from 100% power has occurred.
A loss of D2P from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.(Hand examinee the procedure.)
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
JPM No. 1B Page 8 of 13 INITIAL CONDITIONS:
A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing     open is a result   of the loss of D2P and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
(Hand examinee the procedure.)
 
JPM No. 1B                                                       Page 8 of 13 INITIAL CONDITIONS:
A loss of D2P from 100% power has occurred.
A loss of D2P from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
The reactor has tripped and SFRCS actuated on a loss of four   (4) RCPs.
Page 9 of 13 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
A loss of AFPT 2 governor speed control and AF 6451,   AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.
START TIME: 1. PERFORMANCE STEP: Locate the correct procedure.
INITIATING CUES:
STANDARD:
You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
Identifies Section 5.2 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
 
CUE: (if asked) ALL prerequisites have been performed.
JPM No. 1B                                                            Page 9 of 13 PERFORMANCE INFORMATION NOTE:   Critical     steps denoted with a "C". Failure to meet any one of these standards for this       item constitutes failure. Sequence is NOT critical     unless denoted in the "Comments".
SAT UNSAT 2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.
START TIME:
STANDARD:
: 1. PERFORMANCE STEP:       Locate the correct procedure.
Applies a downward force to the governor valve linkage labeled L1. CUE: Governor valve moves inward slightly and is NOT STUCK. SAT UNSAT 3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel. STANDARD:
STANDARD:       Identifies Section 5.2 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
Contacts the Control Room to attempt speed control of AFPT 2. CUE: Control Room Operator informs you he has no speed control of AFPT 2. (if necessary)
CUE:   (if   asked) ALL prerequisites have been performed.
Shift Supervisor directs you to continue with the procedure.
SAT UNSAT
SAT UNSAT 4. PERFORMANCE STEP: In AFPT 2 Room, establish communications with the Reactor Operator.
: 2. PERFORMANCE STEP:       Attempt to unstick governor valve/linkage.
STANDARD:
STANDARD:       Applies a downward force to the governor valve linkage labeled L1.
Establish communications with Reactor Operator via Gai-Tronics or radio. CUE: You have established communications with a Reactor Operator.
CUE:   Governor valve moves inward slightly       and is NOT STUCK.
The Reactor Operator directs you to reduce AFPT 2 speed. SAT UNSAT JPM No. 1B Page 10 of 13 5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the face of the governor.
SAT UNSAT
STANDARD:
: 3. PERFORMANCE STEP:       Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.
Locates electrical connector and unscrews it. COMMENT: This step must be performed prior to Step 6. CUE: The electrical connector is DISCONNECTED.
STANDARD:       Contacts the Control Room to attempt   speed control of AFPT 2.
SAT UNSAT 6. PERFORMANCE STEP: Turn the manual speed setting control knob as ........ C .........
CUE:   Control Room Operator informs you he has no speed control of AFPT 2.
appropriate to control AFPT speed/flow as directed by the Reactor Operator.
(if necessary) Shift Supervisor directs you to continue with the procedure.
STANDARD:
SAT UNSAT
Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
: 4. PERFORMANCE STEP:       In AFPT 2 Room, establish communications   with the Reactor Operator.
COMMENT: AFPT 2 speed will not change regardless of the examinee's actions.
STANDARD:       Establish communications with Reactor Operator via Gai-Tronics or radio.
CUE: AFPT 2 speed remains constant. (if asked) AFPT speed is 3600 rpm. SAT UNSAT 7. PERFORMANCE STEP: Identify AFPT 2 speed control, using the governor ........ C .........
CUE:   You have established communications with a Reactor Operator.         The Reactor Operator directs you to reduce AFPT 2 speed.
valve, has failed and route to Section 5.4. STANDARD:
SAT UNSAT
Locate the correct procedure section Identifies Section 5.4 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
 
CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 2 speed. SAT UNSAT 8. PERFORMANCE STEP: Establish communication with Control Room. STANDARD:
JPM No.     1B                                                           Page 10 of 13
Utilize the Gai-Tronics or radio to communicate with the Control Room. CUE: (If asked) You have established communications with the Control Room. SAT UNSAT JPM No. 1B Page 11 of 13 9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38D. ... ... C.........
: 5. PERFORMANCE STEP:               Unscrew and remove the electrical connector on the face of the governor.
STANDARD:
STANDARD:             Locates electrical connector and unscrews it.
The trip throttle valve seal disconnected.
COMMENT:               This step must be performed prior to Step 6.
CUE: The trip throttle valve seal is DISCONNECTED.
CUE:       The electrical       connector is DISCONNECTED.
SAT UNSAT 10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38D. ... ....C.. ....1. STANDARD:
SAT   UNSAT
Valve handwheel rotated clockwise to CLOSE. CUE Valve handwheel is rotated FULLY clockwise (to CLOSE). SAT UNSAT 11. PERFORMANCE STEP: Obtain red governor tool and other required tools. ..... ..C.........
: 6. PERFORMANCE STEP:               Turn the manual speed setting control knob as
STANDARD:
    ........       C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.
Obtain necessary tools at entrance to AFP room. COMMENT: Tools may have already been obtained.
STANDARD:             Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
This step can be performed out of sequence.
COMMENT:             AFPT 2 speed will not change regardless of the examinee's actions.
CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.
CUE:       AFPT 2 speed remains constant.
SAT UNSAT 12. PERFORMANCE STEP: Disconnect the linkage between the governor and the ........ C ........ governor valve, where the spring meets linkage.
(if     asked) AFPT speed is   3600 rpm.
STANDARD:
SAT UNSAT
Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.
: 7. PERFORMANCE STEP:               Identify AFPT 2 speed control, using the governor
CUE: The linkage is DISCONNECTED.
    ........       C ......... valve, has failed and route to Section 5.4.
SAT UNSAT 13. PERFORMANCE STEP: Block the governor valve, ICS 38A, "full open". ..... C .........
STANDARD:             Locate the correct procedure section Identifies Section 5.4 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
STANDARD:
CUE:       (If     asked) Shift Supervisor directs you to gain control of AFPT 2 speed.
Pull up on L1, put the Red AFPT governor blocking tool in CUE: place above the governor rod in red area on linkage.
SAT UNSAT
L1 has been pulled up. The block is in place above the governor rod in the Red area.SAT UNSAT JPM No. 1B Page 12 of 13 14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38D. ...... .C.........
: 8. PERFORMANCE               STEP: Establish communication with Control Room.
STANDARD:
STANDARD:             Utilize the Gai-Tronics or radio to communicate with the Control Room.
CUE: Trip throttle valve, ICS 38D, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm. The trip throttle valve, ICS 38D, handwheel is rotated slowly counterclockwise.
CUE:         (If asked) You have established communications with the Control Room.
AFPT 2 speed has INCREASED TO 2800 rpm.SAT UNSAT 15. PERFORMANCE STEP: Control the AFPT 2 speed to maintain the required AFW flow. STANDARD:
SAT UNSAT
Ask Control Room for feedback.
 
CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 1B Page 13 of 13 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: ] RO E ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
JPM No.         1B                                                                               Page 11 of 13
Yes No N/A Result: [ I SATISFACTORY
: 9. PERFORMANCE STEP:                         Unseal the trip       throttle   valve,   ICS 38D.
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
      ... ...           C.........
STANDARD:                 The trip         throttle     valve seal disconnected.
CUE:             The trip           throttle       valve seal is     DISCONNECTED.
SAT UNSAT
: 10. PERFORMANCE STEP:                         Close the trip     throttle   valve,   ICS 38D.
    ...         .... C..       .... 1.
STANDARD:                 Valve handwheel rotated clockwise to CLOSE.
CUE             Valve handwheel is                   rotated FULLY clockwise     (to CLOSE).
SAT UNSAT
: 11. PERFORMANCE STEP:                         Obtain red governor tool and other required tools.
    .....           .. C.........
STANDARD:                 Obtain necessary tools at entrance to AFP room.
COMMENT:                 Tools may have already been obtained.                     This step can be performed out of sequence.
CUE:             The Red governor tool and other required tools to disconnect linkage have been obtained.
SAT UNSAT
: 12. PERFORMANCE STEP:                         Disconnect the linkage between the governor and the
    ........           C ........             governor valve, where the spring meets linkage.
STANDARD:                 Linkage disconnected where the spring meets the linkage at the second joint             from the governor controller with the tools from the emergency hatch cabinet.
CUE:             The linkage is               DISCONNECTED.
SAT UNSAT
: 13. PERFORMANCE STEP:                         Block the governor valve,         ICS 38A,   "full   open".
            .....     C .........
STANDARD:                 Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE:                      L1 has been pulled up.
The block is             in place above the governor rod in       the Red area.
SAT UNSAT
 
JPM No. 1B                                                                         Page 12 of 13
: 14. PERFORMANCE STEP:             Slowly open the trip       throttle     valve,   ICS 38D.
    ......   .C.........
STANDARD:           Trip throttle       valve, ICS 38D, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.
CUE:                The trip   throttle     valve, ICS 38D,     handwheel is   rotated slowly counterclockwise.
AFPT 2   speed has INCREASED TO 2800 rpm.
SAT UNSAT
: 15. PERFORMANCE STEP:             Control the AFPT 2 speed to maintain the required AFW flow.
STANDARD:           Ask Control Room for feedback.
CUE:                 The Control Room Operator directs you to maintain speed at the current value until       he can evaluate SG level trend.
SAT UNSAT TERMINATING     CUES:         This JPM is       complete.
END TIME
 
JPM No. I                                                    Page 13 of 13 VERIFICATION OF COMPLETION Operator                                 Evaluator SSN                                       Date License:       ] RO     E ] SRO Validated   Completion Time:             minutes Actual Completion Time:                 minutes Acceptable Progress Maintained:               Yes         No       N/A Result:     [ I SATISFACTORY     [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Comments/Feedback:
/Evaluator's Signature JPM No. I Date DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 57 Rev. 06 Page 1 of 6 TASK NO.: 002-008-04-0100 TASK DESCRIPTION:
                                                                /
Borate the RCS from Outside the Control Room K/A  
Evaluator's Signature           Date
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   57                           Rev. 06                   Page 1 of 6 TASK NO.: 002-008-04-0100 TASK DESCRIPTION:     Borate the RCS from Outside the Control Room K/A  


==REFERENCE:==
==REFERENCE:==
004-A2.14 3.8/3.9 APPLICABLE METHOD OF TESTING:      Simulate performance In-Plant TIME FOR COMPLETION:      20 minutes APPLICABILITY:    [X]  RO      [X] SRO TASK STANDARDS:
: 1. Lineup for boric acid addition using local valves.
: 2. Start BA Pump 1.
REOUIRED MATERIALS:
DB-OP-06001,  Boron Concentration Control,      Revision 2, C-1 GENERAL
==REFERENCES:==
DB-OP-06001,  Boron Concentration Control,      Revision 2, C-1 INITIAL CONDITIONS:
The plant is  in Mode 1 at 100% power.
A load reduction to 50% power is      planned.
INITIATING CUES:
The normal boric acid addition method cannot be used.
You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
(Hand copy of DB-OP-06001 to examinee.)
JPM No. 57                                                Page 2 of 6 INITIAL  CONDITIONS:
The plant is  in Mode 1 at 100% power.
A load reduction to 50% power is  planned.
INITIATING CUES:
The normal boric acid addition method cannot be used.
You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
JPM No. 57                                                            Page 3 of 6 PERFORMANCE INFORMATION NOTE:  Critical    steps denoted with a "C".        Failure to meet any one of these standards for this          item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME:
: 1. PERFORMANCE STEP:      Locate the correct procedure section.
STANDARD:      Identifies DB-OP-06001, Boron Concentration Control, Section 5.1, as the correct procedure section.
COMMENT:      Provide correct procedure to examinee.        When the correct procedure section has been located, provide the CUE.
CUE:    All prerequisites have been completed.
SAT  UNSAT
: 2. PERFORMANCE    STEP:  Verify valve MU 348,    Boric Acid Pump 1 Discharge,  is open.
STANDARD:      Handwheel/stem position indicate OPEN.
CUE:    MU 348,    valve stem is      UP.
SAT  UNSAT
: 3. PERFORMANCE STEP:      Verify valve WC 394, from Concentrates      Storage Tank to BAATs Discharge, is open.
STANDARD:      Handwheel/stem position indicate OPEN.
CUE:    WC 394,    valve stem is      UP.
SAT  UNSAT
: 4. PERFORMANCE    STEP:  Verify valve WC 393, Concentrate Storage Tank to MU Filters    Line 2, is open.
STANDARD:      Handwheel/stem position indicate OPEN.
CUE:    WC 393,    valve stem is      UP.
SAT  UNSAT


004-A2.14 3.8/3.9 APPLICABLE METHOD OF TESTING: Simulate performance In-Plant TIME FOR COMPLETION:
JPM No. 57                                                              Page 4 of 6
20 minutes APPLICABILITY:
: 5. PERFORMANCE STEP:              Verify MU 351,  Boric Acid Pump 2 to Makeup Filters open.
[X] RO [X] SRO TASK STANDARDS:
STANDARD:            MU 351 stem position indicates OPEN.
: 1. Lineup for boric acid addition using local valves. 2. Start BA Pump 1. REOUIRED MATERIALS:
CUE:      MU 351 valve stem is        UP.
DB-OP-06001, Boron Concentration Control, Revision 2, C-1 GENERAL
SAT  UNSAT
: 6. PERFORMANCE STEP:              Close MU 363,  BAAT 1 to Makeup Filters.
STANDARD:            Handwheel  to the CLOSE position.
COMMENT:            MU 363 located between BAATs in      CA.
CUE:      MU 363 has been rotated clockwise/CLOSED;            valve stem is  DOWN.
SAT  UNSAT
: 7. PERFORMANCE STEP:             Open MU 366,  BAAT 2 to Makeup Filters.
        ...  ....C.......
STANDARD:           MU 366 handwheel    turned  (CCW) until  FULLY OPEN.
CUE:       MU 366 handwheel has been rotated counterclockwise/OPENED;            valve stem is UP.
SAT  UNSAT
: 8. PERFORMANCE              STEP: Start Boric Acid Pump 1.
    ...        .. C.........
STANDARD:        BA Pump 1 started from Control Room.
CUE:      Control Room Operator has started BA Pump 1.
SAT  UNSAT
: 9. PERFORMANCE              STEP: Stop Boric Acid Pump 1.
STANDARD:         BA Pump 1 is    stopped from the Control Room.
CUE:      Control Room Operator reports that 50 gallons have been added to the MUT and BA Pump 1 has been stopped.
SAT  UNSAT


==REFERENCES:==
JPM No. 57                                                          Page 5 of 6
: 10. PERFORMANCE  STEP:  Close MU 366,  BAAT 2 to Makeup Filters.
STANDARD:  Restore L/U, MU 366 handwheel turned  (CW)  until    FULLY CLOSED.
CUE:    MU 366 handwheel has been rotated clockwise/CLOSED;        Valve stem is DOWN.
SAT  UNSAT
: 11. PERFORMANCE STEP:    Open MU 363,  BAAT 1 to Makeup Filters.
STANDARD:  Restore L/U, MU 363 handwheel turned  (CCW)  until    FULLY OPEN.
CUE:    MU 363 handwheel has been rotated counterclockwise/OPENED:        valve stem is UP.
SAT  UNSAT TERMINATING CUES:    This JPM is complete.
END TIME


DB-OP-06001, Boron Concentration Control, Revision 2, C-1 INITIAL CONDITIONS:
JPM No. 57                                                   Page 6 of 6 VERIFICATION   OF COMPLETION Operator                                   Evaluator SSN                                         Date License:       [ ] RO     [ SRO Validated     Completion Time:             minutes Actual   Completion Time:                 minutes Acceptable Progress Maintained:                 Yes         No       N/A Result:       [ I SATISFACTORY     [ ] UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
The plant is in Mode 1 at 100% power. A load reduction to 50% power is planned.
INITIATING CUES: The normal boric acid addition method cannot be used. You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.  (Hand copy of DB-OP-06001 to examinee.)
JPM No. 57 Page 2 of 6 INITIAL CONDITIONS:
The plant is in Mode 1 at 100% power. A load reduction to 50% power is planned.
INITIATING CUES: The normal boric acid addition method cannot be used. You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
Page 3 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME: 1. PERFORMANCE STEP: Locate the correct procedure section.
STANDARD:
Identifies DB-OP-06001, Boron Concentration Control, Section 5.1, as the correct procedure section.
COMMENT: Provide correct procedure to examinee.
When the correct procedure section has been located, provide the CUE. CUE: All prerequisites have been completed.
SAT UNSAT 2. PERFORMANCE STEP: Verify valve MU 348, Boric Acid Pump 1 Discharge, is open. STANDARD:
Handwheel/stem position indicate OPEN. CUE: MU 348, valve stem is UP. SAT UNSAT 3. PERFORMANCE STEP: Verify valve WC 394, from Concentrates Storage Tank to BAATs Discharge, is open. STANDARD:
Handwheel/stem position indicate OPEN. CUE: WC 394, valve stem is UP. SAT UNSAT 4. PERFORMANCE STEP: Verify valve WC 393, Concentrate Storage Tank to MU Filters Line 2, is open. STANDARD:
Handwheel/stem position indicate OPEN. CUE: WC 393, valve stem is UP. SAT UNSAT JPM No. 57 Page 4 of 6 5. PERFORMANCE STEP: Verify MU 351, Boric Acid Pump 2 to Makeup Filters open. STANDARD:
MU 351 stem position indicates OPEN. CUE: MU 351 valve stem is UP. SAT UNSAT 6. PERFORMANCE STEP: Close MU 363, BAAT 1 to Makeup Filters.
STANDARD:
Handwheel to the CLOSE position.
COMMENT: MU 363 located between BAATs in CA. CUE: MU 363 has been rotated clockwise/CLOSED; valve stem is DOWN. SAT UNSAT 7. PERFORMANCE STEP: Open MU 366, BAAT 2 to Makeup Filters. 
... .... C.......
STANDARD:
MU 366 handwheel turned (CCW) until FULLY OPEN. CUE: MU 366 handwheel has been rotated counterclockwise/OPENED; valve stem is UP. SAT UNSAT 8. PERFORMANCE STEP: Start Boric Acid Pump 1.  ... .. C.........
STANDARD:
BA Pump 1 started from Control Room. CUE: Control Room Operator has started BA Pump 1. SAT UNSAT 9. PERFORMANCE STEP: Stop Boric Acid Pump 1. STANDARD:
BA Pump 1 is stopped from the Control Room. CUE: Control Room Operator reports that 50 gallons have been added to the MUT and BA Pump 1 has been stopped.
SAT UNSAT JPM No. 57 Page 5 of 6 10. PERFORMANCE STEP: Close MU 366, BAAT 2 to Makeup Filters.
STANDARD:
Restore L/U, MU 366 handwheel turned (CW) until FULLY CLOSED. CUE: MU 366 handwheel has been rotated clockwise/CLOSED; Valve stem is DOWN. SAT UNSAT 11. PERFORMANCE STEP: Open MU 363, BAAT 1 to Makeup Filters.
STANDARD:
Restore L/U, MU 363 handwheel turned (CCW) until FULLY OPEN. CUE: MU 363 handwheel has been rotated counterclockwise/OPENED:
valve stem is UP. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 57 Page 6 of 6 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
Yes No N/A Result: [ I SATISFACTORY
[ ] UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Comments/Feedback:
Evaluator's Signature Date JPM No. 57 DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 4C Rev. 00 Page 19 of 28 TASK NO.: 000-058-05-0100 TASK DESCRIPTION:
Evaluator's Signature           Date
Establishing Long Term Boron Dilution Using LPI Train 2 K/A  
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   4C                             Rev. 00               Page 19 of 28 TASK NO.:   000-058-05-0100 TASK DESCRIPTION:       Establishing Long Term Boron Dilution Using LPI Train 2 K/A  


==REFERENCE:==
==REFERENCE:==
 
006-K6.03   3.6/3.9,   006-A1.11 3.1/3.4 006-A2.05   3.4/3.5 APPLICABLE METHOD OF TESTING:         Actual performance Simulator Alternate Path TIME FOR COMPLETION:       10 minutes APPLICABILITY:     [X] RO       [X] SRO TASK STANDARDS:
006-K6.03 3.6/3.9, 006-A1.11 3.1/3.4 006-A2.05 3.4/3.5 APPLICABLE METHOD OF TESTING: Actual performance Simulator Alternate Path TIME FOR COMPLETION:
: 1. Align HPI Train 1 to supplement core cooling with LPI Train 1.
10 minutes APPLICABILITY:
: 2. Align LPI Train 2 to take a suction off of the DH Drop line and discharge to the RCS.
[X] RO[X] SRO TASK STANDARDS:
: 3. Establish long term boron dilution with LPI Train 2.
: 1. Align HPI Train 1 to supplement core cooling with LPI Train 1. 2. Align LPI Train 2 to take a suction off of the DH Drop line and discharge to the RCS. 3. Establish long term boron dilution with LPI Train 2. 4. Align LPI Train 1 to inject through both LPI injection lines. REQUIRED MATERIALS:
: 4. Align LPI Train 1 to inject through both LPI injection lines.
DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-I GENERAL  
REQUIRED MATERIALS:
DB-OP-02000,   RPS,   SFAS,   SFRCS Trip and SG Tube Rupture, Revision 5, C-I GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-1 INITIAL CONDITIONS:
DB-OP-02000,   RPS,   SFAS,   SFRCS Trip and SG Tube Rupture, Revision 5, C-1 INITIAL CONDITIONS:
A large break LOCA has occurred.
A large break LOCA has occurred.
HPI Pump 2 has failed to start. Both MU pumps and HPI Pump 1 have been stopped per procedure.
HPI Pump 2 has failed to start.
Both LPI pumps have been transferred to the Emergency Sump. INITIATING CUES: You have been directed to establish long term boron dilution according to Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.Step D on Page 1 of Attachment 12 has been completed.
Both MU pumps and HPI Pump 1 have been stopped per procedure.
Page 20 of 28 INITIAL CONDITIONS:
Both LPI pumps have been transferred to the Emergency Sump.
INITIATING CUES:
You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.
Step D on Page 1 of Attachment 12 has been completed.
 
JPM No. 4C                                                Page 20 of 28 INITIAL CONDITIONS:
A large break LOCA has occurred.
A large break LOCA has occurred.
HPI Pump 2 has failed to start. Both MU pumps and HPI Pump 1 have been stopped per procedure.
HPI Pump 2 has failed to start.
Both LPI pumps have been transferred to the Emergency Sump. INITIATING CUES: You have been directed to establish long term boron dilution according to Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2. Step D on Page 1 of Attachment 12 has been completed.
Both MU pumps and HPI Pump 1 have been stopped per procedure.
JPM No. 4C Page 21 of 28 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
Both LPI pumps have been transferred to the Emergency Sump.
START TIME: _ 1. PERFORMANCE STEP: Locate the correct step. STANDARD:
INITIATING CUES:
Identifies Step E on Page 1 of Attachment 12 is the correct start point. CUE: None. SAT UNSAT 2. PERFORMANCE STEP: Return control power to DH 11 and DH 12. ... ....C........
You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.
STANDARD:
Step D on Page 1 of Attachment 12 has been completed.
Depress the ON pushbutton on HIS DH1IA and HIS DHl2A. COMMENT: DH 11 and DH 12 must be open to complete the task. CUE: None. SAT UNSAT 3. PERFORMANCE STEP: Verify open DH 11, Normal Suction Isolation.
 
,, ..C .........
JPM No.       4C                                                             Page 21 of 28 PERFORMANCE INFORMATION NOTE:         Critical           steps denoted with a "C". Failure to meet any one of these standards for this           item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
STANDARD:
START TIME:   _
Depress the OPEN pushbutton on HIS DH11. CUE: None. SAT UNSAT 4. PERFORMANCE STEP: Verify open DH 12, Normal Suction Isolation.
: 1. PERFORMANCE STEP:                   Locate the correct step.
.. .... C.........
STANDARD:               Identifies Step E on Page 1 of Attachment     12 is the correct start   point.
STANDARD:
CUE:         None.
Depress the OPEN pushbutton on HIS DHl2. COMMENT: Examinee may turn off control power to DH 11 and DH 12 which not required by procedure.
SAT UNSAT
CUE: None.SAT UNSAT JPM No. 4C Page 22 of 28 5. PERFORMANCE STEP: Route to Method 2 using LPI Train 2. STANDARD:
: 2. PERFORMANCE STEP:                   Return control power to DH 11 and DH 12.
Route to Page 4 of Attachment
        ... ....     C........
: 12. CUE: None. SAT UNSAT 6. PERFORMANCE STEP: Check that the suction of LPI and CTMT Spray has been transferred to the Emergency Sump. STANDARD:
STANDARD:               Depress the ON pushbutton on HIS DH1IA and HIS DHl2A.
Observe the RED lights are lit on HIS DH9B and HIS DH9A. Observe the GREEN lights are lit on HIS DH7B and HIS DH7A. CUE: None. SAT UNSAT 7. PERFORMANCE STEP: Check that both LPI trains are cooling the core. STANDARD:
COMMENT:               DH 11 and DH 12 must be open to complete the task.
Observe >1000 gpm flow on FYI DH2B and FYI DH2A. CUE: (If asked how long LPI has been in operation.)
CUE:         None.
LPI has been operating for 90 minutes.
SAT UNSAT
SAT UNSAT 8. PERFORMANCE STEP: Verify Incores temperatures are < 333 0 F. STANDARD:
: 3. PERFORMANCE STEP:                   Verify open DH 11, Normal Suction Isolation.
Rotate Incore temperature selector switches HS 4627 and HS 4628 to verify the Incore Temperature indicators, TI 4627 and TI 4628 are < 333 0 F. CUE: None. SAT UNSAT 9. PERFORMANCE STEP: Check that SCM does not exist. STANDARD:
      ,,       .   . C .........
Observe RCS pressure on one of the various wide range indicators and determine the SCM is < 20 0 F. CUE: None. SAT UNSAT 10. PERFORMANCE STEP: Route to Method 2 using LPI Train 2. STANDARD:
STANDARD:               Depress the OPEN pushbutton on HIS DH11.
Route to Page 8 of Attachment
CUE:         None.
: 12. CUE: None. SAT UNSAT JPM No. 4C Page 23 of 28 11. PERFORMANCE STEP: Identify CCW Train 2 is < 95&deg;F and direct an EO to manually CCW Outlet temperature 95 0 F to 115 0 F. STANDARD:
SAT UNSAT
Contact an Equipment Operator.
: 4. PERFORMANCE STEP:                   Verify open DH 12, Normal Suction Isolation.
COMMENT; An EO will report that SW 38 has been throttled and CCW Outlet temperature is 105 0 F. CUE: None. SAT UNSAT 12. PERFORMANCE STEP: Verfiy open DH 64, DHR Cooler 1 Outlet to HPI Pump 1 ........ C .........
    ..   ....       C.........
Suction.
STANDARD:               Depress the OPEN pushbutton on HIS DHl2.
STANDARD:
COMMENT:               Examinee may turn off control power to DH 11 and DH 12 which not required by procedure.
Depress the OPEN pushbutton on HIS DH64. CUE: None. SAT UNSAT 13. PERFORMANCE STEP: Verify closed HP 32, HPI Recirc to BWST. STANDARD:
CUE:         None.
Verify GREEN light is lit on HIS HP32. CUE: None. SAT UNSAT 14. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm. STANDARD:
SAT UNSAT
Depress ON control power for DH lB using HIS DHIB-2. Throttle DH 1B, using HIS DHIB, until LPI Train 1 flow is about 3000 gpm on FYI DH2B. COMMENT: Required by Specific Rule 2. CUE: None. SAT UNSAT 15. PERFORMANCE STEP: Start HPI Pump 1. .. .....C.........
 
STANDARD:
JPM No. 4C                                                       Page 22 of 28
Turn the control switch HIS 1524 to START. CUE: None. SAT UNSAT JPM No. 4C Page 24 of 28 16. PERFORMANCE STEP: Verify open HP 2C and HP 2D, HP Injection 1 valves. STANDARD:
: 5. PERFORMANCE STEP:     Route to Method 2 using LPI Train 2.
Verify RED lights are lit on HIS HP2C and HIS HP2D. CUE: None. SAT UNSAT 17. PERFORMANCE STEP: Verify flow is indicated on HPI Train 1. STANDARD:
STANDARD:     Route to Page 4 of Attachment   12.
Verify flow is indicated on FYI HP3C and FYI HP3D. CUE: None. SAT UNSAT 18. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS ........ C .........
CUE:   None.
Isolation.
SAT   UNSAT
STANDARD:
: 6. PERFORMANCE STEP:     Check that the suction of LPI and CTMT Spray has been transferred to the Emergency Sump.
Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DH1A, until only the GREEN light is lit. CUE: None. SAT UNSAT 19. PERFORMANCE STEP: Verify core cooling is adequate.
STANDARD:     Observe the RED lights are lit   on HIS DH9B and HIS DH9A.
STANDARD:
Observe the GREEN lights are lit   on HIS DH7B and HIS DH7A.
Observe the Incore temperature indicators, TI 4627 and TI 4626, are constant.
CUE:   None.
CUE: Incore temperature indicators, TI 4627 and TI 4626, are constant and will be monitored by the Shift Manager.
SAT UNSAT
SAT UNSAT 20. PERFORMANCE STEP: Stop LPI Pump 2. .. .... C........
: 7. PERFORMANCE STEP:     Check that both LPI trains are cooling the core.
STANDARD:
STANDARD:     Observe >1000 gpm flow on FYI DH2B and FYI DH2A.
Depress the BLOCK pushbutton on HIS DH6A1 and turn the control switch HIS DH6A to STOP. COMMENT: LPI Pump 2 must be stopped prior to repositioning DH 2734. CUE: None. SAT UNSAT JPM No. 4C Page 25 of 28 21. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve. .. ...C.........
CUE:   (If asked how long LPI has been in     operation.)     LPI has been operating for 90 minutes.
STANDARD:
SAT UNSAT
Depress the BLOCK pushbutton on HIS 2734A and depress the CLOSE pushbutton on HIS 2734. CUE: None. SAT UNSAT 22. PERFORMANCE STEP: Verify open DH 11 and DH 12, Normal Suction Isolation.
: 8. PERFORMANCE   STEP: Verify Incores temperatures are < 333 0 F.
STANDARD:
STANDARD:     Rotate Incore temperature selector switches HS 4627 and HS 4628 to verify the Incore Temperature indicators, TI 4627 and TI 4628 are < 333 0 F.
Observe the RED lights are lit on HIS DHll and HIS DHl2. CUE: None. SAT UNSAT 23. PERFORMANCE STEP: Verify open DH 1518, DH Pump 2 Suction from RCS. .... .. .C.........
CUE:   None.
STANDARD:
SAT UNSAT
Depress the OPEN pushbutton on HIS 1518. CUE: None. SAT UNSAT 24. PERFORMANCE STEP: Start LPI Pump 2. .. ...C.........
: 9. PERFORMANCE   STEP: Check that SCM does not exist.
STANDARD:
STANDARD:     Observe RCS pressure on one of the various wide range indicators and determine the SCM is   < 20 0 F.
Turn the control switch HIS DH6A to START. CUE: None. SAT UNSAT 25. PERFORMANCE STEP: Verify no indication of cavitation on LPI Pump 2. STANDARD:
CUE:   None.
Observe constant amperes and flow on LPI Train 2. CUE: None. SAT UNSAT 26. PERFORMANCE STEP: Adjust LPI Train 2 flow to 300 to 500 gpm. ......&deg;C ........
SAT UNSAT
STANDARD:
: 10. PERFORMANCE   STEP: Route to Method 2 using LPI Train 2.
Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DHIA, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A. COMMENT: Restoration of control power will not be required if control power was not removed previously.
STANDARD:     Route to Page 8 of Attachment   12.
CUE: None.SAT UNSAT JPM No. 4C Page 26 of 28 27. PERFORMANCE STEP: Identify indications of cavitation on LPI Pump 2. .. ..... C ........
CUE:   None.
STANDARD:
SAT UNSAT
Observe swinging amperes and flow on LPI Train 2. CUE: None. SAT UNSAT 28. PERFORMANCE STEP: Stop LPI Pump 2. .. .....C.........
 
STANDARD:
JPM No.     4C                                                           Page 23 of 28
Turn the control switch HIS DH6A to STOP. CUE: None. SAT UNSAT 29. PERFORMANCE STEP: Verify closed DH 1518, DH Pump 2 Suction from RCS. ....Co.........
: 11. PERFORMANCE             STEP: Identify CCW Train 2 is   < 95&deg;F and direct an EO to manually CCW Outlet temperature 95 0 F to 115 0 F.
STANDARD:
STANDARD:             Contact an Equipment Operator.
Depress the CLOSE pushbutton on HIS 1518. CUE: None. SAT UNSAT 30. PERFORMANCE STEP: Route to Step 10.7. .... .C...........
COMMENT;             An EO will report that SW 38 has been throttled     and CCW Outlet 0
STANDARD:
temperature is 105 F.
Route to Step 10.7. CUE: None. SAT UNSAT 31. PERFORMANCE STEP: Verify LPI Pump 2 is off. STANDARD:
CUE:       None.
Observe the GREEN light is LIT on control switch HIS DH6A. CUE: None. SAT UNSAT 32. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve. STANDARD:
SAT   UNSAT
Observe the GREEN light is LIT on HIS 2734. CUE: None. SAT UNSAT JPM No. 4C Page 27 of 28 33. PERFORMANCE STEP: .. ..Ce.........
: 12. PERFORMANCE STEP:             Verfiy open DH 64,   DHR Cooler 1 Outlet to HPI Pump 1
STANDARD: Verify closed DH 1A, DH Pump 2 Discharge to RCS Isolation.
    ........       C ......... Suction.
Depress ON control power for DH 1A using HIS DHlA-2. Depress and hold the CLOSE pushbutton HIS DHIA, until only the GREEN light is lit.COMMENT: Restoration of control power will not be required if control power was not removed previously.
STANDARD:           Depress the OPEN pushbutton on HIS DH64.
CUE: None. SAT UNSAT 34. PERFORMANCE STEP: Verify open DH 831, Decay Heat Cooler Disch Xover 1 .... C...........
CUE:       None.
to 2. STANDARD:
SAT   UNSAT
Depress the OPEN pushbutton on HIS 831. CUE: None.SAT UNSAT 35. PERFORMANCE STEP: ........Ce........
: 13. PERFORMANCE STEP:             Verify closed HP 32,   HPI Recirc to BWST.
STANDARD: Adjust LPI Train 1 flow to maintain < 4000 gpm on LPI Pump 1.Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DH1B, until LPI Train 1 flow is about 1500 gpm on FYI DH2B.COMMENT: HPI Pump 1 is still running and must be included in the total flow through LPI Pump 1. Required by Specific Rule 2. Restoration of control power will not be required if control power was not removed previously.
STANDARD:           Verify GREEN light     is lit on HIS HP32.
CUE: None. SAT UNSAT 36. PERFORMANCE STEP: Adjust LPI Train 2 flow to obtain about 1500 gpm. .. ..oC .........STANDARD: Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 1500 gpm on FYI DH2A.COMMENT: Restoration of control power will not be required if control power was not removed previously.
CUE:       None.
CUE: None. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 4C Page 28 of 28 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
SAT   UNSAT
Yes No N/A Result: [ I SATISFACTORY
: 14. PERFORMANCE             STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm.
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
STANDARD:           Depress ON control power for DH lB using HIS DHIB-2.         Throttle DH 1B, using HIS DHIB, until     LPI Train 1 flow is about 3000 gpm on FYI DH2B.
Comments/Feedback:  
COMMENT:             Required by Specific Rule 2.
/JPM No. 4 Date Evaluator's Signature DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 2 Rev. 00 Page 1 of 9 TASK NO.: 000-068-05-0100, 334-017-05-0300 TASK DESCRIPTION:
CUE:       None.
Serious Control Room Fire, Assistant Shift Supervisor Actions, Attachment 2 K/A  
SAT   UNSAT
: 15. PERFORMANCE             STEP: Start HPI Pump 1.
    ..       .....C.........
STANDARD:           Turn the control switch HIS 1524 to START.
CUE:       None.
SAT   UNSAT
 
JPM No.     4C                                                               Page 24 of 28
: 16. PERFORMANCE STEP:                 Verify open HP 2C and HP 2D,     HP Injection 1 valves.
STANDARD:               Verify RED lights     are lit on HIS HP2C and HIS HP2D.
CUE:           None.
SAT UNSAT
: 17. PERFORMANCE STEP:                 Verify flow is   indicated on HPI Train 1.
STANDARD:             Verify flow is     indicated on FYI HP3C and FYI HP3D.
CUE:           None.
SAT UNSAT
: 18. PERFORMANCE STEP:                 Verify closed DH 1A, DH Pump 2 Discharge to RCS
    ........       C .........       Isolation.
STANDARD:             Depress ON control power for DH 1A using HIS DH1A-2.         Depress and hold the CLOSE pushbutton HIS DH1A, until       only the GREEN light   is lit.
CUE:           None.
SAT UNSAT
: 19. PERFORMANCE               STEP:   Verify core cooling is   adequate.
STANDARD:             Observe the Incore temperature indicators,       TI 4627 and TI 4626, are constant.
CUE:         Incore temperature indicators, TI 4627 and TI 4626,             are constant and will be monitored by the Shift Manager.
SAT UNSAT
: 20. PERFORMANCE STEP:                 Stop LPI Pump 2.
    ..     .... C........
STANDARD:             Depress the BLOCK pushbutton on HIS DH6A1 and turn the control switch HIS DH6A to STOP.
COMMENT:               LPI Pump 2 must be stopped prior to repositioning DH 2734.
CUE:           None.
SAT UNSAT
 
JPM No. 4C                                                         Page 25 of 28
: 21. PERFORMANCE STEP:         Verify closed DH 2734, DH Pump 2 LPI Suction valve.
    .. . .. C.........
STANDARD:         Depress the BLOCK pushbutton on HIS 2734A and depress the CLOSE pushbutton on HIS 2734.
CUE:   None.
SAT UNSAT
: 22. PERFORMANCE STEP:         Verify open DH 11 and DH 12, Normal Suction Isolation.
STANDARD:         Observe the RED lights are lit   on HIS DHll and HIS DHl2.
CUE:   None.
SAT UNSAT
: 23. PERFORMANCE STEP:         Verify open DH 1518, DH Pump 2 Suction from RCS.
        .. ....
            .C.........
STANDARD:       Depress the OPEN pushbutton on HIS 1518.
CUE:   None.
SAT UNSAT
: 24. PERFORMANCE STEP:         Start LPI Pump 2.
    .. . .. C.........
STANDARD:         Turn the control switch HIS DH6A to START.
CUE:   None.
SAT   UNSAT
: 25. PERFORMANCE STEP:         Verify no indication of cavitation on LPI Pump 2.
STANDARD:       Observe constant amperes and flow on LPI Train 2.
CUE:   None.
SAT   UNSAT
: 26. PERFORMANCE         STEP: Adjust LPI Train 2 flow to 300 to 500 gpm.
      .     &deg;C ........
          .....
STANDARD:       Depress ON control power for DH 1A using HIS DHIA-2.     Throttle DH 1A, using HIS DHIA, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A.
COMMENT:         Restoration of control power will not be required if     control power was not removed previously.
CUE:   None.
SAT   UNSAT
 
JPM No.       4C                                                       Page 26 of 28
: 27. PERFORMANCE STEP:               Identify indications of cavitation on LPI Pump 2.
    ..     .....     C ........
STANDARD:             Observe swinging amperes and flow on LPI Train 2.
CUE:           None.
SAT UNSAT
: 28. PERFORMANCE STEP:             Stop LPI Pump 2.
    ..           .....C.........
STANDARD:             Turn the control switch HIS DH6A to STOP.
CUE:           None.
SAT UNSAT
: 29. PERFORMANCE             STEP: Verify closed DH 1518, DH Pump 2 Suction from RCS.
    . . .           . Co.........
STANDARD:             Depress the CLOSE pushbutton on HIS 1518.
CUE:           None.
SAT UNSAT
: 30. PERFORMANCE STEP:             Route to Step 10.7.
      ....         .C...........
STANDARD:             Route to Step 10.7.
CUE:           None.
SAT UNSAT
: 31. PERFORMANCE STEP:             Verify LPI Pump 2 is off.
STANDARD:             Observe the GREEN light is LIT on control switch HIS DH6A.
CUE:           None.
SAT UNSAT
: 32. PERFORMANCE             STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve.
STANDARD:             Observe the GREEN light is LIT on HIS 2734.
CUE:           None.
SAT UNSAT
 
JPM No.     4C                                                           Page 27 of 28
: 33. PERFORMANCE STEP:                 Verify closed DH 1A, DH Pump 2 Discharge to RCS
            ..   .. Ce.........      Isolation.
STANDARD:             Depress ON control power for DH 1A using HIS DHlA-2.       Depress and hold the CLOSE pushbutton HIS DHIA, until     only the GREEN light   is lit.
COMMENT:               Restoration of control power will not be required if     control power was not removed previously.
CUE:         None.
SAT   UNSAT
: 34. PERFORMANCE STEP:                 Verify open DH 831, Decay Heat Cooler Disch Xover 1
    ....           C...........     to 2.
STANDARD:             Depress the OPEN pushbutton on HIS 831.
CUE:         None.
SAT   UNSAT
: 35. PERFORMANCE STEP:                 Adjust LPI Train 1 flow to maintain < 4000 gpm on
    ........        Ce........       LPI Pump 1.
STANDARD:            Depress ON control power for DH lB using HIS DHlB-2.       Throttle DH 1B, using HIS DH1B, until     LPI Train 1 flow is about 1500 gpm on FYI DH2B.
COMMENT:             HPI Pump 1 is still     running and must be included in the total flow through LPI Pump 1. Required by Specific Rule 2.
Restoration of control power will not be required if       control power was not removed previously.
CUE:         None.
SAT   UNSAT
: 36. PERFORMANCE               STEP:   Adjust LPI Train 2 flow to obtain about 1500 gpm.
            .. .. oC .........
STANDARD:             Depress ON control power for DH 1A using HIS DHIA-2.       Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 1500 gpm on FYI DH2A.
COMMENT:             Restoration of control power will not be required if       control power was not removed previously.
CUE:         None.
SAT   UNSAT TERMINATING CUES:               This JPM is   complete.
END TIME
 
JPM No. 4                                                  Page 28 of 28 VERIFICATION OF COMPLETION Operator                                 Evaluator SSN                                     Date License:     [ ] RO   [ ] SRO Validated   Completion Time:           minutes Actual Completion Time:                 minutes Acceptable Progress Maintained:               Yes         No       N/A Result:     [ I SATISFACTORY     [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
                                                                /
Evaluator's Signature           Date
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   2                           Rev. 00                       Page 1 of 9 TASK NO.:     000-068-05-0100,   334-017-05-0300 TASK DESCRIPTION:     Serious Control Room Fire,     Assistant Shift Supervisor Actions, Attachment 2 K/A  


==REFERENCE:==
==REFERENCE:==
 
062-A2.04 3.1/3.4,     064-A2.05 3.1/3.2 064-A2.11 2.6/2.9,     BW/A05-AAI.01 4.3/4.2 APPLICABLE METHOD OF TESTING:       Simulate performance In-plant TIME FOR COMPLETION:       25 minutes APPLICABILITY:     [ ] RO       [X] SRO TASK STANDARDS:
062-A2.04 3.1/3.4, 064-A2.05 3.1/3.2 064-A2.11 2.6/2.9, BW/A05-AAI.01 4.3/4.2 APPLICABLE METHOD OF TESTING: Simulate performance In-plant TIME FOR COMPLETION:
25 minutes APPLICABILITY:
[ ] RO [X] SRO TASK STANDARDS:
: 1. Cooling flow (CCW) to EDG 1 is established.
: 1. Cooling flow (CCW) to EDG 1 is established.
: 2. All required emergency control transfer switches are in LOCAL. 3. EDG 1 is protected.
: 2. All required emergency control transfer switches are in       LOCAL.
: 4. Isolate B bus and remove bus control power. REQUIRED MATERIALS:
: 3. EDG 1 is protected.
DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 GENERAL  
: 4. Isolate B bus and remove bus control power.
REQUIRED MATERIALS:
DB-OP-02519,   Serious Control Room Fire,     Revision 4, C-3 GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 INITIAL CONDITIONS:
DB-OP-02519,   Serious Control Room Fire,     Revision 4, C-3 INITIAL CONDITIONS:
The Control Room has been evacuated due to a serious Control Room fire. INITIATING CUES: You have been directed to perform the Assistant Shift Supervisor actions in Attachment 2 of DB-OP-02519, Serious Control Room Fire. You have obtained all the required serious Control Room fire equipment. (Hand copy of DB-OP-02519 to examinee.)
The Control Room has been evacuated due to a serious Control Room fire.
JPM No. 2 Page 2 of 9 INITIAL CONDITIONS:
INITIATING CUES:
The Control Room has been evacuated due to a Serious Control Room Fire. INITIATING CUES: You have been directed to perform the Assistant Shift Supervisor actions in Attachment 2 of DB-OP-02519, Serious Control Room Fire. You have obtained all the required Serious Control Room Fire Equipment.
You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.
Page 3 of 9 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
You have obtained all     the required serious Control Room fire   equipment.
START TIME: 1. PERFORMANCE STEP: Verify the radio is NOT in silence mode. STANDARD:
(Hand copy of DB-OP-02519 to examinee.)
Key radio to transmit.
 
CUE: Radio transmitter switch has been depressed and released.
JPM No. 2                                                   Page 2 of 9 INITIAL CONDITIONS:
SAT UNSAT 2. PERFORMANCE STEP: Establish CCW flow to EDG 1. .. .....C ........
The Control Room has been evacuated due to a Serious Control Room Fire.
STANDARD:
INITIATING CUES:
CC 1471 is OPENED. CUE: HV 1471 has been rotated clockwise to CLOSE. CC 1471 IA regulator drain petcock has been rotated counterclockwise to OPEN. Position indicator on CC 1471 indicates OPEN. SAT UNSAT 3. PERFORMANCE STEP: Isolate the EDG 1 Engine Control Panel from the ........ C ........ Control Room fire. STANDARD:
You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.
On C3621, EDG 1 Engine Control Panel, disconnect switch, Emergency Control Transfer Switch DS-4A, in LOCAL. CUE: Emergency Control Transfer Switch DS-4A has been placed in LOCAL. SAT UNSAT JPM No. 2 Page 4 of 9 4. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control ........ C ........ Room fire. STANDARD:
You have obtained all the required Serious Control Room Fire Equipment.
Place disconnect switches on C3615, DG 1 Local Control Panel, ISO SW DS-lB Appendix R in EMERGENCY, and ISO SW DS-l Appendix R for relay SAX/13, in LOCAL. CUE: ISO SW DS-lB Appendix R switch has been placed in EMERGENCY.
 
ISO SW DS-l Appendix R for relay SAX/13 has been placed in LOCAL. SAT UNSAT 5. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control ........ C ........ Room fire (cont.).
JPM No.          2                                                                  Page 3 of 9 PERFORMANCE   INFORMATION NOTE:           Critical       steps denoted with a "C". Failure to meet any one of these standards for this         item constitutes failure. Sequence is   NOT required unless denoted in the "Comments".
STANDARD:
START TIME:
Open the nine TS-4 test disconnect switches on Panel C3615, DG 1 Local Control Panel. CUE: All nine TS-4, test disconnect switches, have been placed in the OPEN position.
: 1. PERFORMANCE STEP:                 Verify the radio is   NOT in silence mode.
SAT UNSAT 6. PERFORMANCE STEP: Isolate the EDG Voltage Regulator cabinet from the ........ C ........ Control Room fire (cont.).
STANDARD:                 Key radio to transmit.
STANDARD:
CUE:           Radio transmitter switch has been depressed and released.
Disconnect switch ISO SW DS-3 Appendix R on Panel C3617, DG 1 Voltage Regulator Cabinet, in LOCAL. CUE: ISO SW DS-3 Appendix R switch has been placed in LOCAL. SAT UNSAT 7. PERFORMANCE STEP: Force the EDG into the Isochronous Mode. .. ....C.........
SAT   UNSAT
STANDARD:
: 2. PERFORMANCE STEP:                 Establish CCW flow to EDG 1.
Isochronous droop switch placed in isochronous.
    ..       ..... C ........
CUE: Isochronous droop switch has been placed in ISOCHRONOUS.
STANDARD:                 CC 1471 is OPENED.
SAT UNSAT 8. PERFORMANCE STEP: Disable the Voltage Regulator Droop mode. .. ... .C.........
CUE:           HV 1471 has been rotated clockwise to CLOSE.
STANDARD:
CC 1471 IA regulator drain petcock has been rotated counterclockwise to OPEN.
Voltage Regulator droop switch in OFF. CUE: Voltage Regulator droop switch has been placed in OFF. SAT UNSAT JPM No. 2 Page 5 of 9 9. PERFORMANCE STEP: Shutdown EDG 2. STANDARD:
Position indicator on CC 1471 indicates OPEN.
Push emergency shutdown on EDG 2 at C3622, DG 2 Engine Control Panel. CUE: Emergency shutdown has been pushed. EDG 2 is STOPPED.
SAT   UNSAT
SAT UNSAT 10. PERFORMANCE STEP: Place DG 1 Sycn Selector in the DG BKR to C1 position.
: 3. PERFORMANCE STEP:                 Isolate the EDG 1 Engine Control Panel from the
STANDARD:
    ........           C ........     Control Room fire.
Rotate the DG 1 Sycn Selector to the DG BKR to C1 position.
STANDARD:                 On C3621, EDG 1 Engine Control Panel, disconnect switch, Emergency Control Transfer Switch DS-4A, in LOCAL.
CUE: The DG 1 Sycn Selector switch has been rotated to the DG BKR to Cl position.
CUE:           Emergency Control Transfer Switch DS-4A has been placed in             LOCAL.
SAT UNSAT 11. PERFORMANCE STEP: Determine status of EDG 1. STANDARD:
SAT   UNSAT
Verify that EDG 1 is running unloaded.
 
COMMENT: The order of the cues is respective to the If-Then statements in the step. CUE: EDG 1 Running volt meter indicates 124 VAC. EDG 1 Kilwatt meter indicates 0 KWe. EDG 1 is running and ACII0, Bus Cl to Bus C2 Tie Brkr, is CLOSED. SAT UNSAT 12. PERFORMANCE STEP: Notify the Shiftf Supervisor EDG 1 is running unloaded and route to step 1.0.d.4.
JPM No.         2                                                                   Page 4 of 9
STANDARD:
: 4. PERFORMANCE STEP:                 Isolate the EDG Local Control Panel from the Control
Contact the Shift Supervisor and route to step 1.0.d.4.
    ........         C ........     Room fire.
CUE: Shift Supervisor has been notified EDG 1 is running unloaded.
STANDARD:               Place disconnect switches on C3615, DG 1 Local Control Panel, ISO SW DS-lB Appendix R in EMERGENCY, and ISO SW DS-l Appendix R for relay SAX/13, in LOCAL.
SAT UNSAT JPM No. 2 Page 6 of 9 13. PERFORMANCE STEP: Adjust EDG 1 voltage to 4300 VAC. ..... C.........
CUE:           ISO SW DS-lB Appendix R switch has been placed in               EMERGENCY.
STANDARD:
ISO SW DS-l Appendix R for relay SAX/13 has been placed in               LOCAL.
Determine EDG 1 voltage and adjust EDG 1 voltage using DG 1 Voltage regulator switch. CUE: EDG 1 voltage is 4220 VAC. EDG 1 Voltage Regulator switch has been rotated to RAISE. EDG 1 voltage is 4300 VAC. EDG 1 Voltage Regulator switch has been released to neutral.
SAT UNSAT
SAT UNSAT 14. PERFORMANCE STEP: Adjust EDG 1 frequency to 60 Hz. ........C........
: 5. PERFORMANCE STEP:               Isolate the EDG Local Control Panel       from the Control
STANDARD:
    ........         C ........     Room fire     (cont.).
Determine EDG 1 frequency and adjust EDG 1 frequency using DG 1 Spd Cntrl switch. CUE: EDG 1 Frequency is 60.7 Hz. EDG 1 Speed Control switch has been rotated to LOWER. EDG 1 Frequency is 60 Hz. EDG 1 Speed Control switch has been released to neutral.
STANDARD:               Open the nine TS-4 test       disconnect switches on Panel C3615, DG 1 Local Control Panel.
SAT UNSAT 15. PERFORMANCE STEP: Notify the Secondary RO and the SS that EDG 1 is ........ C .........
CUE:           All nine TS-4,       test   disconnect switches,   have been placed in   the OPEN position.
protected.
SAT UNSAT
STANDARD:
: 6. PERFORMANCE STEP:               Isolate the EDG Voltage Regulator cabinet         from the
Using the radio or Gai-Tronics, inform the Secondary RO and the SS that EDG 1 is protected.
    ........         C ........     Control Room fire     (cont.).
CUE: The Secondary RO and SS have been notified EDG 1 is protected.
STANDARD:               Disconnect switch ISO SW DS-3 Appendix R on Panel C3617,           DG 1 Voltage Regulator Cabinet, in LOCAL.
SAT UNSAT JPM No. 2 Page 7 of 9 16. PERFORMANCE STEP: At D1 Bus Cubicle 2, remove AACD1 close control power ........ C .........
CUE:           ISO SW DS-3 Appendix R switch has been placed in             LOCAL.
fuses AND trip AACD1 using the manual trip plunger at the base of the breaker.STANDARD: AACD1 checked open and close fuses pulled and lift the manual trip plunger.CUE: Breaker AACDI green light lit, control fuses pulled. The manual trip plunger for breater AACDl has been lifted. asked) Breaker position indicator points to open.(if SAT UNSAT 17. PERFORMANCE STEP: Remove control power from B bus source breakers.
SAT UNSAT
.. ... C.........
: 7. PERFORMANCE STEP:               Force the EDG into the Isochronous Mode.
STANDARD:
    ..       . ... C.........
Knife switch in Cubicle 14 placed in mid position.
STANDARD:               Isochronous droop switch placed in       isochronous.
CUE: Knife switch has been placed in the MID position.
CUE:           Isochronous droop switch has been placed in             ISOCHRONOUS.
SAT UNSAT 18. PERFORMANCE STEP: Verify OPEN B bus supply breakers.
SAT UNSAT
STANDARD:
: 8. PERFORMANCE STEP:               Disable the Voltage Regulator Droop mode.
Check OPEN the following B bus supply breakers:
    ..       ...   .C.........
HX01B, HX02B, and HXlIB. COMMENT: Provide CUE for appropriate breaker as each is checked.
STANDARD:               Voltage Regulator droop switch in       OFF.
Examinee may elect to trip via manual plunger.
CUE:           Voltage Regulator droop switch has been placed in             OFF.
CUE: Breaker HX01B has the Green light LIT; Red light OFF. The manual trip plunger for breater HX01B has been lifted. (if asked) Breaker position indicator points to open. Breaker HX11B has the Green light LIT; Red light OFF. The manual trip plunger for breater HXlIB has been lifted. (if asked) Breaker position indicator points to open. Breaker HX02B has the Green light LIT; Red light OFF. The manual trip plunger for breater HX02B has been lifted. (if asked) Breaker position indicator points to open. SAT UNSAT JPM No. 2 JPM No. 2 Page 8 of 9 19. PERFORMANCE STEP: Remove control power from B bus load breakers.
SAT UNSAT
.. ..... Co........
 
STANDARD:
JPM No. 2                                                       Page 5 of 9
Knife switch in B Bus Cubicle 1 placed in mid position.
: 9. PERFORMANCE   STEP: Shutdown EDG 2.
CUE: Knife switch has been placed in the MID position.
STANDARD:   Push emergency shutdown on EDG 2 at C3622,   DG 2 Engine Control Panel.
SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME Page 9 of 9 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
CUE:   Emergency shutdown has been pushed.
Yes No N/A Result: [ I SATISFACTORY
EDG 2 is STOPPED.
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
SAT UNSAT
Comments/Feedback:  
: 10. PERFORMANCE STEP:   Place DG 1 Sycn Selector in the DG BKR to C1 position.
/JPM No. 2 Date Evaluator's Signature DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 94B Rev. 04 Page 12 of 22 TASK NO.: 000-054-05-0100 , 040-012-04-0100 TASK DESCRIPTION:
STANDARD:   Rotate the DG 1 Sycn Selector to the DG BKR to C1 position.
Perform Operator Actions for a High Steam Genereator Level due to a SGTR K/A  
CUE:   The DG 1 Sycn Selector switch has been rotated to the DG BKR to Cl position.
SAT UNSAT
: 11. PERFORMANCE   STEP: Determine status of EDG 1.
STANDARD:   Verify that EDG 1 is running unloaded.
COMMENT:   The order of the cues is respective to the If-Then statements in the step.
CUE:   EDG 1 Running volt meter indicates 124 VAC.
EDG 1 Kilwatt meter indicates 0 KWe.
EDG 1 is running and ACII0, Bus Cl to Bus C2 Tie Brkr,   is CLOSED.
SAT   UNSAT
: 12. PERFORMANCE STEP:   Notify the Shiftf Supervisor EDG 1 is running unloaded and route to step 1.0.d.4.
STANDARD:   Contact the Shift Supervisor and route to step 1.0.d.4.
CUE:   Shift Supervisor has been notified EDG 1 is   running unloaded.
SAT   UNSAT
 
JPM No.     2                                                           Page 6 of 9
: 13. PERFORMANCE STEP:           Adjust EDG 1 voltage to 4300 VAC.
    .....         C.........
STANDARD:           Determine EDG 1 voltage and adjust EDG 1 voltage using DG 1 Voltage regulator switch.
CUE:       EDG 1 voltage is       4220 VAC.
EDG 1 Voltage Regulator switch has been rotated to RAISE.
EDG 1 voltage is       4300 VAC.
EDG 1 Voltage Regulator switch has been released to neutral.
SAT UNSAT
: 14. PERFORMANCE STEP:           Adjust EDG 1 frequency to 60 Hz.
    ........     C........
STANDARD:           Determine EDG 1 frequency and adjust EDG 1 frequency using DG 1 Spd Cntrl switch.
CUE:       EDG 1 Frequency is       60.7 Hz.
EDG 1 Speed Control switch has been rotated to LOWER.
EDG 1 Frequency is       60 Hz.
EDG 1 Speed Control switch has been released to neutral.
SAT UNSAT
: 15. PERFORMANCE STEP:             Notify the Secondary RO and the SS that EDG 1 is
    ........ C .........     protected.
STANDARD:           Using the radio or Gai-Tronics, inform the Secondary RO and the SS that EDG 1 is protected.
CUE:       The Secondary RO and SS have been notified EDG 1 is       protected.
SAT UNSAT
 
JPM No.     2                                                                     Page 7 of 9
: 16. PERFORMANCE STEP:               At D1 Bus Cubicle 2, remove AACD1 close control power
    ........         C ......... fuses AND trip     AACD1 using the manual trip   plunger at the base of the breaker.
STANDARD:             AACD1 checked open and close fuses pulled and lift         the manual trip   plunger.
CUE:         Breaker AACDI green light         lit,   control fuses pulled.
The manual trip         plunger for breater AACDl has been lifted.         (if asked) Breaker position indicator points to open.
SAT   UNSAT
: 17. PERFORMANCE STEP:               Remove control power from B bus source breakers.
    ..       ... C.........
STANDARD:             Knife switch in   Cubicle 14 placed in       mid position.
CUE:         Knife switch has been placed in             the MID position.
SAT   UNSAT
: 18. PERFORMANCE               STEP: Verify OPEN B bus supply breakers.
STANDARD:             Check OPEN the following B bus supply breakers:           HX01B, HX02B, and HXlIB.
COMMENT:               Provide CUE for appropriate breaker as each is         checked.
Examinee may elect to trip       via manual plunger.
CUE:         Breaker HX01B has the Green light             LIT; Red light OFF.
The manual trip       plunger for breater HX01B has been lifted.
(if     asked) Breaker position indicator points to open.
Breaker HX11B has the Green light             LIT; Red light OFF.
The manual trip       plunger for breater HXlIB has been lifted.
(if     asked) Breaker position indicator points to open.
Breaker HX02B has the Green light             LIT; Red light OFF.
The manual trip       plunger for breater HX02B has been lifted.
(if     asked) Breaker position indicator points to open.
SAT   UNSAT
 
JPM No. 2                                                         Page 8 of 9
: 19. PERFORMANCE     STEP: Remove control power from B bus load breakers.
    ..     .....Co........
STANDARD:       Knife switch in B Bus Cubicle 1 placed in mid position.
CUE:     Knife switch has been placed in   the MID position.
SAT   UNSAT TERMINATING     CUES:   This JPM is complete.
END TIME
 
JPM No. 2                                                      Page 9 of 9 VERIFICATION OF COMPLETION Operator                                   Evaluator SSN                                         Date License:       [ ] RO     [ ] SRO Validated   Completion Time:             minutes Actual   Completion Time:               minutes Acceptable Progress Maintained:                 Yes       No       N/A Result:     [ I SATISFACTORY     [ I UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
                                                                  /
Evaluator's Signature           Date
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   94B                           Rev. 04                     Page 12 of 22 TASK NO.:   000-054-05-0100         , 040-012-04-0100 TASK DESCRIPTION:       Perform Operator Actions for a High Steam Genereator Level due to a SGTR K/A  


==REFERENCE:==
==REFERENCE:==
 
040-013-01-0100,     Block an SFRCS Signal 000-054-05-0100,     Perform required operator actions for a SGTR APPLICABLE METHOD OF TESTING:         Actual performance Simulator TIME FOR COMPLETION:       17 minutes APPLICABILITY:     [X] RO       [X] SRO TASK STANDARDS:
040-013-01-0100, Block an SFRCS Signal 000-054-05-0100, Perform required operator actions for a SGTR APPLICABLE METHOD OF TESTING: Actual performance Simulator TIME FOR COMPLETION:
: 3. Isolate Steam Generator 1.
17 minutes APPLICABILITY:
: 4. Bypass SFRCS Hi Level Trip on Steam Generator 1 per Attachment 6.
[X] RO [X] SRO TASK STANDARDS:
REQUIRED MATERIALS:
: 3. Isolate Steam Generator
DB-OP-02000,   RPS,   SFAS,   SFRCS Trip or SG Tube Rupture,   Revision 5, C-1 GENERAL  
: 1. 4. Bypass SFRCS Hi Level Trip on Steam Generator 1 per Attachment
: 6. REQUIRED MATERIALS:
DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-1 GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-1 INITIAL CONDITIONS:
DB-OP-02000,   RPS,   SFAS,   SFRCS Trip or SG Tube Rupture,   Revision 5, C-1 INITIAL CONDITIONS:
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator
The plant is in Mode 3,       post trip,   following a Steam Generator Tube Rupture on Steam Generator 1.
: 1. INITIATING CUES: This Shift Supervisor directs you perform step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
INITIATING CUES:
This Shift Supervisor directs you perform step 8.14.6 of DB-OP-02000,         RPS, SFAS, SFRCS Trip or SG Tube Rupture.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator
The plant is in Mode 3,       post trip,   following a Steam Generator Tube Rupture on Steam Generator 1.
: 1. INITIATING CUES: This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
INITIATING CUES:
JPM No. 94B Page 13 of 21 INITIAL CONDITIONS:
This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000,         RPS, SFAS, SFRCS Trip or SG Tube Rupture.
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator
 
: 1. INITIATING CUES: This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
JPM No. 94B                                                   Page 13 of 21 INITIAL CONDITIONS:
Page 14 of 21 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.
START TIME: 1. PERFORMANCE STEP: Identifies the correct procedure step. STANDARD:
INITIATING CUES:
Locate Step 8.14.6 of DB-OP-02000, as the correct step. CUE: None. SAT UNSAT 2. PERFORMANCE STEP: .. .... C.........
This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
STANDARD: Continue cooldown of the RCS on the good Steam Generator by blocking and opening ICS 11A.Place PIC ICS11A in HAND, decrease the demand to zero on PIC ICS1IA, depress the BLOCK pushbutton on HIS ICS11C and depress the AUTO pushbutton on HIS ICSIIA.CUE: Another RO will continue the cooldown on the good Steam Generator.
 
SAT UNSAT 3. PERFORMANCE STEP: Verify MSIV 1, MS 101, is closed. STANDARD:
JPM No. 94B                                                                  Page 14 of 21 PERFORMANCE INFORMATION NOTE:     Critical         steps denoted with a "C". Failure to meet any one of these standards for this           item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
Verify the green light is lit on HIS 101. CUE: None. SAT UNSAT 4. PERFORMANCE STEP: Verify AVV 1, ICSllB, is closed. STANDARD:
START TIME:
Verify PIC ICS11B in HAND and decrease the demand to zero on PIC ICSlIB, and the GREEN light is lit on pushbutton HIS ICSlIB. CUE: None. SAT UNSAT JPM No. 94B Page 15 of 21 5. PERFORMANCE STEP: Verify MS Line 1 to AFPT 1 Isolation valve, MS 106, is ........ C .........
: 1. PERFORMANCE STEP:             Identifies the correct procedure     step.
closed. STANDARD:
STANDARD:           Locate Step 8.14.6 of DB-OP-02000,       as the correct step.
Depress the BLOCK pushbutton on HIS 106AB and depress the CLOSE on pushbutton on HIS 106A. CUE: None. SAT UNSAT 6. PERFORMANCE STEP: Verify MS Line 1 to AFPT 2 Isolation valve, MS 107A, ........ C .........
CUE:     None.
is closed.STANDARD: Depress the BLOCK pushbutton on HIS 107EB and depress the CLOSE on pushbutton on HIS 107E.CUE: None.SAT UNSAT 7. PERFORMANCE STEP: Verify AFW to SG 1 Stop valve, MS 608, is closed. .... .. C........STANDARD: Depress the ON pushbutton on HIS 608E, depress the CLOSE on pushbutton on HIS 608A and depress OFF pushbutton on HIS 608E.COMMENT: Depressing OFF on HIS 608E is NOT critical.
SAT UNSAT
CUE: None.SAT UNSAT 8. PERFORMANCE STEP: Verify SG 1 Main FW Stop valve, FW 612, is closed.STANDARD: Depress the BLOCK pushbutton on HIS 612A and depress the CLOSE on pushbutton on HIS 612.CUE: None.SAT UNSAT 9. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 1 Stop valve, AF 3870, is closed. STANDARD:
: 2. PERFORMANCE             STEP: Continue cooldown of the RCS on the good Steam
Depress the BLOCK pushbutton on HIS 3870B and depress the CLOSE on pushbutton on HIS 3870. CUE: None. SAT UNSAT JPM No. 94B Page 16 of 21 10. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 2 Stop valve, AF 3869, is closed. STANDARD:
    ..  .... C.........       Generator by blocking and opening ICS 11A.
Depress the BLOCK pushbutton on HIS 3869B and depress the OPEN on pushbutton on HIS 3869. CUE: None. SAT UNSAT 11. PERFORMANCE STEP: Route to Attachment 6, Overriding a SFRCS High Level .... C............
STANDARD:          Place PIC ICS11A in HAND, decrease the demand to zero on PIC ICS1IA, depress the BLOCK pushbutton on HIS ICS11C and depress the AUTO pushbutton on HIS ICSIIA.
Trip. STANDARD:
CUE:     Another RO will continue the cooldown on the good Steam Generator.
Identifies DB-OP-02000, Attachment 6, Section A, as the correct procedure section.
SAT UNSAT
CUE: None. SAT UNSAT 12. PERFORMANCE STEP: Obtain the bypass keys and door keys for all four SFRCS channels.
: 3. PERFORMANCE             STEP: Verify MSIV 1, MS 101,   is closed.
STANDARD:
STANDARD:           Verify the green light     is lit on HIS 101.
Keys obtained from Shift Supervisor.
CUE:     None.
COMMENT: If being performed on the simulator, allow the examinee to obtain the keys. CUE: None. SAT UNSAT 13. PERFORMANCE STEP: Open SFRCS Channel 1/3 door. STANDARD:
SAT UNSAT
Open door. COMMENT: If being performed on the simulator, allow the examinee to open the doors. CUE: None. SAT UNSAT 14. PERFORMANCE STEP: Bypass Logic Channel 1. ..... .C .........
: 4. PERFORMANCE             STEP: Verify AVV 1, ICSllB, is   closed.
STANDARD:
STANDARD:           Verify PIC ICS11B in HAND and decrease the demand to zero on PIC ICSlIB, and the GREEN light is lit       on pushbutton HIS ICSlIB.
Place key in KS-I and turn to BYPASS. CUE: None. SAT UNSAT JPM No. 94B Page 17 of 21 15. PERFORMANCE STEP: Bypass Logic Channel 1 (cont.).
CUE:     None.
........C ........
SAT UNSAT
STANDARD:
 
Put SB switch 071 (SP9B8) to BYP. CUE: None. SAT UNSAT 16. PERFORMANCE STEP: Bypass Logic Channel 3. ........C........
JPM No.     94B                                                                   Page 15 of 21
STANDARD:
: 5. PERFORMANCE STEP:                 Verify MS Line 1 to AFPT 1 Isolation valve,         MS 106, is
Place key in KS-3 and turn to BYPASS. CUE: None. SAT UNSAT 17. PERFORMANCE STEP: Bypass Logic Channel 3 (cont.).
    ........         C ......... closed.
........C........
STANDARD:               Depress the BLOCK pushbutton on HIS 106AB and depress the CLOSE on pushbutton on HIS 106A.
STANDARD:
CUE:       None.
Put SB switch 073 (SP9B9) to BYP. CUE: None. SAT UNSAT 18. PERFORMANCE STEP: Close and lock SFRCS Channel 1/3. STANDARD:
SAT   UNSAT
Door closed and locked. CUE: None. SAT UNSAT 19. PERFORMANCE STEP: Open SFRCS Channel 2/4 door. STANDARD:
: 6. PERFORMANCE STEP:                 Verify MS Line 1 to AFPT 2 Isolation valve,         MS 107A,
Open door. COMMENT: If being performed on the simulator, allow the examinee to open the doors. CUE: None. SAT UNSAT 20. PERFORMANCE STEP: Bypass Logic Channel 2. ........C........
    ........         C ......... is closed.
STANDARD:
STANDARD:               Depress the BLOCK pushbutton on HIS 107EB and depress the CLOSE on pushbutton on HIS 107E.
Place key in KS-2 and turn to BYPASS. CUE: None. SAT UNSAT JPM No. 94B Page 18 of 21 21. PERFORMANCE STEP: Bypass Logic Channel 2 (cont.).
CUE:       None.
....o Co...... .. STANDARD:
SAT   UNSAT
Put SB switch 072 (SP9B6) to BYP. CUE: None. SAT UNSAT 22. PERFORMANCE STEP: Bypass Logic Channel 4. .C ........
: 7. PERFORMANCE                 STEP: Verify AFW to SG 1 Stop valve,       MS 608, is   closed.
STANDARD:
              .. .... C........
Place key in KS-4 and turn to BYPASS. CUE: None. SAT UNSAT 23. PERFORMANCE STEP: Bypass Logic Channel 4 (cont.).
STANDARD:               Depress the ON pushbutton on HIS 608E, depress the CLOSE on pushbutton on HIS 608A and depress OFF pushbutton on HIS 608E.
.. ....C........
COMMENT:                 Depressing OFF on HIS 608E is   NOT critical.
STANDARD:
CUE:       None.
Put SB switch 074 (SP9B7) to BYP. CUE: None. SAT UNSAT 24. PERFORMANCE STEP: Close and lock SFRCS Channel 2/4 door. STANDARD:
SAT   UNSAT
Door closed and locked. CUE: None. SAT UNSAT 25. PERFORMANCE STEP: Return keys to Shift Supervisor.
: 8. PERFORMANCE STEP:                 Verify SG 1 Main FW Stop valve,       FW 612,   is closed.
STANDARD:
STANDARD:               Depress the BLOCK pushbutton on HIS 612A and depress the CLOSE on pushbutton on HIS 612.
Keys returned to Shift Supervisor.
CUE:       None.
CUE: None. SAT UNSAT 26. PERFORMANCE STEP: Route to DB-OP-06910, Trip Recovery, Step 4.3.10. STANDARD:
SAT   UNSAT
Identifies DB-OP-06910, Step 4.3.10 as the correct procedural step. COMMENT: If asked, Condenser vacuum is available.
: 9. PERFORMANCE                 STEP: Verify AFP 1 Discharge to SG 1 Stop valve,         AF 3870, is closed.
CUE: None. SAT UNSAT JPM No. 94B Page 19 of 21 27. PERFORMANCE STEP: Verify Main Steam Non-Return valve, MS 209, is open. STANDARD:
STANDARD:               Depress the BLOCK pushbutton on HIS 3870B and depress the CLOSE on pushbutton on HIS 3870.
Depress OPEN on HIS 209. CUE: None. SAT UNSAT 28. PERFORMANCE STEP: Verify MSIV 2 Bypass valve, MS 100A, is open. .... .C........
CUE:       None.
STANDARD:
SAT   UNSAT
Depress OPEN on HIS 100-1. CUE: Differential Pressure across the MSIV, MS 100, is less than 250 psi. SAT UNSAT 29. PERFORMANCE STEP: Verify AVV 1, ICSIIB, is in hand. STANDARD:
 
Verify PIC ICS11B in HAND. CUE: None. SAT UNSAT 30. PERFORMANCE STEP: Verify AVV 2, ICSllA, is in hand. STANDARD:
JPM No. 94B                                                         Page 16 of 21
Verify PIC ICS11A in HAND. CUE: None. SAT UNSAT 31.PERFORMANCE STEP: Verify TBVs for Steam Line 1, ICSl2B, is in hand and closed. STANDARD:
: 10. PERFORMANCE     STEP:   Verify AFP 1 Discharge to SG 2 Stop valve,   AF 3869, is closed.
Depress HAND on PIC ICS12B and REDUCE demand to ZERO. CUE: None.SAT UNSAT 32. PERFORMANCE STEP: Verify TBVs for Steam Line 2, ICSl2A, is in hand and closed. STANDARD:
STANDARD:     Depress the BLOCK pushbutton on HIS 3869B and depress the OPEN on pushbutton on HIS 3869.
Depress HAND on PIC ICS12B and REDUCE demand to ZERO. CUE: None.SAT UNSAT JPM No. 94B Page 20 of 21 33. PERFORMANCE STEP: Depress closed on MSIV 2, MS 100. STANDARD:
CUE:     None.
Depress CLOSE on HIS 100. CUE: None. SAT UNSAT 34. PERFORMANCE STEP: Reset SFRCS solenoids for MSIV 2, MS100. .... .C...........
SAT   UNSAT
STANDARD:
: 11. PERFORMANCE STEP:       Route to Attachment 6, Overriding a SFRCS High Level
Depress REST on HS 100. CUE: None. SAT UNSAT 35. PERFORMANCE STEP: Verify MSIV 2, MS 100, is open. .. ..C &deg;.........
    ....       C............ Trip.
STANDARD:
STANDARD:     Identifies DB-OP-02000, Attachment 6,     Section A, as the correct procedure section.
Depress OPEN on HIS 100. CUE: (If asked) Differential Pressure across the MSIV, MS 100, is less than 250 psi. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 94B Page 21 of 21 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
CUE:   None.
Yes No N/A Result: [ ] SATISFACTORY
SAT   UNSAT
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
: 12. PERFORMANCE STEP:       Obtain the bypass keys and door keys for all   four SFRCS channels.
Comments/Feedback:  
STANDARD:     Keys obtained from Shift Supervisor.
/JPM No. 94 Date Evaluator's Signature}}
COMMENT:       If being performed on the simulator,     allow the examinee to obtain the keys.
CUE:   None.
SAT   UNSAT
: 13. PERFORMANCE     STEP:   Open SFRCS Channel 1/3 door.
STANDARD:     Open door.
COMMENT:       If being performed on the simulator,     allow the examinee to open the doors.
CUE:   None.
SAT   UNSAT
: 14. PERFORMANCE     STEP:   Bypass Logic Channel 1.
    .....   .C .........
STANDARD:     Place key in   KS-I and turn to BYPASS.
CUE:   None.
SAT   UNSAT
 
JPM No.     94B                                                           Page 17 of 21
: 15. PERFORMANCE STEP:             Bypass Logic Channel 1   (cont.).
    ........ C ........
STANDARD:           Put SB switch 071   (SP9B8) to BYP.
CUE:       None.
SAT UNSAT
: 16. PERFORMANCE STEP:             Bypass Logic Channel 3.
    ........ C........
STANDARD:           Place key in KS-3 and turn to BYPASS.
CUE:       None.
SAT UNSAT
: 17. PERFORMANCE STEP:             Bypass Logic Channel 3   (cont.).
    ........ C........
STANDARD:           Put SB switch 073   (SP9B9) to BYP.
CUE:       None.
SAT UNSAT
: 18. PERFORMANCE STEP:             Close and lock SFRCS Channel 1/3.
STANDARD:           Door closed and locked.
CUE:       None.
SAT UNSAT
: 19. PERFORMANCE             STEP: Open SFRCS Channel 2/4 door.
STANDARD:           Open door.
COMMENT:             If being performed on the simulator,     allow the examinee to open the doors.
CUE:       None.
SAT UNSAT
: 20. PERFORMANCE STEP:             Bypass Logic Channel 2.
    ........ C........
STANDARD:           Place key in KS-2 and turn to BYPASS.
CUE:       None.
SAT UNSAT
 
JPM No. 94B                                                               Page 18 of 21
: 21. PERFORMANCE STEP:               Bypass Logic Channel 2   (cont.).
    . . .     .o Co......     ..
STANDARD:           Put SB switch 072     (SP9B6) to BYP.
CUE:     None.
SAT   UNSAT
: 22. PERFORMANCE STEP:               Bypass Logic Channel 4.
                .C ........
STANDARD:           Place key in   KS-4 and turn to BYPASS.
CUE:     None.
SAT UNSAT
: 23. PERFORMANCE STEP:             Bypass Logic Channel 4   (cont.).
      .. . ... C........
STANDARD:           Put SB switch 074     (SP9B7) to BYP.
CUE:     None.
SAT UNSAT
: 24. PERFORMANCE STEP:             Close and lock SFRCS Channel 2/4 door.
STANDARD:           Door closed and locked.
CUE:     None.
SAT UNSAT
: 25. PERFORMANCE             STEP: Return keys to Shift Supervisor.
STANDARD:           Keys returned to Shift Supervisor.
CUE:     None.
SAT UNSAT
: 26. PERFORMANCE             STEP: Route to DB-OP-06910,   Trip Recovery, Step 4.3.10.
STANDARD:           Identifies DB-OP-06910,     Step 4.3.10 as the correct procedural step.
COMMENT:             If   asked, Condenser vacuum is available.
CUE:     None.
SAT UNSAT
 
JPM No. 94B                                                               Page 19 of 21
: 27. PERFORMANCE STEP:         Verify Main Steam Non-Return valve,     MS 209,     is open.
STANDARD:         Depress OPEN on HIS 209.
CUE:     None.
SAT   UNSAT
: 28. PERFORMANCE STEP:         Verify MSIV 2 Bypass valve,   MS 100A,   is   open.
    .   ... .C........
STANDARD:         Depress OPEN on HIS 100-1.
CUE:     Differential     Pressure across the MSIV,   MS 100, is   less than 250 psi.
SAT   UNSAT
: 29. PERFORMANCE STEP:         Verify AVV 1, ICSIIB, is in hand.
STANDARD:         Verify PIC ICS11B in   HAND.
CUE:     None.
SAT   UNSAT
: 30. PERFORMANCE         STEP: Verify AVV 2, ICSllA, is in hand.
STANDARD:         Verify PIC ICS11A in   HAND.
CUE:     None.
SAT   UNSAT
: 31. PERFORMANCE         STEP: Verify TBVs for Steam Line 1, ICSl2B,       is   in hand and closed.
STANDARD:         Depress HAND on PIC ICS12B and REDUCE demand to ZERO.
CUE:     None.
SAT   UNSAT
: 32. PERFORMANCE         STEP: Verify TBVs for Steam Line 2,   ICSl2A,     is   in hand and closed.
STANDARD:         Depress HAND on PIC ICS12B and REDUCE demand to ZERO.
CUE:     None.
SAT   UNSAT
 
JPM No. 94B                                                           Page 20 of 21
: 33. PERFORMANCE STEP:         Depress closed on MSIV 2, MS 100.
STANDARD:     Depress CLOSE on HIS 100.
CUE:   None.
SAT   UNSAT
: 34. PERFORMANCE STEP:         Reset SFRCS solenoids for MSIV 2, MS100.
    ....   .C...........
STANDARD:     Depress REST on HS 100.
CUE:   None.
SAT UNSAT
: 35. PERFORMANCE STEP:         Verify MSIV 2, MS 100, is open.
    ..   . . C   &deg;.........
STANDARD:     Depress OPEN on HIS 100.
CUE:     (If asked) Differential     Pressure across the MSIV, MS 100,   is less than 250 psi.
SAT UNSAT TERMINATING CUES:         This JPM is complete.
END TIME
 
JPM No. 94                                                      Page 21 of 21 VERIFICATION OF COMPLETION Operator                                     Evaluator SSN                                         Date License:       [ ] RO     [ ] SRO Validated     Completion Time:             minutes Actual   Completion Time:                 minutes Acceptable Progress Maintained:                   Yes         No       N/A Result:       [ ] SATISFACTORY     [ I UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
                                                                  /
Evaluator's Signature           Date}}

Revision as of 05:59, 24 November 2019

Initial Exam (10/2000) Initial Submittal of the Walkthrough Jpms Week of October 2, 2000
ML010510268
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/02/2000
From:
NRC/RGN-III
To:
References
-RFPFR
Download: ML010510268 (50)


Text

INITIAL SUBMITTAL OF THE WALKTHROUGH JPMS FOR THE DAVIS-BESSE EXAMINATION THE WEEK OF OCTOBER 2, 2000

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Davis Besse Nuclear Power Station Date of Examination: 10/2/2000 Exam Level (circle one): RO / SRO(I)/I *-J Operating Test No.:

B.1 Control Room Systems System / JPM Title Type Safety Code* Function

a. Establish Long Term Boron Dilution using LPI Train 2. N, S, A, L 2-ESF
b. Perform Operator Actions for a High Steam Generator M, S, L 7 Level due to a SGTR.

C.

d.

e.

f.

g.

B.2 Facility Walk-Through

a. Serious Control Fire, Assistant Shift Supervisor Actions M, L 6 (EDG and High Voltage Switchgear Room)
b. Locally Operate the AFW Turbine. M, A Secondary (PSA related) 4
c. Borate the RCS from Outside the Control Room D,R 1
  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA

DAVIS-BESSE NUJCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 1A Rev. 00 Page 1 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION: Local Operation of the AFW Pump Turbine 1 (Use when Train 2 is protected.)

K/A

REFERENCE:

061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061:A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION: 20 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:

AFW Train 1 manual speed control at the AFPT governor.

REQUIRED MATERIALS:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL

REFERENCES:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:

A loss of DIP from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.

(Hand examinee the procedure.)

JPM No. 1A Page 2 of 13 INITIAL CONDITIONS:

A loss of DIP from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.

JPM No. 1A Page 3 of 13 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct procedure.

STANDARD: Identifies Section 5.1 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.

CUE: (if asked) ALL prerequisites have been performed.

SAT UNSAT

2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.

STANDARD: Applies a downward force to the governor valve linkage labeled L1.

CUE: Governor valve moves inward slightly and is NOT STUCK.

SAT UNSAT

3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.

STANDARD: Contacts the Control Room to attempt speed control of AFPT 1.

CUE: Control Room operator informs you he has no speed control of AFPT 1.

(if necessary) Shift Supervisor directs you to continue with the procedure.

SAT UNSAT

4. PERFORMANCE STEP: In AFPT 1 Room, establish communications with the Reactor Operator.

STANDARD: Establish communications with Reactor Operator via Gai-Tronics or radio.

CUE: You have established communications with a Reactor Operator. The Reactor Operator directs you to reduce AFPT 1 speed.

SAT UNSAT

JPM No. 1A Page 4 of 13

5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the face of the governor.

STANDARD: Locates electrical connector and unscrews it.

COMMENT: This step must be performed prior to Step 6.

CUE: The electrical connector is DISCONNECTED.

SAT UNSAT

6. PERFORMANCE STEP: Turn the manual speed setting control knob as

........ C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.

STANDARD: Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).

COMMENT: AFPT 1 speed will not change regardless of the examinee's actions.

CUE: AFPT 1 speed remains constant.

(if asked) AFPT speed is 3600 rpm.

SAT UNSAT

7. PERFORMANCE STEP: Identify AFPT 1 speed control, using the governor

........ C ......... valve, has failed and route to Section 5.3.

STANDARD: Locate the correct procedure section. Identifies Section 5.3 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.

CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 1 speed.

SAT UNSAT

8. PERFORMANCE STEP: Establish communication with Control Room.

STANDARD: Utilize the Gai-Tronics or radio to communicate with the Control Room.

CUE: (If asked) You have established communications with the Control Room.

SAT UNSAT

JPM No. 1A Page 5 of 13

9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38C.

... .... C........

STANDARD: The trip throttle valve seal disconnected.

CUE: The trip throttle valve seal is DISCONNECTED.

SAT UNSAT

10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38C.

........ C ........

STANDARD: Valve handwheel rotated clockwise to CLOSE.

CUE Valve handwheel is rotated FULLY clockwise (to CLOSE).

SAT UNSAT

11. PERFORMANCE STEP: Obtain red governor tool and other required tools.

... ... C........

STANDARD: Obtain necessary tools at entrance to AFP room.

COMMENT: Tools may have already been obtained. This step can be performed out of sequence.

CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.

SAT UNSAT

12. PERFORMANCE STEP: Disconnect the linkage between the governor and the

........ C ........ governor valve, where the spring meets linkage.

STANDARD: Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.

CUE: The linkage is DISCONNECTED.

SAT UNSAT

13. PERFORMANCE STEP: Block the governor valve, ICS 38B, "full open".

.... .C.........

STANDARD: Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.

CUE: Ll has been pulled up.

The block is in place above the governor rod in the Red area.

SAT UNSAT

JPM No. 1A Page 6 of 13

14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38C.

. ..... C........

STANDARD: Trip throttle valve, ICS 38C, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.

CUE: The trip throttle valve, ICS 38C, handwheel is rotated slowly counterclockwise.

AFPT 1 speed has INCREASED TO 2800 rpm.

SAT UNSAT

15. PERFORMANCE STEP: Control the AFPT 1 speed to maintain the required AFW flow.

STANDARD: Ask Control Room for feedback.

CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: lB Rev. 00 Page 7 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION: Local Operation of the AFW Pump Turbine 2 (Use when Train 1 is protected.)

K/A

REFERENCE:

061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION: 20 minutes APPLICABILITY: [X] RO [XI SRO TASK STANDARDS:

AFW Train 2 manual speed control at the AFPT governor.

REQUIRED MATERIALS:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL

REFERENCES:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:

A loss of D2P from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.

(Hand examinee the procedure.)

JPM No. 1B Page 8 of 13 INITIAL CONDITIONS:

A loss of D2P from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.

JPM No. 1B Page 9 of 13 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct procedure.

STANDARD: Identifies Section 5.2 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.

CUE: (if asked) ALL prerequisites have been performed.

SAT UNSAT

2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.

STANDARD: Applies a downward force to the governor valve linkage labeled L1.

CUE: Governor valve moves inward slightly and is NOT STUCK.

SAT UNSAT

3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.

STANDARD: Contacts the Control Room to attempt speed control of AFPT 2.

CUE: Control Room Operator informs you he has no speed control of AFPT 2.

(if necessary) Shift Supervisor directs you to continue with the procedure.

SAT UNSAT

4. PERFORMANCE STEP: In AFPT 2 Room, establish communications with the Reactor Operator.

STANDARD: Establish communications with Reactor Operator via Gai-Tronics or radio.

CUE: You have established communications with a Reactor Operator. The Reactor Operator directs you to reduce AFPT 2 speed.

SAT UNSAT

JPM No. 1B Page 10 of 13

5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the face of the governor.

STANDARD: Locates electrical connector and unscrews it.

COMMENT: This step must be performed prior to Step 6.

CUE: The electrical connector is DISCONNECTED.

SAT UNSAT

6. PERFORMANCE STEP: Turn the manual speed setting control knob as

........ C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.

STANDARD: Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).

COMMENT: AFPT 2 speed will not change regardless of the examinee's actions.

CUE: AFPT 2 speed remains constant.

(if asked) AFPT speed is 3600 rpm.

SAT UNSAT

7. PERFORMANCE STEP: Identify AFPT 2 speed control, using the governor

........ C ......... valve, has failed and route to Section 5.4.

STANDARD: Locate the correct procedure section Identifies Section 5.4 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.

CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 2 speed.

SAT UNSAT

8. PERFORMANCE STEP: Establish communication with Control Room.

STANDARD: Utilize the Gai-Tronics or radio to communicate with the Control Room.

CUE: (If asked) You have established communications with the Control Room.

SAT UNSAT

JPM No. 1B Page 11 of 13

9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38D.

... ... C.........

STANDARD: The trip throttle valve seal disconnected.

CUE: The trip throttle valve seal is DISCONNECTED.

SAT UNSAT

10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38D.

... .... C.. .... 1.

STANDARD: Valve handwheel rotated clockwise to CLOSE.

CUE Valve handwheel is rotated FULLY clockwise (to CLOSE).

SAT UNSAT

11. PERFORMANCE STEP: Obtain red governor tool and other required tools.

..... .. C.........

STANDARD: Obtain necessary tools at entrance to AFP room.

COMMENT: Tools may have already been obtained. This step can be performed out of sequence.

CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.

SAT UNSAT

12. PERFORMANCE STEP: Disconnect the linkage between the governor and the

........ C ........ governor valve, where the spring meets linkage.

STANDARD: Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.

CUE: The linkage is DISCONNECTED.

SAT UNSAT

13. PERFORMANCE STEP: Block the governor valve, ICS 38A, "full open".

..... C .........

STANDARD: Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.

CUE: L1 has been pulled up.

The block is in place above the governor rod in the Red area.

SAT UNSAT

JPM No. 1B Page 12 of 13

14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38D.

...... .C.........

STANDARD: Trip throttle valve, ICS 38D, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.

CUE: The trip throttle valve, ICS 38D, handwheel is rotated slowly counterclockwise.

AFPT 2 speed has INCREASED TO 2800 rpm.

SAT UNSAT

15. PERFORMANCE STEP: Control the AFPT 2 speed to maintain the required AFW flow.

STANDARD: Ask Control Room for feedback.

CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. I Page 13 of 13 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: ] RO E ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

/

Evaluator's Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 57 Rev. 06 Page 1 of 6 TASK NO.: 002-008-04-0100 TASK DESCRIPTION: Borate the RCS from Outside the Control Room K/A

REFERENCE:

004-A2.14 3.8/3.9 APPLICABLE METHOD OF TESTING: Simulate performance In-Plant TIME FOR COMPLETION: 20 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:

1. Lineup for boric acid addition using local valves.
2. Start BA Pump 1.

REOUIRED MATERIALS:

DB-OP-06001, Boron Concentration Control, Revision 2, C-1 GENERAL

REFERENCES:

DB-OP-06001, Boron Concentration Control, Revision 2, C-1 INITIAL CONDITIONS:

The plant is in Mode 1 at 100% power.

A load reduction to 50% power is planned.

INITIATING CUES:

The normal boric acid addition method cannot be used.

You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.

(Hand copy of DB-OP-06001 to examinee.)

JPM No. 57 Page 2 of 6 INITIAL CONDITIONS:

The plant is in Mode 1 at 100% power.

A load reduction to 50% power is planned.

INITIATING CUES:

The normal boric acid addition method cannot be used.

You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.

JPM No. 57 Page 3 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct procedure section.

STANDARD: Identifies DB-OP-06001, Boron Concentration Control, Section 5.1, as the correct procedure section.

COMMENT: Provide correct procedure to examinee. When the correct procedure section has been located, provide the CUE.

CUE: All prerequisites have been completed.

SAT UNSAT

2. PERFORMANCE STEP: Verify valve MU 348, Boric Acid Pump 1 Discharge, is open.

STANDARD: Handwheel/stem position indicate OPEN.

CUE: MU 348, valve stem is UP.

SAT UNSAT

3. PERFORMANCE STEP: Verify valve WC 394, from Concentrates Storage Tank to BAATs Discharge, is open.

STANDARD: Handwheel/stem position indicate OPEN.

CUE: WC 394, valve stem is UP.

SAT UNSAT

4. PERFORMANCE STEP: Verify valve WC 393, Concentrate Storage Tank to MU Filters Line 2, is open.

STANDARD: Handwheel/stem position indicate OPEN.

CUE: WC 393, valve stem is UP.

SAT UNSAT

JPM No. 57 Page 4 of 6

5. PERFORMANCE STEP: Verify MU 351, Boric Acid Pump 2 to Makeup Filters open.

STANDARD: MU 351 stem position indicates OPEN.

CUE: MU 351 valve stem is UP.

SAT UNSAT

6. PERFORMANCE STEP: Close MU 363, BAAT 1 to Makeup Filters.

STANDARD: Handwheel to the CLOSE position.

COMMENT: MU 363 located between BAATs in CA.

CUE: MU 363 has been rotated clockwise/CLOSED; valve stem is DOWN.

SAT UNSAT

7. PERFORMANCE STEP: Open MU 366, BAAT 2 to Makeup Filters.

... ....C.......

STANDARD: MU 366 handwheel turned (CCW) until FULLY OPEN.

CUE: MU 366 handwheel has been rotated counterclockwise/OPENED; valve stem is UP.

SAT UNSAT

8. PERFORMANCE STEP: Start Boric Acid Pump 1.

... .. C.........

STANDARD: BA Pump 1 started from Control Room.

CUE: Control Room Operator has started BA Pump 1.

SAT UNSAT

9. PERFORMANCE STEP: Stop Boric Acid Pump 1.

STANDARD: BA Pump 1 is stopped from the Control Room.

CUE: Control Room Operator reports that 50 gallons have been added to the MUT and BA Pump 1 has been stopped.

SAT UNSAT

JPM No. 57 Page 5 of 6

10. PERFORMANCE STEP: Close MU 366, BAAT 2 to Makeup Filters.

STANDARD: Restore L/U, MU 366 handwheel turned (CW) until FULLY CLOSED.

CUE: MU 366 handwheel has been rotated clockwise/CLOSED; Valve stem is DOWN.

SAT UNSAT

11. PERFORMANCE STEP: Open MU 363, BAAT 1 to Makeup Filters.

STANDARD: Restore L/U, MU 363 handwheel turned (CCW) until FULLY OPEN.

CUE: MU 363 handwheel has been rotated counterclockwise/OPENED: valve stem is UP.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 57 Page 6 of 6 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ ] UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

Evaluator's Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 4C Rev. 00 Page 19 of 28 TASK NO.: 000-058-05-0100 TASK DESCRIPTION: Establishing Long Term Boron Dilution Using LPI Train 2 K/A

REFERENCE:

006-K6.03 3.6/3.9, 006-A1.11 3.1/3.4 006-A2.05 3.4/3.5 APPLICABLE METHOD OF TESTING: Actual performance Simulator Alternate Path TIME FOR COMPLETION: 10 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:

1. Align HPI Train 1 to supplement core cooling with LPI Train 1.
2. Align LPI Train 2 to take a suction off of the DH Drop line and discharge to the RCS.
3. Establish long term boron dilution with LPI Train 2.
4. Align LPI Train 1 to inject through both LPI injection lines.

REQUIRED MATERIALS:

DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-I GENERAL

REFERENCES:

DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-1 INITIAL CONDITIONS:

A large break LOCA has occurred.

HPI Pump 2 has failed to start.

Both MU pumps and HPI Pump 1 have been stopped per procedure.

Both LPI pumps have been transferred to the Emergency Sump.

INITIATING CUES:

You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.

Step D on Page 1 of Attachment 12 has been completed.

JPM No. 4C Page 20 of 28 INITIAL CONDITIONS:

A large break LOCA has occurred.

HPI Pump 2 has failed to start.

Both MU pumps and HPI Pump 1 have been stopped per procedure.

Both LPI pumps have been transferred to the Emergency Sump.

INITIATING CUES:

You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.

Step D on Page 1 of Attachment 12 has been completed.

JPM No. 4C Page 21 of 28 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME: _

1. PERFORMANCE STEP: Locate the correct step.

STANDARD: Identifies Step E on Page 1 of Attachment 12 is the correct start point.

CUE: None.

SAT UNSAT

2. PERFORMANCE STEP: Return control power to DH 11 and DH 12.

... .... C........

STANDARD: Depress the ON pushbutton on HIS DH1IA and HIS DHl2A.

COMMENT: DH 11 and DH 12 must be open to complete the task.

CUE: None.

SAT UNSAT

3. PERFORMANCE STEP: Verify open DH 11, Normal Suction Isolation.

,, . . C .........

STANDARD: Depress the OPEN pushbutton on HIS DH11.

CUE: None.

SAT UNSAT

4. PERFORMANCE STEP: Verify open DH 12, Normal Suction Isolation.

.. .... C.........

STANDARD: Depress the OPEN pushbutton on HIS DHl2.

COMMENT: Examinee may turn off control power to DH 11 and DH 12 which not required by procedure.

CUE: None.

SAT UNSAT

JPM No. 4C Page 22 of 28

5. PERFORMANCE STEP: Route to Method 2 using LPI Train 2.

STANDARD: Route to Page 4 of Attachment 12.

CUE: None.

SAT UNSAT

6. PERFORMANCE STEP: Check that the suction of LPI and CTMT Spray has been transferred to the Emergency Sump.

STANDARD: Observe the RED lights are lit on HIS DH9B and HIS DH9A.

Observe the GREEN lights are lit on HIS DH7B and HIS DH7A.

CUE: None.

SAT UNSAT

7. PERFORMANCE STEP: Check that both LPI trains are cooling the core.

STANDARD: Observe >1000 gpm flow on FYI DH2B and FYI DH2A.

CUE: (If asked how long LPI has been in operation.) LPI has been operating for 90 minutes.

SAT UNSAT

8. PERFORMANCE STEP: Verify Incores temperatures are < 333 0 F.

STANDARD: Rotate Incore temperature selector switches HS 4627 and HS 4628 to verify the Incore Temperature indicators, TI 4627 and TI 4628 are < 333 0 F.

CUE: None.

SAT UNSAT

9. PERFORMANCE STEP: Check that SCM does not exist.

STANDARD: Observe RCS pressure on one of the various wide range indicators and determine the SCM is < 20 0 F.

CUE: None.

SAT UNSAT

10. PERFORMANCE STEP: Route to Method 2 using LPI Train 2.

STANDARD: Route to Page 8 of Attachment 12.

CUE: None.

SAT UNSAT

JPM No. 4C Page 23 of 28

11. PERFORMANCE STEP: Identify CCW Train 2 is < 95°F and direct an EO to manually CCW Outlet temperature 95 0 F to 115 0 F.

STANDARD: Contact an Equipment Operator.

COMMENT; An EO will report that SW 38 has been throttled and CCW Outlet 0

temperature is 105 F.

CUE: None.

SAT UNSAT

12. PERFORMANCE STEP: Verfiy open DH 64, DHR Cooler 1 Outlet to HPI Pump 1

........ C ......... Suction.

STANDARD: Depress the OPEN pushbutton on HIS DH64.

CUE: None.

SAT UNSAT

13. PERFORMANCE STEP: Verify closed HP 32, HPI Recirc to BWST.

STANDARD: Verify GREEN light is lit on HIS HP32.

CUE: None.

SAT UNSAT

14. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm.

STANDARD: Depress ON control power for DH lB using HIS DHIB-2. Throttle DH 1B, using HIS DHIB, until LPI Train 1 flow is about 3000 gpm on FYI DH2B.

COMMENT: Required by Specific Rule 2.

CUE: None.

SAT UNSAT

15. PERFORMANCE STEP: Start HPI Pump 1.

.. .....C.........

STANDARD: Turn the control switch HIS 1524 to START.

CUE: None.

SAT UNSAT

JPM No. 4C Page 24 of 28

16. PERFORMANCE STEP: Verify open HP 2C and HP 2D, HP Injection 1 valves.

STANDARD: Verify RED lights are lit on HIS HP2C and HIS HP2D.

CUE: None.

SAT UNSAT

17. PERFORMANCE STEP: Verify flow is indicated on HPI Train 1.

STANDARD: Verify flow is indicated on FYI HP3C and FYI HP3D.

CUE: None.

SAT UNSAT

18. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS

........ C ......... Isolation.

STANDARD: Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DH1A, until only the GREEN light is lit.

CUE: None.

SAT UNSAT

19. PERFORMANCE STEP: Verify core cooling is adequate.

STANDARD: Observe the Incore temperature indicators, TI 4627 and TI 4626, are constant.

CUE: Incore temperature indicators, TI 4627 and TI 4626, are constant and will be monitored by the Shift Manager.

SAT UNSAT

20. PERFORMANCE STEP: Stop LPI Pump 2.

.. .... C........

STANDARD: Depress the BLOCK pushbutton on HIS DH6A1 and turn the control switch HIS DH6A to STOP.

COMMENT: LPI Pump 2 must be stopped prior to repositioning DH 2734.

CUE: None.

SAT UNSAT

JPM No. 4C Page 25 of 28

21. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve.

.. . .. C.........

STANDARD: Depress the BLOCK pushbutton on HIS 2734A and depress the CLOSE pushbutton on HIS 2734.

CUE: None.

SAT UNSAT

22. PERFORMANCE STEP: Verify open DH 11 and DH 12, Normal Suction Isolation.

STANDARD: Observe the RED lights are lit on HIS DHll and HIS DHl2.

CUE: None.

SAT UNSAT

23. PERFORMANCE STEP: Verify open DH 1518, DH Pump 2 Suction from RCS.

.. ....

.C.........

STANDARD: Depress the OPEN pushbutton on HIS 1518.

CUE: None.

SAT UNSAT

24. PERFORMANCE STEP: Start LPI Pump 2.

.. . .. C.........

STANDARD: Turn the control switch HIS DH6A to START.

CUE: None.

SAT UNSAT

25. PERFORMANCE STEP: Verify no indication of cavitation on LPI Pump 2.

STANDARD: Observe constant amperes and flow on LPI Train 2.

CUE: None.

SAT UNSAT

26. PERFORMANCE STEP: Adjust LPI Train 2 flow to 300 to 500 gpm.

. °C ........

.....

STANDARD: Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DHIA, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A.

COMMENT: Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT

JPM No. 4C Page 26 of 28

27. PERFORMANCE STEP: Identify indications of cavitation on LPI Pump 2.

.. ..... C ........

STANDARD: Observe swinging amperes and flow on LPI Train 2.

CUE: None.

SAT UNSAT

28. PERFORMANCE STEP: Stop LPI Pump 2.

.. .....C.........

STANDARD: Turn the control switch HIS DH6A to STOP.

CUE: None.

SAT UNSAT

29. PERFORMANCE STEP: Verify closed DH 1518, DH Pump 2 Suction from RCS.

. . . . Co.........

STANDARD: Depress the CLOSE pushbutton on HIS 1518.

CUE: None.

SAT UNSAT

30. PERFORMANCE STEP: Route to Step 10.7.

.... .C...........

STANDARD: Route to Step 10.7.

CUE: None.

SAT UNSAT

31. PERFORMANCE STEP: Verify LPI Pump 2 is off.

STANDARD: Observe the GREEN light is LIT on control switch HIS DH6A.

CUE: None.

SAT UNSAT

32. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve.

STANDARD: Observe the GREEN light is LIT on HIS 2734.

CUE: None.

SAT UNSAT

JPM No. 4C Page 27 of 28

33. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS

.. .. Ce......... Isolation.

STANDARD: Depress ON control power for DH 1A using HIS DHlA-2. Depress and hold the CLOSE pushbutton HIS DHIA, until only the GREEN light is lit.

COMMENT: Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT

34. PERFORMANCE STEP: Verify open DH 831, Decay Heat Cooler Disch Xover 1

.... C........... to 2.

STANDARD: Depress the OPEN pushbutton on HIS 831.

CUE: None.

SAT UNSAT

35. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm on

........ Ce........ LPI Pump 1.

STANDARD: Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DH1B, until LPI Train 1 flow is about 1500 gpm on FYI DH2B.

COMMENT: HPI Pump 1 is still running and must be included in the total flow through LPI Pump 1. Required by Specific Rule 2.

Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT

36. PERFORMANCE STEP: Adjust LPI Train 2 flow to obtain about 1500 gpm.

.. .. oC .........

STANDARD: Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 1500 gpm on FYI DH2A.

COMMENT: Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 4 Page 28 of 28 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

/

Evaluator's Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 2 Rev. 00 Page 1 of 9 TASK NO.: 000-068-05-0100, 334-017-05-0300 TASK DESCRIPTION: Serious Control Room Fire, Assistant Shift Supervisor Actions, Attachment 2 K/A

REFERENCE:

062-A2.04 3.1/3.4, 064-A2.05 3.1/3.2 064-A2.11 2.6/2.9, BW/A05-AAI.01 4.3/4.2 APPLICABLE METHOD OF TESTING: Simulate performance In-plant TIME FOR COMPLETION: 25 minutes APPLICABILITY: [ ] RO [X] SRO TASK STANDARDS:

1. Cooling flow (CCW) to EDG 1 is established.
2. All required emergency control transfer switches are in LOCAL.
3. EDG 1 is protected.
4. Isolate B bus and remove bus control power.

REQUIRED MATERIALS:

DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 GENERAL

REFERENCES:

DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 INITIAL CONDITIONS:

The Control Room has been evacuated due to a serious Control Room fire.

INITIATING CUES:

You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.

You have obtained all the required serious Control Room fire equipment.

(Hand copy of DB-OP-02519 to examinee.)

JPM No. 2 Page 2 of 9 INITIAL CONDITIONS:

The Control Room has been evacuated due to a Serious Control Room Fire.

INITIATING CUES:

You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.

You have obtained all the required Serious Control Room Fire Equipment.

JPM No. 2 Page 3 of 9 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Verify the radio is NOT in silence mode.

STANDARD: Key radio to transmit.

CUE: Radio transmitter switch has been depressed and released.

SAT UNSAT

2. PERFORMANCE STEP: Establish CCW flow to EDG 1.

.. ..... C ........

STANDARD: CC 1471 is OPENED.

CUE: HV 1471 has been rotated clockwise to CLOSE.

CC 1471 IA regulator drain petcock has been rotated counterclockwise to OPEN.

Position indicator on CC 1471 indicates OPEN.

SAT UNSAT

3. PERFORMANCE STEP: Isolate the EDG 1 Engine Control Panel from the

........ C ........ Control Room fire.

STANDARD: On C3621, EDG 1 Engine Control Panel, disconnect switch, Emergency Control Transfer Switch DS-4A, in LOCAL.

CUE: Emergency Control Transfer Switch DS-4A has been placed in LOCAL.

SAT UNSAT

JPM No. 2 Page 4 of 9

4. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control

........ C ........ Room fire.

STANDARD: Place disconnect switches on C3615, DG 1 Local Control Panel, ISO SW DS-lB Appendix R in EMERGENCY, and ISO SW DS-l Appendix R for relay SAX/13, in LOCAL.

CUE: ISO SW DS-lB Appendix R switch has been placed in EMERGENCY.

ISO SW DS-l Appendix R for relay SAX/13 has been placed in LOCAL.

SAT UNSAT

5. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control

........ C ........ Room fire (cont.).

STANDARD: Open the nine TS-4 test disconnect switches on Panel C3615, DG 1 Local Control Panel.

CUE: All nine TS-4, test disconnect switches, have been placed in the OPEN position.

SAT UNSAT

6. PERFORMANCE STEP: Isolate the EDG Voltage Regulator cabinet from the

........ C ........ Control Room fire (cont.).

STANDARD: Disconnect switch ISO SW DS-3 Appendix R on Panel C3617, DG 1 Voltage Regulator Cabinet, in LOCAL.

CUE: ISO SW DS-3 Appendix R switch has been placed in LOCAL.

SAT UNSAT

7. PERFORMANCE STEP: Force the EDG into the Isochronous Mode.

.. . ... C.........

STANDARD: Isochronous droop switch placed in isochronous.

CUE: Isochronous droop switch has been placed in ISOCHRONOUS.

SAT UNSAT

8. PERFORMANCE STEP: Disable the Voltage Regulator Droop mode.

.. ... .C.........

STANDARD: Voltage Regulator droop switch in OFF.

CUE: Voltage Regulator droop switch has been placed in OFF.

SAT UNSAT

JPM No. 2 Page 5 of 9

9. PERFORMANCE STEP: Shutdown EDG 2.

STANDARD: Push emergency shutdown on EDG 2 at C3622, DG 2 Engine Control Panel.

CUE: Emergency shutdown has been pushed.

EDG 2 is STOPPED.

SAT UNSAT

10. PERFORMANCE STEP: Place DG 1 Sycn Selector in the DG BKR to C1 position.

STANDARD: Rotate the DG 1 Sycn Selector to the DG BKR to C1 position.

CUE: The DG 1 Sycn Selector switch has been rotated to the DG BKR to Cl position.

SAT UNSAT

11. PERFORMANCE STEP: Determine status of EDG 1.

STANDARD: Verify that EDG 1 is running unloaded.

COMMENT: The order of the cues is respective to the If-Then statements in the step.

CUE: EDG 1 Running volt meter indicates 124 VAC.

EDG 1 Kilwatt meter indicates 0 KWe.

EDG 1 is running and ACII0, Bus Cl to Bus C2 Tie Brkr, is CLOSED.

SAT UNSAT

12. PERFORMANCE STEP: Notify the Shiftf Supervisor EDG 1 is running unloaded and route to step 1.0.d.4.

STANDARD: Contact the Shift Supervisor and route to step 1.0.d.4.

CUE: Shift Supervisor has been notified EDG 1 is running unloaded.

SAT UNSAT

JPM No. 2 Page 6 of 9

13. PERFORMANCE STEP: Adjust EDG 1 voltage to 4300 VAC.

..... C.........

STANDARD: Determine EDG 1 voltage and adjust EDG 1 voltage using DG 1 Voltage regulator switch.

CUE: EDG 1 voltage is 4220 VAC.

EDG 1 Voltage Regulator switch has been rotated to RAISE.

EDG 1 voltage is 4300 VAC.

EDG 1 Voltage Regulator switch has been released to neutral.

SAT UNSAT

14. PERFORMANCE STEP: Adjust EDG 1 frequency to 60 Hz.

........ C........

STANDARD: Determine EDG 1 frequency and adjust EDG 1 frequency using DG 1 Spd Cntrl switch.

CUE: EDG 1 Frequency is 60.7 Hz.

EDG 1 Speed Control switch has been rotated to LOWER.

EDG 1 Frequency is 60 Hz.

EDG 1 Speed Control switch has been released to neutral.

SAT UNSAT

15. PERFORMANCE STEP: Notify the Secondary RO and the SS that EDG 1 is

........ C ......... protected.

STANDARD: Using the radio or Gai-Tronics, inform the Secondary RO and the SS that EDG 1 is protected.

CUE: The Secondary RO and SS have been notified EDG 1 is protected.

SAT UNSAT

JPM No. 2 Page 7 of 9

16. PERFORMANCE STEP: At D1 Bus Cubicle 2, remove AACD1 close control power

........ C ......... fuses AND trip AACD1 using the manual trip plunger at the base of the breaker.

STANDARD: AACD1 checked open and close fuses pulled and lift the manual trip plunger.

CUE: Breaker AACDI green light lit, control fuses pulled.

The manual trip plunger for breater AACDl has been lifted. (if asked) Breaker position indicator points to open.

SAT UNSAT

17. PERFORMANCE STEP: Remove control power from B bus source breakers.

.. ... C.........

STANDARD: Knife switch in Cubicle 14 placed in mid position.

CUE: Knife switch has been placed in the MID position.

SAT UNSAT

18. PERFORMANCE STEP: Verify OPEN B bus supply breakers.

STANDARD: Check OPEN the following B bus supply breakers: HX01B, HX02B, and HXlIB.

COMMENT: Provide CUE for appropriate breaker as each is checked.

Examinee may elect to trip via manual plunger.

CUE: Breaker HX01B has the Green light LIT; Red light OFF.

The manual trip plunger for breater HX01B has been lifted.

(if asked) Breaker position indicator points to open.

Breaker HX11B has the Green light LIT; Red light OFF.

The manual trip plunger for breater HXlIB has been lifted.

(if asked) Breaker position indicator points to open.

Breaker HX02B has the Green light LIT; Red light OFF.

The manual trip plunger for breater HX02B has been lifted.

(if asked) Breaker position indicator points to open.

SAT UNSAT

JPM No. 2 Page 8 of 9

19. PERFORMANCE STEP: Remove control power from B bus load breakers.

.. .....Co........

STANDARD: Knife switch in B Bus Cubicle 1 placed in mid position.

CUE: Knife switch has been placed in the MID position.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 2 Page 9 of 9 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

/

Evaluator's Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 94B Rev. 04 Page 12 of 22 TASK NO.: 000-054-05-0100 , 040-012-04-0100 TASK DESCRIPTION: Perform Operator Actions for a High Steam Genereator Level due to a SGTR K/A

REFERENCE:

040-013-01-0100, Block an SFRCS Signal 000-054-05-0100, Perform required operator actions for a SGTR APPLICABLE METHOD OF TESTING: Actual performance Simulator TIME FOR COMPLETION: 17 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:

3. Isolate Steam Generator 1.
4. Bypass SFRCS Hi Level Trip on Steam Generator 1 per Attachment 6.

REQUIRED MATERIALS:

DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-1 GENERAL

REFERENCES:

DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-1 INITIAL CONDITIONS:

The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.

INITIATING CUES:

This Shift Supervisor directs you perform step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.

INITIAL CONDITIONS:

The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.

INITIATING CUES:

This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.

JPM No. 94B Page 13 of 21 INITIAL CONDITIONS:

The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.

INITIATING CUES:

This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.

JPM No. 94B Page 14 of 21 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Identifies the correct procedure step.

STANDARD: Locate Step 8.14.6 of DB-OP-02000, as the correct step.

CUE: None.

SAT UNSAT

2. PERFORMANCE STEP: Continue cooldown of the RCS on the good Steam

.. .... C......... Generator by blocking and opening ICS 11A.

STANDARD: Place PIC ICS11A in HAND, decrease the demand to zero on PIC ICS1IA, depress the BLOCK pushbutton on HIS ICS11C and depress the AUTO pushbutton on HIS ICSIIA.

CUE: Another RO will continue the cooldown on the good Steam Generator.

SAT UNSAT

3. PERFORMANCE STEP: Verify MSIV 1, MS 101, is closed.

STANDARD: Verify the green light is lit on HIS 101.

CUE: None.

SAT UNSAT

4. PERFORMANCE STEP: Verify AVV 1, ICSllB, is closed.

STANDARD: Verify PIC ICS11B in HAND and decrease the demand to zero on PIC ICSlIB, and the GREEN light is lit on pushbutton HIS ICSlIB.

CUE: None.

SAT UNSAT

JPM No. 94B Page 15 of 21

5. PERFORMANCE STEP: Verify MS Line 1 to AFPT 1 Isolation valve, MS 106, is

........ C ......... closed.

STANDARD: Depress the BLOCK pushbutton on HIS 106AB and depress the CLOSE on pushbutton on HIS 106A.

CUE: None.

SAT UNSAT

6. PERFORMANCE STEP: Verify MS Line 1 to AFPT 2 Isolation valve, MS 107A,

........ C ......... is closed.

STANDARD: Depress the BLOCK pushbutton on HIS 107EB and depress the CLOSE on pushbutton on HIS 107E.

CUE: None.

SAT UNSAT

7. PERFORMANCE STEP: Verify AFW to SG 1 Stop valve, MS 608, is closed.

.. .... C........

STANDARD: Depress the ON pushbutton on HIS 608E, depress the CLOSE on pushbutton on HIS 608A and depress OFF pushbutton on HIS 608E.

COMMENT: Depressing OFF on HIS 608E is NOT critical.

CUE: None.

SAT UNSAT

8. PERFORMANCE STEP: Verify SG 1 Main FW Stop valve, FW 612, is closed.

STANDARD: Depress the BLOCK pushbutton on HIS 612A and depress the CLOSE on pushbutton on HIS 612.

CUE: None.

SAT UNSAT

9. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 1 Stop valve, AF 3870, is closed.

STANDARD: Depress the BLOCK pushbutton on HIS 3870B and depress the CLOSE on pushbutton on HIS 3870.

CUE: None.

SAT UNSAT

JPM No. 94B Page 16 of 21

10. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 2 Stop valve, AF 3869, is closed.

STANDARD: Depress the BLOCK pushbutton on HIS 3869B and depress the OPEN on pushbutton on HIS 3869.

CUE: None.

SAT UNSAT

11. PERFORMANCE STEP: Route to Attachment 6, Overriding a SFRCS High Level

.... C............ Trip.

STANDARD: Identifies DB-OP-02000, Attachment 6, Section A, as the correct procedure section.

CUE: None.

SAT UNSAT

12. PERFORMANCE STEP: Obtain the bypass keys and door keys for all four SFRCS channels.

STANDARD: Keys obtained from Shift Supervisor.

COMMENT: If being performed on the simulator, allow the examinee to obtain the keys.

CUE: None.

SAT UNSAT

13. PERFORMANCE STEP: Open SFRCS Channel 1/3 door.

STANDARD: Open door.

COMMENT: If being performed on the simulator, allow the examinee to open the doors.

CUE: None.

SAT UNSAT

14. PERFORMANCE STEP: Bypass Logic Channel 1.

..... .C .........

STANDARD: Place key in KS-I and turn to BYPASS.

CUE: None.

SAT UNSAT

JPM No. 94B Page 17 of 21

15. PERFORMANCE STEP: Bypass Logic Channel 1 (cont.).

........ C ........

STANDARD: Put SB switch 071 (SP9B8) to BYP.

CUE: None.

SAT UNSAT

16. PERFORMANCE STEP: Bypass Logic Channel 3.

........ C........

STANDARD: Place key in KS-3 and turn to BYPASS.

CUE: None.

SAT UNSAT

17. PERFORMANCE STEP: Bypass Logic Channel 3 (cont.).

........ C........

STANDARD: Put SB switch 073 (SP9B9) to BYP.

CUE: None.

SAT UNSAT

18. PERFORMANCE STEP: Close and lock SFRCS Channel 1/3.

STANDARD: Door closed and locked.

CUE: None.

SAT UNSAT

19. PERFORMANCE STEP: Open SFRCS Channel 2/4 door.

STANDARD: Open door.

COMMENT: If being performed on the simulator, allow the examinee to open the doors.

CUE: None.

SAT UNSAT

20. PERFORMANCE STEP: Bypass Logic Channel 2.

........ C........

STANDARD: Place key in KS-2 and turn to BYPASS.

CUE: None.

SAT UNSAT

JPM No. 94B Page 18 of 21

21. PERFORMANCE STEP: Bypass Logic Channel 2 (cont.).

. . . .o Co...... ..

STANDARD: Put SB switch 072 (SP9B6) to BYP.

CUE: None.

SAT UNSAT

22. PERFORMANCE STEP: Bypass Logic Channel 4.

.C ........

STANDARD: Place key in KS-4 and turn to BYPASS.

CUE: None.

SAT UNSAT

23. PERFORMANCE STEP: Bypass Logic Channel 4 (cont.).

.. . ... C........

STANDARD: Put SB switch 074 (SP9B7) to BYP.

CUE: None.

SAT UNSAT

24. PERFORMANCE STEP: Close and lock SFRCS Channel 2/4 door.

STANDARD: Door closed and locked.

CUE: None.

SAT UNSAT

25. PERFORMANCE STEP: Return keys to Shift Supervisor.

STANDARD: Keys returned to Shift Supervisor.

CUE: None.

SAT UNSAT

26. PERFORMANCE STEP: Route to DB-OP-06910, Trip Recovery, Step 4.3.10.

STANDARD: Identifies DB-OP-06910, Step 4.3.10 as the correct procedural step.

COMMENT: If asked, Condenser vacuum is available.

CUE: None.

SAT UNSAT

JPM No. 94B Page 19 of 21

27. PERFORMANCE STEP: Verify Main Steam Non-Return valve, MS 209, is open.

STANDARD: Depress OPEN on HIS 209.

CUE: None.

SAT UNSAT

28. PERFORMANCE STEP: Verify MSIV 2 Bypass valve, MS 100A, is open.

. ... .C........

STANDARD: Depress OPEN on HIS 100-1.

CUE: Differential Pressure across the MSIV, MS 100, is less than 250 psi.

SAT UNSAT

29. PERFORMANCE STEP: Verify AVV 1, ICSIIB, is in hand.

STANDARD: Verify PIC ICS11B in HAND.

CUE: None.

SAT UNSAT

30. PERFORMANCE STEP: Verify AVV 2, ICSllA, is in hand.

STANDARD: Verify PIC ICS11A in HAND.

CUE: None.

SAT UNSAT

31. PERFORMANCE STEP: Verify TBVs for Steam Line 1, ICSl2B, is in hand and closed.

STANDARD: Depress HAND on PIC ICS12B and REDUCE demand to ZERO.

CUE: None.

SAT UNSAT

32. PERFORMANCE STEP: Verify TBVs for Steam Line 2, ICSl2A, is in hand and closed.

STANDARD: Depress HAND on PIC ICS12B and REDUCE demand to ZERO.

CUE: None.

SAT UNSAT

JPM No. 94B Page 20 of 21

33. PERFORMANCE STEP: Depress closed on MSIV 2, MS 100.

STANDARD: Depress CLOSE on HIS 100.

CUE: None.

SAT UNSAT

34. PERFORMANCE STEP: Reset SFRCS solenoids for MSIV 2, MS100.

.... .C...........

STANDARD: Depress REST on HS 100.

CUE: None.

SAT UNSAT

35. PERFORMANCE STEP: Verify MSIV 2, MS 100, is open.

.. . . C °.........

STANDARD: Depress OPEN on HIS 100.

CUE: (If asked) Differential Pressure across the MSIV, MS 100, is less than 250 psi.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 94 Page 21 of 21 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ ] SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

/

Evaluator's Signature Date