(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML061140265
| number = ML061140265
| issue date = 04/10/2006
| issue date = 04/10/2006
| title = Pilgrim Nuclear Power Station - Technical Specification Pages Re Revised Applicability for Containment Oxygen and Differential Pressure Limits
| title = Technical Specification Pages Re Revised Applicability for Containment Oxygen and Differential Pressure Limits
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:LIMTl-ING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7. !ONTAINMENT SYSTEMS (CONT)4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont)A. Primary Containment (Cont)e. In order to continue reactor power operation, the suppression chamber pool bulk temperature must be reduced to <8b 0 F within 24 hours.f. If the suppression pool bulk temperature exceeds the limits of Specification 3.7.A.1.d, RCIC, HPCI or ADS testing shall be terminated and suppression pool cooling shall be initiated.
{{#Wiki_filter:LIMTl-ING CONDITIONS FOR OPERATION             SURVEILLANCE REQUIREMENTS 3.7. !ONTAINMENT SYSTEMS (CONT)                 4.7 CONTAINMENT SYSTEMS (Cont)
: g. If the suppression pool bulk temperature during reactor power operation exceeds 11 O 0 F, the reactor shall be scrammed.h. During reactor isolation conditions, the reactor pressure vessel shall be depressurized to less than 200 psig at normal cool down rates if the pool bulk temperature reaches 120'F.d. Whenever there is indication of relief valve operation with the local temperature of the suppression pool T-quencher reaching 200 0 F or more, an external visual examination of the suppression chamber shall be conducted before resuming power operation.
A. Primary Containment (Cont)                 A. Primary Containment (Cont)
: e. A visual inspection of the suppression chamber interior, including water line regions, shall be made at each major refueling outage.f. (Deleted)g. Suppression chamber water level shall be recorded at least once each shift when the differential pressure is required.I I i. (Deleted)j. (Deleted)Amendment No. 4-S. 21' 4.3/4.7-2 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS
: e. In order to continue reactor power       d. Whenever there is indication of relief operation, the suppression chamber         valve operation with the local pool bulk temperature must be               temperature of the suppression pool reduced to <8b0 F within 24 hours.         T-quencher reaching 2000 F or more, an external visual examination of the
: f. If the suppression pool bulk                 suppression chamber shall be temperature exceeds the limits of           conducted before resuming power Specification 3.7.A.1.d, RCIC, HPCI         operation.
or ADS testing shall be terminated and suppression pool cooling shall       e. A visual inspection of the suppression be initiated.                               chamber interior, including water line regions, shall be made at each major
: g. If the suppression pool bulk                 refueling outage.
temperature during reactor power operation exceeds 11 O0 F, the           f. (Deleted) reactor shall be scrammed.
: g. Suppression chamber water level
: h. During reactor isolation conditions,         shall be recorded at least once each the reactor pressure vessel shall be         shift when the differential pressure is depressurized to less than 200 psig           required.
at normal cool down rates if the pool bulk temperature reaches 120'F.
I         i. (Deleted)
I        j. (Deleted)
Amendment No. 4-S.         21'                                                         4.
3/4.7-2


===3.7 COIJTAINMENT===
LIMITING CONDITIONS FOR OPERATION                SURVEILLANCE REQUIREMENTS 3.7 COIJTAINMENT SYSTEMS (CONT)                  4.7 CONTAINMENT SYSTEMS (Cont)
A. Primary Containment (Cont)
: k. (Deleted)
I. (Deleted) mn.Suppression chamber water level shall be between -6 to -1 inches on torus level instrument which corresponds to a downcomer submergence of 3 feet to 3 feet 5 inches.
: n. The suppression chamber can be drained if the conditions as specified in Section 3.5.F.5 of this Technical Specification are adhered to.
Amendment No. 17, 113, 163, 200,218                                    314.7-3


SYSTEMS (CONT) 4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont)k. (Deleted)I. (Deleted)mn. Suppression chamber water level shall be between -6 to -1 inches on torus level instrument which corresponds to a downcomer submergence of 3 feet to 3 feet 5 inches.n. The suppression chamber can be drained if the conditions as specified in Section 3.5.F.5 of this Technical Specification are adhered to.Amendment No. 17, 113, 163, 200,218 314.7-3 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7 A.CONTAINMENT SYSTEMS (Cont)Primary Containment (Cont)d. If a failure of one of the two installed position alarm systems occurs for one or more vacuum breakers, reactor operation may continue provided that a differential pressure decay rate test is initiated immediately and performed every 15 days thereafter until the failure is corrected.
LIMITING CONDITIONS FOR OPERATION                SURVEILLANCE REQUIREMENTS 3.7  CONTAINMENT SYSTEMS (Cont)                 4.7 CONTAINMENT SYSTEMS (Cont)
The test shall meet the requirements of Specification 3.7.A.4.b.
A. Primary Containment (Cont)                 A. Primary Containment (Cont)
: 5. If the specifications of 3.7.A.1 thru 3.7.A.4 cannot be met, an orderly shutdown shall be initiated and the reactor shall be in Cold Shutdown condition within 24 hours.4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont)I 6. Oxygen Concentration
: d. If a failure of one of the two installed position alarm systems occurs for one or more vacuum breakers, reactor operation may continue provided that a differential pressure decay rate test is initiated immediately and performed every 15 days thereafter until the failure is corrected. The test shall meet the requirements of Specification 3.7.A.4.b.
: a. The primary containment atmosphere shall be reduced to less than 4% oxygen by volume with nitrogen gas while in RUN MODE during the time period: i. From 24 hours after thermal power is greater than 15%rated thermal power following startup, to ii. 24 hours prior to reducing thermal power to less than 15% rated thermal power prior to the next scheduled shutdown, except as specified in 3.7.A.6.b.
: 5. If the specifications of 3.7.A.1 thru 3.7.A.4 cannot be met, an orderly shutdown shall be initiated and the reactor shall be in Cold Shutdown condition within 24 hours.
: b. If the specifications of 3.7.A.6.a above cannot be met, and the primary containment oxygen concentration cannot be restored to less than 4% oxygen by volume within the subsequent 24 hour period, reactor thermal power shall be less than 15%rated thermal power within the next 8 hours.6. Oxygen Concentration The primary containment o)ygen concentration shall be measured and recorded at least twice weekly I Amendment No. 87,-1-^ , 218 314.7-9 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS
I      6. Oxygen Concentration                        6. Oxygen Concentration                 I
: a. The primary containment                     The primary containment o)ygen atmosphere shall be reduced to             concentration shall be measured and less than 4% oxygen by volume             recorded at least twice weekly with nitrogen gas while in RUN MODE during the time period:
: i. From 24 hours after thermal power is greater than 15%
rated thermal power following startup, to ii. 24 hours prior to reducing thermal power to less than 15% rated thermal power prior to the next scheduled shutdown, except as specified in 3.7.A.6.b.
: b. If the specifications of 3.7.A.6.a above cannot be met, and the primary containment oxygen concentration cannot be restored to less than 4% oxygen by volume within the subsequent 24 hour period, reactor thermal power shall be less than 15%
rated thermal power within the next 8 hours.
Amendment No. 87,-1-^ , 218                                                         314.7-9


===3.7 CONTAINMENT===
LIMITING CONDITIONS FOR OPERATION                SURVEILLANCE REQUIREMENTS 3.7 CONTAINMENT SYSTEMS (Cont)                  4.7 CONTAINMENT SYSTEMS (Cont)
A. Primary Containment (Cont)                    A. Primary Containment (Cont)
: 7. Containment AtmosDhere Dilution              7. Containment Atmosohere Dilution
: a. Within the 24-hour period after              a. The post-LOCA containment placing the reactor in the Run Mode              atmosphere dilution system shall be the Post - LOCA Containment                      functionally tested once per operating Atmosphere Dilution System must                  cycle.
be operable and capable of supplying nitrogen to the containment for atmosphere dilution. If this specification cannot be met, the system must be restored to an operable condition within 30 days or the reactor must be at least in Hot Shutdown within 12 hours.
: b. Within the 24-hour period after              b. The level in the liquid N2 storage tank placing the reactor in the Run                    shall be recorded weekly.
Mode, the Nitrogen Storage Tank
: c. Not used.
shall contain a minimum of 1500 gallons of liquid N2. If this                d. Once per month each manual or specification cannot be met the                  power operated valve in the CAD minimum volume will be restored                  system flow path not locked, sealed within 30 days or the reactor must              or otherwise secured in position shall be in at least Hot Shutdown within              be observed and recorded to be in its 12 hours.                                        correct position.
: 8. Drvwell and Suopression Chamber              8. Drywell and Sumroression Chamber Differential Pressure                            Differential Pressure
: a. Differential pressure between the              a. The pressure differential between drywell and suppression chamber                    the drywell and suppression shall be maintained at equal to or                chamber shall be recorded at least greater than 1.17 psid, while in                  once each shift when the differential RUN MODE during the time period:                  pressure is required.
: i. From 24 hours after thermal power is greater than 15%
rated thermal power following startup, to ii. 24 hours prior to reducing thermal power to less than 15% rated thermal power prior to the next scheduled shutdown, except as specified in 3.7.A.8.b and c.
Amendment No. 5, 206, 218                                                          3/4.7-1 0


SYSTEMS (Cont)A. Primary Containment (Cont)7. Containment AtmosDhere Dilution a. Within the 24-hour period after placing the reactor in the Run Mode the Post -LOCA Containment Atmosphere Dilution System must be operable and capable of supplying nitrogen to the containment for atmosphere dilution.
LIMITING CONDITIONS FOR OPERATION                 SURVEILLANCE REQUIREMENTS 3.7 CONTAINMENT SYSTEMS (Cont)                   4.7 CONTAINMENT SYSTEMS (Cont)
If this specification cannot be met, the system must be restored to an operable condition within 30 days or the reactor must be at least in Hot Shutdown within 12 hours.b. Within the 24-hour period after placing the reactor in the Run Mode, the Nitrogen Storage Tank shall contain a minimum of 1500 gallons of liquid N 2.If this specification cannot be met the minimum volume will be restored within 30 days or the reactor must be in at least Hot Shutdown within 12 hours.8. Drvwell and Suopression Chamber Differential Pressure a. Differential pressure between the drywell and suppression chamber shall be maintained at equal to or greater than 1.17 psid, while in RUN MODE during the time period: i. From 24 hours after thermal power is greater than 15%rated thermal power following startup, to ii. 24 hours prior to reducing thermal power to less than 15% rated thermal power prior to the next scheduled shutdown, except as specified in 3.7.A.8.b and c.4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont)7. Containment Atmosohere Dilution a. The post-LOCA containment atmosphere dilution system shall be functionally tested once per operating cycle.b. The level in the liquid N 2 storage tank shall be recorded weekly.c. Not used.d. Once per month each manual or power operated valve in the CAD system flow path not locked, sealed or otherwise secured in position shall be observed and recorded to be in its correct position.8. Drywell and Sumroression Chamber Differential Pressure a. The pressure differential between the drywell and suppression chamber shall be recorded at least once each shift when the differential pressure is required.Amendment No. 5, 206, 218 3/4.7-1 0 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS
A. Primary Containment (Cont)                   A. Primary Containment (Cont) to. The differential pressure may be reduced to less than 1.17 psid for a maximum of 4 hours for maintenance activities on the differential pressure control system and during required operability testing of the HPCI system, the relief valves, the RCIC system and the drywell-suppression chamber vacuum breakers.
 
: c. If the specifications of 3.7.A.8.a and b above cannot be met, and the differential pressure cannot be restored within the subsequent 8 hour period, reactor thermal power shall be less than 15% rated thermal power within the next 12 hours.
===3.7 CONTAINMENT===
Amendmeit No. 65, 206, 21                                                       /
 
3/4.7-1 Oa}}
SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont) A. Primary Containment (Cont)to. The differential pressure may be reduced to less than 1.17 psid for a maximum of 4 hours for maintenance activities on the differential pressure control system and during required operability testing of the HPCI system, the relief valves, the RCIC system and the drywell-suppression chamber vacuum breakers.c. If the specifications of 3.7.A.8.a and b above cannot be met, and the differential pressure cannot be restored within the subsequent 8 hour period, reactor thermal power shall be less than 15% rated thermal power within the next 12 hours.Amendmeit No. 65, 206, 21 /3/4.7-1 Oa}}

Latest revision as of 20:31, 23 November 2019

Technical Specification Pages Re Revised Applicability for Containment Oxygen and Differential Pressure Limits
ML061140265
Person / Time
Site: Pilgrim
Issue date: 04/10/2006
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML061140265 (5)


Text

LIMTl-ING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7. !ONTAINMENT SYSTEMS (CONT) 4.7 CONTAINMENT SYSTEMS (Cont)

A. Primary Containment (Cont) A. Primary Containment (Cont)

e. In order to continue reactor power d. Whenever there is indication of relief operation, the suppression chamber valve operation with the local pool bulk temperature must be temperature of the suppression pool reduced to <8b0 F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. T-quencher reaching 2000 F or more, an external visual examination of the
f. If the suppression pool bulk suppression chamber shall be temperature exceeds the limits of conducted before resuming power Specification 3.7.A.1.d, RCIC, HPCI operation.

or ADS testing shall be terminated and suppression pool cooling shall e. A visual inspection of the suppression be initiated. chamber interior, including water line regions, shall be made at each major

g. If the suppression pool bulk refueling outage.

temperature during reactor power operation exceeds 11 O0 F, the f. (Deleted) reactor shall be scrammed.

g. Suppression chamber water level
h. During reactor isolation conditions, shall be recorded at least once each the reactor pressure vessel shall be shift when the differential pressure is depressurized to less than 200 psig required.

at normal cool down rates if the pool bulk temperature reaches 120'F.

I i. (Deleted)

I j. (Deleted)

Amendment No. 4-S. 21' 4.

3/4.7-2

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7 COIJTAINMENT SYSTEMS (CONT) 4.7 CONTAINMENT SYSTEMS (Cont)

A. Primary Containment (Cont)

k. (Deleted)

I. (Deleted) mn.Suppression chamber water level shall be between -6 to -1 inches on torus level instrument which corresponds to a downcomer submergence of 3 feet to 3 feet 5 inches.

n. The suppression chamber can be drained if the conditions as specified in Section 3.5.F.5 of this Technical Specification are adhered to.

Amendment No. 17, 113, 163, 200,218 314.7-3

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7 CONTAINMENT SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)

A. Primary Containment (Cont) A. Primary Containment (Cont)

d. If a failure of one of the two installed position alarm systems occurs for one or more vacuum breakers, reactor operation may continue provided that a differential pressure decay rate test is initiated immediately and performed every 15 days thereafter until the failure is corrected. The test shall meet the requirements of Specification 3.7.A.4.b.
5. If the specifications of 3.7.A.1 thru 3.7.A.4 cannot be met, an orderly shutdown shall be initiated and the reactor shall be in Cold Shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

I 6. Oxygen Concentration 6. Oxygen Concentration I

a. The primary containment The primary containment o)ygen atmosphere shall be reduced to concentration shall be measured and less than 4% oxygen by volume recorded at least twice weekly with nitrogen gas while in RUN MODE during the time period:
i. From 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after thermal power is greater than 15%

rated thermal power following startup, to ii. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to reducing thermal power to less than 15% rated thermal power prior to the next scheduled shutdown, except as specified in 3.7.A.6.b.

b. If the specifications of 3.7.A.6.a above cannot be met, and the primary containment oxygen concentration cannot be restored to less than 4% oxygen by volume within the subsequent 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, reactor thermal power shall be less than 15%

rated thermal power within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Amendment No. 87,-1-^ , 218 314.7-9

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7 CONTAINMENT SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)

A. Primary Containment (Cont) A. Primary Containment (Cont)

7. Containment AtmosDhere Dilution 7. Containment Atmosohere Dilution
a. Within the 24-hour period after a. The post-LOCA containment placing the reactor in the Run Mode atmosphere dilution system shall be the Post - LOCA Containment functionally tested once per operating Atmosphere Dilution System must cycle.

be operable and capable of supplying nitrogen to the containment for atmosphere dilution. If this specification cannot be met, the system must be restored to an operable condition within 30 days or the reactor must be at least in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b. Within the 24-hour period after b. The level in the liquid N2 storage tank placing the reactor in the Run shall be recorded weekly.

Mode, the Nitrogen Storage Tank

c. Not used.

shall contain a minimum of 1500 gallons of liquid N2. If this d. Once per month each manual or specification cannot be met the power operated valve in the CAD minimum volume will be restored system flow path not locked, sealed within 30 days or the reactor must or otherwise secured in position shall be in at least Hot Shutdown within be observed and recorded to be in its 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. correct position.

8. Drvwell and Suopression Chamber 8. Drywell and Sumroression Chamber Differential Pressure Differential Pressure
a. Differential pressure between the a. The pressure differential between drywell and suppression chamber the drywell and suppression shall be maintained at equal to or chamber shall be recorded at least greater than 1.17 psid, while in once each shift when the differential RUN MODE during the time period: pressure is required.
i. From 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after thermal power is greater than 15%

rated thermal power following startup, to ii. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to reducing thermal power to less than 15% rated thermal power prior to the next scheduled shutdown, except as specified in 3.7.A.8.b and c.

Amendment No. 5, 206, 218 3/4.7-1 0

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7 CONTAINMENT SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)

A. Primary Containment (Cont) A. Primary Containment (Cont) to. The differential pressure may be reduced to less than 1.17 psid for a maximum of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for maintenance activities on the differential pressure control system and during required operability testing of the HPCI system, the relief valves, the RCIC system and the drywell-suppression chamber vacuum breakers.

c. If the specifications of 3.7.A.8.a and b above cannot be met, and the differential pressure cannot be restored within the subsequent 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, reactor thermal power shall be less than 15% rated thermal power within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Amendmeit No. 65, 206, 21 /

3/4.7-1 Oa