| number = ML061210471
| number = ML061210471
| issue date = 05/16/2006
| issue date = 05/16/2006
| title = Callaway, License Amendment, Request to Change the Reactor Coolant System Leakage Detection Instrumentation Methodology
| title = License Amendment, Request to Change the Reactor Coolant System Leakage Detection Instrumentation Methodology
| author name = Donohew J N
| author name = Donohew J
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Naslund C D
| addressee name = Naslund C
| addressee affiliation = Union Electric Co
| addressee affiliation = Union Electric Co
| docket = 05000483
| docket = 05000483
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 16, 2006Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
{{#Wiki_filter:May 16, 2006 Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251


==SUBJECT:==
==SUBJECT:==
CALLAWAY PLANT, UNIT 1 - LICENSE AMENDMENT REQUEST TOCHANGE THE REACTOR COOLANT SYSTEM LEAKAGE DETECTION INSTRUMENTATION METHODOLOGY (TAC NO. MC8220)
CALLAWAY PLANT, UNIT 1 - LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR COOLANT SYSTEM LEAKAGE DETECTION INSTRUMENTATION METHODOLOGY (TAC NO. MC8220)


==Dear Mr. Naslund:==
==Dear Mr. Naslund:==


In your license amendment request application dated August 26, 2005 (UL NRC-05197), youproposed to revise your commitment to Regulatory Guide (RG) 1.45, "Reactor Coolant Pressure Boundary Leakage Detection Systems," dated May 1973, in the Final Safety Analysis Report for the Callaway Plant. This revision would change the plant licensing basis to account for the containment atmosphere gaseous radioactivity monitor in Technical Specification (TS) 3.4.15, "RCS [Reactor Coolant System] Leakage Detection Instrumentation," not beingable to promptly detect a 1 gpm RCS leakrate in 1 hour at the levels of radioactivity that are currently normally present in the RCS. Because TS 3.4.16, "RCS Specific Activity," allowed plant operation at the RCS radioactivity levels where the containment atmosphere gaseousradioactivity monitor would be able to promptly detect a 1 gpm RCS leakrate in 1 hour, the radioactivity monitor was not proposed to be removed from TS 3.4.15.On April 13, 2006, the basis for not removing the containment atmosphere gaseousradioactivity monitor (gaseous radmonitor) in TS 3.4.15 was discussed in a conference call with your staff. The other three instrumentations listed in TS 3.4.15, in addition to this monitor, are capable of promptly measuring a 1 gpm RCS leakrate in 1 hour for normal plant conditions and the gaseous radmonitor does not appear to be capable of doing this. This is also stated in your application dated August 26, 2005. Your staff did not explain in the call how the gaseousradioactivity monitor could promptly detect a 1 gpm RCS leakrate in 1 hour for normal plant conditions.RG 1.45 states that "in analyzing the sensitivity of leak detection systems using airborneparticulate or gaseous radioactivity, a realistic primary coolant radioactivity concentration assumption should be used" and a realistic concentration would be that which is currently normally expected to be present in the RCS coolant. Although RG 1.45 also states that thecoolant radioactivity concentration values in the plant environmental report would be acceptable as the realistic primary coolant radioactivity concentration, this statement would no longer be correct if the values in the plant environmental report are significantly higher than the valuesthat would be currently expected in the RCS coolant.It has always been the NRC's position that the instrumentation listed in TS 3.4.15 as a methodfor meeting Part 50, Appendix A, General Design Criterion (GDC) 30 of Title 10 of the Code ofFederal Regulations, "Quality of reactor coolant pressure boundary," should be capable ofdetecting a 1 gpm RCS leakrate in 1 hour for realistic or normal plant conditions. In the NRC C. Naslund- 2 -Standard Review Plan 5.2.5, "Reactor Coolant Pressure Boundary Leakage Detection," it isstated that RG 1.45 is an acceptable method to meet GDC 30 for RCS leak detection, and, in1973, when RG 1.45 was issued, the underlying assumption was that the acceptable detectionmethods would have that detection capability for the normal plant conditions that existed at thattime. The containment atmosphere gaseous radioactivity monitor was listed in RG 1.45 because the normal RCS radioactivity concentrations at that time were such that this monitor could detect a 1 gpm RCS leakrate in 1 hour. Now that normal plant conditions have much lower RCS radioactivity concentrations, the monitor cannot meet this criterion. Therefore, the RCS detection instrumentation in TS 3.4.15 should be capable of promptly detecting RCSleakage for the current plant conditions.Because TS 3.4.15 defines the RCS leakage detection instrumentation being relied upon tomeet the criterion of detecting a 1 gpm RCS leakrate in 1 hour for normal plant conditions, we are requesting that you either provide justification that the containment gaseous radioactivitymonitor can meet this criterion or revise your amendment request dated August 26, 2005, to remove the containment gaseous radioactivity monitor from TS 3.4.15. We also request that you submit your response no later than June 30, 2006, so that we can complete our review in a timely manner.If you have any questions concerning this letter, you may contact me at (301) 415-1307, or viathe internet at jnd@nrc.gov
In your license amendment request application dated August 26, 2005 (ULNRC-05197), you proposed to revise your commitment to Regulatory Guide (RG) 1.45, "Reactor Coolant Pressure Boundary Leakage Detection Systems," dated May 1973, in the Final Safety Analysis Report for the Callaway Plant. This revision would change the plant licensing basis to account for the containment atmosphere gaseous radioactivity monitor in Technical Specification (TS) 3.4.15, "RCS [Reactor Coolant System] Leakage Detection Instrumentation," not being able to promptly detect a 1 gpm RCS leakrate in 1 hour at the levels of radioactivity that are currently normally present in the RCS. Because TS 3.4.16, "RCS Specific Activity," allowed plant operation at the RCS radioactivity levels where the containment atmosphere gaseous radioactivity monitor would be able to promptly detect a 1 gpm RCS leakrate in 1 hour, the radioactivity monitor was not proposed to be removed from TS 3.4.15.
.Sincerely,/RA/Jack Donohew Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483 cc:  See next page C. Naslund- 2 -Standard Review Plan 5.2.5, "Reactor Coolant Pressure Boundary Leakage Detection," it isstated that RG 1.45 is an acceptable method to meet GDC 30 for RCS leak detection, and, in1973, when RG 1.45 was issued, the underlying assumption was that the acceptable detectionmethods would have that detection capability for the normal plant conditions that existed at thattime. The containment atmosphere gaseous radioactivity monitor was listed in RG 1.45 because the normal RCS radioactivity concentrations at that time were such that this monitor could detect a 1 gpm RCS leakrate in 1 hour. Now that normal plant conditions have much lower RCS radioactivity concentrations, the monitor cannot meet this criterion. Therefore, the RCS detection instrumentation in TS 3.4.15 should be capable of promptly detecting RCSleakage for the current plant conditions.Because TS 3.4.15 defines the RCS leakage detection instrumentation being relied upon tomeet the criterion of detecting a 1 gpm RCS leakrate in 1 hour for normal plant conditions, we are requesting that you either provide justification that the containment gaseous radioactivitymonitor can meet this criterion or revise your amendment request dated August 26, 2005, to remove the containment gaseous radioactivity monitor from TS 3.4.15. We also request that you submit your response no later than June 30, 2006, so that we can complete our review in a timely manner.If you have any questions concerning this letter, you may contact me at (301) 415-1307, or viathe internet at jnd@nrc.gov
On April 13, 2006, the basis for not removing the containment atmosphere gaseous radioactivity monitor (gaseous radmonitor) in TS 3.4.15 was discussed in a conference call with your staff. The other three instrumentations listed in TS 3.4.15, in addition to this monitor, are capable of promptly measuring a 1 gpm RCS leakrate in 1 hour for normal plant conditions and the gaseous radmonitor does not appear to be capable of doing this. This is also stated in your application dated August 26, 2005. Your staff did not explain in the call how the gaseous radioactivity monitor could promptly detect a 1 gpm RCS leakrate in 1 hour for normal plant conditions.
.Sincerely,/RA/Jack Donohew Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483cc:  See next pageDISTRIBUTION:PUBLICLPLIV r/f RidsNrrDorl (CHaney/CHolden)RidsNrrDorlLpl4 (DTerao)
RG 1.45 states that "in analyzing the sensitivity of leak detection systems using airborne particulate or gaseous radioactivity, a realistic primary coolant radioactivity concentration assumption should be used" and a realistic concentration would be that which is currently normally expected to be present in the RCS coolant. Although RG 1.45 also states that the coolant radioactivity concentration values in the plant environmental report would be acceptable as the realistic primary coolant radioactivity concentration, this statement would no longer be correct if the values in the plant environmental report are significantly higher than the values that would be currently expected in the RCS coolant.
RidsNrrPMJDonohewRidsNrrDorlDpr RidsNrrLALFeizollahiRidsOgcRp RidsAcrsAcnwMailCenterRidsRegion4MailCenter (BJones)RidsNrrDssSsib (DSolorio)ACCESSION NO.:  OFFICENRR/LPL4/PMNRR/LPL4/LA SBPB/BCNRR/LPL4/BCNAMEJDonohewLFeizollahiDSolorioDTerao DATE5/16/0605/15/200605/12/20065/16/06OFFICIAL RECORD COPY Callaway Plant, Unit 1 cc:Professional Nuclear Consulting, Inc.
It has always been the NRC's position that the instrumentation listed in TS 3.4.15 as a method for meeting Part 50, Appendix A, General Design Criterion (GDC) 30 of Title 10 of the Code of Federal Regulations, "Quality of reactor coolant pressure boundary," should be capable of detecting a 1 gpm RCS leakrate in 1 hour for realistic or normal plant conditions. In the NRC
19041 Raines Drive Derwood, MD  20855John O'Neill, Esq.Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.
Washington, D.C. 20037Mr. Mark A. Reidmeyer, RegionalRegulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO  65251U.S. Nuclear Regulatory CommissionResident Inspector Office


8201 NRC RoadSteedman, MO  65077-1302Mr. Les H. KanuckelManager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO  65251Missouri Public Service CommissionGovernor Office Building 200 Madison Street Jefferson City, MO  65102-0360Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011-4005Mr. H. Floyd GilzowDeputy Director for Policy Missouri Department of Natural Resources
C. Naslund                                      Standard Review Plan 5.2.5, "Reactor Coolant Pressure Boundary Leakage Detection," it is stated that RG 1.45 is an acceptable method to meet GDC 30 for RCS leak detection, and, in 1973, when RG 1.45 was issued, the underlying assumption was that the acceptable detection methods would have that detection capability for the normal plant conditions that existed at that time. The containment atmosphere gaseous radioactivity monitor was listed in RG 1.45 because the normal RCS radioactivity concentrations at that time were such that this monitor could detect a 1 gpm RCS leakrate in 1 hour. Now that normal plant conditions have much lower RCS radioactivity concentrations, the monitor cannot meet this criterion. Therefore, the RCS detection instrumentation in TS 3.4.15 should be capable of promptly detecting RCS leakage for the current plant conditions.
Because TS 3.4.15 defines the RCS leakage detection instrumentation being relied upon to meet the criterion of detecting a 1 gpm RCS leakrate in 1 hour for normal plant conditions, we are requesting that you either provide justification that the containment gaseous radioactivity monitor can meet this criterion or revise your amendment request dated August 26, 2005, to remove the containment gaseous radioactivity monitor from TS 3.4.15. We also request that you submit your response no later than June 30, 2006, so that we can complete our review in a timely manner.
If you have any questions concerning this letter, you may contact me at (301) 415-1307, or via the internet at jnd@nrc.gov.
Sincerely,
                                              /RA/
Jack Donohew Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page


P. O. Box 176 Jefferson City, MO  65102-0176Mr. Rick A. MuenchPresident and Chief Executive Officer Wolf Creek Nuclear Operating Corporation
C. Naslund                                      Standard Review Plan 5.2.5, "Reactor Coolant Pressure Boundary Leakage Detection," it is stated that RG 1.45 is an acceptable method to meet GDC 30 for RCS leak detection, and, in 1973, when RG 1.45 was issued, the underlying assumption was that the acceptable detection methods would have that detection capability for the normal plant conditions that existed at that time. The containment atmosphere gaseous radioactivity monitor was listed in RG 1.45 because the normal RCS radioactivity concentrations at that time were such that this monitor could detect a 1 gpm RCS leakrate in 1 hour. Now that normal plant conditions have much lower RCS radioactivity concentrations, the monitor cannot meet this criterion. Therefore, the RCS detection instrumentation in TS 3.4.15 should be capable of promptly detecting RCS leakage for the current plant conditions.
Because TS 3.4.15 defines the RCS leakage detection instrumentation being relied upon to meet the criterion of detecting a 1 gpm RCS leakrate in 1 hour for normal plant conditions, we are requesting that you either provide justification that the containment gaseous radioactivity monitor can meet this criterion or revise your amendment request dated August 26, 2005, to remove the containment gaseous radioactivity monitor from TS 3.4.15. We also request that you submit your response no later than June 30, 2006, so that we can complete our review in a timely manner.
If you have any questions concerning this letter, you may contact me at (301) 415-1307, or via the internet at jnd@nrc.gov.
Sincerely,
                                              /RA/
Jack Donohew Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page DISTRIBUTION:
PUBLIC                                        LPLIV r/f RidsNrrDorl (CHaney/CHolden)                  RidsNrrDorlLpl4 (DTerao)
RidsNrrPMJDonohew                            RidsNrrDorlDpr RidsNrrLALFeizollahi                          RidsOgcRp RidsAcrsAcnwMailCenter                        RidsRegion4MailCenter (BJones)
RidsNrrDssSsib (DSolorio)
ACCESSION NO.:
OFFICE    NRR/LPL4/PM      NRR/LPL4/LA      SBPB/BC        NRR/LPL4/BC NAME      JDonohew        LFeizollahi      DSolorio      DTerao DATE      5/16/06          05/15/2006        05/12/2006 5/16/06 OFFICIAL RECORD COPY


P.O. Box 411 Burlington, KA  66839Mr. Dan I. Bolef, PresidentKay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130Mr. Lee Fritz, Presiding CommissionerCallaway County Court House 10 East Fifth Street Fulton, MO 65151Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149Mr. Keith D. YoungManager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251Mr. Keith G. Henke, PlannerDivision of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102Certrec Corporation4200 South Hulen, Suite 630 Fort Worth, TX 76109Director, Missouri State Emergency   Management Agency
Callaway Plant, Unit 1 cc:
 
Professional Nuclear Consulting, Inc. Mr. Dan I. Bolef, President 19041 Raines Drive                      Kay Drey, Representative Derwood, MD 20855                        Board of Directors Coalition for the Environment John ONeill, Esq.                      6267 Delmar Boulevard Pillsbury Winthrop Shaw Pittman LLP      University City, MO 63130 2300 N. Street, N.W.
P.O. Box 116 Jefferson City, MO 65102-0116}}
Washington, D.C. 20037                  Mr. Lee Fritz, Presiding Commissioner Callaway County Court House Mr. Mark A. Reidmeyer, Regional          10 East Fifth Street Regulatory Affairs Supervisor            Fulton, MO 65151 Regulatory Affairs AmerenUE                                Mr. David E. Shafer P.O. Box 620                            Superintendent, Licensing Fulton, MO 65251                        Regulatory Affairs AmerenUE U.S. Nuclear Regulatory Commission      P.O. Box 66149, MC 470 Resident Inspector Office                St. Louis, MO 63166-6149 8201 NRC Road Steedman, MO 65077-1302                  Mr. Keith D. Young Manager, Regulatory Affairs Mr. Les H. Kanuckel                      AmerenUE Manager, Quality Assurance              P.O. Box 620 AmerenUE                                Fulton, MO 65251 P.O. Box 620 Fulton, MO 65251                        Mr. Keith G. Henke, Planner Division of Community and Public Health Missouri Public Service Commission      Office of Emergency Coordination Governor Office Building                930 Wildwood P.O. Box 570 200 Madison Street                      Jefferson City, MO 65102 Jefferson City, MO 65102-0360 Certrec Corporation Regional Administrator, Region IV        4200 South Hulen, Suite 630 U.S. Nuclear Regulatory Commission      Fort Worth, TX 76109 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005                Director, Missouri State Emergency Management Agency Mr. H. Floyd Gilzow                      P.O. Box 116 Deputy Director for Policy              Jefferson City, MO 65102-0116 Missouri Department of Natural Resources P. O. Box 176 Jefferson City, MO 65102-0176 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839}}

Latest revision as of 19:17, 23 November 2019

License Amendment, Request to Change the Reactor Coolant System Leakage Detection Instrumentation Methodology
ML061210471
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/16/2006
From: Donohew J
Plant Licensing Branch III-2
To: Naslund C
Union Electric Co
Donohew J N, NRR/DORL, 415-1307
References
TAC MC8220
Download: ML061210471 (4)


Text

May 16, 2006 Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR COOLANT SYSTEM LEAKAGE DETECTION INSTRUMENTATION METHODOLOGY (TAC NO. MC8220)

Dear Mr. Naslund:

In your license amendment request application dated August 26, 2005 (ULNRC-05197), you proposed to revise your commitment to Regulatory Guide (RG) 1.45, "Reactor Coolant Pressure Boundary Leakage Detection Systems," dated May 1973, in the Final Safety Analysis Report for the Callaway Plant. This revision would change the plant licensing basis to account for the containment atmosphere gaseous radioactivity monitor in Technical Specification (TS) 3.4.15, "RCS [Reactor Coolant System] Leakage Detection Instrumentation," not being able to promptly detect a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at the levels of radioactivity that are currently normally present in the RCS. Because TS 3.4.16, "RCS Specific Activity," allowed plant operation at the RCS radioactivity levels where the containment atmosphere gaseous radioactivity monitor would be able to promptly detect a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the radioactivity monitor was not proposed to be removed from TS 3.4.15.

On April 13, 2006, the basis for not removing the containment atmosphere gaseous radioactivity monitor (gaseous radmonitor) in TS 3.4.15 was discussed in a conference call with your staff. The other three instrumentations listed in TS 3.4.15, in addition to this monitor, are capable of promptly measuring a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for normal plant conditions and the gaseous radmonitor does not appear to be capable of doing this. This is also stated in your application dated August 26, 2005. Your staff did not explain in the call how the gaseous radioactivity monitor could promptly detect a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for normal plant conditions.

RG 1.45 states that "in analyzing the sensitivity of leak detection systems using airborne particulate or gaseous radioactivity, a realistic primary coolant radioactivity concentration assumption should be used" and a realistic concentration would be that which is currently normally expected to be present in the RCS coolant. Although RG 1.45 also states that the coolant radioactivity concentration values in the plant environmental report would be acceptable as the realistic primary coolant radioactivity concentration, this statement would no longer be correct if the values in the plant environmental report are significantly higher than the values that would be currently expected in the RCS coolant.

It has always been the NRC's position that the instrumentation listed in TS 3.4.15 as a method for meeting Part 50, Appendix A, General Design Criterion (GDC) 30 of Title 10 of the Code of Federal Regulations, "Quality of reactor coolant pressure boundary," should be capable of detecting a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for realistic or normal plant conditions. In the NRC

C. Naslund Standard Review Plan 5.2.5, "Reactor Coolant Pressure Boundary Leakage Detection," it is stated that RG 1.45 is an acceptable method to meet GDC 30 for RCS leak detection, and, in 1973, when RG 1.45 was issued, the underlying assumption was that the acceptable detection methods would have that detection capability for the normal plant conditions that existed at that time. The containment atmosphere gaseous radioactivity monitor was listed in RG 1.45 because the normal RCS radioactivity concentrations at that time were such that this monitor could detect a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Now that normal plant conditions have much lower RCS radioactivity concentrations, the monitor cannot meet this criterion. Therefore, the RCS detection instrumentation in TS 3.4.15 should be capable of promptly detecting RCS leakage for the current plant conditions.

Because TS 3.4.15 defines the RCS leakage detection instrumentation being relied upon to meet the criterion of detecting a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for normal plant conditions, we are requesting that you either provide justification that the containment gaseous radioactivity monitor can meet this criterion or revise your amendment request dated August 26, 2005, to remove the containment gaseous radioactivity monitor from TS 3.4.15. We also request that you submit your response no later than June 30, 2006, so that we can complete our review in a timely manner.

If you have any questions concerning this letter, you may contact me at (301) 415-1307, or via the internet at jnd@nrc.gov.

Sincerely,

/RA/

Jack Donohew Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page

C. Naslund Standard Review Plan 5.2.5, "Reactor Coolant Pressure Boundary Leakage Detection," it is stated that RG 1.45 is an acceptable method to meet GDC 30 for RCS leak detection, and, in 1973, when RG 1.45 was issued, the underlying assumption was that the acceptable detection methods would have that detection capability for the normal plant conditions that existed at that time. The containment atmosphere gaseous radioactivity monitor was listed in RG 1.45 because the normal RCS radioactivity concentrations at that time were such that this monitor could detect a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Now that normal plant conditions have much lower RCS radioactivity concentrations, the monitor cannot meet this criterion. Therefore, the RCS detection instrumentation in TS 3.4.15 should be capable of promptly detecting RCS leakage for the current plant conditions.

Because TS 3.4.15 defines the RCS leakage detection instrumentation being relied upon to meet the criterion of detecting a 1 gpm RCS leakrate in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for normal plant conditions, we are requesting that you either provide justification that the containment gaseous radioactivity monitor can meet this criterion or revise your amendment request dated August 26, 2005, to remove the containment gaseous radioactivity monitor from TS 3.4.15. We also request that you submit your response no later than June 30, 2006, so that we can complete our review in a timely manner.

If you have any questions concerning this letter, you may contact me at (301) 415-1307, or via the internet at jnd@nrc.gov.

Sincerely,

/RA/

Jack Donohew Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page DISTRIBUTION:

PUBLIC LPLIV r/f RidsNrrDorl (CHaney/CHolden) RidsNrrDorlLpl4 (DTerao)

RidsNrrPMJDonohew RidsNrrDorlDpr RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenter (BJones)

RidsNrrDssSsib (DSolorio)

ACCESSION NO.:

OFFICE NRR/LPL4/PM NRR/LPL4/LA SBPB/BC NRR/LPL4/BC NAME JDonohew LFeizollahi DSolorio DTerao DATE 5/16/06 05/15/2006 05/12/2006 5/16/06 OFFICIAL RECORD COPY

Callaway Plant, Unit 1 cc:

Professional Nuclear Consulting, Inc. Mr. Dan I. Bolef, President 19041 Raines Drive Kay Drey, Representative Derwood, MD 20855 Board of Directors Coalition for the Environment John ONeill, Esq. 6267 Delmar Boulevard Pillsbury Winthrop Shaw Pittman LLP University City, MO 63130 2300 N. Street, N.W.

Washington, D.C. 20037 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House Mr. Mark A. Reidmeyer, Regional 10 East Fifth Street Regulatory Affairs Supervisor Fulton, MO 65151 Regulatory Affairs AmerenUE Mr. David E. Shafer P.O. Box 620 Superintendent, Licensing Fulton, MO 65251 Regulatory Affairs AmerenUE U.S. Nuclear Regulatory Commission P.O. Box 66149, MC 470 Resident Inspector Office St. Louis, MO 63166-6149 8201 NRC Road Steedman, MO 65077-1302 Mr. Keith D. Young Manager, Regulatory Affairs Mr. Les H. Kanuckel AmerenUE Manager, Quality Assurance P.O. Box 620 AmerenUE Fulton, MO 65251 P.O. Box 620 Fulton, MO 65251 Mr. Keith G. Henke, Planner Division of Community and Public Health Missouri Public Service Commission Office of Emergency Coordination Governor Office Building 930 Wildwood P.O. Box 570 200 Madison Street Jefferson City, MO 65102 Jefferson City, MO 65102-0360 Certrec Corporation Regional Administrator, Region IV 4200 South Hulen, Suite 630 U.S. Nuclear Regulatory Commission Fort Worth, TX 76109 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Director, Missouri State Emergency Management Agency Mr. H. Floyd Gilzow P.O. Box 116 Deputy Director for Policy Jefferson City, MO 65102-0116 Missouri Department of Natural Resources P. O. Box 176 Jefferson City, MO 65102-0176 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839