(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 11/24/2006 | | | issue date = 11/24/2006 |
| | title = IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed | | | title = IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed |
| | author name = Munday J T | | | author name = Munday J |
| | author affiliation = NRC/RGN-II/DRS/PSB2 | | | author affiliation = NRC/RGN-II/DRS/PSB2 |
| | addressee name = Stall J A | | | addressee name = Stall J |
| | addressee affiliation = Florida Power & Light Co | | | addressee affiliation = Florida Power & Light Co |
| | docket = 05000335, 05000389 | | | docket = 05000335, 05000389 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:DOCUMENT CONTAINS ENCLOSURE CONTAINS . | | {{#Wiki_filter:ber 24, 2006 |
| UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1) November 24, 2006Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear OfficerP. O. Box 14000 Juno Beach, FL 33408-0420
| |
|
| |
|
| SUBJECT: SAINT LUCIE NUCLEAR POWER PLANT - NRC SECURITY INSPECTIONREPORT 05000335/2006007,05000389/2006007 | | ==SUBJECT:== |
| | SAINT LUCIE NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000335/2006007,05000389/2006007 |
|
| |
|
| ==Dear Mr. J. A. Stall:== | | ==Dear Mr. J. A. Stall:== |
| On October 27, 2006, the U. S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your St. Lucie Nuclear Power Plant Units 1 and 2. The enclosed report documents the inspection findings, which were discussed with you, and other members of your staff on October 27, 2006. This inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license. | | On October 27, 2006, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your St. Lucie Nuclear Power Plant Units 1 and 2. The enclosed report documents the inspection findings, which were discussed with you, and other members of your staff on October 27, 2006. |
|
| |
|
| The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection no findings of significance were identified.
| | This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390 a copy of this letter's enclosure will not be available for public inspection.
| | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. |
|
| |
|
| DOCUMENT CONTAINS FP&L2DOCUMENT CONTAINS ENCLOSURE CONTAINS .
| | Based on the results of this inspection no findings of significance were identified. |
| UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
| |
|
| |
|
| Sincerely,/RA: James Shehee for/
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection. |
| Joel Munday, ChiefPlant Support Branch 2 Division of Reactor SafetyDocket No.: 50-335/50-389License No:DPR-67/NPF-16
| |
|
| |
|
| ===Enclosure:===
| | DOCUMENT CONTAINS ENCLOSURE CONTAINS . |
| NRC Inspection Report No. 05000335,389/2006007
| | UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1) |
|
| |
|
| ===w/Attachment:===
| | FP&L 2 DOCUMENT CONTAINS In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1). |
| Supplemental Information (Safeguards Information)cc w/encl:Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957Christopher R. CostanzoPlant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957(cc w/encl cont'd - See page 3)
| |
| DOCUMENT CONTAINS FP&L3DOCUMENT CONTAINS ENCLOSURE CONTAINS . | |
| UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)(cc w/encl cont'd)Mr. Bill Parks Operations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957cc w/o encl:Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957William E. WebsterVice President, Nuclear Operations Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 34408Mark Warner, Vice PresidentNuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420Rajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420Mr. Seth B. DustonTraining Manager St. Lucie Nuclear Plant Jensen Beach, Florida 34957-2000(cc w/o encl cont'd - See page 4)
| |
| DOCUMENT CONTAINS FP&L4DOCUMENT CONTAINS ENCLOSURE CONTAINS .
| |
| UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)(cc w/o encl cont'd)M. S. Ross, Managing Attorney Florida Power & Light P. O. Box 14000 Juno Beach, FL 33408-0420Marjan Mashhadi, Senior AttorneyFlorida Power & Light Company 801 Pennsylvania Ave., NW, Suite 220 Washington, DC 20004William A. PassettiBureau of Radiation Control Department of Health 2020 Capital Circle SE, Bin #C21 Tallahassee, FL 32399-1741Craig Fugate, DirectorDivision of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100J. KammelRadiological Emergency Planning Administrator Department of Public Safety 6000 SE Tower Drive Stuart, FL 34997Douglas AndersonCounty Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982Distribution w/encl: See page 5 DOCUMENT CONTAINS FP&L5DOCUMENT CONTAINS ENCLOSURE CONTAINS .
| |
| UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)Distribution w/encl
| |
| :B. Westreich, NSIR E. McNiel, NSIRDistribution w/o encl
| |
| :B. Moroney, NRR RIDSNRRDIRS PUBLIC
| |
|
| |
|
| _________________________OFFICERII:DRSRII:DRSRII:DRSRII:DRPSIGNATURERARARANAMEWALLORICHARDSONMUNDAYMERNSTESDATE11/ 21 /200611/21 /200611/ /200611/ 22 /2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESN O
| | Sincerely, |
| | /RA: James Shehee for/ |
| | Joel Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-335/50-389 License No: DPR-67/NPF-16 Enclosure: NRC Inspection Report No. 05000335,389/2006007 w/Attachment: Supplemental Information (Safeguards Information) |
| | cc w/encl: |
| | Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 (cc w/encl contd - See page 3) |
| | DOCUMENT CONTAINS ENCLOSURE CONTAINS . |
| | UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1) |
| | |
| | FP&L 3 DOCUMENT CONTAINS (cc w/encl contd) |
| | Mr. Bill Parks Operations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 cc w/o encl: |
| | Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 William E. Webster Vice President, Nuclear Operations Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 34408 Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Seth B. Duston Training Manager St. Lucie Nuclear Plant Jensen Beach, Florida 34957-2000 (cc w/o encl contd - See page 4) |
| | DOCUMENT CONTAINS ENCLOSURE CONTAINS . |
| | UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1) |
| | |
| | FP&L 4 DOCUMENT CONTAINS (cc w/o encl contd) |
| | M. S. Ross, Managing Attorney Florida Power & Light P. O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW, Suite 220 Washington, DC 20004 William A. Passetti Bureau of Radiation Control Department of Health 2020 Capital Circle SE, Bin #C21 Tallahassee, FL 32399-1741 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE Tower Drive Stuart, FL 34997 Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Distribution w/encl: See page 5 DOCUMENT CONTAINS ENCLOSURE CONTAINS . |
| | UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1) |
| | |
| | FP&L 5 DOCUMENT CONTAINS Distribution w/encl: |
| | B. Westreich, NSIR E. McNiel, NSIR Distribution w/o encl: |
| | B. Moroney, NRR RIDSNRRDIRS PUBLIC DOCUMENT CONTAINS ENCLOSURE CONTAINS . |
| | UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1) |
| | |
| | _________________________ |
| | OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA NAME WALLO RICHARDSON MUNDAY MERNSTES DATE 11/ 21 /2006 11/21 /2006 11/ /2006 11/ 22 /2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
| }} | | }} |
|
---|
Category:Inspection Report Correspondence
MONTHYEARML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML22251A3682022-09-0909 September 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000335 2022011, 05000389 2022011) and Request for Information (RFI) ML22077A3732022-03-22022 March 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report IR 05000335/20170112017-04-18018 April 2017 Final Significance Determination of a White Finding; NRC Inspection Report 05000335/2017011 IR 05000335/20080072008-04-18018 April 2008 IR 05000335-08-007, IR 05000389-08-007, and IR 07200061-08-001, on 02/25/2008 - 03/14/2008, for St. Lucie, Units 1 and 2, and ISFSI, Inspector Notes IR 05000335/20074022007-07-26026 July 2007 Transmittal Letter for St. Lucie Nuclear Plant - NRC Security Inspection Report 05000335/2007402 and 05000389/2007402 - SGI Removed ML0708501102007-03-22022 March 2007 NRC Inspection Report No. 05000335,389/2007401 IR 05000335/20070012007-03-0101 March 2007 Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335, 389/2007001) IR 05000335/20064012007-01-18018 January 2007 NRC Inspection Report 05000335-06-401 and 05000389-06-401 IR 05000335/20060072006-11-24024 November 2006 IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed IR 05000033/20060032006-07-27027 July 2006 IR 0500033-06-003, 05000389-06-003, on 04/01/2006 - 06/30/2006, St. Lucie, Units 1 & 2 ML0401608942003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401201012003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401200992003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0400902832003-12-22022 December 2003 Undated Inspection Post-Inspection Debrief to Region II DRS Managers Regarding St. Lucie Triennial Fire Protection Inspection ML0401201042003-04-0404 April 2003 Input for St Lucie Inspection Report 03-02 IR 05000335/20020052002-05-21021 May 2002 IR 05000335/2002-005 & 05000389/2002-005, St. Lucie Nuclear Plant, Inspection on 04/15/2002-04/25/2002 Related to Identification & Resolution of Problems. No Findings of Significance Identified ML0209508842002-04-0505 April 2002 IR 05000335/2002-006, St. Lucie Nuclear Power Plant, Inspection on 03/14/2002-04/03/2002 Related to Fire Protection Unresolved Item 50-335, 389/98-201-09 IR 05000335/20010072002-03-0707 March 2002 IR 05000335/2001-007 & IR 05000389/2001-007 for Inspection on 02/01/2002 Related to Safety System Design & Performance Capability. No Violations Noted IR 05000335/20010052002-01-28028 January 2002 IR 05000335/2001-005 & IR 05000389/2001-005, St. Lucie, Units 1 & 2, Inspection on 09/30 - 12/29/2001 Related to Administrative & Engineering Controls. Non-cited Violation Noted 2024-04-18
[Table view] Category:Letter
MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report 2024-09-09
[Table view] |
Text
ber 24, 2006
SUBJECT:
SAINT LUCIE NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000335/2006007,05000389/2006007
Dear Mr. J. A. Stall:
On October 27, 2006, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your St. Lucie Nuclear Power Plant Units 1 and 2. The enclosed report documents the inspection findings, which were discussed with you, and other members of your staff on October 27, 2006.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.
DOCUMENT CONTAINS ENCLOSURE CONTAINS .
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
FP&L 2 DOCUMENT CONTAINS In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
Sincerely,
/RA: James Shehee for/
Joel Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-335/50-389 License No: DPR-67/NPF-16 Enclosure: NRC Inspection Report No. 05000335,389/2006007 w/Attachment: Supplemental Information (Safeguards Information)
cc w/encl:
Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 (cc w/encl contd - See page 3)
DOCUMENT CONTAINS ENCLOSURE CONTAINS .
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
FP&L 3 DOCUMENT CONTAINS (cc w/encl contd)
Mr. Bill Parks Operations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 cc w/o encl:
Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 William E. Webster Vice President, Nuclear Operations Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 34408 Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Seth B. Duston Training Manager St. Lucie Nuclear Plant Jensen Beach, Florida 34957-2000 (cc w/o encl contd - See page 4)
DOCUMENT CONTAINS ENCLOSURE CONTAINS .
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
FP&L 4 DOCUMENT CONTAINS (cc w/o encl contd)
M. S. Ross, Managing Attorney Florida Power & Light P. O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW, Suite 220 Washington, DC 20004 William A. Passetti Bureau of Radiation Control Department of Health 2020 Capital Circle SE, Bin #C21 Tallahassee, FL 32399-1741 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE Tower Drive Stuart, FL 34997 Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Distribution w/encl: See page 5 DOCUMENT CONTAINS ENCLOSURE CONTAINS .
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
FP&L 5 DOCUMENT CONTAINS Distribution w/encl:
B. Westreich, NSIR E. McNiel, NSIR Distribution w/o encl:
B. Moroney, NRR RIDSNRRDIRS PUBLIC DOCUMENT CONTAINS ENCLOSURE CONTAINS .
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
_________________________
OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA NAME WALLO RICHARDSON MUNDAY MERNSTES DATE 11/ 21 /2006 11/21 /2006 11/ /2006 11/ 22 /2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO